I. REQUEST: The applicant is requesting approval of a Conditional Use
Permit to allow a temporary bank under the provisions of Municipal
Code Section 21.42.06. The project is an existing Bank of America
facility located on the east side of El Camino Real between Haymar
Drive and Marron Road.
II. RECOMMENDATION: Staff recommends APPROVAL of Conditional Use Permit
#101 based on the following findings:
1. The requested use is necessary or desirable for the development
of the community, is essentially in harmony with the various
elements and objectives of the general plan, and is not detri-
mental to existing uses or to uses specifically permitted in
the zone in which the proposed use is to be located. The appli-
cant feels that a facility at this location serves the needs and
demands of the c0111Tiunity. Very recent developments in the area
have not allowed the relocation of the facility envisioned for
this year. The project is in compliance with the General Plan
designation of C0111Tiunity Commercial.
2. The site for the intended use is adequate in size and shape to
accOOJ11odate the use.
3. All of the yards, setbacks, walls, fences, landscaping, and other
features necessary to adjust the requested use to existing or
permitted future uses in the neighborhood are provided and being
maintained. The use is adjacent to other similar and compatible
uses.
4. That the street system serving the proposed use is adequate to
properly handle all traffic generated by the proposed use. The
facility is existing, cannot be expanded, and generates small
demand for public services and facilities.
--
Conditions of Approval
1. The approval is granted for the land described in the application
and any attachments thereto, and as shown on the plot plan
submitted labeled Exhibit A. The location of all buildings,
fences, signs, roadways, parking areas, landscaping, and other
facilities or features shall be located substantially as shown
on the plot plan labeled Exhibit A, dated 10/25/74, unless or
except indicated otherwise herein.
2. All requirements of any law, ordinance or regulation of the
State of California, City of Carlsbad, and any other govern-
mental entity shall be complied with.
3. The applicant shall plant the slope on the southern property
boundary with materials acceptable to the Parks and Recreation
Director. This shall be accomplished within one month after
this approval.
4. The mutual driveway between the subject property and service
station to the north of the site shall be restriped to show
shared:ingress/egress. This shall be accomplished within two
months after this approval.
5. This approval shall expire in one year. The Planning Commission
may grant a six-month extension of the Conditional Use Pennit
only if construction of a permanent facility has cormnenced and
is being diligently pursued. In order to commence construction
within this time frame, the applicant shall obtain building
permits by May 12, 1975.
III. BACKGROUND
A. Local Description: A portion of Northwesterly one-fourth of
Fractional Section 32, Township 11, South, Range West, S.B.M.,
City of Carlsbad.
B. Location: On the east side of El Camino Real, 200 ft. south of
the intersection of Haymar Drive and El Camino Real.
C. Type of Structure: Temporary bank facility with aluminum and
stained wood exterior.
D. Size: 1988 sq. ft. floor area; site area .50 acres.
E. Coverage: 9%
F. E.I.R. Finding: The project is exempt from the requirements of
the City's Environmental Protection Ordinance, for reason of prior
compliance.
G. Zoning: C-2 with Specific Plan.
H. General Plan: The General Plan shows a commercial designation for
the subject property.
.. -· -
I. Parking: Twenty-six spaces are provided on site. The Ordinance
requires only five spaces for this use.
J. History: There was some concern at the time the original Specific
Plan was approved by the Planning Co11111ission {October 1970) as
to the duration of the temporary use. The applicant's representa-
tive, Mr. Crowell, indicated at that time that other temporary
banks (such as ones in Vista and Laguna Niguel) were requiring
one to two years to move into permanent facilities. This period,
he explained, was necessary for determining banking needs and
establ i-shing services relative to demand.
It has been four years since the original Specific Plan was approved.
The applicant requested and was granted on November 17, 1972,
an amendment to the Specific Plan which allows the temporary bank
structure and use to continue until November 17, 1974. The appli-
cant in January 1974 requested another two-year extension of the
Specific Plan.
This created an unusual situation because since the time of the
original specific plan approval, the City has approved a zone code
amendment #49 which would allow such uses only by conditional use
permit for a period of one year. An extension of that Conditional
Use Pennit could be granted only if construction has corrmenced and
reasonable progress toward completion is being made. The Planning
Co11111ission determined that the Conditional Use Permit procedure
would be required instead of a Specific Plan extension, and instructed
the applicant to return with such an application.
IV. MAJOR PLANNING CONSIDERATION: At the February hearing for the Specific
Plan extension, several Corrmissioners raised the question of the ethics
of continually extending so-called "temporary" uses. Staff believes
that this is a valid issue. Zone Code Amendment #49 elminates this
problem for new uses by allowing a maximum of l½ years for temporary
conmercial uses.
Staff feels that the applicant is making progress toward a permanent
facility and for this reason is reconmending that the one-year Conditional
Use Permit be approved. A lease has already been signed for a permanent
bank to be located in the Kelly/Kurlander/Vanderburg Shopping Center.