Loading...
HomeMy WebLinkAbout1818 ASTON AVE; ; US100121; PermitJob Address: 1818 ASTON AV Permit Type: HI Parcel No: 2121200500 Lot #: 0 Status: ISSUED Applied 8/27/2010 Approved: 8/27/2010 Reference No.: Issued: 8/27/2010 City of Carlsbad Hazardous Installations Permit No: US100121 PC #: Inspector: Project Title: COBRA - PUMA HIGH PILE STORAGE Applicant: BLACKMORE PARKVIEW ASSOCIATES P0 BOX 424 RANCHO SANTA FE CA Owner: BLACKMORE PARKVIEW ASSOCIATES P0 BOX 424 RANCHO SANTA FE CA Fees ($) Add'I Fees ($) Total Balance ($) p FiSB FIRE PROTECTION, LLC Fire Protection Plan Review & Code Consulting 9384 Suva Street Downey, CA 90240 (562) 833-3596 To: Mr. Mike Davis - Fire Marshal City of Carlsbad Fire Department 1635 Faraday Avenue Carlsbad, CA 92008 Project: Cobra - Puma 1818 Aston Ave Carlsbad, CA Date: August 23, 2010 Scope of work: High piled combustible storage of shafts (graphite and steel, steel heads, and plastic ferrules) in single and double row racks to 18 feet high within a 6371 sqft area. Sprinkler design is .45/2000(existing). Required density is .411/2000. Commodities are maximum class IV (ferrules are considered as free flowing - class IV). One pallet load in (5) double row racks have rubber grips, and is allowed to be protected as a class IV per the 2002 NFPA 135.6.1.2.3. Plan Submittal: (5) sets of plans consisting of (2) sheets each. Plan Review # N/A Contractor/Engineer: Premier Fire Consulting, LLC Review Comments We have reviewed the submittal, and it is our opinion that it is in substantial conformance with the applicable codes and standards in force at this time, including local adopted ordinances. Acceptance of these plans is recommended subject to the following comments incorporated onto the plans: NO COMMENTS These plans are recommended for acceptance subject to the comments above incorporated onto the drawings, and contingent upon the City of Carlsbad Fire Department field inspection for compliance. Sincerely, James . Barger, P.E. JSB Fire Protection, LLC Cynthia Wong From: Cynthia Wong Sent: Tuesday, September 07, 2010 10:08 AM To: 'greg@premier4ire.net' Subject: plan submittal Greg, I explained to James Barger that this submittal will be accepted with his approval for high pile storage. In the future, the technical report shall be done by a preapproved company on the list that was provided. The technical report along with the rack plans are submitted to either an outside consultant ( on list) or Carlsbad Fire directly for review. If sprinkler work is required, then a copy goes to the firm that reviews the sprinkler plans. I hope that makes sense. Please call if there is more clarification required. In addition, I know that the design density is sufficient. What sprinkler head are they using? K factor? Thank you Cindy 760-602-4662