Loading...
HomeMy WebLinkAbout2012-06-06; Planning Commission; ; CUP 11-06|HMP 11-05 – FAIRFIELD INN CARLSBAD The City of Carlsbad Planning Division A REPORT TO THE PLANNING COMMISSION Item No. Application complete date: December 23, 2011 P.C. AGENDA OF: June 6, 2012 Project Planner: Dan Halverson Project Engineer: David Rick SUBJECT: CUP 11-06/HMP 11-05 – FAIRFIELD INN CARLSBAD – Request for approval of a Conditional Use Permit and Habitat Management Plan Permit to allow for the development of a 99 room business hotel on a 2.49 acre vacant lot on property generally located on the south side of Palomar Oaks Way, south of Palomar Airport Road and east of West Oaks Way, in Local Facilities Management Zone 5. I. RECOMMENDATION That the Planning Commission ADOPT Planning Commission Resolutions No. 6888 and 6889 APPROVING Conditional Use Permit CUP 11-06 and Habitat Management Plan Permit HMP 11-05 based on the findings and subject to the conditions contained therein. II. INTRODUCTION The applicant, Surya LP, is requesting the approval of a Conditional Use Permit (CUP) and a Habitat Management Plan Permit (HMP) to allow for the development of a 2.49 acre vacant lot with a 99 room business hotel, Fairfield Inn, on the south side of Palomar Oaks Way on property zoned Planned Industrial (P-M). The P-M zone allows hotel uses which cater to, and are ancillary to, the allowed industrial and office uses of the zone. The rear of the lot has a vegetated hillside which is zoned Open Space (OS), is not being proposed for development and will be preserved in Open Space through a conservation easement. As designed, conditioned, and modified by the City Planner the project is consistent with all applicable standards and policies and the necessary findings to approve the project can be made. III. PROJECT DESCRIPTION AND BACKGROUND The project site is generally located on the south side of Palomar Oaks Way, south of Palomar Airport Road and east of West Oaks Way. The pad was previously graded for development and is currently vacant. The southern section of the lot is a natural steeply sloping north facing hillside with native mature vegetation on it. This southern slope area is identified in the Carlsbad Habitat Management Plan (HMP) as a hardline area to be conserved as open space and natural habitat. The proposed hotel and associated parking is sited to the north of this hardline area which will be conditioned to be preserved as open space. The site and the surrounding area have a General Plan Land Use and Zoning designation of Planned Industrial (PI/P-M) while the southern slope is designated and zoned as Open Space (OS). The property is surrounded by an industrial office building to the east, a vacant P-M zoned 4 CUP 11-06/HMP 11-05 – FAIRFIELD INN CARLSBAD June 6, 2012 PAGE 2 lot to the west, open space to the south and Palomar Oaks Way to the north. Access onto the lot is provided by two driveways located off of Palomar Oaks Way. The proposed hotel, a Fairfield Inn by Marriott, includes 99 rooms, a 400 square foot meeting room, a small exercise room, a large lobby area with registration area, small breakfast lounge (with associated food preparation area), a laundry room, and employee offices and break rooms. The hotel is sited in the center of the lot with 109 parking spaces and a porte-cochere located around the rear of the building. A pool and recreational area, with a fire pit, and a safety wall will be located along the front of the hotel. The multi-earth toned colored stucco hotel is three stories (33 feet to the top of roof and 43 feet to the tallest parapet) and has a modern industrial architectural style designed to blend in with the industrial buildings that are predominant in the industrial zone. The building includes stair towers, cultured stone accents, and a metal trellis which creates plane changes along the building edges as well as varying roof heights to break up the massing of the building. There are no outstanding issues concerning the proposed business hotel and staff is recommending approval of the project. IV. ANALYSIS The proposed project is subject to the following plans, ordinances, standards, and policies: A. Planned Industrial (PI) and Open Space (OS) General Plan Land Use designation; B. Planned Industrial (P-M) and Open Space (OS) Zone (CMC Chapter 21.34 & 21.33); C. Conditional Use Permit Regulations (CMC Chapter 21.42); D. Parking Ordinance (C.M.C. Chapter 21.44); E. Habitat Preservation and Management Requirements (CMC Chapter 21.210); and F. Growth Management Ordinance (CMC Chapter 21.90) and the Zone 5 Local Facilities Management Plan. The recommendation for approval of this project was developed by analyzing the project’s consistency with the applicable policies and regulations listed above. The following analysis section discusses compliance with each of these regulations/policies utilizing both text and tables. A. Planned Industrial (PI) and Open Space (OS) General Plan Land Use designation The project site has a Planned Industrial (PI) General Plan Land Use designation and the southern slope is designated Open Space (OS). Planned Industrial Implementing Policy (C.9) of the General Plan Land Use Element allows, by Conditional Use Permit, ancillary commercial, office, and recreational uses when clearly oriented to support industrial development and their populations. These include short-term lodging or hotel uses. The hotel use proposed is intended to support the business community within the planned industrial parks and the surrounding community at large. Accordingly, the proposed use can be found consistent with the Planned Industrial (PI) General Land Use designation. The southern slope of the property is a Habitat Management Plan (HMP) Hardline Preserve Area and is designated Open Space. This area of the lot is located within “Linkage F” of the Carlsbad CUP 11-06/HMP 11-05 – FAIRFIELD INN CARLSBAD June 6, 2012 PAGE 3 HMP and as such must be conserved as a linkage to the natural habitats in the area. The proposed hotel and associated parking and landscaping will not encroach in to the open space area of the lot. This open space area will be conditioned to be preserved and protected by the recordation of a conservation easement as well as a long term management and monitoring agreement. B. Planned Industrial (P-M) and Open Space (OS) Zone (CMC Chapter 21.34 & 21.33) The site is zoned Planned Industrial (P-M) and is therefore subject to the provisions of Chapter 21.34 of the Zoning Ordinance. Hotel and Motel uses are permitted in the P-M Zone subject to approval of a Conditional Use Permit. The proposed hotel use does comply with the intent and purpose of the zone because it is a commercial use that will cater to and be ancillary to the other uses, including industrial-office, which are allowed in the zone. As shown in Table A below, the project complies with all of the development standards established for the Planned Industrial Zone. Parking is discussed in section D below. TABLE A – PLANNED INDUSTRIAL ZONE DEVELOPMENT STANDARDS STANDARD REQUIRED PROPOSED COMPLY? Max Building Height 35’ max roof height and three levels 45’ max top of parapet or roof protrusions 33’ to top of roof 43’ to top of tallest parapet Yes Yes Setbacks: Front Side Rear 35’ avg. / 25’ minimum on a collector street 10’ minimum 20’ minimum 35’ average and 25’ minimum 10’ 20’ Yes Yes Yes Lot Coverage 50% maximum 17% Yes The southern portion of the project site, which is zoned Open Space will be undeveloped and preserved in open space through a conservation easement. C. Conditional Use Permit Regulations (CMC Chapter 21.42) The proposed project is a use which is allowed in the Planned Industrial Zone (P-M) subject to the approval of a CUP and Section 21.42.140(B)(80) of the C.M.C. Chapter 21.42 of the Carlsbad Municipal Code requires that four findings be made in order to approve a conditional use permit. All of these findings can be made for this project as discussed below: 1. That the requested use is necessary or desirable for the development of the community, and is in harmony with the various elements and objectives of the general plan, including, if applicable, the certified local coastal program, specific plan or master plan. CUP 11-06/HMP 11-05 – FAIRFIELD INN CARLSBAD June 6, 2012 PAGE 4 The proposed business hotel is designed for use by business visitors to the City and the adjacent industrial office area. The use is necessary and desirable in that the proposed hotel is in close vicinity of the airport and is within a planned industrial business park and will supply transient housing for business travelers and visitors to the City. As discussed in Section A above, the project complies with the General Plan Land Use Designations. 2. That the requested use is not detrimental to existing uses or to uses specifically permitted in the zone in which the proposed use is to be located. The proposed business hotel is designed to meet or exceed the zoning development regulations, is architecturally compatible with the surrounding industrial buildings, and the site is adequately designed to accommodate the operations of a hotel. For these reasons, the hotel will not be detrimental to surrounding industrial office and open space uses. 3. That the site for the proposed conditional use is adequate in size and shape to accommodate the yards, setbacks, walls, fences, parking, loading facilities, buffer areas, landscaping and other development features prescribed in this code and required by the City Planner, Planning Commission or City Council, in order to integrate the use with other uses in the neighborhood. With the exception of the approved 10 space parking reduction (discussed in Section D below), the proposed hotel is designed to meet all required setbacks, parking, habitat buffers, safety fencing for the proposed pool, and is conditioned to maintain the landscaping and other hotel amenities associated with a business hotel so as to integrate the hotel use with the industrial office uses in the neighborhood. 4. That the street system serving the proposed use is adequate to properly handle all traffic generated by the proposed use. The proposed 693 ADT’s projected for the business hotel is within the same acceptable range as an office building (a comparable sized office building would generate 1095ADT’s) which would be allowed by right within the Planned Industrial zone. The street system is designed and sized to accommodate any traffic from the project and cumulative development within the surrounding business park. Conditional Use Permit Section 21.42.140(B)(80) states that any CUP application for a hotel or motel shall include architectural theme, colored elevations, and a site plan. The applicant has submitted all plans as part of their applications. The CUP standards contained within Section 21.42.140(B)(80) of the CMC are applicable to hotels that are located adjacent to residentially zoned properties. Since the site is not adjacent to residential zone, none of the standards apply. The findings to approve a CUP in the P-M Zone can be made. D. Parking Ordinance (C.M.C. Chapter 21.44) The proposed hotel will have 99 rooms. Pursuant to the Parking Ordinance, CMC Section 21.44.020 Table A, the required number of parking spaces for a hotel or motel is 1.2 spaces per room, or 119 spaces (99 x 1.2 = 119) for this project. The applicant is proposing a parking reduction per Section 21.44.040B of the CMC which states that the City Planner may modify the CUP 11-06/HMP 11-05 – FAIRFIELD INN CARLSBAD June 6, 2012 PAGE 5 required parking standards where it can be demonstrated that adequate parking will be provided and the modification will not adversely affect the neighborhood or the site design or circulation. The applicant is proposing 1.1 parking spaces per room instead of the required 1.2 parking spaces per room, which would be a total of a 10 space reduction, or 109 spaces. The applicant has submitted a letter to the City Planner which states that the Marriott standards for all their hotels is 1.1 space per room, plus additional spaces to support other uses such as meeting rooms. Since the project includes only one small (408 square foot) meeting room, the City Planner finds the reduction to 109 spaces is more than adequate for a 99 room business hotel and the reduction to 1.1 spaces per room can therefore be found to be consistent with the City’s standards. E. Habitat Preservation and Management Requirements (CMC Chapter 21.210) The City of Carlsbad’s HMP identifies the 2.49-acre project site as a Development Area and the small southern hillside portion as Hardline Preserve Area. The adopted HMP is a comprehensive plan to protect native plant and animal species and their habitats by the creation of a citywide, regional habitat preserve system. In return, impacts to native habitats outside the citywide, regional preserve system boundaries are allowed. The native habitat contained on the developable area of the project site is not a part of, nor is of any biological value to the HMP citywide regional habitat preserve system, and will not jeopardize the existence or survival of any rare, threatened or endangered plant or animal species, and the impact can be mitigated through the payment of a habitat in-lieu mitigation fees as conditions of approval of the project. A habitat assessment of the project site (Planning Systems, November 30, 2011) was prepared in accordance with the HMP, which identified a portion of the site as being previously graded (disturbed) as a future development site. The southern section of the property contains a naturally steeply sloping north-facing hillside which is wholly in the Hardline Area. The report calculates the total amounts and types of vegetation occurring on the 2.49 acre site as: 1.55 acres of Disturbed Non-Native Grasslands; 0.42 acres of Developed Land; 0.36 acres of Coastal Sage Chaparral; 0.06 acres of Oak Trees; 0.05 acres of Disturbed Southern Mixed Chaparral; 0.03 acres of Southern Mixed Chaparral; and 0.02 acres of Disturbed Lands. No sensitive plant or wildlife species listed by the United States Fish & Wildlife Service (USFWS), California Department of Fish & Game (CDFG), or the HMP were observed onsite. No Riparian/Riverine habitat, wetland habitat, artificially created wetlands, wetland species, or evidence of jurisdictional waters were observed or identified onsite. The HMP conservation goals for Zone 5 require conservation of the majority of sensitive habitats in or contiguous with biological core and linkage areas, including no net loss of wetlands habitats, southern maritime chaparral, maritime succulent scrub, and coastal sage scrub within Linkage Area F. The proposed project is to develop on the disturbed areas to the maximum extent feasible and will primarily impact the disturbed non-native grassland, developed land and disturbed lands. The project will impact a small amount of habitat located on the developable section of the lot. These impacts have already been analyzed, anticipated and authorized by the City’s HMP. See Table B below: CUP 11-06/HMP 11-05 – FAIRFIELD INN CARLSBAD June 6, 2012 PAGE 6 TABLE B – HABITAT RESOURCES AND IMPACTS Habitat Property Area (acres) Impact Totals (acres) Conserved Area (acres) Group D Habitat Coastal Sage Scrub/Chaparral 0.36 acres 0.03 acres 0.33 acres Southern Mixed Chaparral 0.03 acres 0.03 acres 0 Disturbed Southern Mixed Chaparral 0.05 acres 0.05 acres 0 Group E Habitat Disturbed Non-Native Grassland 1.55 acres 1.53 acres 0.02 acres Group F Habitat Disturbed Land 0.02 acres 0.02 acres 0 Other Habitat Oak Trees 0.06 acres 0.02 acres 0.04 acres Developed land 0.42 acres 0.42 acres 0 TOTALS 2.49 acres 2.1 acres 0.39 acres Pursuant to the HMP, the project has been conditioned to pay in-lieu fees for impacts to 2.1 acres consisting of: Coastal Sage Scrub, Southern Mixed Chaparral, Disturbed Southern Mixed Chaparral, Disturbed Non-Native Grassland, and Disturbed Lands. There will be no impacts to any habitat within the hardline area and an open space conservation easement will be recorded over the 0.39 acres to prohibit development of this property which is currently designated for Open Space by the Carlsbad General Plan. In order to prevent negative effects on the HMP Hardline Preserve, conditions have been included with the project approval to address the interface between the proposed development and the hardline habitat. These include fire management; erosion control; landscaping restrictions; fencing, signage, and lighting requirements; and predator and exotic species control. Additionally, in accordance with the HMP, the open space area has been conditioned to be protected by a conservation easement. An Open Space Management Plan will be prepared, and an endowment will need to be established for long-term management, monitoring and reporting of the area in perpetuity. F. Growth Management Ordinance (CMC Chapter 21.90) and the Zone 5 Local Facilities Management Plan The project is located within Local Facilities Management Zone 5 in the southwest quadrant of the City. The impacts on public facilities created by this project, and its compliance with adopted performance standards, are summarized in the table below: TABLE C – GROWTH MANAGEMENT COMPLIANCE STANDARD IMPACTS COMPLY? City Administration N/A N/A Library N/A N/A CUP 11-06/HMP 11-05 – FAIRFIELD INN CARLSBAD June 6, 2012 PAGE 7 TABLE C – GROWTH MANAGEMENT COMPLIANCE CONTINUED STANDARD IMPACTS COMPLY? Waste Water Treatment 59.4 EDU Yes Parks Zone 5 in-lieu fee Yes Drainage Drainage Basin “C” Yes Circulation 693 ADT Yes Fire Fire Station 4 Yes Open Space N/A N/A Schools (Carlsbad) N/A N/A Sewer Collection System 59.4 EDU Yes Water 12,596 GPD Yes V. ENVIRONMENTAL REVIEW The Planning Director has determined that this project is exempt from the requirements of the California Environmental Quality Act (CEQA) per Section 15332, In-Fill Development: where the project is consistent with the General Plan designations and policies; the lot is less than five acres in size and is surrounded by urban development; the site has no biological value for endangered, rare or threatened species; the project would not result in any significant impacts relating to traffic, noise, air quality or water quality; and, the site is adequately served by the required utilities. A notice of Exemption will be filed upon approval of the project. ATTACHMENTS: 1. Planning Commission Resolution No. 6888 (CUP) 2. Planning Commission Resolution No. 6889 (HMP) 3. Location Map 4. Parking Letter from Marriott 5. Background Data Sheet 6. Local Facilities Impact Assessment Form 7. Disclosure Statement 8. Reduced Exhibits 9. Full Size Exhibits “A”-“M” dated June 6, 2012 PALOMAR AIRPORT RD PALOMAR OAKS WY W E S T O A K S W Y CUP 11-06/HMP 11-06 Fairfield Inn Carlsbad SITE MAP SITE E L C AMINO R E A L LA COSTA AV ALGA RD C A R L S B A D B L Revised 01/06 BACKGROUND DATA SHEET CASE NO: CUP 11-06/HMP 11-05 CASE NAME: FAIRFIELD INN CARLSBAD APPLICANT: Surya, LP REQUEST AND LOCATION: Request for approval of a Conditional Use Permit and Habitat Management Plan to allow for the development of a 99 room business hotel on a 2.49 acre vacant lot on property generally located on the south side of Palomar Oaks Way, south of Palomar Airport Road and east of Palomar Oaks Way and in Local Facilities Management Zone 5. _ LEGAL DESCRIPTION: All of Lot 16 and a Portion of Lot 15 of Carlsbad Tract No. 80-38, Map No. 10198, as filed in the Office of the County Recorder, County of San Diego, State of California, as Instrument No. 81-294627, dated September 15, 1981. APN: 213-091-06 Acres: 2.49 Proposed No. of Lots/Units: N/A GENERAL PLAN AND ZONING Existing Land Use Designation: Planned Industrial (PI)/Open Space (OS) Proposed Land Use Designation: N/A Density Allowed: N/A Density Proposed: N/A Existing Zone: Planned Industrial (P-M) Proposed Zone: N/A Surrounding Zoning, General Plan and Land Use: Zoning General Plan Current Land Use Site Planned Industrial (P- M)/ Open Space (OS) Planned Industrial (PI)/ Open Space (OS) Vacant North Planned Industrial(P-M) Planned Industrial (PI) Planned Industrial Office South Open Space (OS) Open Space (OS) Open Space East Planned Industrial(P-M) Planned Industrial (PI)/ Open Space (OS) Planned Industrial Office West Planned Industrial(P-M) Planned Industrial (PI)/ Open Space (OS) Vacant LOCAL COASTAL PROGRAM Coastal Zone: Yes No Local Coastal Program Segment: N/A Within Appeal Jurisdiction: Yes No Coastal Development Permit: Yes No Local Coastal Program Amendment: Yes No Revised 01/06 Existing LCP Land Use Designation: N/A Proposed LCP Land Use Designation: N/A Existing LCP Zone: N/A Proposed LCP Zone: N/A PUBLIC FACILITIES School District: Carlsbad Water District: Carlsbad Sewer District: Carlsbad Equivalent Dwelling Units (Sewer Capacity): N/A ENVIRONMENTAL IMPACT ASSESSMENT Categorical Exemption, 15332 – Infill Exemption Negative Declaration, issued Certified Environmental Impact Report, dated Other, CITY OF CARLSBAD GROWTH MANAGEMENT PROGRAM LOCAL FACILITIES IMPACTS ASSESSMENT FORM (To be Submitted with Development Application) PROJECT IDENTITY AND IMPACT ASSESSMENT: FILE NAME AND NO: Fairfield Inn Carlsbad – CUP 11-06/HMP 11-05 LOCAL FACILITY MANAGEMENT ZONE: 5 GENERAL PLAN: Planned Industrial (PI)/Open Space (OS) ZONING: Planned Industrial (P-M) DEVELOPER’S NAME: Surya, LP ADDRESS: 10660 Scripps Ranch Blvd., Suite 100, San Diego, CA 92121 PHONE NO.: 858-621-4908 ASSESSOR’S PARCEL NO.: 213-091-06 QUANTITY OF LAND USE/DEVELOPMENT (AC., SQ. FT., DU): 2.49 AC. ESTIMATED COMPLETION DATE: N/A A. City Administrative Facilities: Demand in Square Footage = N/A B. Library: Demand in Square Footage = N/A C. Wastewater Treatment Capacity (Calculate with J. Sewer) 59.4 D. Park: Demand in Acreage = N/A E. Drainage: Demand in CFS = 59.4 Identify Drainage Basin = C (Identify master plan facilities on site plan) F. Circulation: Demand in ADT = 693 (Identify Trip Distribution on site plan) G. Fire: Served by Fire Station No. = 4 H. Open Space: Acreage Provided = N/A I. Schools: N/A (Demands to be determined by staff) J. Sewer: Demands in EDU 59.4 Identify Sub Basin = N/A (Identify trunk line(s) impacted on site plan) K. Water: Demand in GPD = 12,596