A REPORT TO THE PLANNING COMMISSION
Item No. ( 2 )
P.C. AGENDA OF: September 7, 2011
Application complete date: June 30, 2011
Project Planner: Greg Fisher
Project Engineer: Clyde Wickham
SUBJECT: CUP 11-04 - HOLY CROSS EPISCOPAL CHURCH - Request for approval
of a Conditional Use Permit to allow Holy Cross Episcopal Church to operate and
hold worship services in an existing 5,208 square foot vacant office/industrial
building (building "E") on property located at 2510 Gateway Road within the
Bressi Ranch Master Plan in the Planned Industrial (P-M) Zone, in Local
Facilities Management Zone 17.
I. RECOMMENDATION
That the Planning Commission ADOPT Planning Commission Resolution No. 6800
APPROVING CUP 11-04 for a period of 10 years, based upon the findings and subject to the
conditions contained therein.
II.INTRODUCTION
This application is a request for a Conditional Use Permit to allow Holy Cross Episcopal Church
to operate and hold worship services in an existing 5,208 square foot vacant office/industrial
building (building "E") on property located at 2510 Gateway Road within the Bressi Ranch
Master Plan, Planned Industrial (P-M) Zone, and in Local Facilities Management Zone 17.
Tenant improvements fon the building include a 1,763 square foot assembly area with 62 fixed
seats and Sunday school facilities for children. No exterior improvements are proposed to
accommodate the church use. The projects parking requirement is satisfied through the 20
parking spaces allotted to this building. A joint use of parking facilities is not necessary as there
are a sufficient number of on-site parking spaces. All findings can be made to recommend
approval of this conditional use permit at this location.
III. PROJECT DESCRIPTION AND BACKGROUND
The project site is located within the Ocean Collection business park within Planning Area 3 of
the Bressi Ranch Master Plan. The General Plan Land Use designation for the site is Planned
Industrial (PI) and the Zoning designation for the site is Planned Industrial (P-M). The applicant
is requesting to locate a church in an existing 5,208 square foot vacant office/industrial building
(building "E") within an existing five building office park on property located at 2510 Gateway
Road, between Campbell Place and Alicante Road. The existing building "E" (approved under
CT 07-12/PUD 07-07/PIP 06-11) is one of five constructed buildings on the project site.
Currently operating within this office park are two existing office uses. However, most of the
buildings remain vacant. The existing office/industrial building is surrounded by
office/industrial uses to the north, vacant land to the east and west, and vacant land and
residential uses to the south. The proposed church will consist of tenant improvements including
CUP 11-04 - HOLY CROSS EPISCOPAL CHURCH
September?, 2011
PAGE 2
a 1,763 square foot assembly area with 62 fixed seats, social gathering area, dressing room,
storage room, break room, two restrooms, two offices, Sunday school room, and a nursery room.
The proposed church is an allowed use in the Bressi Ranch Master Plan, Planned Industrial (P-
M) Zone, and McClellan-Palomar Airport Land Use Compatibility Plan subject to approval of a
Conditional Use Permit (CUP). All findings required for approving a CUP can be made with
this project.
The church's hours of operation are as follows:
Monday - Office hours 9:00 a.m. to 4:00 p.m.
Tuesday - Office hours 9:00 a.m. to 4:00 p.m.
Wednesday - Currently closed, future office hours 9:00 a.m. to 4:00 p.m.
Thursday - Office hours (9:00 a.m. to 4:00 p.m.); Bible study class (10:00 a.m. to noon) 6-10
attendees.
Friday - Currently closed, future office hours 9:00 a.m. to.4:00 p.m.
Saturday - Closed except for special days of worship (i.e., Christmas and occasional classes
and programs for the community not to exceed 75 attendees including children).
Sunday - Worship services and classes for congregation: (8 a.m. to 12:30 p.m.) 25 - 75
attendees including children.
Occasional assemblies of the congregation may occur at other times such as Christmas Eve,
Easter Sunday or for memorial services. These assemblies shall not occur on weekdays during
normal business hours 8:00 a.m. to 5:00 p.m. except for holidays.
The Planning Division is recommending that the Conditional Use Permit (CUP 11-04) be
approved for a period of 10 years from September 7, 2011 through September 6, 2021.
However, if building permits are not issued within 24 months from approval, a Conditional Use
Permit Extension must be submitted prior to the end of the 24 month period.
The proposed church is an allowed use in the P-M Zone subject to approval of a Conditional Use
Permit (CUP). All findings required for approving a CUP can be made with this project.
IV. ANALYSIS
The proposed project is subject to the following plans, ordinances, standards, and policies:
A. Planned Industrial (PI) General Plan Land Use Designation;
B. Planned Industrial (P-M) Zone (C.M.C. Chapter 21.34);
C. Bressi Ranch Master Plan, MP 178;
D. Parking Ordinance (C.M.C. Chapter 21.44);
E. Conditional Use Permit Regulations (C.M.C. Chapter 21.42); and
F. Growth Management Ordinance (C.M.C. Chapter 21.90).
The recommendation for approval of this project was developed by analyzing the project's
consistency with the applicable regulations and policies. The project's compliance with each of
the above regulations is discussed in the sections below.
CUP 11-04 - HOLY CROSS EPISCOPAL CHURCH
September?, 2011
PAGE 3
A. General Plan Compliance
The project complies with the General Plan. The site has a General Plan Land Use designation of
Planned Industrial (PI). Per the Carlsbad General Plan Land Use Element, church uses are
encouraged by the General Plan Land Use Element in that they create diversity in land uses
within the city. No changes are being proposed to either the General Plan or Zoning. The
project complies with all elements of the General Plan as illustrated in Table 1 below.
TABLE 1 - GENERAL PLAN COMPLIANCE
ELEMENT
USE, CLASSIFICATION,
GOAL, OBJECTIVE OR
PROGRAM
PROPOSED USES &
IMPROVEMENTS COMPLY
Land Use USE: Site is designated for
Planned Industrial (PI)
GOAL: Provide for a variety
of community facilities uses
(including churches) that are
available to residents in
Carlsbad.
The General Plan encourages
Church uses in any Land Use
Designation where needed.
Churches are a conditionally
permitted use in any zone for the
convenience of the surrounding
residents. The proposed church
will create diversity in land uses
within the city and provides for
adequate onsite parking facilities.
Yes
Circulation To provide an adequate
circulation infrastructure
concurrent with or prior to the
actual demand for such
facilities.
To provide safe, adequate and
attractively landscaped parking
facilities.
All public facilities, including
curb, gutter, sidewalk and
roadways exists along the
southern and westerly property
line on Gateway Road and
Campbell Place. The project is
not adding additional driveway
cuts, intersections, or conflicting
traffic movements.
The project site has an existing
onsite parking lot which is fully
landscaped and has adequate
parking stalls available to serve
all existing and proposed uses.
Yes
Noise Utilize noise standards
contained in the Airport Land
Use Compatibility Plan
(ALUCP) for McClellan-
Palomar Airport.
Based on the noise/land use
compatibility matrix of the
CLUP, the proposed land use is
compatible with the airport since
the project site has a noise level
of less than 60 dBA CNEL in
which the CLUP identifies as
compatible with church uses.
Yes
CUP 11-04 - HOLY CROSS EPISCOPAL CHURCH
September?, 2011
PAGE 4
TABLE 1 - GENERAL PLAN COMPLIANCE CONTINUED
ELEMENT
USE, CLASSIFICATION,
GOAL, OBJECTIVE OR
PROGRAM
PROPOSED USES &
IMPROVEMENTS COMPLY
Open Space/
Conservation
Utilize Best Management
Practices for control of storm
water and to protect water
quality.
The project will conform to all
National Pollution Discharge
Elimination Standards (NPDES)
as well as the City's most up-to-
date Stormwater Management
Regulations.
Yes
Public Safety Enforce the Uniform Building
Code and Fire Codes adopted
by the City to provide fire
protection standards for all
existing and proposed
structures.
The project requires the issuance
of a building permit prior to any
building construction activity
(tenant improvements), whereby
the building is reviewed against
the Uniform Building Code and
Fire Codes to ensure that all
applicable fire protection
measures are appropriately
incorporated into the final
building design.
Yes
B. Planned Industrial (P-M) Zone (C.M.C. Chapter 21.34)
The proposed site is zoned Planned Industrial (P-M) and is therefore subject to the provisions of
Chapter 21.34 of the Zoning Ordinance. Churches are permitted in the P-M Zone subject to
approval of a Conditional Use Permit. The proposed church will occupy an existing
office/industrial building and does not propose any additions, only minor interior tenant
improvements to the existing building. The existing building complies with all setbacks, lot
coverage, and height requirements. Parking compliance is discussed in Section D below.
C.Bressi Ranch Master Plan - MP 178
The planning area is currently designated (Land Use and Zoning) as Planned Industrial in the
Master Plan. In addition, general development standards and design guidelines were established
for the development of the Bressi Ranch Planning Area 3. The existing five building office park
was designed and approved by the Planning Commission (CT 07-12/PUD 07-07/PIP 06-11) to
meet all standards. The Holy Cross Episcopal Church is proposing only interior tenant
improvements for this project.
D. Parking Ordinance (C.M.C. Chapter 21.44)
The proposed church will occupy an existing office/industrial building within the Ocean
Collection office park and with a parking lot consisting of a total of 205 parking stalls. The
building was allotted 20 parking spaces for the site based on the assumption that the building
(building "E") would consist of 100 percent office land use. Based on this building use
assumption, the total number of parking spaces allocated to the building is 20 spaces consistent
CUP 11-04 - HOLY CROSS EPISCOPAL CHURCH
September?, 2011
PAGES
with the approved Planned Industrial Permit (PIP 06-11). Pursuant to Chapter 21.44 of the
CMC, the parking requirement for a church facility is 1 space per 5 fixed seats or 1 space per 100
square feet of assembly area (whichever is greater). Therefore, the proposed church's 1,763
assembly area will require a total of 18 parking spaces (1,763/100 = 17.6 rounded to 18).
Additionally, a portion of the building will be used for Sunday school (including the nursery
room); however, the children's attendance will not result in an increase in demand in church
parking since these children will be driven to the facility by their parents who are attending the
church assembly services concurrently. Therefore, the total amount of parking required during
peak hours on Sunday's would be 18 parking spaces which is two less parking spaces than what
was originally allotted to the building. The 18 parking spaces are also adequate to accommodate
the church's weekday office hours and Thursday bible study class.
E. Conditional Use Permit Regulations
The proposed project is a use which is allowed in the Planned Industrial Zone (P-M) subject to
the approval of a CUP. Chapter 21.42 of the Carlsbad Municipal Code requires that four findings
be made in order to approve a conditional use permit. All of these findings can be made for this
project as discussed below:
1. That the requested use is necessary or desirable for the development of the community, and is
in harmony with the various elements and objectives of the General Plan in that church uses
are encouraged by the General Plan Land Use Element and permitted by Conditional
Use Permit in any zone in the city for the convenience of residents. The City's General
Plan recognizes the need for this type of use and the proposed church use is consistent
with the General Plan (Refer to Section "A") regarding the availability of community
facility uses (including churches) for residents of Carlsbad.
2. That the requested use is not detrimental to existing'uses or to uses specifically permitted in
the zone in which the proposed use is to be located in that the proposed church is
compatible with the residential development to the south and the existing
office/industrial uses located on-site and within the surrounding P-M zone. The project
has been designed to accommodate all required parking on-site and provides for
adequate traffic circulation. Additionally, the church's primary hours of operation
(occasional Saturdays and each Sunday) are essentially different then the neighboring
office/industrial uses. The differing peak hours of operation will reduce or avoid
potential conflicts with the existing approved permitted office/industrial uses and the
proposed church use. The 18 parking spaces allocated to building E are also adequate
to accommodate the church's weekday office hours and Thursday bible study class.
3. That the site for the proposed conditional use is adequate in size and shape to accommodate
the yards, setbacks, walls, fences, parking, loading facilities, buffer areas, landscaping and
other development features prescribed in this code and required by the planning director,
planning commission or city council, in order to integrate the use with other uses in the
neighborhood in that the Holy Cross Episcopal Church will occupy a 5,208 square foot
existing office/industrial building with existing onsite landscaping as previously
approved under Planned Industrial Permit (PIP 06-11) and the proposed tenant
improvements are in compliance with Fire Code regulations for public assembly use.
Furthermore, the project complies with all of the required development standards of
CUP 11 -04 - HOLY CROSS EPISCOPAL CHURCH
September?, 2011
PAGE 6
the P-M Zone and the proposed 5,208 square foot building space is adequate in size and
shape to accommodate the proposed Holy Cross Episcopal Church, as shown on Exhibit
"A".
4. That the street system serving the proposed use is adequate to properly handle all traffic
generated by the proposed use in that the project is provided access from Gateway Road,
a local street, which intersects with El Camino Real, a prime arterial to the west and
Innovation Way, a collector street to the east, and are currently operating at acceptable
levels of service. The Ocean Collection office project was previously analyzed for traffic
generation and the street system was designed to properly handle all traffic generated
by the office park. The 45 average daily trips (ADTs) on weekdays and 188 ADTs on
weekends (specifically Sunday) associated with this proposed Holy Cross Episcopal
Church can be accommodated by the existing street system.
F. Growth Management Ordinance
The proposed project is located within Local Facilities Management Zone 17 in the southeast
quadrant of the City. The impacts on public facilities created by the project and its compliance
with the adopted performance standards are summarized in Table 2 below.
TABLE 2
Growth Management Compliance
STANDARD
City Administration
Library
Waste Water Treatment
Parks
Drainage
Circulation
Fire
Open Space
Schools
Sewer Collection System
Water
IMPACTS
N/A
N/A
1.33EDUs
N/A
N/A
Mon-Fri: 45 ADT
Sat-Sun: 188 ADT
Station No. 5
N/A
N/A
<1EDU
550 GPD
COMPLIANCE
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
V.ENVIRONMENTAL REVIEW
The Planning Director has determined that this project is exempt from the requirements of the
California Environmental Quality Act (CEQA) per Section 15301, "Existing Facilities," of the
State CEQA Guidelines and will not have any adverse significant impact on the environment. A
Notice of Exemption shall be filed with the County Clerk upon approval of this project.
ATTACHMENTS;
1. Planning Commission Resolution No. 6800
2. Location Map
CUP 11-04 - HOLY CROSS EPISCOPAL CHURCH
September?, 2011
PAGE 7
3. Disclosure Statement
4. Background Data Sheet
5. Local Facilities Impact Assessment Form
6. Reduced Exhibit
7. Exhibit "A" dated September 7,2011
NOT TO SCALE
SITE MAP
Holy Cross Episcopal Church
CUP 11-04
,x
*
DISCLOSURE Development Services
STATEMENT Planning Division
CITY OF p_ «I/A\ 1635 Faraday Avenue
DAp\ * ' (760)602-4610
U*»l—' www.carlsbadca.gov
Applicant's statement or disclosure of certain ownership interests on all applications which will
require discretionary action on the part of the City Council or any appointed Board, Commission
or Committee.
The following information MUST be disclosed at the time of application submittal. Your project
cannot be reviewed until this information is completed. Please print.
Note:
Person is defined as "Any individual, firm, co-partnership, joint venture, association, social club, fraternal
organization, corporation, estate, trust, receiver, syndicate, in this and any other county, city and county,
city municipality, district or other political subdivision or any other group or combination acting as a unit."
Agents may sign this document; however, the legal name and entity of the applicant and property owner
must be provided below.
1 . APPLICANT (Not the applicant's agent)
Provide the COMPLETE, LEGAL names and addresses of ALL persons having a
financial interest in the application. If the applicant includes a corporation or partnership.
include the names, titles, addresses of all individuals owning more than 10% of the
shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE
INDICATE NON-APPLICABLE (N/A) IN THE SPACE BELOW. If a publicly-owned
corporation, include the names, titles, and addresses of the corporate officers. (A
separate page may be attached if necessary.)
Holy Cross
Title VAc*y (pr-ip^f^ _ Title _
Address UsLL, CcnrK r\» \ C* A^ Address 6066 Corte del Cerro
<U-rM>«L<J. C^ 12.0 U Carlsbad, CA 92011
2. OWNER (Not the owner's agent)
Provide the COMPLETE. LEGAL names and addresses of ALL persons having any
ownership interest in the property involved. Also, provide the nature of the legal
ownership (i.e., partnership, tenants in common, non-profit, corporation, etc.). If the
ownership includes a corporation or partnership, include the names, titles, addresses of
all individuals owning more than 10% of the shares. IF NO INDIVIDUALS OWN MORE
THAN 10% OF THE SHARES, PLEASE INDICATE NON-APPLICABLE (N/A) IN THE
SPACE BELOW. If a publicly-owned corporation, include the names, titles, and
addresses of the corporate officers. (A separate page may be attached if necessary.)
,,
Person DM^iz^L £T 1:^A Corp/Part
Title P<z firs t D fc. /^TiA-jeT K) E-£— Title
Address P- ^ •r^>^ \S~g0 _ Address p-°- Box
CA "UO'S-S' Vista, CA 92085
NE.
P-1(A) 0 Q.TBs^y I5S"I Page 1 of 2 Revised 07/10
\).s-TA
NON-PROFIT ORGANIZATION OR TRUST
If any person identified pursuant to (1) or (2) above is a nonprofit organization or a trust.
list the names and addresses of ANY person serving as an officer or director of the non-
profit organization or as trustee or beneficiary of the.
Non Profit/Trust HolY Cross Episcopal ChurchNon Profit/Trust
Title
Address
Title
Address 6066 Corte del Cerro
Carlsbad, CA 92011
Have you had more than $500 worth of business transacted with any member of City
staff, Boards, Commissions, Committees and/or Council within the past twelve (12)
months?
Yes No If yes, please indicate person(s):_
NOTE: Attach additional sheets if necessary.
I certify that all the above ition is true and correct to the best of my knowledge.
Sigr/ature of owner/date
S
of applicant/date
%W-,cU
Print or type name of owner Print or type name of applicant
Signature of owner/applicant's agent if applicable/date
Print or type name of owner/applicant's agent
Page 2 of 2 Revised 07/10
BACKGROUND DATA SHEET
CASE NO: CUP 11-04
CASE NAME: HOLY CROSS EPISCOPAL CHURCH
APPLICANT: Holy Cross Episcopal Church
REQUEST AND LOCATION: Request for approval of a Conditional Use Permit to allow
Holy Cross Episcopal Church to operate and hold worship services in an existing 5,208 square
foot vacant office/industrial building (building "E") on property located at 2510 Gateway Road
within the Bressi Rancho Master Plan in the Planned Industrial (P-M) Zone, in Local Facilities
Management Zone 17.
LEGAL DESCRIPTION: Parcel "A" in the City of Carlsbad, County of San Diego. State of
California, according to certificate of compliance recorded December 20, 2006 as document No.
2006-0902548 of official records.
APN: 213-261-15-00 Sq. Ft: 5,208 Proposed No. of Lots/Units: N/A
GENERAL PLAN AND ZONING
Existing Land Use Designation: PI
Proposed Land Use Designation: N/A
Density Allowed: N/A Density Proposed: N/A
Existing Zone: P-C . Proposed Zone: N/A
Surrounding Zoning, General Plan and Land Use:
ZoninR General Plan Current Land Use
Site
North
South
East
West
P-M
P-M
P-M & P-C
P-M
P-M
PI
PI
PI&RM
PI
PI
Office/Industrial
Offi ce/Industri al
Vacant & Residential
Vacant
Vacant
LOCAL COASTAL PROGRAM
Coastal Zone: I I Yes IXI No Local Coastal Program Segment: N/A
Within Appeal Jurisdiction: I I Yes [X] No Coastal Development Permit: | [ Yes [x] No
Local Coastal Program Amendment: I I Yes [X] No
Existing LCP Land Use Designation: N/A Proposed LCP Land Use Designation: N/A
Existing LCP Zone: N/A Proposed LCP Zone: N/A
Revised 01/06
PUBLIC FACILITIES
School District: Carlsbad Water District: Carlsbad Sewer District: Carlsbad
Equivalent Dwelling Units (Sewer Capacity): N/A "Existing"
ENVIRONMENTAL IMPACT ASSESSMENT
1X1 Categorical Exemption, Class 1, Section 15301 "Existing Facilities"
I I Negative Declaration, issued N/A
Certified Environmental Impact Report, dated N/A
Other, N/A
Revised 01/06
CITY OF CARLSBAD
GROWTH MANAGEMENT PROGRAM
LOCAL FACILITIES IMPACTS ASSESSMENT FORM
(To be Submitted with Development Application)
PROJECT IDENTITY AND IMPACT ASSESSMENT:
FILE NAME AND NO: Holy Cross Episcopal Church - CUP 11-04
LOCAL FACILITY MANAGEMENT ZONE: 17 GENERAL PLAN: PL
ZONING: P-C
DEVELOPER'S NAME: Holy Cross Episcopal Church
ADDRESS: 6066 Corte del Cedro. Carlsbad. CA 92011
PHONE NO.: 760-213-4445 ASSESSOR'S PARCEL NO.: 213-261-15-00
QUANTITY OF LAND USE/DEVELOPMENT (AC., SQ. FT., DU): 5,208 SO. FT.
ESTIMATED COMPLETION DATE: December 2011
A.
B.
C.
D.
E.
City Administrative Facilities: Demand in Square Footage = N/A
Library: Demand in Square Footage - N/A
Wastewater Treatment Capacity (Calculate with H Sewer) 1.33 EDUs
Park: Demand in Acreage =
Drainage: Demand in CFS =
Identify Drainage Basin = San Marcos/
N/A
N/A
Batiquitos
F.
(Identify master plan facilities on site plan)
Circulation: Demand in ADT =Mon-Fri: 45 APT
Sat-Sun: 188 ADT
G.
H.
I.
J.
N/A
N/A
K.
L.
(Identify Trip Distribution on site plan)
Fire: Served by Fire Station No.
Open Space: Acreage Provided =
Schools:
(Demands to be determined by staff)
Sewer: Demands in EDU
Identify Sub Basin =
(Identify trunk line(s) impacted on site plan)
Water: Demand in GPD =
The project does not impact the Growth Management Dwelling unit allowance.
<1EDU
H
550
CAUTION: IF THIS SHEET IS NOT J0"x42" IT IS A REDUCED PRINT
SITE PLAN NOTES
VICINITY MAP
FLOOR PLAN
CUP 11-04
HOLY CROSS
EPISCOPAL CHURCH
2510 GATEWAY ROAD
CARLSBAD, CA
PROJECT DATA
PROJECT DESCRIPTION
PROJECT NME
PROJECT TEAM
APPLICANT *XY doss £««WAL om»o<
EXISTING « PROPOSED GENERAL fvW nl n>A ncvsnul
PLANNING CONSULTANT- »0<CS mOEP * «SSOC1*1H
__—M 1 ^««-
Typjcd Strgci Section - Fr-xistiny, Gateway Road
CC j
Olai
I
.Jlfif III!
s.
O;
n
LJJ
A1.0