Loading...
HomeMy WebLinkAbout2617 TOWN GARDEN RD; ; CB043025; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 08-19-2004 Residential Permit Permit No: CB043025 • Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: 08/19/2004 # Dwelling Units: Bedrooms: Project Title: Applicant: Building Inspection Request Line (760) 602-2725 2617 TOWN GARDEN RD CBAD RESDNTL Sub Type: 2131712400 Lot#: $307,239.00 Construction Type: Reference#: SFD 411 NEW CT02-14 Structure Type: SFD 3 Bathrooms: 4.5 GARDENSIDE@BRESSI-PHASE 1 PLAN 6-3391SF LIV,626SF GAR, 76SF PORCH Owner: Status: Applied: Entered By: Issued: Inspect Area: Orig PC#: Plan Check#: ISSUED 07/20/2004 KMT Plan Approved: 08/19/2004 TP PC03-66 GREYSTONE HOMES 101 5973 AVENIDA ENCINAS CARLSBAD CA 92009 760-804-7700 9313 08/19/04 0002 01 CGP Building Permit Add'I Building Permit Fee Plan Check Add'I Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'I Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'I Pot. Water Con. Fee Reel. Water Con. Fee $1,187.20 $0.00 $771.68 $0.00 ($61.73) $30.72 $2,436.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,999,00 05/8 $0.00 $0.00 Meter Size Add'I Reel. Water Con. Fee Meter Fee SDCWA Fee CFO Payoff Fee PFF PFF (CFO Fund) License Tax License Tax (CFO Fund) Traffic Impact Fee Traffic Impact (CFO Fund) Sidewalk Fee PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Housing Impact Fee Housing lnlieu Fee Housing Credit Fee Master Drainage Fee Sewer Fee Additional Fees TOTAL PERMIT FEES Total Fees: $20,664.52 Total Payments To Date: $0.00 Balance Due: Inspector: ::n:2-FINAL APPROVAL Date ~/2.~C Clearance: $0.00 $140.00 $2,004.00 $2,848.90 $5,591.75 $0.00 $0.00 $0.00 $660.00 $0.00 $0.00 $161.00 $60.00 $81.00 $0.00 $0.00 $0.00 $0.00 $1,735.00 $20.00 $20,664.52 $20,664,52 NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action lo attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees xacti ns f whi h ou have reviou I b n iven N Tl E imilar this r o which h st lute f limita ion ha revi u I h twise x ir 02 20664d 52 City of Carlsbad Bldg Inspection Request For: 02/17/2005 Permit# CB043025 Title: GARDENSIDE@BRESSI· PHASE 1 Description: PLAN 6· 3391SF LIV,626SF GAR, 76SF PORCH Type: RESDNTL Sub Type: SFD Job Address: Suite: 2617 TOWN GARDEN RD Lot 411 Location: APPLICANT GREYSTONE HOMES Owner: GREYSTONE HOMES INC Remarks: Total Time: CD Description Act Comment Inspector Assignment: TP --- Phone: 7608013398 Inspector:-µ.__ Requested By: ROBERT Entered By: CHRISTINE 19 29 39 Final Structural Final Plumbing Final Electrical llf_-------~.---#"-'--?---- t~~~ 49 Final Mechanical Associated PCRs/CVs lns1,1ection Histo[Y Date Description Act lnsp Comments 02/07/2005 39 Final Electrical AP PC EMR 12/16/2004 82 Drywall/Ext Lath/Gas Test AP PC 12/13/2004 16 Insulation AP PC 12/09/2004 84 Rough Combo AP TP 12/08/2004 14 Frame/Steel/Bolting/Welding co TP 11/18/2004 13 Shear Panels/HD's AP TP 11/16/2004 13 Shear Panels/HD's NS TP 11/01/2004 15 Roof/Reroof AP TP 10/29/2004 15 Roof/Reroof CA TP 09/13/2004 11 Ftg/Foundation/Piers AP TP 09/13/2004 12 Steel/Bond Beam AP TP 09/09/2004 11 Ftg/Foundation/Piers co TP 09/09/2004 12 Steel/Bond Beam co TP 08/31/2004 21 Underground/Under Floor AP TP 08/30/2004 21 Underground/Under Floor NR TP 08/30/2004 22 Sewer/Water Service NR TP