HomeMy WebLinkAbout2613 TOWN GARDEN RD; ; CB042919; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
08-19-2004 Residential Permit Permit No: CB042919
Building Inspection Request Line (760) 602-2725
Job Address: 2613 TOWN GARDEN RD CBAD
Permit Type: RESDNTL Sub Type: SFO Status: ISSUED
Parcel No: 2131712300 Lot#: 410 Applied: 07/20/2004
Valuation: $230,901.00 Construction Type: NEW Entered By: KMT
Occupancy Group: Reference #: CT02-14 Plan Approved:
08/19/2004
# Dwelling Units: Structure Type: SFO Issued: 08/19/2004
Bedrooms: 3 Bathrooms: 2.5 Inspect Area: TP
Project Title: GARDENSIDE@BRESSI PH 1-PLAN 4 Orig PC#: PC03-66
2544SF, 459 SF GARAGE,142 SF PORCH Plan Check#:
Applicant: Owner:
GREYSTONE HOMES
101
5973 AVENIDA ENCINAS
CARLSBAD CA 92009
760-804-7700
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
STD #2 Fee
STD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
Total Fees: $18,844.56
Inspector:
$950.04
$0.00
$617.53
$0.00
($49.40)
$23.09
$2,436.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2,999.00
0518
$0.00
$0.00
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SOCWAFee
CFO Payoff Fee
PFF
PFF (CFO Fund)
License Tax
License Tax (CFO Fund)
Traffic Impact Fee
Traffic Impact (CFO Fund)
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing lnlieu Fee
Housing Credit Fee
Master Drainage Fee
Sewer Fee
Additional Fees
TOTAL PERMIT FEES
9313 08/19/04 0002 01
CGF·
$0.00
$140.00
$2,004.00
$2,848.90
$4,202.40
$0.00
$0.00
$0.00
$660.00
$0.00
$0.00
$126.00
$60.00
$72.00
$0.00
$0.00
$0.00
$0.00
$1,735.00
$20.00
$18,844.56
Total Payments To Date: $0.00 Balance Due: $18,844.56
FINAL APPROVAL
Date: 2/7::2,/45' Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required infonnation with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
f<><>s/ex::octionc: of which vou h::ove np,viouslv be<>n niven a Nl"lTICE similar to this or ::is to which th<> stat11te of limitatinnc: has nreviouc:lv otherwise i<>xnlred,
02
W844-56
City of Carlsbad Bldg Inspection Request
For: 02/17/2005
Permit# CB042919
Title: GARDENSIDE@BRESSI PH 1-PLAN 4
Description: 2544SF, 459 SF GARAGE,142 SF PORCH
Type: RESDNTL Sub Type: SFD
Job Address:
Suite:
Location:
2613 TOWN GARDEN RD
Lot 410
APPLICANT GREYSTONE HOMES
Owner: GREYSTONE HOMES INC
Remarks:
Total Time:
CD Description Act Comment
19 Final Structural L
29 Final Plumbing
±== 39 Final Electrical
49 Final Mechanical
Associated PCRs/CVs
lns11ection History
Date Description Act lnsp Comments
02/07/2005 39 Final Electrical AP PC EMR
Inspector Assignment: TP ---
Phone: 7608013398
Inspector: µ.-
Requested By: ROBERT
Entered By: CHRISTINE
02/02/2005 69 Final Masonry AP PS see attached paperwork
12/16/2004 82 Drywall/Ext Lath/Gas Test AP PC
12/13/2004 16 Insulation AP PC MOVE B FLUE @ W.H.
12/06/2004 84 Rough Combo AP PC
12/03/2004 14 Frame/Steel/Bolting/Welding co TP
12/02/2004 14 Frame/Steel/Bolting/Welding NS PS
11/10/2004 13 Shear Panels/HO's AP TP
10/25/2004 15 Roof/Reroof AP TP
09/08/2004 11 Ftg/Foundation/Piers AP TP
09/08/2004 12 Steel/Bond Beam AP TP
08/30/2004 21 Underground/Under Floor AP TP
08/30/2004 22 Sewer/Water Service AP TP