Loading...
HomeMy WebLinkAbout2508 GATEWAY RD; ; CBC2022-0375; PermitBuilding Permit Finaled (city of Carlsbad Commercial Permit Print Date: 01/03/2024 Job Address: 2508 GATEWAY RD, CARLSBAD, CA 92009 Permit No: Status: CBC2022-0375 Closed -Finaled Permit Type: BLDG-Commercial 2132612300 $153,956.44 Work Class: Tenant Improvement Parcel#: Valuation: Occupancy Group: FA-B #of Dwelling Units: Bedrooms: Bathrooms: Occupant Load: 25 Code Edition: 2019 Sprinkled: Yes Project Title: Description: VIASAT: 2,671 SF OFFICE & LAB Tl Track#: Lot#: Project#: Plan#: Construction Type:IIIB Orig. Plan Check#: Plan Check#: Applicant: Property Owner: SJS STUDIOS INC STEPHEN SCIRROTTO 543 N HIGHWAY 101 PIVOTAL 650 CALIFORNIA ST LLC 1702 E HIGHLAND AVE, # 310 PHOENIX, AZ 85016-4667 SOLANA BEACH, CA 92075-1132 {858) 914-7262 FEE BUILDING PLAN CHECK BUILDING PLAN REVIEW-MINOR PROJECTS (LOE) BUILDING PLAN REVIEW -MINOR PROJECTS (PLN} CERTIFICATE OF OCCUPANCY COMM/IND USES-STRUCTURAL FIRE F Occupancies Tl SB1473 -GREEN BUILDING STATE STANDARDS FEE STRONG MOTION -COMMERCIAL (SMlP) Total Fees: $3,996.92 Total Payments To Date: $3,996.92 Applied: 10/18/2022 Issued: 03/10/2023 Fina led Close Out: 09/21/2023 Final Inspection: 09/08/2023 INSPECTOR: Kersch, Tim Alvarado, Tony Contractor: BINGHAM CONSTRUCTION COMPANY INC 11440 W BERNARDO CT, # STE 168 SAN DIEGO, CA 92127-1641 (858) 312-6417 Balance Due: AMOUNT $1,140.38 $194.00 $98.00 $16.00 $1,754.43 $744.00 $7.00 $43.11 $0.00 Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherwise expired. Building Division Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov B-1 /B-2 APPLICATION MISSING FOR THIS PROJECT , PERMIT INSPECTION HISTORY for (CBC2022-0375) Permit Type: BLDG-Commercial Work Class: Tenant Improvement Status: Scheduled Date 06/26/2023 09/08/2023 Closed -Finaled Actual Inspection Type Start Date Checklist Item BLDG-Mechanical Final BLDG-Structural Final BLDG-Electrical Final 06/26/2023 BLDG-Final Inspection Checklist Item BLDG-Plumbing Final BLDG-Mechanical Final BLDG-Structural Final BLDG-Electrical Final BLDG-Final Inspection Checklist Item BLDG-Plumbing Final BLDG-Mechanical Final BLDG-Structural Final BLDG-Electrical Final Wednesday, January 3, 2024 Application Date: 10/18/2022 Owner: PIVOTAL 650 CALIFORNIA ST LLC Issue Date: 03/10/2023 Subdivision: Expiration Date: 11/21/2023 IVR Number: 44063 Address: 2508 GATEWAY RD CARLSBAD, CA 92009 Inspection No. COMMENTS Inspection Status May 25, 2023: Partial pass. Primary Inspector 1. Final electrical, scope of work per engineered plans -OK. 2. Final mechanical, scope of work per engineered plans -partial pass. a) required air balance mechanical report, informed contractor representative. 3. Final commercial tenant improvement, final building inspection -NOT approved. a) required fire prevention inspection approval, prior to final building inspection approvals. 215304-2023 COMMENTS Partial Pass June 26, 2023: Pass. Tony Alvarado 1. Final electrical, scope of work per engineered plans -OK. 2. Final mechanical, scope of work per engineered plans-OK.. a) required air balance mechanical report-pending 3. Final commercial tenant improvement, final building inspection-partial pass and required air balance report to be verified. a) fire prevention inspection approved. 223464-2023 COMMENTS Passed September 8, 2023: Approved .. Tony Alvarado 1. Final electrical, scope of work per engineered plans -approved. 2. Final mechanical, scope of work per engineered plans-approved. a) New air balance mechanical report-verified and approved. 3. Final commercial tenant improvements-fire prevention inspection approved. Reinspection Inspection Passed Yes Yes Yes Reinspection Incomplete Passed Yes Yes Yes Yes Passed Yes Yes Yes Yes Complete Page 4 of 4 I PERMIT INSPECTION HISTORY for (CBC2022-0375) Permit Type: BLDG-Commercial Work Class: Tenant Improvement Application Date: 10/18/2022 Issue Date; 03/10/2023 Owner: PIVOTAL 650 CALIFORNIA ST LLC Subdivision: Status: Scheduled Date 05/25/2023 Closed -FinaJed Expiration Date: 11/21/2023 IVR Number: 44063 Address: 2508 GATEWAY RD CARLSBAD, CA 92009 Actual Inspection Type Start Date Inspection No. Inspection Status Primary Inspector Checklist Item BLDG-Building Deficiency BLDG-14 Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout BLDG-34 Rough Electrical BLDG-44 Rough-Ducts-Dampers NOTES Created By Angie Teanio COMMENTS T bar only. No meps. TEXT 619-654-1764 Wayne 05/25/2023 BLDG-84 Rough Combo(14,24,34,44) 212148-2023 Passed Tony Alvarado Checklist Item BLDG-14 Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout BLDG-34 Rough Electrical BLDG-44 Rough-Ducts-Dampers NOTES Created By Angie Teanio COMMENTS May 25, 2023: Partial pass. 1. Final electrical, scope of work per engineered plans -OK. 2. Final mechanical, scope of work per engineered plans -partial pass. a) required air balance mechanical report, informed contractor representative. 3. Final commercial tenant improvement, final building inspection -NOT approved. a) required fire prevention inspection approval, prior to final building inspection approvals. TEXT WAYNE 619-654-1764 BLDG-Final Inspection 212245-2023 Partial Pass Tony Alvarado Reinspection Inspection Passed Yes Yes Yes Yes Yes Created Date 04/2712023 Passed Yes Yes Yes Yes Created Date 05/2412023 Complete Reinspection Incomplete Wednesday, January 3, 2024 Page 3 of 4 PERMIT INSPECTION HISTORY for (CBC2022-0375) Permit Type: BLDG-Commercial Work Class: Tenant Improvement Application Date: 10/18/2022 Owner: PIVOTAL 650 CALIFORNIA ST LLC Status: Closed -Finaled Issue Date: 03/10/2023 Subdivision: Expiration Date: 11/21/2023 IVR Number: 44063 Address: 2508 GATEWAY RD CARLSBAD, CA 92009 Scheduled Date Actual Inspection Type Start Date Inspection No. Inspection Primary Inspector Reinspection Inspection 04/18/2023 04/28/2023 05/15/2023 Checklist Item BLDG-Building Deficiency NOTES Created By Angie Teanio Status COMMENTS Vertical, nonload bearing, partition walls, per plan, gypsum/drywall method of attachment anchoring, scope of work-partial approval. TEXT 619-654-1764 Wayne 04/18/2023 BLDG-44 208442-2023 Passed Tony Alvarado 04/28/2023 05/15/2023 Rough/Ducts/Dampers Checklist Item BLDG-Building Deficiency COMMENTS April 18, 2023 1. Reroute/alteration modification of existing Rough overhead mechanical/HVAC piping, inspection -pass (Viasat). BLDG-85 T-Bar, Celling 208304-2023 Passed Tony Alvarado Grids, Overhead Checklist Item BLDG-44 Rough-Ducts-Dampers NOTES Created By Angie Teanio COMMENTS April 18, 2023 1. Reroute/alteration modification of existing Rough overhead mechanical/HVAC piping, inspection -pass (Viasat). TEXT From Subject Received Size Categories 619-654-1764 Wayne BLDG-85 T-Bar, Celling 209416-2023 Partial Pass Tim Kersch Grids, Overhead Checklist Item COMMENTS BLDG-Building Deficiency T bar only. No meps. BLDG-14 Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout BLDG-34 Rough Electrical BLDG-44 Rough-Ducts-Dampers NOTES Created By TEXT Angie Teanio 619-654-1764 Wayne BLDG-85 T -Bar, Celling 210939-2023 Passed Tim Kersch Grids, Overhead Wednesday, January 3, 2024 Passed Yes Created Date 04/03/2023 Passed Yes Passed Yes Created Date 04/17/2023 Reinspectlon Passed Yes No No No No Created Date 04/27/2023 Complete Complete Incomplete Complete Page2of4 Building Permit Inspection History Finaled (cityof Carlsbad PERMIT INSPECTION HISTORY for (CBC2022-0375) Permit Type: BLDG-Commercial Work Class: Tenant Improvement Application Date: 10/18/2022 Owner: PIVOTAL 650 CALIFORNIA ST LLC Issue Date: 03/10/2023 Subdivision: Status: Closed -Finaled Expiration Date: 11/21/2023 IVR Number: 44063 Address: 2508 GATEWAY RD CARLSBAD, CA 92009 Scheduled Date 03/23/2023 03/29/2023 Actual Inspection Type Start Date Inspection No. Inspection Primary Inspector Status 03/23/2023 BLDG-85 T-Bar, Ceiling 206186-2023 Partial Pass Tony Alvarado Grids, Overhead Checklist Item BLDG-24 Rough-Topout BLDG-44 Rough-Ducts-Dampers COMMENTS March 23, 2023 1. Reroute/alteration modification of existing Rough overhead 2 inch and 3 inch copper piping, inspection -partial pass (Viasat). March 23. 2023 1. Reroute/alteration modification of existing Rough overhead 2 inch and 3 inch copper piping, inspection -partial pass (Viasat). 03/29/2023 BLDG-14 206689-2023 Partial Pass Tony Alvarado Frame/Steel/Bolting/We ldlng (Decks) Checklist Item BLDG-Building Deficiency COMMENTS March 29, 2023: 1. Rough framing, rough electrical, scope of work per engineer plans and detail specifications Partial approved. 2. Mechanical and plumbing scope of work printer near plans pending inspections. 3. Rest of vertical partition walls and in-line partition wall electrical work-OK to continue and cover. BLDG-34 Rough Electrical 206521-2023 Partial Pass Tony Alvarado Checklist Item BLDG-Building Deficiency NOTES Created By Angie Teanio COMMENTS March 29, 2023: 1. Rough framing, rough electrical, scope of work per engineer plans and detail specifications -Partial approved. 2. Mechanical and plumbing scope of work printer near plans pending inspections. 3. Rest of vertical partition walls and in-line partition wall electrical work-OK to continue and cover. TEXT 619-654-1764 Wayne II Early AM 04/04/2023 04/04/2023 BLDG-17 Interior 207025-2023 Partial Pass Tony Alvarado Lath/Drywall Wednesday, January 3, 2024 Reinspection Inspection Reinspectlon Incomplete Passed Yes Yes Relnspection Incomplete Passed Yes Relnspection Incomplete Passed Yes Created Date 03/28/2023 Relnspectlon Incomplete Page 1 of 4