Loading...
HomeMy WebLinkAbout5932 SEA OTTER PL; ; FPC2016-0003; PermitPERXT REPORT (7city Of Carlsbad AR~) LPQ~ Print Date: 12/29/2020 Permit No: FPC2016-0003 Job Address: 5932 SEA OTTER P1, CARLSBAD, CA 92010-6630 Status: Closed - Finaled Permit Type: FIRE-Construction Commercial Work Class: Fire Sprinklers Parcel #: Track #: Applied: 11/09/2016 Valuation: $0.00 Lot #: Issued: 11/18/2016 Occupancy Group: Project #: Finaled Close Out: 12/29/2020 #of Dwelling Units: Plan #: Bedrooms: Construction Type: Bathrooms: Orig. Plan Check #: Inspector: Plan Check #: Final Inspection: Project Title: Description: MODIFY EXISTING OVERHEAD SPRINKLER SYSTEM PER NFPA 13 140 HEADS FPContractor: TITAN FIRE PROTECTION INC 1341 DISTRIBUTION WAY, # STE 14 VISTA, CA 92081-8843 (760) 295-3436 FEE AMOUNT FIRE NFPA 13 or 13R System > 100 heads $634.00 Total Fees: $634.00 Total Payments To Date: $634.00 Balance Due: $0.00 Fire Department Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 760-602-4665 1 760-602-8561 f I www.carlsbadca.gov Automatic Sprinkler Systems Contractor's Material and Test Certificate for Aboveground Piping IDate: IOCt 11'! Property Name: Pro-Spot L Property Address: 5932 SEA OTTER PLACE, CARLSBAD CA. L:J Procedure Upon completion of work, inspection and tests shall be made by the contractor's representative and witnessed by an owner's representative. All defects shall be corrected and the system left in service before contractor's personnel finally leave the job. A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authori- ties, owners, and contractors. It is understood that the owner's representative's signature in no way prejudices any claim against contractor for faulty material, poor workmanship, or failure to comply with approving authority's requirements or local ordinances. Plans Accepted by [approving CARLSBAD FIRE DEPARTMENT authority's name(s)] Address 1222 First Ave. Installation conforms to accepted plans? Yes El No Equipment used is approved? 2 Yes El No If no, explain deviations. Instructions Has person in charge of fire equipment been instructed as to location of control valves and care and maintenance of this new equipment? EEi Yes El No If no, explain. Have copies of appropriate instructions and care and maintenance charts and NFPA 13 been left on premises? Li Yes El No If no, explain. Location of System Supplies building(s) Sprinklers Year of Orifice Temperature Make Model Manufacture Size Quantity Rating VICTAULIC V2708 2016 1/2 76 155 VICTAULIC V2703 2016 1/2 64 200 Pipe and Fittings Pipe conforms to NFPA 13, 2013 ed. standard. Li Yes III No Fittings conform to NFPA 13, 2013 ed. standard. Li Yes El No If no, explain. PAGE 1 of 3 Automatic Sprinkler Systems IJJI Contractor's Material and Test Certificate for Aboveground Piping (cont.) Alarm Valve or Flow Indicator Alarm Device Maximum Time to Operate Through Test Pipe Type Make Model Mm. Sec. Flow Indicator POTTER VSR-4 1 30 Dry Pipe Operating Test Dry Valve Q.O.D. Make Model Serial No. Make Model Serial No. Time to Trip Trip Point Time Water Alarm Through Water Air Air Reached Operated Test Pipe* Pressure Pressure Pressure Test Outlet* Properly Mm. Sec. Psi (Bar) Psi (Bar) Psi (Bar) Mm. Sec. Yes No Without Q.O.D. With Q.O.D. If no, explain. Deluge and Preaction Valves Operation El Pneumatic El Electric El Hydraulic Piping supervised? El Yes El No Detecting media supervised? El Yes El No Is there an accessible facility in each circuit for testing? El Yes E No If no, explain. Does each circuit operate Does each circuit Maximum Time to supervision loss alarm? operate valve release? Operate Release Yes No Yes No Make Model Mm. Sec. Test Description HYDROSTATIC: Hydrostatic tests shall be made at not less than 200 psi (13.6 bar) for two hours or 50 psi (3.4 bar) above static pressure in excess of 150 psi (10.2 bar) for two hours. Differential dry pipe valve clappers shall be left open during test to prevent damage. All aboveground piping leakage shall be stopped. FLUSHING: Flow the required rate until water is clear as indicated by no collection of foreign material in burlap bags at outlets such as hydrants and blow-offs. Flush at flows not less than 400 gpm (1514 L/min) for 4-in. (102-mm) pipe, 600 gpm (2271 L/min) for 5-in. (127-mm) pipe, 750 gpm (2839 L/min) for 6-in. (152-mm) pipe, 1000 gpm (3785 L/min) for 8-in. (203-mm) pipe, 1500 gpm (5678 L/min) for 10-in. (254-mm) pipe and 2000 gpm (7570 L/min) for 12-in. (305-mm) pipe. When supply cannot produce stipulated flow rates, obtain maximum available. *Measured from time inspector's test pipe is opened. PAGE 2 of 3 Automatic Sprinkler Systems Contractor's Material and Test Certificate for Aboveground Piping (cont.) Test Description (cont.) PNEUMATIC: Establish 40 psi (2.7 bar) air pressure and measure drop, which shall not exceed 11/2 Psi (0.1 bar) in 24 hours. Test pressure tanks at normal water level and air pressure and measure air pressure drop, which shall not exceed 1112 psi (0.1 bar) in 24 hours. Tests All piping hydrostatically tested at200 psi (bar) for hrs. Dry piping pneumatically tested? El Yes III No Equipment operates properly? El Yes El No If no, state reason. Drain test—Reading of gauge located near water supply test pipe: Static pressure: psi (bar) Drain test—Residual pressure with valve in test pipe open wide: psi (bar) Underground mains and lead-in connections to system risers flushed before connections made to sprinkler piping Verified by copy of the U Form No. 85B Z Yes El No El Other Flushed by installer of underground sprinkler piping R Yes EJ No El Other If other, explain. Blank Testing Gaskets Number used 0 Locations Number removed Welding Welded piping? 1 Yes No If yes, Do you certify as the sprinkler contractor that welding procedures comply with the requirements of at least AWS Dl 0.9, Level AR-3? 21 Yes El No Do you certify that the welding was performed by welders qualified in com- pliance with the requirements of at least AWS Dl 0.9, Level AR-3? 21 Yes III No Do you certify that welding was carried out in compliance with a documented quality control procedure to insure that all discs are retrieved, that openings in piping are smooth, that slag and other welding residue are removed, and that the internal diameters of piping are not penetrated? El Yes El No Hydraulic Data Nameplate Nameplate provided? ZI Yes El No If no, explain. Remarks Date left in service with all control valves open: Sprinkler Contractor: Titan Fire Protection Signatures of Test Witnessp For property owner (signed) ITitle Date For sprinkler contractor (signed) Smartto Title General Superinte Date 01/06/2017 - PAGE 3of3