GRADING NOTES
(IN ADDITION TO THE REQUIREMENTS OF CHAPTER 15.16 OF THE
CARLSBAD MUNICIPAL CODE.)
1. THIS PLAN SUPERSEDES ALL OTHER PLANS PREVIOUSLY APPROVED BY THE CITY
OF CARLSBAD REGARDING GRADING SHOWN ON THIS SET OF PLANS.
2. APPROVAL OF THIS PLAN DOES NOT LESSEN OR WAIVE ANY PORTION OF THE
CARLSBAD MUNICIPAL CODE, RESOLUTION OF CONDITIONAL APPROVAL, CITY
STANDARDS OR OTHER ADDITIONAL DOCUMENTS LISTED HEREON AS THEY MAY
PERTAIN TO THIS PROJECT. THE ENGINEER IN RESPONSIBLE CHARGE SHALL
REVISE THESE PLANS WHEN NON-CONFORMANCE IS DISCOVERED.
3. CITY APPROVAL OF PLANS DOES NOT RELIEVE THE DEVELOPER OR ENGINEER-OF-
WORK FROM RESPONSIBILITY FOR THE CORRECTION OF ERRORS AND OMISSIONS
DISCOVERED DURING CONSTRUCTION. ALL PLAN REVISIONS SHALL BE PROMPTLY
SUBMITTED TO THE CITY ENGINEER FOR APPROVAL.
4. A RIGHT-OF-WAY PERMIT FROM THE CITY ENGINEER WILL BE REQUIRED FOR ANY
WORK IN THE PUBLIC RIGHT OF WAY. PRIOR TO PERMIT ISSUANCE, A
CERT/FICA TE OF INSURANCE AS WELL AS ADDITIONAL INSURED ENDORSEMENT MUST BE
FILED NAMING THE CITY OF CARLSBAD AS AN ADDITIONAL INSURED ON THE
PERMITTEE'S POLICY IN THE MINIMUM AMOUNT OF $1,000,000.00 FOR EACH
OCCURRANCE OF LIABILITY. THE INSURANCE COMPANY WRITING THE POLICY MUST
HAVE A RATING OF "A-" OR BETTER AND A SIZE CATEGORY OF CLASS \/ff
OR BETTER AS ESTABLISHED BY "BESTS" KEY RA TING GUIDE.
5. NO WORK SHALL BE COMMENCED UNTIL ALL PERMITS HA VE BEEN OBTAINED FROM
THE CITY AND OTHER APPROPRIATE AGENCIES.
6. REVISION OF THESE PLANS MAY BE REQUIRED IF THE PROPOSED
IMPROVEMENTS ARE NOT CONSTRUCTED PRIOR TO THE DEADLINE DA TE OF THE
IMPROVEMENT AGREEMENT.
7. APPROVAL OF THESE PLANS BY THE CITY ENGINEER DOES NOT AUTHORIZE ANY
WORK OR GRADING TO BE PERFORMED UNTIL THE PROPERTY OWNER'S PERMISSION
HAS BEEN OBTAINED AND A VALID GRADING PERMIT HAS BEEN ISSUED.
8. NO REVISIONS WILL BE MADE TO THESE PLANS WITHOUT THE WRITTEN APPROVAL
OF THE CITY ENGINEER, NOTED WITHIN THE REVISION BLOCK, ON THE
APPROPRIATE SHEET OF THE PLANS AND THE TITLE SHEET.
9. ORIGINAL ORA WINGS SHALL BECOME THE PROPERTY OF THE CITY UPON BEING
SIGNED BY THE CITY ENGINEER.
10. THE ORIGINAL DRAWING SHALL BE REVISED TO REFLECT AS-BUILT CONDITIONS
BY THE ENGINEER-OF-WORK PRIOR TO FINAL ACCEPTANCE OF THE WORK BY THE
CITY.
11. ACCESS FOR FIRE AND OTHER EMERGENCY VEHICLES SHALL BE MAINTAINED TO
THE PROJECT SITE AT ALL TIMES DURING CONSTRUCT/ON.
12. WHERE TRENCHES ARE WITHIN CITY EASEMENTS, A SOILS REPORT COMPRISED
OF: (A) SUMMARY SHEET, (B) LABORATORY WORK SHEETS AND (C) COMPACTION
CURVES, SHALL BE SUBMITTED BY A PROFESSIONAL ENGINEER OF THE STA TE OF
CALIFORNIA, PR/NC/PALLY DOING BUSINESS IN THE FIELD OF APPLIED SOILS
MECHANICS. THE SOILS REPORT WILL BE SUBMITTED TO THE CITY ENGINEERING
INSPECTOR WITHIN TWO WORKING DAYS OF THE COMPLETION OF FIELD TESTS.
13. A SOILS COMPACTION REPORT AND COMPLIANCE VER/FICA TION REGARDING
ADHERENCE TO RECOMMENDATIONS OUTLINED IN THE SOILS REPORT IS REQUIRED
PRIOR TO THE ISSUANCE OF A BUILDING PERMIT. ALL CONTROLLED GRADING
SHALL BE DONE UNDER THE DIRECTION OF A PROFESSIONAL ENGINEER OF THE
STA TE OF CALIFORNIA PR/NC/PALLY DOING BUSINESS IN THE FIELD OF APPLIED
SOILS MECHANICS. ALL FILL OR FUTURE FILL AREAS SHALL BE CONSTRUCTED IN
ACCORDANCE WITH THE CITY OF CARLSBAD STANDARD SPECIF/CA TfONS AND THE
" EARTHWORK SPECIF/CA TfONS • ATTACHED TO THE PRELIMINARY SOILS
INVEST/GA TfON. DAILY FIELD COMPACTION REPORTS WILL BE SUBMITTED TO THE
PROJECT INSPECTOR.
14. A PRECONSTRUCTION MEETING SHALL BE HELD PRIOR TO THE BEGINNING OF
WORK AND SHAii BE ATTENDm BY All REPRESENTATIVES RESPONSIBLE FOR
CONSTRUCTION, INSPECTION, SUPERVISION, TESTING AND ALL OTHER ASPECTS OF THE
WORK. THE CONTRACTOR WILL BE CONTACTED BY THE PROJECT INSPECTOR TO
COORDINATE A DA TE AND TIME FOR THE PRECONSTRUCTION MEETING. APPROVED
DRAWINGS MUST BE AVAILABLE PRIOR TO SCHEDULING. THE GRADING PERMIT WILL
BE PROVIDED BY THE PROJECT INSPECTOR AT THE MEETING.
15. All INSPfGTJON REQUESTS OTHER THAN WR PRECONSTRUCTJON MEETING WIii BE
MADE BY CAIi ING THE ENGINEFRING 24 HOIIR INSPECTION REQUEST I/NE AT
(760) 438 3891 IN5PECTION REQUEST MUST BE RECEIVED PRIOR TO 2: 00 PM.
ON THE WORKING DAY BEFORE THE INSPECTION IS NEEDED INSPECTIONS WILL BE MADE
THE NEXT WORK DAY UNLESS YOU REQUEST OTHERWISE. REQUESTS MADE AFTER
2: 00 P.M. WILL BE SCHEDULED FOR TWO FULL WORK DAYS LATER.
16. THE OWNER AND/OR APPLICANT THROUGH THE DEVELOPER AND/OR CONTRACTOR
SHALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES, INCLUDING
SHORING, AND SHALL BE SOLELY RESPONSIBLE FOR CONFORMING TO ALL LOCAL,
STATE AND FEDERAL SAFETY AND HEALTH STANDARDS, LAWS AND REGULATIONS.
17. THE CONTRACTOR SHALL CONFORM TO LABOR CODE SECTION 6705 BY SUBMITTING
A DETAIL PLAN TO THE CITY ENGINEER AND/OR CONCERNED AGENCY SHOWING
THE DESIGN OF SHORING, BRACING SLOPING OR OTHER PROVISIONS TO BE MADE
OF WORKER PROTECTION FROM THE HAZARD OF CA \/ING GROUND DURING THE
EXCAVATION OF SUCH TRENCH OR TRENCHES OR DURING THE PIPE fNSTALLA TION
THEREIN. THIS PLAN MUST BE PREPARED FOR ALL TRENCHES FIVE FEET (5') OR
MORE IN DEPTH AND APPROVED BY THE CITY ENGINEER AND/OR CONCERNED
AGENCY PRIOR TO EXCAVATION. IF THE PLAN VARIES FROM THE SHORING SYSTEM
STANDARDS ESTABLISHED BY THE CONSTRUCTION SAFETY ORDERS, TITLE 8
CALIFoRNIA ADMINISTRATIVE CODE, THE PLAN SHALL BE PREPARED BY A
REGISTERED ENGINEER AT THE CONTRACTORS EXPENSE. A COPY OF THE OSHA
EXCAVATION PERMIT MUST BE SUBMITTED TO THE INSPECTOR PRIOR TO
EXCAVATION.
18. NO BLASTING SHALL BE PERFORMED UNTIL A VALID BLASTING PERMIT HAS BEEN
OBTAINED FROM THE CITY OF CARLSBAD. SUBMIT APPL/CATION FOR BLASTING
PERMIT WELL IN ADVANCE OF THE SCHEDULING OF BLASTING OPERA TfONS.
19. IF ANY ARCHAEOLOGICAL RESOURCES ARE DISCOVERED WITHIN ANY WORK AREA
DURING CONSTRUCTION, OPERATIONS WILL CEASE fMMEDfA TEL Y, AND THE
PERMITTEE WILL NOTIFY THE CITY ENGINEER. OPERA TfONS WILL NOT RESTART
UNTIL THE PERMITTEE HAS RECEIVED WRITTEN AUTHORITY FROM THE CITY
ENGINEER TO DO SO.
20. ALL OPERATIONS CONDUCTED ON THE SITE OR ADJACENT THERETO, INCLUDING
WARMING UP, REPAIR, ARRIVAL, DEPARTURE OR OPERATION OF TRUCKS,
EARTHMOVING EQUIPMENT, CONSTRUCTION EQUIPMENT AND ANY OTHER ASSOC/A TED
GRADING EQUIPMENT SHALL BE LIMITED TO THE PERIOD BETWEEN 7: 00 A.M. AND
6: 00 P.M. EACH DAY, MONDAY THRU FRIDAY AND NO EARTHMOVING OR GRADING
OPERATIONS SHALL BE CONDUCTED ON WEEKENDS OR HOLIDAYS. (A LIST OF CITY
HOLIDAYS IS AVAILABLE AT THE ENGINEERING DEPARTMENT COUNTER.)
21. ALL OFF-SITE HAUL ROUTES SHALL BE SUBMITTED BY THE CONTRACTOR TO THE
CITY INSPECTOR FOR APPROVAL TWO FULL WORKING DAYS PRIOR TO BEGINNING OF
WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DEBRIS OR DAMAGE
OCCURRING ALONG THE HAUL ROUTE OR ADJACENT STREETS AS A RESULT OF THE
GRADING OPERATION.
22. IMPORT MATERIAL SHALL BE OBTAINED FROM, AND WASTE MATERIAL SHALL BE
DEPOSITED AT, A SITE APPROVED BY THE CITY ENGINEER. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR ANY DEBRIS OR DAMAGE OCCURRING ALONG THE
HAUL ROUTES OR ADJACENT STREETS AS A RESULT OF THE GRADING OPERATION.
23. BRUSH SHALL BE REMOVED ONLY WITHIN THE AREA TO BE GRADED. NO TREES ARE
TO BE REMOVED UNLESS SPECIF/CALLY NOTED ON THE PLAN.
24. ALL AREAS SHALL BE GRADED TO DRAIN. GRADING RESULTING IN THE PONDING OF
WATER IS NOT PERMITTED. ALL EARTHEN SWALES AND DITCHES SHALL HAVE A
MINIMUM ONE PERCENT SLOPE.
25. THESE PLANS ARE SUBJECT TO A SIGNED AND APPROVED SWPPP AND/OR SET OF
EROSION CONTROL PLANS. EROSION CONTROL SHALL BE AS SHOWN AND AS APPROVED
BY THE CITY ENGINEER OR AS DIRECTED BY THE PROJECT INSPECTOR.
26. ALL SLOPES SHALL BE TRIMMED TO A FINISH GRADE TO PRODUCE A UNIFORM
SURFACE AND CROSS SECTION. THE SITE SHALL BE LEFT IN A NEAT AND
ORDERLY CONDITION. ALL STONES, ROOTS OR OTHER DEBRIS SHALL BE REMOVED
AND DISPOSED OF AT A SITE APPROVED OF BY THE CITY ENGINEER.
27. ALL SLOPES SHALL BE fRRfGA TED, STABILIZED, PLANTED AND/OR HYDROSEEDED
WITHIN TEN (10) DAYS OF THE TIME WHEN EACH SLOPE IS BROUGHT TO GRADE
AS SHOWN ON THE APPROVED GRADING PLANS.
28. LANDSCAPING SHALL BE ACCOMPLISHED ON ALL SLOPES AND PADS AS REQUIRED
BY THE CITY OF CARLSBAD LANDSCAPE MANUAL, THE LANDSCAPING PLANS FOR
THIS PROJECT, DRAWING NO. N/A , AND/OR AS DIRECTED BY THE CITY
ENGINEER OR PLANNING DIRECTOR.
29. THE OWNER/APPLICANT SHALL INSURE THAT ALL CONTRACTORS SHALL COORDINATE
THE WORK OF THESE GRADING PLANS WITH THAT SHOWN ON BOTH THE LANDSCAPE
AND fRRfGA TION PLANS AND THE IMPROVEMENT PLANS AS REQUIRED FOR THIS WORK
IN ACCORDANCE WITH THE LANDSCAPE MANUAL TIME REQUIREMENTS.
30. WHERE AN EXISTING Pf PE LINE IS TO BE ABANDONED AS A RESULT OF THE
GRADING OPERATION, IT SHALL BE REMOVED WITHIN TWENTY FEET OF BUILDING
OR STREET AREAS AND REPLACED WITH PROPERLY COMPACTED SOILS. IN OTHER
AREAS THE PIPE WILL BE PLUGGED WITH CONCRETE OR REMOVED AS APPROVED BY
THE CITY ENGINEER.
31. THE EXISTENCE AND LOCATION OF UTILITY STRUCTURES AND FACILITIES SHOWN
ON THE CONSTRUCT/ON PLANS WERE OBTAINED BY A SEARCH OF THE AVAILABLE
RECORDS. ATTENTION IS CALLED TO THE POSSIBLE EXISTENCE OF OTHER
UTILITY FACILITIES OR STRUCTURES NOT SHOWN OR IN A LOCATION DIFFERENT
FROM THAT SHOWN ON THE PLANS. THE CONTRACTOR IS REQUIRED TO TAKE DUE
PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES SHOWN ON THE PLANS AND
ANY OTHER EXISTING FACILITIES OR STRUCTURES NOT SHOWN.
32. THE CONTRACTOR SHALL VERIFY THE LOCA TfON OF ALL EXISTING FACILITIES
( ABOVE GROUND AND UNDER GROUND ) WITHIN THE PROJECT SITE SUFFICIENTLY
AHEAD OF GRADING TO PERMIT THE REVISION OF THE GRADING PLANS IF IT IS
FOUND THAT THE ACTUAL LOCATIONS ARE IN CONFLICT 'MTH THE PROPOSED
WORK.
33. THE CONTRACTOR SHALL NOTIFY AFFECTED UTILITY COMPANIES (SEE BELOW) AT
LEAST 2 FULL WORKING DAYS PRIOR TO STARTING GRADING NEAR THEIR
FACILITIES AND SHALL COORDINATE THE WORK WITH A COMPANY REPRESENTA TfVE.
UNDERGROUND SERVICE ALERT (800)422-4133
SDG&E (800)411-7343
AT&T (800)892-0123
TIME WARNER CABLE (760)438-7741
COX COMMUN/CATIONS (619)262-1122
CITY OF CARLSBAD(STREETS & STORM DRAIN) (760)434-2980
*CITY OF CARLSBAD(SEWER, WATER & RECLAIMED WATER) (760)438-2722
*SAN DIEGU/TO WATER DISTRICT (760)633-2650
*LEUCADIA WASTEWATER DISTRICT (760)753-0155
*VALLECITOS WATER DISTRICT (760)744-0460
*OLIVENHAIN WATER DISTRICT (760)753-6466
*BUENA SANITATION DISTRICT (760)726-1340 x1330
• AS APPROPRIATE
34. PERMIT COMPLIANCE REQUIREMENTS:
A. FOR CONTROLLED GRADING -THE APPLICANT HIRES A CIVIL ENGINEER,
SOILS ENGINEER, AND /OR GEOLOGIST TO GIVE TECHNICAL ADVICE,
OBSERVE AND CONTROL THE WORK IN PROGRESS [15.16.120 A.BJ
CARLSBAD MUNICIPAL CODE.
B. PRIOR TO FINAL APPROVAL OF A GRADING PERMIT -THE FOLLO'MNG
REPORTS MUST BE SUBMITTED TO THE CITY ENGINEER VIA THE
PROJECT INSPECTOR {15.16.120 A. 10} CARLSBAD MUNICIPAL CODE:
(1) FINAL REPORT BY SUPERVISING GRADING ENGINEER STA TING ALL
GRADING IS COMPLETE. ALL EROSION CONTROL, SLOPE PLANTING
AND /RR/GA TfON ARE INSTALLED IN CONFORMANCE WITH CITY
CODE AND THE APPROVED PLANS ( OBTAIN SAMPLE OF COMPLIANCE
LETTER FROM CITY ENGINEERING DEPARTMENT).
(2) AS-BUILT GRADING PLAN.
(3) REPORT FROM THE SOILS ENGINEER, WHICH INCLUDES
RECOMMENDED SOIL BEARING CAPACITIES, A STATEMENT AS TO
THE EXPANSIVE QUALITY OF THE SOIL, AND SUMMARIES OF
FIELD AND LABORATORY TESTS AND PLOTTED TEST POINTS THE
REPORT SHALL ALSO INCLUDE A STATEMENT BY THE SOILS
ENGINEER THAT THE GRADING WAS DONE IN ACCORDANCE 'MTH THE
REQUIREMENTS AND RECOMMENDATIONS OUTLINED IN THE
PRELIMINARY SOILS REPORT AND ANY SUPPLEMENTS THERETO.
(4) REPORT WITH AS-BUILT GEOLOGIC PLAN, IF REQUIRED BY THE
CITY.
35. UNLESS A GRADING PERMIT FOR THIS PROJECT JS ISSUED 'MTHIN ONE (1)
YEAR AFTER THE CITY ENGINEER'S APPROVAL, THESE PLANS MAY BE REQUIRED
TO BE RESUBMITTED FOR PLANCHECK. PLANCHECK FEES WILL BE REQUIRED FOR
ANY SUCH RECHECK.
35. IN ACCORDANCE WITH THE CITY STORM WATER STANDARDS, ALL STORM DRAIN INLETS
CONSTRUCTED BY THIS PLAN SHALL INCLUDE "STENCILS" BE ADDED TO PROHIBIT
WASTEWATER DISCHARGE DOWNSTREAM. STENCILS SHALL BE ADDED TO THE
SATISFACTION OF THE CITY ENGINEER.
"DECLARATION OF RESPONSIBLE CHARGE"
f HEREBY DECLARE THAT f AM THE ENGINEER OF WORK FOR THIS PROJECT, THAT f
HA VE EXERCISED RESPONSIBLE CHARGE OVER THE DESIGN OF THE PROJECT AS DEFINED
IN SECTION 6 703 OF THE BUSINESS AND PROFESSIONS CODE, AND THAT THE DESIGN IS
CONSISTENT WITH CURRENT STANDARDS.
f UNDERSTAND THAT THE CHECK OF PROJECT DRAWINGS AND SPECIF/CATIONS BY THE
EROSION CONTROL NOTES
1. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT DAVID M. PAGE AT
310-625-5335 (PHONE NUMBER)
2. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL
TIMES DURING THE RAINY SEASON. ALL NECESSARY MATERIALS SHALL BE STOCKPILED ON
SITE AT CONVENIENT LOCATIONS TO FAG/LITA TE RAPID CONSTRUCTION OF TEMPORARY
DEVICES WHEN RAIN IS EMINENT.
3. FOR PROJECTS COVERED BY STA TE SWPPP /WDID, IN ACCORDANCE WITH THE CONSTRUCTION
ORDER ISSUED BY THE CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD, THE
CONTRACTOR'S QUALIFIED SWPPP PRACTITIONER (QSP) SHALL UPDATE AND MAINTAIN
THE WATER POLLUTION CONTROL (WPC) PLAN TO ADDRESS UPDATED SITE CONDITIONS OF
THE PROJECT. THE UPDATED WPC PLAN AND UPDATED SWPPP SHALL BE KEPT AT THE
PROJECT SITE AND MADE AVAILABLE TO THE CITY INSPECTOR. ADDITIONAL CONSTRUCTION
BMP'S BEYOND THE ORIGINAL APPROVED SWPPP SHALL BE PROVIDED TO ADDRESS SITE
CONDITIONS NOT ANTIC/PA TED. THE QSP SHALL REPORT BMP DEFICIENCIES TO THE CITY
INSPECTOR. THE QSP SHALL OBTAIN APPROVAL FROM THE CONTRACTOR'S QUALIFIED
SWPPP DEVELOPER AND THE CITY INSPECTOR REGARDING ANY SIGNIFICANT CHANGES TO
BMP DEPLOYMENT.
4. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER
TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL.
5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE
REQUIRED BY THE CITY ENGINEER AND/OR CITY INSPECTOR DUE TO UNCOMPLETED
GRADING OPERATIONS OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE.
6. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO
PREVENT PUBLIC TRESPASS ONTO AREAS WHERE IMPOUNDED WATERS CREA TE A
HAZARDOUS CONDITION.
7. ALL EROSION CONTROL MEASURES PROVIDED PER THE APPROVED SWPPP AND/OR
EROSION CONTROL PLAN SHALL BE JNCORPORA TED HEREON.
8. GRADED AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE FACE OF
SLOPE AT THE CONCLUSION OF EACH WORKING DAY.
9. ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF EACH
WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY
PERCENT (40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL.
10. ALL GRAVEL BAGS SHALL BE BURLAP TYPE WITH 3/4 INCH MINIMUM AGGREGRA TE.
11. SHOULD GERM/NATION OF HYDROSEEDED SLOPES FAIL TO PROVIDE EFFECTIVE COVERAGE
OF GRADED SLOPES (90% COVERAGE) PRIOR TO NOVEMBER 15, THE SLOPES SHALL BE
STABILIZED BY PUNCH STRAW INSTALLED IN ACCORDANCE WITH SECTION 35.023 OF THE
EROSION ANO SEDIMENT CONTROL HANDBOOK OF THE DEPARTMENT OF CONSERVATION,
STA TE OF CALIFORNIA.
TEMPORARY EROSION CONTROL
PLANTING AND IRRIGATION
ALL PERMANENT AND TEMPORARY EROSION CONTROL PLANTING AND /RR/GA TION SHALL BE
INSTALLED AND MAINTAINED AS REQUIRED IN SECTION 212 OF THE STANDARD
SPEC/FICA TIONS AND THE FOLLOWING:
A. HYDROSEEDING SHALL BE APPLIED TO:
1. ALL SLOPES THAT ARE GRADED 6: 1 (HORIZONTAL TO VERTICAL) OR STEEPER WHEN
THEY ARE:
a. THREE FEET OR MORE IN HEIGHT AND ADJACENT TO A
PUBLIC WALL OR STREET.
b. ALL SLOPES 4 FEET OR MORE IN HEIGHT.
2. AREAS GRADED FLATTER THAN 6: 1 WHEN ANY OF THE FOLLOWING CONDITIONS
EXIST:
a. NOT SCHEDULED FOR fMPROVEMENTS(CONSTRUCTION OR GENERAL
LANDSCAPING) WITHIN 60 DAYS OF ROUGH GRADING.
b. IDENTIFIED BY THE PARKS AND RECREA TfON DIRECTOR AS HfGHL Y
VISIBLE TO THE PUBLIC.
c. HA VE ANY SPECIAL CONDITION IDENTIFIED BY THE CITY ENGINEER
THAT WARRANTS IMMEDIATE TREATMENT.
B. HYDROSEEDED AREAS SHALL BE /RR/GA TED IN ACCORDANCE WITH THE FOLLOWING
CRITERIA:
1. ALL SLOPES THAT ARE GRADED 6: 1 OR STEEPER AND THAT ARE:
a. THREE TO EIGHT FEET IN HEIGHT SHALL BE /RR/GA TED BY HAND
WATERING FROM QUICK COUPLERS/HOSE BIBS OR A CONVENTIONAL
SYSTEM OF LOW PRECIP/TA TION SPRINKLER HEADS PROVIDING 100%
COVERAGE.
b. GREATER THAN 8 FEET IN HEIGHT SHALL BE WATERED BY A
CONVENTIONAL SYSTEM OF LOW PREC/PfTA TfON SPRINKLER HEADS
PROVIDING 100% COVERAGE.
2. AREAS SLOPED LESS THAN 6: 1 SHALL BE /RR/GA TED AS APPROVED BY THE CITY
ENGINEER, PRIOR TO HYDROSEEDING. THE DEVELOPER SHALL SUBMIT A PROPOSED
SCHEME TO PROVIDE fRRfGA TION TO THE CITY ENGINEER. THE PROPOSAL SHALL BE
SPECIFIC REGARDING THE NUMBERS, TYPES AND COSTS OF THE ELEMENTS OF THE
THE PROPOSED SYSTEM.
3. fRRfGA TION SHALL MAINTAIN THE MOISTURE LEVEL OF THE SOIL AT THE OPTIMUM
LEVEL FOR THE GROWTH OF THE HYDROSEEDED GROWTH.
C. HYDROSEEDING MIX SHALL CONSIST OF ALL OF THE FOLLOWING:
1. SEED MIX SHALL CONSIST OF NO LESS THAN:
a. 20 lbs. PER ACRE OF ROSE CLOVER
b. 20 lbs. PER ACRE OF ZORRO FESCUE
c. 3 lbs. PER ACRE OF E SCHOOL CIA CALIFORNICA
d. 4 lbs. PER ACRE OF ACHILLEA MILLEFOLIA
e. 3 lbs. PER ACRE OF AL YSSUM (CARPET OF SNOW)
CITY OF CARLSBAD DOES NOT RELIEVE ME, AS ENGINEER OF WORK, OF M'J.l'-----f. 1 /2 lb. PER ACRE OF DIMORPHOLECA
g. ITEMS c,d,e, AND f OF THIS SUBSECTION MAY BE OMITTED ON LOCA TfONS
WHERE THE AREA BEING HYDROSEEDED IS NOT VISIBLE FROM EITHER A
PUBLIC STREET OR RESIDENTIAL STRUCTURES.
RESPONS/BfL/TfES FOR PROJECT DESIGN.
FIRM: ALDRICH CONSUL TING ENGINEERS
ADDRESS: --=~4~1:6:S:H:A=D=O:W:=:TR:E:E:D:R~I_VE~=========== ~•£ __ -~ CITY, STA TE: OCEANSIDE. CA 92058
h. ITEM a OF THIS SUBSECTION MUST BE INOCULATED WITH A NITROGEN FIXING
BACTERIA AND APPLIED DRY EITHER BY DRILLING OR BROADCASTING BEFORE
H YDROSEEDING.
TELEPHONE: 760-783-6222 \
BY: ERICK J. ALDRICH DATE: _______ ,"'«i ;::----:: ~,-.
(NAME OF ENGINEER) '"oFcALlfrfl'
i. ALL SEED MATERIALS SHALL BE TRANSPORTED TO THE JOBS/TE IN UNOPENED
CONTAINERS 'MTH THE CALIFORNIA DEPARTMENT OF FOOD AND AGRICULTURE
CERT/FICA TION TAG A TT ACHED TO, OR PRINTED ON SAID CONTAINERS.
R.C.E. N0.:_~5=7~8=2~7 ____________ _
REGISTRA TfON EXP/RATION DA TE: _ _.6.,I_..J"'0,_.(2..,4'------
SOILS ENGINEER'S CERTIFICATE
f, RUSSELL C. LAMB . A REGISTERED (CIVIL/
GEO TECHNICAL) ENGINEER OF THE STA TE OF CALIFORNIA, PRING/PALLY DOING
BUSINESS IN fHE FIELD OF APPLIED SOILS MECHANICS, HEREBY CERTIFY THAT
A SAMPLING AND STUDY OF THE SOIL CONDITIONS PREVALENT WITHIN THIS
SITE WAS MADE BY ME OR UNDER MY DIRECTION BETWEEN THE DA TES OF
APRIL 07 , 20 23 AND MAY 21 , 20 _ll_. TWO
COPIES OF THE SOILS REPORT COMPILED FROM THIS STUDY, WITH MY
RECOMMENDATIONS, HAS BEEN SUBMITTED TO THE OFFICE OF THE CITY
ENGINEER. 2_
SIGNED: <'f =~ C fo-.&-
G.E./P.E. NO.:
DATE:
LICENSE EXP/RA TfON DA TE:
OWNER'S CERTIFICATE
f ( WE ) HEREBY CERTIFY THAT A REG/STEREO SOILS ENGINEER OR
GEOLOGIST HAS BEEN OR 'MLL BE RETAINED TO SUPERVISE OVER-ALL GRADING
ACTIVITY AND ADVISE ON THE COMPACTION AND STABILITY OF THIS SITE. IF
THIS PROJECT/DEVELOPMENT IS SUBJECT TO A STATE-REGULATED SWPPP, f
(WE) ALSO AGREE A QUALIFIED SWPPP PRACTITIONER (QSP) HAS BEEN OR 'MLL BE
RETAINED TO SUPERVISE fMPLEMENTA TION OF THE SWPPP IN ACCORDANCE WITH THE
CALIFORNIA CONSTRUCTION ORDER AND MUNICIPAL PERMIT, LA TEST VERSION.
STEVEN FEDER, MANAGER, TRIUMPH PROPERTIES GROUP DATE
j. NON-PHYTO-TOXIC WEmNG AGENTS MAY BE ADDED TO THE HYDROSEED
SLURRY AT THE DISCRETION OF THE CONTRACTOR.
2. TYPE 1 MULCH APPLIED AT THE RA TE OF NO LESS THAN 2000 lbs PER ACRE.
TYPE 6 MULCH {STRAW) MAY BE SUBSTITUTED, ALL OR PART, FOR
HYDRAULICALLY APPLIED FIBER MATERIAL. WHEN STRAW IS USED IT MUST BE
ANCHORED TO THE SLOPE BY MEGHAN/CALLY PUNCHING NO LESS THAN 50% OF
THE STRAW INTO THE SOIL.
3. FERTILIZER CONSISTING OF AMMONIUM PHOSPHATE SULFATE, 16-20-0, WITH 15%
SULPHUR APPLIED AT THE RA TE OF 500 lbs. PER ACRE.
D. AREAS TO BE HYDROSEEDED SHALL BE PREPARED PRIOR TO HYDROSEEDING BY:
1. ROUGHENING THE SURFACE TO BE PLANTED BY ANY OR A COMBINATION OF:
a. TRACK WALKING SLOPES STEEPER THAN 6: 1
b. HARROWING AREAS 6: 1 OR FLATTER THAT ARE SUFFICIENTLY
FRIABLE.
c. RIPPING AREAS THAT WILL NOT BREAK UP USING ITEMS a OR b
ABOVE.
2. CONDITIONING THE SOILS SO THAT IT JS SUITABLE FOR PLANTING BY:
a. ADJUSTING THE SURFACE SOIL MOISTURE TO PROVIDE A DAMP
BUT NOT SATURATED SEED BED.
b. THE ADDITION OF SOIL AMENDMENTS, PH ADJUSTMENT, LEACHING
COVERING SALINE SOILS TO PROV/OED VIABLE CONDITIONS FOR
GROWTH.
E. HYDROSEEDED AREAS SHALL BE MAINTAINED TO PROVIDE A VIGOROUS GROWTH UNTIL THE
THE PROJECT IS PERMANENTLY LANDSCAPED OR, FOR AREAS WHERE HYDROSEEDING IS THE
THE PERMANENT LANDSCAPING, UNTIL THE PROJECT IS COMPLETED AND ALL BONDS
RELEASED.
SOURCE OF TOPOGRAPHY
TOPOGRAPHY SHOWN ON THESE PLANS WAS GENERA TED BY AERIAL
.LJQAB METHODS FROM JNFORMA TION GATHERED ON APRIi 7
2Q.2J.._ BY APM ENGINEERING
TOPOGRAPHY SHOWN HEREON CONFORMS TO NATIONAL MAP
ACCURACY STANDARDS.
PROJECT LOCATION
THIS PROJECT IS LOCATED WITHIN ASSESSORS PARCEL NUMBER(S)
1670306400
SITE
VICINITY MAP
CITY
WORK TO BE DONE
THE GRADING WORK SHALL CONSIST OF RE-GRADING OF TWO EXISTING SURFICIAL SLOPE
FAILURES AND REPAIR OF EXISTING DAMAGED DRAINING SWALES, AS-BUILT GEOLOGIC MAPS
AND REPORTS, ALL AS SHOWN OR REQUIRED ON THIS SET OF PLANS AND THE CITY
STANDARDS, SPECIF/CA TfONS, REQUIREMENTS, RESOLUTIONS AND ORDINANCES Cf TEO ON
THESE PLANS.
THE GRADING WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE FOLLOWING
DOCUMENTS, CURRENT AT THE TIME OF CONSTRUCTION, AS DIRECTED BY THE CITY
ENGINEER.
1. CARLSBAD MUNICIPAL CODE
2. CITY OF CARLSBAD ENGINEERING STANDARDS
3. THIS SET OF PLANS
4. THE STANDARD SPECIF/CATIONS FOR PUBLIC WORKS CONSTRUCTION (GREEN
BOOK).
CITY or VISTA 5. SOILS REPORT AND RECOMMENDA T/ONS BY GEOSITE ENGINEERING
PACIFIC
OCEAN
INDEX OF SHEETS
1. TITLE SHEET
2. TOPOGRAPHIC MAP
3. GRADING REPAIR PLAN
4. TIER 2 SWPPP
5. EROSION CONTROL PLAN
6. SOILS REPORT RECOMMENDA TfONS
LEGAL DESCRIPTION
SEC 32-11-4W*LOTS 3-5*PAR B PER DOC93-285936\
PROJECT ADDRESS
2701 AVENIDA DE ANITA, CARLSBAD, CA 92010-8353
DEVELOPER
NAME: TRIUMPH MANAGEMENT COMPANY
9454 WILSHIRE BL VD. SUITE 800
ADDRESS: BEVERLY HILLS, CA 90212
PHONE NO.: 310-625-5335
REFERENCE DRAWINGS
DWG 168-4
EARTHWORK QUANTITIES
CUT: 200 CY
FILL: 240 CY
IMPORT: _4-0 ____ cy
EXPORT: n CY
REMEDIAL: 240 CY
BENCH MARK
DESCRIPTION: CITY OF CARLSBAD BENCHMARK CLSB-087
LOCA TfON: mllNQ IN 2 5• DISK IN WE:SI CURB OPPOSITE
2906 A VEN/DA DE ANITA 190 FT. NORTH OF CALLE SUSANA
RECORDED: __________________ _
ELEVATION: 165.36 DA TUM: NGVD 29
_____ DATED MAY 21, 2023
6. THE SAN DIEGO REGIONAL STANDARD DRAWINGS AND AS MAY BE MODIFIED BY
THE CITY OF CARLSBAD STANDARDS.
7. CALIFORNIA STORM WATER QUALITY ASSOC/A TION BMP CONSTRUCTION HANDBOOK AND
CAL TRANS CONSTRUCTION SITE BMP MANUAL.
LEGEND
-#-
E--------3
R.O.W. BOUNDARY
TOPO CONTOUR
(E) V-DfTCH W/ 12" FREEBOARD PER PLAN
(E) 6" CURB AND SIDEWALK
ABANDONMENT NOTES
PART/ALLY COMPLETED PROJECTS SEEKING TO INDEFINITELY STOP WORK AND CLOSE THE
GRADING PERMIT MUST IMPLEMENT APPROPRIATE ACCESS RESTRICTION AND EROSION AND
SEDIMENT CONTROL MEASURES TO THE SA TfSFACTfON OF THE CITY, INCLUDING BUT NOT
LIMITED TO THE FOLLOWING:
1) PERMANENTLY STABILIZE ALL SLOPES (>5%) -70% COVER WITH WELL-ESTABLISHED,
SUSTAINABLE, NON-WEED VEGETA TfON (SEE CITY LANDSCAPE MANUAL FOR
GUIDELINES) JS CONSIDERED ADEQUATE.
2) PERMANENTLY STABILIZE FLAT AREAS (,<;;5%) -70% COVER WITH WELL-ESTABLISHED,
SUSTAINABLE, NON-WEED VEGETA TfON (SEE CITY LANDSCAPE MANUAL FOR
GUIDELINES) OR 2 INCHES (MINIMUM) OF PERMEABLE COVER (E.G., GRAVEL) IS
CONSIDERED ADEQUATE.
3) RESTRICT ACCESS TO SITE -COORDINATE WITH CITY STAFF TO DETERMINE
APPROPRIATE FENCING TYPE.
4) SfGNAGE ALONG FRONTAGE ROAD(S) POSTING THAT DUMPING, LITTERING, AND
TRESPASS/NG ARE PROHIBITED.
5) TRESPASS ENFORCEMENT AUTHORJZA TION LETTER MUST BE SENT FROM THE OWNER TO
THE CITY OF CARLSBAD POLICE DEPARTMENT.
6) NOTARIZE AND RECORD AGAINST THE PROPERTY AN AGREEMENT STATING THAT OWNER
IS RESPONSIBLE FOR MAINTAINING FENCING AND SfGNAGE, ADHERING TO THE FIRE
PREVENTION ORD/NATION, KEEPING THE SITE FREE FROM LITTER ACCUMULA TfON AND
VEGETATION GROWTH, AND REMOVING ANY fLLEGALL Y DUMPED MATERIALS AT THE SITE
UNTIL THE PROPERTY IS DEVELOPED IN THE FUTURE.
ALL STANDARD DRAWINGS ARE SAN DIEGO REGIONAL STANDARD DRAWINGS (SDRSD) UNLESS NOTED OTHER'MSE:
* CITY OF CARLSBAD STANDARD
** CARLSBAD MUNICIPAL WATER DISTRICT STANDARD ORA WING
••• SDRSD AS MODIFIED BY CITY OF CARLSBAD
POST-CONSTRUCTION BMP TABLE
STORM WATER REQUIREMENTS THAT APPLY:
~ STANDARD STORMWA TER REQUIREMENTS □ PRIORITY PROJECT REQUIREMENTS
TYPE DESCRIPTION OWNERSHIP
EXEMPT FROM
TRASH CAPTURE? ~ YES D NO
MAINTENANCE
AGREEMENT
EXEMPT FROM
HYDROMODIFICA TfON? ~ YES □ NO
SHEET NO. MAINTENANCE
FREQUENCY
11 AS BUIL T 11
RCE ___ EXP, ___ _ DATE
REVIE\JED BY:
INSPECTOR DATE
t--+---+-------------+----+--+--t--t lsHE1ETI. _c_rT_Y __ o_F_c_A_R_L_s_B_A_D~lsH~Tsl _ ENGINEERING DEPARTMENT
DATE INITIAL DATE INITIAL DATE INITIAL
ENGINEER OF WORK REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL
GRADING PLANS FOR:
THE BLUFFS SLOPE REPAIR -SOUTH SIDE OF MARRON ROAD
GR2023-0032 TITLE SHEET
APPROVED: JASON S. GELDERT
ENGINEERING MANAGER RCE 63912 EXPIRES 9/30/24 DATE
DWN BY:
CHKD BY:...,.....,.....,...._
RVWD BY: / ,f h<
PROJECT NO.
PD2023-0021
DRAWING NO.
544-2A
DocuSign Envelope ID: 206C0002-5897-442A-B69A-C97BAF435BA4
10/24/2023
E
ERICK J.
ALDRICH
No. 57827
CIVIL
SSFIOORNPADL
EE
NR
GTE
ISNIEGEERR
S
T
TA
EO OFFCA
ARLINI
Aldrich Consulting Engineers
0 ll o'
SLOPE REPAIR AREA 1
PREPARED BY: ERICK J. ALDRICH PE
ALDRICH CONSUL TING ENGINEERS
416 SHADOW TREE DRIVE
OCEANSIDE, CA 92058
RCE 57827
EXPIRES 6/30/24
/-----
SLOPE REPAIR AREA 2
I C
I I
I
I
I '1
I \
I I
I
I
----1
-_J ___ _
I
I
I
I --
/
C
\ i
\ I I
\I I I I
7
I
I
I
7
/
/
~THE BLUFFS APARTMENTS
2701 AVENIDA DE ANITA
CARSLBAD, CA 92010
BENCH MARK
DESCRI PT/ON: CITY OF CARLSBAD BENCHMARK CLSB-087
LOCATION: mt INQ IN 2 5• Q/5/< IN WE5I CURB QPPQ51TE
2906 AVENIDA DE ANITA 190 FT. NORTH OF CALLE SUSANA
RECORDED: ___________________ _ 1
DATE INITIAL
T
I
ELEVATION: 165.36 DA TUM: NGVD 29
ENGINEER OF WORK REVISION DESCRIPTION
11 AS BUIL T11
RCE EXP, DATE
SCALE: 1· = 50•-o· REVIE\JED BY1
0 50' 100'
INSPECTOR DATE
I SH~ET I CITY OF CARLSBAD I SH~ETS I
ENGINEERING DEPARTMENT
GRADING PLANS FOR:
THE BLUFFS SLOPE REPAIR -SOUTH SIDE OF MARRON ROAD
GR2023-0032 TOPOGRAPHIC MAP
APPROVED: JASON s. GELDERT
ENGINEERING MANAGER RCE 63912 EXPIRES 9/30/24 DATE
DATE INITIAL DATE INITIAL
OTHER APPROVAL CITY APPROVAL
DWN BY: PROJECT NO. DRAWING NO.
CHKD BY:f.<
RVWD BY: I Jt PD2023-0021 544-2A
DocuSign Envelope ID: 206C0002-5897-442A-B69A-C97BAF435BA4
10/24/2023
E
ERICK J.
ALDRICH
No. 57827
CIVIL
SSFIOORNPADL
EE
NR
GTE
ISNIEGEERR
S
T
TA
EO OFFCA
ARLINI
Aldrich Consulting Engineers
CE) CURB AND
APPROXIMATE LIMIT □F 5' KEY
~\
)
\
·,.,~ 10' TD
PER
RD\./
----
SHEET 6 /
I
•
CE) CONCRETE V-DITCH
0 ll o'
PREPARED BY: ERICK J. ALDRICH P.E.
ALDRICH CONSUL TING ENGINEERS
416 SHADOW TREE DRIVE
OCEANSIDE, CA 92058
RCE 57827
EXPIRES 6/30/24
SIDE\./ ALK
RON ROAD
MAR
/,,,.,✓----·/ ----· -------
/_/
WEST SLOPE REPAIR AREA 1
SCALE 1" = 10'
NOTES:
1. REMOVE LOOSE SOIL WITHIN SLOPE FAILURE AREA PER GEOTECHNICAL REPORT
RECOMMENDAllONS (SEE SHEET 6) AND PER GEOTECHNICAL ENGINEER DURING GRADING.
2. REPLACE/RECOMPACT SOIL TO ORIGINAL SLOPE GRADES.
3. FILL PLACEMENT AND COMPACllON TO BE OBSERVED AND TESTED BY THE GEOTECHNICAL
ENGINEER.
4. REPAIR CONCRETE V-DITCH TO MATCH EXISllNG.
5. OTHER DRAINAGE RECOMMENDA llONS PER SOILS ENGINEER, SEE SHEET 6.
CE) CURB AND
APPROXIMATE LIMIT □F 5' KEY
PER SHEET 6
10' TD RD\./
--
APPROXIMATE LIMITS
□ F GRADING REPAIR
CE) CONCRETE V-DITCH
SIDE\./ ALK
) '
)
·::-\1:-
,;--\--
•
. . . . . j .
. •.•.•.• .... ·.·.·.·.·.·.·.·.·.·.·.1·.·
,+' . .
• __ _I,.--
< \ __ j -. -, .. , ___ _,, __
• )-
\ \'1
,_--k ..
-------\
),
)
\--r'
• '\
• ) . .
'·--. ~ --"
) \"• . .)
I \"•
)
/ !
'""'---------"-APPROXIMATE LIMIT
□F FAILURE AREA
ADD
NE\./
AND
12" FREEB □ARD TD TOP
CSEE DETAIL
DITCH BY 18"
\
\
\
V-DITCH
\./IDEN V
□F
Al)
~ APPROXIMATE LIMIT FAILURE AREA
~ APPROXIMATE LIMITS □F GRADING REPAIR
12"
INCREASE FREE BOARD
12" PER PLAN BY
PLACE CONCRETE MONOLITHICALLY
\./ITH NE\./ V DITCH
MIN.t
t=-=-===== INCREASE S\./ALE
\./IDTH BY 18" f-18" -j
DETAIL A1
NO SCALE
~ CE) V DITCH TD BE
REPLACED
BENCH MARK
DESCRIPTION: CITY OF CARLSBAD BENCHMARK CLSB-087
LOCATION: mt INQ IN 2 5• Q/5/< IN WF5I CURB QPPQ51TE
2906 AVENIDA DE ANITA 190 FT. NORTH OF CALLE SUSANA
RECORDED: ___________________ _
ELEVA 770N: 165.36 DA TUM: NGVD 29
EAST SLOPE REPAIR AREA 2
SCALE 1" = 10'
NOTES:
1. REMOVE LOOSE SOIL WITHIN SLOPE FAILURE AREA PER GEOTECHNICAL REPORT
RECOMMENDAllONS (SEE SHEET 6) AND PER GEOTECHNICAL ENGINEER DURING GRADING.
2. REPLACE/RECOMPACT SOIL TO ORIGINAL SLOPE GRADES. RESTORE LANDSCAPE /RR/GA 770N, IF
PRESENT.
3. FILL PLACEMENT AND COMPACTION TO BE OBSERVED AND TESTED BY THE GEOTECHNICAL
ENGINEER.
4. REPAIR CONCRETE V-DITCH TO MATCH EXISllNG, INCREASE FREE-BOARD HEIGHT AT CURVE
OF V-DITCH BY 12 INCHES. AT LOCA 770N SHOWN ON PLAN.
5. OTHER DRAINAGE RECOMMENDA llONS PER SOILS ENGINEER. SEE SHEET 6.
6. PERMANENT LANDSCAPING. HYDROSEED EFFECTED AREAS.
"AS BUILT"
RCE __ _ EXP, ____ _ DATE
REVIE\JED BY:
INSPECTOR DATE
1---+-+--------------t----t---t----t-~ I SH3EET I CITY OF CARLSBAD I SH~ETS I ENGINEERING DEPARTMENT ~~==;=~~:::::::::::::::::::::::::::=:=======-=====;
1
DATE INITIAL DATE INITIAL DATE INITIAL
ENGINEER OF WORK REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL
GRADING PLANS FOR:
THE BLUFFS SLOPE REPAIR -SOUTH SIDE OF MARRON ROAD
GR2023-032
APPROVED:
ENGINEERING MANAGER
DWN BY:
CHKD BY: __ _
RVWD BY:
GRADING REPAIR PLAN
JASON S. GELDERT
RCE 63912 EXPIRES 9 30
PROJECT NO.
PD2023-0021
24 DATE
DRAWING NO.
544-2A
DocuSign Envelope ID: 206C0002-5897-442A-B69A-C97BAF435BA4
10/24/2023
E
ERICK J.
ALDRICH
No. 57827
CIVIL
SSFIOORNPADL
EE
NR
GTE
ISNIEGEERR
S
T
TA
EO OFFCA
ARLINI
Aldrich Consulting Engineers
STORM WATER POLLUTION PREVENTION NOTES
APN :
TIER 2 CITY STORM WATER POLLUTION PREVENTION PLAN (TIER 2 SWPPP)
AREA OF DISTURBANCE
CONSTRUCTION THREAT:
OWNER/APPLICANT:
SITE ADDRESS:
EMERGENCY CONTACT :
SHEET INDEX:
OWNER'S CERTIFICATION:
WEATHER TRIGGERED ACTION PLAN
VICINITY MAP
LEGEND
CASQA Designation
Construction Activity
(BMP) Description
Best Management Practice*
Erosion Control Sediment Control BMPsBMPs
Tracking
Control BMPs
Non-Storm Water
Management BMPs
Waste Management and Materials
Pollution Control BMPs
BEST MANAGEMENT PRACTICES (BMP) SELECTION TABLE
10/9/2023
10/9/2023Steven Feder
GENERAL SITE MANAGEMENT REQUIREMENTS
THE FOLLOWING GENERAL SITE MANAGEMENT REQUIREMENTS SHALL BE ADHERED TO
THROUGHOUT THE DURATION OF THE CONSTRUCTION WORK (YEAR ROUND}.
TRIUMPH
1. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT:DA V/D M PAGE FROM: MANAGEMENT
AT (TEL.NO.) 310-625-5335
2. DEVICES SHOWN ON CITY APPROVED PLANS SHALL NOT BE MOVED OR MODIFIED
WITHOUT THE APPROVAL OF THE ENGINEERING INSPECTOR.
3. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER
TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL.
4. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE
REQUIRED BY THE CITY ENGINEER DUE TO UNCOMPLETED GRADING OPERA 7/0NS OR UNFORSEEN
CIRCUMSTANCES WHICH MAY ARISE.
5. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS
TO PREVENT PUBLIC TRESPASS ONTO AREAS WHERE IMPOUNDED WATERS CREA TE A HAZARDOUS
CONDITION.
6. GRADING AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE FACE
OF SLOPE AT THE CONCLUSION OF EACH WORKING DAY.
7. ALL REMOVABLE PROTECTIVE DEVICES SHALL BE IN PLACE AT THE END OF EACH WORKING
DAY WHEN FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40%). SILT
AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL.
8. ALL GRAVEL BAGS SHALL CONTAIN 3/4 INCH MINIMUM AGGREGATE.
9. ALL EXPOSED DISTURBED AREAS MUST HA VE EROSION PROTECTION BMPs PROPERLY
INSTALLED. THIS INCLUDES ALL BUILDING PADS, UNFINISHED ROADS, AND SLOPES.
10. ADEQUATE PERIMETER PROTECl/ON BMPs MUST BE INSTALLED AND MAINTAINED AND
WILL BE UPGRADED, IF NECESSARY, TO PROVIDE SUFFICIENT PROTECTION FROM RUNOFF
DURING RAIN EVENTS.
II. ADEQUATE SEDIMENT CONTROL BMPs MUST BE INSTALLED AND MAINTAINED.
12. ADEQUATE BMPs TO CONTROL OFFS/TE SEDIMENT TRACKING MUST BE INSTALLED AND
MAINTAINED.
13. A MINIMUM OF 125% OF THE MATERIAL NEEDED TOO INSTALL STANDBY BMPs TO
PROTECT THE EXPOSED AREAS FROM EROSION AND PREVENT SEDIMENT DISCHARGES,
MUST BE STORED ONSITE. AREAS ALREADY PROTECTED FROM EROSION USING PHYSICAL
STAB/LIZA TION OR ESTABLISHED VEGETATION STAB/LIZA TION BMPs ARE NOT CONSIDERED
TO BE "EXPOSED" FOR PURPOSES OF THIS REQUIREMENT.
14. THE OWNER/DEVELOPER/CONTRACTOR MUST FOLLOW "WEATHER TRIGGERED" ACTION
PLAN AND BE ABLE TO DEPLOY STANDBY BMPs TO PROTECT THE EXPOSED PORl/ONS OF
THE SITE WITHIN 48 HOURS OF A PREDICTED STORM EVENT (A PREDICTED STORM EVENT
IS DEFINED AS A 40% CHANCE OF RAIN WITHIN A 5-DA Y NA 7/0NAL M'A THER SERVICE
FORECAST). ON REQUEST, THE OWNER/DEVELOPER/CONTRACTOR MUST PROVIDE PROOF
OF THIS CAPABILITY.
15. DEPLOYMENT OF PHYSICAL OR VEGETATION EROSION CONTROL BMPs MUST COMMENCE
AS SOON AS SLOPES ARE COMPLETED. THE OWNER/DEVELOPER/CONTRACTOR MAY NOT RELY
ON THE ABILITY TO DEPLOY STANDBY BMP MATERIALS TO PREVENT EROSION OF SLOPES THAT
HA VE BEEN COMPLETED.
16. THE AREA THAT CAN BE CLEARED, GRADED, AND LEFT EXPOSED AT ONE TIME IS
LIMITED TO THE AMOUNT OF ACREAGE THAT THE CONTRACTOR CAN ADEQUATELY PROTECT
PRIOR TO A PREDICTED RAIN EVENT. FOR LARGER SITES, GRADING SHOULD BE PHASED.
IT MAY BE NECESSARY TO DEPLOY EROSION AND SEDIMENT CONTROL BMPs IN AREAS THAT
ARE NOT COMPLETED, BUT ARE NOT ACTIVELY BEING WORKED BEFORE ADDITIONAL GRADING
IS ALLOM'D TO PROCEED, AT THE DISCRETION OF THE CITY INSPECTOR.
17. ALL DISTURBED AREAS THAT ARE NOT COMPLETED AND/OR NOT BEING ACTIVELY GRADED
MUST BE FULLY PROTECTED FROM EROSION IF LEFT FOR 14 OR MORE DAYS. THE ABILITY
TO INSTALL BMP MATERIALS IN A PROMPT MANNER IS l:1f)I SUFFICIENT. BMPs NEED TO BE
INSTALLED IN THESE AREAS.
18. BMPs MUST BE STOCKPILED AT VARIOUS LOCATION THROUGHOUT THE PROJECT SITE
THROUGHOUT THE YEAR. WHENEVER THERE IS A 40% CHANCE OR CREA TER OF A RAIN
WITHIN A THREE (3) DAY FORECAST, THE INSPECTOR WILL VERIFY THAT BMPs ARE
ADEQUATELY STOCKPILED. BMPs MUST BE STOCKPILED AND READY FOR DEPLOYMENT WHEN
THERE IS 50% CHANCE OF RAIN WITHIN A 48 HOUR FORECAST. FAILURE TO COMPLY WITH
THIS REQUIREMENT COULD RESULT IN THE ISSUANCE OF A STOP WORK NOTICE OR OTHER
ENFORCEMENT ACl/ON.
19. ALL TREATMENT AND EROSION CONTROL BMPs MUST BE INSPECTED M'EKL Y AND
PRIOR TO A FORECASTED RAIN EVENT OF CREA TER THAN 50%, AND AFTER A RAIN EVENT.
IN ADDITION, TREATMENT CONTROL BMPs MUST BE SERVICED AS NEEDED THROUGHOUT
THE YEAR.
20. IF SELECTED BMP FAILS DURING A RAIN EVENT, IT MUST BE REPAIRED OR IMPROVED
OR REPLACED WITH AN ACCEPTABLE AL TERNA TE AS SOON AS IT IS SAFE TO DO SO. THE
FAILURE OF A BMP IND/CA TES IT WAS NOT ADEQUATE FOR THE CIRCUMSTANCES IN WHICH
IT WAS USED. REPAIRS AND REPLACEMENT MUST THEREFORE PUT A MORE ROBUST BMP
MEASURE IN PLACE.
21. ALL CONSTRUCTION EMPLOYEES MUST BE TRAINED ON THE IMPORTANCE OF STORM
WATER POLLUTION PREVENTION AND BMP MAINTENANCE.
0 C o'
PREPARED BY: ERICK J. ALDRICH PE
ALDRICH CONSUL TING ENGINEERS
416 SHADOW TREE DRIVE
OCEANSIDE, CA 92058
RC£ 57827
EXPIRES 6/30/24
EROSION CONTROL HYDROSEEDING, PLANTING AND /RR/GA TION
1. ALL PERMANENT AND TEMPORARY EROSION CONTROL PLANTING AND /RR/GA TION SHALL
BE INSTALLED AND MAINTAINED AS REQUIRED IN SECTION 212 OF THE STANDARD
SPECIF/CATIONS AND THE FOLLOWING:
A HYDROSEEDING SHALL BE APPLIED TO:
1 ALL SLOPES THAT ARE GRADED 6: 1 {HORIZONTAL TO VERTICAL} OR
STEEPER WHEN THEY ARE:
a. THREE FEET OR MORE IN HEIGHT AND ADJACENT TO PUBLIC
WALL OR STREET.
b. ALL SLOPES 4 FEET OR MORE IN HEIGHT.
2 AREAS GRADED FLATTER THAN 6: 1 WHEN ANY OF THE
FOLLOWING CONDITIONS EXIST:
a. NOT SCHEDULED FOR IMPROVEMENTS (CONSTRUCTION OR
GENERAL LANDSCAPING} WITHIN 60 DAYS OF ROUGH GRADING.
b. IDENTIFIED BY THE PARKS AND RECREATION DIRECTOR AS
HIGHL Y VISIBLE TO THE PUBLIC.
c. HA VE ANY SPECIAL CONDITION IDENTIFIED BY THE CITY
ENGINEER THAT WARRANTS IMMEDIATE TREATMENT.
B HYDROSEEDING AREAS SHALL BE /RR/GA TED IN ACCORDANCE WITH THE
FOLLOWING CRITERIA:
1 ALL SLOPES THAT ARE GRADED 6: 1 OR STEEPER AND THAT ARE.·
a. THREE TO EIGHT FEET IN HEIGHT SHALL BE /RR/GA TED BY HAND
WATERING FROM QUICK COUPLERS/HOSE BIBS OR A
CONVENTIONAL SYSTEM OF LOW PRECIP/TA TION SPRINKLER
HEADS PROVIDING 100% COVERAGE.
b. CREA TER THAN 8 FEET IN HEIGHT SHALL BE WATERED BY A
CONVENTIONAL SYSTEM OF LOW PRECIPITATION SPRINKLER HEADS
PRO VIDING 100% CO VERA GE.
2 AREAS SLOPED LESS THAN 6: 1 SHALL BE /RR/GA TED AS APPROVED BY
THE CITY ENGINEER, PRIOR TO HYDROSEEDING. THE DEVELOPER SHALL
SUBMIT A PROPOSED SCHEME TO PROVIDE /RR/GA TION TO THE CITY
ENGINEER. THE PROPOSAL SHALL BE SPECIFIC REGARDING THE
NUMBERS, TYPE, AND COSTS OF THE ELEMENTS OF THE PROPOSED SYSTEM.
3 /RR/GA TION SHALL MAINTAIN THE MOISTURE LEVEL OF THE SOIL AT THE
OPTIMUM LEVEL FOR THE GRADING OF THE HYDROSEEDED GROWTH.
C HYDROSEEDING MIX SHALL CONSIST OF ALL OF THE FOLLOWING:
1 SEED MIX SHALL CONSIST OF NO LESS THAN:
a. 20 lbs. PER ACRE OF ROSE CLOVER
b. 20 lbs PER ACRE OF ZORRO FESCUE
c. Jibs PER ACRE OF E SCHOOL CIA CALIFORNICA
d. 4 lbs PER ACRE OF ACHILLEA MILLEFOLIA
e. Jibs PER ACRE OF AL YSSUM (CARPET OF SNOW)
f. 1/2 lb. PER ACRE IF DIMORPHOLECA
g. ITEMS c, d, e, AND f OF THIS SUBSECTION MAY BE OMITTED ON
VISIBLE FROM EITHER A PUBLIC STREET OR RESIDENTIAL
STRUCTURES.
h. ITEM a OF THIS SUBSECTION MUST BE INOCULATED WITH A
NITROGEN FIXING BACTERIA AND APPLIED DRY EITHER BY
DRILLING OR BROADCASING BEFORE HYDROSEEDING.
i ALL SEED MATERIALS SHALL BE TRANSPORTED TO THE JOBS/TE
IN UNOPENED CONTAINERS WITH THE CALIFORNIA DEPARTMENT
OF FOOD AND AGR/CUL TUR£ CERT/FICA TION TAG ATTACHED TO,
OR PRINTED ON SAID CONTAINERS.
j NON-PHYTO-TOX/C WETTING AGENTS MAY BE ADDED TO THE
HYDROSEED SLURRY AT THE DISCRETION OF THE CONTRACTOR.
2 TYPE 1 MULCH APPLIED AT THE RA TE OF NO LESS HAN 2000 lbs PER
ACRE. TYPE 6 MULCH (STRAW} MAY BE SUBSTITUTED, WHEN STRAW IS USED,
IT MUST BE ANCHORED TO THE SLOPE BY MEGHAN/CALLY PUNCHING NO LESS
THAN 50% IF THE STRAW INTO THE SOIL.
3 FERTILIZER CONSISTING OF AMMONIUM PHOSPHATE SULFA TE. 16-20-0
WITH 15% SULPHUR APPLIED AT THE RA TE OF 500 lbs. PER ACRE.
D AREAS TO BE HYDROSEEDED SHALL BE PREPARED PRIOR TO HYDROSEEDING:
1 ROUGHENING THE SURFACE TO BE PLANTED BY ANY OR A
COMB/NA TION OF:
a. TRACK WALKING SLOPES STEEPER THAN 6: 1.
b. HARROWING AREAS 6: 1 OR FLATTER THAT ARE SUFFICIENTLY
FRIABLE.
2 AREAS GRADED FLATTER THAN 6: 1 WHEN ANY OF THE FOLLOWING
CONDITIONS EXIST:
a. ADJUSl/NG THE SURFACE SOIL MOISTURE TO PROVIDE A DAMP
BIT NOT SATURATED SEED 8£0.
b. THE ADDITION OF SOIL AMENDMENTS, PH ADJUSTMENT, LEACHING
COVERING SALINE SOILS TO PROVIDED VIABLE CONDITIONS FOR
GROWTH.
E HYDROSEEDING AREAS SHALL BE MAINTAINED TO PROVIDE A VIGOROUS GROWTH
UNTIL THE PROJECT IS PERMANENTLY LANDSCAPED OR, FOR AREAS WHERE
HYDROSEEDING IS THE PERMANENT LANDSCAPING, UNTIL THE PROJECT IS
COMPLETED AND ALL BONDS RELEASED.
2. ALL SLOPES SHALL HA VE /RR/GA 7/0N INSTALLED AND BE STABILIZED, PLANTED
AND/OR HYDROSEEDED WITHIN TEN (10} DAYS OF THE 7/ME WHEN EACH SLOPE IS BROUGHT
TO GRADE AS SHOWN ON THE APPROVED GRADING PLANS.
3. SHOULD GERM/NATION OF HYDROSEEDED SLOPES FAIL TO PROVIDE EFFICIENT
COVERAGE OF GRADING SLOPES {90% COVERAGE} PRIOR TO OCTOBER 1, THE SLOPES SHALL
BE STABILIZED BY AN APPROPRIATE EROSION CONTROL MATTING MATERIAL APPROVED BY
THE PUBLIC WORKS INSPECTOR.
4. LANDSCAPING SHALL BE ACCOMPLISHED ON ALL SLOPES AND PADS AS REQUIRED BY
THE CITY OF CARLSBAD LANDSCAPE MANUAL, THE LANDSCAPING PLANS FOR THIS PROJECT
OR AS DIRECTED BY THE CITY ENGINEER OF PLANNING DIRECTOR.
5. THE OWNER/APPLICANT SHALL ENSURE THAT All CONTRACTORS SHALL
COORDINATE THE WORK OF THIS CONSTRUCTION SWPPP SHOWN ON ANY GRADING
PLANS, LANDSCAPE AND /RR/GA TION PLANS, AND IMPROVEMENT PLANS AS
REQUIRED FOR THIS PROJECT WORK.
THE DEVELOPER SHALL DEPLOY STANDBY BEST MANAGEMENT PRACTICE MEASURES TO
COMPLETELY PROTECT THE EXPOSED PORTIONS OF THE SITE WITHIN 48 HOURS OF A
PREDICTED STORM EVENT ( A PREDICTED STORM EVENT IS DEFINED AS A FORECASTED, 40%
CHANCE OF RAIN BY THE NATIONAL WEATHER SERVICE), IN ADDITION TO BMPs IMPLEMENTED
YEAR-ROUND INCLUDING PERIMETER CONTROL, WIND EROSION CONTROL, TRACKING,
NON-STORM WATER CONTROL, WASTE MANAGEMENT, AND MATERIALS POLLUTION CONTROL.
THE NATIONAL WEATHER SERVICE FORECAST SHALL BE MONITORED AND USED BY
THE DEVELOPER ON A DAILY BASIS. IF PRECIPITATION IS PREDICTED (40% CHANCE OF
RAIN), THEN THE NECESSARY WATER POLLUTION CONTROL PRACTICES SHALL BE DEPLOYED
WITHIN 48 HOURS AND PRIOR TO THE ONSET OF THE PRECIPITATION.
THE DEPLOYMENT OF THE BMPS SHALL INCLUDE BUT NOT BE LIMITED TO GRAVEL BAGS AND
SILT FENCES. A MINIMUM OF 125% OF THE MATERIAL NEEDED TO INSTALL STANDBY BEST
MANAGEMENT PRACTICES MEASURES TO PROTECT THE EXPOSED AREAS FORM EROSION AND
PREVENT SEDIMENT DISCHARGES MUST BE STORED ON-SITE. AREAS THAT HAVE ALREADY
BEEN PROTECTED FROM EROSION USING PHYSICAL STAB/LIZA TION OR ESTABLISHED
VEGETATION STAB/LIZA TION BMPS AS DETERMINED BY THE CITY OF CARLSBAD ARE NOT
CONSIDERED TO BE "EXPOSED" FOR THE PURPOSES OF "WEATHER TRIGGERED ACTION PLAN~
AN ADEQUATE SOURCE OF EQUIPMENT AND WORKERS SHALL BE AVAILABLE FOR
DEPLOYMENT OF "WEATHER TRIGGERED BMPS~
.§
., -0 -::!; 1;:, ., ~o o-0, C: "
~
" g. ., ~ .s Oo Cll C: 0, 0,
., " .,
>!:: ➔
➔
Grading/Soil Disturbance
Trenchinn !Excavation
Stockvifino
Oriflinn /Rorina
Concrete/ Asvhalt Sawcuttina
Concrete Flotwork
Pavina
Conduit IPioe lnstaffation
Stucco/Mortar Work
Waste Disoosal
Staainn ILav Down Area
Eauioment Maintenance and Fuelina
Hazardous Substance Use/Storoae
Dewaterina
Site Access Across Dirt
Other Oist):
Instructions:
-2~ .s 1;:, -.,
§! 0, " a; .s; .,
i ., -Ill-~ ct~
('J ....
I I
::.3 ::.3
.c .s
~
., -'2 "V)
" ~ 0,
" :, ~Q.) e 0 -0 "' C: c:, 0 Cll -::!; c:, 0, c:, C: ., a:: "' :S-~ ~ " ~ ti '!< 1;:, ., .... -0 g. ., 0 .... 0 -., & ., ~ ~tS Vi ~ c'l 6 ~ "'
" o:i 0, ---,.., .... LC') "' I I I I
~ ~ ~ ~
I
::.3 ::.3 ::.3 ::.3 t:J
C: C:
1;:, .2 .2
C: --0 0 0 2 2 -0, .... ., --:s .s -~ ., ., .,
Ii} t: C: ., C: 0 ., 0 0 .s c.,
" 0,
c., .... Cll ea 0,
"' C: ""2¼:z 1;:, ,._ V) ·-0, c:,._ _E 0 -" 0 E~ ..... ., ~:ii: " :, '§ ~ (/) ·-1;:, ., :, " --g ~ il 0 .... 0
~
00
en g _..., -0, -o V) Cl.. V) ..s V) a::
" c:,
"' --('J
I
~ ~
I I
t:J f):: f)::
J~ ---~ 1;:, ~ 0,
·r §. § 1;:, C: .s ~ C: .2 1;:, 0 -~ ~ ~ c 0, §!
-~
0 .§ .... t;; § ., ., --1;:, ., 1;:, ., ~
., ., ::!; C:
C: C: c:, ::, '!< 0 ., §_§ 0 0,
c., "
., .,
~ :-§ ~ -~ "' ct e 0 o,~ ~ .£; ~ L. ~ .0 C: 0 0 <:: ~ e ., 0 ·s ~ 0 i; g 0 ~c: ~o -~o -0 i ct cf& 0 ~D 0 -0 -S½-8 Cl.. '.:!; V) ::!; V)
,.., " "' -('J ,.., .... -I I I I I I I I V) V) V) V) i i i i < < < <
'
" -., ., -~-., -i] " C: <:: -" ., " i~ " E " E .g " -" ., 0, 0, .... 0,
1;:, 0 oO tJ 0
:.:::: § " <:: <:: <::
c5: ::!; oo 0 0 :i: ::!; c., ::!;
LC') "' o:i I I I i i i
CITY OF OCEANSIDE
HIGHWAY, -7B -
PACIFIC
OCEAN
CITY OF VISTA
-f'
q_..O
CITY OF
' SAN MARCOS
SHEET 1: TITLE SHEET
SHEET 2: EROSION CONmOL PLANS
1670306400
2701 A VEN/DA DE ANITA, CARLSBAD, CA 92010-8353
AREA OF DISTURBANCE _ _,2c...:,:40,,,0,...__ S.F.
(THIS AREA INCLUDES BUT IS NOT LIMITED TO
OFF-SITE WORK INCLUDING PUBLIC IMPROVEMENTS
AND TEMPORARY DISTURBANCE SUCH AS VEHICLE
AND EQUIPMENT STAGING AREAS, CONSTRUCTION
WORKER FOOT mAFFIC, SOIL/GRAVEL PILES, UTILITY
mENCHES, BACKFILL CUTS AND SLOPE KEYWA YS)
1. Check the box to the left of off applicable construction activity (first column) expected to occur during construction. CONSTRUCTION THREAT TO STORM WATER QUALITY (CHECK BOX):
181 HIGH □ MEDIUM 2. Located along the top of the BMP Table is a fist of BMP's with it's corresponding California Stormwater Quality Association (CASOA) designation number. Choose one
or more BMPs you intend to use during construction from the list. Check the box where the chosen activity row intersects with the BMP column.
3. Refer to the CASOA construction handbook for information and details of the chosen BMPs and how to apply them to the project.
{DELETE ITEMS NOT USED ON THE SITE MAP)
(ADD CASQA DETAILS FOR EROSION AND SEDIMENT CONTROL UTILIZED ON SITE)
DESCRIPTION
EC-10, VELOCITY DISS/PA TION
5£-1, SILT FENCE
SE-5, FIBER ROLL
5£-6, GRAVEL BAG
TR-1, STABILIZED CONSmUCTION ENTRANCE
NS-8, VEHICLE AND EQUIPMENT CLEANING
NS-9, VEHICLE AND EQUIPMENT FUELING
NS-10, VEHICLE AND EQUIPMENT MAINTENANCE
W,\,/-1, MATERIAL DELIVERY AND STORAGE
W,\,/-2, MATERIAL USE
W,\,/-5, SOLID WASTE MANAGEMENT
W,\,/-9, SANITARY/SEPTIC WASTE MANAGEMENT
SYMBOL
... ... --...---...,-
-" __ ,. -
=
m11111111111111111•
NS-8
NS-9
NS-10
W,\,/-1
W,\,/-2
W,\,/-5
WM-9
I UNDERSTAND AND ACKNOWLEDGE THAT I MUST.· (1) IMPLEMENT
BEST MANAGEMENT PRACTICES (BMPs} DURING CONSTRUCTION ACTIVITIES
TO THE MAXIMUM EXTENT PRACTICABLE TO A VOID THE MOB/LIZA TION OF
POLLUTANTS SUCH AS SEDIMENT AND TO AVOID THE EXPOSURE OF STORM
WATER TO CONSTRUCTION RELATED POLLUTANTS; AND (2) ADHERE TO, AND
AT ALL TIMES, COMPLY WITH THIS CITY APPROVED TIER 2 CONSTRUCTION SWPPP
THROUGHOUT THE DURA TIDN OF THE CONSTRUCTION ACT/Vil/ES UNTIL THE
CONSTRUCl/ON WORK IS COMPLETE AND SIGNED OFF BY THE CITY OF CARLSBAD.
OWNFR(S)/ OWNFR'S AGFNT NAMF (PRINT) DATE ~6)Q~A-
OWNER{S}/ OWNER'S AGENT NAME (SIGNA TUR£) DATE
NAME: TRIUMPH MANAGEMENT COMPANY
ADDRESS.· 9454 WILSHIRE BL IIV. SUI TE 800, BEVERL Y HILLS, CA 90212
TELEPHONE NO.: 310-625-5335
NAME: DA V/0 PA GE
ADDRESS: 9454 WILSHIRE Bl IIV. SUITE 800, BEVERLY HILLS, CA 90212:
TELEPHONE NO.: 310-625-5335
11 AS BUIL T 11
RCE___ EXP, ___ _ DATE
REVIE\JED BY:
INSPECTOR DATE
f--+---+-----------+--+--+--1--------llsH!ETl.c----'rT=Y=o=F-=--=c=A~R~L~s=B~A-D~lsH~Tsl _ ENGINEERING DEPARTMENT
1------1--------1------------------l----l---l----l-----l GRADING PLANS FOR:
THE BLUFFS SLOPE REPAIR -SOUTH SIDE OF MARRON ROAD
STORMWATER POLLUTION PREVEmION PLAN (SWPPP) TIER 2
GR2023-0032 EROSION CONTROL TITLE SHEET
APPROVED: JASON S. GELDERT
1------l--------l~-----------------l----l---l----l-----l ENGINEERING MANAGER RCE 63912 EXPIRES 9/30/24 DATE
/1\
DATE INITIAL
ENGINEER OF WORK REVISION DESCRIPTION
DA TE INITIAL
OTHER APPROVAL
DWN BY: ---PROJECT NO. DRAWING NO.
CHKD BY: 'n
RVWD BY: /Jt 1-:s. PD2023-0021 544-2A
DATE INITIAL
CITY APPROVAL
DocuSign Envelope ID: 206C0002-5897-442A-B69A-C97BAF435BA4
10/24/2023
E
ERICK J.
ALDRICH
No. 57827
CIVIL
SSFIOORNPADL
EE
NR
GTE
ISNIEGEERR
S
T
TA
EO OFFCA
ARLINI
Aldrich Consulting Engineers
Fiber Rolls SE-5
INST ALL SILT FENCE
PER DETAIL El
APPROXIMATE\ LIMIT
CSE -1)
BELO'w'
/
I '
\
OF 5' KEY
\ PER SHEET '~
l.
0 ll o'
//
_,/ __ .,,,-.....
PREPARED BY: ERICK J. ALDRICH PE
ALDRICH CONSUL TING ENGINEERS
416 SHADOW TREE DRIVE
OCEANSIDE, CA 92058
RC£ 57827
EXPIRES 6/30/24
\~'·,,
/
SLOPE REPAIR AREA
SCALE 1" 10'
1
2.
APPROXIMATE LIMIT OF 5' KEY
I ('
' I
I ;
_,,//
/'
(
' I /;
APPROXIMATE LIMIT OF REPAIR GRADING
'---FIBER ROLLS 15' APART PER
ATTACH THE FILTER FABRIC AND
EXTEND IT TO THE TRENCH
1. SET POSTS AND EXCAVATE A 4• X 4•
TRENCH UPSLOPE FROM AND ALONG
THE LINE POSTS.
1/
4'X4' TRENCH SLOPE
PE
3. BACKFILL AND COMPACT THE
EXCAVATED SOIL.
DETAIL SE-5
\/,er .ICCll ~f"lClrl'.I
·-1ea~ureJ c orq L-1~
l<J•. H u li1H ,; '.JfJ<-c
vurie~ belw~c;r
I U _ ·1c '.:'(·'
PER SHEET 6
J
,,
I -~:y ml~
::Le
11,;:nll -n,P.-c·I
8lcr·g e-/e cc11~0_11·.
·,,i:o I c t1Je1· r::ill 1·ecr
·, vpc •:,l·::·c • rrm~sil'c I''
·,lo ·1 >:IRH'.1flr slClf'H
I
!
\ ,-
(:'("•
. -·
' • ' .,----l'i-
·-,\-.1
,·--\--
~:-:: _j-~~ ==-~~-=--/-
/
.+.
' ' ' _ _\,.--
' ) C•
' .,
' , __ _,,_
' ) .
\ \'1
SLOPE REPAIR AREA 2
SCALE 1" = 10'
f-l:2~ 'DII
,5" ~-ii-
j
'>V:Jc,,j S~·:J<ES
)) h 4'
_.1--, ' . , ___ \.---'
.--\-
' .,
' '.
' ' ' '
/ !
' ' ' ' '
APPROXIMATE LIMIT
OF REPAIR GRADING
----FIBER ROLLS
PER DETAIL
15'
SE-5
APART
"AS BUILT"
RCE __ _ EXP, ____ _
REVIE\JED BY,
INSPECTOR
DATE
DATE
i---t-----t------------l---l--l---L-_JI SH~ET I CITY OF CARLSBAD I SHE6ETS I ENGINEERING DEPARTMENT
~G;R~AD~I;;:N;;;G,=;P;::LAN~S~F~O~R:::: =:=:::::::::::::::::::::::::::::=::::::::::==::_::::==::
-~-} ~-0 T_SCA-~-=[ __ N-=-C-=['--------"@
BENCH MARK
DESCRI P Tl ON: _.,,,c1':':T'c-Y ~O'-,F::-'Ce:,Ae1RL~S~B,iA!LD .1.Bti;.EwNCi,!H!!!M!!!Ac!1RKCL..!,C,1,.LS;iiB2=.10!Q8L7 __ _
LOCA Tf ON:==-:SF~n,,11'.'!N~D.f°"N~2-51'"~Q'!'I 5uK~INc"-eW~Ec.5iI~Ce,f y,fRctB!.,.!,D11:.P'.!=PccQ1:.5iLITfLt_,=~-
2906 AVENIDA DE ANITA 190 FT. NORTH OF CALLE SUSANA
RECORDED:
ELEVATION: =,1~6:::5,,,~.3:::6,,,_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-~-DA_TU_M_: ==~N-G::vo:~=2-9~=== DATE INITIAL
ENGINEER OF WORK
1
DA TE INITIAL DATE INITIAL
REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL
THE BLUFFS SLOPE REPAIR -SOUTH SIDE OF MARRON ROAD
GR2023-0032 EROSION CONTROL PLAN
APPROVED:
ENGINEERING MANAGER
DWN BY:
~~~~~TEA
JASON
RCE 63912 EXPIRES 9 30 24
PROJECT NO.
PD2023-0021
S. GELDERT
DATE
DRAWING NO.
544-2A
DocuSign Envelope ID: 206C0002-5897-442A-B69A-C97BAF435BA4
10/24/2023
E
ERICK J.
ALDRICH
No. 57827
CIVIL
SSFIOORNPADL
EE
NR
GTE
ISNIEGEERR
S
T
TA
EO OFFCA
ARLINI
Aldrich Consulting Engineers
’
’
’’
’ ’
May 21, 2023
GeoSite Engineering, Inc.
27068 La Paz Road, #571, Aliso Vieja, CA 92656
949-940-6828
Triumph Property Management
9454 Wilshire Blvd., Suite 800
Beverly Hills, California 90212
Attention: Mr. David M. Page
Subject: Preliminary Geotechnicaf Investigation
Surficial Washout Erosion on Northern Slope
2701 Avenida de Anita Along Marron Road
Carlsbad, California
References: See Appendix A
Dear Mr. Page:
Project No:
Report No:
23004
2J-D02
Geosite Engineering Inc. is presenting herein the results of our geotechnicaf investigation of the
surficia/ washout erosion on the north facing slope located above Marron Road at the subject
site. The slope washouts happened in two areas on the northern slope on January 1, 2023. The
cause of the washouts were surface drainage waters that overflowed a slope v-ditch that drains
east to west at the upper to mid-portion of the northern slope. The purpose of this study was to
obtain surface and subsurface information within the area of the surficia/ washout erosion to
determine soil and geologic conditions and to provide recommendations pertaining to
remediation of the slope.
SCOPE OF SERVICES
The scope of our investigation consisted of the following;
1. A site reconnaissance and geologic mapping of the slope areas.
2. Research and review of reports and literature concerning soil and geologic conditions
within and adjacent to the site.
J. Collection of representative bulk soil samples for laboratory identification.
4. Assessing the probable cause of the washout.
5. Performing an engineering evaluation of all information obtained.
6. Preparation of this report presenting the results of our investigation and providing
recommendations for remediation of the surficiaf slope erasion.
May 21, 2023
ILLUSffiA TIONS AND APPENDICES
Figure 1, Site Mop
Figure 2, Geologic Map
Figure J, Geotechnica/ Map
Figure 4, Cross Section A-A
Figure 5, Cross Section 8-8
Figure 6, Grading Details
Appendix A, List of References
Appendix B, Site Photographs
Plate 1, Topographic Survey Map
LOCATION AND SITE DESCRIPTION
Project No:
Report No:
Page No:
23004
23-002
2
The subject site is located on the northern slope of The Bluffs at Carlsbad apartment complex.
The general location of the site is shown on Figure 1. The northern slope area in the vicinity of
the washouts has a total relief of JO to 50 feet and has an existing slope ratio ranging from 1.7 to
1.8 to 1 (horizontal to vertical) as shown in Figure J. The base map for Figure J is a portion of a
topographic survey prepared in 2012 during remodeling of the property. Figure J shows the
approximate locations of the slope washouts defined in a west area and east area. The overall
slope is covered by a moderate to heavy growth of grass materials.
BACKGROUND INFORMATION
The following background information was obtained during our review of letters, reports and
literature available to us at the time of our evaluation (see Appendix A).
The apartment site was developed during the fate 1980 s to early 1990 s based on our review of
property records and aerial photography. The site is reported to be underlain at depth by bedrock
of the Santiago Formation (see Reference J and Reference 4). The Santiago Formation (map
symbol Tso) is predominantly described as sandstone materials. The geologic map indicates
bedding strikes northwest to northeast and dips 5 degrees east and west, respectively. Vertically
and laterally throughout the formation there exists greenish-brown, clays/one interbeds, and
tongues and lenses of often fossiliferous, fagoonaf clays/one and siltstone.
A comparison of ground elevation from the 2012 Site Topography Map (see Plate 1) and a
historical topographic map (Reference 5) shown in Figure 1, indicates that the property was
developed by site grading that included placement of various depths of fill soil above the original
grade contours. Original ground elevations in the vicinity of the northern slope ranged from
about 50 to 80 feet above mean sea level. Current site topography shows elevations in the
vicinity of the washout ranges from about 60 to 100 feet above mean sea level.
May 21, 2023 Project No:
Report No:
Poge No:
23004
23-002
J
A brief review of the 2012 Site Topographic Map indicates that a significant portion of the
stormwater drainage from the site is directed to the northern slope where it drains into a v-ditch
on the northern slope. This v-ditch carries surface water to the west and then south into a
drainage structure located on the western slope. Stormwater drainage from areas located
adjacent buildings 8 through 1J in the western portion of the site appears to be collected in an
area drain system that drains to the western slope and the northern slope (western portion
only).
The City of Carlsbad indicates that the northern slope washouts occurred during heavy rains on
January 1, 2023. The slope washouts are indicated to have occurred due to high water drainage
volumes in conjunction with sediment and debris build-up in the v-ditch. A review of the site
(see photographs in Appendix B) shows that the eastern slope washout occurred right after the
curved transition from the north flowing drainage swafe to the western flowing v-ditch ( see
Appendix B, Figures 8-J and 8-4). The downslope splash block on the v-ditch was sufficient to
contain the stormwoter flow at the transition. The washout at the western area was located at a
location where an area drain outlet was directing stormwater in a northerly direction (see
Appendix B, Figure 8-7) across the width of the v-ditch.
FIELD EXPLORATION
Our field exploration was performed on April 7, 2023 and consisted of mapping the slope
washout areas and the collection of surface and subsurface soil samples from the washout areas.
Soil materials predominantly consisted of silty fine sand, but also included soil materials
comprised of a varied mixture of silt, lean clays, and sand.
FINDINGS AND CONCLUSIONS
The findings and conclusions presented below are based on our site reconnaissance, mapping of
the subject slope, previous subsurface investigation and laboratory testing, and review of the
2012 topographic map and the referenced reports.
The approximate gross limits of the slope washout areas are shown on our Geotechnical Map
(Figure J). The width of the erosion areas ranges from J to 6 feet (east area) and J to 9 feet (west
area). The depth of the washout areas is estimated to range from 2 to J feet in depth. Cross
section views of the washout areas showing the approximate subsurface geologic conditions are
presented on our Cross Section A-A and 8-8 (Figures 4 and 5).
Based on the overall good performance of other areas of the northern slope, it is concluded that
the overall slope is grossly and surficially stable and needs no overall remedial action. ft is our
opinion that the slope erosion that occurred was solely caused by storm waters that overflowed
the northern v-ditch. Drainage improvements should as a minimum include placement of a 6-
inch concrete splash block (curb) along the outer edge (downslope side) of the northern v-ditch
and a 90-degree elbow on the end of all drainage pipes that direct stormwaters along the flow
fine of the v-ditch.
A WEST AREA 1 B EAST AREA 2 B'
-MARRON RD -V-DITCH
-MARRON RD -V-DITCH -SIDEl,/ALK
-SIDEl,/ALK PRE -ER□SI □N
110 --110
PRE -ER□SI□N
GRADE
110 --11D -FILL SLOPE
GRADE --ORIGINAL
-GRADE -
ORIGINAL --
ELEVATION (FEET GRADE
AF FILL ABOVE MEDIAN -80 SEA LEVEL) 80 -/( --V ? ------
?
V ?~
? ------BENCHING FDR I ----? SLOPE REPAIR
ELEVATION (FEET
ABOVE MEDIAN 5'-D' DR SEA LEVEL) -AF FILL -GREATER
~
-----
[
NATURAL 80 -
,<' f ? -80 ~ -------
SLOPE
' ? -----? -I
? BENCHING FDR -I ! -SLOPE REPAIR --I ------50 50 -ER□SI□N
SURFACE
TSA BEDROCK
-I ER□SI□ N -KEY 2' MIN, J 50 -SURFACE 50 -t --~5'~ TSA BEDROCK
------s: 5
SCALE 1" = 20' VERTICAL AND HORIZONTAL
SCALE 1" = 20' VERTICAL AND HORIZONTAL
May 21, 2023 Project No: 23004
23-002
4
Report No:
Page No:
Locally eroded areas in the west and east areas will require remedial surficia/ grading to replace
the slope to near the original conditions. This will include soil removal and replacement for a
typical width of 10 feet in the eroded areas, exposure of competent fill soil beneath the eroded
areas, and standard keying and benching into the slope to establish competent support prior to
placement of compacted fill (see Figure 6). Re-landscaping of the eroded and covered areas of
the slope will be needed to provide for long-term good performance. Landscaping of slope areas
should include placement of grasses and deep-rooted, drought-resistant plants. A landscape
architect could be consulted if desired to determine the most suitable groundcover for the slope.
Jute netting or equal materials should be placed over the repaired slope areas to protect the slope
un ti/ vegetation is re-established.
RECOMMENDATIONS
Based on our understanding of site conditions and the recent washouts, we propose the following
scope of repair for restoration of the slope as follows:
1. Remove all irrigation fines, vegetation and other debris from the planned work area.
2. Implement measures to enhance the future performance of the northern v-ditch. Drainage
improvements should as a minimum include placement of a 6-inch concrete splash block
J.
4.
5.
6.
--
\. I '\
( curb) along the outer edge ( downslope side) of the northern v-ditch and a 90-degree
elbow on the end of all drainage pipes that direct stormwaters along the flow line of the
v-ditch. Corrective measures should be recommended by the project Civil Engineer.
Construct a stabilization fill in the western and eastern repair areas. A key should be
established at the toe of the erosion surface ( see Figure 4 and 5) that is at feast five feet wide
and two feet deep and founded in competent fill soil material (see Figure 6). Removal
benches should be at feast 4-feet wide. Alf grading should be reviewed, tested and
approved by the geotechnica/ consultant during grading.
Removal bottoms will be scarified and recompacted to achieve at feast 90 percent relative
compaction at a moisture content of 110 percent of optimum moisture content per ASTM
D1557. Engineered fill soil is to be placed in 4 to 6-inch loose lifts and be compacted to at
feast 90 percent relative compaction at a moisture content of 110 percent of optimum
moisture content per ASTM D 1557.
Consult a landscape architect as-desired to design plantings consistent with the soil
conditions, climate, and that are similar and equivalent to the previous conditions.
Place jute netting or equal over the graded slope areas and other slope areas scheduled for
new vegetation. Jute netting should be stapled or otherwise affixed to the slope so that it will
remain in-place during the rainy season.
-----
I
REMOVE UNSUITABLE
MATERIAL
11 AS BUIL T 11
CROSS SECTION A-A' FIGURE 4 CROSS SECTION B-B' FIGURE 5 GRADING DETAILS FIGURE 6 RCE __ _ EXP, ____ _ DATE
0 ll o'
PREPARED BY: ERICK J. ALDRICH P.E.
ALDRICH CONSUL TING ENGINEERS
416 SHADOW ffiEE DRIVE
OCEANSIDE, CA 92058
RCE 57827
EXPIRES 6/J0/24
BENCH MARK
DESCRI PT/ON: CITY OF CARLSBAD BENCHMARK CLSB-087
LOCATION: mt INQ IN 2 5• Q/5/< IN WF5I CURB OPPOSITE
2906 AVENIDA DE ANITA 190 FT. NORTH OF CALLE SUSANA
RECORDED: ___________________ _
ELEVATION: 165.36 DA TUM: NGVO 29
REVIEl,/ED BY:
INSPECTOR DATE
l---j------j--------------r-----r---t--.-----.lsHE5ETl~c_rT_Y __ o_F_c_A_R_1_s_B_A_D~lsH~Tsl _ ENGINEERING DEPARTMENT
DATE INITIAL DATE INITIAL DATE INITIAL
ENGINEER OF WORK REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL
GRADING PLANS FOR:
THE BLUFFS SLOPE REPAIR -SOUTH SIDE OF MARRON ROAD
GR202J-OOJ2 SOILS REPORT RECOMMENDATIONS
APPROVED: JASON S. GELDERT
ENGINEERING MANAGER RCE 63912 EXPIRES 9/30/24
DWN BY:
~~ ~~~ (f k
PROJECT NO.
PD2023-0021
DATE
DRAWING NO.
544-2A
DocuSign Envelope ID: 206C0002-5897-442A-B69A-C97BAF435BA4
10/24/2023