Loading...
HomeMy WebLinkAbout1998-01-21; Planning Commission; ; CT 96-07|PUD 97-04|HDP 96-13|CDP 96-13 - KELLY RANCH VILLAGE EThe City of CARLSBAD Planning Department A REPORT TO THE PLANNING COMMISSION Item No. P.C. AGENDA OF: January 21, 1998 Application complete date: April 22, 1997 Project Planner: Christer Westman Project Engineer: Mike Shirey SUBJECT: CT 96-07/PUD 97-04/HDP 96-13/CDP 96-13 - KELLY RANCH VILLAGE "E" - Request for approval of a Mitigated Negative Declaration, Mitigation Monitoring and Reporting Program, Tentative Map, Planned Development Permit, Hillside Development Permit, and Coastal Development Permit to subdivide property into 144 single-family lots, 9 open space/recreation lots, and construct single family homes on 45 acres generally located south of future Cannon Road and west of El Camino Real in Local Facilities Management Zone 8. I.RECOMMENDATION That the Planning Commission ADOPT Planning Commission Resolution No. 4224 RECOMMENDING APPROVAL of a Mitigated Negative Declaration and ADOPT Planning Commission Resolutions No. 4225, 4226, 4227 and 4228 RECOMMENDING APPROVAL of Carlsbad Tract CT 96-07, Planned Unit Development PUD 97-04, Hillside Development Permit HDP 96-13, and Coastal Development Permit CDP.96-13 based on the findings and subject to the conditions contained therein. II. INTRODUCTION The subject site is designated as Village "E" of the Kelly Ranch Master Plan. The description of Village "E" in the master plan identifies the area as approximately 38 acres. With the inclusion of the land necessary for the improvement of Cannon Road and adjacent slopes, the project area under review by this application becomes 45 acres. This application is a request for approval of a subdivision of approximately 45 acres of land for the development of 144 single family detached homes on 144 residential lots. The subdivision includes 9 open space lots to be used as passive and active recreation lots for the subdivision. As designed and conditioned, the project is consistent with the General Plan, Kelly Ranch Master Plan, Mello II LCP, Subdivision Ordinance, and the relevant Zoning Chapters of the Carlsbad Municipal Code. III. PROJECT DESCRIPTION AND BACKGROUND The subject site is located south of the future extension of Cannon Road and west of El Camino Real. The site is currently vacant except for a single home with facilities for horses. The site has been previously graded and has terraced pads which are higher on the west and step down toward the east. The site is largely devoid of significant vegetation. There are patches of coastal sage scrub along the northern perimeter and in the upland areas to the west. To the north is the Agua a CT 96-07/PUD 97-04/HDP 96-13/CDP 96-13 KELLY RANCH VILLAGE "E" January 21, 1998 Page 2 Hedionda Lagoon and to the south is an existing residential development. The site is Village "E" of the Kelly Ranch Master Plan. The Kelly Ranch Master Plan was approved in 1984 as a residential development for up to 1600 homes. The plan called out for both attached and detached product on a total of 433 acres. More than 200 of the gross acres were set aside as open space both in the Agua Hedionda Lagoon and in upland slopes. The site is subject to the development standards of the Kelly Ranch Master Plan. Village "E" called for up to a maximum of 240 single family detached residential units. . The project is 153 lots of which 144 are for residential development. The residential lots vary in size from 5,000 to 16,500 square feet. Minimum lot pads are 5,000 square feet and the average lot size is 7,000 square feet. The remaining 9 lots are open space/recreational. The subdivision area is 45 acres which includes land to be dedicated for Cannon Road improvements. Shea Homes, the proposed builder, has proposed homes with a variety of elements. The use of materials such as stucco, wood siding, wooden shutters, clay, brick and stone veneers creates a diversity of styles. Each of the floorplans provide a two car garage and the option of a flex space which could either be finished as garage space or living area. The proposed project is subject to the following adopted land use plans and regulations: A. General Plan; B. MP 174 (Kelly Ranch); C. Mello II Segment of the Local Coastal Program (LCP);. D. Carlsbad Municipal Code, Title 21 (Zoning Ordinance), including: • Chapter 21.45 - Planned Development Ordinance • Chapter 21.24 - Residential Density - Multiple • Chapter 21.85 - Inclusionary Housing; • Chapter 21.95- Hillside Development Regulations; • Chapters 21.201, 21.202, and 21.203 - Coastal Development Permit Procedures, Coastal Resource Protection Overlay Zone. E. Small Lot Architectural Guidelines F. Carlsbad Municipal Code, Title 20 (Subdivision Ordinance); G. Habitat Management Plan (in process); H. Growth Management Ordinance, (Zone 8 Local Facilities Management Plan); and IV. ANALYSIS The recommendation of approval for this project was developed by analyzing the project's consistency with the applicable policies and regulations listed above. The following analysis section discusses compliance with each of the regulations/policies utilizing both text and tables. CT 96-07/PUD 97-04/HDP 96-13/CDP 96-13 KELLY RANCH VILLAGE "E" January 21, 1998 Page 3 A. GENERAL PLAN The proposed project is consistent with the policies and programs of the General Plan. The table below indicates how the project complies with the Elements of the General Plan which are particularly relevant to this proposal. GP! ELEMENT Land Use Housing Open Space Circulation Noise - Park & Rec Public Safety DISCUSSION = Proposed residential density of 3 .2 du/net acre in the RM GP designation is below the RM density range of 4-8 du/net acre and below the growth control point of 6 du/net acre. An affordable housing agreement is proposed to provide this project's pro-rata share of affordable housing units (22 units) offsite but within areas "D" and "G" of the Kelly Ranch Master Plan. Lots 145 - 153 totaling 7.1 1 acres are designated as open space and/or open space recreational lots. City Wide Trail Link No. 28 to be parallel to Cannon Road. Proposed project is conditioned to provide roadway and intersection improvements for Cannon Road and local public streets in the subdivision. 1 . Exterior traffic noise levels do not exceed 60 dBA CNEL when mitigated; 2. Mitigation of interior noise levels to 45 dBA. Proposed project is required to pay Park-in-lieu fees. Proposed project is required to provide sidewalks, street lights, and fire hydrants, as shown on the tentative map, or included as conditions of approval. B.KELLY RANCH MASTER PLAN MP 174 The Kelly Ranch Master Plan requires that development of Village "E" shall be subject to the Planned Development process as contained in Chapter 21.45 and the uses found within Chapter 21.24 (Residential Density - Multiple) of the Carlsbad Municipal Code. The master plan also designates single family residential development and open space as uses allowed within the planning area. The master plan also includes development standards in various sections (Environmental Constraints, Land Use and Development Standards, Open Space and Recreation, Public Facilities and Phasing, and Sign Program.) which were incorporated as conditions of approval. A summary of the project mitigation follows: CT 96-07/PUD 97-04/HDP 96-13/CDP 96-13 KELLY RANCH VlS January 21, 1998 Page 4 ENVIRONMENTAL CONSTRAINTS Noise The applicant submitted a noise analysis to determine the level of sound attenuation required along Cannon Road. Attenuation will be achieved through the construction of noise walls in conjunction with berms as shown on exhibits "Y-NN". Hydrology At the time the master plan was submitted for review, there were portions of Village "E that were in a 100 year floodplain. However, since the grading for the surcharge of Cannon Road in the mid-1980s, Village "E" is no longer in a floodplain and no Special Use Permit is required. Appropriate mitigation includes conditions restricting grading during the rainy season, runoff control plans, storm water pollution control plans, and erosion control plans. Each of these conditions must be satisfied prior to the issuance of a grading permit. Biological Resources Those conditions of the master plan which are applicable to this village include maintaining the Cannon Road alignment as shown on the circulation exhibit and minimizing the removal of sage scrub. Both of these conditions have been met through project design. The Cannon Road alignment is consistent with the master plan exhibits and sage scrub will only be removed in conjunction with the construction of Cannon Road. Geology/Topography The master plan requires grading to be consistent with the City Grading Ordinance and that geotechnical studies be conducted prior to the issuance of a grading permit. Both conditions have been satisfied. Archeology/Paleontology A standard condition has been applied requiring reconnaissance for paleontological resources during grading operations. Visual Resources The master plan requires development to occur within the boundaries defined by the Areas of Modification exhibit, building heights are limited to 35 feet, alternate transportation concepts should be considered, and preservations of existing views where feasible. All of the development is proposed within the areas of modification, buildings are proposed at heights under 30 feet, bicycle lanes are designed within Cannon Road and a public trail is proposed to run parallel to Cannon Road. Views of the property are primarily of the upper bluffs which will be preserved. CT 96-07/PUD 97-04/HDP 96-13/CDP 96-13 KELLY RANCH VILrAGE "E" January 21, 1998 Page 5 LAND USE AND DEVELOPMENT STANDARDS Notes to Table III-1 The Kelly Ranch Master Plan identified conditions as notes associated with each of the development villages in Table III-l. Village "E" is subject to notes 7, 9, and 10. Note 7 requires that bus stops be provided along Cannon Road and El Camino Real as determined by the North County Transit District. The North County Transit District has requested that a bus stop be provided on the east side of El Camino Real at the future extension of Cannon Road. A condition has been included in the resolution requiring that bus facilities be provided to the satisfaction of the North County Transit District and the Planning Director. Note 9 requires that all living units within the village shall be sound attenuated and setback a minimum of 30 feet from the right-of-way. The project has been designed with a combination wall and berm to attenuate noise along Cannon Road. The project has also been designed to accommodate a 40 foot building setback along Cannon Road as required by the Planning Development Ordinance. Note 10 requires that a common recreational vehicle storage area be provided prior to the occupancy of the 500th unit in the master plan. The project has been conditioned to provide its share of the common facility prior to the issuance of the 101st building permit within Village "E". Fire Control The master plan requires that fire retardant roofs be used in construction of the homes and that fire retardant plant materials be used when homes are adjacent to native vegetation. Both of these requirements have been satisfied through the use of concrete tile roofs and the submittal of a fire suppression plan. OPEN SPACE AND RECREATION Pertinent to this village is the preservation of major project slopes, provision of a bikeway on Cannon Road, inclusion of a pedestrian system within the Cannon Road right-of-way, and preservation of views to the lagoon. The project complies with these requirements by the preservation of major project slopes through dedication of open space easements over open space lots and by the inclusion of bikeways and a pedestrian system within the design of Cannon Road improvements. In an effort to segregate the preservation of natural open space and open space which will be improved, staff has recommended through a condition of resolution No. 4225 that open space lot 147 be broken into two lots. The upland areas would be placed in a new lot number 154 and the open space adjacent to Cannon Road would remain in lot number 147. By virtue of the existing topography which is higher on the west and north, the project will not obstruct views of the lagoon and will afford a -04/HDTO-CT 96-07/PUD 97-04/HDFT6-13/CDP 96-13 KELLY RANCH VILTAGE "E" January 21, 1998 Page 6 view of the lagoon from some of the proposed home sites. PUBLIC FACILITIES AND PHASING The major public facility required for Village "E" is Cannon Road for the length of the site. Other facilities are those which are identified in the Zone 8 Facilities Management Plan. Cannon Road has been conditioned to be constructed concurrent with development of the site and the project has been conditioned to comply with the requirements of the Zone 8 Facilities Management Plan. Therefore the project complies with this section of the Kelly Ranch Master Plan. SIGN PROGRAM The master plan includes a sign program. No signs are proposed at this time. Prior to the issuance of a sign permit for community signs, a review for consistency with the sign program will be conducted. Discussion of the project's compliance with Chapter 21.45 and 21.24 is provided under the heading of ZONING ORDINANCE. C. MELLO II LOCAL COASTAL PROGRAM Other than Cannon Road, the project is located within and subject to the Mello II segment of the Local Coastal Program and is designated for residential medium (RM) density land use and RD- M zoning. The project is consistent with all Mello II policies regarding land use, sensitive slopes and hydrology. Cannon Road is within the Agua Hedionda segment of the Local Coastal Program and is therefore subject to the review and approval of the California Coastal Commission. The City of Carlsbad has applied for a Coastal Development Permit for the construction of Cannon Road as a Capital Improvements Project and is currently scheduled to be heard by the Coastal Commission in early February 1998. Development Regulations The project is consistent with Mello II LCP policies requiring the preservation of steep slopes (25%+) possessing chaparral and coastal sage plant communities ("dual criterion" slopes). Major slopes which are the backdrop to the project on the southwest side are preserved. Some isolated slopes are disturbed, however, the Kelly Ranch Master Plan was approved by the City Council and Coastal Commission with "Areas of Modification" which allowed a limited disturbance of 25% slopes as designated on an exhibit of the Master Plan. Those areas of modification are within the limits of what is proposed for disturbance in Village "E". Hydrology standards of the Mello II segment of Carlsbad's LCP require the drainage system to be designed to ensure that runoff resulting from a 10 year frequency storm of 6 hours, and 24 hours duration under developed conditions, are less than or equal to the runoff from a storm of CT 96-07/PUD 97-04/HDPT6-13/CDP 96-13 KELLY RANCH VIL^GE "E" January 21, 1998 Page 7 the same frequency and duration under existing developed conditions. Drainage from the project will be routed through storm drains in Cannon Road. The preliminary grading plan includes drainage, siltation and erosion control facilities. D. ZONING ORDINANCE 1. Chapter 21.45- Planned Development Ordinance The developer is proposing a small lot (less than 7,500 square feet) single family subdivision requiring compliance with the Planned Development Ordinance. In accordance with Planned Development design criteria, the project is compatible with surrounding land uses and circulation patterns. Village "E" connects with the adjacent single family development to the south via Frost Street and provides for adequate usable open space that is readily accessible to residents. The following table summarizes the project's compliance with the Planned Development development standards: STANDARD Lot Size (Min.) Setbacks Major Arterial: Front Yard : Building Height Minimum Distance Between Structures: Street Widths Public : (local) Recreational Space: (200 sq. ft./unit) Private Passive Common Resident Parking Guest Parking: Storage RV Storage REQUIRED 3,500 sq. ft. 40' 10'- 20' Max. 3072 stories 10' 56'&60' 15' X 15' Min. Yard 14,400 square feet 2 Covered Spaces/Unit 39 spaces 392 cubic feet 2,880 sq. ft. PROPOSED 5,000-16,500 sq.ft. 40' -85' 10'-35'+ Max. 27.5 72 stories 10' 56'&60' 15' X 15' Min. Yard 20,471 square feet 2 Car Garages 39 spaces (street parking) 392+ cubic feet within garage Common Facility Offsite 2. Chapter 21.24 Residential Density-Multiple The Kelly Ranch Master Plan identifies uses allowed within Village "E" as those found in the [IXACT 96-07/PUD 97-04/HDP 96-13/CDP 96-13 KELLY RANCH VILLAGE "E" January 21, 1998 PageS Residential Density-Multiple chapter of the Carlsbad Municipal Code. The project is proposed as single family residential which is a permitted use of the RD-M zone. 3. Chapter 21.85 Inclusionary Housing, and Chapter 21.53, Site Development Plan The project is subject to the Inclusionary Housing Ordinance requiring that a minimum of 15% of all approved residential units be restricted and made affordable to lower income households. The project includes 144 single-family market rate residential lots and there are approximately 886 residential units proposed for the entire master plan area. Out of approximately 133 affordable units, this project's share of inclusionary housing for the Kelly Ranch Master Plan is 21.6 dwelling units. Ten percent of those units, or 3 units, must be three-bedroom. The applicant has proposed compliance with the Inclusionary Housing provisions of the Municipal Code (Chapter 21.85) through the adoption of an Affordable Housing Agreement which will cover the entire master plan area. The Affordable Housing Agreement is a legally binding agreement between the developer and the City which provides the specific details regarding the phasing and implementation of the affordable housing requirements of this project. The agreement requires the construction of affordable units within Villages "D" and "G" of the Kelly Ranch Master Plan. In order to implement the Affordable Housing Agreement, the developer (Kelly Land Company, Inc.) has involved a separate builder for the construction of both market rate and affordable rental units (subject to the City's approval) in Villages "D" and "G". Kelly Ranch Village "E" is conditioned to enter into the Affordable Housing Agreement prior to issuance of final map. Prior to review of this project by the City Council, and Housing Commission will review the affordable housing agreement and make a recommendation to City Council. 4. Chapter 21.95 Hillside Development Regulations The project site contains slopes of 15% or greater and an elevation differential greater than 15 feet, therefore, a Hillside Development Permit is required. The table below indicates how the project complies with the requirements of the Hillside Development Regulations: STANDARD Slope Height Grading Volume 40%+ Slopes Contour Grading REQUIRED 30 Feet 8,000 - 10,000 cubic yds/acre - potentially acceptable Undevelopable unless modifications to standards approved or excluded from standards. Variety of slope direction & undulation. PROPOSED 30 Feet 7,235 yds/acre Those areas of 40% slope have been excluded as isolated ravines caused by previous disturbance. Slopes adjacent to the existing hillsides follow the same general CT 96-07/PUD 97-04/HDP V6-13/CDP 96-13 KELLY RANCH VILLAGE "E" January 21, 1998 Page 9 STANDARD Slope Screening Slope Setback Architecture Roadways REQUIRED Landscaping Not quantified - 1 5 Foot recommended from top of slope. Roofline, building bulk & scale Follow existing contours PROPOSED contours as the current topography. Combination of trees, shrubs, & ground cover. Minimum 1 7 Feet Roof plains often follow the general direction of the slopes behind the structure. Curvilinear streets that follow contours and provide access to terraced lots. Slopes have been identified on the constraints map. The grading plan shows that the scheme stays within areas that have been previously disturbed and generally follows the existing topography in that the project terraces from the southwest to the northeast and the significant slope areas are being preserved in open space. 5. Chapters 21.201.140 and 21.203- Coastal Development Permit Procedures, Coastal Resource Protection Overlay Zone Chapter 21.201 requires approval of a coastal development permit for the proposed development to ensure that the project is consistent with the Mello II Local Coastal Program policies and conforms to the requirements of the Mello II Coastal Resource Protection Overlay Zone. (See Discussion under C. Mello II Local Coastal Program above.) E.SMALL LOT ARCHITECTURAL GUIDELINES As can be seen on Attachment 10, the proposed project complies with all but two of the Small Lot Architectural Guidelines. Although the home designs don't fully comply with the letter of all of the Small Lot Development Guidelines, there is a great degree of conformance. The project does not comply with Guideline No. 1 in that building elevations which incorporate a 10 foot wide side yard single story element and the rear elevations have only one additional plane versus three. First, incorporation of the 10 foot wide single story element forces a design solution which is inconsistent with the overall design concept of the project. The design solution is a long sloping shed which is not an element found on any of the currently proposed floorplans. Second, consistent with the intent of the Small Lot Guidelines, the project does propose a second story enhancement for the rear elevation but only on 25% of the units rather than 50% of the units (Guideline No. 5). The enhanced rear elevations provide relief in an area and in an amount that can be appreciated by those outside of the individual lot. In this situation, because a large number of homes will not have rear yards visible because of adjacent slopes, providing relief in p%-CT 96-07/PUD 97-04/HDPT6-13/CDP 96-13 KELLY RANCH VILZAGE "E" January 21, 1998 Page 10 key areas on the second floor will provide satisfactory visual interest. All of the plans have substantial single story elements as features of the front elevations. Two of the plans have front porches. Two of the plans have a single story side element in combination with a building jog that creates a greater side yard setback to the second story. This greater separation between second stories enhances the streetscape visual presentation. There are variations in planes on all of the plans along the street and those lots which back up to an area of public view have enhanced rear elevations. F. SUBDIVISION ORDINANCE The proposed tentative map complies with all the requirements of the City's Subdivision Ordinance, Title 20 of the Carlsbad Municipal Code. The project is 153 lots of which 144 are for residential development. The residential lots vary in size from 5,000 to 16,500 square feet. Minimum lot pads are 5,000 square feet and average lot size is 7,000 square feet. The remaining 9 lots are open space/recreational. The subdivision area is 45 acres which includes land to be dedicated for Cannon Road improvements. Primary access to the property would be provided by Cannon Road, a 102' wide, non-loaded, major arterial, which will terminate at the project's western boundary. Secondary access is proposed through the connection of Frost Street to the existing subdivision to the south. The proposed project is required to provide streets including Cannon Road (for the length of the project area), sidewalks, a segment of the City-wide trail system (adjacent to Cannon Road), street lights, and fire hydrants. Cannon Road and all streets will be constructed concurrent with the development of the project. Cannon Road is a major arterial which is 102 feet wide and includes parkways and sidewalks on either side of the street, bicycle lanes, two travel lanes in either direction and a median. As Cannon Road nears the intersection with El Camino Real there will be a bridge structure over Agua Hedionda Creek which runs north to south at this location. The bridge will be 95 feet wide and 133 feet long. It will have a span height of approximately 22 feet above the bottom of the channel. All the local streets within this area would be constructed by the developer to full public street width standards, and have curb, gutters, sidewalks, and underground utilities. The proposed street system is adequate to handle the project's pedestrian and vehicular traffic and accommodate emergency vehicles. To mitigate drainage impacts from the project site, drainage and erosion control have been provided on the preliminary grading plans. The drainage requirements of City ordinances, and Mello II have been considered and appropriate drainage facilities have been designed and secured. In addition to City Engineering Standards and compliance with the City's Master Drainage Plan, National Pollution Discharge Elimination System (NPDES) standards have been satisfied which will prevent any discharge violations. G. HABITAT MANAGEMENT PLAN (DRAFT DECEMBER 1997) The project is not located within Core Area 4 defined by the City's draft Habitat Management Plan (HMP) dated December 1997. Although disturbance to 1.92 acres of coastal sage scrub CT 96-07/PUD 97-04/HDPT6-13/CDP 96-13 KELLY RANCH VIL^vGE "E" January 21, 1998 Page 11 (CSS) will result from the construction of Cannon Road, it will not preclude connectivity between Core Areas nor preclude the preservation of CSS habitat. Moreover, the project is required to provide mitigation for Cannon Road in the form of off-site preservation. Since completion of a subregional NCCP/HMP has not occurred, prior to the issuance of a grading permit, the City will have to authorize this project to draw from the City's 5% CSS take allowance (4d rule). The City's availability of acreage within the 5% will be determined at the time of 4d permit request. If there is no available inventory, a 4d permit may not be issued. The take of 1.92 acres of CSS habitat may not exceed the 5% allowance and may not jeopardize the HMP. This is unlikely since the project is located outside the HMP Core Areas and/or linkage planning areas (LPA) and therefore makes no contribution to the overall preserve system, and will not significantly impact the use of habitat patches as archipelago or stepping stones to surrounding preserve planning areas (PPAs). Since mitigation for the habitat loss will result in the preservation of equal or better habitat in an off-site location, the project will not appreciably reduce the likelihood of the survival and recovery of the gnatcatcher. The habitat loss is incidental to otherwise lawful activities. The development of the Kelly property is a legal development which is consistent with the City's General Plan and all required permits will be obtained. H. GROWTH MANAGEMENT The proposed project is located within the Zone 8 Local Facilities Management Zone in the northwest quadrant of the City. The impacts created by this development on public facilities and compliance with the adopted performance standards are summarized as follows: FACILITY CITY ADMINISTRATION LIBRARY WASTE WATER TREATMENT PARKS DRAINAGE CIRCULATION FIRE OPEN SPACE SCHOOLS SEWER COLLECTION SYSTEM WATER IMPACTS 500 sq. ft.. 267 sq. ft. 144 EDU 1 .0 Acres Basin B 1,440 ADT Station No. 3 7.11 Acres CUSD 144 EDU 31,680GPD COMPLIANCE Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes The project is 126 dwelling units below the Growth Management Dwelling Unit allowance of 270 dwelling units for the property as permitted by the Growth Management Ordinance growth control point. These 126 dwelling units will be placed into a City bank of excess dwelling units. The City can allocate these dwelling units for affordable housing or other special housing needs within this quadrant. This project is in compliance with the requirements of the Local Facilities Management Plan for IP%-CT 96-07/PUD 97-04/HDP 96-13/CDP 96-13 KELLY RANCH VILLAGE "E" January 21, 1998 Page 12 Zone 8. However, further development of the Kelly Ranch Master Plan area requires an amendment to the plan. V. ENVIRONMENTAL REVIEW The direct, indirect, and cumulative environmental impacts from the future development of Kelly Ranch were analyzed in the Kelly Ranch Master Plan EIR. Additional project level studies have been conducted including biological and noise analyses. In addition to the project level analysis, studies regarding the construction of Cannon Road which have been prepared in conjunction with the City capital improvement project to construct Cannon Road have been reviewed and are used as reference. These studies provide more focused and detailed project level analyses and indicate that unmitigable environmental impacts would not result from implementation of the project. The Planning Director issued a Mitigated Negative Declaration on June 17, 1997. The recommended and applicable mitigation measures of the Mitigated Negative Declaration are included as conditions of approval for this project. Conditions include specific mitigation for impacts to coastal sage scrub habitat. With regard to air quality and circulation impacts, the City's MEIR found that the cumulative impacts of the implementation of projects consistent with the General Plan are significant and adverse due to regional factors, therefore, the City Council adopted a statement of overriding consideration. The project is consistent with the General Plan as to these effects; therefore, no additional environmental document is required. A correction should be noted and an addendum made to the Mitigated Negative Declaration and EIA Part II. The project area was erroneously described as 28 acres in both cases and should have been identified as 45.05 acres. The full 45.05 acres were surveyed for environmental resources and are the true area that was analyzed for the purposes of CEQA compliance. ATTACHMENTS; 1. Planning Commission Resolution No. 4224 2. Planning Commission Resolution No. 4225 3. Planning Commission Resolution No. 4226 4. Planning Commission Resolution No. 4227 5. Planning Commission Resolution No. 4228 6. Location Map 7. Background Data Sheet 8. Local Facilities Impact Assessment Form 9. Disclosure Form 10. Small Lot Architectural Guidelines Compliance 11. Exhibits "A" - "XX" dated January 21,1998 KELLY RANCH VILLAGE "E CT96-07/CDP96-13/ HDP 96-13/PUD 97-04 BACKGROUND DATA SHEET CASE NO: CT 96-07/PUD 97-04/HDP 96-13/CDP 96-13 CASE NAME: Kelly Ranch Village "E" APPLICANT: Kelly Land Company. Inc. REQUEST AND LOCATION: Subdivision of approximately 45 acres into 144 single family lots and 9 open space lots generally located east of El Camino Real and south of future Canon Road. LEGAL DESCRIPTION: Portions of lots I and F of Rancho Agua Hedionda. in the County of San Diego, State of California, according to map thereof No. 823, filed in the office of the County Recorder of said San Diego County. November 16, 1896. APN: 208-020-03.33.34.35 207-101-12 Acres: 45.05 Proposed No. of Lots/Units: 153 lots/144 units GENERAL PLAN AND ZONING Land Use Designation: Residential Medium Density Allowed: 4-8 du/ac Density Proposed: 3.2 Existing Zone: Planned Community Proposed Zone: Planned Community Surrounding Zoning and Land Use: (See attached for information on Carlsbad's Zoning Requirements) Zoning Land Use Site PC vacant, RM North PC vacant, OS South PC Residential, RLM East R-l vacant, OS West PC vacant, OS PUBLIC FACILITIES School District: Carlsbad Water District: Carlsbad Sewer District: Carlsbad Equivalent Dwelling Units (Sewer Capacity): 144 Public Facilities Fee Agreement, dated: November 11, 1996 ENVIRONMENTAL IMPACT ASSESSMENT Negative Declaration, issued June 17, 1997 Certified Environmental Impact Report, dated_ Other, CITY OF CARLSBAD GROWTH MANAGEMENT PROGRAM LOCAL FACILITIES IMPACTS ASSESSMENT FORM (To be Submitted with Development Application) PROJECT IDENTITY AND IMPACT ASSESSMENT: FILE NAME AND NO: CT 96-07/PUD 97-04/HDP 96-13/CDP 96-13 LOCAL FACILITY MANAGEMENT ZONE: 8 GENERAL PLAN: RM ZONING: PC DEVELOPER'S NAME: Kelly Land Company. Inc. ADDRESS: 2011 Palomar Airport Road. Suite 206. Carlsbad. CA 92009 PHONE NO.: (760)931-1190 ASSESSOR'S PARCEL NO. 208-020-03. 33. 34. 35. 207-101-12 QUANTITY OF LAND USE/DEVELOPMENT (AC., SQ. FT., DU): 45.05 acres ESTIMATED COMPLETION DATE: A. B. C. D. E. City Administrative Facilities: Library: Demand in Square Footage = 500 sq. ft. Demand in Square Footage = 267 sq. ft F. G. H. I. J. K. L. Wastewater Treatment Capacity (Calculate with J. Sewer) Park: Demand in Acreage = Drainage: Demand in CFS = Identify Drainage Basin = (Identify master plan facilities on site plan) Circulation: Demand in ADT = (Identify Trip Distribution on site plan) Fire: Served by Fire Station No. = Open Space: Acreage Provided = Schools: (Demands to be determined by staff) Sewer: Demands in EDU Identify Sub Basin = (Identify trunk line(s) impacted on site plan) Water: Demand in GPD = 144 EDU 1.0 acre 124 B 1.440 = 3 7.11 29 144 CMWD 31.680 GPD The project is 126 units the Growth Management Dwelling unit allowance. ATTACHMENT 10 SMALL LOT ARCHITECTURAL GUIDELINES COMPLIANCE ' • •'•'•• , GUIDELINE •••••." : ' - : 1 . Where three (3) two-story units occur in a row and they are situated less than 1 5 feet apart, at least one (1) unit must have a single story building edge not less than 1 0 feet in depth. 2. Where three (3) two-story units occur in a row and they are situated 15 to 20 feet apart, at least one (1) unit must have a L single story building edge not less than 5 feet in depth. [ 3. Per project, 33% of all units shall have a single story edge a minimum of 40% of the total perimeter. 4. Per project, 50% of all units with a lot frontage greater than 45 feet must have four (4) separate building planes on the front elevation. 5. Per project, 50% of all units with a lot frontage greater than 45 feet must have four (4) separate building planes on the rear elevation. 1 6. Per project, 50% of all units shall have one side elevation m with a 7 feet average sideyard setback. 8. Three-car garages limited to 75% of the total units where average lot size is 5,000 square feet or less. Three-car garages shall incorporate a mixture of 2-door, 3-door, and offset 2-door designs. 9. 50% of exterior door and window openings shall be projected or recessed a minimum of 2 inches. 10. Roof framing shall exhibit directional variety. MINIMUM STANDARD 1 of 3 1 of 3 33% 50% 50% 50% 100% 50% 100% ;• VILLAGE "E" /" '! No units proposed with a 10 foot side yard single story element. No separation of three or more units with greater than 1 5 foot separation. 80 % satisfy the guideline. All of the units comply with the guideline. All of the units have only two planes on the "enhanced" rear elevations. 50%+ of the plotted units comply with the guideline. Lot sizes are 5,000 or greater. All units with three car garages provide a mix of door configurations All of the windows have architectural surrounds which are at least 2 inches in depth. Each design has a variety of roof angles. ; RESULT ':. v.: Non-compliance. Not Applicable. However, if units were plotted with greater than 1 5 foot separation, the project could be in 100% compliance based on 2 units with 5 foot single story building edges. 240% compliance 200% compliance 25% compliance. The project is proposed with additional planes in those areas that will be clearly, visible from public rights-of-way. 100% compliance 100 % compliance 100% compliance 100% compliance