Loading...
HomeMy WebLinkAbout2011-09-07; Planning Commission; ; CUP 09-03A - NORTH COAST CHURCHThe City of Carlsbad Planning Division A REPORT TO THE PLANNING COMMISSION Item No. ( 1 P.C. AGENDA OF: September 7, 2011 Application complete date: July 12, 2011 Project Planner: Greg Fisher Project Engineer: David Rick SUBJECT: CUP 09-03(A) - NORTH COAST CHURCH - A request for approval of an amendment to Conditional Use Permit CUP 09-03 to expand the total square footage of the existing North Coast Church by 12,768 square feet for a total area of 29,376 square feet within an existing 42,959 square foot office/warehouse building on property located at 2310 Camino Vida Roble in the P-M Zone and in Local Facilities Management Zone 5. I. RECOMMENDATION That the Planning Commission ADOPT Planning Commission Resolution No. 6799 APPROVING CUP 09-03(A) for a period of 10 years, based upon the findings and subject to the conditions contained therein. II. INTRODUCTION This application is a request for an amendment to CUP 09-03 to allow the North Coast Church to expand the existing church facility by an additional 12,768 square feet thereby increasing the total church use area to 29,376 square feet. When completed, North Coast Church will occupy a majority of an existing 42,959 square foot office/warehouse building. The property is located at 2310 Camino Vida Roble in the P-M Zone and in Local Facilities Management Zone 5. The project's parking requirements are satisfied through a previously approved joint use off-street parking facilities agreement. III. PROJECT DESCRIPTION AND BACKGROUND On November 4, 2009, the Planning Commission approved CUP 09-03 to allow North Coast Church to operate and hold worship services in a 16,608 square foot church facility that includes a 402 seat sanctuary, several multi-purpose rooms and offices, a storage room, kitchen, a men's and women's restroom, a conference room, and a reception/lobby area located at 2310 Camino Vida Roble. The current project involves amending CUP 09-03 to allow North Coast Church to expand the church facility by an additional 12,768 square feet, increasing the total area to 29,376 square feet. The church is expanding into a recently vacated suite within the same office/warehouse building. While the seats are not fixed, there exists a total seating capacity for 402 attendees within the 6,696 square foot assembly area. North Coast Church is not requesting a modification to the seating capacity at this time, but they are requesting to expand the assembly area an additional 2,768 square feet to more comfortably accommodate the existing 402 attendees. However, to accommodate future growth, the church is requesting the ability to increase the o CUP 09-03(A) -NORTH COAST CHURCH September?, 2011 PAGE 2 public assembly capacity up to a maximum of 650 attendees. Any expansion over this number will require an amendment to the conditional use permit. As such, the project has been conditioned not to exceed a public assembly capacity of more than 650 attendees for this use. In addition to increasing the size of the sanctuary, the additional 12,768 square feet of building area will include increased storage space, additional offices and restrooms, a copy room, and larger sized youth classrooms. The church's hours of operation, uses and service times outlined and conditioned in CUP 09-03 and shown on Attachment 6 will remain the same. The project site is developed with two office/warehouse buildings identified as 2310 and 2320 Camino Vida Roble. Including the North Coast Church, there are a total of four tenants occupying the two buildings. The church and tenant "A" occupy the front building (building 2310) while tenants "B & C" occupy the rear building (building 2320). The tenants currently operating within this project with North Coast Church are office/warehouse uses. The existing office/warehouse project is surrounded by similar office/warehouse uses to the north, south, east and west. The proposal to increase the church facility by an additional 12,768 square feet was reviewed and found consistent with the McClellan-Palomar Airport Land Use Compatibility Plan (ALUCP), amended March 4,2010 (Refer to Section E below). The project is in conformance with all applicable plans, standards, ordinances, and policies and all required findings for the Conditional Use Permit Amendment can be made for the proposed project. Staff is recommending approval of CUP 09-03(A), with the Conditional Use Permit granted for a period often (10) years from September 7, 2011 to September 6, 2021. IV. ANALYSIS The proposed project is subject to the following plans, ordinances, standards, and policies: A. Planned Industrial (PI) General Plan Land Use Designation; B. Planned Industrial (P-M) Zone (C.M.C. Chapter 21.34); C. Parking Ordinance (C.M.C. Chapter 21.44); D. Conditional Use Permit Regulations (C.M.C. Chapter 21.42); E. McClellan-Palomar Airport Land Use Compatibility Plan (ALUCP); and F. Growth Management Ordinance (C.M.C. Chapter 21.90). The recommendation for approval of this project was developed by analyzing the project's consistency with the applicable regulations and policies. The project's compliance with each of the above regulations is discussed in the sections below. A. General Plan Compliance The current General Plan Land Use designation is Planned Industrial (PI). Church uses are encouraged by the General Plan Land Use Element in that they create diversity in land uses within the city. No changes are being proposed to either the General Plan or Zoning. The project complies with all elements of the General Plan as illustrated in Table 1 below. CUP 09-03(A) - NORTH COAST CHURCH September?, 2011 PAGE 3 TABLE 1 - GENERAL PLAN COMPLIANCE ELEMENT Land Use Housing Circulation Noise Open Space/ Conservation USE, CLASSIFICATION, GOAL, OBJECTIVE OR PROGRAM To provide for the social and economic needs of the community in conjunction with permitted land uses. N/A To provide an adequate circulation infrastructure concurrent with or prior to the actual demand for such facilities. To provide safe, adequate and attractively landscaped parking facilities. Utilize noise standards contained in the Airport Land Use Compatibility Plan (ALUCP) for McClellan- Palomar Airport. Utilize Best Management Practices for control of storm water and to protect water quality. PROPOSED USES & IMPROVEMENTS The General Plan encourages Church uses in any Land Use Designation where needed. Churches are a conditionally allowed use in any zone for the convenience of the surrounding residents. Adequate onsite parking facilities will accommodate the proposed church expansion. N/A All public facilities, including curb, gutter and roadways exist along the south property line on Camino Vida Roble, an existing secondary arterial. The project is not adding additional driveway cuts, intersections, or conflicting traffic movements. The project site has an existing onsite parking lot which is fully landscaped and has adequate parking stalls available to serve the three existing office tenants and the church including the expansion area. Please see Table 2 for parking compliance. Based on the noise/land use compatibility matrix of the ALUCP, the proposed land use is compatible with the airport since the project site has a noise level of less than 60 dBA CNEL in which the ALUCP identifies as compatible with church uses. The project will conform to all National Pollution Discharge Elimination Standards (NPDES) as well as the City's most up-to- date Stormwater Management Regulations. COMPLY Yes N/A Yes Yes Yes CUP 09-03(A) - NORTH COAST CHURCH September?, 2011 PAGE 4 TABLE 1 - GENERAL PLAN COMPLIANCE CONTINUED ELEMENT USE, CLASSIFICATION, GOAL, OBJECTIVE OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY Public Safety Enforce the Uniform Building Code and Fire Codes adopted by the City to provide fire protection standards for all existing and proposed structures. The project requires the issuance of a building permit prior to any building construction activity, whereby the building is reviewed against the Uniform Building Code and Fire Codes to ensure that all applicable fire protection measures are appropriately incorporated into the final building design. Yes Public Safety, Continued Review new development proposals to consider emergency access, fire hydrant locations, fire flow requirements, and wildland fire hazards. The project has been designed in consultation with the City's Fire Department and is consistent with all applicable regulations pertaining to emergency access, fire flow, fire hydrant locations, and wildland fire hazards. Yes B. Planned Industrial (P-M) Zone (C.M.C. Chapter 21.34) The existing church is zoned Planned Industrial (P-M) and is therefore subject to the provisions of Chapter 21.34 of the Zoning Ordinance. Churches are permitted in the P-M Zone subject to approval of a Conditional Use Permit. The church expansion will be occupying an existing office/warehouse building and does not propose any exterior improvements to the existing building which complies with all setbacks, lot coverage, and height requirements and does not require additional parking. C. Parking Ordinance (C.M.C. Chapter 21.44) The existing parking lot consists of a total of 271 parking stalls including 7 handicapped stalls, and 2 handicapped van stalls. The existing parking lot can adequately serve the three existing office/warehouse tenants and the church through an existing joint-use off-street parking agreement in that the office/warehouse uses are primarily daytime/Monday-Friday uses and the church's largest parking demand is on the weekend. The existing joint-use off-street parking agreement allocated a sufficient number of parking spaces to the church to accommodate future growth up to a maximum capacity of 650 attendees during weekends but needs to be amended to reflect the additional parking spaces assigned to the church facility during weekdays. Therefore, the project has been conditioned to amend the joint-use off-street parking agreement prior to final occupancy for the church expansion. CUP 09-03(A) -NORTH COAST CHURCH September?, 2011 PAGES Table 2 below illustrates how there will be no substantial conflict in the principal operating hours of the existing three office/warehouse tenants and the church facility for which a joint use of a parking lot exists and has been previously approved on the property: TABLE 2 - PARKING ORDINANCE COMPLIANCE CURRENT USES Building 23 10 Tenant "A" Building 2320 Tenant "B" Building 2320 Tenant "C" FLOOR SPACE 13, 5 83 sq.ft. total Office: 8,000 sq. ft. Warehouse: 5,583 sq.ft. 9,996 sq. ft. total Office: 9,996. 33,941 so. ft. total Office : 21, 004 sq. ft. Warehouse: 12,937 sq.ft. PARKING SPACES REQUIRED Weekdays 38 spaces required 32 office spaces (1 sp/250 sq. ft.) + 6 warehouse spaces (Isp/ 1,000) 40 spaces required 40 office spaces (1 sp/250 sq. ft.) Weekdays 97 spaces required 84 office spaces (1 sp/250 sq. ft.) + 13 warehouse spaces (1 sp/ 1,000 sq.ft.) Weekends 12 spaces required per reciprocal parking agreement Minimal Activity: 2 staff members in office (max) 11 spaces required per reciprocal parking agreement Minimal Activity: 2 staff members in office (max) Weekends 34 spaces required per reciprocal parking agreement Minimal Activity: 2 staff members in office (max) PARKING SPACES PROVIDED Weekdays 38 spaces provided 40 spaces provided Weekdays 97 spaces provided Weekends 12 spaces provided per reciprocal parking agreement 11 spaces provided per reciprocal parking agreement Weekends 34 spaces provided per reciprocal parking agreement CUP 09-03(A) -NORTH COAST CHURCH September?, 2011 PAGE 6 TABLE 2 - PARKING ORDINANCE COMPLIANCE CONTINUED CURRENT USES Building 23 10 North Coast Church Total required parking for all tenants FLOOR SPACE 29,376 sq. ft. total Sanctuary/Assem blv Area: (650 PARKING SPACES REQUIRED Weekdays 45 spaces maximum required Based on church's summary of operations (see attachment) Weekday 220 spaces Weekends 130 spaces required 1 space/5 assembly seats (650 divided by 5 = 130 Weekend 187 spaces PARKING SPACES PROVIDED Weekdays 45 spaces provided per reciprocal parking agreement 77 spaces proposed through amended reciprocal parking agreement Weekday 271 spaces Weekends 214 spaces provided per reciprocal parking agreement Weekend 271 spaces D. Conditional Use Permit Regulations Chapter 21.42 of the Carlsbad Municipal Code requires that four findings be made in order to approve a conditional use permit. All of these findings can be made for this project as discussed below: 1. That the requested use is necessary or desirable for the development of the community, and is in harmony with the various elements and objectives of the general plan, in that the existing North Coast Church has been in existence since 2009 providing religious worship, and educational activities, and other church services to the residents of the community. The City's General Plan recognizes the need for this type of use and the proposed church expansion is consistent with the General Plan (Refer to section "A") regarding the location of church uses in any zone of the City for the convenience of residents. The church creates diversity in land uses within the city and the proposed expansion area is a benefit and service to the members of the church and is open to the community. 2. That the requested use is not detrimental to existing uses or to uses specifically permitted in the zone in which the proposed use is to be located in that the proposed church expansion is compatible with the existing surrounding office/warehouse uses located on-site and within the P-M zone. The project has been designed to accommodate all required parking on-site through the approval of a joint use off-street parking facilities agreement and provides for adequate traffic circulation. Additionally, the church's hours of operation are essentially different then the neighboring office/warehouse uses. The differing peak hours of operation will reduce or avoid potential conflicts with the existing permitted office/warehouse uses and the proposed church expansion use. CUP 09-03 (A) - NORTH COAST CHURCH September 7, 2011 PAGE? 3. That the site for the proposed conditional use is adequate in size and shape to accommodate the yards, setbacks, walls, fences, parking, loading facilities, buffer areas, landscaping and other development features prescribed in this code and required by the planning director, planning commission or city council, in order to integrate the use with other uses in the neighborhood, in that the church with the proposed expansion will occupy 29,376 square feet of an existing 42,959 square foot office/warehouse building with existing onsite landscaping as previously approved under Tentative Tract Map No. CT 73-49 and requires no site alterations or additional amenities. The project complies with all of the required development standards of the P-M Zone. The proposed 12,768 square foot tenant space expansion is adequate in size and shape to accommodate the church's existing and future operations. Furthermore, to ensure compatibility of the project with the existing tenants, the parking spaces for the church operation on weekdays will be limited to 77 spaces through an amended joint use parking agreement at all times. 4. That the street system serving the proposed use is adequate to properly handle all traffic generated by the proposed use since access to the site is provided from Camino Vida Roble, a secondary arterial, which is currently operating at an acceptable level. The church expansion will increase the number of Average Daily Trips (ADT) on Sundays from 648 to 1,057 ADT, and from 162 to 264 ADT Monday - Saturday. Although the ADT is projected to increase, the surrounding street system is designed to support the increased ADT. If the ADT increases per the calculated projections, the church's differing peak use hours (weekends only) will avoid potential traffic and parking conflicts with adjacent office/warehouse use peak hours (weekdays only). E. McClellan-Palomar Airport Land Use Compatibility Plan (ALUCP) The project is located within Safety Zone 6 as identified in the McClellan-Palomar Airport Land Use Compatibility Plan. Properties located in Safety Zone 6 indicates that all indoor large assembly rooms used for places of worship are deem as a "compatible" use if the basic usage intensity and maximum lot coverage criteria are met and no additional safety criteria apply. The church, including the expansion area, will occupy a large 29,376 square foot suite within an existing and previously approved office/warehouse building and therefore, the usage intensity and maximum lot coverage criteria for the proposed church has previously been met and no additional safety criteria apply. Therefore, the church use is fully consistent with the amended ALUCP Safety Criteria, which permits large indoor assembly rooms up to 300-999 people. Additionally, as illustrated in Table 2 above, the existing parking lot will provide for sufficient parking spaces to accommodate all the existing office/warehouse tenants as well as the proposed church expansion area under the existing joint use off-street parking facilities agreement. F. Growth Management Ordinance The proposed project is located within Local Facilities Management Zone 5 in the southwest quadrant of the City. The proposal is an expansion of an existing church use and that is reflected in the Local Facilities Impacts Analysis. The impacts on public facilities created by the project and its compliance with the adopted performance standards are summarized in Table 3 below. CUP 09-03(A) - NORTH COAST CHURCH September?, 2011 PAGE 8 TABLE 3 Growth Management Compliance STANDARD City Administration Library Waste Water Treatment Parks Drainage Circulation Fire Open Space Schools Sewer Collection System Water IMPACTS N/A N/A <1EDU N/A N/A Mon-Fri: 264 ADT Sat-Sun: 1,057 ADT Station No. 5 N/A N/A N/A N/A COMPLIANCE Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes V.ENVIRONMENTAL REVIEW The Planning Director has determined that the project belongs to a class of projects that the State Secretary for Resources has found do not have a significant impact on the environment, and it is therefore categorically exempt from the requirement for the preparation of environmental documents pursuant to Section 15301 (Existing Facilities) of the state CEQA Guidelines. In making this determination, the Planning Director has found that the exceptions listed in Section 15300.2 of the state CEQA Guidelines do not apply to this project. ATTACHMENTS: 1. Planning Commission Resolution No. 6799 2. Location Map 3. Disclosure Statement 4. Background Data Sheet 5. Local Facilities Impact Assessment Form 6. Summary of Church Operations, Use and Activities, dated September 7, 2011 7. Reduced Exhibits 8. Exhibits "A - D" dated September 7, 2011 SITEMAP NOT TO SCALE North Coast Church CUP 09-03(A) DISCLOSURE Development Services STATEMENT Planning Division CITY OF p <1/A\ 1635 Faraday Avenue I CRAP) (760)6024610 L- J •-'*»•—' www.carlsbadca.gov Applicant's statement or disclosure of certain ownership interests on all applications which will require discretionary action on the part of the City Council or any appointed Board, Commission or Committee. The following information MUST be disclosed at the time of application submittal. Your project cannot be reviewed until this information is completed. Please print. Note: Person is defined as "Any individual, firm, co-partnership, joint venture, association, social club- fraternal organization, corporation, estate, trust, receiver, syndicate, in this and any other county, city and county, city municipality, district or other political subdivision or any other group or combination acting as a unit" Agents may sign this document; however, the legal name and entity of the applicant and property owner must be provided below. 1 . APPLICANT (Not the applicant's agent) Provide the COMPLETE. LEGAL names and addresses of ALL persons having a financial interest in the application. If the applicant includes a corporation or partnership. include the names, titles, addresses of all individuals owning more than 10% of the shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE INDICATE NON-APPLICABLE (N/A) IN THE SPACE BELOW. If a publicly-owned corporation, include the names, titles, and addresses of the corporate officers. (A separate page may be attached if necessary.) Person AWtK Qextxyf" ok-<*-fcJ/\ Corp/Part _ _ Title Title O So^y/K Tg /Joe. Address 2. OWNER (Not the owner's agent) Provide the COMPLETE. LEGAL names and addresses of ALL persons having any ownership interest in the property involved. Also, provide the nature of the legal ownership (i.e., partnership, tenants in common, non-profit, corporation, etc.). If the ownership includes a corporation or partnership, include the names, titles, addresses of all individuals owning more than 10% of the shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE INDICATE NON-APPLICABLE (N/A) IN THE SPACE BELOW. If a publicly-owned corporation, include the names, titles, and addresses of the corporate officers. (A separate page may be attached if necessary.) -^ Te>i«.*> ^> ,v\ Cdxv\*k.ov\ '- Person £~fr* M^O^UI^'Q T»J*V^S <-<LC. Coro/PariT;c.*d. :Frtte' Kriz^^v J^jWo-rs ,i~tc. Title Address 2.r?-^ <*Je. 5/WA ^zag> Address H^tt <sf«fe. P-1(A) Page 1 of 2 Revised 07/10 3. NON-PROFIT ORGANIZATION OR TRUST If any person identified pursuant to (1) or (2) above is a nonprofit organization or a trust, list the names and addresses of ANY person serving as an officer or director of the non- profit organization or as trustee or beneficiary of the. Non Profit/TrusttW#ilW=/cAt*j^l Non Profit/Trust TitleLe^rc^ u). 0c.faour/oe- - fite^hfaj- / Title 0<££>/ £?W €*x> A«. F& A-*4i. Address 4. Have you had more than $500 worth of business transacted with any member of City staff, Boards, Commissions, Committees and/or Council within the past twelve (12) months? Yes No If yes, please indicate person(s):_ NOTE: Attach additional sheets if necessary. I certify that all the above information is true and correct to the best of my knowledge. Signature ofawner/date Signature of applicant^ ate Printor type name of owner Print or type name of applicant SignatureVof owner^pplic^nt's agent if applicable/date Print or type name of owner/applicant's agent Page 2 of 2 Revised 07/10 City of Carlsbad Planning Department- Disclosure Statement Item 2. Owner Information Continued: / Title: Address: Address: Corp/Partner: 77 c~ ">.,- ___ j^l^ ' ^^ y ^"^ ^ \ BACKGROUND DATA SHEET CASE NO:CUP 09-03 (A) CASE NAME: NORTH COAST CHURCH APPLICANT: Jamie Loonev for North Coast Church REQUEST AND LOCATION: A request for approval of an amendment to Conditional Use Permit CUP 09-03 to expand the total square footage of the existing North Coast Church by 12,768 square feet for a total area of 29,376 square feet within an existing 42,959 square foot office/warehouse building on property located at 2310 Camino Vida Roble in the P-M Zone and in Local Facilities Management Zone 5. LEGAL DESCRIPTION: Lot 6 of Carlsbad Tract No. 73-49 (C.C. & F. Palomar Airport Business Park) Unit 1, in the City of Carlsbad, County of San Diego, State of California, according to the Map thereof No. 8054, Filed in the Office of the County Recorder of San Diego County. December 31. 1974. APN: 213-050-08-00 Acres: 5^7 Proposed No. of Lots/Units: N/A GENERAL PLAN AND ZONING Existing Land Use Designation: PI Proposed Land Use Designation: N/A Density Allowed: N/A Existing Zone: P-M Density Proposed: N/A Proposed Zone: N/A Surrounding Zoning, General Plan and Land Use: General Plan Site North South East West P-M P-M P-M •p-M P-M PI PI PI PI PI LOCAL COASTAL PROGRAM Current Land Use Office Office/Manufacturing Office/Manufacturing Office/Manufacturing Office/Manufacturing Coastal Zone: I I Yes [X] No Local Coastal Program Segment: N/A Within Appeal Jurisdiction: I I Yes ^ No Coastal Development Permit: | | Yes Local Coastal Program Amendment: I I Yes EX] No No Existing LCP Land Use Designation: N/A Existing LCP Zone: N/A Proposed LCP Land Use Designation: N/A Proposed LCP Zone: N/A Revised 01/06 PUBLIC FACILITIES School District: Carlsbad Water District: Carlsbad Sewer District: Carlsbad Equivalent Dwelling Units (Sewer Capacity): N/A "Existing" ENVIRONMENTAL IMPACT ASSESSMENT Categorical Exemption, Class 1, Section 15301 "Existing Facilities" Negative Declaration, issued N/AD I | Certified Environmental Impact Report, dated N/A D Other, N/A Revised 01/06 CITY OF CARLSBAD GROWTH MANAGEMENT PROGRAM LOCAL FACILITIES IMPACTS ASSESSMENT FORM (To be Submitted with Development Application) PROJECT IDENTITY AND IMPACT ASSESSMENT: FILE NAME AND NO: North Coast Church - CUP 09-03(A) LOCAL FACILITY MANAGEMENT ZONE: 5 GENERAL PLAN: PI_ ZONING: P-M DEVELOPER'S NAME: Jamie Loonev ADDRESS: 2310 Camino Vida Roble, Carlsbad, CA 92008 PHONE NO.: 760-720-6300 ASSESSOR'S PARCEL NO.: 213-050-08-00 QUANTITY OF LAND USE/DEVELOPMENT (AC., SQ. FT., DU): 12.768 SO. FT. (Expansion area) ESTIMATED COMPLETION DATE: December 20II A. B. C. D. E. City Administrative Facilities: Library: Demand in Square Footage = N/A Demand in Square Footage = N/A F. G. H. I. J. K. L. Wastewater Treatment Capacity (Calculate with J. Sewer) Park: Demand in Acreage = Drainage: Demand in CFS = Identify Drainage Basin = (Identify master plan facilities on site plan) Circulation: Demand in ADT = (Identify Trip Distribution on site plan) Fire: Served by Fire Station No. = Open Space: Acreage Provided = Schools: (Demands to be determined by staff) Sewer: Demands in EDU . Identify Sub Basin = (Identify trunk line(s) impacted on site plan) Water: Demand in GPD = EDU N/A N/A Encinas Creek "C" Mon-Fri: 264 ADT Sat-Sun: 1,057 ADT 5 N/A N/A N/A Bi N/A The project does not impact the Growth Management Dwelling unit allowance. Application Number: CUP 09-03(A) Applicant Name: Jamie Looney SUMMARY OF EXISTING TENANTS HOURS OF OPERATIONS AND TENANT PROVIDED PARKING SURVEY • The existing tenants provided the following data describing their activity levels and use. • Tenant representatives responded via email to a survey conducted 6-14-2011 Tenant - A Rockwell Collins Suite 1Q1 building 2310 Monday - Friday 7:30 AM to 5:30 PM Typical office activities and staffing Saturday and Sunday 7:30 AM to 5:30 PM Minimal Activity 1 or 2 staff members Tenant - B Your Baby Can Suite 105 building 2320 Monday - Friday 8:00 AM to 5:00 PM Typical office activities and staffing Saturday and Sunday 8:00 AM to 5:00 PM Minimal Activity 1 or 2 staff members at most. Tenant - C Luxtera Inc Suite 100 building 2320 Monday - Friday 7:00 AM to 10:00 PM Typical office activities and staffing Saturday and Sunday 8:00 AM to 5:00 PM Minimal Activity 2 to 8 staff members as necessary. *The weekend parking survey data indicates there is an average parking requirement by the existing tenants of (12) twelve spaces. Application Number: CUP 09-03(A) Applicant Name: Jamie Looney SUMMARY OF CHURCH'S OPERATIONS, USE AND ACTIVITIES Monday - Sunday 8:00 AM to 5PM Room 107-109, 125-126 Typical office staffing of: (1) Full time Campus Pastor (1) Full time Youth Pastor (1) Part time Pastor Tuesday 7:00 PM to 9:00 PM Room 105 High School Bible Study: 40 to 60 Attendees Wednesday 7:00 PM to 9:00 PM Room 105 Jr High Bible Study: 50 to 60 Attendees Thursday 7:00 AM to 8:00 AM Room 124 Men's Bible Study: 10 to 15 Attendees 9:00 AM to 11:00 AM Room 105 Mothers Support Group: 35to 40 Attendees Room 104 & 101 Child Care for attendees: 15 to 20 Children Friday 7:00 PM to 9:00 PM Room 105 Adult Bible Study Session: 40 to 50 Attendees Saturday No activity at this time. Sunday Two Sessions of Equal Size 9:00 AM to 10:00 AM Room 100 Room 101 Room 102 Room 103 Room 104 Room 105 Room 112 Room 113 Room 114 Room 115 Room 116 Room 117 Room 118 Room 124 Child Care for attendees: Child Care for attendees: Child Care for attendees: Child Care for attendees: Child Care for attendees: Sanctuary Services: Child Care for attendees: Child Care for attendees: Child Care for attendees: Child Care for attendees: Instructional Youth Classes: Instructional Youth Classes: Instructional Youth Classes: Instructional Classes: 10 to 20 Children 10 to 20 Children 10 to 20 Children 10 to 20 Children 10 to 20 Children 402 Attendees 10 to 15 Children 10 to 15 Children 10 to 20 Children 10 to 20 Children 20 to 30 Youth 30 to 40 Youth 40 to 50 Youth 10 to 20 Youth 10:50 AM to 11:45 AM Room 100 Room 101 Room 102 Room 103 Room 104 Room 105 Room 112 Room 113 Room 114 Room 115 Room 116 Room 117 Room 118 Room 124 Child Care for attendees: Child Care for attendees: Child Care for attendees: Child Care for attendees: Child Care for attendees: Sanctuary Services: Child Care for attendees: Child Care for attendees: Child Care for attendees: Child Care for attendees: Instructional Youth Classes: Instructional Youth Classes: Instructional Youth Classes: Instructional Classes: 10 to 20 Children 10 to 20 Children 10 to 20 Children 10 to 20 Children 10 to 20 Children 402 Attendees 10 to 15 Children 10 to 15 Children 10 to 20 Children 10 to 20 Children 20 to 30 Youth 30 to 40 Youth 40 to 50 Youth 10 to 20 Youth Application Number: CUP 09-03(A) Applicant Name: Jamie Looney Vehicle Trip Generation Per Land Development Code Trip Generation Manual, revised 2003 House of worship General Gross area of entire facility = 29,376 square feet Cumulative Vehicle Trip Rate = 9 Trips/1000 sq ft: quadruple for days of worship Days of the Week Number of Trips Generated Monday-Friday 264 Saturday 264 .Sunday;' ' ' ; ''•'...'". : '. ' .-;: • ' 'J;': 1057 PARKIN© STALL KEQUIREMENT9 MHKPAY PABMNg UMBO •9MB 3IB EjggSawssss. LMCWTCPI «•• M R/HO . *l «IN1* H LOT* MAP NO. 0094 «praufaniwiHan.iaii»«fi| • JIB MI«B JIM »«li I i ib 3 oaptcr^^Ka.TiMogCTXaatCTPl <H» imm»»pf. . IM I i4/erfBnaMMm. . OM i•KWUWXJH .an ' iOo <CV 4 [ACCESSIBLE PARKINS PLAN 5 PROJECT PARKINS CALCULATIONS NOTES CORRESPONDING TO SCHEDULE *B* BUUMO2MO CAMNO WM ROBII2 STORY CCMdCTE/OASS 5UUXNCBUUHNC MKHt - J1.y*BUIUJtJO WEA - 42,294 SQUME FCCT± NOTE: ncM «nUMC OMUU nc HnmtkiMM cotmti MB DRTWCCI WOMI wMC MneT MWI MC nut MD cwitei wo *ccuumKMCXHT OC MUNOMO NO Mt* OF ME MKUSB. .Mauoa iron t * 4. •.PtgvMu. Mtnc-cmun.F. fUOUMIT TO K MCUUCYMt[ Of JM* $shipi3? IS I ?§&s! II* i ! i * 3 lOu [ CLu. j =)" I CV< i Qo- U 5. A.L.T.A. / A.C..5.M. LAND TITLE SURVEY NOTE-. SURVEY DATED-. \-\b-Ob SC44JE. «K SIMmiC fiCM£ PROJECT DESCRIPTION - EXHIBIT "A" VACANCY (EXPANSION AREA) EXISTING SPACE PLAN - NORTH COAST CHURCH 23IO CAMINO VIDA ROBLE STE IO3 PROPOSED SPACE PLAN - NORTH COAST CHURCH EXPANSION 2310 CAMINO VIDA ROBLE STE IO3 (UPON APPROVAL OF MODIFICATION TO CUP O^-O3, THE SPACE PLAN WILL BE REVIEWED, MODIFIED PER THE CONDITIONS OF APPROVAL, AND SUBMITTED TO CARLSBAD PLANNING DEPARTMENT FOR APPROVAL^ 6. EXISTIN& SPACE PLAN - NORTH COAST CHURCH 23IO CAMINO VIDA KOBLE SUITE IO3 _r\ 1. PROPOSED SPACE PLAN EXPANSION - NORTH COAST CHURCH 23IO CAMINO VIDA ROBLE SUITE IO3