HomeMy WebLinkAbout2566 TOWN GARDEN RD; ; CB042922; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
10-19-2004 Residential Permit Permit No: CB042922
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
10/19/2004
2566 TOWN GARDEN RD CBAD
RESDNTL Sub Type:
2131305900 Lot#:
$299,324.00 Construction Type:
Reference #:
SFD
59
NEW
CT02-14
Status:
Applied:
Entered By:
# Dwelling Units: Structure Type: SFD Issued:
Bedrooms: 3 Bathrooms: 3.5 Inspect Area:
Project Title: GARDENSIDE@BRESSI PHS 1A PLN 5 Orig PC#:
3272SF,626SF GAR, 90SF PRCH,81 SF DECK,152SF PATIO Plan Check#:
Applicant:
GREYSTONE HOMES
101
5973 AVENIDA ENCINAS
CARLSBAD CA 92009
760-804-7700
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
$1,162.56
$0.00
$755.66
$0.00
($60.45)
$29.93
$2,436.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2,999.00
D5/8
$0.00
$0.00
Owner:
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SDCWA Fee
CFD Payoff Fee
PFF
PFF (CFD Fund)
License Tax
License Tax (CFD Fund)
Traffic Impact Fee
Traffic Impact (CFD Fund)
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing lnLieu Fee
Housing Credit Fee
Master Drainage Fee
Sewer Fee
Additional Fees
TOTAL PERMIT FEES
ISSUED
07120/2004
KMT
Plan Approved:
10/19/2004
TP
PC03-66
$0.00
$140.00
$2,004.00
$1,798.16
$5,447.70
$0.00
$0.00
$0.00
$660.00
$0.00
$0.00
$140.00
$60.00
$74.50
$0.00
$0.00
$0.00
$0.00
$1,735.00
$20.00
$19,402.06
Total Fees: $19,402.06 Total Payments To Date: $0.00 Balance Due: $19,402.06
Inspector: t.1 FINA~ffl
Date: Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
fees/exactions of which vou have nreviousi" be0 n "iven a NOTICE similar to this or a~ to which the statu•e of limit-=>1ion" has "reviousl" otherwise exr irP.d.
City of Carlsbad Bldg Inspection Request
For: 05/09/2005
Permit# CB042922 Inspector Assignment: TP ---
Title: GARDENSIDE@BRESSI PHS 1A PLN 5
Description: 3272SF,626SF GAR, 90SF PRCH,81 SF DECK,152SF PATIO
Type: RESDNTL Sub Type: SFD
Job Address: 2566 TOWN GARDEN RD
Suite: Lot 59
Location:
APPLICANT GREYSTONE HOMES
Owner:
Remarks:
Total Time:
GREYSTONE HOMES INC .5
~7fe,
Act Comment
Phone: 7608013398
Inspector:
Requested By: ROBERT
Entered By: CHRISTINE
CD
19
29
Description
Final Structural f fu_ _ ___,_(¥,A--"-----,,.,.,,__,.e>(.,.__Gif[_____._,._____,,(5Vt):........:.....'.1 t:.____
Aff ~ \, · fm,'()l Final Plumbing
39 Final Electrical
49 Final Mechanical
Associated PCRs/CVs
lns!)ection History
Date Description Act lnsp Comments
05/06/2005 89 Final Combo NR PC NO ACCESS FLOOR TILE.
05/05/2005 89 Final Combo NR PC NO ACCESS -SETTING FLOOR TILE
04/26/2005 34 Rough Electric PA TP MTR REL
03/08/2005 82 Drywall/Ext Lath/Gas Test AP TP
02/28/2005 16 Insulation AP TP
02/23/2005 84 Rough Combo AP PC
02/22/2005 14 Frame/Steel/Bolting/Welding NS PY
02/01/2005 13 Shear Panels/HD's AP PC
01/18/2005 15 Roof/Reroof AP TP
12/01/2004 11 Ftg/Foundation/Piers AP PC
12/01/2004 31 Underground/Conduit-Wiring AP PC UFER
11/26/2004 11 Ftg/Foundation/Piers CA PC
11/24/2004 11 Ftg/Foundation/Piers NR TP
11/04/2004 21 Underground/Under Floor AP TP
11/04/2004 22 Sewer/Water Service AP TP