HomeMy WebLinkAbout1205 AVIARA PKWY; ; CBC2021-0491; PermitBuilding Permit Finaled
(Cityof
Carlsbad
Commercial Permit
Print Date: 01/02/2024
Job Address;
Permit Type:
Parcel#:
Valuation:
Occupancy Group:
#of Dwelling Units:
Bedrooms:
Bathrooms:
Occupant load:
Code Edition:
Sprinkled:
1205 AVIARA PKWY,
BLDG-Commercial
2120405600
$299,400.64
Project Title: AVIARA APARTMENTS
CARLSBAD, CA 92011-1276
Work Class:
Track#:
Lot#:
Project#:
Plan#:
Construction Type:
Orig. Plan Check#:
Plan Check#:
Demo
DEV2017-0033
Permit No:
Status:
CBC2021-0491
Closed -Finaled
Applied: 12/29/2021
Issued: 01/10/2022
Finaled Close Out: 01/02/2024
Final Inspection: 12/28/2023
INSPECTOR: Alvarado, Tony
Administrator, System
Description: AVIARA APTS: DEMOLISH EXISTING WAREHOUSE STRUCTURE (48,604 SF) TO FOUNDATION -FOUNDATION TO REMAIN IN
PLACE UNTIL GRADING PERMIT IS ISSUED
Applicant:
WERMERS PROPERTIES
5120 SHOREHAM PL, # STE 150
SAN DIEGO, CA 92122-5959
(858) 535-1475
FEE
Property Owner:
JAMES UKEGAWA
1205 AVIARA PKWY
CARLSBAD, CA 92011-1276
(760) 603-9608
BUILDING PLAN REVIEW-MINOR PROJECTS (LDE)
BUILDING PLAN REVIEW-MINOR PROJECTS (PLN)
DEMOLITION OF BUILDING: COMMERCIAL
INSPECTIONS-OTHER MISC
SB1473 -GREEN BUILDING STATE STANDARDS FEE
Total Fees: $624.00 Total Payments To Date: $624.00
Contractor:
AMG DEMOLITION AND ENVIRONMENTAL
SERVICE
4005 PACIFIC HWY
SAN DIEGO, CA 92110-2028
(619) 501-7427
Balance Due:
AMOUNT
$194.00
$98.00
$191.00
$129.00
$12.00
$0.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
Building Division Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f ] www.carlsbadca.gov
APPLICATION
•. MISSING
FOR THIS
• PROJECT
1
PERMIT INSPECTION HISTORY for (CBC2021-0491)
Permit Type: BLDG-Commercial
Work Class: Demo
Status: Closed -Finaled
Scheduled Actual Inspection Type
Date Start Date
Tuesday,January2,2024
Are BMPs stockpiled for
emergency deployment?
Application Date: 12/29/2021 Owner: JAMES UKEGAWA
Issue Date: 01/10/2022 Subdivision: RANCHO AGUA HEDIONDA POR
OF
Expiration Date: 10/04/2022 Address: 1205 AVIARA PKWY
IVR Number: 37873 CARLSBAD, CA 92011-1276
Inspection No. Inspection Primary Inspector Reinspection Inspection
Status
Yes
Page 3 of 3
PERMIT INSPECTION HISTORY for (CBC2021-0491)
Permit Type:
Work Class:
Status:
Scheduled
Date
BLDG-Commercial Application Date:
Demo Issue Date:
Closed -Finaled Expiration Date:
IVRNumber:
Actual Inspection Type
Start Date
Inspection No.
Checklist Item
Are inactives slopes properly
stabilized?
Are areas flatter than 3:1
covered or protected?
Are sediment controls properly
maintained?
Are erosion control BMPs
functioning properly?
Are natural areas protected
from erosion?
Do basins appear to be
maintained as required?
Are perimeter control BMPs
maintained?
Is the entrance stabilized to
prevent tracking?
Have sediments been tracked
on to the street?
Are storm drain inlets
protected and maintained?
Have materials collected
around the storm drains?
Has sediment accumulated on
impervious surfaces?
Are dumpsters and trash
receptacles covered?
Has trash/debris accumulated
throughout the site?
Are stockpiles and spoils
protected from runoff?
Are all storage areas clean
and maintained?
Are spill kits provided onsite?
Are washout areas maintained
and protected?
Were spills/leaks observed
during the inspection?
Were there any discharges
during the inspection?
Is the SWPPP wall map up to
date and accurate?
Was the SWPPP or Erosion
Control Plan reviewed?
Are portable restrooms
properly positioned?
Do portable restrooms have
secondary containment?
COMMENTS
Tuesday, January 2, 2024
12/29/2021
01/10/2022
10/04/2022
37873
Inspection
Status
Owner: JAMES UKEGAWA
Subdivision: RANCHO AGUA HEDIONOA POR
OF
Address: 1205 AVIARA PKWY
CARLSBAD, CA 92011-1276
Primary Inspector Reinspection Inspection
Passed
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Page 2 of 3
Building Permit Inspection History Finaled
(cityof
Carlsbad
PERMIT INSPECTION HISTORY for (CBC2021-0491)
Application Date: 12/29/2021 Owner: JAMES UKEGAWA Permit Type: BLDG-Commercial
Work Class: Demo Issue Date: 01/10/2022 Subdivision: RANCHO AGUA HEDIONDA POR
Status: Closed -Finaled Expiration Date: 10/04/2022
IVR Number: 37873
OF
Address: 1205 AVIARA PKWY
CARLSBAD, CA 92011-1276
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date
03/18/2022 03/18/2022 BLDG-SW-Pre-Con
Checklist Item
178610-2022
COMMENTS
Status
Passed Tony Alvarado
BLDG-Building Deficiency March 17, 2022:
04/07/2022
12/28/2023
04/07/2022 BLDG-11
Foundatlon/Ftg/Plers
(Rebar)
Checklist Item
1. Informed and addressed All
preconstruction meeting requirements with
owners representative Chris and
demolition contractor representative
Manuel Pablo's -approved.
2. APCD-asbestos testing and containment,
PW, Fire, Bldg., SDGE, CW□, SWPPP,
Recycle, and all other public utility
connection and agency requirements
concerns and requirements; informed,
discussed and addressed.
179941-2022 Passed Tony Alvarado
COMMENTS
BLDG-Building Deficiency April 7, 2022: Final demolition of
building-approved.
1. Informed and addressed All
preconstruction meeting requirements with
owners representative Chris and
demolition contractor representative
Manuel Pablo's -approved.
2. APCD-asbestos testing and containment,
PW, Fire, Bldg., SDGE, CW□, SWPPP,
Recycle, and all other public utility
connection and agency requirements
concerns and requirements; informed,
discussed and addressed-approved.
3. Final demolition of existing building
structure, demolished down to concrete
slab on grade-approved.
12/28/2023 BLDG-Final Inspection 235178•2023 Passed Tony Alvarado
Checklist Item
BLDG-Plumbing Final
BLDG-Mechanical Final
BLDG-Structural Final
BLDG-Electrical Final
BLDG-SW-Inspection
COMMENTS
235179•2023 Passed Tony Alvarado
Tuesday, January 2, 2024
Passed
Yes
Passed
Yes
Passed
Yes
Yes
Yes
Yes
Complete
Complete
Complete
Complete
Page 1 of 3