Loading...
HomeMy WebLinkAbout6140 INNOVATION WAY; ; AS130066; Permit8/17/22, 4:53 PM AS 130066 Permit Data City of Carlsbad Sprinkler Permit 6140 INNOVATION Job Address: WY Permit Type: SPRINK Parcel No: 2132621307 Lot #: 0 Reference No.: Permit No: AS130066 Status: APPROVED Applied 5/22/2013 Approved: 5/22/2013 Issued: 5/22/2013 PC #: Inspector: Project Title: SPECIFIC PERFORMANCE INSTALLATION OF NEW SPRINKLER HEADS/NEW WALLS Applicant: Owner: A & D FIRE SPRINKLERS PALOMAR AIRPORT ROAD LLC 11465 WOODSIDE AV C/O RYAN CO US INC/M JINDRA SANTEE, CA 50 S 10TH ST #300 MINNEAPOLIS MN 619-448-1962 Fees ($) Add'I Fees ($) Total ($) Balance ($) 268 0 268 0 1/1 F rpm : 10/30/2013 07:33 #059 P.001/003 A ' Scoci copy Contractor's Material and Test Certificate for Aboveground Piping Lcartl.flitrate completion of work, Inspection and tests shall be made by the contractor's representative and witnessed by an owner's representative. ts shall be corrected and system left In service before contractor's personnel finally leave the job. te shall be tilled cut and signed by both representatives. Copies shall be prepared for approving authorities, owners, and r. It is understood the owner's reprásOntetive's signature In no way prejudIces anyclaim against contractor for faulty material, poor ship, orfailure to comply with approvingauthority's requirements or localordinances. ame Date k))z 1 i': ddress I Accepted by approving authorities (names) (.Ar I iicL I Address Plans Installation confornls to accepted plans WYes No Equipment used Is approved zy~s ED No If no explain deviations Has person In charge of fire equipment been instruôtad as 4es E No to location of control valves and care and maintenance of this new equipment? If no, explain? Instructions Have copioá of the follOwing been left on the premises? Li Yes Ci No System components Instructions Li Yes Ci No Care and maintenance Instructions Ci Yes C] No NFPA2S C] Yes C] No Location of system j Supplies buildings (QIL4O Year of J Orifice I I Temperature Make Model manufacture I i size J Quantity J rIiflg 1jce - Q. TYV Zb I IS l'szfl Sprinklers Pipe and fittings Alarm valve or 110w Indicator Dry pipe operating test W [4 of pipe rc.gAe_ of fittings Maximum time to operate Alarm device through test connection Tvoe I Make I Model Minutes I Seconds Make Model Serial no Make Model Serial no. Time to trip Time water Alarm through test Water Air Trip point reached operated connection1 pressure pressure air pressure test outlet1 property MInutes I Seconds psi psi psi MInutes Seconds Yes No If no, explain FIRE SPRINKLERS INC. From 10/30/2013 07:33 #059 P.002/003 Operation Pneumatic Electric E Hydraulicr Piping supervised Yes ED No Detecting media supervised Does valve operate from the manual trip, remote, or both control stations? Deluge arid preaction Is there an accessible facility in each circuit If no, explain valves for testing? Eyes c:JNo O Yes O NO O Yes 0 No Does each circuit operate Does each circuit operate Maximum time to Make Model supervision loss alarm? valve release? operate release Yes No Yes No Minutes Second Location Make and Setting Static pressure Residual pressure How rate Pressure and floor model (flowing) reducing inlet (psi) j Outlet (psi) inlet (psi) I Outlet (psi) Flow (gpm) valve test Hvrfrostatic: Hydrostatic tests shall be made at not less than 200 psi (13.6 bar) for 2 hours or 50 pal (3.4 bar) above static pressure In excess of 150 psi (10.2 bar) for 2 hours. Differential dry-pipe valve clappers shall be left Test open during the test to prevent damage. AN aboveground piping leakage shall be stopped. description aaif Establish 40 psi (2.7 bar) air pressure and measure drop, which shalt not exceed 114 psi (0.1 bar) In 24 hours. Test pressure tanks at normal water level and air pressure and measure air pressure drop, which shall not exceed 1½ psi (0.1 bar) in 24 hours, jr tttM.r (. All piping hydrostatically tested at 60... psI (....__. bar) for _.!hoUrs If no, state reason Dry piping pneumatically tested 0 Yes E] No Equipment operates properly 0 Yes 0 No D~Kes ify as thesprinkler contractor that additives and corrosive chemicals, sodium silicate or derivatives of ilicate, brine, or other corrosive chemicals were not used for testing systems or stopping leaks? 0 No Drain Reading of gauge located near water Residual pressure with valve in test Tests test supply test connection: psi ( bar) connection open w1de_psi ( bar) Underground mains and lead In connections to system risers flushed before connection made to sprinkler piping Verified by copy of the U Form No. 858 0 Yes C3 No Other Explain flushed by installer of underground sprinkler piping 0 Yes O No It powder-driven fasteners are used In concrete, has 0 Yes 0 No if no, explain representative sample testing be satisfactorily completed? Blank testing Number used Locations Number removed gaskets Welding piping c: Yes If yes... Do you certify as the sprinkler contractor that welding procedures comply CJ Yes 0 No with the requirements of at least AWS 62.1? Welding Do you certify that the welding was performed by welders qualified in 0 Yes 0 No compliance with the requirements of at least AWS B2.1? Do you certify that the welding was carried out In compliance with a documented 0 Yes [J No quality control procedure to ensure that all discs are retrieved, that openings In piping are smooth, that slag and other welding residue are removed, and that the internal diameters of piping are not penetrated? Cutouts Do you certify that you have a control feature to ensure that t'Yes 0 No (discs) allcutouts (discs) are retrieved? FIRE SPRINKLERS INC. F r m 10/30/2013 07:33 #059 P.003/003 Hydraulic data nameplate Nameplate provided D Yes EJ No 1 If no, explain I Data left In service with all control valves open Remarks Name of sprinkler contractor Tests witnessed by Signatures For property owner (signed) Title Date ntm.Ign F7 d) TitI... Date ioJz/s2 Additional explanations and notes FIRE SPRINKLERS INC.