HomeMy WebLinkAbout2617 TOWN GARDEN RD; ; CB043025; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
08-19-2004 Residential Permit Permit No: CB043025 •
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
08/19/2004
# Dwelling Units:
Bedrooms:
Project Title:
Applicant:
Building Inspection Request Line (760) 602-2725
2617 TOWN GARDEN RD CBAD
RESDNTL Sub Type:
2131712400 Lot#:
$307,239.00 Construction Type:
Reference#:
SFD
411
NEW
CT02-14
Structure Type: SFD
3 Bathrooms: 4.5
GARDENSIDE@BRESSI-PHASE 1
PLAN 6-3391SF LIV,626SF GAR, 76SF PORCH
Owner:
Status:
Applied:
Entered By:
Issued:
Inspect Area:
Orig PC#:
Plan Check#:
ISSUED
07/20/2004
KMT
Plan Approved:
08/19/2004
TP
PC03-66
GREYSTONE HOMES
101
5973 AVENIDA ENCINAS
CARLSBAD CA 92009
760-804-7700
9313 08/19/04 0002 01
CGP
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
$1,187.20
$0.00
$771.68
$0.00
($61.73)
$30.72
$2,436.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2,999,00
05/8
$0.00
$0.00
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SDCWA Fee
CFO Payoff Fee
PFF
PFF (CFO Fund)
License Tax
License Tax (CFO Fund)
Traffic Impact Fee
Traffic Impact (CFO Fund)
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing lnlieu Fee
Housing Credit Fee
Master Drainage Fee
Sewer Fee
Additional Fees
TOTAL PERMIT FEES
Total Fees: $20,664.52 Total Payments To Date: $0.00 Balance Due:
Inspector: ::n:2-FINAL APPROVAL
Date ~/2.~C Clearance:
$0.00
$140.00
$2,004.00
$2,848.90
$5,591.75
$0.00
$0.00
$0.00
$660.00
$0.00
$0.00
$161.00
$60.00
$81.00
$0.00
$0.00
$0.00
$0.00
$1,735.00
$20.00
$20,664.52
$20,664,52
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action lo attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
fees xacti ns f whi h ou have reviou I b n iven N Tl E imilar this r o which h st lute f limita ion ha revi u I h twise x ir
02
20664d 52
City of Carlsbad Bldg Inspection Request
For: 02/17/2005
Permit# CB043025
Title: GARDENSIDE@BRESSI· PHASE 1
Description: PLAN 6· 3391SF LIV,626SF GAR, 76SF PORCH
Type: RESDNTL Sub Type: SFD
Job Address:
Suite:
2617 TOWN GARDEN RD
Lot 411
Location:
APPLICANT GREYSTONE HOMES
Owner: GREYSTONE HOMES INC
Remarks:
Total Time:
CD Description Act Comment
Inspector Assignment: TP ---
Phone: 7608013398
Inspector:-µ.__
Requested By: ROBERT
Entered By: CHRISTINE
19
29
39
Final Structural
Final Plumbing
Final Electrical
llf_-------~.---#"-'--?----
t~~~
49 Final Mechanical
Associated PCRs/CVs
lns1,1ection Histo[Y
Date Description Act lnsp Comments
02/07/2005 39 Final Electrical AP PC EMR
12/16/2004 82 Drywall/Ext Lath/Gas Test AP PC
12/13/2004 16 Insulation AP PC
12/09/2004 84 Rough Combo AP TP
12/08/2004 14 Frame/Steel/Bolting/Welding co TP
11/18/2004 13 Shear Panels/HD's AP TP
11/16/2004 13 Shear Panels/HD's NS TP
11/01/2004 15 Roof/Reroof AP TP
10/29/2004 15 Roof/Reroof CA TP
09/13/2004 11 Ftg/Foundation/Piers AP TP
09/13/2004 12 Steel/Bond Beam AP TP
09/09/2004 11 Ftg/Foundation/Piers co TP
09/09/2004 12 Steel/Bond Beam co TP
08/31/2004 21 Underground/Under Floor AP TP
08/30/2004 21 Underground/Under Floor NR TP
08/30/2004 22 Sewer/Water Service NR TP