HomeMy WebLinkAbout1818 ASTON AVE; ; US100121; PermitJob Address: 1818 ASTON AV
Permit Type: HI
Parcel No: 2121200500
Lot #: 0
Status: ISSUED
Applied 8/27/2010
Approved: 8/27/2010
Reference No.: Issued: 8/27/2010
City of Carlsbad
Hazardous Installations
Permit No: US100121
PC #: Inspector:
Project Title: COBRA - PUMA HIGH PILE STORAGE
Applicant:
BLACKMORE PARKVIEW ASSOCIATES
P0 BOX 424
RANCHO SANTA FE CA
Owner:
BLACKMORE PARKVIEW ASSOCIATES
P0 BOX 424
RANCHO SANTA FE CA
Fees ($) Add'I Fees ($) Total Balance ($)
p
FiSB FIRE PROTECTION, LLC
Fire Protection Plan Review & Code Consulting
9384 Suva Street
Downey, CA 90240
(562) 833-3596
To: Mr. Mike Davis - Fire Marshal
City of Carlsbad Fire Department
1635 Faraday Avenue
Carlsbad, CA 92008
Project: Cobra - Puma
1818 Aston Ave
Carlsbad, CA
Date: August 23, 2010
Scope of work: High piled combustible storage of shafts (graphite and steel, steel heads, and plastic ferrules) in
single and double row racks to 18 feet high within a 6371 sqft area. Sprinkler design is .45/2000(existing).
Required density is .411/2000. Commodities are maximum class IV (ferrules are considered as free flowing -
class IV). One pallet load in (5) double row racks have rubber grips, and is allowed to be protected as a class IV
per the 2002 NFPA 135.6.1.2.3.
Plan Submittal: (5) sets of plans consisting of (2) sheets each.
Plan Review # N/A
Contractor/Engineer: Premier Fire Consulting, LLC
Review Comments
We have reviewed the submittal, and it is our opinion that it is in substantial conformance with the
applicable codes and standards in force at this time, including local adopted ordinances. Acceptance of
these plans is recommended subject to the following comments incorporated onto the plans:
NO COMMENTS
These plans are recommended for acceptance subject to the comments above incorporated onto the
drawings, and contingent upon the City of Carlsbad Fire Department field inspection for compliance.
Sincerely,
James . Barger, P.E.
JSB Fire Protection, LLC
Cynthia Wong
From: Cynthia Wong
Sent: Tuesday, September 07, 2010 10:08 AM
To: 'greg@premier4ire.net'
Subject: plan submittal
Greg,
I explained to James Barger that this submittal will be accepted with his approval for high pile storage. In the future, the
technical report shall be done by a preapproved company on the list that was provided. The technical report along with
the rack plans are submitted to either an outside consultant ( on list) or Carlsbad Fire directly for review. If sprinkler
work is required, then a copy goes to the firm that reviews the sprinkler plans. I hope that makes sense. Please call if
there is more clarification required.
In addition, I know that the design density is sufficient. What sprinkler head are they using? K factor?
Thank you
Cindy
760-602-4662