Carlsbad Unified School District October 6, 2023
Mr. Brian Litchfield NOVA Project No. 1020087
6225 El Camino Real
Carlsbad, CA 92009
Subject: Report
As-Graded Geotechnical Conditions
Hope Elementary School Modernization Phase 1
3010 Tamarack Avenue, Carlsbad, California 92010
File No.: 37-12
DSA No.: 04-118734
Dear Mr. Litchfield:
This report presents the geotechnical observations and the results of testing performed by NOVA
Services, Inc. (NOVA) during grading for the above-referenced project. This report addresses only the
geologic and geotechnical considerations associated with the project’s construction.
The services described herein were performed by NOVA for Carlsbad Unified School District. NOVA
is retained by Carlsbad Unified School District as Geotechnical Engineer-of-Record (GEOR) for this
work.
Based on the observations and testing reported herein, NOVA certifies that the soil engineering and
engineering geologic aspects of the grading are in compliance with the approved geotechnical reports
and the grading plans provided by FPL and Associates, Inc. (Drawing No. 528-2A).
Affected in part by civil redesigns, the entire modernization project was completed over a period of
about three years, in distinct construction efforts denoted herein as ‘Phase 1’ and ‘Phase 2’. The
principal elements of work for each of the phases are abstracted below.
• Phase 1. Completed over the period from July 20, 2020 to September 18, 2021 and provided
earthwork related to the construction of pads for a series of new classrooms, a classroom
addition, utilities, playground areas, and new pavements.
• Phase 2. Completed over the period from June 2023 to August 2023 and provided earthwork
for new storm drains, water treatment ponds, playground equipment areas, new pavements,
and walkways.
This report addresses Phase 1 only. Reporting related to Phase 2 is submitted under separate cover.
Report of As-Graded Geotechnical and Geologic Conditions Hope Elementary School Modernization Phase 1, Carlsbad, CA NOVA Project No. 1020087
October 6, 2023
2
BACKGROUND
Location
Hope Elementary School (hereinafter, ‘the site’) is an approximately 12.5-acre campus nominally
located at 3010 Tamarack Avenue in Carlsbad, California. The campus is bounded to the north, west,
and south by descending natural slopes and on the east by Tamarack Avenue.
Project Description
The purpose of the earthwork was to provide building pads for construction of three new single-story
classroom buildings, referenced as Buildings ‘G, H, and J’, a new kindergarten classroom, referenced
as Building ‘K’, and an addition to the existing Building ‘A’.
Associated improvements include play equipment areas, underground utilities, a lunch shelter, asphalt
pavements, and walkways.
Plate 1: As-Graded Geotechnical Map presents the site layout.
Permitted Design Documentation
Geotechnical
The design basis geotechnical report is Report, Geotechnical and Geohazard Investigation, Hope
Elementary School Modernization, 3010 Tamarack Avenue, Carlsbad, California, NOVA Services Inc.,
Project No. 2019157, September 5, 2019 (hereinafter, ‘NOVA 2019’).
Construction
Permitted construction drawings addressing earthwork are provided in Grading Plans For: Hope
Elementary School, FPL and Associates, Inc., Project Number PD2020-0049, (Drawing No. 528-2A),
October 2, 2019 (hereinafter, ‘FPLA 2019’).
OBJECTIVES AND SCOPE OF NOVA’S SERVICES
Objectives
The objectives of the work reported herein were twofold, namely: (i) to observe geologic conditions
encountered during grading, and (ii) to document that earthwork/grading was completed in
conformance with the requirements of the design documentation listed above.
Scope
In order to accomplish the above objectives, NOVA undertook the scope of services abstracted below
during the period of relevant construction, July 20, 2020 to September 18, 2021.
1. Observation and Testing. Performed observation and testing as requested by the contractor
during grading (removals and compaction) and post-grading (pavements and utilities)
operations. Quality Assurance (QA) in-place density testing of soils placed as compacted fills
and backfills was performed after ASTM D6938 (‘In-Place Density and Moisture by Nuclear
Report of As-Graded Geotechnical and Geologic Conditions Hope Elementary School Modernization Phase 1, Carlsbad, CA NOVA Project No. 1020087
October 6, 2023
3
Methods’). The density of the asphaltic wearing surface of pavements was determined after
ASTM D2950 (‘Standard Test Method for Density of Bituminous Concrete by Nuclear
Methods’).
The approximate locations of the density tests conducted for this work are shown on the
attached plates. The laboratory test results are presented in Table I. The field in-place density
test results are summarized in Table II.
2. Laboratory Testing. The field density testing was supported by laboratory testing of
representative samples of soils utilized for fills, backfills, and pavement materials in
accordance with ASTM D1557. The test results are presented in Table I. The indications of
this testing are the basis for NOVA’s judgments regarding the relative compaction of the fills
placed.
3. Technical Support. Provided technical support in response to geotechnical-related issues that
arose during construction.
4. Reporting. Provided reporting during the conduct of the work. Submittal of this report completes
NOVA’s scope of services.
OBSERVED SOIL AND GEOLOGIC UNITS
General
The adequacy of earthwork was determined in part by observation of earthwork operations by
experienced soils technicians familiar with both the specific intent and specific requirements of this
project. This observation was the basis for selection by NOVA of locations for testing of density and
for recovery of samples for laboratory testing.
The following subsections provide discussion regarding NOVA’s observations of the geologic units.
Engineered Artificial Fill Placed by NOVA (af)
During grading, previously placed fills and excavated Santiago Formation were removed and replaced
as compacted engineered fill after ASTM D6938 (‘In-Place Density and Moisture by Nuclear
Methods’). All of this earthwork was the object of QA observation, testing, and technical support by
NOVA, as described above.
Santiago Formation (Tsa)
As reported in NOVA 2019 and encountered during grading operations in the field, the site is underlain
by medium to very dense formational sandstones of the Santiago Formation. These deposits generally
consisted of white to light gray silty sandstones.
Report of As-Graded Geotechnical and Geologic Conditions Hope Elementary School Modernization Phase 1, Carlsbad, CA NOVA Project No. 1020087
October 6, 2023
4
CONSTRUCTION SUMMARY
General
Period of Work
Construction of relevance to this report was completed during the period July 20, 2020, to September
18, 2021.
Part-Time Surveillance
NOVA provided part-time observation of earthwork operations, as requested by the contractor. The
description of earthwork operations provided in the following subsections reflects observations by
NOVA during its presence on-site and may not reflect all work by the contractor.
Operations
The contractor was Erickson Hall Construction Co. The specialty earthwork subcontractor was Anton’s
Service, Inc. Electrical utilities were installed by Fredericks Electric, Inc. Wet utilities were installed by
Interpipe Contracting, Inc. Installment of pavements and pavement materials was completed by Post
Brothers Construction Co. and RAP Engineering, Inc.
The grading subcontractor utilized a variety of medium to heavy-duty equipment to perform the
earthwork. Equipment included: tracked dozers, graders, wheel loaders, backhoes, tracked
excavators, rollers, and sheepsfoot compaction wheels. Manually operated reciprocating hammers
were used where access to larger equipment was limited.
Site Preparation
Prior to earthwork operations, debris, topsoil, and vegetation in the areas being improved were
removed and disposed of off-site.
Site Buildings
Grading
Earthwork for all site buildings may be generalized to include the step-wise sequence of operations
described below.
1. Step 1, Removals. Soils were removed to an elevation of approximately 24 inches below the
bottom of footings wherever planned footing excavations were present in the areas receiving
the new building pad. Laterally, the removals extended outward of the planned improvements
at least 3 feet.
2. Step 2, Re-densification. Where the bottoms of removals probed firm and unyielding, the soils
were scarified to a depth of 12 inches and densified to 90% relative compaction after ASTM
D1557 (the ‘Modified Proctor’) in accordance with the project specifications.
Report of As-Graded Geotechnical and Geologic Conditions Hope Elementary School Modernization Phase 1, Carlsbad, CA NOVA Project No. 1020087
October 6, 2023
5
3. Step 3, Replacement. Soils staged in Step 1 were replaced as compacted fill. The replaced
soils were moisture conditioned to near optimum moisture content and then spread in loose
lifts of typically 4 to 8 inches. Thereafter, the soils were densified to at least 90% relative
compaction after ASTM D1557 in accordance with the project specifications.
During grading for building pads ‘H’ and ‘K’, a zone of sandy clay was observed at the bottom of
removals in each of the pads. In these areas, one extra foot of the clayey material was removed (to 5
feet below finished pad grade), and the area was stabilized with 1 foot of compacted base prior to
commencing fill operations.
Figure 1 depicts the remedial excavations for building pad ‘G’. Figure 2 depicts the compaction of
placed fill for the backfill of the remedial excavations for building pad ‘J’.
Figure 1. Remedial Excavations for Building Pad ‘G’ (December 3, 2020)
Report of As-Graded Geotechnical and Geologic Conditions Hope Elementary School Modernization Phase 1, Carlsbad, CA NOVA Project No. 1020087
October 6, 2023
6
Figure 2. Grading Operations for Building Pad ‘J’ (January 21, 2021)
Foundations
NOVA observed soils exposed during excavation for both isolated and continuous foundations for the
support of the classroom buildings (Buildings A, G, H, J, and K). The foundation excavations were
observed by NOVA to be properly dimensioned and embedded into proper bearing strata comprised
of engineered fill.
Lunch Shelter Structure
Earthwork for the lunch shelter structure may be generalized to include the step-wise sequence of
operations described below.
1. Step 1, Removals. Soils were removed to an elevation of approximately 4 feet below the
planned subgrade elevation in the areas receiving the new structure. Laterally, the removals
extended outward of the planned improvements at least 3 feet.
2. Step 2, Re-densification. Where the bottoms of removals probed firm and unyielding, the soils
were scarified to a depth of 12 inches and densified to 90% relative compaction after ASTM
D1557 (the ‘Modified Proctor’) in accordance with the project specifications.
3. Step 3, Replacement. Soils staged in Step 1 were replaced as compacted fill. The replaced
soils were moisture conditioned to near optimum moisture content and then spread in loose
lifts of typically 4 to 8 inches. Thereafter, the soils were densified to at least 90% relative
compaction after ASTM D1557 in accordance with the project specifications.
Report of As-Graded Geotechnical and Geologic Conditions Hope Elementary School Modernization Phase 1, Carlsbad, CA NOVA Project No. 1020087
October 6, 2023
7
Foundations
NOVA observed soils exposed during excavation for the isolated foundations for the support of the
lunch shelter. The foundation excavations were observed by NOVA to be properly dimensioned and
embedded into proper bearing strata comprised of engineered fill.
Playground Structure
Cast-in-drilled hole (‘CIDH’) piles were installed for foundation support of the playground structure.
NOVA observed the drilling and installation of the CIDH piles and noted them to be minimally
dimensioned in accordance with the approved plans and reporting (NOVA 2019). The piles were
observed by NOVA to be founded in the proper bearing strata comprised of Santiago Formation (Tsa).
Figure 3 depicts drilling operations for the playground structure foundations.
Figure 3. Foundation Drilling (July 30, 2020)
Post Grading
Utilities
NOVA observed backfilling operations for several utility line trenches. Characteristically sandy utility
backfill was moisture conditioned to near optimum moisture content and compacted to at least 90%
relative compaction after ASTM D1557 using a manually operated reciprocating hammer. Figure 4
depicts the compaction of the utilities.
Report of As-Graded Geotechnical and Geologic Conditions Hope Elementary School Modernization Phase 1, Carlsbad, CA NOVA Project No. 1020087
October 6, 2023
8
Figure 4. Utility Compaction (August 21, 2020)
Flexible Pavements
Areas of newly installed utility lines within existing driveways and walkways were subject to patching
with hot-mix asphalt. Pavements were also constructed within the campus for recreation use and for
walkways between structures. Construction of these flexible pavement sections included the
sequence of operations described below.
1. Step 1, Subgrade Preparation. Subgrade preparation for construction of paved areas
consisted of removing 2 feet of existing soils and scarifying the surficial soils, moisture
conditioning, and densification of the bottoms of removals. Where Santiago Formation was
exposed during removals, over-excavation to 2 feet was not required. In either case, soils
were then replaced and densified to a depth of 12 inches to at least 95% relative compaction
after ASTM D1557.
2. Step 2, Base Course. An approximately 4- to 6.5-inch-thick layer of recycled class II
aggregate base for driveways, recreational areas, and walkways was densified to at least
95% of the material’s maximum density.
3. Step 3, Wearing Surface. An approximately 3- to 4-inch-thick asphaltic wearing surface was
spread in loose lifts and densified by static rolling.
Figure 5 depicts Step 3 of the above-described paving operations.
Report of As-Graded Geotechnical and Geologic Conditions Hope Elementary School Modernization Phase 1, Carlsbad, CA NOVA Project No. 1020087
October 6, 2023
9
Figure 5. Paving Operations for Area Surrounding Playground (August 13, 2021)
Flatwork
Flatwork subgrade preparation consisted of performing excavations of approximately 12 inches of
soils from the planned finished grade elevations or to contact with Santiago Formation, whichever
occurred first. Exposed soils were then scarified, moisture conditioned, and densified to a depth of 12
inches to at least 90% relative compaction after ASTM D1557. Thereafter, soil was moisturized to near
optimum moisture content and then spread in loose lifts of typically 4 to 8 inches. Soils were then
densified to at least 90% relative compaction after ASTM D1557 in accordance with the project
specifications.
CONCLUSIONS AND LIMITATIONS
Observed Geologic and Soil Conditions
Based on the observations and testing reported herein, NOVA certifies that the soil engineering and
engineering geologic aspects of the grading are in compliance with the approved geotechnical report
(NOVA 2019) and the grading plans provided by FPL and Associates, Inc (Drawing No. 528-2A).
Report of As-Graded Geotechnical and Geologic Conditions Hope Elementary School Modernization Phase 1, Carlsbad, CA NOVA Project No. 1020087
October 6, 2023
10
Limitations
Testing and Observation
This report presents opinions, information, and data relative to the earthwork at the subject site.
Representatives of NOVA conducted testing and made observations per the request of the contractor
during the progress of the construction to evaluate conformance with the project requirements. The
testing by NOVA indicates that the earthwork observed conforms with the project requirements for
placement and densification.
Results presented herein are only representative of the samples and areas tested. As with any
manufactured product, there are statistical variations in the uniformity of an earth fill and in the
accuracy of the test used to measure its qualities. As compared with other manufactured products,
earthwork usually has wider fluctuations in both the product and the test results. Variations in material
properties are inherent in any earthwork operation and should be expected at this site.
Survey
References to elevations and locations herein were based on surveyors or grade checker stakes in
the field and from the project grading plans prepared by FPL and Associates, Inc (FPLA 2019). NOVA
did not provide construction surveying services. NOVA has no opinion regarding the accuracy of the
elevations or surface geometry with respect to the approved plans.
Supervision
The presence of NOVA personnel during the work progress did not involve any direct supervision of
the contractor or their work forces. Professional and technical advice and recommendations were
provided to the owner during the conduct of the work, based upon NOVA’s observations and
evaluations.
CLOSURE
Should you have any questions regarding this letter or other matters, please do not hesitate to contact
the undersigned at 858.292.7575 x 409.
Respectfully submitted,
NOVA Services, Inc.
_______________________ _______________________ Wail Mokhtar John F. O’Brien, PE, GE Regional Manager Principal Geotechnical Engineer
Attachments: Attachment 1: Tables I and II Attachment 2: As-Graded Geotechnical Maps Plates
Report of As-Graded Geotechnical and Geologic Conditions Hope Elementary School Modernization Phase 1, Carlsbad, CA NOVA Project No. 1020087
October 6, 2023
ATTACHMENT 1
TABLES
As-Graded Geologic and Geotechnical Conditions
Hope Elementary School Modernization Phase 1 3010 Tamarack Avenue, Carlsbad, California 92010 File No.: 37-12 DSA No.: 04-118734
Hope E.S.
Carlsbad, California
2020
NOVA Project No. 1020087
Maximum Optimum
Dry Density Moisture
Material ID Material Description (pcf)(%)
A Light Gray Silty Sand 126.9 9.2
B Gray Silty Clayey Sand 126.2 8.1
C Light Gray Silty Sand 121.0 10.6
D Dark Brown Clayey Sand 116.7 13.1
E Dark Brown Clayey Sand 126.8 8.7
F Brown Clayey DG 131.1 8.5
G Dark Greyish Brown Clay Sand 126.8 8.4
H Class II Recycled Base 118.3 12.8
I Light Brown Clayey Sand w/ Gravel 121.7 11.5
J Class II Base 119.8 7.3
K Gray Clayey Sand 121.3 10.8
L Light Gray Brown Silty Sand 127.2 9.3
M Dark Brown Silty Sand w/ Gravel (Moody's, Oceanside)124.6 9.6
N Class II Recycled Base (Hanson Aggregates)117.1 7.3
O Class II Recycled Base (Moody's, El Corazon Recycling)116.0 13.4
Laboratory Maximum Density (ASTM D1560)
Maximum
Wet Density
Material ID Material Description (pcf)
AC-1 10-232 3C2 (Superior Ready Mix, Plant #41)150.0
AC-2 10-830 3D (Superior Ready Mix, Plant #41)144.8
AC-3 10-233 3C3 (Superior Ready Mix, Plant #41)147.0
Test Type Description of Terms
MG Mass Grading
SG Subgrade
FL Fire Line
E Electrical Line Trench
JT Joint Utility Line Trench
B Aggregate Base
W Water Line Trench
AC Asphalt Concrete
SW Sidewalk Subgrade
S Sewer Line Trench
SD Storm Drain Trench
CG Curve and Gutter Subgrade
TABLE I
LABORATORY DENSITES AND TESTING TERMINOLOGY
Laboratory Maximum Density (ASTM D1557)
NOVA Services, Inc.Page 1 of 1
Hope E.S.
Carlsbad, California
2020
NOVA Project No. 1020087
Test Test Soil Rel.Pass/Date Number Type Test Location Elevation ID (pcf)(%)(pcf)(%)Comp.Fail
7/21/20 1 MG Asphalt Pavement Area 220.0 A 126.9 9.2 121.3 9.8 96%Pass
2 MG Asphalt Pavement Area 220.0 A 126.9 9.2 120.4 10.1 95%Pass
3 MG Asphalt Pavement Area 219.5 A 126.9 9.2 121.0 10.1 95%Pass
4 MG Asphalt Pavement Area 219.5 A 126.9 9.2 122.4 10.0 96%Pass
5 MG Asphalt Pavement Area 219.5 A 126.9 9.2 121.7 9.9 96%Pass
6 MG Asphalt Pavement Area 220.5 C 121.0 10.6 117.7 11.4 97%Pass
7 MG Asphalt Pavement Area 220.0 C 121.0 10.6 117.2 13.2 97%Pass
8 MG Asphalt Pavement Area 221.5 C 121.0 10.6 118.0 12.8 98%Pass
9 MG Asphalt Pavement Area 221.5 C 121.0 10.6 115.8 12.4 96%Pass
10 MG Asphalt Pavement Area 219.5 A 126.9 9.2 120.8 11.4 95%Pass
11 MG Asphalt Pavement Area 219.5 A 126.9 9.2 122.7 10.7 97%Pass
12 MG Asphalt Pavement Area 221.0 C 121.0 10.6 116.4 11.8 96%Pass
7/22/20 13 MG Asphalt Pavement Area 220.0 C 121.0 10.6 117.2 12.2 97%Pass
14 MG Asphalt Pavement Area 220.0 C 121.0 10.6 117.5 13.0 97%Pass
15 MG Asphalt Pavement Area 221.5 C 121.0 10.6 116.7 12.8 96%Pass
16 MG Asphalt Pavement Area 221.5 C 121.0 10.6 115.4 11.4 95%Pass
17 MG Asphalt Pavement Area 219.5 C 121.0 10.6 116.2 11.0 96%Pass
18 MG Asphalt Pavement Area 219.5 C 121.0 10.6 117.1 11.2 97%Pass
19 MG Asphalt Pavement Area 220.0 C 121.0 10.6 115.8 10.8 96%Pass
20 MG Asphalt Pavement Area 222.5 C 121.0 10.6 118.2 13.0 98%Pass
21 MG Asphalt Pavement Area 222.5 C 121.0 10.6 117.8 12.4 97%Pass
22 MG Asphalt Pavement Area 223.0 C 121.0 10.6 116.8 12.8 97%Pass
23 MG Asphalt Pavement Area 224.0 C 121.0 10.6 117.0 11.3 97%Pass
24 MG Asphalt Pavement Area 224.0 C 121.0 10.6 115.4 11.7 95%Pass
7/23/20 25 MG Asphalt Pavement Area 221.0 C 121.0 10.6 116.4 12.4 96%Pass
26 MG Asphalt Pavement Area 221.0 C 121.0 10.6 116.4 10.9 96%Pass
27 MG Asphalt Pavement Area 221.5 C 121.0 10.6 117.0 11.1 97%Pass
28 MG Asphalt Pavement Area 221.5 C 121.0 10.6 117.2 11.6 97%Pass
29 MG Asphalt Pavement Area 222.0 C 121.0 10.6 117.5 12.0 97%Pass
30 MG Asphalt Pavement Area 222.5 C 121.0 10.6 117.4 12.3 97%Pass
31 MG Asphalt Pavement Area 219.5 C 121.0 10.6 117.3 13.1 97%Pass
32 MG Asphalt Pavement Area 220.0 C 121.0 10.6 116.4 11.8 96%Pass
7/24/20 33 MG Asphalt Pavement Area 223.5 C 121.0 10.6 116.0 10.8 96%Pass
34 MG Asphalt Pavement Area 222.5 C 121.0 10.6 115.3 10.4 95%Pass
35 MG Asphalt Pavement Area 222.0 C 121.0 10.6 115.7 11.0 96%Pass
36 MG Asphalt Pavement Area 223.0 C 121.0 10.6 116.8 11.8 97%Pass
37 MG Asphalt Pavement Area 223.0 C 121.0 10.6 115.4 10.9 95%Pass
7/27/20 38 SG Building Pad H 222.0 A 126.9 9.2 121.4 10.8 96%Pass
39 SG Building Pad H 222.0 A 126.9 9.2 120.8 11.0 95%Pass
40 SG Building Pad H 222.0 D 116.7 13.1 102.4 12.0 88%Fail
41 SG Building Pad H 222.0 D 116.7 13.1 102.1 13.4 87%Fail
7/30/20 42 MG Playground Section 222.0 C 121.0 10.6 117.0 11.4 97%Pass
43 MG Playground Section 223.5 C 121.0 10.6 116.4 11.4 96%Pass
44 MG Playground Section 224.0 C 121.0 10.6 115.8 10.9 96%Pass
45 MG Playground Section 224.0 C 121.0 10.6 117.3 12.0 97%Pass
Laboratory Field
SUMMARY OF FIELD IN-PLACE DENSITY AND MOISTURE TEST RESULTSTABLE II
NOVA Services, Inc.3 of 13
Hope E.S.
Carlsbad, California
2020
NOVA Project No. 1020087
Test Test Soil Rel.Pass/Date Number Type Test Location Elevation ID (pcf)(%)(pcf)(%)Comp.FailLaboratoryField
SUMMARY OF FIELD IN-PLACE DENSITY AND MOISTURE TEST RESULTSTABLE II
46 MG Asphalt Pavement Area 224.0 C 121.0 10.6 117.4 12.0 97%Pass
47 MG Asphalt Pavement Area 224.0 C 121.0 10.6 119.2 13.1 99%Pass
48 MG Asphalt Pavement Area 223.5 C 121.0 10.6 117.7 12.7 97%Pass
8/3/20 49 MG Asphalt Pavement Area 224.5 F 131.1 8.5 125.3 9.8 96%Pass
50 MG Asphalt Pavement Area 225.5 F 131.1 8.5 126.2 10.2 96%Pass
51 MG Asphalt Pavement Area 224.5 F 131.1 8.5 124.8 10.2 95%Pass
52 MG Asphalt Pavement Area 224.5 F 131.1 8.5 126.3 9.4 96%Pass
53 MG Asphalt Pavement Area 225.0 F 131.1 8.5 126.1 11.4 96%Pass
54 MG Asphalt Pavement Area 225.0 F 131.1 8.5 125.4 11.2 96%Pass
55 MG Asphalt Pavement Area 226.0 F 131.1 8.5 126.4 10.8 96%Pass
56 MG Asphalt Pavement Area 226.0 F 131.1 8.5 127.0 10.9 97%Pass
8/5/20 57 MG Asphalt Pavement Area 223.0 H 118.3 12.8 114.3 13.4 97%Pass
58 MG Asphalt Pavement Area 223.0 H 118.3 12.8 113.8 13.8 96%Pass
59 MG Asphalt Pavement Area 224.0 H 118.3 12.8 113.4 13.0 96%Pass
60 MG Asphalt Pavement Area 224.0 H 118.3 12.8 112.9 14.4 95%Pass
61 MG Asphalt Pavement Area 224.5 H 118.3 12.8 115.2 14.1 97%Pass
8/6/20 62 MG Retest of #40 & #41(Building Pad H)223.0 H 118.3 12.8 113.4 15.0 96%Pass
63 MG Building H Foundation 223.0 H 118.3 12.8 113.4 14.8 96%Pass
64 MG Building H Foundation 223.0 H 118.3 12.8 113.2 13.9 96%Pass
8/7/20 65 MG Building H Foundation 223.5 H 118.3 12.8 112.8 12.5 95%Pass
66 MG Building H Foundation 224.0 H 118.3 12.8 114.4 14.1 97%Pass
67 MG Building H Foundation 224.0 H 118.3 12.8 113.4 13.2 96%Pass
68 MG Building H Foundation 224.5 H 118.3 12.8 113.8 14.0 96%Pass
8/13/20 69 MG Asphalt Pavement Area 223.5 J 121.8 7.0 115.8 9.1 95%Pass
70 MG Asphalt Pavement Area 223.5 J 121.8 7.0 116.0 8.7 95%Pass
71 MG Asphalt Pavement Area 224.5 J 121.8 7.0 116.7 8.7 96%Pass
72 MG Asphalt Pavement Area 224.5 J 121.8 7.0 115.8 7.9 95%Pass
8/14/20 73 MG Asphalt Pavement Area 223.0 J 121.8 7.0 117.4 8.8 96%Pass
74 MG Asphalt Pavement Area 223.0 J 121.8 7.0 116.9 9.0 96%Pass
75 MG Asphalt Pavement Area 224.0 J 121.8 7.0 116.3 8.8 95%Pass
76 MG Asphalt Pavement Area 224.0 J 121.8 7.0 117.2 8.4 96%Pass
8/17/20 77 MG Asphalt Pavement Area 223.0 J 121.8 7.0 117.4 8.6 96%Pass
78 MG Asphalt Pavement Area 224.0 J 121.8 7.0 118.1 9.4 97%Pass
79 MG Asphalt Pavement Area 224.5 J 121.8 7.0 117.4 8.0 96%Pass
80 MG Asphalt Pavement Area 224.5 J 121.8 7.0 116.9 8.5 96%Pass
8/18/20 81 MG Building Pad H 225.0 J 121.8 7.0 116.2 9.1 95%Pass
82 MG Building Pad H 225.0 J 121.8 7.0 115.7 10.0 95%Pass
83 MG Building Pad H 226.0 J 121.8 7.0 115.5 9.2 95%Pass
84 MG Building Pad H 226.0 J 121.8 7.0 116.1 8.8 95%Pass
85 MG Building Pad H 226.0 J 121.8 7.0 117.2 9.2 96%Pass
8/19/20 86 MG Asphalt Pavement Area 224.5 F 131.1 8.5 126.4 10.5 96%Pass
87 MG Asphalt Pavement Area 224.5 F 131.1 8.5 126.1 10.8 96%Pass
88 MG Playground Section 225.0 K 121.3 10.8 116.4 13.1 96%Pass
89 MG Playground Section 225.0 K 121.3 10.8 115.4 13.0 95%Pass
NOVA Services, Inc.4 of 13
Hope E.S.
Carlsbad, California
2020
NOVA Project No. 1020087
Test Test Soil Rel.Pass/Date Number Type Test Location Elevation ID (pcf)(%)(pcf)(%)Comp.FailLaboratoryField
SUMMARY OF FIELD IN-PLACE DENSITY AND MOISTURE TEST RESULTSTABLE II
90 MG Playground Section 225.5 K 121.3 10.8 116.1 12.9 96%Pass
8/20/20 91 MG Concrete Pavement Area between Bldgs H & G 225.0 J 121.8 7.0 115.6 10.1 95%Pass
92 MG Concrete Pavement Area between Bldgs H & G 226.0 J 121.8 7.0 115.4 9.7 95%Pass
8/21/20 93 FL Fire Line Trench 224.0 J 121.8 7.0 116.3 8.8 95%Pass
94 FL Fire Line Trench 224.0 J 121.8 7.0 115.7 9.2 95%Pass
95 FL Fire Line Trench 224.5 J 121.8 7.0 116.7 8.9 96%Pass
8/24/20 96 MG Sidewalk 224.5 J 121.8 7.0 117.7 9.4 97%Pass
97 MG Sidewalk 223.5 J 121.8 7.0 116.9 10.1 96%Pass
98 MG Fire Lane 224.3 J 121.8 7.0 118.0 10.2 97%Pass
8/29/20 99 E Electrical Line Trench 225.5 J 121.8 7.0 115.8 11.5 95%Pass
100 E Electrical Line Trench 225.5 J 121.8 7.0 116.2 11.4 95%Pass
101 E Electrical Line Trench 224.5 J 121.8 7.0 116.1 10.8 95%Pass
9/3/20 102 JT Joint Utility Line Trench 224.0 C 121.0 10.6 115.0 11.0 95%Pass
103 JT Joint Utility Line Trench 224.0 C 121.0 10.6 116.3 10.9 96%Pass
9/8/20 104 B Temporary Walkway B J 121.8 7.0 116.1 10.9 95%Pass
105 W Water Line Trench 224.5 J 121.8 7.0 115.8 10.8 95%Pass
106 E Electrical Line Trench 224.0 J 121.8 7.0 117.0 11.2 96%Pass
107 E Electrical Line Trench 225.0 J 121.8 7.0 116.3 11.0 95%Pass
108 E Electrical Line Trench 225.5 J 121.8 7.0 116.7 10.2 96%Pass
9/9/20 109 E Electrical Line Trench 225.5 J 121.8 7.0 118.2 10.8 97%Pass
110 E Electrical Line Trench 225.5 J 121.8 7.0 117.4 10.4 96%Pass
111 E Electrical Line Trench 226.0 J 121.8 7.0 117.5 11.0 96%Pass
112 E Electrical Line Trench 224.5 J 121.8 7.0 115.3 10.0 95%Pass
113 E Electrical Line Trench 225.0 J 121.8 7.0 117.1 10.2 96%Pass
114 B Temporary Walkway B J 121.8 7.0 115.8 9.7 95%Pass
9/21/20 115 B Temporary Walkway B J 121.8 7.0 116.2 9.3 95%Pass
116 B Temporary Walkway B J 121.8 7.0 116.0 10.4 95%Pass
117 AC Temporary Walkway FS AC-1 150.0 N/A 141.8 N/A 95%Pass
118 AC Temporary Walkway FS AC-1 150.0 N/A 143.1 N/A 95%Pass
9/24/20 119 FG Building Pad H FG J 121.8 7.0 118.3 7.8 97%Pass
120 FG Building Pad H FG J 121.8 7.0 118.8 8.0 98%Pass
121 FG Building Pad H FG J 121.8 7.0 117.6 7.9 97%Pass
10/1/20 122 FG Building H Column Foundations 225.0 J 121.8 7.0 117.4 8.9 96%Pass
123 FG Building H Column Foundations 226.0 J 121.8 7.0 115.3 10.9 95%Pass
124 FG Building H Column Foundations 226.0 J 121.8 7.0 116.8 9.2 96%Pass
10/6/20 125 W Water Line Trench 226.0 J 121.8 7.0 117.0 8.8 96%Pass
126 W Water Line Trench 226.0 J 121.8 7.0 115.9 8.2 95%Pass
10/8/20 127 E Electrical Line Trench 226.0 J 121.8 7.0 116.7 10.0 96%Pass
128 MG Building Pad K 226.5 C 121.0 10.6 113.8 11.8 94%Pass
129 MG Building Pad K 226.5 C 121.0 10.6 114.1 11.7 94%Pass
130 MG Building Pad K 223.5 C 121.0 10.6 114.0 12.8 94%Pass
131 MG Building Pad K 223.5 C 121.0 10.6 115.2 13.0 95%Pass
NOVA Services, Inc.5 of 13
Hope E.S.
Carlsbad, California
2020
NOVA Project No. 1020087
Test Test Soil Rel.Pass/Date Number Type Test Location Elevation ID (pcf)(%)(pcf)(%)Comp.FailLaboratoryField
SUMMARY OF FIELD IN-PLACE DENSITY AND MOISTURE TEST RESULTSTABLE II
10/9/20 132 JT Joint Utility Line Trench 225.0 C 121.0 10.6 113.4 12.4 94%Pass
133 JT Joint Utility Line Trench 226.0 C 121.0 10.6 111.7 12.1 92%Pass
134 JT Joint Utility Line Trench 226.0 J 121.8 7.0 116.4 10.1 96%Pass
135 MG Building Pad K 223.5 C 121.0 10.6 109.3 11.4 90%Pass
136 MG Building Pad K 224.0 C 121.0 10.6 112.4 13.1 93%Pass
137 MG Building Pad K 224.0 C 121.0 10.6 113.7 12.4 94%Pass
138 MG Building Pad K 224.5 C 121.0 10.6 113.4 12.8 94%Pass
139 MG Building Pad K 225.0 C 121.0 10.6 114.7 12.3 95%Pass
10/12/20 140 MG Building Pad K 225.0 C 121.0 10.6 115.0 11.8 95%Pass
141 MG Building Pad K 226.0 C 121.0 10.6 113.9 11.7 94%Pass
142 MG Building Pad K 226.0 C 121.0 10.6 114.2 12.2 94%Pass
10/15/20 143 MG Building Pad K 222.5 C 121.0 10.6 116.3 12.0 96%Pass
144 MG Building Pad K 222.5 C 121.0 10.6 115.4 11.9 95%Pass
10/16/20 145 MG Building Pad K 223.0 C 121.0 10.6 112.4 10.2 93%Pass
146 MG Building Pad K 223.0 C 121.0 10.6 114.3 11.8 94%Pass
147 MG Building Pad K 223.0 C 121.0 10.6 113.4 11.4 94%Pass
148 MG Building Pad K 223.5 C 121.0 10.6 115.2 12.1 95%Pass
149 MG Building Pad K 223.5 C 121.0 10.6 115.6 12.0 96%Pass
150 MG Building Pad K 224.0 C 121.0 10.6 115.3 13.1 95%Pass
151 MG Building Pad K 224.0 C 121.0 10.6 114.2 12.3 94%Pass
152 MG Building Pad K 224.0 C 121.0 10.6 116.2 11.9 96%Pass
10/19/20 153 MG Building Pad K 224.5 C 121.0 10.6 114.8 10.8 95%Pass
154 MG Building Pad K 224.5 C 121.0 10.6 115.0 11.3 95%Pass
155 MG Building Pad K 225.5 C 121.0 10.6 113.4 9.8 94%Pass
156 MG Building Pad K 225.5 C 121.0 10.6 116.1 12.4 96%Pass
157 MG Building Pad K 226.0 C 121.0 10.6 115.3 11.8 95%Pass
158 MG Building Pad K 226.0 C 121.0 10.6 114.7 11.4 95%Pass
10/20/20 159 MG Building Pad K 226.5 C 121.0 10.6 115.4 11.4 95%Pass
160 MG Building Pad K 226.5 C 121.0 10.6 115.8 10.8 96%Pass
161 MG Building Pad K 226.5 C 121.0 10.6 118.2 12.0 98%Pass
162 MG Building Pad K 226.5 C 121.0 10.6 114.3 11.4 94%Pass
163 MG Building Pad K 226.5 C 121.0 10.6 116.2 12.1 96%Pass
164 MG Building Pad K 226.5 C 121.0 10.6 115.7 12.0 96%Pass
10/28/20 165 W Water Line Trench 226.6 C 121.0 10.6 113.2 11.8 94%Pass
10/30/20 166 JT Joint Utility Line Trench 226.6 C 121.0 10.6 114.4 12.0 95%Pass
167 JT Joint Utility Line Trench 226.6 C 121.0 10.6 115.2 12.3 95%Pass
12/8/20 168 MG Building Pad G 223.0 C 121.0 10.6 116.6 11.8 96%Pass
169 MG Building Pad G 224.0 C 121.0 10.6 115.5 10.9 95%Pass
170 MG Building Pad G 224.0 C 121.0 10.6 116.4 12.1 96%Pass
12/9/20 171 MG Building Pad G 224.5 C 121.0 10.6 117.7 10.9 97%Pass
172 MG Building Pad G 224.5 C 121.0 10.6 116.4 11.3 96%Pass
173 MG Building Pad G 225.5 C 121.0 10.6 115.3 11.4 95%Pass
174 MG Building Pad G 225.5 C 121.0 10.6 116.4 10.7 96%Pass
12/10/20 175 MG Building Pad G 226.0 C 121.0 10.6 116.6 11.2 96%Pass
176 MG Building Pad G 226.0 C 121.0 10.6 116.8 11.4 97%Pass
177 MG Building Pad G 226.5 C 121.0 10.6 117.3 10.9 97%Pass
NOVA Services, Inc.6 of 13
Hope E.S.
Carlsbad, California
2020
NOVA Project No. 1020087
Test Test Soil Rel.Pass/Date Number Type Test Location Elevation ID (pcf)(%)(pcf)(%)Comp.FailLaboratoryField
SUMMARY OF FIELD IN-PLACE DENSITY AND MOISTURE TEST RESULTSTABLE II
178 MG Building Pad G 226.5 C 121.0 10.6 114.7 10.0 95%Pass
12/17/20 179 MG Building Pad G 223.0 L 127.2 9.2 123.4 11.9 97%Pass
180 MG Building Pad G 223.0 L 127.2 9.2 124.4 12.1 98%Pass
181 MG Building Pad G 223.0 L 127.2 9.2 122.7 13.0 96%Pass
182 MG Building Pad G 223.0 L 127.2 9.2 122.6 11.4 96%Pass
12/18/20 183 MG Building Pad G 223.0 L 127.2 9.2 123.1 11.0 97%Pass
184 MG Building Pad G 224.0 L 127.2 9.2 121.7 12.4 96%Pass
185 MG Building Pad G 224.0 L 127.2 9.2 122.4 11.0 96%Pass
186 MG Building Pad G 224.0 L 127.2 9.2 124.2 10.6 98%Pass
187 MG Building Pad G 224.0 L 127.2 9.2 123.1 10.2 97%Pass
12/21/20 188 MG Building Pad G 225.0 L 127.2 9.2 123.0 11.1 97%Pass
189 MG Building Pad G 225.0 L 127.2 9.2 121.9 11.2 96%Pass
190 MG Building Pad G 225.0 L 127.2 9.2 122.3 10.9 96%Pass
12/22/20 191 MG Building Pad G 226.0 L 127.2 9.2 121.4 10.8 95%Pass
192 MG Building Pad G 226.0 L 127.2 9.2 123.2 11.2 97%Pass
193 MG Building Pad G 226.0 L 127.2 9.2 123.4 10.7 97%Pass
194 MG Building Pad G 223.0 L 127.2 9.2 121.7 10.7 96%Pass
195 MG Building Pad G 224.0 L 127.2 9.2 121.4 11.4 95%Pass
12/23/20 196 MG Building Pad G 225.0 L 127.2 9.2 122.1 11.7 96%Pass
197 MG Building Pad G 226.0 L 127.2 9.2 121.8 12.0 96%Pass
12/30/20 198 E Electrical Line Trench 226.0 C 121.0 10.6 114.8 10.2 95%Pass
199 E Electrical Line Trench 226.0 C 121.0 10.6 115.1 11.0 95%Pass
200 E Electrical Line Trench 225.0 C 121.0 10.6 115.0 11.5 95%Pass
201 E Electrical Line Trench 226.0 C 121.0 10.6 116.2 10.9 96%Pass
202 E Electrical Line Trench 225.0 C 121.0 10.6 114.7 10.9 95%Pass
12/31/20 203 B Electrical Line Trench B M 124.6 9.6 119.2 11.2 96%Pass
204 B Electrical Line Trench B M 124.6 9.6 118.7 11.4 95%Pass
205 B Electrical Line Trench B M 124.6 9.6 118.1 11.0 95%Pass
206 AC Electrical Line Trench FS AC 146.1 N/A 142.1 N/A 97%Pass
207 AC Electrical Line Trench FS AC 146.1 N/A 140.5 N/A 96%Pass
208 AC Electrical Line Trench FS AC 146.1 N/A 141.7 N/A 97%Pass
1/20/21 209 MG Building Pad J 222.0 C 121.0 10.6 116.2 10.8 96%Pass
210 MG Building Pad J 223.0 C 121.0 10.6 117.1 11.2 97%Pass
211 MG Building Pad J 224.0 C 121.0 10.6 116.5 11.6 96%Pass
212 MG Building Pad J 224.0 C 121.0 10.6 115.3 11.2 95%Pass
NOVA Services, Inc.7 of 13
Hope E.S.
Carlsbad, California
2020
NOVA Project No. 1020087
Test Test Soil Rel.Pass/Date Number Type Test Location Elevation ID (pcf)(%)(pcf)(%)Comp.FailLaboratoryField
SUMMARY OF FIELD IN-PLACE DENSITY AND MOISTURE TEST RESULTSTABLE II
1/21/21 213 MG Building Pad J 224.0 C 121.0 10.6 117.2 12.3 97%Pass
214 MG Building Pad J 225.0 C 121.0 10.6 114.6 11.1 95%Pass
215 MG Building Pad J 225.0 C 121.0 10.6 116.3 11.4 96%Pass
216 MG Building Pad J 226.0 C 121.0 10.6 115.4 10.9 95%Pass
217 MG Building Pad J 226.0 C 121.0 10.6 115.1 12.0 95%Pass
218 MG Building Pad J 226.0 C 121.0 10.6 116.7 11.8 96%Pass
2/2/21 219 MG Building Pad J 223.0 L 127.2 9.2 119.8 11.2 94%Pass
220 MG Building Pad J 223.0 L 127.2 9.2 119.4 11.6 94%Pass
221 MG Building Pad J 224.0 L 127.2 9.2 121.4 10.9 95%Pass
222 MG Building Pad J 224.0 L 127.2 9.2 121.7 11.2 96%Pass
223 MG Building Pad J 225.0 L 127.2 9.2 120.4 11.4 95%Pass
224 MG Building Pad J 226.0 L 127.2 9.2 122.3 12.1 96%Pass
225 MG Building Pad J 226.0 L 127.2 9.2 121.6 11.7 96%Pass
Building Pad J
2/3/21 226 FG Building Pad J FG L 127.2 9.2 122.4 11.3 96%Pass
227 FG Building Pad J FG L 127.2 9.2 119.4 11.4 94%Pass
228 FG Building Pad J FG L 127.2 9.2 120.7 12.1 95%Pass
229 FG Building Pad J FG L 127.2 9.2 122.9 11.4 97%Pass
2/8/21 230 SW Sidewalk FG C 121.0 10.6 118.8 11.4 98%Pass
231 SW Sidewalk FG C 121.0 10.6 117.6 10.8 97%Pass
2/18/21 232 S Sewer Line Trench 226.0 L 127.2 9.2 119.3 10.8 94%Pass
233 S Sewer Line Trench 227.0 L 127.2 9.2 120.6 11.1 95%Pass
2/23/21 234 MG Building Pad A 223.5 C 121.0 10.6 114.7 11.0 95%Pass
235 MG Building Pad A 224.5 C 121.0 10.6 116.1 13.0 96%Pass
236 MG Building Pad A 226.5 C 121.0 10.6 115.9 13.1 96%Pass
237 MG Building Pad A 224.0 C 121.0 10.6 115.4 12.6 95%Pass
2/24/21 238 MG Building Pad A 225.0 C 121.0 10.6 116.2 11.8 96%Pass
239 MG Building Pad A 226.5 C 121.0 10.6 116.3 11.4 96%Pass
2/25/21 240 MG Building Pad A 225.0 C 121.0 10.6 115.4 12.2 95%Pass
241 MG Building Pad A 226.5 C 121.0 10.6 114.2 13.1 94%Pass
242 MG Building Pad A 224.0 C 121.0 10.6 115.0 12.8 95%Pass
243 MG Building Pad A 225.5 C 121.0 10.6 116.2 11.8 96%Pass
244 MG Building Pad A 226.5 C 121.0 10.6 115.2 12.2 95%Pass
3/3/21 245 MG Building Pad A 224.0 C 121.0 10.6 113.7 13.3 94%Pass
246 MG Building Pad A 226.5 C 121.0 10.6 114.1 11.4 94%Pass
247 MG Building Pad A 224.5 C 121.0 10.6 116.3 12.2 96%Pass
248 MG Building Pad A 226.5 C 121.0 10.6 115.7 12.0 96%Pass
3/9/21 249 E Electrical Line Trench 226.0 C 121.0 10.6 116.4 11.2 96%Pass
250 E Electrical Line Trench 226.5 C 121.0 10.6 117.1 11.9 97%Pass
251 E Electrical Line Trench 226.5 C 121.0 10.6 116.7 11.8 96%Pass
NOVA Services, Inc.8 of 13
Hope E.S.
Carlsbad, California
2020
NOVA Project No. 1020087
Test Test Soil Rel.Pass/Date Number Type Test Location Elevation ID (pcf)(%)(pcf)(%)Comp.FailLaboratoryField
SUMMARY OF FIELD IN-PLACE DENSITY AND MOISTURE TEST RESULTSTABLE II
3/19/21 252 S Sewer Line Trench 223.0 C 121.0 10.6 113.4 13.1 94%Pass
253 S Sewer Line Trench 224.0 C 121.0 10.6 115.2 12.4 95%Pass
254 S Sewer Line Trench 225.0 C 121.0 10.6 114.3 11.8 94%Pass
255 S Sewer Line Trench 226.0 C 121.0 10.6 114.0 11.5 94%Pass
3/20/21 256 MG Building Pad A 223.5 C 121.0 10.6 115.0 12.1 95%Pass
257 MG Building Pad A 224.0 C 121.0 10.6 115.2 12.0 95%Pass
258 MG Building Pad A 224.0 C 121.0 10.6 116.0 13.3 96%Pass
259 MG Building Pad A 225.0 C 121.0 10.6 114.5 12.8 95%Pass
260 MG Building Pad A 225.0 C 121.0 10.6 115.7 11.9 96%Pass
3/22/21 261 S Sewer Line Trench 224.0 C 121.0 10.6 113.4 13.2 94%Pass
262 S Sewer Line Trench 225.0 C 121.0 10.6 112.6 12.9 93%Pass
263 S Sewer Line Trench 226.0 C 121.0 10.6 114.0 12.7 94%Pass
264 MG Building Pad A 225.5 C 121.0 10.6 115.3 11.3 95%Pass
265 MG Building Pad A 226.0 C 121.0 10.6 117.3 12.1 97%Pass
266 MG Building Pad A 226.5 C 121.0 10.6 114.9 12.3 95%Pass
267 MG Building Pad A 226.0 C 121.0 10.6 115.7 11.8 96%Pass
3/24/21 268 MG Building Pad A 223.5 C 121.0 10.6 114.3 13.1 94%Pass
269 MG Building Pad A 224.0 C 121.0 10.6 115.6 12.8 96%Pass
270 MG Building Pad A 224.5 C 121.0 10.6 115.4 11.8 95%Pass
271 MG Building Pad A 225.0 C 121.0 10.6 116.2 12.4 96%Pass
272 SW Sidewalk FG C 121.0 10.6 114.8 11.8 95%Pass
273 SW Sidewalk FG C 121.0 10.6 114.7 11.6 95%Pass
3/25/21 274 MG Building Pad A 224.5 C 121.0 10.6 117.1 12.7 97%Pass
275 MG Building Pad A 225.0 C 121.0 10.6 115.8 13.2 96%Pass
276 MG Building Pad A 225.5 C 121.0 10.6 116.3 11.9 96%Pass
277 MG Building Pad A 226.0 C 121.0 10.6 116.3 12.1 96%Pass
278 MG Building Pad A 226.0 C 121.0 10.6 114.7 12.5 95%Pass
3/26/21 279 MG Building A Pad 226.0 C 121.0 10.6 117.3 12.2 97%Pass
280 FG Building A Pad FG C 121.0 10.6 116.4 12.4 96%Pass
281 FG Building A Pad FG C 121.0 10.6 115.4 13.1 95%Pass
282 FG Building A Pad FG C 121.0 10.6 116.3 12.8 96%Pass
283 FG Building A Pad FG C 121.0 10.6 116.6 12.4 96%Pass
4/5/21 284 E Electrical Line Trench 226.0 C 121.0 10.6 118.3 11.4 98%Pass
285 E Electrical Line Trench 226.0 C 121.0 10.6 117.4 10.9 97%Pass
4/7/21 286 S Sewer Line Trench 225.5 C 121.0 10.6 109.5 14.2 90%Pass
287 S Sewer Line Trench 226.5 C 121.0 10.6 110.1 14.6 91%Pass
288 FL Fire Line Trench 226.0 C 121.0 10.6 109.7 16.5 91%Pass
5/6/21 289 S Sewer Line Trench 226.5 C 121.0 10.6 114.5 12.1 95%Pass
290 W Water Line Trench 226.0 C 121.0 10.6 117.9 11.3 97%Pass
291 JT Joint Utility Line Trench 226.5 C 121.0 10.6 115.3 11.6 95%Pass
5/7/21 292 E Electrical Line Trench 225.5 C 121.0 10.6 113.8 13.7 94%Pass
293 E Electrical Line Trench 226.0 C 121.0 10.6 114.1 14.3 94%Pass
NOVA Services, Inc.9 of 13
Hope E.S.
Carlsbad, California
2020
NOVA Project No. 1020087
Test Test Soil Rel.Pass/Date Number Type Test Location Elevation ID (pcf)(%)(pcf)(%)Comp.FailLaboratoryField
SUMMARY OF FIELD IN-PLACE DENSITY AND MOISTURE TEST RESULTSTABLE II
294 S Sewer Line Trench 226.4 C 121.0 10.6 115.8 12.9 96%Pass
5/10/21 295 E Electrical Line Trench 227.0 C 121.0 10.6 118.1 11.8 98%Pass
296 E Electrical Line Trench 227.0 C 121.0 10.6 116.3 12.4 96%Pass
6/23/21 297 FL Fire Line Trench 226.5 C 121.0 10.6 117.3 12.2 97%Pass
298 FL Fire Line Trench 226.5 C 121.0 10.6 116.4 12.0 96%Pass
6/25/21 299 FL Fire Line Trench 225.0 C 121.0 10.6 117.3 12.1 97%Pass
300 FL Fire Line Trench 225.0 C 121.0 10.6 116.4 12.4 96%Pass
301 FL Fire Line Trench 225.5 C 121.0 10.6 116.7 13.1 96%Pass
302 FL Fire Line Trench 225.5 C 121.0 10.6 115.8 11.8 96%Pass
303 FL Fire Line Trench 225.5 C 121.0 10.6 117.4 12.4 97%Pass
6/29/21 304 SD Storm Drain Line Trench 225.5 C 121.0 10.6 114.8 11.4 95%Pass
305 SD Storm Drain Line Trench 227.0 C 121.0 10.6 115.3 10.9 95%Pass
6/30/21 306 E Electrical Line Trench 226.5 C 121.0 10.6 116.4 12.3 96%Pass
307 E Electrical Line Trench 226.5 C 121.0 10.6 115.2 11.9 95%Pass
7/6/21 308 SD Storm Drain Line Trench 226.0 C 121.0 10.6 114.9 12.0 95%Pass
309 SD Storm Drain Line Trench 226.0 C 121.0 10.6 116.2 10.9 96%Pass
7/8/21 310 SD Storm Drain Line Trench 225.0 C 121.0 10.6 116.4 11.4 96%Pass
311 SD Storm Drain Line Trench 226.0 C 121.0 10.6 117.0 11.7 97%Pass
312 SD Storm Drain Line Trench 226.0 C 121.0 10.6 115.3 11.4 95%Pass
44386 313 FG Flatwork 226.3 L 127.2 9.3 122.4 11.1 0.9623 Pass
314 FG Flatwork 226.3 L 127.2 9.3 121.7 10.8 0.9568 Pass
315 FG Flatwork 226.3 L 127.2 9.3 123.1 10.9 0.9678 Pass
316 SD Storm Drain Line Trench 225 C 121 10.6 117.4 11 0.9702 Pass
317 SD Storm Drain Line Trench 226 C 121 10.6 117 11.4 0.9669 Pass
318 SD Storm Drain Line Trench 226.5 C 121 10.6 115.4 13.8 0.9537 Pass
7/12/21 319 SD Storm Drain Line Trench 225.0 C 121.0 10.6 116.2 11.4 96%Pass
320 SD Storm Drain Line Trench 226.0 C 121.0 10.6 116.4 11.2 96%Pass
7/16/21 321 W Water Line Trench 225.5 C 121.0 10.6 115.8 12.0 96%Pass
322 W Water Line Trench 226.0 C 121.0 10.6 117.2 11.4 97%Pass
323 W Water Line Trench 226.5 C 121.0 10.6 117.1 11.0 97%Pass
324 W Water Line Trench 226.0 C 121.0 10.6 116.8 12.0 97%Pass
325 W Water Line Trench 226.5 C 121.0 10.6 116.2 11.7 96%Pass
326 SW Sidewalk FG H 118.3 12.8 114.7 12.9 97%Pass
327 SW Sidewalk FG H 118.3 12.8 113.4 14.1 96%Pass
328 FG Playground Area FG H 118.3 12.8 115.1 13.3 97%Pass
7/17/21 329 MG Playground Area 224.5 H 118.3 12.8 112.7 14.9 95%Pass
330 MG Playground Area 225.5 C 121.0 10.6 118.2 12.1 98%Pass
331 MG Playground Area 225.5 C 121.0 10.6 117.8 11.2 97%Pass
332 MG Playground Area 226.5 C 121.0 10.6 117.4 11.7 97%Pass
7/19/21 333 SW Sidewalk 226.4 H 118.3 12.8 112.3 12.4 95%Pass
334 SW Sidewalk 226.4 H 118.3 12.8 112.1 12.2 95%Pass
NOVA Services, Inc.10 of 13
Hope E.S.
Carlsbad, California
2020
NOVA Project No. 1020087
Test Test Soil Rel.Pass/Date Number Type Test Location Elevation ID (pcf)(%)(pcf)(%)Comp.FailLaboratoryField
SUMMARY OF FIELD IN-PLACE DENSITY AND MOISTURE TEST RESULTSTABLE II
335 SW Sidewalk 226.4 H 118.3 12.8 113.4 13.1 96%Pass
336 SW Sidewalk 226.4 H 118.3 12.8 112.7 12.4 95%Pass
337 SW Sidewalk 226.4 C 121.0 10.6 115.4 11.4 95%Pass
338 SW Sidewalk 226.4 C 121.0 10.6 115.4 11.1 95%Pass
339 SW Sidewalk 226.0 H 118.3 12.8 114.0 12.9 96%Pass
340 SW Sidewalk 226.0 H 118.3 12.8 113.4 13.4 96%Pass
341 SW Sidewalk 226.0 H 118.3 12.8 112.7 13.2 95%Pass
342 SW Sidewalk 226.0 H 118.3 12.8 113.3 13.7 96%Pass
343 MG Playground Area 225.5 C 121.0 10.6 116.4 12.4 96%Pass
344 MG Playground Area 226.5 C 121.0 10.6 115.5 12.1 95%Pass
7/20/21 345 SW Sidewalk FG C 121.0 10.6 113.8 10.2 94%Pass
346 SW Sidewalk FG C 121.0 10.6 114.3 9.8 94%Pass
347 SW Sidewalk FG C 121.0 10.6 113.7 10.7 94%Pass
348 MG Playground Area 225.5 C 121.0 10.6 116.4 12.4 96%Pass
349 MG Playground Area 226.0 C 121.0 10.6 115.4 11.8 95%Pass
350 MG Playground Area 226.5 C 121.0 10.6 117.1 11.1 97%Pass
7/21/21 351 MG Lunch Shelter 222.5 C 121.0 10.6 114.0 10.4 94%Pass
352 MG Lunch Shelter 224.0 H 118.3 12.8 113.4 14.0 96%Pass
353 MG Lunch Shelter 224.0 H 118.3 12.8 114.2 13.7 97%Pass
7/22/21 354 MG Lunch Shelter 225.0 H 118.3 12.8 113.8 12.4 96%Pass
355 MG Lunch Shelter 226.0 C 121.0 10.6 116.4 11.2 96%Pass
356 MG Lunch Shelter 226.5 C 121.0 10.6 115.3 11.8 95%Pass
357 W Water Line Trench 225.0 C 121.0 10.6 117.2 11.6 97%Pass
358 W Water Line Trench 226.0 C 121.0 10.6 116.8 10.8 97%Pass
359 W Water Line Trench 226.0 C 121.0 10.6 116.7 11.5 96%Pass
360 W Water Line Trench 226.0 C 121.0 10.6 115.4 12.0 95%Pass
7/26/21 361 MG Playground Area 224.5 C 121.0 10.6 114.3 12.4 94%Pass
362 MG Playground Area 224.5 C 121.0 10.6 116.4 11.9 96%Pass
363 MG Playground Area 223.5 C 121.0 10.6 115.4 11.8 95%Pass
364 MG Playground Area 223.5 C 121.0 10.6 115.1 12.1 95%Pass
7/27/21 365 JT Grease Interceptor 226.5 C 121.0 10.6 117.3 11.8 97%Pass
366 JT Grease Interceptor 226.5 C 121.0 10.6 115.4 12.9 95%Pass
367 S Sewer Line Trench 226.5 C 121.0 10.6 115.1 11.9 95%Pass
7/28/21 368 MG Playground Area 226.0 C 121.0 10.6 115.4 10.9 95%Pass
369 MG Playground Area 226.0 C 121.0 10.6 116.0 11.8 96%Pass
370 MG Playground Area 226.0 C 121.0 10.6 116.0 11.6 96%Pass
371 W Water Line Trench 227.0 C 121.0 10.6 115.8 12.3 96%Pass
NOVA Services, Inc.11 of 13
Hope E.S.
Carlsbad, California
2020
NOVA Project No. 1020087
Test Test Soil Rel.Pass/Date Number Type Test Location Elevation ID (pcf)(%)(pcf)(%)Comp.FailLaboratoryField
SUMMARY OF FIELD IN-PLACE DENSITY AND MOISTURE TEST RESULTSTABLE II
7/29/21 372 B Playground Area B N 117.1 7.3 113.5 10.1 97%Pass
373 B Playground Area B N 117.1 7.3 112.1 10.4 96%Pass
374 FL Fire Line Trench 226.0 C 121.0 10.6 114.8 12.8 95%Pass
375 MG Playground Area 224.5 C 121.0 10.6 116.2 12.4 96%Pass
376 MG Playground Area 224.5 C 121.0 10.6 115.7 11.9 96%Pass
7/30/21 377 MG Playground Area 226.5 C 121.0 10.6 115.3 12.0 95%Pass
378 MG Playground Area 226.5 C 121.0 10.6 116.0 12.8 96%Pass
379 FL Fire Line Trench 226.0 C 121.0 10.6 115.4 11.7 95%Pass
8/3/21 380 S Sewer Line Trench 226.0 C 121.0 10.6 114.8 12.3 95%Pass
381 E Electrical Line Trench 226.0 C 121.0 10.6 116.2 11.4 96%Pass
8/6/21 382 SW Sidewalk FG C 121.0 10.6 115.5 12.5 95%Pass
383 SW Sidewalk FG C 121.0 10.6 116.7 13.1 96%Pass
8/12/21 384 FG Playground Area 226.0 C 121.0 10.6 117.4 11.8 97%Pass
385 FG Playground Area 225.5 C 121.0 10.6 116.3 12.4 96%Pass
386 FG Playground Area 225.5 C 121.0 10.6 116.7 12.4 96%Pass
387 FG Playground Area 225.2 C 121.0 10.6 116.9 13.0 97%Pass
388 FG Playground Area 225.5 C 121.0 10.6 115.6 12.2 96%Pass
389 CG Curb and Gutter SG C 121.0 10.6 115.8 10.1 96%Pass
390 CG Curb and Gutter SG C 121.0 10.6 116.3 11.7 96%Pass
391 CG Curb and Gutter SG C 121.0 10.6 115.5 12.3 95%Pass
392 SW Sidewalk FG C 121.0 10.6 116.4 12.0 96%Pass
8/13/21 393 SG Fire Lane SG C 121.0 10.6 117.3 11.8 97%Pass
394 SG Fire Lane SG C 121.0 10.6 116.7 11.0 96%Pass
395 SG Playground Area SG C 121.0 10.6 115.8 12.4 96%Pass
396 SG Playground Area SG C 121.0 10.6 116.4 11.3 96%Pass
397 B Playground Area B O 116.0 13.4 113.5 14.4 98%Pass
398 B Playground Area B O 116.0 13.4 113.2 16.2 98%Pass
399 B Playground Area B O 116.0 13.4 112.7 15.4 97%Pass
400 AC Playground Area FS AC-2 144.8 N/A 141.6 N/A 98%Pass
401 AC Playground Area FS AC-2 144.8 N/A 142.1 N/A 98%Pass
402 AC Playground Area FS AC-2 144.8 N/A 142.5 N/A 98%Pass
8/14/21 403 B Playground Area 226.4 O 116.0 13.4 111.4 15.4 96%Pass
404 B Playground Area 225.8 O 116.0 13.4 110.3 16.0 95%Pass
405 B Playground Area 225.7 O 116.0 13.4 112.3 14.7 97%Pass
406 AC Playground Area 226.5 AC-3 147.0 N/A 142.6 N/A 97%Pass
407 AC Playground Area 226.0 AC-3 147.0 N/A 141.8 N/A 96%Pass
408 AC Playground Area 226.4 AC-3 147.0 N/A 142.0 N/A 97%Pass
8/17/21 409 SW Sidewalk FG C 121.0 10.6 117.4 11.3 97%Pass
410 SW Sidewalk FG C 121.0 10.6 117.5 11.7 97%Pass
411 SW Sidewalk FG C 121.0 10.6 115.3 12.1 95%Pass
NOVA Services, Inc.12 of 13
Hope E.S.
Carlsbad, California
2020
NOVA Project No. 1020087
Test Test Soil Rel.Pass/Date Number Type Test Location Elevation ID (pcf)(%)(pcf)(%)Comp.FailLaboratoryField
SUMMARY OF FIELD IN-PLACE DENSITY AND MOISTURE TEST RESULTSTABLE II
412 SW Sidewalk FG C 121.0 10.6 116.1 11.8 96%Pass
413 SW Sidewalk FG C 121.0 10.6 115.4 12.0 95%Pass
8/18/21 414 SG Driveway SG C 121.0 10.6 114.9 11.6 95%Pass
415 SG Driveway SG C 121.0 10.6 116.2 12.0 96%Pass
416 SG Driveway SG C 121.0 10.6 115.7 12.0 96%Pass
417 SG Driveway SG C 121.0 10.6 115.4 11.9 95%Pass
44427 418 SG Pavement Section 226 C 121 10.6 117.8 10.2 0.9736 Pass
419 SG Pavement Section 226 C 121 10.6 117.1 11 0.9678 Pass
420 B Drivewas Aggerate Base 223 O 116 13.4 114.5 12.5 0.9871 Pass
421 B Drivewas Aggerate Base 223 O 116 13.4 113.5 13.1 0.9784 Pass
422 B Drivewas Aggerate Base 223 O 116 13.4 112.3 12.6 0.9681 Pass
423 B Drivewas Aggerate Base 224 O 116 13.4 113.7 10 0.9802 Pass
424 B Drivewas Aggerate Base 224 O 116 13.4 114.1 11.1 0.9836 Pass
425 B Fireline Aggerate Base 225 O 116 13.4 114 12.3 0.9828 Pass
426 B Fireline Aggerate Base 225 O 116 13.4 114.7 11.7 0.9888 Pass
427 B Fireline Aggerate Base 225 O 116 13.4 113.6 12.9 0.9793 Pass
428 B Fireline Aggerate Base 225 O 116 13.4 112 13 0.9655 Pass
429 B Fireline Aggerate Base 225 O 116 13.4 113.7 10.2 0.9802 Pass
430 B Fireline Aggerate Base 225 O 116 13.4 118.6 11.4 1.0224 Pass
431 AC Driveway FS AC-3 147.0 N/A 147.4 N/A 100%Pass
432 AC Driveway FS AC-3 147.0 N/A 147.9 N/A 101%Pass
433 AC Driveway FS AC-3 147.0 N/A 142.0 N/A 97%Pass
434 AC Driveway FS AC-3 147.0 N/A 147.0 N/A 100%Pass
435 AC Driveway FS AC-3 147.0 N/A 145.5 N/A 99%Pass
436 AC Driveway FS AC-3 147.0 N/A 150.4 N/A 102%Pass
437 AC Driveway FS AC-3 147.0 N/A 144.3 N/A 98%Pass
438 AC Driveway FS AC-3 147.0 N/A 142.1 N/A 97%Pass
439 AC Driveway FS AC-3 147.0 N/A 142.0 N/A 97%Pass
440 AC Driveway FS AC-3 147.0 N/A 143.4 N/A 98%Pass
441 AC Driveway 226.0 AC-2 144.8 N/A 147.2 N/A 102%Pass
9/3/21 442 FL Fire Line Trench 226.0 C 121.0 10.6 115.1 11.8 95%Pass
443 FL Fire Line Trench 226.0 C 121.0 10.6 115.9 12.6 96%Pass
9/13/21 444 FL Fire Line Trench 226.0 C 121.0 10.6 116.2 12.8 96%Pass
445 FL Fire Line Trench 225.0 C 121.0 10.6 115.4 12.7 95%Pass
44457 446 SG Subgrade 226.4 C 121 10.6 114.9 10.2 0.9496 Pass
447 SG Subgrade 225.8 C 121 10.6 116.1 12.3 0.9595 Pass
448 FL Fire Line Trench 225 C 121 10.6 115.3 11.9 0.9529 Pass
449 B Aggregate Base 226 O 116 13.4 111.2 14.4 0.9586 Pass
450 B Aggregate Base 225.9 O 116 13.4 112.3 15.1 0.9681 Pass
451 B Aggregate Base 225.64 O 116 13.4 111.8 14.8 0.9638 Pass
452 B Aggregate Base 225.35 O 116 13.4 112.4 15.2 0.969 Pass
453 AC Asphalt Concrete 227 AC 146 N/A 141.2 N/A 0.9671 Pass
454 AC Asphalt Concrete 226.4 AC 146 N/A 141.4 N/A 0.9685 Pass
455 AC Asphalt Concrete 226 AC 146 N/A 140.7 N/A 0.9637 Pass
456 AC Asphalt Concrete 226 AC 146 N/A 141.6 N/A 0.9699 Pass
NOVA Services, Inc.13 of 13
Report of As-Graded Geotechnical and Geologic Conditions Hope Elementary School Modernization Phase 1, Carlsbad, CA NOVA Project No. 1020087
October 6, 2023
ATTACHMENT 2
PLATE 1
As-Graded Geologic and Geotechnical Conditions
Hope Elementary School Modernization Phase 1 3010 Tamarack Avenue, Carlsbad, California 92010 File No.: 37-12 DSA No.: 04-118734
452
455
429 440 428 360 439
392
409
417 391 359 427
410 411
426
438
385
292
295293
296
203
198 206 201 204 199 207200445
347
346
309
308
304
305
226.27'226.27'
396
446
453
450
400
399
401
371
398
272
351356
352
353
354355
300
331
329
350
349376
348
375
362
363
369
332
286
287
395
441
414
430
449 447 454
273
167
166
165
324325
377
378
128
139
130 136 141161
159 135 129
131
145 164
153
222.6'
142 160 138
140 137
162151
157
148
222.6'
152 158
146
143
156 155 147
150 163 150144
149
154
af
Tsa
0 30'60'
4373 Viewridge Avenue, Suite BSan Diego, CA 92123P: 858.292.7575
944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710
NOVA
HO
P
E
E
L
E
M
E
N
T
A
R
Y
S
C
H
O
O
L
MO
D
E
R
N
I
Z
A
T
I
O
N
P
H
A
S
E
1
30
1
0
T
A
M
A
R
A
C
K
A
V
E
.
CA
R
L
S
B
A
D
,
C
A
L
I
F
O
R
N
I
A
GEOTECHNICAL
MATERIALS
SPECIAL INSPECTION
DVBE
www.usa-nova.com
PLATE NO.1 OF 4
SBE SDVOSB SLBE
KEY TO SYMBOLS
af FILL PLACED BY NOVA
Tsa SANTIAGO FORMATION
APPROXIMATE LOCATION OFIN-PLACE DENSITY TESTS130
APPROXIMATE LIMITS OF WORK
KEY PLAN
NW
E
N
S
PROJECT NO.:
DRAWN BY:
REVIEWED BY:
1020087
DJ
WM
AS-GRADEDGEOTECHNICAL MAP
DRAWING TITLE:
SCALE:1"=30'
MA
T
C
H
L
I
N
E
S
E
E
P
L
A
T
E
3
MATCH LINE SEE PLATE 2
224.75'APPROXIMATE ELEVATIONAT EXCAVATION BOTTOM
MA
T
C
H
L
I
N
E
S
E
E
P
L
A
T
E
3
MATCH LINE SEE PLATE 2
APPROXIMATE LIMITS OF REMEDIAL
GRADING FOR STRUCTURES
'
I I
I I I I I --
®M~MH ~~~~~
' e
--=--1-----, . ~~ ~~ -----...--
•
345
347
402
397
351356
363
368 344364
361
343
370
226.42'
0 30'60'
4373 Viewridge Avenue, Suite BSan Diego, CA 92123P: 858.292.7575
944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710
NOVA
HO
P
E
E
L
E
M
E
N
T
A
R
Y
S
C
H
O
O
L
MO
D
E
R
N
I
Z
A
T
I
O
N
P
H
A
S
E
1
30
1
0
T
A
M
A
R
A
C
K
A
V
E
.
CA
R
L
S
B
A
D
,
C
A
L
I
F
O
R
N
I
A
GEOTECHNICAL
MATERIALS
SPECIAL INSPECTION
DVBE
www.usa-nova.com
PLATE NO.2 OF 4
SBE SDVOSB SLBE
KEY PLAN
NW
E
N
S
PROJECT NO.:
DRAWN BY:
REVIEWED BY:
DJ
WM
AS-GRADEDGEOTECHNICAL MAP
DRAWING TITLE:
SCALE:1"=30'
MA
T
C
H
L
I
N
E
S
E
E
P
L
A
T
E
4
MATCH LINE SEE PLATE 1MA
T
C
H
L
I
N
E
S
E
E
P
L
A
T
E
4
MATCH LINE SEE PLATE 1 KEY TO SYMBOLS
af FILL PLACED BY NOVA
Tsa SANTIAGO FORMATION
APPROXIMATE LOCATION OFIN-PLACE DENSITY TESTS130
APPROXIMATE LIMITS OF WORK
224.75'APPROXIMATE ELEVATIONAT EXCAVATION BOTTOM
APPROXIMATE LIMITS OF REMEDIAL
GRADING FOR STRUCTURES
1020087
•
1
300
301
299
298
297
302303374379
443
442
288 96
97
224.75'
222.75'
222'
98
222'
78
77
73
79
71
70
75 50
222.4'
222'
222'
86
87
49
56
223.3'46
29
34
18 26 14
6
5 21
3
47 2848
35 17
24
31 11 925
4 2015
10
16
36
12
219.5'
219.5'
219.25'219.25'219.22'
220.25'
8
7
2
13
22
23
33
32 27
19
37
5576
74
72
51
385
383
390
393
437425
416
412 382
357
415
413
418
389
423
435
436
394
408
424
431
451434
448
456
420 421 433
422
432
405
388
404 386
100
107
101
103102105
106
254
253
255
252
263 261
95
94
93275268
274
269
270 279
276
277 278
282 271
258
265
259
264
444
205
208
202
284
285 323
320
322
319
311310 312
381380
365
367 366
222.66'
222.66'
225.52'
115
117
116 118419
283
280
266
256
260
257
267
af
Tsa
281
243 244242
241
240
235
236
234
237
238 239
248 247
246
245
313 307
262
289
225
223
221
227
219
210
214 216
212
228
215209
231
218
321 317
316
222.36'
af
Tsa
0 30'60'
4373 Viewridge Avenue, Suite BSan Diego, CA 92123P: 858.292.7575
944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710
NOVA
HO
P
E
E
L
E
M
E
N
T
A
R
Y
S
C
H
O
O
L
MO
D
E
R
N
I
Z
A
T
I
O
N
P
H
A
S
E
1
30
1
0
T
A
M
A
R
A
C
K
A
V
E
.
CA
R
L
S
B
A
D
,
C
A
L
I
F
O
R
N
I
A
GEOTECHNICAL
MATERIALS
SPECIAL INSPECTION
DVBE
www.usa-nova.com
PLATE NO.3 OF 4
SBE SDVOSB SLBE
KEY PLAN
NW
E
N
S
PROJECT NO.:
DRAWN BY:
REVIEWED BY:
DJ
WM
AS-GRADEDGEOTECHNICAL MAP
DRAWING TITLE:
SCALE:1"=30'
MA
T
C
H
L
I
N
E
S
E
E
P
L
A
T
E
1
MATCH LINE SEE PLATE 4
MA
T
C
H
L
I
N
E
S
E
E
P
L
A
T
E
1
MATCH LINE SEE PLATE 4
KEY TO SYMBOLS
af FILL PLACED BY NOVA
Tsa SANTIAGO FORMATION
APPROXIMATE LOCATION OFIN-PLACE DENSITY TESTS130
APPROXIMATE LIMITS OF WORK
224.75'APPROXIMATE ELEVATIONAT EXCAVATION BOTTOM
APPROXIMATE LIMITS OF REMEDIAL
GRADING FOR STRUCTURES
1020087
···•·············•~1•····
.. . ...........
•
===;·=====: I
~
)
I
(
)
~ I / I
I
/
I
\
/
1719
3037
72
52
53
54
122
134
80
69
44
42
60
90
57
4559
89
43
8858
61
120
39
121
6784
38 12664 83
63
66125
62
40
81
68
85
65
82
119
4191
92
124123
385
403 406
384
387
404
407
386
111
109
110
127
104
114
99
108
328
327
326
340
339335
372
336
373
341 342
290
133132113
112
334333
249
291 338337
233
232
315
314
306
250 294
251
313 307
171
177 173
168
178
230
169 175 174
193 179
189
183181
187
184 190
170
176
172
192 185
180188
186182
191195
197196
194
211 213
222
224
220218229
217 226
225
223
210
214 216
231
222.36'
222.36'
222.36'
af
af
Tsa
af
Tsa
af
Tsa
af
Tsa
af
Tsa
0 30'60'
4373 Viewridge Avenue, Suite BSan Diego, CA 92123P: 858.292.7575
944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710
NOVA
HO
P
E
E
L
E
M
E
N
T
A
R
Y
S
C
H
O
O
L
MO
D
E
R
N
I
Z
A
T
I
O
N
P
H
A
S
E
1
30
1
0
T
A
M
A
R
A
C
K
A
V
E
.
CA
R
L
S
B
A
D
,
C
A
L
I
F
O
R
N
I
A
GEOTECHNICAL
MATERIALS
SPECIAL INSPECTION
DVBE
www.usa-nova.com
PLATE NO.4 OF 4
SBE SDVOSB SLBE
KEY PLAN
NW
E
N
S
PROJECT NO.:
DRAWN BY:
REVIEWED BY:
DJ
WM
AS-GRADEDGEOTECHNICAL MAP
DRAWING TITLE:
SCALE:1"=30'MATCH LINE SEE PLATE 3MATCH LINE SEE PLATE 3
MA
T
C
H
L
I
N
E
S
E
E
P
L
A
T
E
2
MA
T
C
H
L
I
N
E
S
E
E
P
L
A
T
E
2
KEY TO SYMBOLS
af FILL PLACED BY NOVA
Tsa SANTIAGO FORMATION
APPROXIMATE LOCATION OFIN-PLACE DENSITY TESTS130
APPROXIMATE LIMITS OF WORK
224.75'APPROXIMATE ELEVATIONAT EXCAVATION BOTTOM
APPROXIMATE LIMITS OF REMEDIAL
GRADING FOR STRUCTURES
1020087I ( / __
•