Loading...
HomeMy WebLinkAbout1205 AVIARA PKWY; ; CBC2021-0491; PermitBuilding Permit Finaled (Cityof Carlsbad Commercial Permit Print Date: 01/02/2024 Job Address; Permit Type: Parcel#: Valuation: Occupancy Group: #of Dwelling Units: Bedrooms: Bathrooms: Occupant load: Code Edition: Sprinkled: 1205 AVIARA PKWY, BLDG-Commercial 2120405600 $299,400.64 Project Title: AVIARA APARTMENTS CARLSBAD, CA 92011-1276 Work Class: Track#: Lot#: Project#: Plan#: Construction Type: Orig. Plan Check#: Plan Check#: Demo DEV2017-0033 Permit No: Status: CBC2021-0491 Closed -Finaled Applied: 12/29/2021 Issued: 01/10/2022 Finaled Close Out: 01/02/2024 Final Inspection: 12/28/2023 INSPECTOR: Alvarado, Tony Administrator, System Description: AVIARA APTS: DEMOLISH EXISTING WAREHOUSE STRUCTURE (48,604 SF) TO FOUNDATION -FOUNDATION TO REMAIN IN PLACE UNTIL GRADING PERMIT IS ISSUED Applicant: WERMERS PROPERTIES 5120 SHOREHAM PL, # STE 150 SAN DIEGO, CA 92122-5959 (858) 535-1475 FEE Property Owner: JAMES UKEGAWA 1205 AVIARA PKWY CARLSBAD, CA 92011-1276 (760) 603-9608 BUILDING PLAN REVIEW-MINOR PROJECTS (LDE) BUILDING PLAN REVIEW-MINOR PROJECTS (PLN) DEMOLITION OF BUILDING: COMMERCIAL INSPECTIONS-OTHER MISC SB1473 -GREEN BUILDING STATE STANDARDS FEE Total Fees: $624.00 Total Payments To Date: $624.00 Contractor: AMG DEMOLITION AND ENVIRONMENTAL SERVICE 4005 PACIFIC HWY SAN DIEGO, CA 92110-2028 (619) 501-7427 Balance Due: AMOUNT $194.00 $98.00 $191.00 $129.00 $12.00 $0.00 Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherwise expired. Building Division Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f ] www.carlsbadca.gov APPLICATION •. MISSING FOR THIS • PROJECT 1 PERMIT INSPECTION HISTORY for (CBC2021-0491) Permit Type: BLDG-Commercial Work Class: Demo Status: Closed -Finaled Scheduled Actual Inspection Type Date Start Date Tuesday,January2,2024 Are BMPs stockpiled for emergency deployment? Application Date: 12/29/2021 Owner: JAMES UKEGAWA Issue Date: 01/10/2022 Subdivision: RANCHO AGUA HEDIONDA POR OF Expiration Date: 10/04/2022 Address: 1205 AVIARA PKWY IVR Number: 37873 CARLSBAD, CA 92011-1276 Inspection No. Inspection Primary Inspector Reinspection Inspection Status Yes Page 3 of 3 PERMIT INSPECTION HISTORY for (CBC2021-0491) Permit Type: Work Class: Status: Scheduled Date BLDG-Commercial Application Date: Demo Issue Date: Closed -Finaled Expiration Date: IVRNumber: Actual Inspection Type Start Date Inspection No. Checklist Item Are inactives slopes properly stabilized? Are areas flatter than 3:1 covered or protected? Are sediment controls properly maintained? Are erosion control BMPs functioning properly? Are natural areas protected from erosion? Do basins appear to be maintained as required? Are perimeter control BMPs maintained? Is the entrance stabilized to prevent tracking? Have sediments been tracked on to the street? Are storm drain inlets protected and maintained? Have materials collected around the storm drains? Has sediment accumulated on impervious surfaces? Are dumpsters and trash receptacles covered? Has trash/debris accumulated throughout the site? Are stockpiles and spoils protected from runoff? Are all storage areas clean and maintained? Are spill kits provided onsite? Are washout areas maintained and protected? Were spills/leaks observed during the inspection? Were there any discharges during the inspection? Is the SWPPP wall map up to date and accurate? Was the SWPPP or Erosion Control Plan reviewed? Are portable restrooms properly positioned? Do portable restrooms have secondary containment? COMMENTS Tuesday, January 2, 2024 12/29/2021 01/10/2022 10/04/2022 37873 Inspection Status Owner: JAMES UKEGAWA Subdivision: RANCHO AGUA HEDIONOA POR OF Address: 1205 AVIARA PKWY CARLSBAD, CA 92011-1276 Primary Inspector Reinspection Inspection Passed Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Page 2 of 3 Building Permit Inspection History Finaled (cityof Carlsbad PERMIT INSPECTION HISTORY for (CBC2021-0491) Application Date: 12/29/2021 Owner: JAMES UKEGAWA Permit Type: BLDG-Commercial Work Class: Demo Issue Date: 01/10/2022 Subdivision: RANCHO AGUA HEDIONDA POR Status: Closed -Finaled Expiration Date: 10/04/2022 IVR Number: 37873 OF Address: 1205 AVIARA PKWY CARLSBAD, CA 92011-1276 Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection Date Start Date 03/18/2022 03/18/2022 BLDG-SW-Pre-Con Checklist Item 178610-2022 COMMENTS Status Passed Tony Alvarado BLDG-Building Deficiency March 17, 2022: 04/07/2022 12/28/2023 04/07/2022 BLDG-11 Foundatlon/Ftg/Plers (Rebar) Checklist Item 1. Informed and addressed All preconstruction meeting requirements with owners representative Chris and demolition contractor representative Manuel Pablo's -approved. 2. APCD-asbestos testing and containment, PW, Fire, Bldg., SDGE, CW□, SWPPP, Recycle, and all other public utility connection and agency requirements concerns and requirements; informed, discussed and addressed. 179941-2022 Passed Tony Alvarado COMMENTS BLDG-Building Deficiency April 7, 2022: Final demolition of building-approved. 1. Informed and addressed All preconstruction meeting requirements with owners representative Chris and demolition contractor representative Manuel Pablo's -approved. 2. APCD-asbestos testing and containment, PW, Fire, Bldg., SDGE, CW□, SWPPP, Recycle, and all other public utility connection and agency requirements concerns and requirements; informed, discussed and addressed-approved. 3. Final demolition of existing building structure, demolished down to concrete slab on grade-approved. 12/28/2023 BLDG-Final Inspection 235178•2023 Passed Tony Alvarado Checklist Item BLDG-Plumbing Final BLDG-Mechanical Final BLDG-Structural Final BLDG-Electrical Final BLDG-SW-Inspection COMMENTS 235179•2023 Passed Tony Alvarado Tuesday, January 2, 2024 Passed Yes Passed Yes Passed Yes Yes Yes Yes Complete Complete Complete Complete Page 1 of 3