Loading...
HomeMy WebLinkAboutCDP 2022-0013; URBINO MINOR SUBDIVISION; Coastal Development Permit (CDP){city of Carlsbad LAND USE REVIEW APPLICATION P-1 Development Services Planning Division 1635 Faraday Avenue (760) 602-4610 www.carlsbadca.gov APPLICATIONS APPLIED FOR: (CHECK BOXES) Development Permits D Coastal Development Permit D Conditional Use Permit D Minor D Extension D Day Care {Large) 181 Minor D Environmental Impact Assessment D Habitat Management Permit D Hillside Development Permit D Minor D Minor D Nonconforming Construction Permit 0 Planned Development Permit O Minor D Residential O Non-Residential D Planning Commission Determination D Reasonable Accommodation D Site Development Plan D Special Use Permit D Minor 181 Tentative Parcel Map (Minor Subdivision) 0 Tentative Tract Map (Major Subdivision) D Variance D Minor (FOR DEPT USE ONLY) Legislative Permits -:::.:,. ""'°Z-rn,:J--Col 7 to\ ~'Z-02'.L-t,VO ( D General Plan Amendment D Local Coastal Program Amendment D Master Plan D Specific Plan D Zone Change D Amendment D Amendment D Zone Code Amendment South Carlsbad Coastal Review Area Permits D Review Permit D Administrative D Minor O Major Village Review Area Permits D Review Permit D Administrative D Minor D Major (FOR DEPT. USE ONLY) EJ NOTE: A PROPOSED PROJECT REQUIRING APPLICATION SUBMITTAL MUST BE SUBMITTED BY APPOINTMENT*. PLEASE CONTACT THE APPOINTMENT SPECIALIST AT (760) 602-2723 TO SCHEDULE AN APPOINTMENT. ASSESSOR PARCEL NO(S): LOCATION OF PROJECT: NAME OF PROJECT: BRIEF DESCRIPTION OF PROJECT: PROJECT VALUE (SITE IMPROVEMENTS) FOR CITY USE ONLY 0 *SAME DAY APPOINTMENTS ARE NOT AVAILABLE 207-120-40-00 3997 Park Drive, Carlsbad, CA 92008 (STREET ADDRESS) URBINO MINOR SUBDIVISION Proposed 2 -Lot TPM ESTIMATED COMPLETION DATE December 2022 Development No. [)Ei)Zoiu-Q2,,b7 Lead Case No. CD£ &022---~ OQ\.7 D < OWNER NAME (PLEASE PRINT) APPLICANT NAME (PLEASE PRINT) INDIVIDUAL NAME INDIVIDUAL NAME Same as Owner (if applicable): .6,rthyr U rbinQ (if applicable): COMPANY NAME COMPANY NAME (if applicable): (if applicable): MAILING ADDRESS: 421 Iamarack 8llfn11e MAILING ADDRESS: CITY, STATE, ZIP: Carlsbad, CA 92008 CITY, STATE, ZIP: TELEPHONE: 858-774-8754 TELEPHONE: EMAIL ADDRESS: hurbino@earthlink.net EMAIL ADDRESS: I CERTIFY THAT I AM THE LEGAL OWNER AND THAT ALL THE ABOVE I CERTIFY THAT I AM THE LEGAL REPRESENTATIVE OF THE OWNER INFORMATION IS TRUE AND CORRECT TO THE BEST OF MY AND THAT ALL THE ABOVE INFORMATION IS TRUE AND CORRECT TO KNOWLEDGE. I CERTIFY AS LEGAL OWNER THAT THE APPLICANT AS THE BEST OF MY KNOWLEDGE. SET FORTH HEREIN IS MY AUTHORIZED REPRESENTATIVE FOR PURPOSES OF THIS APPLICATION. (!~ ~--~ 1/28/2022 SIGNATURE DATE SIGNATURE DATE APPLICANT'S REPRESENTATIVE (Print): IJQUg LQga □ MAILING ADDRESS: 3:10 Via ~eca Ccuz, suite 205 CITY, STATE, ZIP: San Marcos CA 92078 TELEPHONE: 858-775-8474 EMAIL ADDRESS: Daug@BCESD cam I CERTIFY THAT I AM THE REPRESENTATIVE OF THE APPLICANT FOR PURPOSES OF THIS APPLICATION AND THAT ALL THE ABOVE INFORMATION a ~/4 AND CORRECT TO THE BEST OF MY KNOWLEDGE. /J 1/JJ If II 1 v-1/28/2022 711 V • SIGNATURE DATE IN THE PROCESS OF REVIEWING THIS APPLICATION IT MAY BE NECESSARY FOR MEMBERS OF CITY STAFF, PLANNING COMMISSIONERS OR CITY COUNCIL MEMBERS TO INSPECT AND ENTER THE PROPERTY THAT IS THE SUBJECT OF THIS APPLICATION. I/WE CONSENT TO ENTRY FOR THIS PURPOSE. NOTICE OF RESTRICTION: PROPERTY OWNER ACKNOWLEDGES AND CONSENTS TO A NOTICE OF RESTRICTION BEING RECORDED ON THE TITLE TO HIS PROPERTY IF CONDITIONED FOR THE APPLICANT. NOTICE OF RESTRICTIONS RUN WITH THE LAND,o..::Z,:NY ~~E~EREST. [_PROPERTY OWNER SIGNATURE FOR CITY USE ONLY FEB O 1 2022 en y ( . CAH.LSBAD DATi~~i~1t9'L7dx+rci~~ECEIVED RECEIVED BY: P-1 Page 2 of6 Revised 10/20 December 2, 2021 City of Carlsbad Planning and Building Department RE: LETTER OF AUTHORIZATION FOR APPLICATION SIGNATURES 3997 Park Drive, Carlsbad, CA 92008 To Whom It May Concern: As owner and applicant of the subject, please allow this letter to serve as formal notification to allow Douglas E. Logan, Civil Engineer for our project, to sign all applications maps, and/or documents required for the subject application. Should you have any questions, feel free to contact me at (858) 774-8754. Sincerely, Arthur Urbino 421 Tamarack Avenue Carlsbad, CA 92008 (city of Carlsbad DISCLOSURE STATEMENT P-1(A) Development Services Planning Division 1635 Faraday Avenue (760) 602-4610 www.carlsbadca.gov Applicant's statement or disclosure of certain ownership interests on all applications which will require discretionary action on the part of the City Council or any appointed Board, Commission or Committee. The following information MUST be disclosed at the time of application submittal. Your project cannot be reviewed until this information is completed. Please print. Notse: . Pertcm i~ Q.efin~.~J "AllYJ · ~y~; fi . · q " organkaation,; oorppt,a~t6n/ . ! f ~(µ~Jf .. city municipality, d1$trict or o r poUfica su · Agents may sign this document; however, the legal name and entity of the applicant and property owner must be provided below. 1. APPLICANT (Not the applicant's agent) Provide the COMPLETE, LEGAL names and addresses of ALL persons having a financial interest in the application. If the applicant includes a corporation or partnership, include the names, titles, addresses of all individuals owning more than 10% of the shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE INDICATE NON-APPLICABLE (N/A) IN THE SPACE BELOW. If a publicly-owned corporation, include the names, titles, and addresses of the corporate officers. (A separate page may be attached if necessary.) Person Arthur Urbino Corp/Part_N_/A _________ _ Title Owner Title --------------Address 421 Tamarack Avenue, Carlsbad, CA Address ------------ 2. OWNER (Not the owner's agent) P-1(A) Provide the COMPLETE. LEGAL names and addresses of ALL persons having any ownership interest in the property involved. Also, provide the nature of the legal ownership (i.e., partnership, tenants in common, non-profit, corporation, etc.}. If the ownership includes a corporation or partnership, include the names, titles, addresses of all individuals owning more than 10% of the shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE INDICATE NON-APPLICABLE (N/A) IN THE SPACE BELOW. If a publicly-owned corporation, include the names, titles, and addresses of the corporate officers. (A separate page may be attached if necessary.) Person Arthur Urbino Title Owner Address 421 Tamarack Avenue Carlsbad, CA 92008 Corp/Part. ___________ _ Title _____________ _ Address ____________ _ Page 1 of 2 Revised 07/10 3. NON-PROFIT ORGANIZATION OR TRUST If any person identified pursuant to (1) or (2) above is a nonprofit organization or a trust, list the names and addresses of ANY person serving as an officer or director of the non- profit organization or as trustee or beneficiary of the. Non Profit/Trust N/A Non Profit/Trust N/A ·---------- Title Title -------------------------- Address ----------Address ___________ _ 4. Have you had more than $500 worth of business transacted with any member of City staff, Boards, Commissions, Committees and/or Council within the past twelve (12) months? □ Yes lvl No If yes, please indicate person(s): __________ _ NOTE: Attach additional sheets if necessary. I certify that all the above information is true and correct to the best of my knowledge. ~ ::{JM----121¥21 ~ G:/4~ Signature of owner/date Signature of applicant/date Arthur Urbino Arthur Urbino Print or type name of applicant Doug Logan Print or type name of owner/applicant's agent P-1{A) Page 2 of 2 Revised 07/10 (cicyof Carlsbad PROJECT DESCRIPTION P-1(8) PROJECT NAME: URBINO TPM APPLICANT NAME: Arthur Urbino Development Services Planning Division 1635 Faraday Avenue (760) 602-4610 www.carlsbadca.gov ------------------------- Please describe fully the proposed project by application type. Include any details necessary to adequately explain the scope and/or operation of the proposed project. You may also include any background information and supporting statements regarding the reasons for, or appropriateness of, the application. Use an addendum sheet if necessary. Description/Explanation: This is an application for a simple 2-Lot subdivision on an existing single family residence lot. The existing house will be demolished and the 2 new homes will ultimately be constructed. There are no environmental constraints with this project and is a very simple, straight forward 2-lot TPM. P-1(8) Page 1 of 1 Revised 07/10 {cicyof Carlsbad HAZARDOUS WASTE AND SUBSTANCES STATEMENT P-1{C) Development Services Planning Division 1635 Faraday Avenue (760) 602-4610 www.carlsbadca.gov Consultation of Lists of Sites Related to Hazardous Wastes (Certification of Compliance with Government Code Section 65962.5) Pursuant to State of California Government Code Section 65962.5, I have consulted the Hazardous Waste and Substances Sites List compiled by the California Environmental Protection Agency 8:nd hereby certify that (check one): Ii) The development project and any alternatives proposed in this application are not contained on the lists compiled pursuant to Section 65962.5 of the State Government Code. D The development project and any alternatives proposed in this application !!! contained on the lists compiled pursuant to Section 65962.5 of the State Government Code. APPLICANT Name: Arthur Urbino Address: 421 Tamarack Avenue Carlsbad, CA 92008 Phone Number: 858-774-8754 PROPERTY OWNER Name: Arthur Urbino Address:421 Tamarack Avenue Carlsbad, CA 92008 Phone Number: 858-77 4-8754 Address of Site: 3997 Park Drive, Carlsbad, CA 92008 Local Agency (City and County}:_C_it_y_o_f_C_a_r_ls_b_a_d __________ _ Assessor's book, page, and parcel number:_2_0_7_-_1_2_0_-4_0_-_0_0 __________ _ Specifylist(s}: __ N_/A ______________________ _ Regulatory Identification Number:_N_/_A ___________________ _ Date of List: ___________________________ _ 1/28/2022 1/28/2022 Applicant Signature/Date Property Owner Signature/Date The Hazardous Waste and Substances Sites List (Cortese List) is used by the State, local agencies and developers to comply with the California Environmental Quality Act requirements in providing information about the location of hazardous materials release sites. P-1(C) Page 1 of 2 Revised 02/13 ( Cicyof Carlsbad EIA INFORMATION FORM P-1(D) INSTRUCTION SHEET FOR COMPLETING AN ENVIRONMENTAL IMPACT ASSESSMENT INFORMATION FORM Development Services Planning Division 1635 Faraday Avenue (760) 602-4610 www.carlsbadca.gov This Environmental Information Form will be used to assist staff in determining what type of environmental documentation (i.e., Environmental Impact Report, Mitigated Negative Declaration, Negative Declaration or Exemption) will be required to be prepared for your application, per the California Environmental Quality Act (CEQA) and Title 19 of Carlsbad's Municipal Code. The clarity and accuracy of the information you provide is critical for purposes of quickly determining the specific environmental effects of your project. Any environmental studies (i.e., biological, cultural resource, traffic, noise) that are necessary to substantiate a "no impact" or "yes impact" determination should be submitted as an attachment to this Environmen~I Information Form. This is especially important when a Negative Declaration is being sought. The more information provided in this form, the easier and quicker it will be for staff to complete the Environmental Impact Assessment Form -Initial Study. P-1(D) Page 1 of 4 Revised 07/10 ENVIRONMENTAL INFORMATION FORM (To be Completed by Applicant) Date Filed: ___________ (To be completed by City) Application Number(s): URBINO MINOR SUB. DEV2020-0263 General Information 1. Name of project: URBINO MINOR SUBDIVISION 2. Name of developer or project sponsor: _A_rt_h_u_r _U_r_b_in_o __________ _ Address: 421 TAMARACK AVENUE City, State, Zip Code: Carlsbad, CA 92008 Phone Number: 858-774-8754 3. Name of person to be contacted concerning this project: _D_o_u_g_L_o_g_a_n ______ _ Address: 310 Via Vera Cruz, Suite 205 City, state, Zip code: San Marcos, Ca 92078 Phone Number: 858-775-8474 4. Address of Project: 3997 Park Drive, Carlsbad, CA 92008 Assessor's Parcel Number: 207-120-40 -------------------- 5. List and describe any other related permits and other public approvals required for this project, including those required by city, regional, state and federal agencies: NONE 6. Existing General Plan Land Use Designation: R-4 Residential, 0-4 units/ac. 7. Existing zoning district: R-1, One-Family Residential 8. Existing land use(s): _R_E_S_ID_E_N_T_IA_L _____________ _ 9. Proposed use of site (Project for which this form is filed): __________ _ 2 -LOT MINOR SUBDIVISION Project Description 10. Sitesize: 0.50-acre (21,800 Sq.ft) 11. Proposed Building square footage: _N_/_A _______________ _ 12: 13. 14. P-1(0) Number of floors of construction: N/ A ------------------ Amount of off-street parking provided: __ 0 ______________ _ Associated projects: __ N_/A ___________________ _ Page 2 of 4 Revised 07/10 15. If residential, include the number of units and schedule of unit sizes: ________ _ 2 -LOTS FOR S.F.R. APPROXIMATELY 4400 S.F. PER RESIDENCE 16. If commercial, indicate the type, whether neighborhood, city or regionally oriented, square footage of sales area, and loading facilities: ___________________ _ N/A 17. If industrial, indicate type, estimated employment per shift, and loading facilities: _____ _ N/A 18. If institutional, indicate the major function, estimated employment per shift, estimated occupancy, loading facilities, and community benefits to be derived from the project: _______ _ NIA 19. If the project involves a variance, conditional use or rezoning applications, state this and indicate clearly why the application is required: __________________ _ N/A P-1 (D) Page 3 of4 Revised 07 /10 Are the following items applicable to the project or its effects? Discuss all items checked yes (attach additional sheets as necessary). Yes No 20. Change in existing features of any bays, tidelands, beaches, or hills, or substantial O ~ alteration of ground contours. 21. Change in scenic views or vistas from existing residential areas or public lands or D ~ roads. 22. Change in pattern, scale or character of general area of project. D ~ 23. Significant amounts of solid waste or litter. D ~ 24. Change in dust, ash, smoke, fumes or odors in vicinity. D ~ 25. Change in ocean, bay, lake, stream or ground water quality or quantity, or D ~ alteration of existing drainage patterns. 26. Substantial change in existing noise or vibration levels in the vicinity. D ~ 27. Site on filled land or on slope of 10 percent or more. D ~ 28. Use of disposal of potentially hazardous materials, such as toxic substances, D ~ flammables or explosives. 29. Substantial change in demand for municipal services (police, fire, water, sewage, D ~ etc.). 30. Substantially increase fossil fuel consumption (electricity, oil, natural gas, etc.). D ~ 31. Relationship to a larger project or series of projects. D ~ Environmental Setting Attach sheets that include a response to the following questions: 32. Describe the project site as it exists before the project, including information on topography, soil stability, plants and animals, and any cultural, historical or scenic aspects. Describe any existing structures on the site, and the use of the structures. Attach photographs of the site. Snapshots or Polaroid photos will be accepted. 33. Describe the surrounding properties, including information on plants and animals and any cultural, historical or scenic aspects. Indicate the type of land use (residential, commercial, etc.), intensity of land use (one-family, apartment houses, shops, department stores, etc.), and scale of development (height, frontage, set-back, rear yard, etc.). Attach photographs of the vicinity. Snapshots or polaroid photos will be accepted. Certification I hereby certify that the statements furnished above and in the attached exhibits present the data and information required for this initial evaluation to the best of my ability, and t t the facts, statements, and information presented are true and correct to the best of my knowledg a r Date: _7_---=--\ \_ .... _..l ....... )""""• __ Signature: For: P-1 (D) Page 4 of 4 Revised 07/10 ENVIRONMENTAL SETTING 32. This is an existing .053 ac lot with one existing residence. The lot has been developed as such for many years. The lot has a slope of approximately 8% from Park Drive Westerly. There are no cultural or any other significant environmental issues. 33. All the surrounding properties one very similar, i.e., existing single-family residences with no significant environmental issues or impacts. •· -------------r ~, ______________ ,., ~-------------.. Development Services Planning Division 1635 Faraday Avenue 760-602-4610 www.carlsbadca.gov PURPOSE CLIMATE ACTION PLAN CONSISTENCY CHECKLIST P-30 CCityof Carlsbad In September 2015, the City of Carlsbad adopted a Climate Action Plan (CAP) that outlines actions that the city will undertake to achieve its proportional share of state greenhouse gas (GHG) emissions reductions. This checklist contains measures that are required to be implemented on a project-by-project basis to ensure that the specified emissions targets identified in the Climate Action Plan (CAP) are achieved. Implementation of these measures will ensure that new development is consistent with the CAP's assumption for relevant CAP strategies toward achieving the identified greenhouse gas (GHG) reduction targets. In this manner, a project's incremental contribution to a cumulative GHG emissions effect may be determined not to be cumulatively considerable if it complies with the requirements of the CAP, in accordance with CEQA Guidelines Sections 15064(h)(3), 15130(d), and 15183(b).* *City staff are currently not assessing the greenhouse gas impacts of California Environmental Quality Act projects by using the Climate Action Plan as a qualified GHG reduction plan under CEQA section 15183.S(b). Please consult with the Planning Department for further guidance. Additional information may be found on the Climate Action Plan Update and Vehicle Miles Traveled calculations staff report. This checklist is intended to assist project applicants in identifying CAP ordinance requirements and demonstrate how their project fulfills those requirements. This checklist is to be completed and included in applications for new development projects that are subject to discretionary review or require a building permit. APPLICATION SUBMITTAL REQUIREMENTS • The completed checklist must be included in the project submittal package or building permit application. Application submittal procedures can be found on the City of Carlsbad website. This checklist is designed to assist the applicant in identifying the minimum CAP-related requirements specific to their project. However, it may be necessary to supplement the completed checklist with supporting materials, calculations or certifications, to demonstrate full compliance with CAP requirements. For example, projects that propose or require a performance approach to comply with energy-related measures will need to attach to this checklist separate calculations and documentation as specified by the ordinances. • If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required by ordinance, an explanation must be provided to the satisfaction of the Planning Division or building official. • The requirements in the checklist will be included in the project's conditions of approval or issuance of building permit. • Details on CAP ordinance requirements are available on the city's website. P-30 Page 1 of 7 Revised 07/21 City of Carlsbad Climate Actio Plan Consistency Checklist STEP 1: LAND USE CONSISTENCY The first step in determining CAP consistency for discretionary development is to assess the project's consistency with the growth projections used in the development of the CAP. This section allows the city to determine a project's consistency with the land use assumptions used in the CAP. Projects found not to be consistent with the CAP's land use assumptions and that are projected to emit at or above the CAP screening threshold of 900 metric tons of CO2 equivalent (MTCO2e) GHG will be subject to a project-specific analysis of GHG emissions' impact on the environment in accordance with the requirements of the California Environmental Quality Act (CEQA). This may result in GHG-reducing mitigation measures applied as a condition of project approval in addition to compliance with the CAP ordinance requirements identified in Step 2 of this checklist. (Check the appropriate box and provide an explanation and supporting documentation for your answer) A. Is the proposed project consistent with the existing General Plan land use and specific/master plan or zoning designations? OR, If the proposed project is not consistent with the existing land use plan and zoning designations, does the project include a land use plan and/or specific plan, master plan or zoning designation amendment that would result in an equivalent or less GHG-intensive project when compared to the existing designations? Yes No □ If "Ye~', proceed to Step 2 of the checklist. For the second option under Question A above, provide estimated project-related GHG emissions under both existing and proposed designation(s) for comparison. GHG emissions must be estimated in accordance with the City of Carlsbad Guidance to Demonstrating Consistency with the Climate Action Plan. If "No", proceed to Question B. B. The CAP established a screening threshold of 900 MTC02e/year for new development projects to assist in determining consistency with the CAP. The types and sizes of typical projects listed below have been determined to correspond to the CAP screening threshold. Will the proposed land use change result in the construction of less than any one of the following? • Single-Family Housing: 50 dwelling units • Multi-Family Housing: 70 dwelling units • Office: 35,000 square feet • Retail Store: 11,000 square feet • Grocery Store: 6,300 square feet • Other: If the proposed project is not one of the above types, provide a project-specific GHG emissions analysis to determine whether it is below the 900 MTC02e/year screening threshold. If "Yes", proceed to Step 2 of the checklist. □ □ If "No'', the project's GHG impact is potentially significant and must be analyzed in accordance with CEOA. Applicant must prepare a Self-developed GHG emissions reduction program in accordance with the City of Carlsbad Guidance to Demonstrating Consistency with the Climate Action Plan to demonstrate how it would offset the increase in emissions over the existing designations. The project must incorporate each of the applicable measures identified in Step 2 to mitigate cumulative GHG emissions impacts unless the decision maker finds that a measure is infeasible in accordance with California Environmental Quality Act Guidelines Section 15091. Mitigation in lieu of or in addition to the measures in Step 2 may be required, depending on the results of the project-specific GHG impact analysis. Proceed and complete a project-specific Self-developed GHG emissions reduction program and Step 2 of the Checklist. P-30 Page 2 of 7 Revised 07/21 City of Carlsbad Climate Action Ian Consistency Checklist STEP 2: CAP ORDINANCE COMPLIANCE REQUIREMENTS Completion of this checklist will document a project's compliance with CAP ordinances, and in turn, demonstrate consistency with the applicable measures and actions of the CAP. The compliance requirements in this Step 2 apply to development projects that require a building permit. All other development projects shall implement all emissions-related mitigation measures from the General Plan Update EIR. Project No./Name: Property Address/APN: Applicant Name/Co.: Applicant Address: Contact Phone: URBINO MINOR SUBDIVISION 3997 Park Drive, Carlsbad, CA 92008 APN: 207-120-40-00 Arthur Urbino 421 Tamarack Avenue. Carlsbad. CA 92008 858-77 4-8754 Contact Email : hurbino@earthlink.net Contact information of person completing this checklist (if different than above): Name: Company name/address: Doug Logan Contact Phone: Rancho Coastal Engineering & Surveying, Inc .. 310 V. V C S 205 Contact Email: 1a era ruz. te San Marcos CA 92078 858-775-8474 Doug@RCESD com Use the table below to determine which sections of the Ordinance Compliance checklist are applicable to your project. If your project includes alterations or additions to an existing building, please contact the Carlsbad Building Division for assistance in estimating building permit valuation, by phone at 760-602-2719 or by email at building@carlsbadca.gov. □ Alterations: □ BPV < $60,000 □ BPV ~ $60,000 □ Electrical service panel upgrade □ BPV ~ $200,000 □ New construction □ Alterations: P-30 N/A lA and 4A 4A lA and 4A Page 3 of 7 All residential alterations 1-2 family dwellings and townhouses with attached garages only Multi-family dwellings only where interior finishes are removed and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed Revised 07/21 City of Carlsbad Climate Action Plan Consistency Checklist □ BPV 2!: $200,000 or additions 2!: 1B,5 1,000 square feet □ BPV 2!: $1,000,000 18, 28 and 5 Building alterations of~ 75% existing gross floor area □ ~ 2,000 sq. ft. new roof addition 28 and 5 18 also applies if BPV i!! $200,000 Please refer to Carlsbad Ordinance No. CS-347 and the California Green Building Standards Code (CALGreen) for more information when completing this section. A. D Residential addition or alteration i!! $60,000 building permit valuation. l!!I N/A __________ _ See Ord. CS-347, Section 8. D Exception: Home energy score i!! 7 Year Built Single-family Requirements D Before 1978 Select one: D Duct sealing D Attic insulation □Cool roof D 1978 and later Select one: D Lighting package D Water heating package D Between 1978 and 1990 D 1991 and later B. D Nonresidential* new construction or alterations i!! $200,000 building permit valuation, or additions i!! 1,000 square feet See CALGreen Appendix AS, Discussion AS.2, as amended in CS-347, Section 3. AS.203.1.1.1 D Outdoor lighting: .90 Allowed Outdoor Lighting Power AS.203.1.1.2 □ Restaurant service water heating (comply with California Energy Code Section 140.5, as amended) AS.203.1.2.1 Choose one as applicable: D .95 Energy budget D .90 Energy budget AS.211.1.** D On-site renewable energy AS.211.3** D Green power (if offered by local utility provider, 50% minimum renewable sources) AS.212.1 D Elevators and escalators AS.213.1 D Steel framin P-30 Page 4 of 7 (attach certification) Multi-family Requirements D Attic insulation Select one: D Attic insulation D Duct Sealing □Cool roof Select one: D Lighting package D Water heating package l!!I N/A _________ _ D N/A □ N/A D N/A D N/A D N/A D N/A Revised 07/21 City of Carlsbad Climate Action Plan Consistency Checklist □ N/A * Includes hotels/motels and high-rise residential buildings •• For alterations~ $1,000,000 BPV and affecting> 75% existing gross floor area, or alterations that add 2,000 square feet of new roof addition: comply with California Energy Code section 120.10 instead. A. [81 Residential new construction (for building permit applications submitted after 1/1/20). Refer to 2019 California Energy Code section 150.l(c) 14 for requirements. Note: if project includes installation of an electric heat pump water heater pursuant to Carlsbad ordinance CS-348, increase system size by .3kWdc if PV offset option is selected. Floor Plan ID (use additional CFA #d.u. Calculated kWdc* sheets if necessary) TPM -No building plans at this time Total System Size: kWdc = (CFAx.572) / 1,000 + (1.15 x #d.u.) *Formula calculation where CFA = conditional floor area, #du= number of dwellings per plan type If proposed system size is less than calculated size, please explain. Exception □ □ □ □ kWdc B. D Nonresidential new construction or alterations ~1,000,000 BPV and affecting ~75% existing floor area, or addition that inaeases roof area by ~.ooo square feet. Please refer to Carlsbad Ordinance CS-347, Section 6 when completing this section. Choose one of the following methods: □ Gross Floor Area (GFA) Method GFA: □ If< 10,000s.f. Enter: 5 kWdc Min. System Size: □ If~ 10,000s.f. calculate: 15 kWdc x (GFNl0,000) ** ___ kWdc **Round building size factor to nearest tenth, and round system size to nearest whole number. □ Time-Dependent Valuation Method Annual TDV Energy use:••• x .80= Min. system size: ____ kWdc ***Attach calculation documentation using modeling software approved by the california Energy Commission. P-30 Page 5 of 7 Revised 07/21 City of Carlsbad Climate Actio Plan Consistency Checklist A. ~ Residential and hotel/motel new construction Please refer to carlsbad Ordinance CS-347 and CS-348 when completing this section. 181 For systems serving individual dwelling units choose one: 181 Heat pump water heater AND compact hot water distribution AND drain water heat recovery (low-rise residential only) 0 Heat pump water heater AND PV system .3 kWdc larger than required in CA Energy Code Section 120.10 (for high rise residential hotel/motel) or 150.l(c) 14 (for low-rise residential) □ Heat pump water heater meeting Tier 3 or higher NEEA Advanced Water Heating Specification □ Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors □ Exception: □ For systems serving multiple dwelling units, install a central water-heating system with all of the following: □ Gas or propane water heating system □ Recirculation system per CS-347 (high-rise residential, hotel/motel) or CS-348 (low-rise residential) □ Solar water heating system that is either: □ .60 solar savings fraction or 40 s.f. solar collectors □ .40 solar savings fraction, plus drain water heat recovery □ Exception: 8. D Nonresidential new construction Please refer to Carlsbad Ordinance CS-347 when completing this section. □ Water heating system derives at least 40% of its energy from one of the following (attach documentation): □ Solar-thermal □ Photovoltaics □ Recovered energy □ Water heating system is (choose one): □ Heat pump water heater □ Electric resistance water heater(s) □ Solar water heating system with .40 solar savings fraction □ Exception: A. ~ Residential New construction and major alterations* Please refer to Carlsbad Ordinance CS-349 when completing this section. 181 One and two-family residential dwelling or townhouse with attached garage: 181 One EVSE ready parking space required □ Exception : □ Multi-family residential· □ Exception · Total Parking Spaces EVSE Spaces Proposed Capable I Ready I Calculations: Total ME spaces= .10 x Total parking (rounded up to nearest whole number) ME Installed= Total EVSE Spaces x .50 (rounded up to nearest whole number) EVSE other= Total EVSE spaces -ME Installed (EVSE other may be "Capable," "Ready" or "Installed.") I I Installed Total P-30 Page 6 of 7 Revised 07/21 City of Carlsbad Climate Action Plan Consistency Checklist *Major alterations are: (1) for one and two-family dwellings and townhouses with attached garages, alterations have a building permit valuation~ $60,000 or include an electrical service panel upgrade; (2) for multifamily dwellings (three units or more without attached garages), alterations have a building permit valuation~ $200,000, interior finishes are removed and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed. B. 0 Nonresidential new construction (includes hotels/motels) □ Exception : Total Parking Spaces EVSE Spaces Proposed Capable Ready Installed Total Calculation: Refer to the table below: Total Number of Parking Spaces provided Number of reQuired EV Spaces Number of required ME Installed Spaces □ 0-9 1 1 □ 10-25 2 1 □ 26-50 4 2 □ 51-75 6 3 □ 76-100 9 5 □ 101-150 12 6 □ 151-200 17 9 □ 201 and over 10 percent of total 50 percent of Required EV Spaces A List each proposed nonresidential use and gross floor area (GFA) allocated to each use. B. Employee ADT/1,000 square feet is selected from the Oty of Carlsbad Employee ADTTable. Use GFA Employee ADT/1,000 S.F. Total EmployeeADT Total If total employee ADT is greater than or equal to 110 employee ADT, a IDM plan is required. *NOTE: Notwithstanding the 110 employee ADT threshold above, General Plan Mobility Element Policy 3-P.11 requires new development that adds vehicle traffic to vehicle LOS-exempt street facilities to implement TDM and transportation system management strategies. Please consult with City of Carlsbad Land Development Engineering (LDE) staff to determine whether this policy applies to your project. TDM plan required: Yes □ No □ LDE Staff Verification: □ _____ (staff initials) P-30 Page 7 of 7 Revised 07/21 ( Cicyof Carlsbad I INSTRUCTIONS: STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue (760) 602-2750 www.carlsbadca.gov To address post-development pollutants that may be generated from development projects, the city requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMPs) into the project design per Carlsbad BMP Design Manual (BMP Manual). To view the BMP Manual, refer to the Engineering Standards (Volume 5). This questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to 'STANDARD PROJECT' requirements or be subject to 'PRIORITY DEVELOPMENT PROJECT' (PDP) requirements. Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you , this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the city. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A completed and signed questionnaire must be submitted with each development project application. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. PROJECT INFORMATION PROJECT NAME: URBINO MINOR SUBDIVISION PROJECT ID: DEV2020-0263 ADDRESS: 3997 Park Drive, Carlsbad, CA 92008 APN : 207-120-40-00 The project is (check one): 181 New Development D Redevelopment The total proposed disturbed area is: 14 753 ft2 ( Q 34 ) acres The total proposed newly created and/or replaced impervious area is: 8,500 ft2 ( 0.19 ) acres If your project is covered by an approved SWQMP as part of a larger development project, provide the project ID and the SWQMP # of the larger development project: Project ID SWQMP#: Then, go to Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your application to the city. E-34 Page 1 of 4 REV 03/19 STEP1 TO BE COMPLETED FOR ALL PROJECTS To determine if your project is a "development project", please answer the following question: YES NO Is your project LIMITED TO routine maintenance activity and/or repair/improvements to an existing building □ IZl or structure that do not alter the size (See Section 1.3 of the BMP Design Manual for guidance)? If you answered "yes" to the above question , provide justification below then go to Step 5, mark the third box stating "my project is not a 'development project' and not subject to the requirements of the BMP manual" and complete applicant information. Justification/discussion: (e.g. the project includes only interior remodels within an existing building): Demo (E) House, splitting the lot into 2-lots, and building 2 new single family residence. If you answered "no" to the above question, the project is a 'development project', go to Step 2. STEP2 TO BE COMPLETED FOR ALL DEVELOPMENT PROJECTS To determine if your project is exempt from PDP requirements pursuant to MS4 Permit Provision E.3.b.(3}, please answer the following questions: Is your project LIMITED to one or more of the following: YES NO 1. Constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria: a) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non- erodible permeable areas; OR □ ~ b) Designed and constructed to be hydraulically disconnected from paved streets or roads; OR c) Designed and constructed with permeable pavements or surfaces in accordance with USEPA Green Streets guidance? 2. Retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in □ IZl accordance with the USEPA Green Streets guidance? 3. Ground Mounted Solar Array that meets the criteria provided in section 1.4.2 of the BMP manual? □ ~ If you answered "yes" to one or more of the above questions, provide discussion/justification below, then go to Step 5, mark the second box stating "my project is EXEMPT from PDP ... " and complete applicant information. Discussion to justify exemption ( e.g. the project redeveloping existing road designed and constructed in accordance with the USEPA Green Street guidance): If you answered "no" to the above auestions, vour project is not exempt from PDP, go to Step 3. E-34 Page 2 of 4 REV 03/19 STEP3 TOBECOMPLETEDFORALLNEW R DEVELOP --• To determine if your project is a PDP, please answer the following questions (MS4 Permit Provision E.3.b.(1 )): YES NO 1. Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively over the entire project site? This includes commercial, industrial, residential, mixed-use, □ ~ and public development projects on public or private land. 2. Is your project a redevelopment project creating and/or replacing 5,000 square feet or more of impervious surface collectively over the entire project site on an existing site of 10,000 square feet or □ ~ more of impervious surface? This includes commercial, industrial, residential, mixed-use, and public development Proiects on oublic or Private land. 3. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and □ ~ refreshment stands selling prepared foods and drinks for immediate consumption (Standard Industrial Classification (SIC) code 5812). 4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a hillside development project? A hillside □ ~ development project includes development on anv natural slope that is twentv-five percent or areater. 5. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a parking lot? A parking lot is □ ~ a land area or facility for the temporary parking or storage of motor vehicles used personally for business or for commerce. 6. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious street, road, highway, freeway or driveway surface collectively over the entire project □ ~ site? A street, road, highway, freeway or driveway is any paved impervious surface used for the transportation of automobiles, trucks, motorcvcles, and other vehicles. 7. Is your project a new or redevelopment project that creates and/or replaces 2,500 square feet or more of impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive Area (ESA)? "Discharging Directly to" includes flow that is conveyed overland a distance of · □ ~ 200 feet or less from the project to the ESA , or conveyed in a pipe or open channel any distance as an isolated flow from the project to the ESA (i.e. not comminaled with flows from adiacent lands).* 8. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface that supports an automotive repair shop? An automotive repair □ ~ shop is a facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013, 5014, 5541 , 7532-7534, or 7536-7539. 9. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious area that supports a retail gasoline outlet (RGO)? This category includes □ ~ RGO's that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (ADT) of 100 or more vehicles per dav. 10. Is your project a new or redevelopment project that results in the disturbance of one or more acres of land □ ~ and are expected to generate pollutants post construction? 11 . Is your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of impervious surface or (2) increases impervious surface on the property by more than 10%? (CMC □ ~ 21 .203.040) If you answered "yes" to one or more of the above questions, your project is a PDP. If your project is a redevelopment project, go to step 4. If your project is a new project, go to step 5, check the first box stating "My project is a PDP ... " and complete applicant information. If you answered "no" to all of the above questions, your project is a 'STANDARD PROJECT.' Go to step 5, check the second box statina "Mv proiect is a 'STANDARD PROJECT' ... " and complete applicant information. E-34 Page 3 of 4 REV 03/19 STEP4 TO BE COMPLETED FOR REDEVELOPMENT PROJECTS THAT ARE PRIORITY DEVELOPMENT PROJECTS (PDP) ONLY Complete the questions below regarding your redevelopment project (MS4 Permit Provision E.3.b.(2)): YES NO Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than 50% of the surface area of the previously existing development? Complete the percent impervious calculation below: Existing impervious area (A) = 3 660 sq. ft. □ 181 Total proposed newly created or replaced impervious area (8) = NIA sq. ft. Percent impervious area created or replaced (B/A)*100 = ~lA % If you answered "yes", the structural BMPs required for PDP apply only to the creation or replacement of impervious surface and not the entire development. Go to step 5, check the first box stating "My project is a PDP ... " and complete applicant information. If you answered "no," the structural BM P's required for PDP apply to the entire development. Go to step 5, check the check the first box stating "My project is a PDP ... " and complete aoolicant information. STEPS CHECK THE APPROPRIATE BOX AND COMPLETE APPLICANT INFORMATION D My project is a PDP and must comply with PDP stormwater requirements of the BMP Manual. I understand I must prepare a Storm Water Quality Management Plan (SWQMP) for submittal at time of application. 181 My project is a 'STANDARD PROJECT' OR EXEMPT from PDP and must only comply with 'STANDARD PROJECT' stormwater requirements of the BMP Manual. As part of these requirements, I will submit a "Standard Project Requirement Checklist Form E-36' and incorporate low impact development strategies throughout my project. Note: For projects that are close to meeting the PDP threshold, staff may require detailed impervious area calculations and exhibits to verify if 'STANDARD PROJECT' stormwater requirements apply. D My Project is NOT a 'development project' and is not subject to the requirements of the BMP Manual. Applicant Information and Signature Box Applicant Name: Arthur Urbino Applicant Title: OWNER ~ s:~ ,/l\/"12 Applicant Signature: Date: ,- • Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) Impa1red water bodies; areas designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their equivalent under the Multi Species Conservation Program within the Cities and County of San Diego; Habitat Management Plan; and any other equivalent environmentally sensitive areas which have been identified by the City. This Box for City Use Only YES NO City Concurrence: □ □ By: Date: Project ID: E-34 Page 4 of 4 REV 03/19 { Cicyof Carlsbad STANDARD PROJECT REQUIREMENT CHECKLIST E-36 Project Information Project Name: URBINO MINOR SUBDIVISION Project ID: DEV2020-0263 DWG No. or Building Permit No.: Source Control BMPs Development Services Land Development Engineering 1635 Faraday Avenue {760) 602-2750 www.carlsbadca.gov All development projects must implement source control BMPs SC-1 through SC-6 where applicable and feasible. See Chapter 4 and Appendix E.1 of the BMP Design Manual (Volume 5 of City Engineering Standards) for information to implement source control BMPs shown in this checklist. Answer each category below pursuant to the following. • "Yes" means the project will implement the source control BMP as described in Chapter 4 and/or Appendix E.1 of the Model BMP Design Manual. Discussion/justification is not required. • "No" means the BMP is applicable to the project but it is not feasible to implement. Discussion/justification must be provided . Please add attachments if more space is needed . • "N/A" means the BMP is not applicable at the project site because the project does not include the feature that is addressed by the BMP (e.g., the project has no outdoor materials storage areas). Discussion/justification may be provided. Source Control Requirement Applied? SC-1 Prevention of Illicit Discharges into the MS4 [!)Yes □No □ N/A Discussion/justification if SC-1 not implemented: SC-2 Storm Drain Stenciling or Signage [!)Yes □ No □ N/A Discussion/justification if SC-2 not implemented: SC-3 Protect Outdoor Materials Storage Areas from Rainfall, Run-On, Runoff, and Wind I!) Yes □No □ N/A Dispersal Discussion/justification if SC-3 not implemented: E-36 Page 1 of 4 Revised 09/16 (J Source Couuol Reaulrement (continued) Annlled? SC-4 Protect Materials Stored in Outdoor Work Areas from Rainfall, Run-On, Runoff, and OOYes D No □ N/A Wind Dispersal Discussion/justification if SC-4 not implemented: SC-5 Protect Trash Storage Areas from Rainfall, Run-On, Runoff, and Wind Dispersal OOYes □ No □ N/A Discussion/justification if SC-5 not implemented: SC-6 Additional BMPs based on Potential Sources of Runoff Pollutants must answer for each source listed below and identify additional BMPs. (See Table in Appendix E.1 of BMP Manual for guidance). □ On-site storm drain inlets □Yes Iii No Iii N/A D Interior floor drains and elevator shaft sump pumps □Yes I!] No Iii N/A □ Interior parking garages □Yes 00 No Iii N/A □ Need for future indoor & structural pest control □Yes 00 No Iii N/A □ Landscape/Outdoor Pesticide Use □Yes 00 No Iii N/A □ Pools, spas, ponds, decorative fountains, and other water features □Yes 00 No Iii N/A □ Food service □Yes 00 No Iii N/A □ Refuse areas □Yes 00 No Iii N/A □ Industrial processes □Yes 00 No Iii N/A □ Outdoor storage of equipment or materials OOYes □ No Iii N/A □ Vehicle and Equipment Cleaning OOYes □ No Iii N/A □ Vehicle/Equipment Repair and Maintenance 00 Yes □ No Iii N/A □ Fuel Dispensing Areas □Yes 00 No Iii N/A □ Loading Docks □Yes 00 No Iii N/A □ Fire Sprinkler Test Water □Yes 00 No Iii N/A □ Miscellaneous Drain or Wash Water □Yes 00 No Iii N/A □ Plazas, sidewalks, and parkinQ lots □Yes 00 No 1i1 N/A For "Yes" answers, identify the additional BMP per Appendix E.1 . Provide justification for "No" answers. E-36 Page 2 of 4 Revised 09/16 .. () Site Design BMPs All development projects must implement site design BMPs SD-1 through SD-8 where applicable and feasible. See Chapter 4 and Appendix E.2 thru E.6 of the BMP Design Manual (Volume 5 of City Engineering Standards) for information to implement site design BMPs shown in this checklist. Answer each category below pursuant to the following. • "Yes" means the project will implement the site design BMPs as described in Chapter 4 and/or Appendix E.2 thru E.6 of the Model BMP Design Manual. Discussion / justification is not required. • "No" means the BMPs is applicable to the project but it is not feasible to implement. Discussion/justification must be provided. Please add attachments if more space is needed. • "N/A" means the BMPs is not applicable at the project site because the project does not include the feature that is addressed by the BMPs (e.g., the project site has no existing natural areas to conserve). Discussion/justification may be provided. Site Design Requirement I Applied? SD-1 Maintain Natural Drainage Pathways and Hydrologic Features I l!l Yes I □ No ID N/A Discussion/justification if SD-1 not implemented: SD-2 Conserve Natural Areas, Soils, and Vegetation I [!]Yes I □ No I □ N/A Discussion/justification if SD-2 not implemented: SD-3 Minimize Impervious Area I !!]Yes I □ No I □ N/A Discussion/justification if SD-3 not implemented: SD-4 Minimize Soil Compaction I l!J Yes I □ No ID N/A Discussion/justification if SD-4 not implemented: SD-5 Impervious Area Dispersion I l!l Yes I D No ID N/A Discussion/justification if SD-5 not implemented: E-36 Page 3 of 4 Revised 09/16 ' ~ Site Design Reaulrement (continued) I Applied? SD-6 Runoff Collection I OOYes I □No I □ N/A Discussion/justification if SD-6 not implemented: SD-7 LandscapinQ with Native or Drought Tolerant Species I 00 Yes I □ No ID N/A Discussion/justification if SD-7 not implemented: SD-8 HarvestinQ and UsinQ Precipitation I 00 Yes I □ No ID NIA Discussion/justification if SD-8 not implemented: E-36 Page 4 of 4 Revised 09/16 FNTG • ' BUILDER SERVICES HI A TITL Fidelity ational Titl (I Comrnonwatti 2365 Northside Drive, Suite 600 San Diego, CA 92108 Phone: (619) 521-3500 Fax: (619) 521 -3608 Issuing Policies of Chicago Title Insurance Company ORDER NO.: 00135990-996-SD1-RT4 Arthur Urbino 421 Tamarack Ave Carlsbad, CA 92008 ATTN: Arthur Urbino Email: hurbino@earthlink.net REF: PHOPERTY: 3997 PARK DRIVE, CARLSBAD, CA Escrow/Customer Phone: (619) 521-3500 Title Officer: Theresa Robertson Title Officer Phone: (619) 521-3552 Title Officer Fax: (619) 521-3608 Title Officer Email: theresa.robertson@ctt.com ECEIV-D FEBO 1 2022 CITY OF CARLSBAD FIRST AMENDED PRELIMINARY~ G DIVISIUII\J In response to the application for a policy of title insurance referenced herein, Chicago Title Company hereby reports that it is prepared to issue, or cause to be issued, as of the date hereof, a policy or policies of title insurance describing the land and the estate or interest therein hereinafter set forth, insuring against loss which may be sustained by reason of any defect, lien or encumbrance not shown or referred to as an exception herein or not excluded from coverage pursuant to the printed Schedules, Conditions and Stipulations or Conditions of said policy forms. The printed Exceptions and Exclusions from the coverage and Limitations on Covered Risks of said policy or policies are set forth in Attachment One. The policy to be issued may contain an arbitration clause. When the Amount of Insurance is less than that set forth in the arbitration clause, all arbitrable matters shall be arbitrated at the option of either the Company pr the Insured as the exclusive remedy of the parties. Limitations on Covered Risks applicable to the CL TA and ALTA Homeowner's Policies of Title Insurance which establish a Deductible Amount and a Maximum Dollar Limit of Liability for certain coverages are also set forth in Attachment One. Copies of the policy forms should be read. They are available from the office which issued this report. This report (and any supplements or amendments hereto) is issued solely for the purpose of facilitating the issuance of a policy of title insurance and no liability is assumed hereby. If it is desired that liability be assumed prior to the issuance of a policy of title insurance, a Binder or Commitment should be requested. The policy(s) of title insurance to be issued hereunder will be policy(s) of Chicago Title Insurance Company, a Florida corporation. Please read the exceptions shown or referred to herein and the exceptions and exclusions set forth in Attachment One of this report carefully. The exceptions and exclusions are meant to provide you with notice of matters which are not covered under the terms of the title insurance policy and should be carefully considered. It is important to note that this preliminary report is not a written representation as to the condition of title and may not list a/I liens, defects and encumbrances affecting title to the land. Chicago Title Company lly. ~ By:--~----- A'ITEST Prnidc.111 Sttrctary CL TA Preliminary Report Form -Modified (11/17/06) Page 1 Authorized Signature CL TA Preliminary Report Form -Modified { 11 /17 /06) Page2 F N T G ;,~'. CHICAGOTITLE • Flddtty Natlollal 11tle" BUILDER SERVICES ti Connon.llllllh· PRELIMINARY REPORT EFFECTIVE DATE: November 10, 2021 at 7:30 a.m. ORDER NO.: 00135990-996-SD1-RT4 The form of policy or policies of title insurance contemplated by this report is: Guarantee 2365 Northside Drive, Suite 600 San Diego, CA 92108 Phone: (619) 521-3500 Fax: (619) 521-3608 1. THE ESTATE OR INTEREST IN THE LAND HEREINAFTER DESCRIBED OR REFERRED TO COVERED BY THIS REPORT IS: AFEE 2. TITLE TO SAID ESTATE OR INTEREST AT THE DATE HEREOF IS VESTED IN: ARTHUR URBINO and HEMINA URBINO, Trustees of The Urbino Family Trust dated April 29, 2003 and as restated August 3, 2017 3. THE LAND REFERRED TO IN THIS REPORT IS DESCRIBED AS FOLLOWS: See Exhibit A attached hereto and made a part hereof. CL TA Preliminary Report Form -Modified (11/17/06) Page3 PRELIMINARY REPORT YOUR REFERENCE: EXHIBIT "A" LEGAL DESCRIPTION Chicago Title Company ORDER NO.: 00135990-996-SD1-RT4 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE CITY OF CARLSBAD, IN THE COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: THE SOUTHWESTERLY 109 FEET OF THE SOUTHEASTERLY 200 FEET OF LOT 7, IN BLOCK "G" OF BELLA VISTA, IN THE CITY OF CARLSBAD, COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, ACCORDING TO MAP THEREOF NO. 2152, FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY MARCH 7, 1929. APN: 207-120-40-00 Cl TA Preliminary Report Form -Modified (11/17/06) Page4 PRELIMINARY REPORT YOUR REFERENCE: EXCEPTIONS Chicago Title Company ORDER NO.: 00135990-996-SD1-RT4 AT THE DATE HEREOF, ITEMS TO BE CONSIDERED AND EXCEPTIONS TO COVERAGE IN ADDITION TO THE PRINTED EXCEPTIONS AND EXCLUSIONS IN SAID POLICY FORM WOULD BE AS FOLLOWS: A. Property taxes, which are a lien not yet due and payable, including any assessments collected with taxes to be levied for the fiscal year 2020-2021. B. The lien of supplemental or escaped assessments of property taxes, if any, made pursuant to the provisions of Chapter 3.5 (commencing with Section 75) or Part 2, Chapter 3, Articles 3 and 4, respectively, of the Revenue and Taxation Code of the State of California as a result of the transfer of title to the vestee named in Schedule A or as a result of changes in ownership or new construction occurring prior to Date of Policy. 1. Easement(s) for the purpose(s) shown below and rights incidental thereto, as granted in a document: Granted to: Purpose: Recording Date: Recording No: Affects: City of Carlsbad Public street and public utility January 23, 1995 as Instrument No. 1995-0028707, Official Records A portion of said land as more particularly described in said document. 2. A deed of trust to secure an indebtedness in the amount shown below, Amount: Dated: Trustor/Grantor Trustee: Beneficiary: Loan No.: Recording Date: Recording No: $672,000.00 September 20, 2018 Arthur Urbino and Hemina Urbino, Trustees of The Urbino Family Trust dated April 29, 2003 and as restated August 3, 2017 Olivia Todd U.S. Bank National Association, a National Bank 2200840861 October 3, 2018 as Instrument No. 2018-0410794, Official Records 3. A deed of trust to secure an indebtedness in the amount shown below, Amount: Dated: Trustor/Grantor Trustee: Beneficiary: Recording Date: Recording No: $85,854.00 January 25, 2019 Hemina Urbino and Arthur Urbino, Trustee(s) of the Urbino Family Trust dated x4 29, 2003 and as restate August 3, 2017 U.S. Bank Trust Company, National Association U.S. Bank National Association February 12, 2019 as Instrument No. 20190049611, Official Records CLTA Preliminary Report Form -Modified (11/17/06) Page5 PRELIMINARY REPORT YOUR REFERENCE: EXCEPTIONS (Continued) Chicago Title Company ORDER NO.: 00135990-996-SD1-RT4 4. Any rights of the parties in possession of a portion of, or all of, said Land, which rights are not disclosed by the public records. The Company will require, for review, a full and complete copy of any unrecorded agreement, contract, license and/or lease, together with all supplements, assignments and amendments thereto, before issuing any policy of title insurance without excepting this item from coverage. The Company reserves the right to except additional items and/or make additional requirements after reviewing said documents. PLEASE REFER TO THE "INFORMATIONAL NOTES" AND "REQUIREMENTS" SECTIONS WHICH FOLLOW FOR INFORMATION NECESSARY TO COMPLETE THIS TRANSACTION. END OF EXCEPTIONS Cl TA Preliminary Report Form -Modified (11/17/06} Page6