HomeMy WebLinkAboutCDP 2022-0019; HOM RESIDENCE; GLOBAL SLOPE STABILITY EVALUATION; 2022-03-04GLOBAL SLOPE
STABILITY EVALUATION
HOM PROPERTY
2170 TWAIN AVENUE
CARLSBAD, CALIFORNIA
PREPARED FOR
MR. ROBERT HOM
CARLSBAD, CALIFORNIA
MARCH 4, 2022
PROJECT NO. G2826-32-01
CDP2022-0019
Project No. G2826-32-01
March 4, 2022
Mr. Robert Hom
2170 Twain Avenue
Carlsbad, California 92008
Subject: GLOBAL SLOPE STABILITY EVALUATION
HOM PROPERTY
2170 TWAIN AVENUE
CARLSBAD, CALIFORNIA
Dear Mr. Hom:
In accordance with your request, we have performed a stability analysis of the rear yard slope located
along the western margin of the subject property. The purpose of our study was to evaluate the global
stability of a slope configuration that was created during rear yard retaining wall improvements
constructed on the property. The scope of our work did not include an evaluation of internal retaining
wall stability or the suitability of other hardscape improvements. We have no opinion in that regard.
The subject property is Lot No. 68 of Carlsbad Tract 97-16A (Kelly Core) and was graded in 2003.
Geocon Incorporated provided geotechnical services during project development. The applicable
geotechnical report is entitled Final Report of Testing and Observation Services During Site Grading,
Kelly Core; CT97-16A, Single Family Lot Nos. 1 through 76 and 84 through 155, Carlsbad,
California, prepared by Geocon Incorporated, dated March 3, 2003.
A review of the report indicates that the subject property is a cut lot underlain by natural Terrace
Deposits. The soils consist of fine to medium grained silty sand. The slope excavation along the west
margin of the lot was originally graded at a ratio of 2:1 (horizontal:vertical) with a 5-foot-high
retaining wall at the base. The total slope height is approximately 25 feet. In 2021, the slope was
modified by construction of a series of stepped Mechanically Stabilized Earth (MSE) retaining walls
to create level terraces. A stairway and observation deck were also constructed as part of the rear yard
improvements.
A topographic survey of the new configuration was prepared by O’Day Consultants. We generated
four cross-sections based on the survey for the purpose of evaluating global slope stability. The
locations of Cross-Sections A-A’, B-B’, C-C’ and D-D’are shown on the Site Plan, Figure 1. The cross
sections and output files that show the calculated factor of safety for each section is presented on
Figures 2 through 5.
The computer program SLOPE/W distributed by Geo-Slope International was utilized to perform the
slope stability analyses. This program uses conventional slope stability equations and a two-
dimensional limit-equilibrium method to calculate the factor of safety against deep-seated failure. For
our analysis, Spencer’s Method was used. Spencer’s Method satisfies both moment and force
GEOCON
INCORPORATED
GEO TE C HNI CAL ■ ENVIRONMENTAL ■ MATERIALS O
6960 Flanders Drive ■ San Diego, California 92121-2974 ■ Telephone 858.558.6900 ■ Fax 858.558.6159
Project No. G2826-32-01 - 2 - March 4, 2022
equilibrium. The soil strength parameters for the Terrace Deposits used in our analysis were derived
from laboratory testing during the initial site investigation and our studies performed nearby.
Based on the results of the global slope stability analyses, a minimum static factor of safety of at least
1.5 is present along each cross section analyzed. With respect to the potential for soil erosion, the
hillside has been generally terraced with walls and flat planter surfaces. As a result, the exposure of
potentially erosive soils has been reduced compared to the originally graded slope. Therefore, we
conclude that the conditions are more favorable now compared to the 2:1 graded slope with respect to
surficial soil erosion. As previously noted, our evaluation did not consider the stability of the MSE
retaining walls and their zone of influence. We have no opinion in that regard. With that said, it is our
opinion that the slope is grossly stable with respect to the potential for deep-seated failure.
If there are any questions regarding this correspondence, or if we may be of further service, please
contact the undersigned at your convenience.
Very truly yours,
GEOCON INCORPORATED
Trevor E. Myers
RCE 63773
David B. Evans
CEG 1860
TEM:DBE:am
(e-mail) Addressee
A
A'B'
B C
C'
D'
D
6960 FLANDERS DRIVE - SAN DIEGO, CALIFORNIA 92121 - 2974
PHONE 858 558-6900 - FAX 858 558-6159 SHEET OF
PROJECT NO.
SCALE DATE
FIGURE
Plotted:03/03/2022 2:52PM | By:RUBEN AGUILAR | File Location:Y:\PROJECTS\G2826-32-01 Hom Property\SHEETS\G2826-32-01 SitePlan.dwg
GEOTECHNICAL ENVIRONMENTAL MATERIALS
1" =
SI8E PLAN
HOM PROPERTY
CARLSBAD, CALIFORNIA
5'03 - 04 - 2022
G2826 - 32 - 01
1 1 1
GEOCON LEGEND
........APPROX. LOCATION OF CROSS-SECTION
D D'
2.5
Distance (ft)
-10-8-6-4-2024681012141618202224262830323436384042444648505254565860
320
322
324
326
328
330
332
334
336
338
340
342
344
346
348
350
352
354
El
e
v
a
t
i
o
n
(
M
S
L
)
320
322
324
326
328
330
332
334
336
338
340
342
344
346
348
350
352
354A A'
Hom Property
Project No. G2826-32-01
Section A-A'
Name: AAc0.gsz
Date: 11/18/2021 Time: 10:21:13 AM
Color Name Unit Weight
(pcf)
Cohesion'
(psf)
Phi' (°)
Qt - Terrace Deposits 125 300 30
Existing Condition
Static Analysis
Qt
Figure 2
2.4
Distance (ft)
-10-8-6-4-2024681012141618202224262830323436384042444648505254565860
320
322
324
326
328
330
332
334
336
338
340
342
344
346
348
350
352
354
El
e
v
a
t
i
o
n
(
M
S
L
)
320
322
324
326
328
330
332
334
336
338
340
342
344
346
348
350
352
354B B'
Hom Property
Project No. G2826-32-01
Section B-B'
Name: BBc0.gsz
Date: 11/18/2021 Time: 10:24:12 AM
Color Name Unit Weight
(pcf)
Cohesion'
(psf)
Phi' (°)
Qt - Terrace Deposits 125 300 30
Existing Condition
Static Analysis
Qt
Figure 3
2.3
Distance (ft)
-10-8-6-4-2024681012141618202224262830323436384042444648505254565860
320
322
324
326
328
330
332
334
336
338
340
342
344
346
348
350
352
354
El
e
v
a
t
i
o
n
(
M
S
L
)
320
322
324
326
328
330
332
334
336
338
340
342
344
346
348
350
352
354C C'
Hom Property
Project No. G2826-32-01
Section A-A'
Name: CCc0.gsz
Date: 11/18/2021 Time: 10:25:26 AM
Color Name Unit Weight
(pcf)
Cohesion'
(psf)
Phi' (°)
Qt - Terrace Deposits 125 300 30
Existing Condition
Static Analysis
Qt
Figure 4
1.9
Distance (ft)
-10-8-6-4-2024681012141618202224262830323436384042444648505254565860
314
316
318
320
322
324
326
328
330
332
334
336
338
340
342
344
346
348
350
352
354
El
e
v
a
t
i
o
n
(
M
S
L
)
314
316
318
320
322
324
326
328
330
332
334
336
338
340
342
344
346
348
350
352
354D D'
Hom Property
Project No. G2826-32-01
Section D-D'
Name: DDc0.gsz
Date: 11/18/2021 Time: 10:27:11 AM
Color Name Unit Weight
(pcf)
Cohesion'
(psf)
Phi' (°)
Qt - Terrace Deposits 125 300 30
Existing Condition
Static Analysis
Qt
Pool
Figure 5