HomeMy WebLinkAbout6683 PEREGRINE PL; ; FPR2017-0341; Permit:J iIIfli1II}4I
Ccity of
Carlsbad
Print Date: 08/29/2022 Permit No: FPR2017-0341
Job Address: 6682 PEREGRINE PL, CARLSBAD, CA 92011 Status: Closed - Finaled
Permit Type: FIRE-Construction Residential Work Class: Single Family Fire Sprinkl
Parcel #: 2150432200 Track #: Applied: 10/05/2017
Valuation: $498,203.00 Lot #: Issued: 12/01/2017
Occupancy Group: Project #: DEV05095 Finaled Close Out: 03/08/2021
#of Dwelling Units: Plan #:
Bedrooms: Construction Type: Final Inspection:
Bathrooms: Orig. Plan Check #: INSPECTOR: Workman, Carisa
Plan Check #: Fieri, Dominic
Project Title: SEASCAPE
Description: SEASCAPE AT AVENA CT: SPRINKLER (PLAN 3 / LOT 9) -PHASE 1
FEE AMOUNT
FIRE NFPA 13D Single Family System (lnsp/Bldg) $121.00
FIRE NFPA 13D Single Family System (Plan Review) $239.00
Total Fees: $360.00 Total Payments To Date: $360.00 Balance Due: $0.00
Fire Department Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 1 760-602-4665 1 760-602-8561 f I www.carlsbadca.gov
j97 2or7-- O34
MCMAHON FIRE PROTECTION INC
P0 BOX 27116
SAN DIEGO CA. 92198
HYDRAULIC CALCULATIONS
FOR
Plan 3: Lot
Seascape At Avena Ct
Peregrine Ct
Carlsbad Ca. 92011
FILE NUMBER: 2017
DATE: October 1, 2017
-DESIGN DATA-
OCCUPANCY CLASSIFICATION:
DENSITY:
AREA OF APPLICATION:
COVERAGE PER SPRINKLER:
NUMBER OF SPRINKLERS CALCULATED:
TOTAL SPRINKLER WATER FLOW REQUIRED:
TOTAL WATER REQUIRED (INCLUDING HOSE):
FLOW AND PRESSURE (@ BOR):
SPRINKLER ORFICE SIZE:
NAME OF CONTRACTOR:
DESIGN/LAYOUT BY:
AUTHORITY HAVING JURISDICTION:
CONTRACTOR CERTIFICATION NUMBER:
R3
.05 GPM/ SQ.FT.
2 SPRINKLERS
256 SQ. FT.
2 SPRINKLERS: Master Bedroom
26 GPM
31 GPM
31 GPM@ 31.5 PSI
7/16 INCH
MCMAHON FIRE PROTECTION INC.
T. MCMAHON
City Of Carlsbad
1025457 C-16
CALCULATIONS BY HASS COMPUTOR PROGRAM
HRS SYSTEMS, INC.
SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 1
DATE: 9/23/2017 C:\PROGRAM FILES\HASSDATA\SEASCAPE PLAN 3.SDF
JOB TITLE: seascape plan 3
WATER SUPPLY DATA
SOURCE STATIC RESID. FLOW AVAIL. TOTAL REQ'D
NODE PRESS. PRESS. @ PRESS. @ DEMAND PRESS.
TAG (PSI) (PSI) (GPM) (PSI) (GPM) (PSI)
1 74.7 20.0 1100.0 74.6 31.2 61.5
AGGREGATE FLOW ANALYSIS:
TOTAL FLOW AT SOURCE 31.2 GPM
TOTAL HOSE STREAM ALLOWANCE AT SOURCE 0.0 GPM
OTHER HOSE STREAM ALLOWANCES 5.0 GPM
TOTAL DISCHARGE FROM ACTIVE SPRINKLERS 26.2 GPM
NODE ANALYSIS DATA
NODE TAG ELEVATION NODE TYPE PRESSURE DISCHARGE
(FT) (PSI) (GPM)
1 332.0 SOURCE 61.5 31.2
2 335.0 - - - - 50.3 - - -
3 335.0 - - - - 46.3 - - -
4 335.0 - - - - 46.1 - - -
5 335.0 - - - - 34.1 - - -
6 335.0 HOSE STREAM 31.5 5.0
7 344.0 - - - - 22.7 - - -
8 348.0 - - - - 20.5 - - -
9 348.0 - - - - 16.6 - - -
10 358.0 - - - - 10.4 - - -
11 358.0 - - - - 8.0 - - -
Si 358.0 K= 4.90 7.2 13.2
S2 358.0 K= 4.90 7.0 13.0
SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 2
DATE: 9/23/2017 C:\PROGRAM FILES\HASSDATA\SEASCAPE PLAN 3.SDF
JbB TITLE: seascape plan 3
PIPE DATA
PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS.
END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM.
NODES (FT) (K) (PSI) (GPM) FL/FT (PSI)
Pipe: 1 31.2 0.995 Pb 30.00 PF 9.9
1 332.0 SRCE 61.5 (N/A) 12.9 150 FTG ETG PE -1.3
2 335.0 0.0 50.3 0.0 0.253 TL 39.00 PV
Pipe: 2 FIXED PRESSURE LOSS DEVICE
2 335.0 0.0 50.3 0.0 4.0 psi, 31.2 gpm
3 335.0 0.0 46.3 0.0
Pipe: 3 31.2 1.025 PL 1.00 PF 0.2
3 335.0 0.0 46.3 0.0 12.1 150 FTG ---- PE 0.0
4 335.0 0.0 46.1 0.0 0.219 TL 1.00 PV
Pipe: 4 FIXED PRESSURE LOSS DEVICE
4 335.0 0.0 46.1 0.0 12.0 psi, 31.2 gpm
5 335.0 0.0 34.1 0.0
Pipe: 5 31.2 1.380 PL 40.00 PF 2.5
5 335.0 0.0 34.1 0.0 6.7 150 FTG 2E PE 0.0
6 335.0 H.S. 31.5 5.0 0.051 TL 49.07 PV
Pipe: 6 26.2 1.025 Pb 9.00 PF 4.9
6 335.0 H.S. 31.5 5.0 10.2 150 FTG 22.0 PE -3.9
7 344.0 0.0 22.7 0.0 0.159 TL 31.00 PV
Pipe: 7 26.2 1.101 PL 4.00 PF 0.4
7 344.0 0.0 22.7 0.0 8.8 150 FTG ---- PE -1.7
8 348.0 0.0 20.5 0.0 0.112 TL 4.00 PV
Pipe: 8 26.2 1.101 PL 19.00 PF 3.9
8 348.0 0.0 20.5 0.0 8.8 150 FTG 16.0 PE 0.0
9 348.0 0.0 16.6 0.0 0.112 TL 35.00 PV
Pipe: 9 26.2 1.101 PL 10.00 PF 1.9
9 348.0 0.0 16.6 0.0 8.8 150 FTG 7.0 PE -4.3
10 358.0 0.0 10.4 0.0 0.112 TL 17.00 PV
Pipe: 10 14.7 1.101 Pb 42.00 PF 2.4
10 358.0 0.0 10.4 0.0 4.9 150 FTG 20.0 PE 0.0
11 358.0 0.0 8.0 0.0 0.038 TL 62.00 PV
Pipe: 11 -11.5 1.101 PL 62.00 PF 2.4
11 358.0 0.0 8.0 0.0 3.9 150 FTG 35.0 PE 0.0
10 358.0 0.0 10.4 0.0 0.024 TL 97.00 PV
Pipe: 12 13.2 1.101 Pb 11.00 PF 0.8
11 358.0 0.0 8.0 0.0 4.4 150 FTG 14.0 PE 0.0
Si 358.0 4.9 7.2 13.2 0.031 TL 25.00 PV
Pipe: 13 13.0 1.101 FL 18.00 PF 1.0
11 358.0 0.0 8.0 0.0 4.4 150 FTG 14.0 FE 0.0
S2 358.0 4.9 7.0 13.0 0.031 TL 32.00 PV
SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 3
DATE: 9/23/2017 C:\PROGRAM FILES\HASSDATA\SEASCAPE PLAN 3.SDF
JOB TITLE: seascape plan 3
NOTES (HASS)
Calculations were performed by the HASS 8.7 computer program
in accordance with NFPA13 (2017)
under license no. 27091255 granted by
ERS Systems, Inc.
208 Southside Square
Petersburg, TN 37144
(931) 659-9760
The system has been calculated to provide an average
imbalance at each node of 0.001 gpm and a maximum
imbalance at any node of 0.011 gpm.
Total pressure at each node is used in balancing the system.
Maximum water velocity is 12.9 ft/sec at pipe 1.
Items listed in bold print on the cover sheet
are automatically transferred from the calculation report.
Available pressure at source node 1 under full flow conditions is
74.60 psi with a flow of 36.41 gpm.
PIPE FITTINGS TABLE
Pipe Table Name: STANDARD.PIP
PAGE: A MATERIAL: S40 HWC: 120
Diameter . Equivalent Fitting Lengths in Feet
(in) E T L C B G A D N
Ell Tee LngEll ChkVlv BfyVlv GatVlv AlmChk DPVlv NPTee
1.380 3.00 6.00 2.00 7.00 6.00 1.00 10.00 10.00 6.00
PAGE: F MATERIAL: CPVC HWC: 150
Diameter Equivalent Fitting Lengths in Feet
(in) F E T R K C G
F45 El Tee RunT Kplg ChkVlv Gate
1.101 1.40 2.50 6.00 1.70 1.00 8.00 0.40
PAGE: K MATERIAL: CT-K HWC: 150
Diameter Equivalent Fitting Lengths in Feet
(in) E T F R K C G N
Ell Tee 45-Eli TeeRun Kouplg ChkVlv GatViv NPTee
0.995 2.00 6.00 1.00 2.00 0.00 6.00 0.00 6.00
SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 4
DATE: 9/23/2017 C:\PROGRAM FILES\HASSDATA\SEASCAPE PLAN 3.SDF
JOB TITLE: seascape plan 3
PAGE: L MATERIAL: CT-L HWC: 150
Diameter Equivalent Fitting Lengths in Feet
(in) E T F R K C G N
Eli Tee 45-Eli TeeRun Koupig ChkVlv GatViv NPTee
1.025 3.00 7.00 1.00 2.00 0.00 7.00 0.00 7.00
SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 5
DATE: 9/23/2017 C:\PROGRAN FILES\HASSDATA\SEASCAPE PLAN 3.SDF
JOB TITLE: seascape plan 3
a)
E E a a U U) C'J 'U 'a- 'aCe) (flU) U) U) Cl. a
Z 'U QQ. 'aa 4J
C/) (U• tJ• > 'a- N i am a
7-.
V
V
V
V
V
V
V
V
(N 0 0 0 0 0 0 C C) 0
CD 0 0 0 0 0 CD O
L CD LI) C) (N
((U) ClU)U)cl)JU) —Q.C/)-H--
SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 6
DATE: 9/23/2017 C:\PROGRAN FILES\HASSDATA\SEASCAPE PLAN 3.SDF
JOB TITLE: seascape plan 3
WATER SUPPLY CURVE
84+
77+
0
\
70+ \
I \
I \
63+ \
x \
I \
\
P 56+ \
R I \
E I
S I \
S 49+ \
U I \
R \
E \
42+ \
\
P I \
S I \
I 35+ \
\
\
28+ \
\
\
\
21+
I * <-20.0 psi @ 1100 gpm
Flow Test Point
14+ LEGEND if
I,
I X = Required Water Supply
I 61.46 psi @ 31.2 gpm
7+
0 = Available Water Supply
I 74.63 psi @ 31.2 gpm
+ ------+ --------+ --------+ ---------+ -----------+
400 600 800 1000 1200 1400 1600 1800 2000
FLOW (GPM)