Sprinkler Permit
6140 INNOVATION
Job Address:
WY
Permit Type: SPRINK
Parcel No: 2132621307
Lot #: 0
Reference No.:
Permit No: AS130066
Status: APPROVED
Applied 5/22/2013
Approved: 5/22/2013
Issued: 5/22/2013
PC #: Inspector:
Project Title: SPECIFIC PERFORMANCE INSTALLATION OF NEW
SPRINKLER HEADS/NEW WALLS
Applicant: Owner:
A & D FIRE SPRINKLERS PALOMAR AIRPORT ROAD LLC
11465 WOODSIDE AV C/O RYAN CO US INC/M JINDRA
SANTEE, CA 50 S 10TH ST #300
MINNEAPOLIS MN
619-448-1962
Fees ($) Add'I Fees ($) Total ($) Balance ($)
268 0 268 0
1/1
F rpm : 10/30/2013 07:33 #059 P.001/003
A ' Scoci copy
Contractor's Material and Test Certificate for Aboveground Piping
Lcartl.flitrate
completion of work, Inspection and tests shall be made by the contractor's representative and witnessed by an owner's representative.
ts shall be corrected and system left In service before contractor's personnel finally leave the job.
te shall be tilled cut and signed by both representatives. Copies shall be prepared for approving authorities, owners, and
r. It is understood the owner's reprásOntetive's signature In no way prejudIces anyclaim against contractor for faulty material, poor
ship, orfailure to comply with approvingauthority's requirements or localordinances.
ame Date k))z 1 i':
ddress
I Accepted by approving authorities (names) (.Ar I iicL I Address
Plans
Installation confornls to accepted plans WYes No
Equipment used Is approved zy~s ED No
If no explain deviations
Has person In charge of fire equipment been instruôtad as 4es E No
to location of control valves and care and maintenance
of this new equipment?
If no, explain?
Instructions Have copioá of the follOwing been left on the premises? Li Yes Ci No
System components Instructions Li Yes Ci No
Care and maintenance Instructions Ci Yes C] No
NFPA2S C] Yes C] No
Location of
system j Supplies buildings (QIL4O
Year of J Orifice I I Temperature
Make Model manufacture I i size J Quantity J rIiflg
1jce - Q. TYV Zb I IS
l'szfl Sprinklers
Pipe and
fittings
Alarm
valve or
110w
Indicator
Dry pipe
operating
test
W [4
of pipe rc.gAe_
of fittings
Maximum time to operate
Alarm device through test connection
Tvoe I Make I Model Minutes I Seconds
Make Model Serial no Make Model Serial no.
Time to trip Time water Alarm
through test Water Air Trip point reached operated
connection1 pressure pressure air pressure test outlet1 property
MInutes I Seconds psi psi psi MInutes Seconds Yes No
If no, explain
FIRE SPRINKLERS INC.
From 10/30/2013 07:33 #059 P.002/003
Operation Pneumatic Electric E Hydraulicr
Piping supervised Yes ED No Detecting media supervised
Does valve operate from the manual trip, remote, or both
control stations?
Deluge arid
preaction Is there an accessible facility in each circuit If no, explain
valves for testing?
Eyes c:JNo
O Yes O NO
O Yes 0 No
Does each circuit operate Does each circuit operate Maximum time to
Make Model supervision loss alarm? valve release? operate release
Yes No Yes No Minutes Second
Location Make and Setting Static pressure Residual pressure How rate
Pressure and floor model (flowing)
reducing inlet (psi) j Outlet (psi) inlet (psi) I Outlet (psi) Flow (gpm)
valve test
Hvrfrostatic: Hydrostatic tests shall be made at not less than 200 psi (13.6 bar) for 2 hours or 50 pal (3.4 bar)
above static pressure In excess of 150 psi (10.2 bar) for 2 hours. Differential dry-pipe valve clappers shall be left
Test open during the test to prevent damage. AN aboveground piping leakage shall be stopped.
description aaif Establish 40 psi (2.7 bar) air pressure and measure drop, which shalt not exceed 114 psi (0.1 bar)
In 24 hours. Test pressure tanks at normal water level and air pressure and measure air pressure drop, which shall
not exceed 1½ psi (0.1 bar) in 24 hours,
jr tttM.r (.
All piping hydrostatically tested at 60... psI (....__. bar) for _.!hoUrs If no, state reason
Dry piping pneumatically tested 0 Yes E] No
Equipment operates properly 0 Yes 0 No
D~Kes
ify as thesprinkler contractor that additives and corrosive chemicals, sodium silicate or derivatives
of ilicate, brine, or other corrosive chemicals were not used for testing systems or stopping leaks?
0 No
Drain Reading of gauge located near water Residual pressure with valve in test
Tests test supply test connection: psi ( bar) connection open w1de_psi ( bar)
Underground mains and lead In connections to system risers flushed before connection made
to sprinkler piping
Verified by copy of the U Form No. 858 0 Yes C3 No Other Explain
flushed by installer of underground
sprinkler piping 0 Yes O No
It powder-driven fasteners are used In concrete, has 0 Yes 0 No if no, explain
representative sample testing be satisfactorily
completed?
Blank testing Number used Locations Number removed
gaskets
Welding piping c: Yes
If yes...
Do you certify as the sprinkler contractor that welding procedures comply CJ Yes 0 No
with the requirements of at least AWS 62.1?
Welding Do you certify that the welding was performed by welders qualified in 0 Yes 0 No
compliance with the requirements of at least AWS B2.1?
Do you certify that the welding was carried out In compliance with a documented 0 Yes [J No
quality control procedure to ensure that all discs are retrieved, that openings
In piping are smooth, that slag and other welding residue are removed, and that
the internal diameters of piping are not penetrated?
Cutouts Do you certify that you have a control feature to ensure that t'Yes 0 No
(discs) allcutouts (discs) are retrieved?
FIRE SPRINKLERS INC.
F r m 10/30/2013 07:33 #059 P.003/003
Hydraulic
data
nameplate
Nameplate provided
D Yes EJ No
1 If no, explain I
Data left In service with all control valves open
Remarks
Name of sprinkler contractor
Tests witnessed by
Signatures For property owner (signed) Title Date
ntm.Ign F7 d) TitI... Date
ioJz/s2
Additional explanations and notes
FIRE SPRINKLERS INC.