HomeMy WebLinkAboutCDP 2022-0013; URBINO MINOR SUBDIVISION; Coastal Development Permit (CDP){city of
Carlsbad
LAND USE REVIEW
APPLICATION
P-1
Development Services
Planning Division
1635 Faraday Avenue
(760) 602-4610
www.carlsbadca.gov
APPLICATIONS APPLIED FOR: (CHECK BOXES)
Development Permits
D Coastal Development Permit
D Conditional Use Permit
D Minor D Extension
D Day Care {Large)
181 Minor
D Environmental Impact Assessment
D Habitat Management Permit
D Hillside Development Permit
D Minor
D Minor
D Nonconforming Construction Permit
0 Planned Development Permit O Minor
D Residential O Non-Residential
D Planning Commission Determination
D Reasonable Accommodation
D Site Development Plan
D Special Use Permit
D Minor
181 Tentative Parcel Map (Minor Subdivision)
0 Tentative Tract Map (Major Subdivision)
D Variance D Minor
(FOR DEPT USE ONLY) Legislative Permits
-:::.:,. ""'°Z-rn,:J--Col 7
to\ ~'Z-02'.L-t,VO (
D General Plan Amendment
D Local Coastal Program Amendment
D Master Plan
D Specific Plan
D Zone Change
D Amendment
D Amendment
D Zone Code Amendment
South Carlsbad Coastal Review Area
Permits
D Review Permit
D Administrative D Minor O Major
Village Review Area Permits
D Review Permit
D Administrative D Minor D Major
(FOR DEPT. USE ONLY)
EJ
NOTE: A PROPOSED PROJECT REQUIRING APPLICATION SUBMITTAL MUST BE SUBMITTED BY APPOINTMENT*. PLEASE CONTACT THE APPOINTMENT SPECIALIST
AT (760) 602-2723 TO SCHEDULE AN APPOINTMENT.
ASSESSOR PARCEL NO(S):
LOCATION OF PROJECT:
NAME OF PROJECT:
BRIEF DESCRIPTION OF
PROJECT:
PROJECT VALUE
(SITE IMPROVEMENTS)
FOR CITY USE ONLY
0
*SAME DAY APPOINTMENTS ARE NOT AVAILABLE
207-120-40-00
3997 Park Drive, Carlsbad, CA 92008
(STREET ADDRESS)
URBINO MINOR SUBDIVISION
Proposed 2 -Lot TPM
ESTIMATED COMPLETION DATE December 2022
Development No. [)Ei)Zoiu-Q2,,b7 Lead Case No. CD£ &022---~ OQ\.7
D <
OWNER NAME (PLEASE PRINT) APPLICANT NAME (PLEASE PRINT)
INDIVIDUAL NAME INDIVIDUAL NAME Same as Owner (if applicable): .6,rthyr U rbinQ (if applicable):
COMPANY NAME COMPANY NAME
(if applicable): (if applicable):
MAILING ADDRESS: 421 Iamarack 8llfn11e MAILING ADDRESS:
CITY, STATE, ZIP: Carlsbad, CA 92008 CITY, STATE, ZIP:
TELEPHONE: 858-774-8754 TELEPHONE:
EMAIL ADDRESS: hurbino@earthlink.net EMAIL ADDRESS:
I CERTIFY THAT I AM THE LEGAL OWNER AND THAT ALL THE ABOVE I CERTIFY THAT I AM THE LEGAL REPRESENTATIVE OF THE OWNER
INFORMATION IS TRUE AND CORRECT TO THE BEST OF MY AND THAT ALL THE ABOVE INFORMATION IS TRUE AND CORRECT TO
KNOWLEDGE. I CERTIFY AS LEGAL OWNER THAT THE APPLICANT AS THE BEST OF MY KNOWLEDGE.
SET FORTH HEREIN IS MY AUTHORIZED REPRESENTATIVE FOR
PURPOSES OF THIS APPLICATION.
(!~ ~--~ 1/28/2022
SIGNATURE DATE SIGNATURE DATE
APPLICANT'S REPRESENTATIVE (Print): IJQUg LQga □
MAILING ADDRESS: 3:10 Via ~eca Ccuz, suite 205
CITY, STATE, ZIP: San Marcos CA 92078
TELEPHONE: 858-775-8474
EMAIL ADDRESS: Daug@BCESD cam
I CERTIFY THAT I AM THE REPRESENTATIVE OF THE APPLICANT FOR
PURPOSES OF THIS APPLICATION AND THAT ALL THE ABOVE
INFORMATION a ~/4 AND CORRECT TO THE BEST OF MY
KNOWLEDGE. /J 1/JJ
If II 1 v-1/28/2022 711 V •
SIGNATURE DATE
IN THE PROCESS OF REVIEWING THIS APPLICATION IT MAY BE NECESSARY FOR MEMBERS OF CITY STAFF, PLANNING
COMMISSIONERS OR CITY COUNCIL MEMBERS TO INSPECT AND ENTER THE PROPERTY THAT IS THE SUBJECT OF THIS
APPLICATION. I/WE CONSENT TO ENTRY FOR THIS PURPOSE.
NOTICE OF RESTRICTION: PROPERTY OWNER ACKNOWLEDGES AND CONSENTS TO A NOTICE OF RESTRICTION BEING
RECORDED ON THE TITLE TO HIS PROPERTY IF CONDITIONED FOR THE APPLICANT. NOTICE OF RESTRICTIONS RUN WITH
THE LAND,o..::Z,:NY ~~E~EREST.
[_PROPERTY OWNER SIGNATURE
FOR CITY USE ONLY
FEB O 1 2022
en y ( . CAH.LSBAD
DATi~~i~1t9'L7dx+rci~~ECEIVED
RECEIVED BY:
P-1 Page 2 of6 Revised 10/20
December 2, 2021
City of Carlsbad
Planning and Building Department
RE: LETTER OF AUTHORIZATION FOR APPLICATION SIGNATURES
3997 Park Drive, Carlsbad, CA 92008
To Whom It May Concern:
As owner and applicant of the subject, please allow this letter to serve as formal
notification to allow Douglas E. Logan, Civil Engineer for our project, to sign all
applications maps, and/or documents required for the subject application.
Should you have any questions, feel free to contact me at (858) 774-8754.
Sincerely,
Arthur Urbino
421 Tamarack Avenue
Carlsbad, CA 92008
(city of
Carlsbad
DISCLOSURE STATEMENT
P-1(A)
Development Services
Planning Division
1635 Faraday Avenue
(760) 602-4610
www.carlsbadca.gov
Applicant's statement or disclosure of certain ownership interests on all applications which will
require discretionary action on the part of the City Council or any appointed Board, Commission
or Committee.
The following information MUST be disclosed at the time of application submittal. Your project
cannot be reviewed until this information is completed. Please print.
Notse: .
Pertcm i~ Q.efin~.~J "AllYJ · ~y~; fi . · q "
organkaation,; oorppt,a~t6n/ . ! f ~(µ~Jf ..
city municipality, d1$trict or o r poUfica su ·
Agents may sign this document; however, the legal name and entity of the applicant and property owner
must be provided below.
1. APPLICANT (Not the applicant's agent)
Provide the COMPLETE, LEGAL names and addresses of ALL persons having a
financial interest in the application. If the applicant includes a corporation or partnership,
include the names, titles, addresses of all individuals owning more than 10% of the
shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE
INDICATE NON-APPLICABLE (N/A) IN THE SPACE BELOW. If a publicly-owned
corporation, include the names, titles, and addresses of the corporate officers. (A
separate page may be attached if necessary.)
Person Arthur Urbino Corp/Part_N_/A _________ _
Title Owner Title --------------Address 421 Tamarack Avenue, Carlsbad, CA Address ------------
2. OWNER (Not the owner's agent)
P-1(A)
Provide the COMPLETE. LEGAL names and addresses of ALL persons having any
ownership interest in the property involved. Also, provide the nature of the legal
ownership (i.e., partnership, tenants in common, non-profit, corporation, etc.}. If the
ownership includes a corporation or partnership, include the names, titles, addresses of
all individuals owning more than 10% of the shares. IF NO INDIVIDUALS OWN MORE
THAN 10% OF THE SHARES, PLEASE INDICATE NON-APPLICABLE (N/A) IN THE
SPACE BELOW. If a publicly-owned corporation, include the names, titles, and
addresses of the corporate officers. (A separate page may be attached if necessary.)
Person Arthur Urbino
Title Owner
Address 421 Tamarack Avenue
Carlsbad, CA 92008
Corp/Part. ___________ _
Title _____________ _
Address ____________ _
Page 1 of 2 Revised 07/10
3. NON-PROFIT ORGANIZATION OR TRUST
If any person identified pursuant to (1) or (2) above is a nonprofit organization or a trust,
list the names and addresses of ANY person serving as an officer or director of the non-
profit organization or as trustee or beneficiary of the.
Non Profit/Trust N/A Non Profit/Trust N/A ·----------
Title Title --------------------------
Address ----------Address ___________ _
4. Have you had more than $500 worth of business transacted with any member of City
staff, Boards, Commissions, Committees and/or Council within the past twelve (12)
months?
□ Yes lvl No If yes, please indicate person(s): __________ _
NOTE: Attach additional sheets if necessary.
I certify that all the above information is true and correct to the best of my knowledge. ~ ::{JM----121¥21 ~ G:/4~
Signature of owner/date Signature of applicant/date
Arthur Urbino Arthur Urbino
Print or type name of applicant
Doug Logan
Print or type name of owner/applicant's agent
P-1{A) Page 2 of 2 Revised 07/10
(cicyof
Carlsbad
PROJECT DESCRIPTION
P-1(8)
PROJECT NAME: URBINO TPM
APPLICANT NAME: Arthur Urbino
Development Services
Planning Division
1635 Faraday Avenue
(760) 602-4610
www.carlsbadca.gov
-------------------------
Please describe fully the proposed project by application type. Include any details necessary to
adequately explain the scope and/or operation of the proposed project. You may also include
any background information and supporting statements regarding the reasons for, or
appropriateness of, the application. Use an addendum sheet if necessary.
Description/Explanation:
This is an application for a simple 2-Lot subdivision on an existing single family residence lot.
The existing house will be demolished and the 2 new homes will ultimately be constructed.
There are no environmental constraints with this project and is a very simple, straight forward
2-lot TPM.
P-1(8) Page 1 of 1 Revised 07/10
{cicyof
Carlsbad
HAZARDOUS WASTE
AND SUBSTANCES
STATEMENT
P-1{C)
Development Services
Planning Division
1635 Faraday Avenue
(760) 602-4610
www.carlsbadca.gov
Consultation of Lists of Sites Related to Hazardous Wastes
(Certification of Compliance with Government Code Section 65962.5)
Pursuant to State of California Government Code Section 65962.5, I have consulted the
Hazardous Waste and Substances Sites List compiled by the California Environmental
Protection Agency 8:nd hereby certify that (check one):
Ii) The development project and any alternatives proposed in this application are not contained on the
lists compiled pursuant to Section 65962.5 of the State Government Code.
D The development project and any alternatives proposed in this application !!! contained on the lists
compiled pursuant to Section 65962.5 of the State Government Code.
APPLICANT
Name: Arthur Urbino
Address: 421 Tamarack Avenue
Carlsbad, CA 92008
Phone Number: 858-774-8754
PROPERTY OWNER
Name: Arthur Urbino
Address:421 Tamarack Avenue
Carlsbad, CA 92008
Phone Number: 858-77 4-8754
Address of Site: 3997 Park Drive, Carlsbad, CA 92008
Local Agency (City and County}:_C_it_y_o_f_C_a_r_ls_b_a_d __________ _
Assessor's book, page, and parcel number:_2_0_7_-_1_2_0_-4_0_-_0_0 __________ _
Specifylist(s}: __ N_/A ______________________ _
Regulatory Identification Number:_N_/_A ___________________ _
Date of List: ___________________________ _
1/28/2022 1/28/2022
Applicant Signature/Date Property Owner Signature/Date
The Hazardous Waste and Substances Sites List (Cortese List) is used by the State, local
agencies and developers to comply with the California Environmental Quality Act requirements
in providing information about the location of hazardous materials release sites.
P-1(C) Page 1 of 2 Revised 02/13
( Cicyof
Carlsbad
EIA INFORMATION
FORM
P-1(D)
INSTRUCTION SHEET FOR COMPLETING AN
ENVIRONMENTAL IMPACT ASSESSMENT
INFORMATION FORM
Development Services
Planning Division
1635 Faraday Avenue
(760) 602-4610
www.carlsbadca.gov
This Environmental Information Form will be used to assist staff in determining what type of
environmental documentation (i.e., Environmental Impact Report, Mitigated Negative
Declaration, Negative Declaration or Exemption) will be required to be prepared for your
application, per the California Environmental Quality Act (CEQA) and Title 19 of Carlsbad's
Municipal Code. The clarity and accuracy of the information you provide is critical for purposes
of quickly determining the specific environmental effects of your project.
Any environmental studies (i.e., biological, cultural resource, traffic, noise) that are
necessary to substantiate a "no impact" or "yes impact" determination should be
submitted as an attachment to this Environmen~I Information Form. This is especially
important when a Negative Declaration is being sought. The more information provided in this
form, the easier and quicker it will be for staff to complete the Environmental Impact
Assessment Form -Initial Study.
P-1(D) Page 1 of 4 Revised 07/10
ENVIRONMENTAL INFORMATION FORM
(To be Completed by Applicant)
Date Filed: ___________ (To be completed by City)
Application Number(s): URBINO MINOR SUB. DEV2020-0263
General Information
1. Name of project: URBINO MINOR SUBDIVISION
2. Name of developer or project sponsor: _A_rt_h_u_r _U_r_b_in_o __________ _
Address: 421 TAMARACK AVENUE
City, State, Zip Code: Carlsbad, CA 92008
Phone Number: 858-774-8754
3. Name of person to be contacted concerning this project: _D_o_u_g_L_o_g_a_n ______ _
Address: 310 Via Vera Cruz, Suite 205
City, state, Zip code: San Marcos, Ca 92078
Phone Number: 858-775-8474
4. Address of Project: 3997 Park Drive, Carlsbad, CA 92008
Assessor's Parcel Number: 207-120-40 --------------------
5. List and describe any other related permits and other public approvals required for this project,
including those required by city, regional, state and federal agencies:
NONE
6. Existing General Plan Land Use Designation: R-4 Residential, 0-4 units/ac.
7. Existing zoning district: R-1, One-Family Residential
8. Existing land use(s): _R_E_S_ID_E_N_T_IA_L _____________ _
9. Proposed use of site (Project for which this form is filed): __________ _
2 -LOT MINOR SUBDIVISION
Project Description
10. Sitesize: 0.50-acre (21,800 Sq.ft)
11. Proposed Building square footage: _N_/_A _______________ _
12:
13.
14.
P-1(0)
Number of floors of construction: N/ A ------------------
Amount of off-street parking provided: __ 0 ______________ _
Associated projects: __ N_/A ___________________ _
Page 2 of 4 Revised 07/10
15. If residential, include the number of units and schedule of unit sizes: ________ _
2 -LOTS FOR S.F.R.
APPROXIMATELY 4400 S.F. PER RESIDENCE
16. If commercial, indicate the type, whether neighborhood, city or regionally oriented, square footage
of sales area, and loading facilities: ___________________ _
N/A
17. If industrial, indicate type, estimated employment per shift, and loading facilities: _____ _
N/A
18. If institutional, indicate the major function, estimated employment per shift, estimated occupancy,
loading facilities, and community benefits to be derived from the project: _______ _
NIA
19. If the project involves a variance, conditional use or rezoning applications, state this and indicate
clearly why the application is required: __________________ _
N/A
P-1 (D) Page 3 of4 Revised 07 /10
Are the following items applicable to the project or its effects? Discuss all items checked yes (attach
additional sheets as necessary).
Yes No
20. Change in existing features of any bays, tidelands, beaches, or hills, or substantial O ~
alteration of ground contours.
21. Change in scenic views or vistas from existing residential areas or public lands or D ~
roads.
22. Change in pattern, scale or character of general area of project. D ~
23. Significant amounts of solid waste or litter. D ~
24. Change in dust, ash, smoke, fumes or odors in vicinity. D ~
25. Change in ocean, bay, lake, stream or ground water quality or quantity, or D ~
alteration of existing drainage patterns.
26. Substantial change in existing noise or vibration levels in the vicinity. D ~
27. Site on filled land or on slope of 10 percent or more. D ~
28. Use of disposal of potentially hazardous materials, such as toxic substances, D ~
flammables or explosives.
29. Substantial change in demand for municipal services (police, fire, water, sewage, D ~
etc.).
30. Substantially increase fossil fuel consumption (electricity, oil, natural gas, etc.). D ~
31. Relationship to a larger project or series of projects. D ~
Environmental Setting
Attach sheets that include a response to the following questions:
32. Describe the project site as it exists before the project, including information on topography, soil
stability, plants and animals, and any cultural, historical or scenic aspects. Describe any existing
structures on the site, and the use of the structures. Attach photographs of the site. Snapshots
or Polaroid photos will be accepted.
33. Describe the surrounding properties, including information on plants and animals and any
cultural, historical or scenic aspects. Indicate the type of land use (residential, commercial, etc.),
intensity of land use (one-family, apartment houses, shops, department stores, etc.), and scale of
development (height, frontage, set-back, rear yard, etc.). Attach photographs of the vicinity.
Snapshots or polaroid photos will be accepted.
Certification
I hereby certify that the statements furnished above and in the attached exhibits present the data and
information required for this initial evaluation to the best of my ability, and t t the facts, statements, and
information presented are true and correct to the best of my knowledg a r
Date: _7_---=--\ \_ .... _..l ....... )""""• __ Signature:
For:
P-1 (D) Page 4 of 4 Revised 07/10
ENVIRONMENTAL SETTING
32. This is an existing .053 ac lot with one existing residence. The lot has been
developed as such for many years. The lot has a slope of approximately 8%
from Park Drive Westerly. There are no cultural or any other significant
environmental issues.
33. All the surrounding properties one very similar, i.e., existing single-family
residences with no significant environmental issues or impacts.
•·
-------------r ~, ______________ ,., ~-------------..
Development Services
Planning Division
1635 Faraday Avenue
760-602-4610
www.carlsbadca.gov
PURPOSE
CLIMATE ACTION PLAN
CONSISTENCY CHECKLIST
P-30
CCityof
Carlsbad
In September 2015, the City of Carlsbad adopted a Climate Action Plan (CAP) that outlines actions that
the city will undertake to achieve its proportional share of state greenhouse gas (GHG) emissions
reductions. This checklist contains measures that are required to be implemented on a project-by-project
basis to ensure that the specified emissions targets identified in the Climate Action Plan (CAP) are
achieved. Implementation of these measures will ensure that new development is consistent with the
CAP's assumption for relevant CAP strategies toward achieving the identified greenhouse gas (GHG)
reduction targets. In this manner, a project's incremental contribution to a cumulative GHG emissions
effect may be determined not to be cumulatively considerable if it complies with the requirements of the
CAP, in accordance with CEQA Guidelines Sections 15064(h)(3), 15130(d), and 15183(b).*
*City staff are currently not assessing the greenhouse gas impacts of California Environmental Quality Act
projects by using the Climate Action Plan as a qualified GHG reduction plan under CEQA section
15183.S(b). Please consult with the Planning Department for further guidance. Additional information
may be found on the Climate Action Plan Update and Vehicle Miles Traveled calculations staff report.
This checklist is intended to assist project applicants in identifying CAP ordinance requirements and
demonstrate how their project fulfills those requirements. This checklist is to be completed and included
in applications for new development projects that are subject to discretionary review or require a building
permit.
APPLICATION SUBMITTAL REQUIREMENTS
• The completed checklist must be included in the project submittal package or building permit
application. Application submittal procedures can be found on the City of Carlsbad website. This
checklist is designed to assist the applicant in identifying the minimum CAP-related requirements
specific to their project. However, it may be necessary to supplement the completed checklist with
supporting materials, calculations or certifications, to demonstrate full compliance with CAP
requirements. For example, projects that propose or require a performance approach to comply
with energy-related measures will need to attach to this checklist separate calculations and
documentation as specified by the ordinances.
• If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum
required by ordinance, an explanation must be provided to the satisfaction of the Planning Division
or building official.
• The requirements in the checklist will be included in the project's conditions of approval or issuance
of building permit.
• Details on CAP ordinance requirements are available on the city's website.
P-30 Page 1 of 7 Revised 07/21
City of Carlsbad Climate Actio Plan Consistency Checklist
STEP 1: LAND USE CONSISTENCY
The first step in determining CAP consistency for discretionary development is to assess the project's consistency
with the growth projections used in the development of the CAP. This section allows the city to determine a
project's consistency with the land use assumptions used in the CAP. Projects found not to be consistent with the
CAP's land use assumptions and that are projected to emit at or above the CAP screening threshold of 900 metric
tons of CO2 equivalent (MTCO2e) GHG will be subject to a project-specific analysis of GHG emissions' impact on the
environment in accordance with the requirements of the California Environmental Quality Act (CEQA). This may
result in GHG-reducing mitigation measures applied as a condition of project approval in addition to compliance
with the CAP ordinance requirements identified in Step 2 of this checklist.
(Check the appropriate box and provide an explanation and supporting documentation for your answer)
A. Is the proposed project consistent with the existing General Plan land use and specific/master plan or zoning designations?
OR,
If the proposed project is not consistent with the existing land use plan and zoning designations, does the project include a
land use plan and/or specific plan, master plan or zoning designation amendment that would result in an equivalent or less
GHG-intensive project when compared to the existing designations?
Yes No
□
If "Ye~', proceed to Step 2 of the checklist. For the second option under Question A above, provide estimated project-related GHG emissions under both existing and
proposed designation(s) for comparison. GHG emissions must be estimated in accordance with the City of Carlsbad Guidance to Demonstrating Consistency with the
Climate Action Plan.
If "No", proceed to Question B.
B. The CAP established a screening threshold of 900 MTC02e/year for new development projects to assist in determining
consistency with the CAP. The types and sizes of typical projects listed below have been determined to correspond to the CAP
screening threshold. Will the proposed land use change result in the construction of less than any one of the following?
• Single-Family Housing: 50 dwelling units
• Multi-Family Housing: 70 dwelling units
• Office: 35,000 square feet
• Retail Store: 11,000 square feet
• Grocery Store: 6,300 square feet
• Other: If the proposed project is not one of the above types, provide a project-specific GHG emissions analysis to
determine whether it is below the 900 MTC02e/year screening threshold.
If "Yes", proceed to Step 2 of the checklist.
□ □
If "No'', the project's GHG impact is potentially significant and must be analyzed in accordance with CEOA. Applicant must prepare a Self-developed GHG emissions
reduction program in accordance with the City of Carlsbad Guidance to Demonstrating Consistency with the Climate Action Plan to demonstrate how it would offset
the increase in emissions over the existing designations. The project must incorporate each of the applicable measures identified in Step 2 to mitigate cumulative
GHG emissions impacts unless the decision maker finds that a measure is infeasible in accordance with California Environmental Quality Act Guidelines Section
15091. Mitigation in lieu of or in addition to the measures in Step 2 may be required, depending on the results of the project-specific GHG impact analysis. Proceed
and complete a project-specific Self-developed GHG emissions reduction program and Step 2 of the Checklist.
P-30 Page 2 of 7 Revised 07/21
City of Carlsbad Climate Action Ian Consistency Checklist
STEP 2: CAP ORDINANCE COMPLIANCE REQUIREMENTS
Completion of this checklist will document a project's compliance with CAP ordinances, and in turn, demonstrate
consistency with the applicable measures and actions of the CAP. The compliance requirements in this Step 2 apply
to development projects that require a building permit. All other development projects shall implement all
emissions-related mitigation measures from the General Plan Update EIR.
Project No./Name:
Property
Address/APN:
Applicant Name/Co.:
Applicant Address:
Contact Phone:
URBINO MINOR SUBDIVISION
3997 Park Drive, Carlsbad, CA 92008 APN: 207-120-40-00
Arthur Urbino
421 Tamarack Avenue. Carlsbad. CA 92008
858-77 4-8754 Contact Email : hurbino@earthlink.net
Contact information of person completing this checklist (if different than above):
Name:
Company
name/address:
Doug Logan Contact Phone:
Rancho Coastal Engineering & Surveying, Inc ..
310 V. V C S 205 Contact Email: 1a era ruz. te
San Marcos CA 92078
858-775-8474
Doug@RCESD com
Use the table below to determine which sections of the Ordinance Compliance checklist are applicable to your project. If
your project includes alterations or additions to an existing building, please contact the Carlsbad Building Division for
assistance in estimating building permit valuation, by phone at 760-602-2719 or by email at building@carlsbadca.gov.
□ Alterations:
□ BPV < $60,000
□ BPV ~ $60,000
□ Electrical service panel upgrade
□ BPV ~ $200,000
□ New construction
□ Alterations:
P-30
N/A
lA and 4A
4A
lA and 4A
Page 3 of 7
All residential alterations
1-2 family dwellings and townhouses with attached
garages only
Multi-family dwellings only where interior finishes are
removed and significant site work and upgrades to
structural and mechanical, electrical, and/or plumbing
systems are proposed
Revised 07/21
City of Carlsbad Climate Action Plan Consistency Checklist
□ BPV 2!: $200,000 or additions 2!: 1B,5 1,000 square feet
□ BPV 2!: $1,000,000 18, 28 and 5 Building alterations of~ 75% existing gross floor area
□ ~ 2,000 sq. ft. new roof addition 28 and 5 18 also applies if BPV i!! $200,000
Please refer to Carlsbad Ordinance No. CS-347 and the California Green Building Standards Code (CALGreen) for more information when completing this section.
A. D Residential addition or alteration i!! $60,000 building permit valuation. l!!I N/A __________ _
See Ord. CS-347, Section 8. D Exception: Home energy score i!! 7
Year Built Single-family Requirements
D Before 1978 Select one:
D Duct sealing D Attic insulation □Cool roof
D 1978 and later Select one:
D Lighting package D Water heating package
D Between 1978 and 1990
D 1991 and later
B. D Nonresidential* new construction or alterations i!! $200,000 building permit valuation,
or additions i!! 1,000 square feet
See CALGreen Appendix AS, Discussion AS.2, as amended in CS-347, Section 3.
AS.203.1.1.1
D Outdoor lighting: .90 Allowed Outdoor Lighting Power
AS.203.1.1.2
□ Restaurant service water heating (comply with California Energy Code Section 140.5, as amended)
AS.203.1.2.1
Choose one as applicable: D .95 Energy budget D .90 Energy budget
AS.211.1.**
D On-site renewable energy
AS.211.3**
D Green power (if offered by local utility provider, 50% minimum renewable sources)
AS.212.1
D Elevators and escalators
AS.213.1
D Steel framin
P-30 Page 4 of 7
(attach certification)
Multi-family Requirements
D Attic insulation
Select one:
D Attic insulation D Duct Sealing □Cool roof
Select one:
D Lighting package D Water heating package
l!!I N/A _________ _
D N/A
□ N/A
D N/A
D N/A
D N/A
D N/A
Revised 07/21
City of Carlsbad Climate Action Plan Consistency Checklist
□ N/A
* Includes hotels/motels and high-rise residential buildings
•• For alterations~ $1,000,000 BPV and affecting> 75% existing gross floor area, or alterations that add 2,000 square feet of new roof addition: comply with California
Energy Code section 120.10 instead.
A. [81 Residential new construction (for building permit applications submitted after 1/1/20). Refer to 2019 California Energy Code section 150.l(c) 14 for
requirements. Note: if project includes installation of an electric heat pump water heater pursuant to Carlsbad ordinance CS-348, increase system size by
.3kWdc if PV offset option is selected.
Floor Plan ID (use additional CFA #d.u. Calculated kWdc*
sheets if necessary)
TPM -No building plans at this time
Total System Size:
kWdc = (CFAx.572) / 1,000 + (1.15 x #d.u.)
*Formula calculation where CFA = conditional floor area, #du= number of dwellings per plan type
If proposed system size is less than calculated size, please explain.
Exception
□
□
□
□
kWdc
B. D Nonresidential new construction or alterations ~1,000,000 BPV and affecting ~75% existing floor area, or addition that inaeases roof area by ~.ooo
square feet. Please refer to Carlsbad Ordinance CS-347, Section 6 when completing this section.
Choose one of the following methods:
□ Gross Floor Area (GFA) Method
GFA:
□ If< 10,000s.f. Enter: 5 kWdc
Min. System Size:
□ If~ 10,000s.f. calculate: 15 kWdc x (GFNl0,000) **
___ kWdc
**Round building size factor to nearest tenth, and round system size to nearest whole number.
□ Time-Dependent Valuation Method
Annual TDV Energy use:••• x .80= Min. system size: ____ kWdc
***Attach calculation documentation using modeling software approved by the california Energy Commission.
P-30 Page 5 of 7 Revised 07/21
City of Carlsbad Climate Actio Plan Consistency Checklist
A. ~ Residential and hotel/motel new construction
Please refer to carlsbad Ordinance CS-347 and CS-348 when completing this section.
181 For systems serving individual dwelling units choose one:
181 Heat pump water heater AND compact hot water distribution AND drain water heat recovery (low-rise residential
only)
0 Heat pump water heater AND PV system .3 kWdc larger than required in CA Energy Code Section 120.10 (for high rise
residential hotel/motel) or 150.l(c) 14 (for low-rise residential)
□ Heat pump water heater meeting Tier 3 or higher NEEA Advanced Water Heating Specification
□ Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors
□ Exception:
□ For systems serving multiple dwelling units, install a central water-heating system with all of the following:
□ Gas or propane water heating system
□ Recirculation system per CS-347 (high-rise residential, hotel/motel) or CS-348 (low-rise residential)
□ Solar water heating system that is either:
□ .60 solar savings fraction or 40 s.f. solar collectors
□ .40 solar savings fraction, plus drain water heat recovery
□ Exception:
8. D Nonresidential new construction
Please refer to Carlsbad Ordinance CS-347 when completing this section.
□ Water heating system derives at least 40% of its energy from one of the following (attach documentation):
□ Solar-thermal □ Photovoltaics □ Recovered energy
□ Water heating system is (choose one):
□ Heat pump water heater
□ Electric resistance water heater(s)
□ Solar water heating system with .40 solar savings fraction
□ Exception:
A. ~ Residential New construction and major alterations*
Please refer to Carlsbad Ordinance CS-349 when completing this section.
181 One and two-family residential dwelling or townhouse with attached garage:
181 One EVSE ready parking space required □ Exception :
□ Multi-family residential· □ Exception ·
Total Parking Spaces EVSE Spaces
Proposed Capable I Ready
I
Calculations: Total ME spaces= .10 x Total parking (rounded up to nearest whole number)
ME Installed= Total EVSE Spaces x .50 (rounded up to nearest whole number)
EVSE other= Total EVSE spaces -ME Installed
(EVSE other may be "Capable," "Ready" or "Installed.")
I
I
Installed Total
P-30 Page 6 of 7 Revised 07/21
City of Carlsbad Climate Action Plan Consistency Checklist
*Major alterations are: (1) for one and two-family dwellings and townhouses with attached garages, alterations have a building permit valuation~ $60,000 or
include an electrical service panel upgrade; (2) for multifamily dwellings (three units or more without attached garages), alterations have a building permit
valuation~ $200,000, interior finishes are removed and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems
are proposed.
B. 0 Nonresidential new construction (includes hotels/motels) □ Exception :
Total Parking Spaces EVSE Spaces
Proposed Capable Ready Installed Total
Calculation: Refer to the table below:
Total Number of Parking Spaces provided Number of reQuired EV Spaces Number of required ME Installed Spaces
□ 0-9 1 1
□ 10-25 2 1
□ 26-50 4 2
□ 51-75 6 3
□ 76-100 9 5
□ 101-150 12 6
□ 151-200 17 9
□ 201 and over 10 percent of total 50 percent of Required EV Spaces
A List each proposed nonresidential use and gross floor area (GFA) allocated to each use.
B. Employee ADT/1,000 square feet is selected from the Oty of Carlsbad Employee ADTTable.
Use GFA Employee ADT/1,000 S.F. Total EmployeeADT
Total
If total employee ADT is greater than or equal to 110 employee ADT, a IDM plan is required.
*NOTE: Notwithstanding the 110 employee ADT threshold above, General Plan Mobility Element Policy 3-P.11 requires new development that adds vehicle traffic
to vehicle LOS-exempt street facilities to implement TDM and transportation system management strategies. Please consult with City of Carlsbad Land Development
Engineering (LDE) staff to determine whether this policy applies to your project.
TDM plan required: Yes □ No □
LDE Staff Verification: □ _____ (staff initials)
P-30 Page 7 of 7 Revised 07/21
( Cicyof
Carlsbad
I INSTRUCTIONS:
STORM WATER STANDARDS
QUESTIONNAIRE
E-34
Development Services
Land Development Engineering
1635 Faraday Avenue
(760) 602-2750
www.carlsbadca.gov
To address post-development pollutants that may be generated from development projects, the city requires that new
development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management
Practices (BMPs) into the project design per Carlsbad BMP Design Manual (BMP Manual). To view the BMP Manual,
refer to the Engineering Standards (Volume 5).
This questionnaire must be completed by the applicant in advance of submitting for a development application
(subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of
storm water standards that must be applied to a proposed development or redevelopment project. Depending on the
outcome, your project will either be subject to 'STANDARD PROJECT' requirements or be subject to 'PRIORITY
DEVELOPMENT PROJECT' (PDP) requirements.
Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City
staff has responsibility for making the final assessment after submission of the development application. If staff
determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than
initially assessed by you , this will result in the return of the development application as incomplete. In this case, please
make the changes to the questionnaire and resubmit to the city.
If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the
questions, please seek assistance from Land Development Engineering staff.
A completed and signed questionnaire must be submitted with each development project application. Only one
completed and signed questionnaire is required when multiple development applications for the same project are
submitted concurrently.
PROJECT INFORMATION
PROJECT NAME: URBINO MINOR SUBDIVISION PROJECT ID: DEV2020-0263
ADDRESS: 3997 Park Drive, Carlsbad, CA 92008 APN : 207-120-40-00
The project is (check one): 181 New Development D Redevelopment
The total proposed disturbed area is: 14 753 ft2 ( Q 34 ) acres
The total proposed newly created and/or replaced impervious area is: 8,500 ft2 ( 0.19 ) acres
If your project is covered by an approved SWQMP as part of a larger development project, provide the project ID and the
SWQMP # of the larger development project:
Project ID SWQMP#:
Then, go to Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your
application to the city.
E-34 Page 1 of 4 REV 03/19
STEP1
TO BE COMPLETED FOR ALL PROJECTS
To determine if your project is a "development project", please answer the following question:
YES NO
Is your project LIMITED TO routine maintenance activity and/or repair/improvements to an existing building □ IZl or structure that do not alter the size (See Section 1.3 of the BMP Design Manual for guidance)?
If you answered "yes" to the above question , provide justification below then go to Step 5, mark the third box stating "my
project is not a 'development project' and not subject to the requirements of the BMP manual" and complete applicant
information.
Justification/discussion: (e.g. the project includes only interior remodels within an existing building):
Demo (E) House, splitting the lot into 2-lots, and building 2 new single family residence.
If you answered "no" to the above question, the project is a 'development project', go to Step 2.
STEP2
TO BE COMPLETED FOR ALL DEVELOPMENT PROJECTS
To determine if your project is exempt from PDP requirements pursuant to MS4 Permit Provision E.3.b.(3}, please answer
the following questions:
Is your project LIMITED to one or more of the following:
YES NO
1. Constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria:
a) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non-
erodible permeable areas; OR □ ~ b) Designed and constructed to be hydraulically disconnected from paved streets or roads; OR
c) Designed and constructed with permeable pavements or surfaces in accordance with USEPA
Green Streets guidance?
2. Retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in □ IZl accordance with the USEPA Green Streets guidance?
3. Ground Mounted Solar Array that meets the criteria provided in section 1.4.2 of the BMP manual? □ ~
If you answered "yes" to one or more of the above questions, provide discussion/justification below, then go to Step 5, mark
the second box stating "my project is EXEMPT from PDP ... " and complete applicant information.
Discussion to justify exemption ( e.g. the project redeveloping existing road designed and constructed in accordance with
the USEPA Green Street guidance):
If you answered "no" to the above auestions, vour project is not exempt from PDP, go to Step 3.
E-34 Page 2 of 4 REV 03/19
STEP3
TOBECOMPLETEDFORALLNEW R DEVELOP --•
To determine if your project is a PDP, please answer the following questions (MS4 Permit Provision E.3.b.(1 )):
YES NO
1. Is your project a new development that creates 10,000 square feet or more of impervious surfaces
collectively over the entire project site? This includes commercial, industrial, residential, mixed-use, □ ~
and public development projects on public or private land.
2. Is your project a redevelopment project creating and/or replacing 5,000 square feet or more of
impervious surface collectively over the entire project site on an existing site of 10,000 square feet or □ ~ more of impervious surface? This includes commercial, industrial, residential, mixed-use, and public
development Proiects on oublic or Private land.
3. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more
of impervious surface collectively over the entire project site and supports a restaurant? A restaurant is
a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and □ ~
refreshment stands selling prepared foods and drinks for immediate consumption (Standard Industrial
Classification (SIC) code 5812).
4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious
surface collectively over the entire project site and supports a hillside development project? A hillside □ ~
development project includes development on anv natural slope that is twentv-five percent or areater.
5. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more
of impervious surface collectively over the entire project site and supports a parking lot? A parking lot is □ ~ a land area or facility for the temporary parking or storage of motor vehicles used personally for
business or for commerce.
6. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more
of impervious street, road, highway, freeway or driveway surface collectively over the entire project □ ~ site? A street, road, highway, freeway or driveway is any paved impervious surface used for the
transportation of automobiles, trucks, motorcvcles, and other vehicles.
7. Is your project a new or redevelopment project that creates and/or replaces 2,500 square feet or more
of impervious surface collectively over the entire site, and discharges directly to an Environmentally
Sensitive Area (ESA)? "Discharging Directly to" includes flow that is conveyed overland a distance of · □ ~
200 feet or less from the project to the ESA , or conveyed in a pipe or open channel any distance as an
isolated flow from the project to the ESA (i.e. not comminaled with flows from adiacent lands).*
8. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square
feet or more of impervious surface that supports an automotive repair shop? An automotive repair □ ~ shop is a facility that is categorized in any one of the following Standard Industrial Classification (SIC)
codes: 5013, 5014, 5541 , 7532-7534, or 7536-7539.
9. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square
feet or more of impervious area that supports a retail gasoline outlet (RGO)? This category includes □ ~ RGO's that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily
Traffic (ADT) of 100 or more vehicles per dav.
10. Is your project a new or redevelopment project that results in the disturbance of one or more acres of land □ ~ and are expected to generate pollutants post construction?
11 . Is your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of
impervious surface or (2) increases impervious surface on the property by more than 10%? (CMC □ ~
21 .203.040)
If you answered "yes" to one or more of the above questions, your project is a PDP. If your project is a redevelopment
project, go to step 4. If your project is a new project, go to step 5, check the first box stating "My project is a PDP ... "
and complete applicant information.
If you answered "no" to all of the above questions, your project is a 'STANDARD PROJECT.' Go to step 5, check the
second box statina "Mv proiect is a 'STANDARD PROJECT' ... " and complete applicant information.
E-34 Page 3 of 4 REV 03/19
STEP4
TO BE COMPLETED FOR REDEVELOPMENT PROJECTS THAT ARE PRIORITY DEVELOPMENT PROJECTS (PDP)
ONLY
Complete the questions below regarding your redevelopment project (MS4 Permit Provision E.3.b.(2)):
YES NO
Does the redevelopment project result in the creation or replacement of impervious surface in an amount
of less than 50% of the surface area of the previously existing development? Complete the percent
impervious calculation below:
Existing impervious area (A) = 3 660 sq. ft. □ 181
Total proposed newly created or replaced impervious area (8) = NIA sq. ft.
Percent impervious area created or replaced (B/A)*100 = ~lA %
If you answered "yes", the structural BMPs required for PDP apply only to the creation or replacement of impervious
surface and not the entire development. Go to step 5, check the first box stating "My project is a PDP ... " and complete
applicant information.
If you answered "no," the structural BM P's required for PDP apply to the entire development. Go to step 5, check the
check the first box stating "My project is a PDP ... " and complete aoolicant information.
STEPS
CHECK THE APPROPRIATE BOX AND COMPLETE APPLICANT INFORMATION
D My project is a PDP and must comply with PDP stormwater requirements of the BMP Manual. I understand I must
prepare a Storm Water Quality Management Plan (SWQMP) for submittal at time of application.
181 My project is a 'STANDARD PROJECT' OR EXEMPT from PDP and must only comply with 'STANDARD PROJECT'
stormwater requirements of the BMP Manual. As part of these requirements, I will submit a "Standard Project
Requirement Checklist Form E-36' and incorporate low impact development strategies throughout my project.
Note: For projects that are close to meeting the PDP threshold, staff may require detailed impervious area calculations
and exhibits to verify if 'STANDARD PROJECT' stormwater requirements apply.
D My Project is NOT a 'development project' and is not subject to the requirements of the BMP Manual.
Applicant Information and Signature Box
Applicant Name: Arthur Urbino Applicant Title: OWNER ~ s:~ ,/l\/"12 Applicant Signature: Date: ,-
• Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) Impa1red water bodies; areas designated as Areas of Special
Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies
designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and
amendments); areas designated as preserves or their equivalent under the Multi Species Conservation Program within the Cities and County of San Diego; Habitat
Management Plan; and any other equivalent environmentally sensitive areas which have been identified by the City.
This Box for City Use Only
YES NO
City Concurrence: □ □
By:
Date:
Project ID:
E-34 Page 4 of 4 REV 03/19
{ Cicyof
Carlsbad
STANDARD PROJECT
REQUIREMENT
CHECKLIST
E-36
Project Information
Project Name: URBINO MINOR SUBDIVISION
Project ID: DEV2020-0263
DWG No. or Building Permit No.:
Source Control BMPs
Development Services
Land Development Engineering
1635 Faraday Avenue
{760) 602-2750
www.carlsbadca.gov
All development projects must implement source control BMPs SC-1 through SC-6 where applicable and feasible. See
Chapter 4 and Appendix E.1 of the BMP Design Manual (Volume 5 of City Engineering Standards) for information to
implement source control BMPs shown in this checklist.
Answer each category below pursuant to the following.
• "Yes" means the project will implement the source control BMP as described in Chapter 4 and/or Appendix E.1 of the
Model BMP Design Manual. Discussion/justification is not required.
• "No" means the BMP is applicable to the project but it is not feasible to implement. Discussion/justification must be
provided . Please add attachments if more space is needed .
• "N/A" means the BMP is not applicable at the project site because the project does not include the feature that is
addressed by the BMP (e.g., the project has no outdoor materials storage areas). Discussion/justification may be
provided.
Source Control Requirement Applied?
SC-1 Prevention of Illicit Discharges into the MS4 [!)Yes □No □ N/A
Discussion/justification if SC-1 not implemented:
SC-2 Storm Drain Stenciling or Signage [!)Yes □ No □ N/A
Discussion/justification if SC-2 not implemented:
SC-3 Protect Outdoor Materials Storage Areas from Rainfall, Run-On, Runoff, and Wind I!) Yes □No □ N/A Dispersal
Discussion/justification if SC-3 not implemented:
E-36 Page 1 of 4 Revised 09/16
(J
Source Couuol Reaulrement (continued) Annlled?
SC-4 Protect Materials Stored in Outdoor Work Areas from Rainfall, Run-On, Runoff, and OOYes D No □ N/A Wind Dispersal
Discussion/justification if SC-4 not implemented:
SC-5 Protect Trash Storage Areas from Rainfall, Run-On, Runoff, and Wind Dispersal OOYes □ No □ N/A
Discussion/justification if SC-5 not implemented:
SC-6 Additional BMPs based on Potential Sources of Runoff Pollutants must answer for each source listed below and
identify additional BMPs. (See Table in Appendix E.1 of BMP Manual for guidance).
□ On-site storm drain inlets □Yes Iii No Iii N/A
D Interior floor drains and elevator shaft sump pumps □Yes I!] No Iii N/A
□ Interior parking garages □Yes 00 No Iii N/A
□ Need for future indoor & structural pest control □Yes 00 No Iii N/A
□ Landscape/Outdoor Pesticide Use □Yes 00 No Iii N/A
□ Pools, spas, ponds, decorative fountains, and other water features □Yes 00 No Iii N/A
□ Food service □Yes 00 No Iii N/A
□ Refuse areas □Yes 00 No Iii N/A
□ Industrial processes □Yes 00 No Iii N/A
□ Outdoor storage of equipment or materials OOYes □ No Iii N/A
□ Vehicle and Equipment Cleaning OOYes □ No Iii N/A
□ Vehicle/Equipment Repair and Maintenance 00 Yes □ No Iii N/A
□ Fuel Dispensing Areas □Yes 00 No Iii N/A
□ Loading Docks □Yes 00 No Iii N/A
□ Fire Sprinkler Test Water □Yes 00 No Iii N/A
□ Miscellaneous Drain or Wash Water □Yes 00 No Iii N/A
□ Plazas, sidewalks, and parkinQ lots □Yes 00 No 1i1 N/A
For "Yes" answers, identify the additional BMP per Appendix E.1 . Provide justification for "No" answers.
E-36 Page 2 of 4 Revised 09/16
.. ()
Site Design BMPs
All development projects must implement site design BMPs SD-1 through SD-8 where applicable and feasible. See
Chapter 4 and Appendix E.2 thru E.6 of the BMP Design Manual (Volume 5 of City Engineering Standards) for information
to implement site design BMPs shown in this checklist.
Answer each category below pursuant to the following.
• "Yes" means the project will implement the site design BMPs as described in Chapter 4 and/or Appendix E.2 thru E.6 of
the Model BMP Design Manual. Discussion / justification is not required.
• "No" means the BMPs is applicable to the project but it is not feasible to implement. Discussion/justification must be
provided. Please add attachments if more space is needed.
• "N/A" means the BMPs is not applicable at the project site because the project does not include the feature that is
addressed by the BMPs (e.g., the project site has no existing natural areas to conserve). Discussion/justification may be
provided.
Site Design Requirement I Applied?
SD-1 Maintain Natural Drainage Pathways and Hydrologic Features I l!l Yes I □ No ID N/A
Discussion/justification if SD-1 not implemented:
SD-2 Conserve Natural Areas, Soils, and Vegetation I [!]Yes I □ No I □ N/A
Discussion/justification if SD-2 not implemented:
SD-3 Minimize Impervious Area I !!]Yes I □ No I □ N/A
Discussion/justification if SD-3 not implemented:
SD-4 Minimize Soil Compaction I l!J Yes I □ No ID N/A
Discussion/justification if SD-4 not implemented:
SD-5 Impervious Area Dispersion I l!l Yes I D No ID N/A
Discussion/justification if SD-5 not implemented:
E-36 Page 3 of 4 Revised 09/16
' ~
Site Design Reaulrement (continued) I Applied?
SD-6 Runoff Collection I OOYes I □No I □ N/A
Discussion/justification if SD-6 not implemented:
SD-7 LandscapinQ with Native or Drought Tolerant Species I 00 Yes I □ No ID N/A
Discussion/justification if SD-7 not implemented:
SD-8 HarvestinQ and UsinQ Precipitation I 00 Yes I □ No ID NIA
Discussion/justification if SD-8 not implemented:
E-36 Page 4 of 4 Revised 09/16
FNTG
• ' BUILDER SERVICES
HI A TITL
Fidelity ational Titl
(I Comrnonwatti
2365 Northside Drive, Suite 600
San Diego, CA 92108
Phone: (619) 521-3500
Fax: (619) 521 -3608
Issuing Policies of Chicago Title Insurance Company
ORDER NO.: 00135990-996-SD1-RT4
Arthur Urbino
421 Tamarack Ave
Carlsbad, CA 92008
ATTN: Arthur Urbino
Email: hurbino@earthlink.net
REF:
PHOPERTY: 3997 PARK DRIVE, CARLSBAD, CA
Escrow/Customer Phone: (619) 521-3500
Title Officer: Theresa Robertson
Title Officer Phone: (619) 521-3552
Title Officer Fax: (619) 521-3608
Title Officer Email: theresa.robertson@ctt.com
ECEIV-D
FEBO 1 2022
CITY OF CARLSBAD
FIRST AMENDED PRELIMINARY~ G DIVISIUII\J
In response to the application for a policy of title insurance referenced herein, Chicago Title Company hereby
reports that it is prepared to issue, or cause to be issued, as of the date hereof, a policy or policies of title
insurance describing the land and the estate or interest therein hereinafter set forth, insuring against loss which
may be sustained by reason of any defect, lien or encumbrance not shown or referred to as an exception herein
or not excluded from coverage pursuant to the printed Schedules, Conditions and Stipulations or Conditions of
said policy forms.
The printed Exceptions and Exclusions from the coverage and Limitations on Covered Risks of said policy or
policies are set forth in Attachment One. The policy to be issued may contain an arbitration clause. When the
Amount of Insurance is less than that set forth in the arbitration clause, all arbitrable matters shall be arbitrated at
the option of either the Company pr the Insured as the exclusive remedy of the parties. Limitations on Covered
Risks applicable to the CL TA and ALTA Homeowner's Policies of Title Insurance which establish a Deductible
Amount and a Maximum Dollar Limit of Liability for certain coverages are also set forth in Attachment One.
Copies of the policy forms should be read. They are available from the office which issued this report.
This report (and any supplements or amendments hereto) is issued solely for the purpose of facilitating the
issuance of a policy of title insurance and no liability is assumed hereby. If it is desired that liability be assumed
prior to the issuance of a policy of title insurance, a Binder or Commitment should be requested.
The policy(s) of title insurance to be issued hereunder will be policy(s) of Chicago Title Insurance Company, a
Florida corporation.
Please read the exceptions shown or referred to herein and the exceptions and exclusions set forth in
Attachment One of this report carefully. The exceptions and exclusions are meant to provide you with
notice of matters which are not covered under the terms of the title insurance policy and should be
carefully considered.
It is important to note that this preliminary report is not a written representation as to the condition of title
and may not list a/I liens, defects and encumbrances affecting title to the land.
Chicago Title Company lly.
~ By:--~-----
A'ITEST Prnidc.111
Sttrctary
CL TA Preliminary Report Form -Modified (11/17/06) Page 1
Authorized Signature
CL TA Preliminary Report Form -Modified { 11 /17 /06) Page2
F N T G ;,~'. CHICAGOTITLE
• Flddtty Natlollal 11tle"
BUILDER SERVICES ti Connon.llllllh·
PRELIMINARY REPORT
EFFECTIVE DATE: November 10, 2021 at 7:30 a.m.
ORDER NO.: 00135990-996-SD1-RT4
The form of policy or policies of title insurance contemplated by this report is:
Guarantee
2365 Northside Drive, Suite 600
San Diego, CA 92108
Phone: (619) 521-3500
Fax: (619) 521-3608
1. THE ESTATE OR INTEREST IN THE LAND HEREINAFTER DESCRIBED OR REFERRED TO
COVERED BY THIS REPORT IS:
AFEE
2. TITLE TO SAID ESTATE OR INTEREST AT THE DATE HEREOF IS VESTED IN:
ARTHUR URBINO and HEMINA URBINO, Trustees of The Urbino Family Trust dated April 29, 2003
and as restated August 3, 2017
3. THE LAND REFERRED TO IN THIS REPORT IS DESCRIBED AS FOLLOWS:
See Exhibit A attached hereto and made a part hereof.
CL TA Preliminary Report Form -Modified (11/17/06) Page3
PRELIMINARY REPORT
YOUR REFERENCE:
EXHIBIT "A"
LEGAL DESCRIPTION
Chicago Title Company
ORDER NO.: 00135990-996-SD1-RT4
THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE CITY OF CARLSBAD, IN THE COUNTY OF
SAN DIEGO, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS:
THE SOUTHWESTERLY 109 FEET OF THE SOUTHEASTERLY 200 FEET OF LOT 7, IN BLOCK "G" OF
BELLA VISTA, IN THE CITY OF CARLSBAD, COUNTY OF SAN DIEGO, STATE OF CALIFORNIA,
ACCORDING TO MAP THEREOF NO. 2152, FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAN
DIEGO COUNTY MARCH 7, 1929.
APN: 207-120-40-00
Cl TA Preliminary Report Form -Modified (11/17/06) Page4
PRELIMINARY REPORT
YOUR REFERENCE:
EXCEPTIONS
Chicago Title Company
ORDER NO.: 00135990-996-SD1-RT4
AT THE DATE HEREOF, ITEMS TO BE CONSIDERED AND EXCEPTIONS TO COVERAGE IN ADDITION TO
THE PRINTED EXCEPTIONS AND EXCLUSIONS IN SAID POLICY FORM WOULD BE AS FOLLOWS:
A. Property taxes, which are a lien not yet due and payable, including any assessments collected with taxes
to be levied for the fiscal year 2020-2021.
B. The lien of supplemental or escaped assessments of property taxes, if any, made pursuant to the
provisions of Chapter 3.5 (commencing with Section 75) or Part 2, Chapter 3, Articles 3 and 4,
respectively, of the Revenue and Taxation Code of the State of California as a result of the transfer of title
to the vestee named in Schedule A or as a result of changes in ownership or new construction occurring
prior to Date of Policy.
1. Easement(s) for the purpose(s) shown below and rights incidental thereto, as granted in a document:
Granted to:
Purpose:
Recording Date:
Recording No:
Affects:
City of Carlsbad
Public street and public utility
January 23, 1995
as Instrument No. 1995-0028707, Official Records
A portion of said land as more particularly described in said document.
2. A deed of trust to secure an indebtedness in the amount shown below,
Amount:
Dated:
Trustor/Grantor
Trustee:
Beneficiary:
Loan No.:
Recording Date:
Recording No:
$672,000.00
September 20, 2018
Arthur Urbino and Hemina Urbino, Trustees of The Urbino Family Trust dated
April 29, 2003 and as restated August 3, 2017
Olivia Todd
U.S. Bank National Association, a National Bank
2200840861
October 3, 2018
as Instrument No. 2018-0410794, Official Records
3. A deed of trust to secure an indebtedness in the amount shown below,
Amount:
Dated:
Trustor/Grantor
Trustee:
Beneficiary:
Recording Date:
Recording No:
$85,854.00
January 25, 2019
Hemina Urbino and Arthur Urbino, Trustee(s) of the Urbino Family Trust dated x4
29, 2003 and as restate August 3, 2017
U.S. Bank Trust Company, National Association
U.S. Bank National Association
February 12, 2019
as Instrument No. 20190049611, Official Records
CLTA Preliminary Report Form -Modified (11/17/06) Page5
PRELIMINARY REPORT
YOUR REFERENCE:
EXCEPTIONS
(Continued)
Chicago Title Company
ORDER NO.: 00135990-996-SD1-RT4
4. Any rights of the parties in possession of a portion of, or all of, said Land, which rights are not disclosed
by the public records.
The Company will require, for review, a full and complete copy of any unrecorded agreement, contract,
license and/or lease, together with all supplements, assignments and amendments thereto, before issuing
any policy of title insurance without excepting this item from coverage.
The Company reserves the right to except additional items and/or make additional requirements after
reviewing said documents.
PLEASE REFER TO THE "INFORMATIONAL NOTES" AND "REQUIREMENTS" SECTIONS WHICH
FOLLOW FOR INFORMATION NECESSARY TO COMPLETE THIS TRANSACTION.
END OF EXCEPTIONS
Cl TA Preliminary Report Form -Modified (11/17/06} Page6