Print Date: 12/29/2020 Permit No: FPC2016-0003
Job Address: 5932 SEA OTTER P1, CARLSBAD, CA 92010-6630 Status: Closed - Finaled
Permit Type: FIRE-Construction Commercial Work Class: Fire Sprinklers
Parcel #: Track #: Applied: 11/09/2016
Valuation: $0.00 Lot #: Issued: 11/18/2016
Occupancy Group: Project #: Finaled Close Out: 12/29/2020
#of Dwelling Units: Plan #:
Bedrooms: Construction Type:
Bathrooms: Orig. Plan Check #: Inspector:
Plan Check #: Final Inspection:
Project Title:
Description: MODIFY EXISTING OVERHEAD SPRINKLER SYSTEM PER NFPA 13
140 HEADS
FPContractor:
TITAN FIRE PROTECTION INC
1341 DISTRIBUTION WAY, # STE 14
VISTA, CA 92081-8843
(760) 295-3436
FEE AMOUNT
FIRE NFPA 13 or 13R System > 100 heads $634.00
Total Fees: $634.00 Total Payments To Date: $634.00 Balance Due: $0.00
Fire Department Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 760-602-4665 1 760-602-8561 f I www.carlsbadca.gov
Automatic Sprinkler Systems
Contractor's Material and Test
Certificate for Aboveground Piping
IDate: IOCt 11'! Property Name: Pro-Spot
L Property Address: 5932 SEA OTTER PLACE, CARLSBAD CA.
L:J
Procedure
Upon completion of work, inspection and tests shall be made by the contractor's representative and witnessed by
an owner's representative. All defects shall be corrected and the system left in service before contractor's personnel
finally leave the job.
A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authori-
ties, owners, and contractors. It is understood that the owner's representative's signature in no way prejudices any
claim against contractor for faulty material, poor workmanship, or failure to comply with approving authority's
requirements or local ordinances.
Plans
Accepted by [approving
CARLSBAD FIRE DEPARTMENT
authority's name(s)]
Address 1222 First Ave.
Installation conforms to accepted plans? Yes El No
Equipment used is approved? 2 Yes El No
If no, explain deviations.
Instructions
Has person in charge of fire equipment been instructed as to location of control valves
and care and maintenance of this new equipment? EEi Yes El No
If no, explain.
Have copies of appropriate instructions and care and maintenance charts and NFPA 13
been left on premises? Li Yes El No
If no, explain.
Location of System
Supplies building(s)
Sprinklers
Year of Orifice Temperature
Make Model Manufacture Size Quantity Rating
VICTAULIC V2708 2016 1/2 76 155
VICTAULIC V2703 2016 1/2 64 200
Pipe and Fittings
Pipe conforms to NFPA 13, 2013 ed. standard. Li Yes III No
Fittings conform to NFPA 13, 2013 ed. standard. Li Yes El No
If no, explain.
PAGE 1 of 3
Automatic Sprinkler Systems IJJI Contractor's Material and Test
Certificate for Aboveground Piping (cont.)
Alarm Valve or Flow Indicator
Alarm Device Maximum Time to Operate Through Test Pipe
Type Make Model Mm. Sec.
Flow Indicator POTTER VSR-4 1 30
Dry Pipe Operating Test
Dry Valve Q.O.D.
Make Model Serial No. Make Model Serial No.
Time to Trip Trip Point Time Water Alarm
Through Water Air Air Reached Operated
Test Pipe* Pressure Pressure Pressure Test Outlet* Properly
Mm. Sec. Psi (Bar) Psi (Bar) Psi (Bar) Mm. Sec. Yes No
Without
Q.O.D.
With
Q.O.D.
If no, explain.
Deluge and Preaction Valves
Operation El Pneumatic El Electric El Hydraulic
Piping supervised? El Yes El No Detecting media supervised? El Yes El No
Is there an accessible facility in each circuit for testing? El Yes E No
If no, explain.
Does each circuit operate Does each circuit Maximum Time to
supervision loss alarm? operate valve release? Operate Release
Yes No Yes No Make Model Mm. Sec.
Test Description
HYDROSTATIC: Hydrostatic tests shall be made at not less than 200 psi (13.6 bar) for two hours or 50 psi (3.4 bar)
above static pressure in excess of 150 psi (10.2 bar) for two hours. Differential dry pipe valve clappers shall be left
open during test to prevent damage. All aboveground piping leakage shall be stopped.
FLUSHING: Flow the required rate until water is clear as indicated by no collection of foreign material in burlap
bags at outlets such as hydrants and blow-offs. Flush at flows not less than 400 gpm (1514 L/min) for 4-in. (102-mm)
pipe, 600 gpm (2271 L/min) for 5-in. (127-mm) pipe, 750 gpm (2839 L/min) for 6-in. (152-mm) pipe, 1000 gpm
(3785 L/min) for 8-in. (203-mm) pipe, 1500 gpm (5678 L/min) for 10-in. (254-mm) pipe and 2000 gpm (7570
L/min) for 12-in. (305-mm) pipe. When supply cannot produce stipulated flow rates, obtain maximum available.
*Measured from time inspector's test pipe is opened. PAGE 2 of 3
Automatic Sprinkler Systems
Contractor's Material and Test
Certificate for Aboveground Piping (cont.)
Test Description (cont.)
PNEUMATIC: Establish 40 psi (2.7 bar) air pressure and measure drop, which shall not exceed 11/2 Psi (0.1 bar) in
24 hours. Test pressure tanks at normal water level and air pressure and measure air pressure drop, which shall not
exceed 1112 psi (0.1 bar) in 24 hours.
Tests
All piping hydrostatically tested at200 psi (bar) for hrs.
Dry piping pneumatically tested? El Yes III No
Equipment operates properly? El Yes El No
If no, state reason.
Drain test—Reading of gauge located near water supply test pipe: Static pressure: psi (bar)
Drain test—Residual pressure with valve in test pipe open wide: psi (bar)
Underground mains and lead-in connections to system risers flushed before connections made to sprinkler piping
Verified by copy of the U Form No. 85B Z Yes El No El Other
Flushed by installer of underground sprinkler piping R Yes EJ No El Other
If other, explain.
Blank Testing Gaskets
Number used 0 Locations Number removed
Welding
Welded piping? 1 Yes No
If yes,
Do you certify as the sprinkler contractor that welding procedures comply with
the requirements of at least AWS Dl 0.9, Level AR-3? 21 Yes El No
Do you certify that the welding was performed by welders qualified in com-
pliance with the requirements of at least AWS Dl 0.9, Level AR-3? 21 Yes III No
Do you certify that welding was carried out in compliance with a documented
quality control procedure to insure that all discs are retrieved, that openings in
piping are smooth, that slag and other welding residue are removed, and that
the internal diameters of piping are not penetrated? El Yes El No
Hydraulic Data Nameplate
Nameplate provided? ZI Yes El No
If no, explain.
Remarks Date left in service with all control valves open:
Sprinkler Contractor: Titan Fire Protection
Signatures of Test Witnessp
For property owner (signed) ITitle Date
For sprinkler contractor (signed) Smartto Title General Superinte Date 01/06/2017