Loading...
HomeMy WebLinkAboutAD 5-1959; CARLSBAD BOULEVARD - ASSESSMENT PLAT 1959; CERTIFICATE - ASSESSMENT NUMBER 5-1959; 1959-12-31ASSESSMENT NUMBER 5 J 95.9 In the matter of .the improvement of C.trlsbad Blvd, -Chinquapin Ave, ~ Sequoia Ave. -tamarack Ave, • __________ _,_....._ ____ .....,R_e""dw_o..,_o_d.,....,A,...v-e-.-,.-n""d-H"e_m_l,..o-c""k---,A_v_e-.---- in the City of __ C_a_·r_l_s_b_a_d __________ • County of __ s_a_n_D_i_e~g~o _________ , State of California, as provided for in Resolution of Intention No, 624 , passed by the City Council , of said ---------~-~--------- __ C-'-i~ty~-----on the -~19_t_h __ day of __ J'-a'"n"'"u"'a"'r_.y'------• 19 60 : Pursuant to and in accordance with the statute, "Improvement Act of 1911", being Division 7 of the Streets and Highways Code of the State of California, r. Clyde L. Jenken Engineer of Work and ' Sape•>Rtendant ef S~•eete of the said City do hereby certify that that certain contract, entered into by and between Don Hubbard Contracting Co. Encinitas, California -----------------------• as contractor, and the Engineer of Work and Superin-of said tendent of St.:eats ----'C"'t"'t,.,.v"-----on the __ _,,.1.,,8,,_th"--day of __ A,_,p,._r,,.l,,.,l.__ _____ , 19 60 , for OO11struct ing sanltarv S8l"l!!Ilh manholes, appurtenances and pumping station in said City above set forth, has been --======~=~=~=~===----------------==----- fulfilled and performed to the satisfaction of the Engineer of Work and Superintendent of Streets of said City , that the Engineer of Work & Superintendent of said City has accepted the work __ _,,=.,_ ____ _ of Streets contracted for, and that I have estimated upon all lots. portions of lots and parcels of land within the assessment district described in said Resolution of Intention and shown upon the diagram, prepared by the Ellginaar og Work and and hereto attached, the benefits arising from the work performed Superintendent of Streets under said contract and to be received by each of said lots, portions of lots and parcels of land within the said assessment district, and as such Englnger of Work & Superintendent; of Street!!.., I do now hereby assess upon the lands in said assessment district the sum of Twenty-Six Thousand, One Hundred Twenty~Nine 19 and -r5o' ................ --------•.,.,.•·""""'""'""•.,.,.··.,.-----•··---•-"""··-'""•·--·--Dollars ( $ 26.129 .. 19 ) ,, the sa~d sum being the total amount due for the work performed and specified in said contract, together with incidental expenses, reduced by the sum of$ ___________ , to be paid by the -----------------, as follows& CONT RAC T COST --... .. ··-······-· . .. . -· ,,_,_, _____ -----,---,, ____ .... -.,~~ 2 7 9 7 C D L, .Ft. 8" Standard Strength v.c .. Sewer 3,65 1 o. 2 0 9. 0 5 '" 9 eaoh Construct Standard Concrete Manholes 235.00 2. 1 1 s. 0 0 -··---~"·· -· "'"''" 3 each Conatruct Standard v.c. Deacl Ends 75.00 2 2 5. 0 0 ----.... , ... ------·· -~••-n•'""'V ' I 8 ( 0 . L, Ft. 6" T.A.C. 150 ft, of Head forcernean pipe 3.00 1, 4 6 4. 0 0 . --·-··· ,, ... ... , .. . v~- l Each Construct pumping station complete ready to operste ·6,620, 00 6, 6 2 o. 0 0 ~~--"'~•"''" --·-·-"··-·~-~ .. ~·"·"''" . I 0 5 ( 0 Cu, Yds, Excavation and replacement 0,65 5 2 3. 2 5 -·-,. 2 l 0 0 ( 0 Sq. Ft. 3" A .. C. Surfacing With seal coat 0,33 6 6 o. 0 0 ·-·-----,·· --··-·· """"'""'" --~-"" ,,., .. , .... .,.,~,.-~ 3 0 6 ( 0 Sq, Ft, 4" Road-oil mix surfacing 0.16 5 9 2, 9 6 ·------. ··- • 3 5 0 0 L. Ft, 4" Standard strength v.c. Sewer 3,00 7 0 5. 0 0 • '"··-·. ,_ ·-· _ .. ,. . .,.,,, ... ,,.,,-- 2 3. 1 1 5. 1 9 Total Contract Cost -·--·-,,,,.,,,,. _,, __ ... ,~·--~-~.~i,,,,,....,.... INCIDENTAL EXPENSES ..... -···· """ Engineering $ 924,61 and Inspection $ 462,.30 I l 3 3 6. 9 l Preparing Resolutions, Notices, Contract, etc, 4 ) 2, 3 0 Printing and Advertising 1 ~ 3. 4 9 ·····-.~ .. -----•-'-•'"~~. ~·--· --· .... ,, ... •,··= __ ,,_ -·-· Expense of making Assessment 4 , 2, 3 0 ol-; Estimated Cost of Printing, Servicing and Collecting Bonds 5 • 9. _,,.,. -·-·-------····-· Total Incidental Expenses I 3 0 • 4. 0 0 Total Cost [2 6,1 2 9. l 9 ···-··-·-·· Less Amount to be paid by Total Assessment 2 ,. l 2 9, l 9 ---..... ,_, __ And I do hereby assess such total sum of $ 26, 129,19 upon the several lots. portions ------------- of lots and parcels of land in said assessmept district benefited thereby, to-wit: upon each respec- tively, in proportion to the estimated benefits to be received by each 'of said lots, portions of lots and parcels of land, as follows: JEFFRIES BA.NKNOTI:;; CO .. 1,.oe: ANGiELEl;I-F'RONI SHl:'.:Ei. CONTRACTORS ASl:i~SSMENI