HomeMy WebLinkAbout2508 GATEWAY RD; ; CBC2022-0375; PermitBuilding Permit Finaled
(city of
Carlsbad
Commercial Permit
Print Date: 01/03/2024
Job Address: 2508 GATEWAY RD, CARLSBAD, CA 92009
Permit No:
Status:
CBC2022-0375
Closed -Finaled
Permit Type: BLDG-Commercial
2132612300
$153,956.44
Work Class: Tenant Improvement
Parcel#:
Valuation:
Occupancy Group: FA-B
#of Dwelling Units:
Bedrooms:
Bathrooms:
Occupant Load: 25
Code Edition: 2019
Sprinkled: Yes
Project Title:
Description: VIASAT: 2,671 SF OFFICE & LAB Tl
Track#:
Lot#:
Project#:
Plan#:
Construction Type:IIIB
Orig. Plan Check#:
Plan Check#:
Applicant: Property Owner:
SJS STUDIOS INC
STEPHEN SCIRROTTO
543 N HIGHWAY 101
PIVOTAL 650 CALIFORNIA ST LLC
1702 E HIGHLAND AVE, # 310
PHOENIX, AZ 85016-4667
SOLANA BEACH, CA 92075-1132
{858) 914-7262
FEE
BUILDING PLAN CHECK
BUILDING PLAN REVIEW-MINOR PROJECTS (LOE)
BUILDING PLAN REVIEW -MINOR PROJECTS (PLN}
CERTIFICATE OF OCCUPANCY
COMM/IND USES-STRUCTURAL
FIRE F Occupancies Tl
SB1473 -GREEN BUILDING STATE STANDARDS FEE
STRONG MOTION -COMMERCIAL (SMlP)
Total Fees: $3,996.92 Total Payments To Date: $3,996.92
Applied: 10/18/2022
Issued: 03/10/2023
Fina led Close Out: 09/21/2023
Final Inspection: 09/08/2023
INSPECTOR: Kersch, Tim
Alvarado, Tony
Contractor:
BINGHAM CONSTRUCTION COMPANY INC
11440 W BERNARDO CT, # STE 168
SAN DIEGO, CA 92127-1641
(858) 312-6417
Balance Due:
AMOUNT
$1,140.38
$194.00
$98.00
$16.00
$1,754.43
$744.00
$7.00
$43.11
$0.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
Building Division Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov
B-1 /B-2
APPLICATION
MISSING
FOR THIS
PROJECT
, PERMIT INSPECTION HISTORY for (CBC2022-0375)
Permit Type: BLDG-Commercial
Work Class: Tenant Improvement
Status:
Scheduled
Date
06/26/2023
09/08/2023
Closed -Finaled
Actual Inspection Type
Start Date
Checklist Item
BLDG-Mechanical Final
BLDG-Structural Final
BLDG-Electrical Final
06/26/2023 BLDG-Final Inspection
Checklist Item
BLDG-Plumbing Final
BLDG-Mechanical Final
BLDG-Structural Final
BLDG-Electrical Final
BLDG-Final Inspection
Checklist Item
BLDG-Plumbing Final
BLDG-Mechanical Final
BLDG-Structural Final
BLDG-Electrical Final
Wednesday, January 3, 2024
Application Date: 10/18/2022 Owner: PIVOTAL 650 CALIFORNIA ST LLC
Issue Date: 03/10/2023 Subdivision:
Expiration Date: 11/21/2023
IVR Number: 44063
Address: 2508 GATEWAY RD
CARLSBAD, CA 92009
Inspection No.
COMMENTS
Inspection
Status
May 25, 2023: Partial pass.
Primary Inspector
1. Final electrical, scope of work per
engineered plans -OK.
2. Final mechanical, scope of work per
engineered plans -partial pass.
a) required air balance mechanical report,
informed contractor representative.
3. Final commercial tenant improvement,
final building inspection -NOT approved.
a) required fire prevention inspection
approval, prior to final building inspection
approvals.
215304-2023
COMMENTS
Partial Pass
June 26, 2023: Pass.
Tony Alvarado
1. Final electrical, scope of work per
engineered plans -OK.
2. Final mechanical, scope of work per
engineered plans-OK..
a) required air balance mechanical
report-pending
3. Final commercial tenant improvement,
final building inspection-partial pass and
required air balance report to be verified.
a) fire prevention inspection approved.
223464-2023
COMMENTS
Passed
September 8, 2023: Approved ..
Tony Alvarado
1. Final electrical, scope of work per
engineered plans -approved.
2. Final mechanical, scope of work per
engineered plans-approved.
a) New air balance mechanical
report-verified and approved.
3. Final commercial tenant
improvements-fire prevention inspection
approved.
Reinspection Inspection
Passed
Yes
Yes
Yes
Reinspection Incomplete
Passed
Yes
Yes
Yes
Yes
Passed
Yes
Yes
Yes
Yes
Complete
Page 4 of 4
I PERMIT INSPECTION HISTORY for (CBC2022-0375)
Permit Type: BLDG-Commercial
Work Class: Tenant Improvement
Application Date: 10/18/2022
Issue Date; 03/10/2023
Owner: PIVOTAL 650 CALIFORNIA ST LLC
Subdivision:
Status:
Scheduled
Date
05/25/2023
Closed -FinaJed Expiration Date: 11/21/2023
IVR Number: 44063
Address: 2508 GATEWAY RD
CARLSBAD, CA 92009
Actual Inspection Type
Start Date
Inspection No. Inspection
Status
Primary Inspector
Checklist Item
BLDG-Building Deficiency
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout
BLDG-34 Rough Electrical
BLDG-44
Rough-Ducts-Dampers
NOTES Created By
Angie Teanio
COMMENTS
T bar only. No meps.
TEXT
619-654-1764 Wayne
05/25/2023 BLDG-84 Rough
Combo(14,24,34,44)
212148-2023 Passed Tony Alvarado
Checklist Item
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout
BLDG-34 Rough Electrical
BLDG-44
Rough-Ducts-Dampers
NOTES Created By
Angie Teanio
COMMENTS
May 25, 2023: Partial pass.
1. Final electrical, scope of work per
engineered plans -OK.
2. Final mechanical, scope of work per
engineered plans -partial pass.
a) required air balance mechanical report,
informed contractor representative.
3. Final commercial tenant improvement,
final building inspection -NOT approved.
a) required fire prevention inspection
approval, prior to final building inspection
approvals.
TEXT
WAYNE 619-654-1764
BLDG-Final Inspection 212245-2023 Partial Pass Tony Alvarado
Reinspection Inspection
Passed
Yes
Yes
Yes
Yes
Yes
Created Date
04/2712023
Passed
Yes
Yes
Yes
Yes
Created Date
05/2412023
Complete
Reinspection Incomplete
Wednesday, January 3, 2024 Page 3 of 4
PERMIT INSPECTION HISTORY for (CBC2022-0375)
Permit Type: BLDG-Commercial
Work Class: Tenant Improvement
Application Date: 10/18/2022 Owner: PIVOTAL 650 CALIFORNIA ST LLC
Status: Closed -Finaled
Issue Date: 03/10/2023 Subdivision:
Expiration Date: 11/21/2023
IVR Number: 44063
Address: 2508 GATEWAY RD
CARLSBAD, CA 92009
Scheduled
Date
Actual Inspection Type
Start Date
Inspection No. Inspection Primary Inspector Reinspection Inspection
04/18/2023
04/28/2023
05/15/2023
Checklist Item
BLDG-Building Deficiency
NOTES Created By
Angie Teanio
Status
COMMENTS
Vertical, nonload bearing, partition walls,
per plan, gypsum/drywall method of
attachment anchoring, scope of
work-partial approval.
TEXT
619-654-1764 Wayne
04/18/2023 BLDG-44 208442-2023 Passed Tony Alvarado
04/28/2023
05/15/2023
Rough/Ducts/Dampers
Checklist Item
BLDG-Building Deficiency
COMMENTS
April 18, 2023
1. Reroute/alteration modification of
existing Rough overhead
mechanical/HVAC piping, inspection -pass
(Viasat).
BLDG-85 T-Bar, Celling 208304-2023 Passed Tony Alvarado
Grids, Overhead
Checklist Item
BLDG-44
Rough-Ducts-Dampers
NOTES Created By
Angie Teanio
COMMENTS
April 18, 2023
1. Reroute/alteration modification of
existing Rough overhead
mechanical/HVAC piping, inspection -pass
(Viasat).
TEXT
From Subject Received Size Categories
619-654-1764 Wayne
BLDG-85 T-Bar, Celling 209416-2023 Partial Pass Tim Kersch
Grids, Overhead
Checklist Item COMMENTS
BLDG-Building Deficiency T bar only. No meps.
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout
BLDG-34 Rough Electrical
BLDG-44
Rough-Ducts-Dampers
NOTES Created By TEXT
Angie Teanio 619-654-1764 Wayne
BLDG-85 T -Bar, Celling 210939-2023 Passed Tim Kersch
Grids, Overhead
Wednesday, January 3, 2024
Passed
Yes
Created Date
04/03/2023
Passed
Yes
Passed
Yes
Created Date
04/17/2023
Reinspectlon
Passed
Yes
No
No
No
No
Created Date
04/27/2023
Complete
Complete
Incomplete
Complete
Page2of4
Building Permit Inspection History Finaled
(cityof
Carlsbad
PERMIT INSPECTION HISTORY for (CBC2022-0375)
Permit Type: BLDG-Commercial
Work Class: Tenant Improvement
Application Date: 10/18/2022 Owner: PIVOTAL 650 CALIFORNIA ST LLC
Issue Date: 03/10/2023 Subdivision:
Status: Closed -Finaled Expiration Date: 11/21/2023
IVR Number: 44063
Address: 2508 GATEWAY RD
CARLSBAD, CA 92009
Scheduled
Date
03/23/2023
03/29/2023
Actual Inspection Type
Start Date
Inspection No. Inspection Primary Inspector
Status
03/23/2023 BLDG-85 T-Bar, Ceiling 206186-2023 Partial Pass Tony Alvarado
Grids, Overhead
Checklist Item
BLDG-24 Rough-Topout
BLDG-44
Rough-Ducts-Dampers
COMMENTS
March 23, 2023
1. Reroute/alteration modification of
existing Rough overhead 2 inch and 3 inch
copper piping, inspection -partial pass
(Viasat).
March 23. 2023
1. Reroute/alteration modification of
existing Rough overhead 2 inch and 3 inch
copper piping, inspection -partial pass
(Viasat).
03/29/2023 BLDG-14 206689-2023 Partial Pass Tony Alvarado
Frame/Steel/Bolting/We
ldlng (Decks)
Checklist Item
BLDG-Building Deficiency
COMMENTS
March 29, 2023:
1. Rough framing, rough electrical, scope
of work per engineer plans and detail
specifications Partial approved.
2. Mechanical and plumbing scope of work
printer near plans pending inspections.
3. Rest of vertical partition walls and in-line
partition wall electrical work-OK to
continue and cover.
BLDG-34 Rough
Electrical
206521-2023 Partial Pass Tony Alvarado
Checklist Item
BLDG-Building Deficiency
NOTES Created By
Angie Teanio
COMMENTS
March 29, 2023:
1. Rough framing, rough electrical, scope
of work per engineer plans and detail
specifications -Partial approved.
2. Mechanical and plumbing scope of work
printer near plans pending inspections.
3. Rest of vertical partition walls and in-line
partition wall electrical work-OK to
continue and cover.
TEXT
619-654-1764 Wayne II Early AM
04/04/2023 04/04/2023 BLDG-17 Interior 207025-2023 Partial Pass Tony Alvarado
Lath/Drywall
Wednesday, January 3, 2024
Reinspection Inspection
Reinspectlon Incomplete
Passed
Yes
Yes
Relnspection Incomplete
Passed
Yes
Relnspection Incomplete
Passed
Yes
Created Date
03/28/2023
Relnspectlon Incomplete
Page 1 of 4