HomeMy WebLinkAboutPD 2023-0013; AVIARA OAKS ELEMENTARY SCHOOL MODERNIZATION; GEOTECHNICAL REPORT; 2023-02-084373 Viewridge Avenue Suite B San Diego, California 92123 858.292.7575 944 Calle Amanecer Suite F San Clemente, CA 92673 949.388.7710 www.usa-nova.com NOVA Project No. 2021251 February 8, 2023 Aviara Oaks Elementary School Modernization PD 2023-0013 6900 Ambrosia Lane Carlsbad, California Submitted to: Carlsbad Unified School District 6225 El Camino Real Carlsbad, California 92009 REPORT UPDATE GEOTECHNICAL INVESTIGATION -~ CARLSBAD ~~ Unified School District Jl \ , •• NOVA Services GEOTECHNICAL MATERIALS SPECIAL INSPECTION DVBE  SBE  SDVOSB  SLBE 4373 Viewridge Avenue, Suite B San Diego, CA 92123 P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite F San Clemente, CA 92673 P: 949.388.7710 Jessica Kimbrell February 8, 2023 Carlsbad Unified School District NOVA Project No. 2021251 6225 El Camino Real Carlsbad, CA 92009 Subject: Report Update Geotechnical Investigation Aviara Oaks Elementary School Modernization 6900 Ambrosia Lane, Carlsbad, CA Dear Ms. Kimbrell: NOVA Services, Inc. (NOVA) is pleased to present its report describing the geotechnical investigation and stormwater infiltration testing performed for the Aviara Oaks Elementary School Modernization project. NOVA’s services were conducted in accordance with its proposals dated November 10, 2021, and November 14, 2022. Since the report by NOVA was submitted to Carlsbad Unified School District (CUSD) in December 2021, the scope of the modernization has changed; however, the original report with the incomplete scope of work was submitted to California Geological Survey (CGS) for review. This report provides the findings of additional site characterization and reporting to address development concepts that are current as of this date as well as addressing the Engineering Geology and Seismology Review comments from CGS. NOVA appreciates the opportunity to be of continued service to the Carlsbad Unified School District. If you have any questions regarding this report, please do not hesitate to call us at 858.292.7575 x 413. Sincerely, NOVA Services, Inc. _________________________ _______________________ John F. O’Brien, PE, GE Melissa Stayner, PG, CEG Principal Geotechnical Engineer Senior Engineering Geologist Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 i REPORT UPDATE GEOTECHNICAL INVESTIGATION Aviara Oaks Elementary School Modernization 6900 Ambrosia Lane, Carlsbad, California TABLE OF CONTENTS 1. INTRODUCTION ............................................................................................................. 1 1.1. Terms of Reference .......................................................................................................... 1 1.2. Previous Geotechnical Reporting ...................................................................................... 2 1.3. Objectives, Scope, and Limitations .................................................................................... 2 1.3.1 Objectives ............................................................................................................ 2 1.3.2 Scope .................................................................................................................. 2 1.3.3 Limitations ........................................................................................................... 3 2. BACKGROUND .............................................................................................................. 4 2.1. Site Description ................................................................................................................. 4 2.2. Historical Use .................................................................................................................... 5 2.2.1 General ............................................................................................................... 5 2.2.2 Site Development Earthwork ............................................................................... 5 2.3. Proposed School Improvements ....................................................................................... 6 2.3.1 Architectural ........................................................................................................ 6 2.3.2 Structural ............................................................................................................. 6 2.3.3 Earthwork ............................................................................................................ 7 2.3.4 Stormwater .......................................................................................................... 7 3. SUBSURFACE EXPLORATION AND LABORATORY TESTING ................................. 8 3.1. Overview ........................................................................................................................... 8 3.2. Engineering Borings .......................................................................................................... 9 3.3. Laboratory Testing ............................................................................................................ 9 3.4. CPT Soundings ................................................................................................................. 9 3.5. Percolation Testing ........................................................................................................... 9 4. GEOLOGY AND SUBSURFACE CONDITIONS .......................................................... 10 Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 ii 4.1. Regional Geology ............................................................................................................ 10 4.2. Site-Specific Geology ...................................................................................................... 11 4.3. Groundwater ................................................................................................................... 12 4.4. Mechanical Characteristics of the Subsurface Materials .................................................. 12 5. REVIEW OF GEOLOGIC, SOIL, AND SITING HAZARDS........................................... 14 5.1. Overview ......................................................................................................................... 14 5.2. Geologic Hazards ............................................................................................................ 14 5.2.1 Strong Ground Motion ....................................................................................... 14 5.2.2 Faulting in the Site Vicinity ................................................................................. 14 5.2.3 Historical Seismicity ........................................................................................... 15 5.2.4 Landslide ........................................................................................................... 16 5.3. Soil Hazards .................................................................................................................... 16 5.3.1 Liquefaction ....................................................................................................... 16 5.3.2 Seismic Compression ........................................................................................ 16 5.3.3 Deep Fill Settlement .......................................................................................... 17 5.3.4 Hydro-Collapse .................................................................................................. 18 5.3.5 Expansive Soils ................................................................................................. 18 5.4. Siting Hazards ................................................................................................................. 19 5.4.1 Site Suitability .................................................................................................... 19 5.4.2 Inundation .......................................................................................................... 19 5.4.3 Subsidence ........................................................................................................ 19 6. EARTHWORK AND FOUNDATIONS ........................................................................... 20 6.1. Overview ......................................................................................................................... 20 6.1.1 Review of Seismic Hazards ............................................................................... 20 6.1.2 Conformance with Codes .................................................................................. 20 6.1.3 Review and Surveillance ................................................................................... 20 6.2. Seismic Resistant Design ................................................................................................ 20 6.2.1 Site Class .......................................................................................................... 20 6.2.2 CBC Seismic Design Parameters ...................................................................... 21 6.3. Corrosion and Sulfate Attack ........................................................................................... 22 6.4. Earthwork ........................................................................................................................ 22 6.4.1 General ............................................................................................................. 22 6.4.2 Potential Effects of Past Site Use ...................................................................... 23 Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 iii 6.4.3 Site Preparation ................................................................................................. 23 6.4.4 Select Fill ........................................................................................................... 23 6.4.5 Remedial Grading - Building 800 and Relocatable/Modular Classrooms ........... 23 6.4.6 Remedial Grading – Pedestrian Hardscape ....................................................... 24 6.4.7 Remedial Grading – Pavements ........................................................................ 24 6.4.8 Remedial Grading – Site Walls and Retaining Walls .......................................... 24 6.4.9 Remedial Grading – Play Area .......................................................................... 25 6.4.10 Temporary Excavations ..................................................................................... 25 6.4.11 Surface Drainage ............................................................................................... 25 6.5. Foundations .................................................................................................................... 26 6.5.1 General ............................................................................................................. 26 6.5.2 Spread Footings for Building 800 ....................................................................... 26 6.5.3 Relocatable/Modular Classrooms ...................................................................... 27 6.5.4 CIDH Piles ......................................................................................................... 27 6.5.5 Foundation Plan Review .................................................................................... 28 6.6. Interior Slabs-On-Grade .................................................................................................. 28 6.7. Hardscape ....................................................................................................................... 28 6.8. Conventional Retaining Walls .......................................................................................... 29 6.8.1 Foundations ....................................................................................................... 29 6.8.2 Active Earth Pressures ...................................................................................... 29 6.8.3 Drainage ............................................................................................................ 29 6.9. Pipelines ......................................................................................................................... 30 6.10. Pavements .................................................................................................................... 31 7. INFILTRATION FEASIBILITY ....................................................................................... 32 7.1. Overview ......................................................................................................................... 32 7.2. Percolation Testing ......................................................................................................... 32 7.3. Review of Infiltration Restrictions..................................................................................... 33 7.4. Suitability of the Site for Stormwater Infiltration ............................................................... 34 8. REFERENCES .............................................................................................................. 35 8.1. Site Specific .................................................................................................................... 35 8.2. Design ............................................................................................................................. 35 8.3. Site Setting ...................................................................................................................... 36 Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 iv List of Figures Figure 1-1. Site Vicinity Figure 2-1. Site Location Map Figure 2-2. USGS Quadrangle Map Figure 2-3. Locations of New Building 800 and Proposed Portable/Modular Classrooms Figure 2-4 Planned New Stormwater BMPs Figure 3-1. Location of Subsurface Explorations Figure 4-1. Regional Geology in the Vicinity of the Site Figure 4-2. Fill at Boring 3 Figure 4-3. Representative Santiago Formation Soil Figure 4-4. Tip Resistance, Constrained Modulus, and Soil Type, CPT-2 Figure 5-1. Faulting in the Site Vicinity Figure 5-2. Liquefaction Hazard Mapping, City of Carlsbad General Plan Figure 6-1. Typical Conventional Retaining Wall Backdrain Details List of Tables Table 6-1. 2019 CBC and ASCE 7-16 Seismic Design Parameters – Building 800 and Relocatable/Modular Buildings Table 6-2. 2019 CBC and ASCE 7-16 Seismic Design Parameters –Western Portion of Campus Table 6-3. Summary of Corrosivity Testing of the Near Surface Soil Table 6-4. AC and PCC Pavement Sections Table 7-1. Summary of Percolation Testing Table 7-2. Determination of Safety Factor Table 7-3. Infiltration Restrictions List of Plates Plate 1 Geotechnical Map Plate 2 Geologic Cross-Sections Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 v List of Appendices Appendix A Use of the Geotechnical Report Appendix B Boring Logs Appendix C Geotechnical Laboratory Testing Appendix D CPT Logs Appendix E Liquefaction and Seismic Settlement Calculations Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 1 1. INTRODUCTION 1.1. Terms of Reference This report presents the findings of the geotechnical investigation and stormwater infiltration testing performed for the Aviara Oaks Elementary School Modernization project. The work was completed for Carlsbad Unified School District in general accordance with its proposals dated November 10, 2021, and November 14, 2022. Figure 1-1 depicts the site vicinity. Figure 1-1. Site Vicinity Map Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 2 1.2. Previous Geotechnical Reporting NOVA provided a report of the geotechnical investigation of this site in a December 17, 2021 report (NOVA, 2021). This Update report provides the findings of additional site characterization and reporting to address development concepts that are current as of this date as well as addressing the Engineering Geology and Seismology Review comments from California Geological Survey (CGS,2022a). 1.3. Objectives, Scope, and Limitations 1.3.1 Objectives The objectives of the work reported herein are threefold, as described below. 1. Geohazards. Assessment of geologic and geotechnical hazards associated with Aviara Oaks Elementary School, completing this assessment in conformance with the requirements of California Geological Survey, Note 48 Checklist for Review of Engineering Geology and Seismology Reports for California Public Schools, Hospitals, and Essential Service Buildings (CGS, 2022b). 2. Geotechnical. Characterization of the subsurface in a manner sufficient to provide recommendations for earthwork and foundation-related design and construction in conformance with Chapter 18A of Title 24, Part 2 of the 2019 California Building Code (CBC). 3. Stormwater. Testing and related evaluation to provide guidance for design of stormwater infiltration Best Management Practices (‘stormwater BMPs’) in conformance with the City of Carlsbad BMP Design Manual (Carlsbad, 2023). 1.3.2 Scope In order to accomplish the objectives above, NOVA undertook a program of subsurface exploration, in situ testing, laboratory testing, geologic evaluation, engineering evaluation, and reporting as abstracted below. • Subsurface conditions were explored by drilling and sampling 11 geotechnical hollow-stem borings (B-1 through B-11), one geotechnical hand-auger boring (HA-1), and four percolation test borings (P-1 through P-4), and to depths between 5 to 81½ feet below the ground surface (bgs). • Borehole percolation testing was completed at two locations identified by the design team as prospective stormwater BMPs. • As a part of the update investigation, three cone penetration tests (CPTs) (CPT-1 through CPT-3) were pushed to depths up to about 79 feet bgs. • Laboratory testing was completed on representative soil samples. • The findings of the subsurface exploration and laboratory testing were utilized to support evaluations of the geologic and geotechnical aspects of the proposed school modernization. Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 3 1.3.3 Limitations Geotechnical engineering and the related geological sciences are characterized by uncertainty. The recommendations provided in this report have been developed by NOVA using judgment and opinion and based upon the limited information available from the borings. NOVA can finalize its recommendations only by observing actual subsurface conditions revealed during construction. NOVA cannot assume responsibility or liability for the report's recommendations if NOVA does not perform construction observation. This report does not address any environmental assessment or investigation for the presence or absence of hazardous or toxic materials in the soil, soil gas, groundwater, or surface water within or beyond the site. This report is supported by five appendices: • Appendix A Use of the Geotechnical Report • Appendix B Boring Logs • Appendix C Geotechnical Laboratory Testing • Appendix D CPT Logs • Appendix E Liquefaction and Seismic Settlement Calculations Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 4 2. BACKGROUND 2.1. Site Description Aviara Oaks Elementary School is located at 6900 Ambrosia Lane in the City of Carlsbad, San Diego County, California. The school is bounded on the north by Aviara Oaks Middle School, on the east by undeveloped land, on the west and southwest by Ambrosia Lane, and on the southeast by Aviara Parkway. The portion of the site proposed for modernization currently supports sidewalks, grass fields, asphalt play courts, and an asphalt paved parking lot. Figure 2-1 depicts the site location on a recent aerial image. Figure 2-1. Site Location Map Site elevations range from approximately +166 feet mean sea level (msl) in the northwestern parking lot to approximately +145 feet msl near the southern site boundary. This ± 20-foot elevation differential occurs over a horizontal distance of about 1,000 feet, a surface gradient of about 2%. Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 5 2.2. Historical Use 2.2.1 General A review of historic aerial photos shows that the site area was undeveloped until about 1989, with portions of the site used for agricultural purposes. By 1989 grading operations for Aviara Parkway and the school had begun. By 1991, the grading was complete, and the site was in its existing configuration. 2.2.2 Site Development Earthwork Review of historic topographic mapping indicates that the campus spans a previous ridge on the west, and canyon on the east. Figure 2-2 presents the site location on a United States Geologic Survey (USGS) 7½ Minute Quadrangle Map that reflects historic topography prior to grading of the school. Figure 2-2. USGS Quadrangle Map Review of topographic mapping indicates the ridge rose to approximately El. +240 feet msl, and the bottom of the canyon was at an elevation of about El. +110 feet msl. This pre-construction topography suggests there was significant grading to develop the current, relatively level groundform of the Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 6 campus. Grading included cuts up to 70 feet on the far west side and fills of at least 60 feet below the east side of campus. This cut and deep valley fill within the site limits is consistent with the findings of NOVA’s geotechnical borings, which encountered bedrock from the surface in the western portion of the campus and deepening artificial fill moving eastward. The subsurface conditions observed in the borings are discussed further in Section 4. 2.3. Proposed School Improvements 2.3.1 Architectural An architectural plan sheet provided by Ruhnau Clarke Architects (hereinafter ‘RCA 2022’) indicates that structural modernizations to the school will include the replacement of Building 800, currently a single-story modular building with construction of a permanent single-story building, as well as construction of single-story modular and relocatable buildings. Figure 2-3 indicates these locations. Additional improvements will include reconfiguration and paving of asphalt parking lots and drop-off areas, new flatwork, utility installation, and new stormwater BMP structures. Play structures will be added in the hardcourt play area. Figure 2-3. Locations of New Building 800 and Proposed Portable/Modular Classrooms 2.3.2 Structural Building 800 and the portable/modular classrooms will impart relatively light loads to foundations, such that structures may be founded on shallow foundations. The ground level slab of Building 800 may be supported at grade. r- ........... ,..._, .. ,.,.._ =:;:..:ao;:::··- GATE NOTES ------··-----, ... ...:...~ .. '_.., __ ., ___ _ ....,,._.1..... ______ .,_ Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 7 2.3.3 Earthwork Grading plans have not been developed for this site at the time of this report, but based on conversations with the architect, planned grades will not vary appreciably from existing grades, and as such, grading and earthwork will be minimal. The principal elements of earthwork will be related to remedial grading for the new classrooms, utilities, pavement, and flatwork. 2.3.4 Stormwater Two new stormwater infiltration basins will be developed at the southern portion of the site. Figure 2-4 depicts the locations and alignment of these basins on the campus. Figure 2-4. Planned New Stormwater BMPs Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 8 3. SUBSURFACE EXPLORATION AND LABORATORY TESTING 3.1. Overview The subsurface exploration comprised of the elements of work abstracted below. 1. Engineering Borings. 12 geotechnical borings (B-1 through B-11 and HA-1) were extended to depths of 7 feet to 81½ feet below the ground surface (bgs). Borings B-1 through B-11 were advanced using a truck-mounted drill rig equipped with a hollow-stem auger. HA-1 was advanced using a hand auger. Borings B-1 through B-9 were completed on November 23, 2021 and the additional borings were completed on November 21, 2022. 2. Percolation Testing. Four percolation test borings (P-1 through P-4) were each extended to about 5 feet bgs, converted to percolation test wells, then tested in conformance with City of Carlsbad requirements. 3. CPT Soundings. Three cone penetration test soundings (CPT-1 through CPT-3) were extended to depths up to 80 feet on November 26, 2022. Figure 3-1 presents the approximate locations of the above explorations. Plate 1- Subsurface Investigation Map, provided following the text of this report, provides this graphic on a larger scale. Figure 3-1. Location of Subsurface Exploration KEV TO SYMBOLS B-11 GEOTECHNICAL 8 BORING P-4 PERCOLATION TEST EE) BORING CPT-3 CONE PENETRATION @ TEST HA-1 HAND AUGER (i) BORING Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 9 Soil samples recovered from the borings were returned to NOVA’s materials laboratory for inspection and testing. The remainder of this section describes the subsurface exploration and laboratory testing. 3.2. Engineering Borings The engineering borings were advanced by a truck-mounted drilling rig utilizing hollow stem auger drilling equipment. Boring locations were determined in the field by the NOVA geologist. Elevations of the ground surface at the boring locations were estimated based on existing topography that was provided to NOVA. A NOVA geologist logged the boring and collected samples of the materials encountered for laboratory testing. Relatively undisturbed samples were obtained using a modified California (CAL) sampler, a ring-lined split tube sampler with a 3-inch outer diameter and 2½-inch inner diameter. Disturbed samples were recovered by means of the Standard Penetration Test (SPT), using a 2-inch outer diameter and 1⅜-inch inner diameter split tube sampler. Disturbed bulk samples were also obtained from the drill cuttings The CAL and SPT samplers were driven using an automatic hammer with a calibrated Energy Transfer Ratio (ETR) of approximately 70.6%. The number of blows needed to drive the sampler the final 12 inches of an 18-inch drive is noted on the logs. The field blow counts, N, were corrected to a standard hammer (cathead and rope) with a 60% ETR. The corrected blow counts are noted on the boring logs as N60. Logs of the borings are presented in Appendix B. Soils are classified according to the Unified Soil Classification System. 3.3. Laboratory Testing NOVA tested selected samples from the borings to evaluate soil classification and engineering properties. The laboratory tests consisted of particle-size distribution, maximum density and optimum moisture content, Atterberg limits, expansion index, direct shear, R-value, and corrosivity. The results of the laboratory tests and brief explanations of the test procedures are presented in Appendix C. 3.4. CPT Soundings Three cone penetration test (CPT) soundings after ASTM D5778 were completed on November 26, 2022 at the locations indicated on Figure 3-1. Appendix D presents the CPT data and the liquefaction/seismic compression analysis based on CPT data. 3.5. Percolation Testing NOVA coordinated with the design team to identify locations for potential stormwater BMPs. Four 8-inch diameter percolation test wells and two exploratory borings were drilled within the area of the two proposed BMPs. Testing was conducted in accordance with the borehole percolation test method described within the City of Carlsbad BMP Design Manual. Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 10 4. GEOLOGY AND SUBSURFACE CONDITIONS 4.1. Regional Geology The site is located within the Peninsular Ranges Geomorphic Province of California, which stretches from the Los Angeles basin to the tip of Baja California in Mexico. This province is characterized as a series of northwest-trending mountain ranges separated by subparallel fault zones and a coastal plain of subdued landforms. The mountain ranges are underlain primarily by Mesozoic metamorphic rocks that were intruded by plutonic rocks of the Peninsular Ranges Batholith, while the coastal plain is underlain by subsequently deposited marine and nonmarine sedimentary formations. The site is located within the coastal plain portion of the province, underlain by Santiago Formation and Alluvium. Figure 4-1 reproduces mapping of surficial geology in the vicinity of the site. Plate 1 (provided following the text of the report) presents the site-specific geology. Plate 2 presents geologic cross-sections. Figure 4-1. Regional Geology Map KEV TO SYMBOLS YOUNG ALLUVIAL FLOOD-PLAIN DEPOSITS VERY OLD PARALIC DEPOSITS, UNIT 10 SANTIAGO FORMATION METAMORPHOSED AND UNMETAMORPHOSED VOLCANIC AND SEDIMENTARY ROCKS, UNDIVIDED Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 11 4.2. Site-Specific Geology The western portion of the campus is in cut, underlain by Tertiary Santiago Formation (map symbol Tsa). Moving eastward, the campus transitions from cut conditions to deep fill conditions, where the pre-exiting canyon was infilled to construct the campus. Geologic Cross-Section A-A’ on Plate 2 depicts this transition. Alluvium was identified as overlying the Santiago Formation in the southern portion of the site in Boring B-1. Descriptions of the materials encountered in the borings are presented below. Fill (af): As discussed, the depth of artificial fill across the site increases in depth moving eastward. Fill was encountered in Boring B-11, drilled on the eastern portion of the site, to a maximum depth of 70 feet bgs. The fill is comprised of generally medium dense to dense, light gray-brown and olive brown silty and clayey sand and sandy clay The fill appears to be mostly derived from the underlying Santiago Formation. Figure 4-2 depicts this unit. No record of the placement and compaction of this fill was available at the time of this report. As a result, the fill is considered ‘undocumented’. However, data obtained from the borings and CPT soundings suggest that this fill was engineered. Figure 4-2. Fill at Boring B-3 Quaternary Older Alluvium (Qoa): Beneath the fill in Boring B-1, the site is underlain by alluvium. The geologic map indicates that it is young alluvium; however, due to the relatively dense nature and visual appearance of the alluvium, it is NOVA’s judgement that this unit is more appropriately characterized as older alluvium. As encountered in the borings, the older alluvium consists of yellowish-brown to dark brown silty sand with thin interbedded lenses of yellow sand. Blow counts indicate this unit is dense. Tertiary Santiago Formation (Tsa): The Santiago Formation was encountered at the surface within Borings B-6 and B-11 and deepens moving eastward. As encountered in the borings, this formation is comprised of light gray-brown to yellowish-brown silty and clayey sandstone and sandy claystone, which is very dense and hard. Figure 4-3 depicts this unit. Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 12 Figure 4-3. Representative Santiago Formation Soil 4.3. Groundwater Perched groundwater was encountered in Boring B-10 with a seep at approximately 51 feet bgs and in B-11 water was encountered at 46 feet bgs. Infiltrating storm water from prolonged wet periods can ‘perch’ atop localized zones of lower permeability soil above the static groundwater level. Localized perched groundwater conditions can also develop once site development is complete and landscape irrigation commences. For the purpose of modeling seismic-related settlement, water was conservatively estimated to be located at 30 feet bgs. 4.4. Mechanical Characteristics of the Subsurface Materials Figure 4-4 reproduces the profile developed by CPT-2, the deepest of the soundings. Below a depth of about 15 feet bgs, the soils are characteristically fine grained, comprised of a mixture of clayey sand to sandy clay of dense/stiff consistency. In general, the subsurface at the location of CPT-2 is characterized by relatively higher resistance to penetration of the cone tip (qt), an indicator of soils of low compressibility. The constrained modulus (M) inferred by this tip resistance is high, characteristically exceeding 1,000 tsf. As may further be seen by review of Figure 4-4, resistance to penetration by the cone tip is characteristic of denser soils, as indicated by the dilative response to shear by the cone tip. Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 13 Figure 4-4. Tip Resistance, Constrained Modulus, and Soil Type, CPT-2 d, Nor m. SBTm1 0 -.---------------, 5 - 0 iO o-l--~::=~=~~--~ D 1 IJ; 2 01Il l Da 400 501Il I) ,000 ,4 ..00 0 D r.eststa -ce f ) • (C ) (1!lr ) Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 14 5. REVIEW OF GEOLOGIC, SOIL, AND SITING HAZARDS 5.1. Overview This section provides review of geologic, soil and siting hazards common to this region of California, considering each for its potential to affect the site. The primary hazard identified by this review is that the site is at risk of moderate-to-severe ground shaking in response to a large-magnitude earthquake during the life of the school campus. This circumstance is common to all civil works in this area of California, and while strong ground motion could affect the site, there is no risk of liquefaction or related seismic phenomena. The following subsections detail NOVA’s review of geologic, soil, and siting hazards. 5.2. Geologic Hazards 5.2.1 Strong Ground Motion The site is located in a seismically active area, and the potential for strong ground motion is considered significant during the design life of the proposed structure. Major known active faults in the region consist generally of en echelon, northwest striking, right-lateral, strike-slip faults. These include the San Andreas, Elsinore, and San Jacinto faults located northeast of the site, and the San Clemente, San Diego Trough, and Agua Blanca-Coronado Bank faults located to the west of the site. The fault zone with the most potential for strong ground motion in Carlsbad is the major north and northwest striking Newport-Inglewood-Rose Canyon Fault Zone (NIRC). This fault zone is estimated to be able to generate earthquakes of MW = 6.9. 5.2.2 Faulting in the Site Vicinity Earthquake Fault Zones have been established along known active faults in California in accordance with the Alquist-Priolo Earthquake Fault Zoning Act. The State Geologist defines an “active” fault as one which has had surface rupture within recent geologic time (i.e., Holocene time, <11,700 years before present [b.p.]). Earthquake Fault Zones have been delineated to encompass traces of known, Holocene-active faults to address hazards associated with fault surface rupture within California. Where developments for human occupancy are proposed within these zones, the state requires detailed fault evaluations be performed to identify the locations of active faults and recommend setbacks from locations of possible surface fault rupture. The site is not located in an Alquist-Priolo Earthquake Fault Zone. No active surface faults are mapped across the site. The nearest active fault is within the Oceanside section of the NIRC fault zone about 5.5 miles to the west. Due to the lack of active faulting, the probability of fault rupture at this site is considered very low. Figure 5-1 depicts faulting in the site vicinity. Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 15 Figure 5-1. Faulting in the Site Vicinity 5.2.3 Historical Seismicity Most of the large historical earthquakes that have been documented in this area of San Diego County occur east of the site, 60 or more miles away. Most of these appear to be on splays of the San Jacinto Fault Zone. In 1954 the San Jacinto Fault Earthquake (Mw 6.4) cracked plaster walls in San Diego. In 1968 the Borrego Mountain Earthquake (Mw 6.5) reportedly severed powerlines in San Diego County. Two additional large quakes without local damage reports have been noted from the SCEC website: The Imperial Valley Earthquake (Mw 6.4) on October 15, 1979, and the Superstition Hills Earthquake (Mw 6.6) In 1987. In summary, in the event of a large earthquake on one of the larger southern California fault zones, ground motion acceleration may be noted at the site, but it appears doubtful based on historical seismicity that the proposed improvements will experience anything more than minor cosmetic damage. y I I I Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 16 5.2.4 Landslide As used herein, ‘landslide’ describes downslope displacement of a mass of rock, soil, and/or debris by sliding, flowing, or falling. Such mass earth movements are greater than about 10 feet thick and larger than 300 feet across. Landslides typically include cohesive block glides and disrupted slumps that are formed by translation or rotation of the slope materials along one or more slip surfaces. The causes of classic landslides start with a preexisting condition - characteristically, a plane of weak soil or rock - inherent within the rock or soil mass. Thereafter, movement may be precipitated by earthquakes, wet weather, and changes to the structure or loading conditions on a slope (e.g., by erosion, cutting, filling, release of water from broken pipes, etc.). No evidence of landslides, deep-seated landslides, or slope instabilities were observed in geologic reconnaissance at the time of the field investigation. Review of the California Geologic Survey Landslide Inventory indicates that there are no known landslides in this area. In consideration of the indications of published information, the flat-lying topography of the site, and the minor grading operations involved with the proposed modernization improvements, the potential for a landslide to affect this site is considered very low. 5.3. Soil Hazards 5.3.1 Liquefaction Liquefaction occurs when loose, saturated, generally fine sands and silts are subjected to strong ground shaking. The soil loses shear strength and become liquid, resulting in large total and differential ground surface settlements. NOVA analyzed the subsurface for liquefaction, assuming a groundwater level at 30 feet depth. This evaluation showed that the site is not at risk for liquefaction. The site is not mapped within a Liquefaction zone by either CGS or the City of Carlsbad. Figure 5-2 (following page) reproduces liquefaction zones within the City of Carlsbad General Plan (Carlsbad, 2015). In consideration of the analyses by NOVA and the indications of mapping by the City Of Carlsbad, NOVA does not consider the site to be at risk for liquefaction. 5.3.2 Seismic Compression As used herein, seismic compression is intended to describe the accrual of contractive volumetric strains in unsaturated soils as a result of a seismic event. Also referenced as ‘dynamic settlement’ and ‘dry sand settlement’ in unsaturated sands and silts, the phenomenon is well recognized as a cause of seismically-induced damage to structures and infrastructure. Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 17 Figure 5-2. Liquefaction Hazard Mapping, City of Carlsbad General Plan Estimates of seismic compression for the sandy soils of this site were completed using the CPT data and procedures recommended by Robertson and Shao (2010). These estimates indicate that less than 0.5 inch of ground settlement could occur as a result of a major seismic event. This settlement will not threaten the integrity of the planned construction, such that no corrective measures are recommended to address this risk. A summary of this analysis is included in Appendix D. 5.3.3 Deep Fill Settlement As discussed in Sections 2 and 4, the eastern portion of the school campus is developed on deep fill. No records are available regarding placement of this fill, such that the fill is considered ‘undocumented’. However, data obtained from the borings and CPT soundings suggest that this fill was engineered. Even with good planning and control during fill placement, deep fills are often associated with large total and differential movements. r--i ! I ! i c..-.J Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 18 The causes of these movements are typically related to settlement of deeper portions of the fill by ‘hydrocompression’ and by self-weight, and swelling of thinner areas of fill that may include expansive soils. As used herein, ‘hydrocompression’ is intended to describe settlement of a thick fill by longer- term wetting following construction. The term is distinct from hydro-collapse, as described in the following subsection. The fill at the Aviara Oaks site is non-plastic, with little risk of soil expansion. However, it is likely that areas of the thicker fill at this site have experienced some hydrocompression. Even if the fill as placed with relatively good quality control (i.e., placing the fill at >90% relative compaction and at moisture contents above optimum) the risk of post-construction settlement due to hydrocompression cannot be ignored. Such settlements are commonly observed to initiate several years to a decade following construction, as the fill is wetted by irrigation, infiltrating stormwater, and water infiltrating from surrounding formational units. In consideration of the foregoing, it is NOVA’s judgment that the zones of deep fill at this site have likely experienced post-construction settlements of perhaps several inches. However, in consideration of the age of the fill (more than 30 years) and the coarse-grained nature of the fill, it is likely that this movement is complete. As such, the risk of potentially damaging total and differential movement beneath the planned temporary classrooms and related modernization infrastructure is low. 5.3.4 Hydro-Collapse Hydro-collapsible soils are common in the arid climates of the western United States in specific depositional environments (principally, in areas of young alluvial fans, mudflow/debris flow sediments, and loess (wind-blown sediment)) deposits. These soils are characterized by low in situ density, low moisture contents, and relatively high unwetted strength. The soil grains of hydro-collapsible soils were initially deposited in a loose state (i.e., high initial ‘void ratio’) and thereafter lightly bonded by water-sensitive binding agents (e.g., clay particles, low-grade cementation, etc.). While relatively strong in a dry state, the introduction of water into these soils causes the binding agents to fail, causing rapid densification and volume loss. This change is manifested at the ground surface as subsidence or settlement. Ground settlements from the hydro-collapse can be damaging to structures and civil works. Human activities that can facilitate soil collapse include irrigation, water impoundment, changes to the natural drainage, disposal of wastewater, etc. The fill, the alluvium, and the Santiago Formation underlying the site are not susceptible to hydro- collapse. 5.3.5 Expansive Soils Expansive soils are characterized by their ability to undergo significant volume changes (shrinking or swelling) due to variations in moisture content, the magnitude of which is related to both clay content and plasticity index. These volume changes can be damaging to structures. Laboratory testing was performed on the fill in the near subsurface to determine expansion index (‘EI’) after ASTM D4829. Testing indicates the fills soils are characteristic of soils with Very Low expansion potential. Expansive soils are not considered a hazard to the proposed construction at this site. Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 19 5.4. Siting Hazards 5.4.1 Site Suitability Based upon the indications of the field and laboratory data developed for this investigation, it is the judgment of NOVA that the site is suitable for development of the planned structures on shallow foundations, provided the recommendations described in herein are followed. The school modernization will not affect the structural integrity of adjacent properties or existing public improvements and street right-of-way located adjacent to the school if the recommendations of this report are incorporated into project design. 5.4.2 Inundation Flood The site is mapped within an area of minimal flood hazard (FEMA, 2019). Tsunami The site is not located within a mapped area on the State of California Tsunami Inundation Maps. The altitude of the site and distance from the ocean preclude the risk of inundation by a tsunami. Seiche Seiches are periodic oscillations in large bodies of water such as lakes, harbors, bays, or reservoirs. The site is not located adjacent to a confined body of water with the potential to generate a seiche that could affect the site. Surface Water Structures The school is not located near a dam, levee, canal or tankage, the failure of which would have the potential to inundate the site. 5.4.3 Subsidence The site is not located in an area of known subsidence associated with fluid withdrawal (groundwater or petroleum); therefore, the potential for subsidence due to the extraction of fluids is considered negligible. Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 20 6. EARTHWORK AND FOUNDATIONS 6.1. Overview 6.1.1 Review of Seismic Hazards Section 5 provides a review of soil, geologic and siting hazards common to development of civil works in the project area. The primary hazard identified by that review is that this site is at risk of the effects of moderate-to-severe ground shaking in response to a large-magnitude earthquake during the life of the planned development. While strong ground motion could affect the site, there is no risk of liquefaction or related seismic phenomena. This circumstance is common to all civil works in this area of California. Section 6.2 provides design parameters for seismic resistant design. 6.1.2 Conformance with Codes Design for foundations and related infrastructure should be developed in accordance with the Chapter 18A of Title 24, Part 2 of the 2019 California Building Code (CBC), the governing regulation at the time the first version of this report was submitted for review, and the requirements of the City of Carlsbad. Foundations should not be placed without inspection by a representative of this office to ensure conformance with 2019 CBC and the City of Carlsbad. 6.1.3 Review and Surveillance If these recommendations appear not to address a specific feature of the project, NOVA should be contacted for additions or revisions to the recommendations. NOVA should be given the opportunity to review the grading plans, foundation plans, and geotechnical- related specifications as they become available to confirm that the recommendations presented in this report have been incorporated into the plans prepared for the project. The recommendations presented herein may need to be updated once final plans are developed. All earthwork related to site and foundation preparation should be completed under the observation of NOVA, the Geotechnical Engineer-of-Record (GEOR) for this work. 6.2. Seismic Resistant Design 6.2.1 Site Class Site Class is determined by the weighted average of shear-wave velocity or standard penetration resistances (N-values) of the upper 100 feet of the soils/rock underlying a site. Rock displaying blow counts higher than 50 blows per foot are considered Site Class C. Structures in the eastern portion of the site near B-3, B-4, B-5, and B-10 through B-11, constructed over areas of deep fill soils may be considered Site Class D (including Building 800 and proposed relocatable/modular classrooms). The blow counts NOVA encountered within the Santiago Formation on the western portion of the site are generally greater than 50 blows per foot; therefore, any proposed Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 21 improvements in the areas of B-1, B-2, and B-6 through B-9 may be considered Site Class C per ASCE 7-16 (Table 20.3-1). Seismic design parameters for both cases are presented below. 6.2.2 CBC Seismic Design Parameters A geologic hazard likely to affect the project is ground shaking as a result of movement along an active fault zone in the vicinity of the subject site. The site coefficients and maximum considered earthquake (MCER) spectral response acceleration parameters in accordance with the 2019 CBC and ASCE 7-16 are presented in Tables 6-1 and 6-2. The 2019 CBC and ASCE 7-16 is used in this report, since the work was first submitted for DSA approval in 2021. Table 6-1. 2019 CBC and ASCE 7-16 Seismic Design Parameters –Building 800 and Relocatable/Modular Buildings Site Coordinates Latitude: 33.102198° Longitude: -117.276296° Site Coefficients and Spectral Response Acceleration Parameters Value Site Class D Site Coefficients, Fa 1.094 Site Coefficients, Fv 1.932 Mapped Spectral Response Acceleration at Short Period, Ss 1.014g Mapped Spectral Response Acceleration at 1-Second Period, S1 0.368g Mapped Design Spectral Acceleration at Short Period, SDS 0.740g Design Spectral Acceleration at 1-Second Period, SD1 0.368g Site Peak Ground Acceleration, PGAM 0.514g Table 6-2. 2019 CBC and ASCE 7-16 Seismic Design Parameters – West Side of the Campus Site Coordinates Latitude: 33.103056° Longitude: -117.277686° Site Coefficients and Spectral Response Acceleration Parameters Value Site Class C Site Coefficients, Fa 1.2 Site Coefficients, Fv 1.5 Mapped Spectral Response Acceleration at Short Period, Ss 1.015g Mapped Spectral Response Acceleration at 1-Second Period, S1 0.368g Mapped Design Spectral Acceleration at Short Period, SDS 0.812g Design Spectral Acceleration at 1-Second Period, SD1 0.368g Site Peak Ground Acceleration, PGAM 0.534g Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 22 For the design of Building 800 and the proposed portable/modular classrooms, NOVA assumes that due to the limited height of the planned one-story buildings, Exception 2 of ASCE 7-16 Chapter 11.4.8 will apply, and therefore a site-specific ground motion hazard analysis (GMHA) will not be necessary. The structural engineer should confirm if the exception applies once the design is finalized. 6.3. Corrosion and Sulfate Attack Electrical resistivity, chloride content, and pH are all indicators of the soil’s tendency to corrode unprotected ferrous metals embedded in the soil. Levels of water-soluble sulfates are indexed to sulfate attack to embedded concrete. These chemical tests were performed on representative samples of the near-surface soils. The results of the testing are tabulated on Table 6-3 and provided in more detail in Appendix C. Table 6-3. Summary of Corrosivity Testing of the Near Surface Soil Parameter Units B-4, 0 – 5’ B-6, 0 – 5’ B-10, ½ – 4½’ B-11, 0 – 5’ pH standard 7.8 7.8 7.9 7.1 Resistivity Ohm-cm 200 970 1100 550 Water-Soluble Chloride ppm 1,230 360 43 230 Water-Soluble Sulfate ppm 3600 210 200 410 The Structural Engineer can use the sulfate results in conjunction with ACI 318 to specify the water/cement ratio, compressive strength, and cementitious material types for concrete exposed to soil. A corrosion engineer should be contacted to provide specific corrosion control recommendations. 6.4. Earthwork 6.4.1 General Grading is anticipated to include limited earthwork, principally in remedial removals below the proposed buildings, and excavations for foundations and utilities across the site. Earthwork should be performed in accordance with Section 300 of the most recent approved edition of the “Standard Specifications for Public Works Construction” and “Regional Supplement Amendments.” The site has a cut/fill transition with Santiago Formation at and near the surface in the western portion of the site, gradually transitioning to deep fills toward the eastern edge of the site. In the area where the portables will be located, fill was observed to extend to about 70 feet in depth. The Santiago Formation is suitable for support of fill or structural loads. The fill on the eastern portion of the site was generally found to be medium dense to dense, though the upper portion of the fill should be reworked prior to construction of new improvements. Recommendations for remedial grading are provided in the following subsections. I I I I I Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 23 6.4.2 Potential Effects of Past Site Use The site of the portable/modular classrooms is currently serving as a grass playfield. There are likely existing irrigation pipes, and other utilities below that area. 6.4.3 Site Preparation Site preparation should begin with the removal of existing improvements, vegetation, and debris. Subsurface improvements planned for abandonment should be removed, and the resulting excavations should be backfilled and compacted in accordance with the recommendations of this report. Pipeline abandonment can consist of capping or rerouting at the project perimeter and removal within the project perimeter. If appropriate, abandoned pipelines can be filled with grout or slurry as recommended by and observed by the geotechnical consultant. 6.4.4 Select Fill Material Requirements Any fill or backfill for structures should be ‘Select Fill’, a non-plastic mineral soil free of organics and regulated constituents with the characteristics listed below: o at least 40% by weight finer than ¼ inches in size, o maximum particle size of 4 inches; o classified as SW, SM, SC, GW, GM after ASTM D2487; and o expansion index (EI) less than 50 (i.e., EI < 50, after ASTM D4829). Much of the existing fill and Santiago Formation soils that underlie the site will conform to the above criteria or can be readily processed to achieve conformance with the above criteria. Any soil imported for structural use should conform to the above criteria. Soil proposed as import should be tested by NOVA prior to transport to the site. Placement All Select Fill should be moisture conditioning to at least 2% above the optimum moisture content. Thereafter, the soils should be spread in loose lifts no thicker than the ability of the compaction equipment to thoroughly densify the lift and compacted to a minimum of 90% relative compaction after ASTM D1557 (the ‘modified Proctor’) following approval of removal bottoms by the Geotechnical Engineer-of-Record. 6.4.5 Remedial Grading - Building 800 and Relocatable/Modular Classrooms Based on the borings and CPT investigation performed by NOVA, the areas of Building 800 and the new classrooms are underlain by competent fill. In these areas NOVA recommends over-excavating the existing fill soils 4 feet below finished grade, or 2 feet below the depth of the deepest footing, whichever is deeper. Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 24 Horizontally, excavations should extend at least 5 feet outside the planned perimeter building foundations or up to existing improvements, whichever is less. NOVA should observe the conditions exposed in the bottom of excavations to evaluate whether additional excavation is recommended. The bottom of the excavations should be scarified to a depth of 6 to 8 inches, moisture conditioned to near optimum moisture content, and compacted to at least 90% relative compaction after ASTM D1557. The excavation should be filled to the finished pad grade with Select Fill per Section 6.4.4 and placed as described within that section. 6.4.6 Remedial Grading – Pedestrian Hardscape Beneath proposed hardscape, the on-site soils should be excavated to a depth of at least 1 foot below planned subgrade elevation. Horizontally, the excavations should extend at least 2 feet outside the planned hardscape or up to existing improvements, whichever is less. The ground surface exposed and disturbed by the excavation should then be scarified to a depth of 6 to 8 inches, moisture conditioned to near optimum moisture content, and compacted to at least 90% relative compaction after ASTM D1557. Thereafter, the excavated soils should be replaced with Select Fill in conformance with the criteria of Section 6.4.4. If competent formational materials are exposed, the above-described remedial grading need not be performed. 6.4.7 Remedial Grading – Pavements Beneath proposed vehicular pavement areas, the existing soils should be excavated to a depth of at least 1 foot below planned subgrade elevation. Horizontally, the excavations should extend at least at least 2 feet outside the planned pavement or up to existing improvements, whichever is less. The ground surface exposed and disturbed by the excavation should then be scarified to a depth of 6 to 8 inches, moisture conditioned to near optimum moisture content, and compacted to at least 90% relative compaction after ASTM D1557. Thereafter, the excavated soils should be replaced with Select Fill in conformance with the criteria of Section 6.4.4. If competent formational materials are exposed, excavation, scarification, and recompaction need not be performed. 6.4.8 Remedial Grading – Site Walls and Retaining Walls Beneath proposed site walls and retaining walls not connected to buildings, the existing fill should be excavated to a depth of at least 2 feet below bottom of footing. Horizontally, the excavations should extend at least 2 feet outside the planned hardscape, wall footing, or up to existing improvements, whichever is less. If a cut/fill transition is encountered at the wall foundation level, the cut portion of the footings should be over-excavated to a depth of 2 feet below the bottom of the deepest footing, whichever is greater. The ground surface exposed and disturbed by the excavation should then be scarified to a depth of 6 to 8 inches, moisture conditioned to near optimum moisture content, and compacted to at least 90% Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 25 relative compaction after ASTM D1557. Thereafter, the excavated soils should be replaced with Select Fill in conformance with the criteria of Section .4.4. If competent formational materials are exposed below the entire wall, over-excavation need not be performed. 6.4.9 Remedial Grading – Play Area Beneath the proposed play area, the existing fill should be excavated to a depth of at least 2 feet below the play area bottom and at least 1 foot below playground footings. Horizontally, the excavations should extend at least 2 feet outside the planned footing, or up to existing improvements, whichever is less. The ground surface exposed and disturbed by the excavation should then be scarified to a depth of 6 to 8 inches, moisture conditioned to near optimum moisture content, and compacted to at least 90% relative compaction after ASTM D1557. Thereafter, the excavated soils should be replaced as Select Fill in conformance with the criteria of Section 6.4.4. If competent formational materials are exposed, excavation need not be performed. 6.4.10 Temporary Excavations Temporary excavations 3 feet deep or less can be made vertically. Deeper temporary excavations in fill should be laid back no steeper than 1H:1V (horizontal:vertical). Deeper temporary excavations in Santiago Formation should be laid back no steeper than ¾H:1V. The stability of temporary excavations is the sole responsibility of the Contractor. The faces of temporary slopes should be inspected daily by the contractor’s Competent Person before personnel are allowed to enter the excavation. Any zones of potential instability, sloughing, or raveling should be brought to the attention of the engineer and corrective action implemented before personnel begin working in the excavation. Excavated soils should not be stockpiled behind temporary excavations within a distance equal to the depth of the excavation. If temporary slopes are to be maintained during the rainy season, berms are recommended along the tops of slopes to prevent runoff water from entering the excavation and eroding the slope faces. Slopes steeper than those described above will require shoring. Additionally, temporary excavations that extend below a plane inclined at 1½H:1V downward from the outside bottom edge of existing structures or improvements will require shoring. Soldier piles and lagging, internally braced shoring, or trench boxes could be used. If trench boxes are used, the soil immediately adjacent to the trench box is not directly supported. Ground surface deformations immediately adjacent to the pit or trench could be greater where trench boxes are used compared to other methods of shoring. 6.4.11 Surface Drainage Final surface grades around structures should be designed to collect and direct surface water away from structures, including retaining walls, and toward appropriate drainage facilities. The ground around the structure should be graded so that surface water flows rapidly away from the structure without ponding. Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 26 In general, the ground adjacent to structures should slope away at a gradient of at least 2%. Densely vegetated areas where runoff can be impaired should have a minimum gradient of at least 5% within the first 5 feet from the structure. Roof gutters with downspouts that discharge directly into a closed drainage system are recommended on structures. Drainage patterns established at the time of fine grading should be maintained throughout the life of the proposed structures. Site irrigation should be limited to the minimum necessary to sustain landscape growth. Should excessive irrigation, impaired drainage, or unusually high rainfall occur, saturated zones of perched groundwater can develop. 6.5. Foundations 6.5.1 General The foundation recommendations provided herein are considered generally consistent with methods typically used in southern California. Other alternatives may be available. NOVA’s recommendations are only minimum criteria based on geotechnical factors and should not be considered a structural design, or to preclude more restrictive criteria of governing agencies or by the Structural Engineer. The design of the foundation system should be performed by the Structural Engineer, incorporating the geotechnical parameters described herein and the requirements of applicable building codes. 6.5.2 Spread Footings for Building 800 It is expected that Building 800 will be a wood framed or steel framed single level structure. Footings should extend at least 18 inches below lowest adjacent finished grade. A minimum width of 18 inches is recommended for continuous footings and 24 inches for isolated or retaining wall footings. An allowable bearing capacity of 2,500 psf can be used for the footings, which will be supported on compacted fill. The allowable bearing capacity can be increased by 500 psf for each foot of depth below the minimum and 250 psf for each foot of width beyond the minimum up to a maximum of 5,000 psf on compacted fill. The bearing value can be increased by ⅓ when considering the total of all loads, including wind or seismic forces. Footings located adjacent to or within slopes should be extended to a depth such that a minimum horizontal distance of 10 feet exists between the lower outside footing edge and the face of slope. Lateral loads will be resisted by friction between the bottoms of footings and passive pressure on the faces of footings and other structural elements below grade. An allowable coefficient of friction of 0.35 can be used. An allowable passive pressure of 350 psf per foot of depth below the ground surface can be used for level ground conditions. The allowable passive pressure should be reduced for sloping ground conditions. The passive pressure can be increased by ⅓ when considering the total of all loads, including wind or seismic forces. The upper 1 foot of soil should not be relied on for passive support unless the ground is covered with pavements or slabs. Foundation settlements are estimated to be less than 1 inch. Differential settlements between adjacent unevenly loaded columns and across continuous footings are estimated to be less than ¾ inch over a distance of 40 feet. Settlements should be completed shortly after structural loads are applied. Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 27 6.5.3 Relocatable/Modular Classrooms Based upon experience with other relocatable/modular structures, NOVA expects that these classrooms will be founded on foundations that are adapted to the design of the modular structures themselves. No structural information has been provided that depicts these foundations. Nonetheless, the portable classrooms will be fixed to either treated wood or concrete foundations embedded in the ground. It is likely that handicapped access will also be provided to the portable classrooms. Such access would be provided in the form of ramps founded atop foundations. Treated wood or concrete foundations for the classrooms and any related access ramping should be established by embedding these foundations a minimum of 12 inches below surrounding ground. These foundations should be a minimum of 18 inches in smallest plan dimension. Founded and dimensioned as such, these foundations may be designed for an allowable contact stress of 1,500 psf. This value may be increased by ⅓ for transient loads such as wind and seismic. Lateral loads to foundations may be resisted by interface shear between the base of the foundations and the supporting soil. A coefficient of friction of 0.35 may be used for this interface. Lateral loads may also be resisted by passive pressure against the faces of footings of 350 psf per foot of depth below the ground surface. The upper 1 foot of soil should not be relied on for passive support unless the ground is covered with pavement or slabs. Foundations developed as described above will settle imperceptibly, less than 0.2 inch, with angular distortion due to differential movement between adjacent, unevenly loaded areas of less than 1:400. Soils will settle elastically, with movement occurring approximately as load is applied. As a consequence, it is expected that about 80% of the expected settlement will occur during construction. 6.5.4 CIDH Piles Shade structures, covered walkways, and other pole-type structures can be supported on cast-in- drilled hole (CIDH) concrete piles. Short cast-in-drilled hole (CIDH) piles can be used for uplift resistance for shade structures or axial resistance for poles. CIDH piles should be a minimum of 10-inches diameter, spaced at least three diameters center on center, and be embedded at least 4 pile diameters into either fill or formational soils. The axial downward capacity of piles will be obtained from skin friction. The axial uplift resistance of piles will be obtained by skin friction and the weight of the pile. An allowable downward skin friction of 400 psf and an allowable end bearing of 2,000 psf can be used. If end bearing is used, the bottom of drilled holes should be cleaned of loose soil prior to placing concrete. The axial uplift capacity of piles can be obtained from skin friction and the weight of the pile. An allowable uplift skin friction of 300 psf can be used. Lateral loads can be resisted by passive pressure on the piles. An allowable passive pressure of 350 psf per foot of embedment acting on twice the pile diameter up to a maximum of 5,000 psf can be used, based on a lateral deflection up to ½-inch at the ground surface and level ground conditions. The uplift Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 28 and passive pressure values can be increased by ⅓ when considering the total of all loads, including wind or seismic forces. The upper 1 foot of soil should not be relied on for passive support unless the ground is covered with pavements or slabs. 6.5.5 Foundation Plan Review NOVA should review the foundation plans to ascertain that the intent of the recommendations in this report has been implemented and that revised recommendations are not necessary as a result of changes after this report was completed. 6.6. Interior Slabs-On-Grade Interior concrete slabs-on-grade should be underlain by at least 2 feet of Select Fill Soils placed per Section 6.4.4. NOVA recommends that conventional concrete slabs-on-grade floors be at least 5 inches thick and reinforced with at least No. 4 bars at 18 inches on center each way. To reduce the potential for excessive cracking, concrete slabs-on-grade should be provided with construction or ‘weakened plane’ joints at frequent intervals. The project structural engineer should design on-grade building slabs and joint spacing. Moisture protection should be installed beneath slabs where moisture-sensitive floor coverings will be used. The project architect should review the tolerable moisture transmission rate of the proposed floor covering and specify an appropriate moisture protection system. Typically, a plastic vapor barrier is used. Minimum 15-mil plastic is recommended. The plastic should comply with ASTM E1745. The vapor barrier installation should comply with ASTM E1643. The slab can be placed directly on the vapor barrier. 6.7. Hardscape Hardscape should be underlain by at least 2 feet of material with an expansion index of 50 or less. Exterior concrete slabs should be at least 4 inches thick and reinforced with at least No. 3 bars at 18 inches on center each way. Slabs should be provided with weakened plane joints. Joints should be placed in accordance with the American Concrete Institute (ACI) guidelines. The project architect should select the final joint patterns. A 1-inch maximum size aggregate mix is recommended for concrete for exterior slabs. The corrosion potential of on-site soils with respect to reinforced concrete will need to be taken into account in concrete mix design. Coarse and fine aggregate in concrete should conform to the “Greenbook” Standard Specifications for Public Works Construction. Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 29 6.8. Conventional Retaining Walls 6.8.1 Foundations Conventional retaining walls can be supported on spread footings. The recommendations for spread footings provided in the Section 6.5.2 are also applicable to conventional retaining walls. 6.8.2 Active Earth Pressures The active earth pressure for the design of unrestrained retaining walls with level backfill can be taken as equivalent to the pressure of a fluid weighing 35 pcf. The at-rest earth pressure for the design of restrained retaining wall with level backfill can be taken as equivalent to the pressure of a fluid weighing 55 pcf. These values assume a granular and drained backfill condition. Higher lateral earth pressures would apply if walls retain clay soils. An additional 20 pcf should be added to these values for walls with 2:1 (h:v) sloping backfill. An increase in earth pressure equivalent to an additional 2 feet of retained soil can be used to account for surcharge loads from light traffic. The above values do not include a factor of safety. Appropriate factors of safety should be incorporated into the design. If any other surcharge loads are anticipated, NOVA should be contacted for the necessary increase in soil pressure. The seismic increment for walls taller than 6 feet can be taken as equivalent to the pressure of a fluid pressure weighing 20 pcf. This value is for level backfill and does not include a factor of safety. Appropriate factors of safety should be incorporated into the design. This pressure is in addition to the un-factored, active earth pressure. The total equivalent fluid pressure can be modeled as a triangular pressure distribution with the resultant acting at a height of H/3 up from the base of the wall, where H is the retained height of the wall. The passive pressure and bearing capacity can be increased by ⅓ in determining the seismic stability of the wall. 6.8.3 Drainage Retaining walls should be provided with a backdrain to reduce the accumulation of hydrostatic pressures or be designed to resist hydrostatic pressures. Backdrains can consist of a 2-foot-wide zone of ¾-inch crushed rock. The crushed rock should be separated from the adjacent soils using a non- woven filter fabric, such as Mirafi 140N or equivalent. A perforated pipe should be installed at the base of the backdrain and sloped to discharge to a suitable storm drain facility, or weep holes should be provided. As an alternative, a geocomposite drainage system such as Miradrain® 6000 or equivalent placed behind the wall and connected to a suitable storm drain facility can be used. The project architect should provide dampproofing/ waterproofing specifications and details. Figure 6-1 presents typical conventional retaining wall backdrain details. Note that the guidance provided on Figure 6-1 is conceptual. A variety of options are available to drain retaining walls. Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 30 Figure 6-1. Typical Conventional Retaining Wall Backdrain Details 6.9. Pipelines For level ground conditions, a passive earth pressure of 350 psf per foot of depth below the lowest adjacent final grade can be used to compute allowable thrust block resistance. A value of 150 psf per foot should be used below groundwater level, if encountered. A modulus of soil reaction (E’) of 1,500 pounds per square inch (psi) can be used to evaluate the deflection of buried flexible pipelines. This value assumes that granular bedding material is placed adjacent to the pipe and is compacted to at least 90% relative compaction. Pipe bedding as specified in the “Greenbook” Standard Specifications for Public Works Construction can be used. Bedding material should consist of clean sand having a sand equivalent not less than 20 and should extend to at least 12 inches above the top of pipe. Alternative materials meeting the intent of the bedding specifications are also acceptable. Samples of materials proposed for use as bedding should be provided to the engineer for inspection and testing before the material is imported for use on the project. The on-site materials are not expected to meet “Greenbook” bedding specifications. The pipe bedding material should be placed over the full width of the trench. After placement of the pipe, the bedding should be brought up uniformly on both sides of the pipe to reduce the potential for unbalanced loads. No voids or uncompacted areas should be left beneath the pipe haunches. Ponding or jetting the pipe bedding should not be allowed. RETAINING WALL FINISHED GRADE CONCRETE BROWDITCH FOOTING 12" GROUND SURFACE WATER PROOFING PER ARCHITECT FILTER FABRIC ENVELOPE (MIRAFI 140N OR APPROVED EQUIVALENT) 3/4" CRUSHED ROCK (1 CU.FT./FT.) FILTER FABRIC ENVELOPE MIRAFI 140N OR EQUIVALENT 4" DIA. SCHEDULE 40 PERFORATED PVC PIPE OR TOTAL DRAIN EXTENDED TO APPROVED OUTLET COMPETENT BEDROCK OR MA TE RIAL AS EVALUATED BY THE GEOTECHNICAL CONSULTANT Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 31 Where pipeline inclinations exceed 15%, cutoff walls are recommended in trench excavations. Additionally, we do not recommend that open graded rock be used for pipe bedding or backfill because of the potential for piping erosion. The recommended bedding is clean sand having a sand equivalent not less than 20 or 2-sack sand/cement slurry. If sand/cement slurry is used for pipe bedding to at least 1 foot over the top of the pipe, cutoff walls are not considered necessary. The need for cutoff walls should be further evaluated by the project civil engineer designing the pipeline. 6.10. Pavements The pavement support characteristics of the soils encountered during NOVA’s investigation are considered low to medium. An R-value of 13 was assumed for design of preliminary pavement sections. The actual R-value of the subgrade soils should be determined after grading, and the final pavement sections should be provided. Based on an R-value of 13, the following preliminary pavement structural sections are provided for the assumed Traffic Indexes on Table 6-4. Table 6-4. AC and PCC Pavement Sections Traffic Type Traffic Index Asphalt Concrete (inches) Portland Cement Concrete (inches) Parking Stalls 5.0 3 AC / 8.5 AB 7 PCC Driveways 6.0 4 AC / 10 AB 7½ PCC Fire Lanes 7.5 4 AC / 15.5 AB 8 PCC AC: Asphalt Concrete AB: Aggregate Base PCC: Portland Cement Concrete Aggregate base and asphalt concrete should conform to the Caltrans Standard Specifications or the “Greenbook” Standard Specifications for Public Works Construction and should be compacted to at least 95% relative compaction. Aggregate base should have an R-value of not less than 78. All materials and methods of construction should conform to good engineering practices and the minimum local standards. Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 32 7. INFILTRATION FEASIBILITY 7.1. Overview NOVA coordinated with the client to provide infiltration testing in the areas most likely to have BMPs. NOVA has evaluated the site as abstracted below after guidance contained in the City of Carlsbad BMP Design Manual, September 2021 (the governing document at the time of the original report). Plate 1 depicts the locations of the percolation test wells and associated exploratory geotechnical borings. This section provides the results of the testing and related recommendations for management of stormwater in conformance with the BMP Manual. Based on infiltration rates of Test Wells P-1 through P-4 divided by the project factor of safety calculated in accordance with Table D.2-3 of the BMP Manual, as well as the deep fills in these areas, stormwater infiltration is not feasible in any appreciable quantity. The BMPs are therefore considered to have a no infiltration condition. The following section provides NOVA’s assessment of the feasibility of stormwater infiltration BMPs utilizing the information developed during the subsurface exploration. 7.2. Percolation Testing The percolation test wells were pre-soaked by filling the holes with water to the ground surface level and testing commenced within a 26-hour window. On the day of testing, two 25-minute trials were conducted in each well. In all of the percolation borings, the pre-soak water percolated less than 6 inches into the soil unit within 25 minutes. Based on the results of the trials in those test wells, water levels were recorded every 30 minutes for 6 hours. At the beginning of each test interval, the water level was raised to approximately the same level as the previous tests, in order to maintain a near-constant head during all test periods. Percolation rates recorded in the field were converted to infiltration rates using the Porchet Method. Table 7-1 summarizes the percolation test conditions and related infiltration rates. Table 7-1. Summary of Percolation Testing Test Location Test Well Depth (feet) Material at Test Depth Infiltration Rate (in/hr, FS=4)1 Infiltration Condition P-1 5 Fill 0.02 No Infiltration P-2 5 Fill 0.04 No Infiltration P-3 5 Fill 0.04 No Infiltration P-4 5 Fill 0.09 Partial Infiltration Note 1: FS indicates ‘Factor of Safety’ As shown in Table 7-1, a factor of safety (FS) is applied to the infiltration rate (I). This factor of safety, calculated for this site as FS = 4, considers the nature and variability of subsurface materials, as well as the natural tendency of infiltration structures to become less efficient with time. NOVA provided the I I I I Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 33 factor values for the Suitability Assessment section of the table, and the project civil engineer provided the factor values for the Design section. The factor of safety was determined using Section D.2.3 of Appendix D of the BMP Manual. This table is reproduced below as Table 7-2. Table 7-2. Determination of Safety Factor From City of Carlsbad BMP Design Manual, September 2021, Table D.2-3: Determination of Safety Factor 7.3. Review of Infiltration Restrictions Section D.2.1 of the BMP Manual presents restriction elements that should be considered by the project geotechnical professional while assessing the feasibility of infiltration related to geotechnical conditions. These elements are listed in Table 7-3. Based on this assessment, NOVA considers the stormwater infiltration basins in the locations in which they are currently designed to be a restricted condition due the fact it will be located in approximately 50 to 70 feet of existing fill. - -l1i.r.nm iwrn;rn= . ..... ,'I I --~ , __ ..... • -=-w:=-:..:.~---IP .::. ._...,.v In.filtr.ation Testing Method 0-25 0.50 Su.it:a0bility Soil Texture Oass 0.25 Refer to 0.50 Assessment Soil Variability 0-25 Table D .2--4 0.75 (A) Depth to Groundwater/Obstruction 0.25 0.25 Suitability Assessment Safety Factor, SA = Lp 2.0 Pretreatment 0.50 1.0 Design Resiliency 0.25 Refer to Table D.2--4 0.5 (B) Compaction 0-25 0.5 Des.igi1 Safety Factor, Sa = Lp 2.0 Safety Fact01, S = SAX SB 4.0 (ill.fust be always greater than or equ~ to 2) Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 34 Table 7-3. Infiltration Restrictions From City of Carlsbad BMP Design Manual, September 2021, Table B.2-1: Infiltration Restrictions 7.4. Suitability of the Site for Stormwater Infiltration The infiltration condition of the proposed BMPs located in fill is considered Restricted by the City of Carlsbad. Infiltration rates determined from the percolation tests indicate that water cannot infiltrate in an appreciable quantity. Therefore, it is NOVA’s recommendation that BMPs should be designed with a no infiltration condition. l\fandatory Considerations Optional Considerations Result Restriction Element BtvlP is within 100' of Contaminated Soils BMP is within 100' of Industrial Activities Lacking Source Control BMP is within 100' of Well/Groundwater Basin B.MP is within 50' of Septic Tanks/Leach Fields BMP is within 10' of Structures/Tanks/Walls Bl'vIP is within 10' of Sewer Utilities ffl'vIP is within 10' of Groundwater Table BMP is within Hydi:ic SoiJs BMP is within HighJy Liquefiable Soils and has Connectivity to Structu(eS BMP is within 1.5 Times the Height of Adjacent Steep Slopes (~25%) City Staff has Assigned "Restricted" Infiltration Category N is within Pred m· t!y ype D So BMP is within 10' of Properry Line BMP is within FiU Depths of ~5' (Existing or Pwposed) is witlun 10' of U der r d U tili • es • .M is within 250' f hemer 1 S ·earn Other (Provide detailed geotechnical support) Unrestricted. None of tlie restriction elements above are applicable. Is Element Applicable? (Yes/No) No No 0 No 0 No No Yes No Yes 0 No No Restricted. One or more of the restriction elements above are applicable. Restricted Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 35 8. REFERENCES 8.1. Site Specific Ruhnau Clarke Architects, 2022, Overall Modernization Site Plan – Inc. #2, Aviara Oaks Elementary School,6900 Ambrosia Ln, Carlsbad, CA, Project No.: RCA# 1-13-12, Sheet AS-2.0 (1sheet), Dec 14, 2022. 8.2. Design American Concrete Institute, 2014, Building Code Requirements for Structural Concrete, ACI 318-14 and Commentary. Brandon, T., Duncan, J.M., and Gardner, W. (1990), “Hydrocompression Settlement of Deep Fills”, Journal of Geotechnical and Geoenvironmental Engineering, ASCE, Vol. 116, No. 10. California Emergency Management Agency (Cal EMA), California Geological Survey, University of Southern California, 2009, Tsunami Inundation Maps for Emergency Planning. California Department of Transportation (Caltrans), 2018, Standard Specifications. California Geological Survey (CGS), 2022a, Engineering Geology and Seismology Review for Aviara Oaks Elementary School – Campus Modernization, 6900 Ambrosia Lane, Carlsbad, CA 92011, CGS Application No. 04-CGS5402, June 17. CGS, 2022b. California Geological Survey – Note 48 Checklist for the Review of Engineering Geology and Seismology Reports for California Public Schools, Hospitals, and Essential Services Buildings, November 2022. City of Carlsbad, 2021, Engineering Standards, Volume 5, Carlsbad BMP Design Manual, BMP Design Manual Appendices, Appendix D – Geotechnical Engineer Analysis, 2021 Edition, Dated September 2021. International Code Council, 2018, 2019 California Building Code, California Code of Regulations, Title 24, Part 2, Volume 2 of 2, Based on the 2018 International Building Code, Effective January 1, 2020. Public Works Standards, Inc., 2018, “Greenbook” Standard Specifications for Public Works Construction, 2018 Edition. Pradel, D., 1998, Procedure to Evaluate Earthquake Induced Settlements in Dry Sandy Soils, Journal of Geotechnical Engineering, ASCE, 124(4). Robertson, P. K. and Shao, Lisheng, 2010, Estimation of Seismic Compression in Dry Soils Using the CPT, International Conferences on Recent Advances in Geotechnical Earthquake Engineering and Soil Dynamics. https://scholarsmine.mst.edu/icrageesd/05icrageesd/session04/18. Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 36 Robertson, P. K., 2016, CPT-based Soil Behaviour Type (SBT) Classification System – an Update, Canadian Geotechnical Journal, cgj-2016-0044.R1, May 2016. Structural Engineers Association of California (SEAOC), 2021, OSHPD Seismic Design Maps: found at https://seismicmaps.org, accessed December 2021. Stewart, J. P., Whang, D. H., Moyneur, M., and Duku, P., 2004, Seismic Compression Of As- Compacted Fill Soils With Variable Levels of Fines Content and Fines Plasticity, Consortium of Univ. for Research in Earthquake Engineering (CUREE), Richmond, CA. Tokimatsu K. and Seed H.B., 1987, Evaluation of Settlements in Sands Due to Earthquake Shaking, Journal of Geotechnical Engineering, ASCE, 113(8). 8.3. Site Setting California Geological Survey (CGS), 2018, Earthquake Fault Zones, A Guide for Government Agencies Property Owners / Developers, and Geoscience Practitioners for assessing Fault Rupture Hazards in California, Special Publication 42, Revised 2018. CGS, Landslide Inventory (Beta), accessed November, 2021 at: https://maps.conservation.ca.gov/cgs/lsi/. CGS, Earthquake Zones of Required Investigation, accessed November, 2021 at: https://maps.conservation.ca.gov/cgs/EQZApp/app/. City of Carlsbad, 2015, General Plan, September 22. Federal Emergency Management Agency, 2019, FIRM Flood Insurance Rate Map, San Diego County, Firm Panel 06073C1032H, https://msc.fema.gov/portal/search, accessed in November 2021. Kennedy, M.P. and Tan, S.S., 2007, Geologic Map of the Oceanside 30’ x 60’ Quadrangle, California, California Geological Survey, Scale 1:100,000. Southern California Earthquake Data Center, accessed November 2021 at: https://scedc.caltech.edu/earthquake/significant.html. United States Geological Survey (USGS), 2020, USGS Geologic Hazards Science Center, U.S. Quaternary Faults, accessed November 2021. USGS, 1948, Encinitas Quadrangle, California – San Diego Co. 7.5-Minute Series (Topographic), Contour Interval 20 feet, Scale 1:12,000. Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 PLATES 3 (E) BUILDING KITCHEN/MPR A# 108787 FFE=159.50 (E) BUILDING ADMIN (E) BUILDING 300 CLASSROOM FFE=153.48 (E) BUILDING 700 CLASSROOM A# 52004 FFE=149.10 (E) BLDG 400 CLASSROOM A# 108787 FFE=158.20 (E) BUILDING 500 CLASSROOM A# 108787 FFE=149.10 (E) BUILDING 600 CLASSROOM A# 108787 FFE=150.28 NEW BUILDING 800 CLASSROOM FFE=150.60 (E) BUILDING LIBRARY FFE=159.43 FFE=159.31 FFE=158.20 T T T B G T BG T --- AS - 2 . 3 (N) 5-30'x32' RELOCATABLE CLASSROOM BLDGS. PC#________ N.I.C.N.I.C.N.I.C.N.I.C. N.I.C. N.I.C.N.I.C. BIO FILTRATION BASIN, SEE CIVIL AND LANDSCAPE DWG. BIO FILTRATION BASIN, SEE CIVIL AND LANDSCAPE DWG. (E)FH (E)FH (E)FH (E)FH (E) PA(E)PA (E) PA (E) PA (E) PA (E)PA (E)PA PLAYFIELD PROP E R T Y L I N E PROPERTY LINE PR O P E R T Y L I N E (E) PA (E) PA (E) CONC. (E ) C O N C . (E) CONC. (E) CONC. (E ) C O N C . A M B R O S I A L N AVIA R A P K W Y RELO 902 RELO 903 RELO 904 CR A#114477 (2016)RELO 901 (N) MODULAR CLASSROOM BLDG. CR CR CR RELOCATED (E) RELO. TOILET BLDG. RELO 905 DF B-8 A' B-9 B-6 Tsa af Tsa ? ? ? ? ? CPT-3 C C' af Qoa Tsa B-2P-2 B-1 P-1 ? ? af Tsa B-4 B-5 Tsa B-7 B-11 B' B HA-1 B-10 CPT-1 P-3 B-3 P-4 CPT-2 ? A NEW BUILDING 800CLASSROOM (N) MODULARCLASSROOM BLDG (N) 5-30'x32' RELOCATABLE CLASSROOM BLDGS NW E N S 4373 Viewridge Avenue, Suite B San Diego, CA 92123 P: 858.292.7575 944 Calle Amanecer, Suite F San Clemente, CA 92673 P: 949.388.7710 NOVA www.usa-nova.com DRAWING TITLE: PLATE NO. 0 80'160' DATE: DRAWN BY: REVIEWED BY: DTJ MS PROJECT NO.: SCALE:1"=80' GEOTECHNICAL MATERIALS SPECIAL INSPECTION DVBE SBE SDVOSB SLBE KEY TO SYMBOLS af Qoa FILL OLDER ALLUVIUM HOLLOW STEM AUGER BORING PERCOLATION TEST BORINGP-4 B-11 GEOLOGIC CROSS-SECTIONCC' GEOLOGIC CONTACT, QUERIED WHERE UNCERTAINTsaSANTIAGO FORMATION ? AREAS OF NEW STRUCTURES AREAS OF NEW PAVEMENT AND FLATWORK PROPOSED BIOFILTRATION BASINS CONE PENETRATION TEST CPT-3 AVIARA OAKS ELEMENTARY SCHOOL CARLSBAD UNIFIED SCHOOL DISTRICT 6900 AMBROSIA LANE, CARLSBAD, CA 92011 2021251 FEB 2023 SUBSURFACE INVESTIGATION MAP 1 OF 2 HAND AUGER BORING HA-1 TD=6½' EXISTING BLDG 400 CLASSROOM FF=158.2' FF=149.1' A 160 180 140 120 0 100 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360 380 400 420 440 460 480 500 520 540 560 580 600 620 640 660 680 700 720 740 760 780 800 820 840 860 880 900 9200 200 80 60 afaf EXISTING BLDG 700 CLASSROOM AREA OF RELOCATABLE/MODULAR CLASSROOMS 160 180 140 120 100 200 80 60 Tsa Tsa ? ? A'BIOFILTRATION BASIN REPAVED PARKING LOT AND FLATWORK ? ? 40 40 B-9(PROJECTED24' SOUTH)B-6(PROJECTED72' SOUTH)B-8(PROJECTED42' SOUTH)TD=6½' CPT-3(PROJECTED59' NORTH) TD=52' B-5(PROJECTED 28' NORTH) B-4(PROJECTED 28' NORTH)CPT-2 B-3(PROJECTED 37' NORTH) B-11 (PROJECTED 49' NORTH) TD=79' TD=60' TD=11½'TD=11½'TD=11½' TD=81½' Tsa 160 180 140 120 0 100 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360 380 400 420 440 460 480 500 520 540 200 80 60 B 40 560 160 180 140 120 100 200 80 60 B' 40 CPT-2/CPT-3 *DEPTH TO Tsa BASED ON AVERAGE OF BOTH CPT-2 AND CPT-3 BIOFILTRATION BASIN B-5(PROJECTED41' EAST) B-4(PROJECTED 47' WEST) TD=11½' FF=150.28' EXISTING BLDG 600 CLASSROOM FF=150.6' PROPOSED BLDG 800 CLASSROOMCPT-1(PROJECTED 11' NORTH) TD=52'????? af af TsaTsa TD=11½' TD=63' AREA OF RELOCATABLE/MODULAR CLASSROOMS 60 160 180 140 120 0 100 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 200 80 60 C 160 180 140 120 100 200 80 C'EXISTING ELECTRICAL ENCLOSURE ?? ? af af Tsa Tsa CPT-1(PROJECTED22' NORTH) TD=52'? B-10(PROJECTED23' NORTH) TD=6½' FF=150.6' PROPOSED BLDG 800 CLASSROOM B-7(PROJECTED4' SOUTH) TD=51½' 4373 Viewridge Avenue, Suite B San Diego, CA 92123 P: 858.292.7575 944 Calle Amanecer, Suite F San Clemente, CA 92673 P: 949.388.7710 NOVA www.usa-nova.com DRAWING TITLE: 0 80'160' GEOTECHNICAL MATERIALS SPECIAL INSPECTION DVBE SBE SDVOSB SLBE KEY TO SYMBOLS af FILL HOLLOW STEM AUGER BORING B-11 Tsa SANTIAGO FORMATION GEOLOGIC CONTACT, QUERIED WHERE UNCERTAIN? PLATE NO. DATE: DRAWN BY: REVIEWED BY: DTJ MS PROJECT NO.: SCALE:1"=80' 2021251 GEOLOGIC CROSS-SECTIONS 2 OF 2 CONE PENETRATION TESTCPT-3 AVIARA OAKS ELEMENTARY SCHOOL CARLSBAD UNIFIED SCHOOL DISTRICT 6900 AMBROSIA LANE, CARLSBAD, CA 92011 FEB 2023 - ____,_ ----------'--- --~------r---+-~_j ----------- -------------- --------- l l Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 APPENDIX A USE OF THE GEOTECHNICAL REPORT Im ortant Information About Your Geotechnical Engineering Report Subsurface problems are a principal cause of construction delays, cost overruns, claims, and disputes. The following information is provided to help you manage your risks. Geotechnical Services Are Performed for Specific Purposes, Persons, and Projects Geotechnical engineers structure their services to meet the specific needs of their clients. A geotechnical engineering study conducted for a civil engi- neer may not fulfill the needs of a construction contractor or even another civil engineer. Because each geotechnical engineering study is unique, each geotechnical engineering report is unique, prepared solelyfor the client. No one except you should rely on your geotechnical engineering report without first conferring with the geotechnical engineer who prepared it. And no one -not even you -should apply the report for any purpose or project except the one originally contemplated. Read the Full Report Serious problems have occurred because those relying on a geotechnical engineering report did not read it all. Do not rely on an executive summary. Do not read selected elements only. A Geotechnical Engineering R~port Is Based on A Unique Set of Project-Specific Factors Geotechnical engineers consider a number of unique, project-specific fac- tors when establishing the scope of a study. Typical factors include: the client's goals, objectives, and risk management preferences: the general nature of the structure involved, its size, and configuration: the location of the structure on the site: and other planned or existing site improvements, such as access roads, parking lots, and underground utilities. Unless the geotechnical engineer who conducted the study specifically indicates oth- erwise, do not rely on a geotechnical engineering report that was: • not prepared for you, • not prepared for your project. • not prepared for the specific site explored, or • completed before important project changes were made. Typical changes that can erode the reliability of an existing geotechnical engineering report include those that affect: • the function of the proposed structure, as when it's changed from a parking garage to an office building , or from a light industrial plant to a refrigerated warehouse, • elevation, configuration, location, orientation, or weight of the proposed structure, • composition of the design team, or • project ownership. As a general rule, always inform your geotechnical engineer of project changes-even minor ones-and request an assessment of their impact. Geotechnical engineers cannot accept responsibility or liability for problems that occur because their reports do not consider developments of which they were not informed Subsurface Conditions Can Change A geotechnical engineering report is based on conditions that existed at the time the study was performed. Do not rely on a geotechnical engineer- ing reportwhose adequacy may have been affected by: the passage of time; by man-made events, such as construction on or adjacent to the site; or by natural events, such as floods, earthquakes, or groundwater fluctua- tions. Always contact the geotechnical engineer before applying the report to determine if it is still reliable. A minor amount of additional testing or analysis could prevent major problems. Most Geotechnical Findings Are Professional Opinions Site exploration identifies subsurface conditions only at those points where subsurface tests are conducted or samples are taken. Geotechnical engi- neers review field and laboratory data and then apply their professional judgment to render an opinion about subsurface conditions throughout the site. Actual subsurface conditions may differ-sometimes significantly- from those indicated in your report. Retaining the geotechnical engineer who developed your report to provide construction observation is the most effective method of managing the risks associated with unanticipated conditions. A Report's Recommendations Are Not Final Do not overrely on the construction recommendations included in your report. Those recommendations are not final, because geotechnical engi- neers develop them principally from judgment and opinion. Geotechnical engineers can finalize their recommendations only by observing actual subsurface conditions revealed during construction. The geotechnical engineer who developed your report cannot assume responsibility or liability for the report's recommendations if that engineer does not perform construction observation. A Geotechnical Engineering Report Is Subject to Misinterpretation Other design team members' misinterpretation of geotechnical engineering reports has resulted in costly problems. Lower that risk by having your geo- technical engineer confer with appropriate members of the design team after submitting the report. Also retain your geotechnical engineer to review perti- nent elements of the design team's plans and specifications. Contractors can also misinterpret a geotechnical engineering report. Reduce that risk by having your geotechnical engineer participate in prebid and preconstruction conferences, and by providing construction observation. Do Not Redraw the Engineer's Logs Geotechnical engineers prepare final boring and testing logs based upon their interpretation of field logs and laboratory data. To prevent errors or omissions, the logs included in a geotechnical engineering report should never be redrawn for inclusion in architectural or other design drawings. Only photographic or electronic reproduction is acceptable, but recognize that separating logs from the report can elevate risk. Give Contractors a Complete Report and Guidance Some owners and design professionals mistakenly believe they can make contractors liable for unanticipated subsurface conditions by limiting what they provide for bid preparation. To help prevent costly problems, give con- tractors the complete geotechnical engineering report, but preface it with a clearly written letter of transmittal. In that letter, advise contractors that the report was not prepared for purposes of bid development and that the report's accuracy is limited; encourage them to confer with the geotechnical engineer who prepared the report (a modest fee may be required) and/or to conduct additional study to obtain the specific types of information they need or prefer. A prebid conference can also be valuable. Be sure contrac- tors have sufficient time to perform additional study. Only then might you be in a position to give contractors the best information available to you, while requiring them to at least share some of the financial responsibilities stemming from unanticipated conditions. Read Responsibility Provisions Closely Some clients, design professionals, and contractors do not recognize that geotechnical engineering is far less exact than other engineering disci- plines. This lack of understanding has created unrealistic expectations that have led to disappointments, claims, and disputes. To help reduce the risk of such outcomes, geotechnical engineers commonly include a variety of explanatory provisions in their reports. Sometimes labeled "limitations" many of these provisions indicate where geotechnical engineers' responsi- bilities begin and end, to help others recognize their own responsibilities and risks. Read these provisions closely Ask questions. Your geotechnical engineer should respond fully and frankly. Geoenvironmental Concerns Are Not Covered The equipment. techniques, and personnel used to perform a geoenviron- mental study differ significantly from those used to perform a geotechnical study. For that reason, a geotechnical engineering report does not usually relate any geoenvironmental findings, conclusions, or recommendations; e.g., about the likelihood of encountering underground storage tanks or regulated contaminants. Unanticipated environmental problems have led to numerous project failures. If you have not yet obtained your own geoen- vironmental information, ask your geotechnical consultant for risk man- agement guidance. Do not rely on an environmental report prepared for someone else. Obtain Professional Assistance To Deal with Mold Diverse strategies can be applied during building design, construction, operation, and maintenance to prevent significant amounts of mold from growing on indoor surfaces. To be effective, all such strategies should be devised for the express purpose of mold prevention, integrated into a com- prehensive plan, and executed with diligent oversight by a professional mold prevention consultant. Because just a small amount of water or moisture can lead to the development of severe mold infestations, a num- ber of mold prevention strategies focus on keeping building surfaces dry. While groundwater, water infiltration, and similar issues may have been addressed as part of the geotechnical engineering study whose findings are conveyed in this report, the geotechnical engineer in charge of this project is not a mold prevention consultant; none of the services per- formed in connection with the geotechnical engineer's study were designed or conducted for the purpose of mold preven- tion. Proper implementation of the recommendations conveyed in this report will not of itself be sufficient to prevent mold from growing in or on the structure involved. Rely, on Your ASFE-Member Geotechncial Engineer for Additional Assistance Membership in ASFE/The Best People on Earth exposes geotechnical engineers to a wide array of risk management techniques that can be of genuine benefit for everyone involved with a construction project. Confer with you ASFE-member geotechnical engineer for more information. ASFE The Best People 10 larlh 8811 Colesville Road/Suite G106, Silver Spring, MD 20910 Telephone: 301/565-2733 Facsimile: 301/589-2017 e-mail: info@asfe.org www.asfe.org Copyright 2004 by ASFE, Inc. Duplication, reproduction, or copying of this document, in whole or in part, by any means whatsoever, is strictly prohibited, except with ASFE'S specific written permission. Excerpting, quoting, or otherwise extracting wording from this document is permitted only with the express written permission of ASFE, and only for purposes of scholarly research or book review. Only members of ASFE may use this document as a complement to or as an element of a geotechnical engineering report. Any other firm, individual, or other entity that so uses this document without being an ASFE member could be commiling negligent or intentional (fraudulent) misrepresentation. IIGER06045.0M Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 APPENDIX B BORING LOGS SUBSURFACE EXPLORATION LEGEND BULK SAMPLE SPT SAMPLE ( ASTM D1586) MOD. CAL. SAMPLE (ASTM D3550) NO SAMPLE RECOVERY GEOLOGIC CONTACT SOIL TYPE CHANGE * GROUNDWATER / STABILIZED NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION SBEDVBE SDVOSB 4373 Viewridge Ave., Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 MAJOR DIVISIONS TYPICAL NAMES GRAVEL MORE THAN HALF COARSE FRACTION IS LARGER THAN NO. 4 SIEVE GRAVEL WITH 15% OR MORE FINES CLEAN GRAVEL WITH LESS THAN 15% FINES CLEAN SAND SAND MORE THAN HALF COARSE FRACTION IS FINER THAN NO. 4 SIEVE SIZE SAND WITH 15% OR MORE FINES WITH LESS THAN 15% FINES SILTS AND CLAYS LIQUID LIMIT 50% OR LESS SILTS AND CLAYS LIQUID LIMIT GREATER THAN 50% HIGHLY ORGANIC SOILS GW GP GM GC SW SP SM SC ML CL OL MH CH OH PT WELL-GRADED GRAVEL WITH OR WITHOUT SAND POORLY GRADED GRAVEL WITH OR WITHOUT SAND SILTY GRAVEL WITH OR WITHOUT SAND CLAYEY GRAVEL WITH OR WITHOUT SAND WELL-GRADED SAND WITH OR WITHOUT GRAVEL POORLY GRADED SAND WITH OR WITHOUT GRAVEL SILTY SAND WITH OR WITHOUT GRAVEL CLAYEY SAND WITH OR WITHOUT GRAVEL SILT WITH OR WITHOUT SAND OR GRAVEL ELASTIC SILT WITH OR WITHOUT SAND OR GRAVEL FAT CLAY WITH OR WITHOUT SAND OR GRAVEL ORGANIC SILT OR CLAY OF HIGH PLASTICITY WITH OR WITHOUT SAND OR GRAVEL PEAT AND OTHER HIGHLY ORGANIC SOILS FI N E - G R A I N E D S O I L S CO A R S E - G R A I N E D S O I L S MO R E T H A N H A L F I S F I N E R T H A N N O . 2 0 0 S I E V E MO R E T H A N H A L F I S C O A R S E R T H A N N O . 2 0 0 S I E V E RELATIVE DENSITY OF COHESIONLESS SOILS RELATIVE DENSITY VERY LOOSE LOOSE MEDIUM DENSE DENSE VERY DENSE SPT N60 BLOWS/FOOT 0 - 4 4 - 10 10 - 30 30 - 50 OVER 50 CONSISTENCY OF COHESIVE SOILS CONSISTENCY VERY SOFT SOFT MEDIUM STIFF STIFF VERY STIFF HARD SPT N60 BLOWS/FOOT 0 - 2 2 - 4 4 - 8 8 - 15 15 - 30 OVER 30 NUMBER OF BLOWS OF 140 LB HAMMER FALLING 30 INCHES TO DRIVE A 2 INCH O.D. (1-3/8 INCH I.D.) SPLIT-BARREL SAMPLER THE LAST 12 INCHES OF AN 18-INCH DRIVE (ASTM-1586 STANDARD PENETRATION TEST). IF THE SEATING INTERVAL (1st 6 INCH INTERVAL) IS NOT ACHEIVED, N IS REPORTED AS REF. POCKET PENETROMETER MEASUREMENT (TSF) 0 - 0.25 0.25 - 0.50 0.50 - 1.0 1.0 - 2.0 2.0 - 4.0 OVER 4.0 DIRECT SHEAR EXPANSION INDEX ATTERBERG LIMITS SIEVE ANALYSIS RESISTANCE VALUE CONSOLIDATION SAND EQUIVALENT CORROSIVITY MAXIMUM DENSITYMD DS EI AL SA RV CN SE LAB TEST ABBREVIATIONS CR LEAN CLAY WITH OR WITHOUT SAND OR GRAVEL ORGANIC SILT OR CLAY OF LOW TO MEDIUM PLASTICITY WITH OR WITHOUT SAND OR GRAVEL PERCHED GROUNDWATER SLBE "SZ/T_ er- 181 IZI □ - a I .. DE P T H ( F T ) N60 BL O W S P E R F O O T N 5 10 15 20 25 30 0 BU L K S A M P L E SUMMARY OF SUBSURFACE CONDITIONS (USCS; COLOR, MOISTURE, DENSITY, GRAIN SIZE, OTHER) LA B T E S T S CA L / S P T S A M P L E SOIL DESCRIPTION DRILLING EQUP.:ELEVATION:GROUNDWATER DEPTH: MO I S T U R E (% ) SO I L C L A S S . (U S C S ) DR Y D E N S I T Y (p c f ) NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Ave., Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB DRILLING METHOD:DATE DRILLED: SAMPLE METHOD:NOTES: LOG OF BORING B-1 NOVEMBER 23, 2021 ±146 FT MSL HAMMER: 140 LBS., DROP: 30 IN (AUTOMATIC) HOLLOW STEM AUGER SABER CAT MTXD NOT ENCOUNTERED FILL (af): CLAYEY SAND; LIGHT GRAY BROWN, MOIST, MEDIUM DENSE, FINE TO MEDIUM GRAINED, ORANGE AND GRAY MOTTLING SC RV 2 INCHES OF ASPHALT CONCRETE OVER 4 INCHES OF AGGREGATE BASE 12 19 14 22 14 22 30 31 19 30 21 34 ETR~95.9%, N60 ~ 95.960*N~1.60*N DENSE SILTY SAND; LIGHT GRAY BROWN, MOIST, MEDIUM DENSE, FINE TO MEDIUM GRAINED, ORANGE STAINING SILTY SAND; LIGHT GRAY BROWN, MOIST, MEDIUM DENSE TO DENSE, FINE TO MEDIUM GRAINED SLBE 21 34 SM SANDY CLAY; DARK GRAY, MOIST, STIFF, FINE TO MEDIUM GRAINED SAND, TRACE ROOTLETS CL SOME GRAVEL, DENSE OLDER ALLUVIUM (Qoa): SILTY SAND; LIGHT YELLOW BROWN TO DARK BROWN WITH THIN INTERBEDDED YELLOW LENSES, DRY TO MOIST, DENSE, FINE TO MEDIUM GRAINED SM SM 15.1 112.2 APPENDIX: B.1DRILLED BY: AR REVIEWED BY: MS AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 PROJECT: 2021251 -J - -,_ -V ---------------~-------------------------------------~----[Z -7 ,__ --------------------------------------------------------~-- =X -v-------------------------------------------------------- ,__ -[7 ,__ -V ,__ • • DE P T H ( F T ) N60 BL O W S P E R F O O T N 35 40 45 50 55 60 30 BU L K S A M P L E SUMMARY OF SUBSURFACE CONDITIONS (USCS; COLOR, MOISTURE, DENSITY, GRAIN SIZE, OTHER) LA B T E S T S CA L / S P T S A M P L E SOIL DESCRIPTION DRILLING EQUP.:ELEVATION:GROUNDWATER DEPTH: MO I S T U R E (% ) SO I L C L A S S . (U S C S ) DR Y D E N S I T Y (p c f ) NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Ave., Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB DRILLING METHOD:DATE DRILLED: SAMPLE METHOD:NOTES: LOG OF BORING B-1 CONTINUED NOVEMBER 23, 2021 ±146 FT MSL HAMMER: 140 LBS., DROP: 30 IN (AUTOMATIC) HOLLOW STEM AUGER SABER CAT MTXD NOT ENCOUNTERED BORING TERMINATED AT 31½ FT. NO GROUNDWATER ENCOUNTERED. 33 53 ETR~95.9%, N60 ~ 95.960*N~1.60*N SLBE SANTIAGO FORMATION (Tsa): SILTY SANDSTONE; GRAY BROWN, DRY TO MOIST, VERY DENSE, FINE TO MEDIUM GRAINED, YELLOW AND ORANGE STAINING APPENDIX: B.2DRILLED BY: AR REVIEWED BY: MS AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 PROJECT: 2021251 - -I - - - - - - - - - - - - - - - - - - - - - - - - - - - - j,a~I ~-- • • • I DE P T H ( F T ) N60 BL O W S P E R F O O T N 5 10 15 20 25 30 0 BU L K S A M P L E SUMMARY OF SUBSURFACE CONDITIONS (USCS; COLOR, MOISTURE, DENSITY, GRAIN SIZE, OTHER) LA B T E S T S CA L / S P T S A M P L E SOIL DESCRIPTION DRILLING EQUP.:ELEVATION:GROUNDWATER DEPTH: MO I S T U R E (% ) SO I L C L A S S . (U S C S ) DR Y D E N S I T Y (p c f ) NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Ave., Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB DRILLING METHOD:DATE DRILLED: SAMPLE METHOD:NOTES: LOG OF BORING B-2 NOVEMBER 23, 2021 ±145 FT MSL HAMMER: 140 LBS., DROP: 30 IN (AUTOMATIC) HOLLOW STEM AUGER SABER CAT MTXD NOT ENCOUNTERED FILL (af): SILTY SAND; LIGHT GRAY BROWN, MOIST, MEDIUM DENSE, FINE TO MEDIUM GRAINED, ABUNDANT ORANGE AND GRAY MOTTLING SM 6 INCHES OF TOPSOIL 17 27 24 25 13 21 13 21 ETR~95.9%, N60 ~ 95.960*N~1.60*N SLBE BORING TERMINATED AT 16½ FT. NO GROUNDWATER ENCOUNTERED. 20.6 102.3 GRAY BROWN DRY TO MOIST, TRACE GRAVEL LIGHT GRAY BROWN TO DARK GRAY, INCREASE IN SILT APPENDIX: B.3DRILLED BY: AR REVIEWED BY: MS AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 PROJECT: 2021251 - - -J -,z - --- - - -z - - - - -7 - - - - - - - - - - - - - - j,a~I ~-- • • • I DE P T H ( F T ) N60 BL O W S P E R F O O T N 5 10 15 20 25 30 0 BU L K S A M P L E SUMMARY OF SUBSURFACE CONDITIONS (USCS; COLOR, MOISTURE, DENSITY, GRAIN SIZE, OTHER) LA B T E S T S CA L / S P T S A M P L E SOIL DESCRIPTION DRILLING EQUP.:ELEVATION:GROUNDWATER DEPTH: MO I S T U R E (% ) SO I L C L A S S . (U S C S ) DR Y D E N S I T Y (p c f ) NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Ave., Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB DRILLING METHOD:DATE DRILLED: SAMPLE METHOD:NOTES: LOG OF BORING B-3 NOVEMBER 23, 2021 ±151 FT MSL HAMMER: 140 LBS., DROP: 30 IN (AUTOMATIC) HOLLOW STEM AUGER SABER CAT MTXD NOT ENCOUNTERED FILL (af): SILTY SAND; LIGHT BROWN, MOIST, MEDIUM DENSE, FINE TO MEDIUM GRAINED, SCATTERED ROOTLETS, ORANGE MOTTLING SM 6 INCHES OF TOPSOIL 13 21 14 22 13 21 19 30 ETR~95.9%, N60 ~ 95.960*N~1.60*N LIGHT GRAY BROWN FREQUENT ORANGE MOTTLING SLBE 19 30 LIGHT GRAY BROWN TO DARK GRAY APPENDIX: B.4DRILLED BY: AR REVIEWED BY: MS AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 PROJECT: 2021251 - - -J - -' -~ - - - -z - - - - -z - - - - -~ - - - - -~ - - - - j,a~I ~-- • • • I DE P T H ( F T ) N60 BL O W S P E R F O O T N 35 40 45 50 55 60 30 BU L K S A M P L E SUMMARY OF SUBSURFACE CONDITIONS (USCS; COLOR, MOISTURE, DENSITY, GRAIN SIZE, OTHER) LA B T E S T S CA L / S P T S A M P L E SOIL DESCRIPTION DRILLING EQUP.:ELEVATION:GROUNDWATER DEPTH: MO I S T U R E (% ) SO I L C L A S S . (U S C S ) DR Y D E N S I T Y (p c f ) NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Ave., Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB DRILLING METHOD:DATE DRILLED: SAMPLE METHOD:NOTES: LOG OF BORING B-3 CONTINUED NOVEMBER 23, 2021 ±151 FT MSL HAMMER: 140 LBS., DROP: 30 IN (AUTOMATIC) HOLLOW STEM AUGER SABER CAT MTXD NOT ENCOUNTERED FILL (af) CONTINUED: SILTY SAND; LIGHT GRAY BROWN, MOIST, MEDIUM DENSE, FINE TO MEDIUM GRAINEDSM 18 29 7 11 ETR~95.9%, N60 ~ 95.960*N~1.60*N CLAYEY SAND; GRAY BROWN, MOIST, MEDIUM DENSE, FINE TO MEDIUM GRAINED, ORANGE AND GRAY MOTTLING SLBE 7 11 BORING LOGGED TO 41½ FT. BORING WAS ADVANCED FURTHER TO 60 FT WITH NO BEDROCK ENCOUNTERED. NO GROUNDWATER ENCOUNTERED. SC APPENDIX: B.5DRILLED BY: AR REVIEWED BY: MS AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 PROJECT: 2021251 - -I ~ - - - - -~ - - - - - ----------~--------------------------------------- - - - - - -7 - - - - - - - - - - - - - - - - - - - j,a~I ~-- • • • I DE P T H ( F T ) N60 BL O W S P E R F O O T N 5 10 15 20 25 30 0 BU L K S A M P L E SUMMARY OF SUBSURFACE CONDITIONS (USCS; COLOR, MOISTURE, DENSITY, GRAIN SIZE, OTHER) LA B T E S T S CA L / S P T S A M P L E SOIL DESCRIPTION DRILLING EQUP.:ELEVATION:GROUNDWATER DEPTH: MO I S T U R E (% ) SO I L C L A S S . (U S C S ) DR Y D E N S I T Y (p c f ) NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Ave., Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB DRILLING METHOD:DATE DRILLED: SAMPLE METHOD:NOTES: LOG OF BORING B-4 NOVEMBER 24, 2021 ±148 FT MSL HAMMER: 140 LBS., DROP: 30 IN (AUTOMATIC) HOLLOW STEM AUGER SABER CAT MTXD NOT ENCOUNTERED FILL (af): CLAYEY SAND; LIGHT GRAY BROWN, MOIST, MEDIUM DENSE, FINE TO MEDIUM GRAINED, ORANGE AND GRAY MOTTLING SC 6 INCHES OF TOPSOIL 11 18 14 22 11 18 ETR~95.9%, N60 ~ 95.960*N~1.60*N SLBE BORING TERMINATED AT 11½ FT. NO GROUNDWATER ENCOUNTERED. FINE GRAINED, SCATTERED DARK BROWN MOTTLING INCREASE IN CLAY SA AL EI CR APPENDIX: B.6DRILLED BY: AR REVIEWED BY: MS AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 PROJECT: 2021251 - - -J -,z - -~ - - - -7 - - - - - - - - - - - - - - - - - - - j,a~I ~-- • • • I DE P T H ( F T ) N60 BL O W S P E R F O O T N 5 10 15 20 25 30 0 BU L K S A M P L E SUMMARY OF SUBSURFACE CONDITIONS (USCS; COLOR, MOISTURE, DENSITY, GRAIN SIZE, OTHER) LA B T E S T S CA L / S P T S A M P L E SOIL DESCRIPTION DRILLING EQUP.:ELEVATION:GROUNDWATER DEPTH: MO I S T U R E (% ) SO I L C L A S S . (U S C S ) DR Y D E N S I T Y (p c f ) NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Ave., Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB DRILLING METHOD:DATE DRILLED: SAMPLE METHOD:NOTES: LOG OF BORING B-5 NOVEMBER 24, 2021 ±147 FT MSL HAMMER: 140 LBS., DROP: 30 IN (AUTOMATIC) HOLLOW STEM AUGER SABER CAT MTXD NOT ENCOUNTERED FILL (af): SILTY SAND; LIGHT GRAY BROWN, MOIST, MEDIUM DENSE, FINE TO MEDIUM GRAINED, ORANGE AND GRAY MOTTLINGSM 6 INCHES OF TOPSOIL 14 22 13 21 14 22 ETR~95.9%, N60 ~ 95.960*N~1.60*N SLBE BORING TERMINATED AT 11½ FT. NO GROUNDWATER ENCOUNTERED. INCREASE IN CLAY, FREQUENT ORANGE MOTTLING APPENDIX: B.7DRILLED BY: AR REVIEWED BY: MS AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 PROJECT: 2021251 - - -J -,z - -~ - - - -7 - - - - - - - - - - - - - - - - - - - j,a~I ~-- • • • I DE P T H ( F T ) N60 BL O W S P E R F O O T N 5 10 15 20 25 30 0 BU L K S A M P L E SUMMARY OF SUBSURFACE CONDITIONS (USCS; COLOR, MOISTURE, DENSITY, GRAIN SIZE, OTHER) LA B T E S T S CA L / S P T S A M P L E SOIL DESCRIPTION DRILLING EQUP.:ELEVATION:GROUNDWATER DEPTH: MO I S T U R E (% ) SO I L C L A S S . (U S C S ) DR Y D E N S I T Y (p c f ) NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Ave., Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB DRILLING METHOD:DATE DRILLED: SAMPLE METHOD:NOTES: LOG OF BORING B-6 NOVEMBER 24, 2021 ±147 FT MSL HAMMER: 140 LBS., DROP: 30 IN (AUTOMATIC) HOLLOW STEM AUGER SABER CAT MTXD NOT ENCOUNTERED SANTIAGO FORMATION (Tsa): CLAYEY SANDSTONE; LIGHT GRAY BROWN, MOIST, VERY DENSE, FINE TO MEDIUM GRAINED, ORANGE AND GRAY MOTTLING 6 INCHES OF TOPSOIL 63 101 55 88 ETR~95.9%, N60 ~ 95.960*N~1.60*N SLBE BORING TERMINATED AT 6½ FT. NO GROUNDWATER ENCOUNTERED. YELLOWISH BROWN TO LIGHT GRAY BROWN, ABUNDANT ORANGE STAINING SA AL EI CR APPENDIX: B.8DRILLED BY: AR REVIEWED BY: MS AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 PROJECT: 2021251 - - -J -,z - -V - - - - - - - - - - - - - - - - - - - - - - - j,a~I ~-- • • • I DE P T H ( F T ) N60 BL O W S P E R F O O T N 5 10 15 20 25 30 0 BU L K S A M P L E SUMMARY OF SUBSURFACE CONDITIONS (USCS; COLOR, MOISTURE, DENSITY, GRAIN SIZE, OTHER) LA B T E S T S CA L / S P T S A M P L E SOIL DESCRIPTION DRILLING EQUP.:ELEVATION:GROUNDWATER DEPTH: MO I S T U R E (% ) SO I L C L A S S . (U S C S ) DR Y D E N S I T Y (p c f ) NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Ave., Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB DRILLING METHOD:DATE DRILLED: SAMPLE METHOD:NOTES: LOG OF BORING B-7 NOVEMBER 24, 2021 ±158 FT MSL HAMMER: 140 LBS., DROP: 30 IN (AUTOMATIC) HOLLOW STEM AUGER SABER CAT MTXD NOT ENCOUNTERED FILL (af): SILTY SAND; LIGHT GRAY BROWN, MOIST, MEDIUM DENSE, FINE TO MEDIUM GRAINED, ORANGE STAINING 6 INCHES OF TOPSOIL 43 69 22 35 ETR~95.9%, N60 ~ 95.960*N~1.60*N SLBE BORING TERMINATED AT 6½ FT. NO GROUNDWATER ENCOUNTERED. MD DS SANTIAGO FORMATION (Tsa): SILTY SANDSTONE; LIGHT GRAY BROWN, MOIST, VERY DENSE, FINE TO MEDIUM GRAINED, ORANGE STAINING SM DENSE APPENDIX: B.9DRILLED BY: AR REVIEWED BY: MS AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 PROJECT: 2021251 - - -J -,z - -V - - - - - - - - - - - - - - - - - - - - - - - j,a~I ~-- • • • I DE P T H ( F T ) N60 BL O W S P E R F O O T N 5 10 15 20 25 30 0 BU L K S A M P L E SUMMARY OF SUBSURFACE CONDITIONS (USCS; COLOR, MOISTURE, DENSITY, GRAIN SIZE, OTHER) LA B T E S T S CA L / S P T S A M P L E SOIL DESCRIPTION DRILLING EQUP.:ELEVATION:GROUNDWATER DEPTH: MO I S T U R E (% ) SO I L C L A S S . (U S C S ) DR Y D E N S I T Y (p c f ) NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Ave., Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB DRILLING METHOD:DATE DRILLED: SAMPLE METHOD:NOTES: LOG OF BORING B-8 NOVEMBER 24, 2021 ±158 FT MSL HAMMER: 140 LBS., DROP: 30 IN (AUTOMATIC) HOLLOW STEM AUGER SABER CAT MTXD NOT ENCOUNTERED FILL (af): SILTY SAND; LIGHT GRAY BROWN, MOIST, MEDIUM DENSE, FINE TO MEDIUM GRAINED, ORANGE STAINING, TRACE GRAVEL 6 INCHES OF TOPSOIL 6 10 13 21 ETR~95.9%, N60 ~ 95.960*N~1.60*N SLBE BORING TERMINATED AT 11½ FT. NO GROUNDWATER ENCOUNTERED. SANTIAGO FORMATION (Tsa): SILTY SANDSTONE; LIGHT GRAY BROWN TO ORANGE BROWN, MOIST, VERY DENSE, FINE TO MEDIUM GRAINED SM SCATTERED DARK BROWN MOTTLING 38 61 CLAYEY SAND; GRAY BROWN, MOIST, LOOSE, FINE TO MEDIUM GRAINED, DARK BROWN AND ORANGE MOTTLINGSC APPENDIX: B.10DRILLED BY: AR REVIEWED BY: MS AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 PROJECT: 2021251 - - - -[2 - --[2 - - ----- - ----- - -~-------------------------------------... - - - - - -7 - - - - - - - - - - - - - - - - - - - j,a~I ~-- • • • I DE P T H ( F T ) N60 BL O W S P E R F O O T N 5 10 15 20 25 30 0 BU L K S A M P L E SUMMARY OF SUBSURFACE CONDITIONS (USCS; COLOR, MOISTURE, DENSITY, GRAIN SIZE, OTHER) LA B T E S T S CA L / S P T S A M P L E SOIL DESCRIPTION DRILLING EQUP.:ELEVATION:GROUNDWATER DEPTH: MO I S T U R E (% ) SO I L C L A S S . (U S C S ) DR Y D E N S I T Y (p c f ) NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Ave., Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB DRILLING METHOD:DATE DRILLED: SAMPLE METHOD:NOTES: LOG OF BORING B-9 NOVEMBER 24, 2021 ±165 FT MSL HAMMER: 140 LBS., DROP: 30 IN (AUTOMATIC) HOLLOW STEM AUGER SABER CAT MTXD NOT ENCOUNTERED SANTIAGO FORMATION (Tsa): CLAYEY SANDSTONE; LIGHT GRAY BROWN, MOIST, DENSE TO VERY DENSE, FINE TO MEDIUM GRAINED 3 INCHES OF ASPHALT CONCRETE OVER 3 INCHES OF AGGREGATE BASE 68 109 ETR~95.9%, N60 ~ 95.960*N~1.60*N SLBE BORING TERMINATED AT 6½ FT. NO GROUNDWATER ENCOUNTERED. VERY DENSE RV APPENDIX: B.11DRILLED BY: AR REVIEWED BY: MS AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 PROJECT: 2021251 - - -J - -' -V - - - - - - - - - - - - - - - - - - - - - - - j,a~I ~-- • • • I DE P T H ( F T ) N60 BL O W S P E R F O O T N 5 10 15 20 25 30 0 BU L K S A M P L E SUMMARY OF SUBSURFACE CONDITIONS (USCS; COLOR, MOISTURE, DENSITY, GRAIN SIZE, OTHER) LA B T E S T S CA L / S P T S A M P L E SOIL DESCRIPTION DRILLING EQUP.:ELEVATION:PERCHED WATER: MO I S T U R E (% ) SO I L C L A S S . (U S C S ) DR Y D E N S I T Y (p c f ) NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Ave., Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB DRILLING METHOD:DATE DRILLED: SAMPLE METHOD:NOTES: LOG OF BORING B-10 NOVEMBER 21, 2022 ±150½ FT MSL HAMMER: 140 LBS., DROP: 30 IN (AUTOMATIC) HOLLOW STEM AUGER CME 95 ±50 FT MSL FILL (af): SILTY SAND; PALE BROWN, MOIST, MEDIUM DENSE, FINE TO MEDIUM GRAINED, SOME ORANGE STAINING, MICACEOUS, SOME MINOR CLAY SM 5 INCHES OF CONCRETE 25 30 17 20 24 28 22 26 ETR~70.6%, N60 ~ 70.660*N~1.18*N ORANGE AND RED STAINING SLBE 20 24 GRAY PALE BROWN APPENDIX: B.12DRILLED BY: GN REVIEWED BY: MS AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 PROJECT: 2021251 RED TO LIGHT OLIVE BROWN CLAYEY SAND; OLIVE BROWN, PALE BROWN, AND BROWN, MOIST, MEDIUM DENSE, FINE GRAINED, SOME ORANGE STAINING, MICACEOUS SC SILTY SAND; LIGHT OLIVE BROWN, MOIST, MEDIUM DENSE, FINE TO MEDIUM GRAINED, SOME ORANGE STAINING, MICACEOUS, SOME CLAY DARK GRAYISH BROWN, TRACE BLACK STAINING PALE OLIVE BROWN WITH ORANGE STAINING, 2-3 IN LAYER OF OLIVE BROWN SANDY CLAY GRAYISH BROWN, TRACE BLACK STAINING MINOR ORANGE STAINING SA MD CR SA - - J -) -' - "w' -- - - - - ----- - ----~------------------------------------->--- -~ - - - --z - - - - - ---------------------------------------------------- - - - - -z - - - - -~ - - - - -~ - - - - j,a~I ~-- • • • I DE P T H ( F T ) N60 BL O W S P E R F O O T N 35 40 45 50 55 60 30 BU L K S A M P L E SUMMARY OF SUBSURFACE CONDITIONS (USCS; COLOR, MOISTURE, DENSITY, GRAIN SIZE, OTHER) LA B T E S T S CA L / S P T S A M P L E SOIL DESCRIPTION DRILLING EQUP.:ELEVATION: MO I S T U R E (% ) SO I L C L A S S . (U S C S ) DR Y D E N S I T Y (p c f ) NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Ave., Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB DRILLING METHOD:DATE DRILLED: SAMPLE METHOD:NOTES: FILL (af) CONTINUED: SILTY SAND; PALE GRAY BROWN AND MEDIUM GRAY, MOIST, MEDIUM DENSE, FINE TO MEDIUM GRAINED, ORANGE STAINING 18 21 16 19 CLAYEY/SILTY SAND; PALE BROWN, MOIST, MEDIUM DENSE, FINE GRAINED, MICACEOUS SLBE 18 21 SC/SM DRILLED BY: GN REVIEWED BY: MS AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 PROJECT: 2021251 APPENDIX: B.13 AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 PROJECT: 2021251 CONTINUED LOG OF BORING B-10 NOVEMBER 21, 2022 ±150½ FT MSL HAMMER: 140 LBS., DROP: 30 IN (AUTOMATIC) HOLLOW STEM AUGER CME 95 ±50 FT MSL ETR~70.6%, N60 ~ 70.660*N~1.18*N 25 30 56 66 BORING TERMINATED AT 51½ FT. PERCHED WATER ENCOUNTERED AT 50 FT. SM DARK ORANGE BROWN AND BROWN SILTY SAND; PALE BROWN WITH YELLOW INCLUSIONS/PRECIPITATE DEPOSITS AND TRACE BROWN LAYERING, MOIST, MEDIUM DENSE, FINE GRAINED, MICACEOUS SM PALE BROWN, ABUNDANT YELLOW MINERAL PRECIPITATE DEPOSITS, INCREASED DRILLING RESISTANCE SANTIAGO FORMATION (Tsa): SILTY SANDSTONE; PALE YELLOWISH BROWN, WET, VERY DENSE, FINE TO MEDIUM GRAINED, ORANGE STAINING, YELLOW MINERAL PRECIPITATE DEPOSITS, WEAKLY CEMENTED, WATER PERCHED ON Tsa AT 50 FT SA SA PERCHED WATER: - -I ~ - - - - -~ - - - - - ----------~--------------------------------------- - - - - - --z - - - - - ---------------------------------------------------- - - - - -z - - - - t_ V - - - - - - - j,a~I ~-- • • • I DE P T H ( F T ) N60 BL O W S P E R F O O T N 5 10 15 20 25 30 0 BU L K S A M P L E SUMMARY OF SUBSURFACE CONDITIONS (USCS; COLOR, MOISTURE, DENSITY, GRAIN SIZE, OTHER) LA B T E S T S CA L / S P T S A M P L E SOIL DESCRIPTION DRILLING EQUP.:ELEVATION:GROUNDWATER DEPTH: MO I S T U R E (% ) SO I L C L A S S . (U S C S ) DR Y D E N S I T Y (p c f ) NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Ave., Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB DRILLING METHOD:DATE DRILLED: SAMPLE METHOD:NOTES: LOG OF BORING B-11 NOVEMBER 21, 2022 ±151 FT MSL HAMMER: 140 LBS., DROP: 30 IN (AUTOMATIC) HOLLOW STEM AUGER CME 95 ±46 FT MSL ETR~70.6%, N60 ~ 70.660*N~1.18*N CLAYEY/SILTY SAND; ORANGE BROWN, MOIST, MEDIUM DENSE, FINE GRAINED SLBE APPENDIX: B.14REVIEWED BY: MS AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 PROJECT: 2021251DRILLED BY: GN FILL (af): SILTY SAND; PALE BROWN WITH ORANGE AND RED STAINING, MOIST, MEDIUM DENSE, FINE GRAINED, MICACEOUS SM OLIVE BROWN SC/SM OLIVE BROWN CLAYEY SAND; OLIVE BROWN, MOIST, MEDIUM DENSE, FINE GRAINED, <5% GRAVELSC SILTY/CLAYEY SAND; OLIVE BROWN, MOIST, MEDIUM DENSE, FINE GRAINED, <5% GRAVELSM/SC MINOR ORANGE STAINING CLAYEY SAND; DARK GRAYISH BROWN, MOIST, MEDIUM DENSE, FINE GRAINED, ORGANIC SCENT SC SA CR SA I ' ------------------~------------------------------------- ----------------------------------------------------- ---------------~-------------------------------------.,_ __ --------------------------------------------------------X DE P T H ( F T ) N60 BL O W S P E R F O O T N 35 40 45 50 55 60 30 BU L K S A M P L E SUMMARY OF SUBSURFACE CONDITIONS (USCS; COLOR, MOISTURE, DENSITY, GRAIN SIZE, OTHER) LA B T E S T S CA L / S P T S A M P L E SOIL DESCRIPTION DRILLING EQUP.:ELEVATION:GROUNDWATER DEPTH: MO I S T U R E (% ) SO I L C L A S S . (U S C S ) DR Y D E N S I T Y (p c f ) NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Ave., Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB DRILLING METHOD:DATE DRILLED: SAMPLE METHOD:NOTES: FILL (af) CONTINUED: CLAYEY SAND; DARK GRAYISH BROWN, MOIST, MEDIUM DENSE, FINE GRAINED, ORGANIC SCENTSC 9 11 SLBE REVIEWED BY: MS AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 PROJECT: 2021251 APPENDIX: B.15 AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 CONTINUED LOG OF BORING B-11 NOVEMBER 21, 2022 ±151 FT MSL HAMMER: 140 LBS., DROP: 30 IN (AUTOMATIC) HOLLOW STEM AUGER CME 95 ±46 FT MSL ETR~70.6%, N60 ~ 70.660*N~1.18*N DRILLED BY: GN 35 41 27 32 OLIVE GRAYISH BROWN CONCRETE DEBRIS, INCREASED DRILLING RESISTANCE, AUGER CHATTER FOR 3 FT WET, GRAVEL / ROCK FRAGMENTS MEDIUM GRAY, DARK GRAY, AND OLIVE BROWN, WET, DENSE, FINE TO MEDIUM GRAINED, RED STAINING AND PRECIPITATE DEPOSITS, <5% GRAVEL FINE GRAINED SA SA SA - -I - - -' -- - - - - - - - - - - "'I" -z - - -~ - - - - -~ - - - - j,a~I ~-- • • • I DE P T H ( F T ) N60 BL O W S P E R F O O T N 65 70 75 80 85 90 60 BU L K S A M P L E SUMMARY OF SUBSURFACE CONDITIONS (USCS; COLOR, MOISTURE, DENSITY, GRAIN SIZE, OTHER) LA B T E S T S CA L / S P T S A M P L E SOIL DESCRIPTION DRILLING EQUP.:ELEVATION:GROUNDWATER DEPTH: MO I S T U R E (% ) SO I L C L A S S . (U S C S ) DR Y D E N S I T Y (p c f ) NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Ave., Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB DRILLING METHOD:DATE DRILLED: SAMPLE METHOD:NOTES: FILL (af) CONTINUED: CLAYEY SAND; PALE BROWN, WET, DENSE, FINE TO MEDIUM GRAINED, ORANGE STAINING, RED AND ORANGE MINERAL PRECIPITATE DEPOSITS SC 27 32 17 20 SANDY CLAY; OLIVE, ORANGE, AND LIGHT GRAY BROWN, WET, STIFF TO VERY STIFF, FINE GRAINED SAND, TRACE BLACK AND RED MINERAL PRECIPITATE DEPOSITS, PP = 1.75 tsf SLBE 33 39 CL APPENDIX: B.16REVIEWED BY: MS AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 PROJECT: 2021251 AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 CONTINUED LOG OF BORING B-11 NOVEMBER 21, 2022 ±151 FT MSL HAMMER: 140 LBS., DROP: 30 IN (AUTOMATIC) HOLLOW STEM AUGER CME 95 ±46 FT MSL ETR~70.6%, N60 ~ 70.660*N~1.18*N BORING TERMINATED AT 81½ FT. GROUNDWATER ENCOUNTERED AT 46 FT. DRILLED BY: GN 48 57 93/11"109/11" SANTIAGO FORMATION (Tsa): CLAYSTONE; LIGHT GREENISH GRAY, WET, VERY STIFF TO HARD, ABUNDANT WHITE MINERAL PRECIPITATE DEPOSITS, PP = 3.5-3.75 tsf INCREASED DRILLING RESISTANCE CLAYEY SILTSTONE, LIGHT GREENISH GRAY, WET, VERY DENSE, FINE TO MEDIUM GRAINED, MICACEOUS, MODERATELY CEMENTED OLIVE BROWN, FINE GRAINED, ABUNDANT WHITE MINERAL PRECIPITATE DEPOSITS, ORANGE STAINING, STRONGLY CEMENTED SA --= -17 ---------------~---------------------------------------- ,__ --= -7---------------------------------------------------------- -17 • • DE P T H ( F T ) N60 BL O W S P E R F O O T N 5 10 15 20 25 30 0 BU L K S A M P L E SUMMARY OF SUBSURFACE CONDITIONS (USCS; COLOR, MOISTURE, DENSITY, GRAIN SIZE, OTHER) LA B T E S T S CA L / S P T S A M P L E SOIL DESCRIPTION DRILLING EQUP.:ELEVATION:GROUNDWATER DEPTH: MO I S T U R E (% ) SO I L C L A S S . (U S C S ) DR Y D E N S I T Y (p c f ) NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Ave., Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB DRILLING METHOD:DATE DRILLED: SAMPLE METHOD:NOTES: LOG OF HAND AUGER BORING HA-1 NOVEMBER 21, 2022 ±158½ FT MSL HAND AUGER HAND AUGER HAND AUGER NOT ENCOUNTERED FILL (af): SILTY SAND; LIGHT GRAY BROWN, MOIST, DENSE TO VERY DENSE, FINE TO MEDIUM GRAINED N/A SLBE BORING TERMINATED AT 6 FT. NO GROUNDWATER ENCOUNTERED. APPENDIX: B.17REVIEWED BY: MS AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 PROJECT: 2021251DRILLED BY: GN SA MD SM -~ - J - - -' - - - - - - - - - - - - - - - - - - - - - - - j,a~I ~-- • • • I DE P T H ( F T ) N60 BL O W S P E R F O O T N 5 10 15 20 25 30 0 BU L K S A M P L E SUMMARY OF SUBSURFACE CONDITIONS (USCS; COLOR, MOISTURE, DENSITY, GRAIN SIZE, OTHER) LA B T E S T S CA L / S P T S A M P L E SOIL DESCRIPTION DRILLING EQUP.:ELEVATION:GROUNDWATER DEPTH: MO I S T U R E (% ) SO I L C L A S S . (U S C S ) DR Y D E N S I T Y (p c f ) NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Ave., Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB DRILLING METHOD:DATE DRILLED: SAMPLE METHOD:NOTES: LOG OF PERCOLATION BORING P-1 NOVEMBER 23, 2021 ±145 FT MSL HAMMER: 140 LBS., DROP: 30 IN (AUTOMATIC) HOLLOW STEM AUGER SABER CAT MTXD NOT ENCOUNTERED FILL (af): SILTY SAND; LIGHT GRAY BROWN, MOIST, MEDIUM DENSE, FINE TO MEDIUM GRAINED, ORANGE AND GRAY MOTTLING SM 6 INCHES OF TOPSOIL ETR~95.9%, N60 ~ 95.960*N~1.60*N BORING TERMINATED AT 5 FT AND CONVERTED TO A PERCOLATION TEST WELL. NO GROUNDWATER ENCOUNTERED. SLBE APPENDIX: B.18DRILLED BY: AR REVIEWED BY: MS AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 PROJECT: 2021251 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - j,a~I ~-- • • • I DE P T H ( F T ) N60 BL O W S P E R F O O T N 5 10 15 20 25 30 0 BU L K S A M P L E SUMMARY OF SUBSURFACE CONDITIONS (USCS; COLOR, MOISTURE, DENSITY, GRAIN SIZE, OTHER) LA B T E S T S CA L / S P T S A M P L E SOIL DESCRIPTION DRILLING EQUP.:ELEVATION:GROUNDWATER DEPTH: MO I S T U R E (% ) SO I L C L A S S . (U S C S ) DR Y D E N S I T Y (p c f ) NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Ave., Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB DRILLING METHOD:DATE DRILLED: SAMPLE METHOD:NOTES: LOG OF PERCOLATION BORING P-2 NOVEMBER 23, 2021 ±145 FT MSL HAMMER: 140 LBS., DROP: 30 IN (AUTOMATIC) HOLLOW STEM AUGER SABER CAT MTXD NOT ENCOUNTERED FILL (af): SILTY SAND; LIGHT GRAY BROWN, MOIST, MEDIUM DENSE, FINE TO MEDIUM GRAINED, ORANGE AND GRAY MOTTLING SM 6 INCHES OF TOPSOIL ETR~95.9%, N60 ~ 95.960*N~1.60*N BORING TERMINATED AT 5 FT AND CONVERTED TO A PERCOLATION TEST WELL. NO GROUNDWATER ENCOUNTERED. SLBE APPENDIX: B.19REVIEWED BY: MS AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 PROJECT: 2021251DRILLED BY: AR - - - - - - - - - - - - - - - - - - - - - - - - - - - - - j,a~I ~-- • • • I DE P T H ( F T ) N60 BL O W S P E R F O O T N 5 10 15 20 25 30 0 BU L K S A M P L E SUMMARY OF SUBSURFACE CONDITIONS (USCS; COLOR, MOISTURE, DENSITY, GRAIN SIZE, OTHER) LA B T E S T S CA L / S P T S A M P L E SOIL DESCRIPTION DRILLING EQUP.:ELEVATION:GROUNDWATER DEPTH: MO I S T U R E (% ) SO I L C L A S S . (U S C S ) DR Y D E N S I T Y (p c f ) NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Ave., Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB DRILLING METHOD:DATE DRILLED: SAMPLE METHOD:NOTES: LOG OF PERCOLATION BORING P-3 NOVEMBER 23, 2021 ±151 FT MSL HAMMER: 140 LBS., DROP: 30 IN (AUTOMATIC) HOLLOW STEM AUGER SABER CAT MTXD NOT ENCOUNTERED FILL (af): SILTY SAND; LIGHT BROWN, MOIST, MEDIUM DENSE, FINE TO MEDIUM GRAINED, SCATTERED ROOTLETS, ORANGE AND GRAY MOTTLING SM 6 INCHES OF TOPSOIL ETR~95.9%, N60 ~ 95.960*N~1.60*N BORING TERMINATED AT 5 FT AND CONVERTED TO A PERCOLATION TEST WELL. NO GROUNDWATER ENCOUNTERED. SLBE APPENDIX: B.20REVIEWED BY: MS AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 PROJECT: 2021251DRILLED BY: AR - - -J - -' - - - - - - - - - - - - - - - - - - - - - - - - j,a~I ~-- • • • I DE P T H ( F T ) N60 BL O W S P E R F O O T N 5 10 15 20 25 30 0 BU L K S A M P L E SUMMARY OF SUBSURFACE CONDITIONS (USCS; COLOR, MOISTURE, DENSITY, GRAIN SIZE, OTHER) LA B T E S T S CA L / S P T S A M P L E SOIL DESCRIPTION DRILLING EQUP.:ELEVATION:GROUNDWATER DEPTH: MO I S T U R E (% ) SO I L C L A S S . (U S C S ) DR Y D E N S I T Y (p c f ) NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Ave., Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB DRILLING METHOD:DATE DRILLED: SAMPLE METHOD:NOTES: LOG OF PERCOLATION BORING P-4 NOVEMBER 23, 2021 ±151 FT MSL HAMMER: 140 LBS., DROP: 30 IN (AUTOMATIC) HOLLOW STEM AUGER SABER CAT MTXD NOT ENCOUNTERED FILL (af): SILTY SAND; LIGHT BROWN, MOIST, MEDIUM DENSE, FINE TO MEDIUM GRAINED, TRACE GRAVEL, ORANGE MOTTLING SM 6 INCHES OF TOPSOIL ETR~95.9%, N60 ~ 95.960*N~1.60*N BORING TERMINATED AT 5 FT AND CONVERTED TO A PERCOLATION TEST WELL. NO GROUNDWATER ENCOUNTERED. SLBE LIGHT GRAY BROWN APPENDIX: B.21REVIEWED BY: MS AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 PROJECT: 2021251DRILLED BY: AR - - -J - -' - - - - - - - - - - - - - - - - - - - - - - - - j,a~I ~-- • • • I Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 APPENDIX C GEOTECHNICAL LABORATORY TESTING Laboratory tests were performed in accordance with the generally accepted American Society for Testing and Materials (ASTM) test methods or suggested procedures. Brief descriptions of the tests performed are presented below: LAB TEST SUMMARY ·CLASSIFICATION: Field classifications were verified in the laboratory by visual examination. The final soil classifications are in accordance with the Unified Soils Classification System and are presented on the exploration logs in Appendix B. ·IN-PLACE MOISTURE AND DENSITY OF SOIL (ASTM D3550): In-place moisture contents and dry densities were determined for representative soil samples. This information was an aid to classification and permitted recognition of variations in material consistency with depth. The dry unit weight is determined in pounds per cubic foot, and the in-place moisture content is determined as a percentage of the soil's dry weight. The results are summarized in the exploration logs presented in Appendix B. ·GRADATION ANALYSIS (ASTM D6913): Gradation analyses were performed on representative soil samples in general accordance with ASTM D422. The grain size distributions of the samples were determined in accordance with ASTM D6913. ·ATTERBERG LIMITS (ASTM D4318): Tests were performed on selected representative fine-grained soil samples to evaluate the liquid limits, plastic limits, and plasticity indexes in general accordance with ASTM D4318. These test results were utilized to evaluate the soil classification in accordance with the Unified Soil Classification System. ·MAXIMUM DENSITY AND OPTIMUM MOISTURE CONTENT (ASTM D1557 METHOD A,B,C): The maximum dry density and optimum moisture content of typical soils was determined in the laboratory in accordance with ASTM Standard Test D1557, Method A, Method B, Method C. ·EXPANSION INDEX (ASTM D4829): The expansion indexes of selected materials was evaluated in general accordance with ASTM D4829. Specimens were molded under a specified compactive energy at approximately 50 percent saturation (plus or minus 1 percent). The prepared 1-inch thick by 4-inch diameter specimens were loaded with a surcharge of 144 pounds per square foot and were inundated with tap water. Readings of volumetric swell were made for a period of 24 hours. ·R-VALUE (CT 301 and ASTM D 2844): The resistance Value, or R-Value, for near-surface site soils was evaluated in general accordance with California Test (CT) 301 and ASTM D 2844. Samples were prepared and evaluated for exudation pressure and expansion pressure. The equilibrium R-value is reported as the lesser or more conservative of the two calculated results. ·CORROSIVITY TEST (CAL. TEST METHOD 417, 422, 643): Soil pH and minimum resistivity tests were performed on representative soil samples in general accordance with test method CT 643. The sulfate and chloride contents of the selected samples were evaluated in general accordance with CT 417 and CT 422, respectively. ·DIRECT SHEAR (ASTM D3080): A direct shear test was performed on a remolded and relatively undisturbed sample in general accordance with ASTM D3080 to evaluate the shear strength characteristics of the selected material. The sample was inundated during shearing to represent adverse field conditions. Soil samples not tested are now stored in our laboratory for future reference and evaluation, if needed. Unless notified to the contrary, samples will be disposed of 90 days from the date of this report. APPENDIX: C.14373 Viewridge Avenue, Suite BSan Diego, CA 92123P: 858.292.7575 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION www.usa-nova.com SBEDVBE SDVOSB BY: GN SLBE AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 PROJECT: 2021251REVIEWED BY: MS A4~1 ~--. . • Gravel CLASSIFICATION TEST RESULTS Sand Coarse FineMediumCoarseFine Silt or Clay Sample Location: Depth (ft): USCS Soil Type: Passing No. 200 (%): B-4 ½ - 5 SC 30 APPENDIX: C.2 NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Avenue, Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB Atterberg Limits (ASTM D4318): Liquid Limit, LL: Plastic Limit, PL: Plasticity Index, PI: SLBE PROJECT: 2021251 29 18 11 REVIEWED BY: MSBY: GN AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 C) C: 'in 1/) ~ a. 'E Cl) 0 ... Cl) a. ~ Size (Inches) ~+~----U.S. Standard Sieve Sizes Hydrometer Analysis 0 0 "<I" ~ ~ ~ g O ~ ~ ci ci ci ci ci ci 100.0 ,,,,-,---,,----,-,-------,.-1--,-,,,--,--■-f-,-----.....,.aa~~ ..... =-=-. ._:a.z-,--,-,.,,-,2---,---y,.-----2-r--~~";-~~2;~--~----~-------- T ---~ : ,: 90. 0 -tt-t-t-+-t--+---t--t'---/-H-+-j---t'--+--+---'---+----'--+-1-4-+-+~1H-\--+-+---'------<-++!..l---+-+-+---l---l------l--l-l-l---l-+--I--I------L---:, I \ 80.0 tttt+-t--+---t-+--t++-n---tt--+--+-+-+--4-l-l+-+-++- 1 1!-411't~+--+----+++l-l--+---l---l---l--l------+--l-1-l---l---+-+-+----+-- 1 \ : \ 70. 0 -tt--t--t-+-t--t-t----t,-1,---++++-+--h-1 ,-+--+-r-+,----,-,-++..+--+,-+-+--.,+--+-+,+--,,.-------+I---M--1--+-+-+---+---+l--l---l---l--+--1----+------<L--_j : \ I 60. 0 -tt-t-t-+-t-i-\----t'----++++-+--f'--j-+--'-+---'--++4--+-l-+-':l----!----ll\~---+1-i-l-l--l---l----1--1------1----+l--l---l---l--l--L-_J__J __ _j I \ I I '.!. 50. 0 ++t-+-+-+-+-+-tt---+f--H-+--+H-f----t-+---+-Htl-+-t---l--t+-+----+---IJ------++-+t+---l----1---1------t----+------+-l-l--l---l---+--l-+----+--____j I 7\ I I \ 40. 0 -tt-t-t-+-t1-+-1--+.---+++++-h--l-+--.--+-----.--++..+--+-+-+--..:1-+---+----;-'.\+-l-+.-1--l---l----l--l------l----+l-l-l---l--l--L--l-_J __ _j I I I ' \ 30. 0 -tt-t-t-+-tt-i-l----t'--1---+++++-+-'-1--+--+-1'-+----'-1-++1+--+'-1-+-1:1--1---+--1'_--+1-l:--L...L-+---l---l---j__j_jl--l---l.......l---l-__J__J_ _ __J I I I 20. 0 -tt--t--t-+-t--+---+---tt---/-H-+-j--Jt-+--+-+-t---t-++t+-+-+-+-t+-+---+---1--+++t+-+-+----l-\--+---l-l---l-l--1---l----l-----l---l----- I I I 10. 0 -tt-+-t-+-t-i-!--+.---++++-+-+;---,\-+--;....+-----;--+++-+-+-+..-;:1----1-------1-___;~--+1-+.-l-+-l----l--l------l----+l--l---l---l--l--l---_J__JL-_ _j I I I 0. 0 -t-'--'---'--_L_L___.l_L__-1J.1. __ -t-1-..L.L-'-ill I_J__J__L..J_, _ __j_,--+1.lL.l'_J_J.......J'L__J____j___J'~--+J__JJ..L_ 'L..l__j___j_ _ __j_ __ .µ_LLl.......l---l-__l _ _L _ __J 100 10 0.1 0.01 0.001 Grain Size (mm) Gravel CLASSIFICATION TEST RESULTS Sand Coarse FineMediumCoarseFine Silt or Clay Sample Location: Depth (ft): USCS Soil Type: Passing No. 200 (%): APPENDIX: C.3 NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Avenue, Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB SLBE B-6 ½ - 5 SC 41 Atterberg Limits (ASTM D4318): Liquid Limit, LL: Plastic Limit, PL: Plasticity Index, PI: 30 14 16 PROJECT: 2021251REVIEWED BY: MSBY: GN AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 C') C: ·;; u, cu ll. 'E Q) (.) ... Q) ll. ~ Size (Inches) ~-<----U.S. Standard Sieve Sizes ----:-➔~<----Hydrometer Analysis 0 ~ ~ ~ ~ g ~ ~ ~ ci ci ci ci 100.0 m---,--r---,--,----,------,.-,----,-.--.-.--.---il.,h--.......,...... .. ._ ......... --,!-_,,_~"r-r-=;2;:.....,-~, __::;:2c___-,------::;:__~2;~-------------- ..... , I \ 90. 0 tt-1-+-t-++-+-----t:---1++++---¥.--+-+----'-+----'---++'+---l-+-+--'+l\.~_+-...!__-+1-+.!..J---l-l---l----l--l-----l-l--1--l--l--l----l----l------l--__J \ I~ \ 80. 0 i-HH-i-t---t---t-----tf---H-++-t---tl-+--+--1-1--+-+-l-l+-H-+-l+-t---'\,-----+-1--+++H-1--+--l---+----l-------+-l--l--l---l---l---L__Je-----l------l \ 70. 0 i-H---t-i-t---t---t-----+r11--H-+++-+,.--+--+--.-,-1----.-, +hi ,+-+-1-+--.-1, -1--'+~~, -+++.-1-!-,-+-+-+----l-------+-l--l--l-l-__)____I__J_--l-_----i \ 60. 0 tti-+-t-++-+----t'-------ji++++--fL--+--+----'-+---'---++1Hl-+-+--4-----l--+-\•,L' -+++!..J--+--l--t--t----l-------l--l--l--1-l-.l-J__J_--l-----l '\ \ 50. 0 -t-H---t-i-t---t---t---tt------,H-+-H---tl-+--+-t-1---l-++IMH-+-l+-t---l----1-.\-\.+++H-1---l--+-+----l-----l--1-1--1-l-__)____I__J _ _j___----l \ \ 40. 0 -t-H-+-t-t-+--t---+.-------,H-+-H--+.-+--!----.-1--.--++;+-j-+-+---;.J--1---l---_;__---l--+--11~~--l-+-+-----l-------l--l--l--1-l-.l-J--l _ _j__ _ _J 30. 0 -t-H--t-t-t---t--t----t'-'------,H-+-H---f'~-t--'-'-+---'--1 -++'-'f-+-Jf-+--41 -+--I---'-' -+++'4-+-+-+-+----l------l--l--l-l--l--.l-J-----l---l------1 20. 0 i-HH-i-+--+-+---+t--H-+++--ll-+--+-t-l---1-t-+t+-l-l-+-l+-t---l----1----l-l---l+l---l-l---l----l--l-----l-l-..)_j__j___j_---l----l------l--__J 10. 0 tt-1-+-t-++-+--+.---1+++++.-+--~+--...;..-++;+-1-+-~---J.-+-...;---+1-+.-1---l-l---l-----t--l-----l-l--1--l--l--l----l----l------l--__J 0. 0 -t-'--'~---'-~~----"-1 '--1-'-'-...L....L--'-'I---L----'--''_,_ _ _._1 +ul 'L.L_I---L-...U' __, _ _j___._, -.f--L-LU-L'_[_..1__..1___J__---J._j_[_L.L__L_JL__J _ _L__----I 100 10 0.1 0.01 0.001 Grain Size (mm) CLASSIFICATION TEST RESULTS Gravel Sand Coarse FineMediumCoarseFine Silt or Clay NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Avenue, Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB SLBE Sample Location: Depth (ft): USCS Soil Type: Passing No. 200 (%): SM 26 B-10 APPENDIX: C.4 ½ - 4½ PROJECT: 2021251REVIEWED BY: MSBY: GN AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 <E------Size (Inches) ~ <: ' ~ Hydrometer Analysis ' U.S. Standard Sieve Sizes ., " ., 0 0 ~ 0 0 0 ~ 0 ~ '1: ~ ~ -st N -st (0 N ~ ~ "' ~"' 0 0 0 0 0 0 0 100.0 -z z z z z z z -,. r,-I -.... It I I I I I ll I I I I I ]\; I 90.0 I I I I I I I I I I I I ,\ I I I I I ' I I I I I a I 80.0 I I I I \ I I I I I \ I I I I I I Cl 70.0 I I I I I I C: \ "iii I I I I I V, I I I I I <a I I I I ~ I ll.. 60.0 I 1, I I I I I I ... I I I I \ I C: I I I I I Q) I I I I \ I (J ... I I I I \I I Q) 50.0 ll.. I I I I "( I I I I I \ I I I I I I 40.0 I I I I \ I ;i II I I I I I \ I I I I I I I I I I I I I I I I 30.0 I I I I I I I I I I I I I I I I I I 20.0 I I I I I I I I I I I I I I I 10.0 I I I I I I I I I I I I I I I I I I I I I I I I I 0.0 100 10 1 0.1 0.01 0.001 Grain Size (mm) I I I I I I I j,a~I ~--. . . CLASSIFICATION TEST RESULTS Gravel Sand Coarse FineMediumCoarseFine Silt or Clay NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Avenue, Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB SLBE Sample Location: Depth (ft): USCS Soil Type: Passing No. 200 (%): SC 31 B-10 APPENDIX: C.5 5 - 6½ PROJECT: 2021251REVIEWED BY: MSBY: GN AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 ~ Size (Inches) '/ U.S. Standard Sieve Sizes ' / Hydrometer Analysis ' , ' , ' , 0 0 ~ iii ~ 00 0 0 0 0 0 0 ,,. -N ,,. <D -N --<'I 0 .!j .!j 0 0 .!j 0 100 ------.. ~ ~,... -..... I 11 I I I I •, I I I I I 90 I I I I I I I I I I I " I I I I \ I I I I 80 I I I I I I I I I \ I I I I Cl 70 I I I I \ C: \ 'iii I I I I VJ I I I I \ 111 I I I I CL 60 I 1, I I 1, I I 1, ... I I I I \ C: I I I I Q) \ ~ I I I I I I I I \' Q) 50 CL I I I I • I I I I ,, I I I I : \ 40 I I I I 11 I I 11 I I ' 11 I I I I I I I I I I II I I I I I 30 ii I I I I I I I I I I I I I I I I I I I I 20 I I I I I I I I I I I I I I I 10 I I I I I I I I I I I I I I I I I I I I I I I I I 0 100 10 1 0.1 0.01 0.001 Grain Size (mm) I I I I I I I j,a~I ~--. . . CLASSIFICATION TEST RESULTS Gravel Sand Coarse FineMediumCoarseFine Silt or Clay NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Avenue, Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB SLBE Sample Location: Depth (ft): USCS Soil Type: Passing No. 200 (%): SC/SM 36 APPENDIX: C.6PROJECT: 2021251REVIEWED BY: MS B-10 35 - 36½ BY: GN AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 ~ Size (Inches) , ' / Hydrometer Analysis ' ,,, ' U.S. Standard Sieve Sizes ,,,...._ ,,, 0 0 "' ;:li S! (X) ~ 0 0 0 ~ 0 --?; " N " (0 N --0 si si 9 0 si 0 100 --·t I --;-I I I I It 1~• I I I I I I-.J1r--90 I I I I I I I I I 't I I I I I \ I I I I I \ I I I I I 80 . I I I I I I I I I I I I I I I \ Cl 70 I I I I I \ C: II 'I II rn I I I I I • rn I I I I I '\ ra I I I I I I \ a.. 60 .. I I I I I I \ C: I I I I I I Cl) (.) I I I I I I \ ... I I I I I I ' Cl) 50 a.. I I I I I I ~ I I I I I I I I I I I I 40 I I I I I I I II I I II I I II I I I I I I I I I I I I I I I I I I 30 I, ' ' I, ' ' I, I I I I I I I I I I I I I I I I I I I I I I I I 20 I I I I I I I I I I I I I I I I I I 10 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 0 100 10 1 0.1 0.01 0.001 Grain Size (mm) I I I I I I I j,a~I ~--. . . CLASSIFICATION TEST RESULTS Gravel Sand Coarse FineMediumCoarseFine Silt or Clay NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Avenue, Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB SLBE Sample Location: Depth (ft): USCS Soil Type: Passing No. 200 (%): SM 39 APPENDIX: C.7PROJECT: 2021251REVIEWED BY: MS B-10 45 - 46½ BY: GN AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 ~ Size (Inches) '/ ' / Hydrometer Analysis ' / .... U.S. Standard Sieve Sizes / ...._ / 0 0 "' ;:r; S! (X) ~ 0 0 0 ~ 0 --?; " N " (0 N ---,g_ si si 9 0 si 0 100 ~ --,.. --,. I 1, .. ~ I I I I I I I I I I I ',11. I I 90 I I I I I I I I I I ' I I I I I I ' I I I I I I ,, I I I I I ,I I 80 I I I I ' I I I I I I I I I I I \ I Cl 70 I I I I I I I C: 11 I I rn I I I I I \ I rn I I I I I \ I ra I I I I I I D.. 60 I .. I I I I I I C: I I I I I I Cl) (.) I I I I I I I ... I I I I I I Cl) 50 D.. I I I I I I' I I I I I I I I I I I I 40 I I I I I II I I I I I I I I I I I I I I I I I I I I 30 I, ' ' ' ' ' ' I I I I I I I I I I I I I I I I I I I I 20 I I I I I I I I I I I I I I I 10 I I I I I I I I I I I I I I I I I I I I I I I I I 0 100 10 1 0.1 0.01 0.001 Grain Size (mm) I I I I I I I j,a~I ~--. . . Gravel CLASSIFICATION TEST RESULTS Sand Coarse FineMediumCoarseFine Silt or Clay Sample Location: Depth (ft): USCS Soil Type: Passing No. 200 (%): APPENDIX: C.8 NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Avenue, Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB SLBE PROJECT: 2021251REVIEWED BY: MS SM 23 B-11 0 - 5 BY: GN AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 ~ Size (Inches) ----,)~(,-----U.S. Standard Sieve Sizes L() "SI" 0 N 0 0 0 (0 N Hydrometer Analysis / ~ o o o o o 100.0 m-,--,----,--,---,---77,,----m--,--,----....-..aar-=-:Z.---____:;Z;:.-,,.,-,-:Z:;.......,-,,--...:;Z=---,----::;:----,-,z~~~~~--------~ .. -~ --... ~ : ~~ : 90 .0 tti-+-t-+-+-t----t:----t-11+++-+'--+--+--'---+----'--H.!J-++~11--1'-----+-_!___-++-+4--t--1----J---l----l-----l-l-l-+-+--l----l-----l---l---~ ~ 80 .0 ++++++-+-+---t1-----t-t-H-+--1-i-+-+-+-+-+-+1-t+-++-+-t+---4-\---+--+---++l-l-l---l--+----+----+-----+-----1-1--1-1--l---l---l-+----1--\ it ~ 70 .0 +rt-H--l-+--t----tT.--+++++--+1.-+--+-~1--l---1.---l-+1..+---I--1 -l-+-~1e-------l-'-\-----l---i..;_-++-hT-1---l--l----l-----l---l---_j_j_..)_j_.L-)__J__j__J_ _ __J i \ ~ \ c 60 .0 +rt-H--l-+--t-----t'----+-l+++--f!L+---!---'--+--'-l-+'+-+++-'-e-------!'-----,+-_!___-++-1-1.J.--l--+---l---l----l-----l-l-l-j_j__j___J_----l.._L-__J Cl) 0 I.. Cl) a. \ 50 .0 +++t-+-t-+-+----+t--+++t-+-tt-+-+-+--+----+-++t+-+-+-+---H-+-----J-.:,.-\ 1----1--1--l+l---l--l----l---l----l---.j_j_j_i---l--1----i---l----l--__J \, ., 40 .0 +r+++-+-+--t---+.----+-!+++--h.+---+--.--+-~1-+.+-+++..-;jf-----l--l---_;.._\...----1--J-.J..;-1---l--l----l-----l---l---___j_j_.J_l_j___j__j__j__j_ _ __j \ ' 30 .0 +r+++-+-+--t----JJ1L__-+++++--JJ1L4---+--'-1 +-__J'L++J.J-+1 +-+--'j'e-------!--l---_l__ '---l\-l-_µ'-l---l--1----1-----l---l---___j_j_.J_l_j___j__j__j__j_ _ __j ' ~ 20 .0 +r+-+-+-+-+-+----+t----t-11+++-+t-+--+--+-+--+-~+++-+e-------lf---+-+---++-l+l--+-+---l---l----l-----l-l-l--l--+--l----l-----l---l--- I I I 10.0 +r+-+-+-+-+--+---+.-----t-11+++-+a--+---+-~-~~++~f----l-+-_:__-++-i-;:-1---l--l----l-----l---l---_j_j_..)_j_-l--1-_J__j__j_ _ __j I I I 0.0 +'-'~--'----'-----.L__-'-L__1 -+-'-1-_L_L-'-'L....L----'----'-' J..__,L+-11.IL.L 1 -'--1..J1L__J _ _j___l__ '--+1-...U'J.......L__j__j___j_ _ _L__ _ __j_L_j__L_L....L_l___L___[_ _ __J 100 10 0.1 0.01 0.001 Grain Size (mm) Gravel CLASSIFICATION TEST RESULTS Sand Coarse FineMediumCoarseFine Silt or Clay Sample Location: Depth (ft): USCS Soil Type: Passing No. 200 (%): APPENDIX: C.9 NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Avenue, Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB SLBE PROJECT: 2021251REVIEWED BY: MS SC 39 B-11 28 - 35 BY: GN AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 ~ Size (Inches) ----;)H(::-----U.S. Standard Sieve Sizes ----~::::.~'-----Hydrometer Analysis .... V ~ ~ ~ ~ ~ ci ~ ci ci ci ci 100.0 TTT-,-,----,---,----,----,1,---1 -m--,-,---i'~i'-,----,--a~..,....._____,,-!.-r-r,.,-..__.:z:::;..-,-,1,------:;2;.----,---::;:---,--,-_:;::;2;~~~-~--------~ n. ' ]\ 90. 0 tt-1-t-t-+-+-+----t:---+f-+++-f:-+--+--'---l---'-++.!J-+++-1+--v, f--+-_.!.__-++-+4--1----1---l---l----l--__jl-l-l--l---+---l----l-----+--1------I I~ \ 80. 0 +H-t-t-+-+-+----J¼---+f-+++-ft-+--+-+-f---+-++tl-+++-t~f--\-', +-+--++-+t+--1----1---l---l----l--__jl-l-l--l---+---l----l-----+--1------I \ ' g> 70. 0 +H-t-t-+-+--t--tfl..--+++--H--t1..-+-,--+-~,-1--.---1-1,....1--+ ,+-+~,1------11---1\-~" -l--l--l-.,.cl-+--1--1-1---l---_)_J__j_j__j___(_--I-_J__J_ _ __j ~ \ ~ \, a. 60. 0 +H-t-t-+-+--t----fL----+-ll-++-+-tL+---+---'---+----'-+-+-4-+++-11------1L__+----i;__--l--l---l-4---l---+--l---1----l----l_j_j_.J___j__j___J__J__L___j c \ ~ \ t \ a. 50. 0 +H-t-t-+-+--t---+t----+-ll-++-+-tt-+---+--+-+--+-++tl-+++-fl------1f----+---+--..L,i-l--l-lf+--+---l--11-1--1---_j_J__j_j_J.......L--I-_J__J_ _ __j 11 40. o ++-t-++-+-+---+--+.----+-1--+++-+.--+---+---.---+-~++.+-+++...;.1------1_+-_;__--l--l-l '-1,;,J....+---1--1-----+--1---_j_j_-W-J.......L--L-+-_j_ _ __j 30. 0 ++-t-t-t-+-+---1--tl..__ '-+++++-+IL--+--1 --+--'-'-+--'L+-+.IJ-+ '++-'-'l------1L__--+--_L' -1--1--1.l'f+--+.---l--i-----+--1---_j_j__j_j_J.......L_J__J__j_ _ __j 20. 0 +H-t-t-+-+--t--tt----+-H-+-+-tt-+-+--+-+---+-++tl-+++-f+----,f--+--+---++~-l---+--l---1----l--------1_j_j_-l---+---l----l__J_ _ _(____j 10. 0 +H-t-t-+-+-+---+.-----+-H-+-+-t.--+---+---c-+----c-++.+-++~l------11--+-...:__-++--R---l----l---l---l-----l--------1_j_j_-l---+---l----l__J_ _ _(____j 0. 0 +'-'~_L_..L__-'-----'I..__ '--t-1--'-_l___L---'IL...L '----'----'-'__J__-L-+1'JL.L I__J___L_JIL__JL___j__..J._1 -J--1--.l-ll 'LL.L_L_L__.l _ _j__ _ _j_l_..L.LJ.......L--l-_[_____l_ _ __j 100 10 0.1 0.01 0.001 Grain Size (mm) CLASSIFICATION TEST RESULTS Gravel Sand Coarse FineMediumCoarseFine Silt or Clay NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Avenue, Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB SLBE Sample Location: Depth (ft): USCS Soil Type: Passing No. 200 (%): APPENDIX: C.10PROJECT: 2021251REVIEWED BY: MS SC 30 B-11 50 - 51½ BY: GN AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 Cl C "' "' Ill Cl. .. C Q) ~ Q) Cl. <E------Size (Inches) U.S. Standard Sieve Sizes Hydrometer Analysis / 0 g 100 TIT7rr•~~-·.,_-◄-H~--~~-~--nrrr,-~~o---,--,-=~o--.--~~~~· rnrr~~o--,--,,-g~o'---,--~~:r----.-~N~on,r,-r-.---r----.TT-.--r.--r-.-----.-----, -I .......... 1-► . I I I I I I I • t--I I : I 90 -H-+-l-+-+--+--+-+11 1 ---+-+-t-+---t'-1+-t~:+-'~"--'.l.l-':t-+-t---t--'1t--+--t-~11 1-'-++-r4--1-t-t-l--t---t++-+-H-t-t--t------t I I I ~ I I I I I 11\ I I I I I I I 1~11 I I 80 -H-+-l-+-+--+--+---tt-1---+-+-t-+--,+1+-t---¼1+----¼11-+1'1t-++\'t-'1t--+--t---<11---+ttff-l-t-t-l--t---t++-+-H-t-t--t------t I I I I I 1\1 I I I I I I 1 I : : : : : : \ : 70 -H+-+-+-+-+--+--1lr--,--t+++-1r+,-+-t---.--+-----.--++1.t-+ ,-+-+.ct-,,-+--f-~----+++1.+-,-+-+-t---+----+++-+--+-+-+--+--f------t : : : : : : I~ I I I I I I \ 60 -t-t+-1-+++-+---t'-1 ---++H--t'-1+-t--'1+---'1+f.11t++-t--'1t-++t---'1--tt-t'4--l-t-tr-r--t---t+++-H-t-l--t------t I I I I I I \ I I I I I I I \ I 50 -H+-11-+-+--+--+---tt-1 ---+-+-t-+--tt-1-+--t-t1+--t1+H1t-+-t---H1t--t----t--\-l'1--t++<ft--l-t-t----jf--t---t++-t---H-t-t---t------t I I I I I I \ I I I I I I I I I I I I 40 -H+-+-+-+--+--+---11r11---+-+-t-+--t.-:-+--t--.1-+----.1+h1f-t--t---h1t---+--t---.---'--\+++;+-+-+-+--+--+---++++-+--t----t----+--t-----~ I I : : 1: : I I\ I I I I I I ~ I I I I I I 1, 30 -H+-+-+-+-+--t--11'-,_-t+++-IH'-+-t~'+--.L..f '-tl'H '-+-+-'+--t----f-~ '-t-Hm--+-+----t--+----1-++-+--+-+-+--t--f------t I I I I I I I I I I I I I I I I I I I I 20 ++++-+-f--t-f----lt----++++-+-lt-l-------,f---i--+---t--++tt-++-11---t+-------,l---+--t---++tt+-+-l----t-------J---+---+++-+-+-1-+-------J---+------< I I I I I I I I I I I I I I I I I I I I I 10 -H+-l---t--t----t-1-+---t,-:---++-t--H---t.:-+--+---.:+----.:+r.:t-+-+-t-.:+--+--+-.----+-+-r.:+-t-+-+----+--+---+++-+--+-+-I--+----+ I I I I I I I I I I I I I I I I I I I I I 0 -t-'-~~~-1-----"----t-'-~~"-'1--L-1---L--L+"JL.L-1-'LU-l'-----'---'--t-'-.u.L-'-J.......J.-l _ ___L_ __ -t-'-J....L-'-J.......J.-l _ __J__----< 100 10 0.1 0.01 0.001 Grain Size (mm) --1 -1 -I -1 -1 -I CLASSIFICATION TEST RESULTS Gravel Sand Coarse FineMediumCoarseFine Silt or Clay NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Avenue, Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB SLBE Sample Location: Depth (ft): USCS Soil Type: Passing No. 200 (%): SC 35 APPENDIX: C.11PROJECT: 2021251REVIEWED BY: MS B-11 55 - 56½ BY: GN AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 <E------Size (Inches) -' / Hydrometer Analysis ' ,., ' U.S. Standard Sieve Sizes ,., ..... / 0 0 "' ;;/; s co ~ 0 0 0 ~ 0 - - ;,; ..,. N ..,. (0 N --0 si si _o 0 si 0 100 --I ·~ ---...., I I I I I I I I I I I ~ I I 90 I I I I I I I I I I I~ I I I I I I I\ I I I I I I '1 I I I I I I ' I 80 I I I I I 'I I I I I I I \ I I I I I I I Cl 70 I I I I I \ I C: \ II I I I I I I 1/) I I I I I I 1/) \ ns I I I I I \ I ll. 60 -I I I I I ' I C: I I I I I I Q) (.) I I I I I I ... I I I I I \ I Q) 50 ll. I I I I I \ I I I I I I I I I I I I I 40 I I I I I I I I I I I I \II I I I I I ~ I I I I I I I I I I I 30 I, ' ' I, ' ' I, I I I I I I I I I I I I I I I I I I I I I I I I 20 I I I I I I I I I I I I I I I I I I 10 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 0 100 10 1 0.1 0.01 0.001 Grain Size (mm) I I I I I I I j,a~I ~--. . . CLASSIFICATION TEST RESULTS Gravel Sand Coarse FineMediumCoarseFine Silt or Clay NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Avenue, Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB SLBE Sample Location: Depth (ft): USCS Soil Type: Passing No. 200 (%): CL 65 APPENDIX: C.12PROJECT: 2021251REVIEWED BY: MS B-11 70 - 71½ BY: GN AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 <E------Size (Inches) -~ / Hydrometer Analysis .... ,, .... U.S. Standard Sieve Sizes ,.. .... / 0 0 "' ~ S! co ;" 0 0 0 ;" 0 --cl .,, N .,, "' N --ci _g _g 9 ci _g ci 100 --';' -....._ I I I I I I I I I I N I I I I I I I 11, I I I 90 I I I I I I I I I I I I I ,.. I I I I I I I I I\! I I I I I I I I I I I I I I ,, I I 80 " I I I I I I ' I I I I I I I I r--' I I I I I I I ♦, I Cl 70 I I I I I I I C 1/) I I I I I I I I 1/) I I I I I I I ~ ns I I I I I I I a. 60 -I I I I I I I I C I I I I I I I I Q) C.) I I I I I I I I ... I I I I I I I I Q) 50 a. I I I I I I I I I I I I I I I I I I I I I I I I 40 I I I I I I I I II II I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 30 I, I, ' ' I, ' I, I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 20 I I I I I I I I I I I I I I I I I I I I I I I I 10 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 0 100 10 1 0.1 0.01 0.001 Grain Size (mm) I I I I I I I j,a~I ~--. . . CLASSIFICATION TEST RESULTS Gravel Sand Coarse FineMediumCoarseFine Silt or Clay NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Avenue, Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB SLBE Sample Location: Depth (ft): USCS Soil Type: Passing No. 200 (%): SM 7 APPENDIX: C.13PROJECT: 2021251REVIEWED BY: MS HA-1 1 - 6 BY: GN AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 <E------Size (Inches) '/ ~ ~ Hydrometer Analysis ' / '-U.S. Standard Sieve Sizes /~ / 0 0 ~ 0 0 0 ~ 0 "' :;!: ~ ~ .,, N .,, "' N ~ ~ "' ~ "' 0 0 0 0 0 0 0 100.0 -z z z z z z z ... ~ ~ .. -.... I -.. I I I I I I H I I I I I I I ~.~ I I I 90.0 I I I I I I I I I I I J\1 I I I I I I 1 I I I I I I :, I I I I I I I I 80.0 \ I I I I I I I I I I I I • I I I I I I I I I I Cl 70.0 I I I I I I I C: ·u; I I I I I I I I ti) I I I I I I I I cu I I I I I I I C. 60.0 1, I I I I, I I I, -I I I I I I I C: I I I I I I I I Q) (.) I I I I I I I ... I I I I I I I Q) 50.0 C. I I I I I I I I I I I I I I I I I I I I I I I 40.0 I I I I I ,1 I II I I I II I I II I I I I I \1 I I I I I I ♦ I I I I I I I 30.0 .. I I I I I \ I I I I I I I I I I I I \ I I I I I I I I 20.0 I I I I I I I I I I I I I I I I I I 10.0 I I I I I II I I I I I I I I I I I • I I I I I I I I I I I I 0.0 100 10 1 0.1 0.01 0.001 Grain Size (mm) I I I I I I I j,a~I ~--. . . LAB TEST RESULTS NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Avenue, Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673 P: 949.388.7710 SBEDVBE SDVOSB Sample Location Expansion Index Expansion Index (ASTM D4829) Sample Depth (ft.) Expansion Potential SLBE Expansion Potential Classification of Expansive Soil (ASTM D4829) Expansion Index 0-20 21-50 51-90 91-130 >130 Very Low Low Medium High Very High Sample Location R-Value Sample Depth (ft.) R-Value (Cal. Test Method 301 & ASTM D2844) APPENDIX: C.14 B-4 20½ - 5 B-6 18 Very Low Very Low½ - 5 Sample Location Maximum Dry Density (pcf) Optimum Moisture Content (%) B-7 Sample Depth (ft.) ½ - 5 122.1 10.8 Maximum Dry Density and Optimum Moisture Content (ASTM D1557) B-1 ½ - 5 25 B-9 ½ - 5 13 PROJECT: 2021251REVIEWED BY: MS B-10 ½ - 4½120.1 11.8 BY: GN HA-1 1 - 6 117.6 14.1 AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 j,a~I ~--. . . LAB TEST RESULTS Corrosivity (Cal. Test Method 417,422,643) Sample Location Sample Depth pH Resistivity Sulfate Content Chloride Content (ppm)(%)(Ohm-cm)(ft.)(ppm)(%) Water-Soluble Sulfate Exposure (ACI 318 Table 19.3.1.1 and Table 19.3.2.1) Water-Soluble Sulfate (SO4) in Soil (% by Weight) Exposure Class Cement Type (ASTM C150) Exposure Severity Max. W/C Min. fc' (psi) SO4 < 0.10 0.10 ≤ SO4 < 0.20 0.20 ≤ SO4 ≤ 0.20 SO4 > 2.00 N/A Moderate Severe Very Severe S0 S1 S2 S3 No type restriction II V V plus pozzolan or slag cement N/A 0.50 0.45 0.45 2,500 4,000 4,500 4,500 NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Avenue, Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB SLBE APPENDIX: C.15 B-4 ½ - 5 7.8 200 3600 1230 0.1230.360 B-6 ½ - 5 7.8 970 210 85 0.0090.021 PROJECT: 2021251REVIEWED BY: MS B-10 ½ - 4½7.9 1100 200 43 0.0040.020 B-11 0 - 5 7.1 550 410 230 0.0230.041 BY: GN AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 j,a~I ~--. . . Sample Location: Sample Depth (ft): Notes: B-7 ½ - 5 NOVA GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Avenue, Suite BSan Diego, CA 92123P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710 SBEDVBE SDVOSB SLBE Remold DIRECT SHEAR TEST RESULTS Fill (af): Silty SandSoil Description: PROJECT: 2021251REVIEWED BY: MS APPENDIX: C.16BY: GN AVIARA OAKS ELEMENTARY SCHOOL 6900 AMBROSIA LANE CARLSBAD, CA 92011 7,000 6,000 5,000 ..... Cl) s Cf) 4,000 Cf) w 0::: I-Cf) 0::: <( 3,000 w I Cf) 2,000 1,000 1,000 Friction Angle (<D): Apparent Cohesion (C): 2,000 3,000 4,000 5,000 NORMAL STRESS (psf) --Peak 31 ° 240 sf --Ultimate 30 ° 150 sf 6,000 Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 APPENDIX D CPT LOGS Project: NOVA Services / Aviara Oaks Elementary School Kehoe Testing and Engineering 714-901-7270 steve@kehoetesting.com www.kehoetesting.com Total depth: 51.85 ft, Date: 11/26/20226900 Ambrosia Ln, Carlsbad, CA CPT-1 Location: Cone resistance Tip resistance (tsf) 5004003002001000 Dep t h ( f t ) 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Cone resistance Sleeve friction Friction (tsf) 1086420 Dep t h ( f t ) 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Sleeve friction Pore pressure u Pressure (psi) 20100-10-20 Dep t h ( f t ) 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Pore pressure u Friction ratio Rf (%) 876543210 Dep t h ( f t ) 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Friction ratio Soil Behaviour Type SBT (Robertson, 2010) 181614121086420 Dep t h ( f t ) 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Soil Behaviour Type Clay & silty clay Silty sand & sandy silt Clay & silty clay Clay Clay & silty clay Silty sand & sandy silt Very dense/stiff soil Very dense/stiff soil Very dense/stiff soil Silty sand & sandy silt Very dense/stiff soil Very dense/stiff soilVery dense/stiff soil Silty sand & sandy silt Very dense/stiff soil Very dense/stiff soil Very dense/stiff soil Silty sand & sandy silt Clay & silty clay Very dense/stiff soil Silty sand & sandy siltClay & silty clay Clay Clay Very dense/stiff soil Very dense/stiff soilClay & silty clay Very dense/stiff soil Very dense/stiff soil Very dense/stiff soil CPeT-IT v.2.3.1.9 - CPTU data presentation & interpretation software - Report created on: 11/28/2022, 10:06:17 AM 1 Project file: 1---.. / J 1---. > <::':._ £ • -~ .. :S ~ --- ~r fi_ ..... ~ t'":a - 1LJ= -~ I------t!= -Ill! i i ---, I I -~ c::::' ,..--C 1.-'9 ~ ~ I I I :r-'° t:> 'I; ~ J -~ .. ---.! '= --~ ;i r_ --~- -' ' ' ' I I I -?= c,,._~ .s,- ~ <.... ~ ~ ~ ~ r. -1 I I I -,-r, Ca -rF Ii ~ I~ --~ I I_... - - Project: NOVA Services / Aviara Oaks Elementary School Kehoe Testing and Engineering 714-901-7270 steve@kehoetesting.com www.kehoetesting.com Total depth: 79.616900 Ambrosia Ln, Carlsbad, CA CPT-2 ft, Date: 11/26/2022Location: Cone resistance Tip resistance (tsf) 5004003002001000 De pt h ( f t ) 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Cone resistance Sleeve friction Friction (tsf) 1086420 De pt h ( f t ) 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Sleeve friction Pore pressure u Pressure (psi) 20100-10-20 De pt h ( f t ) 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Pore pressure u Friction ratio Rf (%) 876543210 De pt h ( f t ) 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Friction ratio Soil Behaviour Type SBT (Robertson, 2010) 181614121086420 De pt h ( f t ) 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Soil Behaviour Type Silty sand & sandy silt Sand & silty sand Silty sand & sandy silt Sand & silty sand Sand & silty sand Silty sand & sandy silt Silty sand & sandy silt Clay & silty clay Clay & silty clayClay & silty clay Silty sand & sandy siltSilty sand & sandy silt Very dense/stiff soil Very dense/stiff soil Clay & silty clay Very dense/stiff soilClay & silty clay Clay & silty clay Clay Clay & silty clay Clay Very dense/stiff soil Clay & silty clay ClayClay Clay & silty clayClay Clay & silty clay Very dense/stiff soil Clay Clay Clay & silty clay Clay Clay & silty clay Clay Clay & silty clay Very dense/stiff soil Clay Very dense/stiff soil Clay Very dense/stiff soil Very dense/stiff soil Clay & silty clay Very dense/stiff soil CPeT-IT v.2.3.1.9 - CPTU data presentation & interpretation software - Report created on: 11/28/2022, 10:06:18 AM 3 Project file: I "\. I I Project: NOVA Services / Aviara Oaks Elementary School Kehoe Testing and Engineering 714-901-7270 steve@kehoetesting.com www.kehoetesting.com Total depth: 51.81 ft, Date: 11/26/20226900 Ambrosia Ln, Carlsbad, CA CPT-3 Location: Cone resistance Tip resistance (tsf) 5004003002001000 Dep t h ( f t ) 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Cone resistance Sleeve friction Friction (tsf) 1086420 Dep t h ( f t ) 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Sleeve friction Pore pressure u Pressure (psi) 20100-10-20 Dep t h ( f t ) 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Pore pressure u Friction ratio Rf (%) 876543210 Dep t h ( f t ) 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Friction ratio Soil Behaviour Type SBT (Robertson, 2010) 181614121086420 Dep t h ( f t ) 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Soil Behaviour Type Silty sand & sandy silt Clay & silty clay Silty sand & sandy silt Sand & silty sand Clay & silty clayClay Clay & silty clay Silty sand & sandy silt Silty sand & sandy silt Very dense/stiff soil Silty sand & sandy silt Very dense/stiff soil Clay & silty clay Silty sand & sandy silt Clay & silty clay Very dense/stiff soil Silty sand & sandy silt Clay Clay Clay & silty clay Clay Clay & silty clayClay Very dense/stiff soil Very dense/stiff soil Very dense/stiff soil CPeT-IT v.2.3.1.9 - CPTU data presentation & interpretation software - Report created on: 11/28/2022, 10:06:19 AM 4 Project file: ~-I -~ -j ~ V j. -.s .. ~ ~ 1---·t ., -_. !F. I - ~ ~ .. i ~ ~ ~ - ~ i =-I_. --- 1.:::11 ~ ~ ~~ -~ - -------~ I I -,=,- ~ ■ I I -~ -lS" ( -12 I ~!I-~ 711 -" -~~~ - - Report of Update Geotechnical Investigation Aviara Oaks Elementary School Modernization, Carlsbad, CA NOVA Project No. 2021251 February 8, 2023 APPENDIX E LIQUEFACTION AND SEISMIC SETTLEMENT CALCULATIONS LIQUEFACTION ANALYSIS REPORT Input parameters and analysis data Analysis method: Fines correction method: Points to test: Earthquake magnitude Mw: Peak ground acceleration: NCEER (1998) NCEER (1998) Based on Ic value 7.00 0.54 . G.W.T. (in-situ): G.W.T. (earthq.): Average results interval: Ic cut-off value: Unit weight calculation: Project title : Aviara Oaks Elementary School Location : 6900 Ambrosia Ln, Carlsbad, CA NOVA Services, Inc. 4373 Viewridge Ave, Suite B San Diego, CA 92123 www.usa-nova.com CPT file : CPT-1 30.00 ft 30.00 ft 3 2.60 Based on SBT Use fill: Fill height: Fill weight: Trans. detect. applied: Kσ applied: No N/A N/A No Yes Clay like behavior applied: Limit depth applied: Limit depth: MSF method: Sands only No N/A Method based Cone resistance qt (tsf) 4002000 De p th ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Cone resistance SBTn Plot Ic (Robertson 1990) 4321 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 SBTn Plot CRR plot CRR & CSR 0.60.40.20 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 CRR plot During earthq. Qtn,cs 200180160140120100806040200 Cy c li c S t r e s s R a t i o * ( C S R * ) 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0 Liquefaction No Liquefaction Normalized friction ratio (%) 0.1 1 10 No r ma l i z e d C P T p e n e t r a t i o n r e s i s t a n c e 1 10 100 1,000 Friction Ratio Rf (%) 1086420 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Friction Ratio Mw=71/2, sigma'=1 atm base curve Summary of liquefaction potential FS Plot Factor of safety 21.510.50 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 FS Plot During earthq. Zone A1: Cyclic liquefaction likely depending on size and duration of cyclic loading Zone A2: Cyclic liquefaction and strength loss likely depending on loading and ground geometry Zone B: Liquefaction and post-earthquake strength loss unlikely, check cyclic softening Zone C: Cyclic liquefaction and strength loss possible depending on soil plasticity, brittleness/sensitivity, strain to peak undrained strength and ground geometry CLiq v.3.4.1.4 - CPT Liquefaction Assessment Software - Report created on: 1/3/2023, 3:46:57 PM 1 Project file: C:\Users\obrie\OneDrive\Documents\b GeoRisk\3 Projects\NOVA San Diego\3. Projects\Aviara Oaks Elem School\e. Evaluation\Seismic Compression\Analysis CPT\Seismic compression gwl 30 ft.clq :-____ ::::t::::::::) ' =::=:t=::=::=::j ' ' ' ' ' ' ----------t-------------' ' ' ;----------:~:::::::::::: i :-----_:~]~~~~~~~~~] : ::::--:~_:::~::::::::::::: : -------~~~~r~~~~~~~~~~~ i ----1------------: --------:------------: :------:::::f =::=::::::! ! :::: __ ::-:)::::::::::::1 ; ---~------------; ' ' ___ _._ ____ _. ____ _ ' ' ' ' ' -----t-----' l:: :::: i ::=r:::. i ::::r::: ----,----- :::: ---r---. ____ _, ' ' -:r::: ----, I ::::~ :::r:::· ::::~ -r:::r::: ' ' ' ' ' ' ' -------r------r------r------r------r------r------1-----1------l------ ------r------r------r------r------r------r------1-----1------r------- ------r---r r-1 1 r--1 : ---r-- ------r-----r---1 -----r-----r-----r-----r ---i------r------ ! ! ! ! ! i-i I I I I I -------.--------.--------.--------.--------.--------.----1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I • I I I I I I I I I I I I I I I I I I I I I I I I --------.--------.--------.--------.--------.-------.--------.--------.--------,--------1 I I I I I I I I I I I I ' I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I ~-------.--------.------~------.--------.--------.--------.--------.--------~-------1 ' I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I ' ' ::::::::t:: :::t:::::::: ::::::+: ::::i:::::::: :::::::::r: ::::r::::::: :::::::::r: ::::r::::::: :~~~~~~~~,~~~-~~~r~~~~~~~ :::::::::r:: :::r:::::::. ' ' ' ' _________ ..,____ __....._ _______ _ ' ' ' ' ' ' ---------... --------t---------' ' ' ' _________ ! ____ _ ---------:-------:-------- ---------t-------t-------- :::::::::i::::: ::+::::::::· • :::::::::r::: ::r:------ --------J_ ------t- This software is licensed to: NOVA Services CPT name: CPT-1 Cone resistance qt (tsf) 4003002001000 De p th ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Cone resistance C P T b a s i c i n t e r p r e t a t i o n p l o t s Friction Ratio Rf (%) 1086420 De p th ( f t ) 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Friction Ratio Pore pressure u (psi) 50-5 De p th ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Pore pressure Insitu SBT Plot Ic(SBT) 4321 De p th ( f t ) 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 SBT Plot Soil Behaviour Type SBT (Robertson et al. 1986) 1817161514131211109876543210 De p th ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Soil Behaviour Type Organic soil Silty sand & sandy silt Clay & silty clay ClayClay & silty clayClay & silty clay Sand & silty sandSilty sand & sandy siltVery dense/stiff soilVery dense/stiff soil Clay & silty clay Very dense/stiff soil Silty sand & sandy siltVery dense/stiff soilVery dense/stiff soilVery dense/stiff soil Very dense/stiff soilVery dense/stiff soil Very dense/stiff soil Very dense/stiff soilVery dense/stiff soilVery dense/stiff soilVery dense/stiff soil Very dense/stiff soil Silty sand & sandy siltSilty sand & sandy siltClayClay Clay Very dense/stiff soil Clay & silty clay Very dense/stiff soilSilty sand & sandy silt Very dense/stiff soil CLiq v.3.4.1.4 - CPT Liquefaction Assessment Software - Report created on: 1/3/2023, 3:46:57 PM 2 Project file: C:\Users\obrie\OneDrive\Documents\b GeoRisk\3 Projects\NOVA San Diego\3. Projects\Aviara Oaks Elem School\e. Evaluation\Seismic Compression\Analysis CPT\Seismic compression gwl 30 ft.clq Input parameters and analysis data Analysis method: Fines correction method: Points to test: Earthquake magnitude Mw: Peak ground acceleration: Depth to water table (insitu): NCEER (1998) NCEER (1998) Based on Ic value 7.00 0.54 30.00 ft Depth to water table (erthq.): Average results interval: Ic cut-off value: Unit weight calculation: Use fill: Fill height: 30.00 ft 3 2.60 Based on SBT No N/A Fill weight: Transition detect. applied: Kσ applied: Clay like behavior applied: Limit depth applied: Limit depth: N/A No Yes Sands only No N/A SBT legend 1. Sensitive fine grained 2. Organic material 3. Clay to silty clay 4. Clayey silt to silty clay5. Silty sand to sandy silt 6. Clean sand to silty sand 7. Gravely sand to sand 8. Very stiff sand to clayey sand9. Very stiff fine grained ' ' ' ' ----1-------'-------.1-------, ' ' ' ' ' ' ' ' ' ' ' -------1-------►------◄-------' ' ' ' ' ' ' ' ' r------,-------' ' ' ' .... -.. -----i;;' -;;::-----➔------- =::=i-=:--r:=::r =::(:: -::::+----i:=:+=::r =:: ------r------::=::r ;:i:;:: ' ____ .J ______ _ ' ' ' ' ' ' ' ~~====~!====~===== -~-----t----~----- ~i=====t====~===== -1-----t----~-----. ' ' ' ' ' -------------~-----' ' ' ' ' ' ::l=====t=~~=l===== --i-----t----~----- :~=====;====~~~=== ---1----------(--------(------ --r----------f---------1-------- • ----------1----------1-------- ■ ■ ■ ■ □ □ I I I I I I I I I I I I I I I I I I Jinr ~lr r ~lr --i---i---i---i---~--~--~--~--~--~--~--~--~-- r --=:::::::' :::::!_-__;t#i::!::!ti::!::!ti:: 1 I I I I I I I I 1 I I I I I I I I -. -. -. --~--r--r--r--r--r--r--r--r-- j --t--t--t--t--t--t--t--t-- ~~;;;;;;;;·_-~-:·~-:~-:-~=~=~t=~t=~t=~t= --,:+:+:+:+::~:~lr r ~lr: : -+-+-+-+-+-t--t--t--t--t--t--t--t--,:rrrrrrrr: r--t--t--t--t--t--t--t--t----r--r--r--r--r--r--1--1--1-- 1~------------r--r--r--r--r--r--r--r--r-- □ □ □ This software is licensed to: NOVA Services CPT name: CPT-1 Norm. cone resistance Qtn 200150100500 De p th ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Norm. cone resistance C P T b a s i c i n t e r p r e t a t i o n p l o t s ( n o r m a l i z e d ) Norm. friction ratio Fr (%) 1086420 De p th ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Norm. friction ratio Nom. pore pressure ratio Bq 10.80.60.40.20-0.2 De p th ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Nom. pore pressure ratio SBTn Plot Ic (Robertson 1990) 4321 De p th ( f t ) 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 SBTn Plot Norm. Soil Behaviour Type SBTn (Robertson 1990) 1817161514131211109876543210 De p th ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Norm. Soil Behaviour Type Organic soil Silty sand & sandy silt Silty sand & sandy siltClay & silty clay Very dense/stiff soil Very dense/stiff soilVery dense/stiff soilVery dense/stiff soilVery dense/stiff soil Silty sand & sandy silt Very dense/stiff soil Very dense/stiff soil Clay & silty clay Very dense/stiff soil Silty sand & sandy siltVery dense/stiff soil Clay & silty clay Silty sand & sandy siltSilty sand & sandy silt Clay & silty clay Clay & silty clay Very dense/stiff soilClay & silty clay Clay & silty clay Clay & silty clay ClayClayClay & silty clayClay & silty clay Clay Clay & silty clayClay Clay & silty clay Silty sand & sandy silt Clay & silty clay Silty sand & sandy silt CLiq v.3.4.1.4 - CPT Liquefaction Assessment Software - Report created on: 1/3/2023, 3:46:57 PM 3 Project file: C:\Users\obrie\OneDrive\Documents\b GeoRisk\3 Projects\NOVA San Diego\3. Projects\Aviara Oaks Elem School\e. Evaluation\Seismic Compression\Analysis CPT\Seismic compression gwl 30 ft.clq SBTn legend 1. Sensitive fine grained 2. Organic material 3. Clay to silty clay 4. Clayey silt to silty clay5. Silty sand to sandy silt 6. Clean sand to silty sand 7. Gravely sand to sand 8. Very stiff sand to clayey sand9. Very stiff fine grained Input parameters and analysis data Analysis method: Fines correction method: Points to test: Earthquake magnitude Mw: Peak ground acceleration: Depth to water table (insitu): NCEER (1998) NCEER (1998) Based on Ic value 7.00 0.54 30.00 ft Depth to water table (erthq.): Average results interval: Ic cut-off value: Unit weight calculation: Use fill: Fill height: 30.00 ft 3 2.60 Based on SBT No N/A Fill weight: Transition detect. applied: Kσ applied: Clay like behavior applied: Limit depth applied: Limit depth: N/A No Yes Sands only No N/A ' ' --------'---------' ' ' ' --------► ------ --------~----+-------- --------~ :.:.;;------i--------- :::=:t:=::=r ::=-~-- =:==t=~--i -~~~~ :::=:+---=:f ::::::: ----r---+------- _£::=:E::: ---(------t-------- :::r::::::r::::::: ---(------t-------- ___ -r-------r-------- --------1--------t-------- ' ' ' ' ------'-------"'-------' ' ' ' ' ' ' ' ' ►------◄-------' ' ' ' ' ----,-------' ' ...., ... _-!;;.;;·----➔------- ----._ __ Po""_ ,------1------- -=:: __ r----F+:=:: :~~~+--f ~~l~~~~ -:::::r:::: --::::r =:: -=::=1:~::~:____ :)::::::: -------t------t-----' ______ t ____ _ ::::::r::::r--r:::::r::::: -------t------' --t-----t------ ------r---r------r------r------ ------t-----I ------r------1------- ' ' I I I I ------_____ ... _____ .,1 _____ .,1 _____ _._ ____ _ I I I I I I I I I I I I I I I I -----------♦-----◄-----◄------i------1 I I I I I I I I I I I I I I I -----T------,------,------.------1 I I I I I I I -----+-----➔-----➔-----+----- ------=:::f ::=:j=:::j::=:t::= ------=::r =r ::r =:r:= ~~~Fl~l~l~~~ =::r:1=::r:r:= ---,=::r=:1=::r=:r := -----t-----t-----(---(---t----- :::::t:::::~:::::~:::::+::::: -----t-----i-----i-----t----- -----r-----1-----1-----r----- -----t-----1-----1-----t----- ·--------------------I ----- ■ ■ ■ ■ □ □ I I I I I I I I I I I I I I I I I I I I I l·--===:i-~:~:~:+tHlf Hlf r--r--r--r--r--r--r--r--r-- --~--~--~--~--~--~--~--~--~~~~~~~~~~~~~~~~ __ !. ~_?~:~=~t=~t=~t=~t= :~:=::=::=::=::=::~: __ ::::_-~:=-~-~;~~l~~l~~l~~l~ " -+-+-+-i::f ::f tf t:f t~:: --i-----=""-r-r-r--r--r--r--r--r--r--r--r--r-- --l---l---l--.!.--~--t--t--t--t--t--t--t--t-- :t:t:t:t::~::~::~::~::~::~::~::~::~:: ,:rrnr~:~lr r ~lr: -+-t-t-t-t--t--t--t--t--t--t--r--t--r-- :rrrrrrrrrrrrr: -t-t-t-t--t--t--t--t--t--t--r--t--r-- -r-r-r-r--r--r--r--r--r--r--1--1--1-- -t-t-t-t--r--r--r--r--r--r--r--r--r-- □ □ □ This software is licensed to: NOVA Services CPT name: CPT-1 Total cone resistance qt (tsf) 4003002001000 De p th ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Total cone resistance L i q u e f a c t i o n a n a l y s i s o v e r a l l p l o t s ( i n t e r m e d i a t e r e s u l t s ) SBTn Index Ic (Robertson 1990) 4321 De p th ( f t ) 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 SBTn Index Norm. cone resistance Qtn 200150100500 De p th ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Norm. cone resistance Grain char. factor Kc 109876543210 De p th ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Grain char. factor Corrected norm. cone resistance Qtn,cs 200150100500 De p th ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Corrected norm. cone resistance CLiq v.3.4.1.4 - CPT Liquefaction Assessment Software - Report created on: 1/3/2023, 3:46:57 PM 4 Project file: C:\Users\obrie\OneDrive\Documents\b GeoRisk\3 Projects\NOVA San Diego\3. Projects\Aviara Oaks Elem School\e. Evaluation\Seismic Compression\Analysis CPT\Seismic compression gwl 30 ft.clq Input parameters and analysis data Analysis method: Fines correction method: Points to test: Earthquake magnitude Mw: Peak ground acceleration: Depth to water table (insitu): NCEER (1998) NCEER (1998) Based on Ic value 7.00 0.54 30.00 ft Depth to water table (erthq.): Average results interval: Ic cut-off value: Unit weight calculation: Use fill: Fill height: 30.00 ft 3 2.60 Based on SBT No N/A Fill weight: Transition detect. applied: Kσ applied: Clay like behavior applied: Limit depth applied: Limit depth: N/A No Yes Sands only No N/A ' ' ' I I I I ---______ ... _________ ... ________ _ I I I I I I I I I I I I I I I I ------♦---------♦---------• I I I I I I I I I I I I I I I ______ T _________ T ________ _ ' ' ' ' ' ' -----t---------t---------' ;-----! __ ------1-------i i :::::: ! :::::::::1=::=:::! i ::/ 1::::=I::=:::! I __ ::j:::::::::j:::::::::! _:::r =::=:1=::=:::! :::::1::::::=:1=::=:::: ----:---------:---------: i-----:+=::i::=:::j ' ' ---------'----------' ' ' ' ---------► ------- ---------~---..:.. 1---------- ----------~ =-------~---------- ====f====~===~~- :::::::::r:---+ _;... ......... ""'"I :::::=:+----_::::]:::::::::: ---f :::::::::j:::::::::: -=:1=::=::r=:::::: :=:J=::=::~:::::::::: ----:---------:---------- -----:1::=::1::::::: ' ' ' ' ' ---------'----------.L---------.1----------, ' ' ' ' ' ' ' ' ' ' .::::::::r::::::::Tf"!-~--_-::•:•:-::•:~; :-:,;;,::;,;:;.;:.:.:.:.::J: ----------~---------t---------~---------- ::=::=:i=::=:::i:::::::::j:::=::= :::=::::f :::::::1:::::::::1::::::::: :~~\~I\\~l~~\~~~i'.'.'.~'.-- ::::::::::~:::::::::1:::::::::j::: :::=::=:~=::::::r ::::::::------- :::=::=r:::::::1:::::::+:: __ ---------:---------:---------7-------- :::=::i::::::r:::::::i:- This software is licensed to: NOVA Services CPT name: CPT-1 CRR plot CRR & CSR 0.60.40.20 De p th ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 CRR plot During earthq. L i q u e f a c t i o n a n a l y s i s o v e r a l l p l o t s FS Plot Factor of safety 21.510.50 De p th ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 FS Plot During earthq. Liquefaction potential LPI 20151050 De p th ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Liquefaction potential Vertical settlements Settlement (in) 0.10.080.060.040.020 De p th ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Vertical settlements Lateral displacements Displacement (in) 0 De p th ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Lateral displacements CLiq v.3.4.1.4 - CPT Liquefaction Assessment Software - Report created on: 1/3/2023, 3:46:57 PM 5 Project file: C:\Users\obrie\OneDrive\Documents\b GeoRisk\3 Projects\NOVA San Diego\3. Projects\Aviara Oaks Elem School\e. Evaluation\Seismic Compression\Analysis CPT\Seismic compression gwl 30 ft.clq F.S. color scheme LPI color schemeInput parameters and analysis data Analysis method: Fines correction method: Points to test: Earthquake magnitude Mw: Peak ground acceleration: Depth to water table (insitu): NCEER (1998) NCEER (1998) Based on Ic value 7.00 0.54 30.00 ft Depth to water table (erthq.): Average results interval: Ic cut-off value: Unit weight calculation: Use fill: Fill height: 30.00 ft 3 2.60 Based on SBT No N/A Fill weight: Transition detect. applied: Kσ applied: Clay like behavior applied: Limit depth applied: Limit depth: N/A No Yes Sands only No N/A Almost certain it will liquefy Very likely to liquefy Liquefaction and no liq. are equally likely Unlike to liquefy Almost certain it will not liquefy Very high risk High risk Low risk ------,--' ' ' ' ::::::::::::1::::: _::=+:=::=::: ------------~------------~------------ ::::::::::::j::::: :::::::~::=::=::: ------------1------------~------------ 1 I ' ' ' ' ' -------------,------------r-------------' ' ' ' :::::::::::l:::=: ~::~::~::~::: :::::::::::l:::::: ::::~::=::=::: ------------:------------:------------ :::::::::::1:::::: =:f ::------- ■ □ □ □ ■ ' ' ::=:1=: :=1:=:::1::::::r :::r-. -----~------l------i-------i-------i-- ::=:j=::=j:::::~:::::i:::::i· -----1------1------+-----+----+---- :::::j::::::j::::::t:::::t: ::t:::: .. -1=::=1:=::~:=::!: __ ::l:::: r:=1:=::l::+::+::: :------r-----:-----:-----:---- ::=:f :£J::::r::::r:: --------------------- -------------------- --------------------- -------------------- --------------------- -------------------- --------------------- -------------------- ---------------------------------------- --------------------- -------------------- --------------------- -------------------- --------------------- -------------------- --------------------- -------------------- --------------------- -------------------- ---------------------------------------- ---------------------------------------- --------------------- -------------------- --------------------- -------------------- ■ □ □ This software is licensed to: NOVA Services CPT name: CPT-1 Normalized friction ratio (%) 0.1 1 10 No rm a l i z e d C P T p e n e t r a t i o n r e s i s t a n c e 1 10 100 1,000 L i q u e f a c t i o n a n a l y s i s s u m m a r y p l o t s Qtn,cs 200180160140120100806040200 Cy cl i c S t r e s s R a t i o * ( C S R * ) 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0 Liquefaction No Liquefaction Thickness of surface layer, H1 (m) 109876543210 Th ic k n e s s o f l i q u e f i a b l e s a n d l a y e r , H 2 ( m ) 12.0 11.0 10.0 9.0 8.0 7.0 6.0 5.0 4.0 3.0 2.0 1.0 0.0 Analysis PGA: 0.54 PG A 0 . 4 0 g - 0 . 5 0 g CLiq v.3.4.1.4 - CPT Liquefaction Assessment Software - Report created on: 1/3/2023, 3:46:57 PM 6 Project file: C:\Users\obrie\OneDrive\Documents\b GeoRisk\3 Projects\NOVA San Diego\3. Projects\Aviara Oaks Elem School\e. Evaluation\Seismic Compression\Analysis CPT\Seismic compression gwl 30 ft.clq Input parameters and analysis data Analysis method: Fines correction method: Points to test: Earthquake magnitude Mw: Peak ground acceleration: Depth to water table (insitu): NCEER (1998) NCEER (1998) Based on Ic value 7.00 0.54 30.00 ft Depth to water table (erthq.): Average results interval: Ic cut-off value: Unit weight calculation: Use fill: Fill height: 30.00 ft 3 2.60 Based on SBT No N/A Fill weight: Transition detect. applied: Kσ applied: Clay like behavior applied: Limit depth applied: Limit depth: N/A No Yes Sands only No N/A ' ' -jf-....1..---1r....1..7~....l..i '--'-i --'-7 --! · · · I I I I ' : ! i i !, !, i i ' ' ' ' ' ' ' ! !, !, !, ! : : ---f------t-' • 1:-------1: ---:: :: ! ! l-----+------:---------f, ------r. --1 1 1 1 1 1 1 : : : ! : : ! ! i ! : ' : --~----------L---+----+---7-----1-----r--r-! • ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ! ! ! ! ! : -------~------t-i : : ------~-------~------1 : : '------+------~ : : : : -------+ ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ------l------+------f----+---t-----r----r ! ! ! ! ! - ' ' ' ' ' ' --r:. ------t:. ---------1------+----+----7----l---r ' ' ' ' ' : : ' 1 1 1 1 1 ---~----+----+-----r-----1 i ------(------i------1--: : : : -----+-----t : : ! ! ! ! ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' i i i _J ______ ~------1-----+---t-----r-' ' • -' ' ' ' ' ' ' _.__ ' ' ' ' ' ' -t, ------' ! ! ! ! ! ! ' ' ' ' ' ' I I I I I ! ! ! I ' ' ' : ! j _____ +-----+----+-----+-----t------r---• _._____ ' ' ' ' ' ' ' O O •1~ -----,---I • t ' ' ----' ' ,· : : ·-,; :; 1 • : I -1 -+-,--• ---·.r• ---(-----+--:,'· :~~ ; : c._.cl------+-...-! ,I I •i , ~~~-7~;w , ---i--_, ---+--- ' ' ' ' ' ' ' ' ' ' ---! ---+---' ' ' ' ' ' ' ' ' ' ' ' ' ' --, --+----,--' ' ' ' ' ' ' ' ' ' ' ' ---+-----i-----+----1------r- • I I I I ·-' : : : : ! -' ' ' ' I I I . : ! ' ' This software is licensed to: NOVA Services CPT name: CPT-1 Norm. cone resistance Qtn 250200150100500 De pt h ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Norm. cone resistance C h e c k f o r s t r e n g t h l o s s p l o t s ( R o b e r t s o n ( 2 0 1 0 ) ) Grain char. factor Kc 109876543210 De pt h ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Grain char. factor Corrected norm. cone resistance Qtn,cs 200150100500 De pt h ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Corrected norm. cone resistance SBTn Index Ic (Robertson 1990) 4321 De pt h ( f t ) 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 SBTn Index Liquefied Su/Sig'v Su/Sig'v 0.50.40.30.20.10 De pt h ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Peak Su ratio Liq. Su ratio Liquefied Su/Sig'v CLiq v.3.4.1.4 - CPT Liquefaction Assessment Software - Report created on: 1/3/2023, 3:46:57 PM 7 Project file: C:\Users\obrie\OneDrive\Documents\b GeoRisk\3 Projects\NOVA San Diego\3. Projects\Aviara Oaks Elem School\e. Evaluation\Seismic Compression\Analysis CPT\Seismic compression gwl 30 ft.clq Input parameters and analysis data Analysis method: Fines correction method: Points to test: Earthquake magnitude Mw: Peak ground acceleration: Depth to water table (insitu): NCEER (1998) NCEER (1998) Based on Ic value 7.00 0.54 30.00 ft Depth to water table (erthq.): Average results interval: Ic cut-off value: Unit weight calculation: Use fill: Fill height: 30.00 ft 3 2.60 Based on SBT No N/A Fill weight: Transition detect. applied: Kσ applied: Clay like behavior applied: Limit depth applied: Limit depth: N/A No Yes Sands only No N/A ' ' ' ' ' ' ' ' -------.&.-------_ ... ______ _ ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' -♦-------' ' ' ' ' ' ' ' i-----+·~~~,;,,-=~.,,=~= .. =.J.f:_:_:.-l--JI j::::::r _:::~::=:::: 1:::::::i:----_:~::~::i::~j +::::::j:::::::j::::::: i -r=::r=::r=::: i ::J:::::::J::=:+=::: i --:-------:-------:-------: J::::+=::r =::: ! ' I I I I ' ' _________ ,, _________ ... _________ .,1 _________ _ • ' ' ' ' ' ' ' ' ' ---------t-------t-------t------t------- --==1====~r!----~~:~:~:~=~:~;~:~=~:~:~=~:~: ---------r-------r-------r------r------ ---------r-------r-------r-------1-------- -----~---------t---------~-------------------~-------t-------t-------~-------- =::=:t:=::=:i=::=:::j::=::=:: ! ! ! ! ---------r-------r-------r------r------- ---------:-------:-------:-------:-------- --~::r :::::::1:::::::::1:::::::::: ~~~~l~~~~l~~~~!:::- ---------t-------t-------t-------(------ ---------r-------r-------r------r------- ---------r-------r------r------r------- --------r-------t-------r-------1-------- ---------r-------r-------r------r------- ---------r-------r------r------r------- ---------r-------1-------1-------1-------- ---------t-------t-------t-------1------- :::::~:::::::::1:::::::::j::: --------+-----+-----+-----+------- ---------r-------1-------1-------1-------- --==t====l===~;--- : -:::::::1 :::::::J:::::::1:::::::t:::::- ---------r-------1-------1-------1-------- 1::=::=:i=::=:+:: __ -··-·-· -· -:---------:---------7-------- ---------t-------t-------t------t------- ---------r-------r------r------r------- --------r-------1-------1-------1-------- --+=::=:1=::=::~:- --------r-------t-------t------t------- ---------r-------r------r------r------- I I I I This software is licensed to: NOVA Services CPT name: CPT-1 Cone resistance qt (tsf) 4003002001000 De pt h ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Cone resistance SBTn Plot Ic (Robertson 1990) 4321 De pt h ( f t ) 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 SBTn Plot FS Plot Factor of safety 21.510.50 De pt h ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 FS Plot During earthq. Vertical settlements Settlement (in) 0.10.080.060.040.020 De pt h ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Vertical settlements E s t i m a t i o n o f p o s t - e a r t h q u a k e s e t t l e m e n t s Strain plot Volumentric strain (%) 6543210 De pt h ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Strain plot CLiq v.3.4.1.4 - CPT Liquefaction Assessment Software - Report created on: 1/3/2023, 3:46:57 PM 8 Project file: C:\Users\obrie\OneDrive\Documents\b GeoRisk\3 Projects\NOVA San Diego\3. Projects\Aviara Oaks Elem School\e. Evaluation\Seismic Compression\Analysis CPT\Seismic compression gwl 30 ft.clq Abbreviations qt: Ic: FS: Volumentric strain: Total cone resistance (cone resistance q c corrected for pore water effects) Soil Behaviour Type Index Calculated Factor of Safety against liquefaction Post-liquefaction volumentric strain ' ' ' I I I I ---______ ... _________ ... ________ _ I I I I I I I I I I I I I I I I ------•---------•---------' I I I I I I I I I I I I I I I ______ T _________ T ________ _ ' ' ' ' ' ' ;--------t -----1-------i ! :::::: ! ::=::=:1=::=) ! ____ :: -1-------1------i i------r-----r-----! _::+=::=:1=::=) ::::r=::=:1=::=) --t:::::::t::::::::~ !-------)---------t---------: LIQUEFACTION ANALYSIS REPORT Analysis method: Fines correction method: Points to test: Earthquake magnitude Mw: Peak ground acceleration: NCEER (1998) NCEER (1998) Based on Ic value 7.00 0.54 . G.W.T. (in-situ): G.W.T. (earthq.): Average results interval: Ic cut-off value: Unit weight calculation: Location : 6900 Ambrosia Ln, Carlsbad, CA NOVA Services, Inc. 4373 Viewridge Ave, Suite B San Diego, CA 92123 www.usa-nova.com Project title : Aviara Oaks Elementary School CPT file : CPT-2 Input parameters and analysis data 30.00 ft 30.00 ft 3 2.60 Based on SBT Use fill: Fill height: Fill weight: Trans. detect. applied: Kσ applied: No N/A N/A No Yes Clay like behavior applied: Limit depth applied: Limit depth: MSF method: Sands only No N/A Method based Cone resistance qt (tsf) 400200 De p th ( f t ) 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Cone resistance SBTn Plot Ic (Robertson 1990) 4321 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 SBTn Plot CRR plot CRR & CSR 0.60.40.20 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 CRR plot During earthq. Qtn,cs 200180160140120100806040200 Cy c li c S t r e s s R a t i o * ( C S R * ) 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0 Liquefaction No Liquefaction Normalized friction ratio (%) 0.1 1 10 No r ma l i z e d C P T p e n e t r a t i o n r e s i s t a n c e 1 10 100 1,000 Friction Ratio Rf (%) 1086420 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Friction Ratio Mw=71/2, sigma'=1 atm base curve Summary of liquefaction potential FS Plot Factor of safety 21.510.50 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 FS Plot During earthq. Zone A1: Cyclic liquefaction likely depending on size and duration of cyclic loading Zone A2: Cyclic liquefaction and strength loss likely depending on loading and ground geometry Zone B: Liquefaction and post-earthquake strength loss unlikely, check cyclic softening Zone C: Cyclic liquefaction and strength loss possible depending on soil plasticity, brittleness/sensitivity, strain to peak undrained strength and ground geometry CLiq v.3.4.1.4 - CPT Liquefaction Assessment Software - Report created on: 1/3/2023, 3:46:59 PM 9 Project file: C:\Users\obrie\OneDrive\Documents\b GeoRisk\3 Projects\NOVA San Diego\3. Projects\Aviara Oaks Elem School\e. Evaluation\Seismic Compression\Analysis CPT\Seismic compression gwl 30 ft.clq -------+ ----------t- :~::~::::1: -----------r- -r-----------r- }=:::::] l=::=::=J: --r-----------r- _______ T t:::r=j:=:: , .... __ ...!.., t---- ----- ' ' ' :::::r ~~2'~- -----r ----I ' ' :~:I t---- r ___ _ ' ' ' ' ' ' ' -------r------r------r------r------r------r------1-----1------l------ ------r------r------r------r------r------r------1-----1------r------- ------r---r r-1 1 r---1 : ---r-- ------r-----r---! -----r-----r-----r-----r ---1------r------ : : : : : ~♦ I .. :~-• -------l--------l--------l-------+------+---♦--1------l------♦--~ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I • I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I --------.--------.--------.--------.--------.-------.--------.--------.--------,--------1 I I I I I I I I I I I I ' I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I --------.--------.------~------.--------.--------.--------.--------.--------,--------1 ' I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I ---------... --- ----------- --------+------t--------· ---------t-------t-------- ::::::::f _ -::r ::::: ' ' ' ' ---------r-------r------- ---------r-------r ------- ::::::::[:: ::f :::::::: :=::::::J::= -=t=::=:: ---------r-------r-------- ---------r------r------- Th i s s o f t w a r e i s l i c e n s e d t o : N O V A S e r v i c e s CP T n a m e : C P T - 2 Co n e r e s i s t a n c e qt ( t s f ) 40 0 30 0 20 0 10 0 Depth (ft) 787674727068666462605856545250484644424038363432302826242220181614121086420 Co n e r e s i s t a n c e C P T b a s i c i n t e r p r e t a t i o n p l o t s Fr i c t i o n R a t i o Rf ( % ) 10 8 6 4 2 0 Depth (ft) 787674727068666462605856545250484644424038363432302826242220181614121086420 Fr i c t i o n R a t i o Po r e p r e s s u r e u ( p s i ) 20 1 5 1 0 5 0 Depth (ft) 787674727068666462605856545250484644424038363432302826242220181614121086420 Po r e p r e s s u r e In s i t u SB T P l o t Ic ( S B T ) 4 3 2 1 Depth (ft) 787674727068666462605856545250484644424038363432302826242220181614121086420 SB T P l o t So i l B e h a v i o u r T y p e SB T ( R o b e r t s o n e t a l . 1 9 8 6 ) 18 1 7 1 6 1 5 1 4 1 3 1 2 1 1 1 0 9 8 7 6 5 4 3 2 1 0 Depth (ft) 78767472706866646260585654525048464442403836343230282624222018161412108642 So i l B e h a v i o u r T y p e Cl a y & s i l t y c l a y Sa n d & s i l t y s a n d Sil t y s a n d & s a n d y s i l t Sa n d & s i l t y s a n d Sa n d & s i l t y s a n d Sil t y s a n d & s a n d y s i l t Sil t y s a n d & s a n d y s i l t Cl a y & s i l t y c l a y Cl a y & s i l t y c l a y Cl a y & s i l t y c l a y Sa n d & s i l t y s a n d Sil t y s a n d & s a n d y s i l t Ve r y d e n s e / s t i f f s o i l Cl a y Ve r y d e n s e / s t i f f s o i l Cl a y & s i l t y c l a y Cl a y & s i l t y c l a y Cl a y Cl a y Ve r y d e n s e / s t i f f s o i l Ve r y d e n s e / s t i f f s o i l Cl a y & s i l t y c l a y Cl a y & s i l t y c l a y Cl a y & s i l t y c l a y Cl a y Cl a y & s i l t y c l a y Ve r y d e n s e / s t i f f s o i l Cl a y Cl a y Cl a y & s i l t y c l a y Cl a y & s i l t y c l a y Cl a y Cl a y & s i l t y c l a y Ve r y d e n s e / s t i f f s o i l Cl a y Ve r y d e n s e / s t i f f s o i l Cl a y Ve r y d e n s e / s t i f f s o i l Ve r y d e n s e / s t i f f s o i l Cl a y & s i l t y c l a y Ve r y d e n s e / s t i f f s o i l CL i q v . 3 . 4 . 1 . 4 - C P T L i q u e f a c t i o n A s s e s s m e n t S o f t w a r e - R e p o r t c r e a t e d o n : 1 / 3 / 2 0 2 3 , 3 : 4 6 : 5 9 P M 10 Pr o j e c t f i l e : C : \ U s e r s \ o b r i e \ O n e D r i v e \ D o c u m e n t s \ b G e o R i s k \ 3 P r o j e c t s \ N O V A S a n D i e g o \ 3 . P r o j e c t s \ A v i a r a O a k s E l e m S c h o o l \ e . E v a l u a t i o n \ S e i s m i c C o m p r e s s i o n \ A n a l y s i s C P T \ S e i s m i c c o m p r e s s i o n g w l 3 0 f t . c l q In p u t p a r a m e t e r s a n d a n a l y s i s d a t a An a l y s i s m e t h o d : Fi n e s c o r r e c t i o n m e t h o d : Po i n t s t o t e s t : Ea r t h q u a k e m a g n i t u d e M w: Pe a k g r o u n d a c c e l e r a t i o n : De p t h t o w a t e r t a b l e ( i n s i t u ) : NC E E R ( 1 9 9 8 ) NC E E R ( 1 9 9 8 ) Ba s e d o n I c v a l u e 7. 0 0 0. 5 4 30 . 0 0 f t De p t h t o w a t e r t a b l e ( e r t h q . ) : Av e r a g e r e s u l t s i n t e r v a l : Ic c u t - o f f v a l u e : Un i t w e i g h t c a l c u l a t i o n : Us e f i l l : Fil l h e i g h t : 30 . 0 0 f t 3 2. 6 0 Ba s e d o n S B T No N/ A Fil l w e i g h t : Tr a n s i t i o n d e t e c t . a p p l i e d : Kσ a p p l i e d : Cl a y l i k e b e h a v i o r a p p l i e d : Li m i t d e p t h a p p l i e d : Li m i t d e p t h : N/ A No Ye s Sa n d s o n l y No N/ A SB T l e g e n d 1. S e n s i t i v e f i n e g r a i n e d 2. O r g a n i c m a t e r i a l 3. C l a y t o s i l t y c l a y 4. C l a y e y s i l t t o s i l t y cl a y 5. S i l t y s a n d t o s a n d y s i l t 6. C l e a n s a n d t o s i l t y s a n d 7. G r a v e l y s a n d t o s a n d 8. V e r y s t i f f s a n d t o cl a y e y s a n d 9. V e r y s t i f f f i n e g r a i n e d I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ _._ _ _._ _ _._ __ L--L--L--.L--.L--.L--.L---1---1---1--_._ _ _._ _ _._ __ L--L--L--L--.L--.L--.L---1---1---1--_._ _ _._ _ _._ _ _._ __ L--L--L--.L---L---L---1---1---1--1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I , __ _._ _ _._ _ _._ __ L--L--L---L--.L---L--.L---'---'---'--_._ _ _._ _ _._ __ L--L--L--L--.L---L---L---1---1---1--_._ _ _._ _ _._ _ _._ __ L--L--L---L---L---L---1---1---1--1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ _._ _ _._ _ _._ __ L--L--L--.L--.L---L--.L---1---'---1--_._ _ _._ _ _._ __ L--L--L--L--.L---L---L---1---1---1--_._ _ _._ _ _._ _ _._ __ L--L--L---L---L---L---1---1---1--1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I , __ _._ _ _._ _ _._ __ L--L--L---L--.L---L--.L---'---'---'--_._ _ _._ _ _._ __ L--L--L--L--.L---L---L---1---1---1--_._ _ _._ _ _._ _ _._ __ L--L--L---L---L---L---1---1---1--1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ _._ _ _._ _ _._ __ L--L--L--.L--.L---L--.L---'---'---'---'--..... --'---L--L--L--L--.L---L---L---'---'---'---'--_._ _ _._ _ _._ __ L--L--L---L---L---L---1---1---1--1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I , __ _._ _ _._ _ _._ __ L--L--L---L--.L---L--.L---1---1---1---'--_._ _ _._ __ L--L--L--L--.L---L---L---1---1---1--_._ _ _._ _ _._ _ _._ __ L--L--L---L---L---L---1---1---1--I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ _._ _ _._ _ _._ __ L--L--L--.L--.L---L--.L---1---1---1---'--_._ _ _._ __ L--L--L--L--.L---L---L---1---1---1---'--_._ _ _._ _ _._ __ L--L--L---L---L---L---1---1---1--I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I , __ _._ _ _._ _ _._ __ L--L--L---L--.L---L--.L---1---1---1---'--_._ _ _._ __ L--L--L--L--.L---L---L---1---1---1--_._ _ _._ _ _._ _ _._ __ L--L--L---L---L---L---1---1---1--I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I --i---i---i---t--t--t--t--t--t--t--1--1--1-.na-:---i---t--t....-L--t--.J.--t--t--'--1--1---:---i---:---i---t-'---L~-~--1--1 -+-+-+--~--~--~--t--t--t--t-'-i· -~.-~·. --~. --~. --1. --~. ----t--t---~--l-+-+-+-+--~ --" _ _. -~.-• I I I I I I I I I I I I I I I I I I I I I I I I I I I I I --+-+-+-+++++++ --~--• +:+-I -+--++-++-+-+-+-+--~ -+ I I I I I I I I I I I I I I • I I I I I I I I I I I I I I I I -t-rtnt-,~--t--t--t ,--1---, ·t· t--1 --t----t--t·· -1--1--t--r--t--r---r ---1 --, -1-+-+ -+-+-1 -r~---++ I ++-+-+-+-+--~ ------~1 I I I I I I I I I I I I I I I I I I I .-i--'-r1rhtnt--t-t I I I I I I I I I I I I I I I I I I I I I I I I I I I I __ ... __ ... __ ... __ ... __ ... __ _, __ _, __ _, __ _, __ _, __ _._ _ _._ _ _._ _ _.__ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I --L--L--L--L--L--.L---L---L--.L---L---1---'---'---'---'---'--_._ _ _._ _ _.__ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I --T--T--T--T--T---,---,---,---,---,---,---,---,---,----r--r--r--r--r--T--T--T--T--T---,---,---,---,---,---.---.---,---.---r--r--r--r-- 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I __ ... __ ... __ ... __ ... __ ... __ _, __ _, __ _, __ _, __ _, __ _._ _ _._ _ _._ _ _._ --L--L--L--L--L--.L---L---L--.L---L---1 __ _, __ _, __ _, __ _._ _ _._ _ _._ _ _._ _ _._ __ L--L--.L--.L-- I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I --t--t--t--t--t--i--i--i--i--i--t-t_t_t_ -+--~-+--~--h-:--t--f--t--t--+ +-++-i--t-t-t-t-t--r--r--r--hr- I ...!..1 I_---!...___..___,_____! I I ~..-! ' ' ' ' ' ' 'Ti~1:rr1~1?t-t-rt--r--•--~-•--•-->+H I I I I ---,---,---.---r-- ' ' ' ----rrI ' ' ' ' ' ' ' ' ' ---,---,--' ' ' ' ' ' -lll-t--· • i . i +--+--+ -~''-➔ I I iV· I ' ' ' ' ' ' ' ' ' ' r-rn-n--1--i--rrrn--n-nnnlff !Ttlt I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I --♦--♦--♦--♦--♦--◄--◄--◄--◄--◄-----------------------►--►--►--►--►--+--+--+--+--+--◄--◄--◄--◄--◄-----------------------►--►--►--►-' I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1r--+. --+. --+. --+--+--~--~--~--~--~--+-+-+-+-+--~--~--~--~--~--+--+--+--+--+--~--~--~--~--~--+-+-+-+-+--~--r -~--~. -I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I • • • • • • • • • -l-+-+--~--~--~--~--r--t--t--t--t--t--ttt((t-t-t-t-t--r--• □□□ ■□□ ■■■ Th i s s o f t w a r e i s l i c e n s e d t o : N O V A S e r v i c e s CP T n a m e : C P T - 2 No r m . c o n e r e s i s t a n c e Qt n 20 0 15 0 10 0 50 0 Depth (ft) 787674727068666462605856545250484644424038363432302826242220181614121086420 No r m . c o n e r e s i s t a n c e C P T b a s i c i n t e r p r e t a t i o n p l o t s ( n o r m a l i z e d ) No r m . f r i c t i o n r a t i o Fr ( % ) 10 8 6 4 2 0 Depth (ft) 787674727068666462605856545250484644424038363432302826242220181614121086420 No r m . f r i c t i o n r a t i o No m . p o r e p r e s s u r e r a t i o Bq 1 0 . 8 0 . 6 0 . 4 0 . 2 0 - 0 . 2 Depth (ft) 787674727068666462605856545250484644424038363432302826242220181614121086420 No m . p o r e p r e s s u r e r a t i o SB T n P l o t Ic ( R o b e r t s o n 1 9 9 0 ) 4 3 2 1 Depth (ft) 787674727068666462605856545250484644424038363432302826242220181614121086420 SB T n P l o t No r m . S o i l B e h a v i o u r T y p e SB T n ( R o b e r t s o n 1 9 9 0 ) 18 1 7 1 6 1 5 1 4 1 3 1 2 1 1 1 0 9 8 7 6 5 4 3 2 1 0 Depth (ft) 78767472706866646260585654525048464442403836343230282624222018161412108642 No r m . S o i l B e h a v i o u r T y p e Sil t y s a n d & s a n d y s i l t Sa n d & s i l t y s a n d Ve r y d e n s e / s t i f f s o i l Sa n d & s i l t y s a n d Sil t y s a n d & s a n d y s i l t Sil t y s a n d & s a n d y s i l t Cl a y & s i l t y c l a y Cl a y & s i l t y c l a y Cl a y Sil t y s a n d & s a n d y s i l t Sil t y s a n d & s a n d y s i l t Ve r y d e n s e / s t i f f s o i l Cl a y & s i l t y c l a y Cl a y & s i l t y c l a y Cl a y & s i l t y c l a y Cl a y Cl a y Cl a y & s i l t y c l a y Cl a y Cl a y & s i l t y c l a y Cl a y & s i l t y c l a y Cl a y Cl a y Or g a n i c s o i l Cl a y & s i l t y c l a y Cl a y Cl a y Cl a y & s i l t y c l a y Cl a y Cl a y & s i l t y c l a y Cl a y & s i l t y c l a y Cl a y & s i l t y c l a y CL i q v . 3 . 4 . 1 . 4 - C P T L i q u e f a c t i o n A s s e s s m e n t S o f t w a r e - R e p o r t c r e a t e d o n : 1 / 3 / 2 0 2 3 , 3 : 4 6 : 5 9 P M 11 Pr o j e c t f i l e : C : \ U s e r s \ o b r i e \ O n e D r i v e \ D o c u m e n t s \ b G e o R i s k \ 3 P r o j e c t s \ N O V A S a n D i e g o \ 3 . P r o j e c t s \ A v i a r a O a k s E l e m S c h o o l \ e . E v a l u a t i o n \ S e i s m i c C o m p r e s s i o n \ A n a l y s i s C P T \ S e i s m i c c o m p r e s s i o n g w l 3 0 f t . c l q SB T n l e g e n d 1. S e n s i t i v e f i n e g r a i n e d 2. O r g a n i c m a t e r i a l 3. C l a y t o s i l t y c l a y 4. C l a y e y s i l t t o s i l t y cl a y 5. S i l t y s a n d t o s a n d y s i l t 6. C l e a n s a n d t o s i l t y s a n d 7. G r a v e l y s a n d t o s a n d 8. V e r y s t i f f s a n d t o cl a y e y s a n d 9. V e r y s t i f f f i n e g r a i n e d In p u t p a r a m e t e r s a n d a n a l y s i s d a t a An a l y s i s m e t h o d : Fi n e s c o r r e c t i o n m e t h o d : Po i n t s t o t e s t : Ea r t h q u a k e m a g n i t u d e M w: Pe a k g r o u n d a c c e l e r a t i o n : De p t h t o w a t e r t a b l e ( i n s i t u ) : NC E E R ( 1 9 9 8 ) NC E E R ( 1 9 9 8 ) Ba s e d o n I c v a l u e 7. 0 0 0. 5 4 30 . 0 0 f t De p t h t o w a t e r t a b l e ( e r t h q . ) : Av e r a g e r e s u l t s i n t e r v a l : Ic c u t - o f f v a l u e : Un i t w e i g h t c a l c u l a t i o n : Us e f i l l : Fil l h e i g h t : 30 . 0 0 f t 3 2. 6 0 Ba s e d o n S B T No N/ A Fil l w e i g h t : Tr a n s i t i o n d e t e c t . a p p l i e d : Kσ a p p l i e d : Cl a y l i k e b e h a v i o r a p p l i e d : Li m i t d e p t h a p p l i e d : Li m i t d e p t h : N/ A No Ye s Sa n d s o n l y No N/ A I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ _._ _ _._ _ _._ __ L--L--L--.L--.L--.L--.L---1---1---1--_._ _ _._ _ _._ __ L--L--L--L--.L--.L--.L---1---1---1--_._ _ _._ _ _._ _ _._ __ L--L--L--.L---L---L---1---1---1--1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I , __ _._ _ _._ _ _._ __ L--L--L---L--.L---L--.L---'---'---'--_._ _ _._ _ _._ __ L--L--L--L--.L---L---L---1---1---1--_._ _ _._ _ _._ _ _._ __ L--L--L---L---L---L---1---1---1--1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ _._ _ _._ _ _._ __ L--L--L--.L--.L---L--.L---1---'---1--_._ _ _._ _ _._ __ L--L--L--L--.L---L---L---1---1---1--_._ _ _._ _ _._ _ _._ __ L--L--L---L---L---L---1---1---1--1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I , __ _._ _ _._ _ _._ __ L--L--L---L--.L---L--.L---'---'---'--_._ _ _._ _ _._ __ L--L--L--L--.L---L---L---1---1---1--_._ _ _._ _ _._ _ _._ __ L--L--L---L---L---L---1---1---1--1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ _._ _ _._ _ _._ __ L--L--L--.L--.L---L--.L---'---'---'---'--..... --'---L--L--L--L--.L---L---L---'---'---'---'--_._ _ _._ _ _._ __ L--L--L---L---L---L---1---1---1--1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I , __ _._ _ _._ _ _._ __ L--L--L---L--.L---L--.L---1---1---1---'--_._ _ _._ __ L--L--L--L--.L---L---L---1---1---1--_._ _ _._ _ _._ _ _._ __ L--L--L---L---L---L---1---1---1--I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ _._ _ _._ _ _._ __ L--L--L--.L--.L---L--.L---1---1---1---'--_._ _ _._ __ L--L--L--L--.L---L---L---1---1---1---'--_._ _ _._ _ _._ __ L--L--L---L---L---L---1---1---1--I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I , __ _._ _ _._ _ _._ __ L--L--L---L--.L---L--.L---1---1---1---'--_._ _ _._ __ L--L--L--L--.L---L---L---1---1---1--_._ _ _._ _ _._ _ _._ __ L--L--L---L---L---L---1---1---1--I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I _ _._ _ _._ _ _._ __ L--L--L--.L--.L---L--.L---1-~-1---1---'--_._ _ _._ __ L--L~-L--L--.L---L---L---'---'---'---'--_._ _ _._ _ _._ __ L--L--L---L---L---L---'---'---'--I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I -+. -+. -+. --~-~. --~--t--t--t--t--i-· ·i--i---~-+--~--~--~--~--~--t--t--t--i--i--i--+-+-+-+--~--~--~--t--t--t--i--i--i--··-+-+-+--u--~--~--t--t--t--t--i-· ·i--i--+-+-+--~--~--~--~--+--+--+--i--i--i--+-+-+-+--~--~--~--+--+--+--i--i--i--' ' ' ' l~n~-t--t. --tc; ·i--i.---~. -+. --~--~--~--~--~--t--t--t--i--i--i--+-+-+-+--~--~--~--t--t--t--i--i--i.--' ' -+--' ' f-i--+-+-+--~--~--~--~--+--+--+--i--i--i--+-+-+-+--~--~--~--+--+--+--+-i--i-- 1 I I I 1~-t--~ r~-t--f.,-t--t-11--1--1--+-+-+-t--~t--t--t--t--t--1r-i1-I lr--f--f--f--f--f--7--7--7--7--7--+-+-+-+-+ ! ! ! ! ! ! ! : : : : : • : : - I I I I I I I I I I I I I I __ ... __ ... __ ... __ ... __ ... __ _, __ _, __ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I [ -1-•r ' ' ' ' ' ' ' ' -,---r--' ' ' ' ' ' --r--r--t--t--' ' ,-: : : lJ I I I I I nn-n--n-n--1--i--i--ri--dHHHHh--r--r- I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 11 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I T[IIL~]Ir-rrlIII[JIIIJIIIlIIIlIIIIJ]III I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I !■ I I I I I I I I I I I I I I I I ln l I I I I I I I I I I I I I I I I I • I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I '~l ' I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I tttt-t--tti ;-(i ' ' ' ' t ' ' ' ' ' ' ' ' ' ' □□□ ■□□ ■■■ This software is licensed to: NOVA Services CPT name: CPT-2 Total cone resistance qt (tsf) 400300200100 De p th ( f t ) 78 76 74 72 70 68 66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Total cone resistance L i q u e f a c t i o n a n a l y s i s o v e r a l l p l o t s ( i n t e r m e d i a t e r e s u l t s ) SBTn Index Ic (Robertson 1990) 4321 De p th ( f t ) 78 76 74 72 70 68 66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 SBTn Index Norm. cone resistance Qtn 200150100500 De p th ( f t ) 78 76 74 72 70 68 66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Norm. cone resistance Grain char. factor Kc 109876543210 De p th ( f t ) 78 76 74 72 70 68 66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Grain char. factor Corrected norm. cone resistance Qtn,cs 200150100500 De p th ( f t ) 78 76 74 72 70 68 66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Corrected norm. cone resistance CLiq v.3.4.1.4 - CPT Liquefaction Assessment Software - Report created on: 1/3/2023, 3:46:59 PM 12 Project file: C:\Users\obrie\OneDrive\Documents\b GeoRisk\3 Projects\NOVA San Diego\3. Projects\Aviara Oaks Elem School\e. Evaluation\Seismic Compression\Analysis CPT\Seismic compression gwl 30 ft.clq Input parameters and analysis data Analysis method: Fines correction method: Points to test: Earthquake magnitude Mw: Peak ground acceleration: Depth to water table (insitu): NCEER (1998) NCEER (1998) Based on Ic value 7.00 0.54 30.00 ft Depth to water table (erthq.): Average results interval: Ic cut-off value: Unit weight calculation: Use fill: Fill height: 30.00 ft 3 2.60 Based on SBT No N/A Fill weight: Transition detect. applied: Kσ applied: Clay like behavior applied: Limit depth applied: Limit depth: N/A No Yes Sands only No N/A ' ' ' ' --------t----------+--' ' ' ' --------►---------+--' ' ' ' --------►---------+--' ' ' ' ◄---------►---------+--' ' ' ' ' ' ◄---------►---------+--' ' ' ' ' ' .J---------L---------'-- 0 ' ' t:~::r~::~t ---------~--------+- ---------~---------1-- i---------~---------1---i---------~--------+- --~-~~~11111111111! ~::1:11::1::1::1::11: ---i---------~---------1-- ---i---------~---------1-- ---i---------~---------1-- ---i---------~---------1-- :::(:::::::~::::::::t: --+---::::f ~~~~~~~r ' ' -----------------' ' ' ' ' ' ----------►---------•---------◄----------' ' ' ' ' ' -------------------' ' ' ' ' ' ----------►---------♦---------◄----------' ' ' ' ' ' ----------►---------♦---------◄ ' ' ' ' ----------L---------.1.---- 0 ' ·::::=::~::::::=:i=::=::r:::::::: ---------+---------t------i--------------------~-----------i---------- -+---------t---------i---------- ---------+ -----t---------i--------- .. ___ :~I~iililliiliiliiiiiiiiii :j ~::1::1::1:11::1::!::1::1:: --~---------t---------i---------- -----------t---------i---------- ---~---------t---------i---------- ---------~---------t---------i---------- -:::~:::::::::t::::::::(:::::::: ---+---:::::~i~~~~~~~~~r ~~~~~~~: ' ' ' ' ---------t----------+----------1----------, ' ' ' ' ' ----------►---------•---------◄----------' ' ' ' ' ' ---------►---------•---------◄----------' ' ' ' ' ' ---------►---------•---------◄----------' ' ' ' ' ' ---------►---------♦---------◄---------r ' ' ' ' ' ' ----------L _________ ,1 _________ .J ________ _ ' ' ' :::~::~:r:::::r:;;;:::; ----------~---------t---------i------ ----------~---------t---------i--------- ---------~---------t--------I ----------~---------t---------i------- :::1::1:11:::::::1::::~~~~I:: __ :::1::1:11::1:::1:::::~i;i~~~:~~:: ----------~---------t-------- ----------~---------t---------i-- ----------~---------t---------i---- ----------~---------t---------i-------- -:::::::::~:::::::::t::::::::~::::: __ -~~~~~~~~I~~~~~~~~E~~::::::: ___ _ This software is licensed to: NOVA Services CPT name: CPT-2 CRR plot CRR & CSR 0.60.40.20 De p th ( f t ) 78 76 74 72 70 68 66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 CRR plot During earthq. L i q u e f a c t i o n a n a l y s i s o v e r a l l p l o t s FS Plot Factor of safety 21.510.50 De p th ( f t ) 78 76 74 72 70 68 66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 FS Plot During earthq. Liquefaction potential LPI 20151050 De p th ( f t ) 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Liquefaction potential Vertical settlements Settlement (in) 0.080.060.040.020 De p th ( f t ) 78 76 74 72 70 68 66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Vertical settlements Lateral displacements Displacement (in) 0 De p th ( f t ) 78 76 74 72 70 68 66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Lateral displacements CLiq v.3.4.1.4 - CPT Liquefaction Assessment Software - Report created on: 1/3/2023, 3:46:59 PM 13 Project file: C:\Users\obrie\OneDrive\Documents\b GeoRisk\3 Projects\NOVA San Diego\3. Projects\Aviara Oaks Elem School\e. Evaluation\Seismic Compression\Analysis CPT\Seismic compression gwl 30 ft.clq F.S. color scheme LPI color schemeInput parameters and analysis data Analysis method: Fines correction method: Points to test: Earthquake magnitude Mw: Peak ground acceleration: Depth to water table (insitu): NCEER (1998) NCEER (1998) Based on Ic value 7.00 0.54 30.00 ft Depth to water table (erthq.): Average results interval: Ic cut-off value: Unit weight calculation: Use fill: Fill height: 30.00 ft 3 2.60 Based on SBT No N/A Fill weight: Transition detect. applied: Kσ applied: Clay like behavior applied: Limit depth applied: Limit depth: N/A No Yes Sands only No N/A Almost certain it will liquefy Very likely to liquefy Liquefaction and no liq. are equally likely Unlike to liquefy Almost certain it will not liquefy Very high risk High risk Low risk ------,--' ' ' ' -------------1-----------►------------' ' ' ' -------------1-----------►------------' ' ' ' -------------1-----------►------------' ' ' ' -------------1------------►------------' ' ' ' -------------1------------►------------' ' ' ' ____________ .J _____ -------L------------ 0 ' ~~~=~~~=~~~l=~~ =~~~~~[~~~~~~~ ------------i------------~------------------------i------------~------------ ------------i------------~------------------------1------------~------------ ' ' ' ' ------------,------------r-------------' ' ' ' ------------,-----------r-------------' ' ' ' ------------,------------r---------' ' ' ' ------------,------------r-----------' ' ------------,------------r-------------' ' ' ' -------------1------------►------------ ____________ J ________ ----L------_-__ -_-_-_-__ -__ ::::::::::::1:1:I I !!::1::1::: ------------i------------~------------ ------------i-----------~------------------------i-----------~------------ ------------i------------~------------ ::::::::::::~:::::: ::::):::::::::::: ~~~~~~~~~~~~~~~~~~~ ~~~~~~[:::::::::: ■ □ □ □ ■ ---r--- 1 I I I I I I I -------+--------+--------►-------►-----' I I I I I I I -------+--------+--------►-------►-----' I I I I I I I -------+--------+--------►-------►------I I I I I I I I -------+--------+--------►-------►----• I I I I I I I -------+--------+--------►-------►----• I I I I I I I ------...1..------...1..-------L-------L------1 I I I ~~~~~r~~~r =~~~r ::::L :::: ------+------+-------~-----~-------------+------+-------~-----~-------------+------+-------~------~-------------+------+-------~ -----~------- ::tr~::f t:i tit:: ~~. 0 ±: -~~~~t~~~~~I~~~~~~t~~~~~~: -----:1~:1::1::1::1::::::1::::::: -+------+-------~-------~--------+------+-------~-------~--------+------+-------~-------~--------+------+-------~-------~------- :+::::::+:::::::~:::::::~::::::: ~f ~~~~~~f ~~~~~~~~~~~~~~~~~~~~~~: ------------------------------------------------------------- ---------------------------------------------------------------------------------------------------- --------------------- -------------------- --------------------- ----------------------------------------- -------------------- --------------------- -------------------- ---------------------------------------- ---------------------------------------- ---------------------------------------- --------------------- ----------------------------------------- -------------------- --------------------- -------------------- --------------------- -------------------- --------------------- -------------------- --------------------- -------------------- --------------------- -------------------- --------------------- ----------------------------------------- -------------------- --------------------- -------------------- --------------------- ---------------------------------------------------------------------------------------------------- ------------------------------------------------------------- -------------------- ■ □ □ This software is licensed to: NOVA Services CPT name: CPT-2 Normalized friction ratio (%) 0.1 1 10 No rm a l i z e d C P T p e n e t r a t i o n r e s i s t a n c e 1 10 100 1,000 L i q u e f a c t i o n a n a l y s i s s u m m a r y p l o t s Qtn,cs 200180160140120100806040200 Cy cl i c S t r e s s R a t i o * ( C S R * ) 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0 Liquefaction No Liquefaction Thickness of surface layer, H1 (m) 109876543210 Th ic k n e s s o f l i q u e f i a b l e s a n d l a y e r , H 2 ( m ) 12.0 11.0 10.0 9.0 8.0 7.0 6.0 5.0 4.0 3.0 2.0 1.0 0.0 Analysis PGA: 0.54 PG A 0 . 4 0 g - 0 . 5 0 g CLiq v.3.4.1.4 - CPT Liquefaction Assessment Software - Report created on: 1/3/2023, 3:46:59 PM 14 Project file: C:\Users\obrie\OneDrive\Documents\b GeoRisk\3 Projects\NOVA San Diego\3. Projects\Aviara Oaks Elem School\e. Evaluation\Seismic Compression\Analysis CPT\Seismic compression gwl 30 ft.clq Input parameters and analysis data Analysis method: Fines correction method: Points to test: Earthquake magnitude Mw: Peak ground acceleration: Depth to water table (insitu): NCEER (1998) NCEER (1998) Based on Ic value 7.00 0.54 30.00 ft Depth to water table (erthq.): Average results interval: Ic cut-off value: Unit weight calculation: Use fill: Fill height: 30.00 ft 3 2.60 Based on SBT No N/A Fill weight: Transition detect. applied: Kσ applied: Clay like behavior applied: Limit depth applied: Limit depth: N/A No Yes Sands only No N/A ' ' -jf-....1..---1r....1..7~....l..i '--'-i --'-7 --! · · · I I I I ' : ! i i !, !, i i ' ' ' ' ' ' ' ! !, !, !, ! : : ---f------t-' • 1:-------1: ---:: :: ! ! l-----+------:---------f, ------r. --1 1 1 1 1 1 1 : : : ! : : ! ! i ! : ' : --~----------L---+----+---7-----1-----r--r-! • ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ! ! ! ! ! : -------~------t-i : : ------~-------~------1 : : '------+------~ : : : : -------+ ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ------l------+------f----+---t-----r----r ! ! ! ! ! •• : , , , , , , --r:. ----------1------+----+----7----l•-r ' ' ' ' ' : : ' 1 1 1 1 1 ---~----+----+-----r-----1 i ------(------i------1--: : : : -----+-----t : : ! ! ! ! ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' i i i _J ______ ~------1-----+---t-----r-' ' • -' ' ' ' ' ' ' _.__ ' ' ' ' ' ' -t, ------' ! ! ! ! ! ! ' ' ' ' ' ' I I I I I ! ! ! I ' ' ' : ! j _____ +-----+----+-----+-----t------r---• _._____ ' ' ' ' ' ' ' O O •1~ -----,---I • t ' ' ----' ' ,· : : ·-,; :; 1 • : I -1 -+-,--• ---·.r• ---(-----+--:,'· :~~ ; : c._.cl------+-...-! ,I I •i , ~~~-7~;w , ---i--_, ---+--- ' ' ' ' ' ' ' ' ' ' ---! ---+---' ' ' ' ' ' ' ' ' ' ' ' ' ' --, --+----,--' ' ' ' ' ' ' ' ' ' ' ' ---+-----i-----+----1------r- • I I I I ·-' : : : : ! -' ' ' ' I I I . : ! ' ' This software is licensed to: NOVA Services CPT name: CPT-2 Norm. cone resistance Qtn 3002001000 De pt h ( f t ) 78 76 74 72 70 68 66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Norm. cone resistance C h e c k f o r s t r e n g t h l o s s p l o t s ( R o b e r t s o n ( 2 0 1 0 ) ) Grain char. factor Kc 109876543210 De pt h ( f t ) 78 76 74 72 70 68 66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Grain char. factor Corrected norm. cone resistance Qtn,cs 200150100500 De pt h ( f t ) 78 76 74 72 70 68 66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Corrected norm. cone resistance SBTn Index Ic (Robertson 1990) 4321 De pt h ( f t ) 78 76 74 72 70 68 66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 SBTn Index Liquefied Su/Sig'v Su/Sig'v 0.50.40.30.20.10 De pt h ( f t ) 78 76 74 72 70 68 66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Peak Su ratio Liq. Su ratio Liquefied Su/Sig'v CLiq v.3.4.1.4 - CPT Liquefaction Assessment Software - Report created on: 1/3/2023, 3:46:59 PM 15 Project file: C:\Users\obrie\OneDrive\Documents\b GeoRisk\3 Projects\NOVA San Diego\3. Projects\Aviara Oaks Elem School\e. Evaluation\Seismic Compression\Analysis CPT\Seismic compression gwl 30 ft.clq Input parameters and analysis data Analysis method: Fines correction method: Points to test: Earthquake magnitude Mw: Peak ground acceleration: Depth to water table (insitu): NCEER (1998) NCEER (1998) Based on Ic value 7.00 0.54 30.00 ft Depth to water table (erthq.): Average results interval: Ic cut-off value: Unit weight calculation: Use fill: Fill height: 30.00 ft 3 2.60 Based on SBT No N/A Fill weight: Transition detect. applied: Kσ applied: Clay like behavior applied: Limit depth applied: Limit depth: N/A No Yes Sands only No N/A ' -----------+--------' ' ' i ~~~((j~~~~~=:T-::~:a~-~~ .. ~-~ .. ~~--~'!l"'~~ .. ~,, : :::::::::+::~~~:~~r~~~~~~r~ --------t-----------t--- ---------t-----------t--- ' ---------t-----------t-----------t--- 1 --+-----------+-----------+--- --~~~~~::1::::::1::1::1::1::1::: ):::::::1::1::1::1::1::1::1::: I ------+-----------+-----------+--- ------t-----------t-----------t--- -------t-----------t-----------t--- -------t-----------t-----------t--- ;--:::::::t::::::::::t::::::::::t:: -----:::l~~~~~~~~~~~l~~~~~~~~~~~l~~~ ' -------+----------1----------, ' . ' ' -----►---------•---------◄----------' ' ' ' ' ' ---------►---------♦---------◄----------' ' ' ' ' ' -··-·-· -· -►---------♦---------◄----------' ' ' ' ' ' -· ·-·-----►---------♦---------◄----------' ' ' ' ' ' --~----~----~-----' ' ' =::f ~~~~~f ;;;::; -----~ ---------t---------~ ------ -----~---------t---------~--------- ~---------t--------I --~----~----~---- --~~llllllll~~i~~~:~:~--~ ---;;;1::1::1:1;::~~;;:~~~~~:::: -----~---------t-------- -----~---------t---------~--- ~---------t---------~---- --~----~----~---- _,,_ .:~:~:~:::::::::t::::::::t::::_ - ----1-~~~~~~==:~-- --y---y---,---- 1 I I I I I I I -------►-------+-------+--------1--------1 I I I I I I I --------►-------•-------•-------◄--------• I I I I I I I -------►-------•-------•-------◄--------• I I I I I I I -------►-------•-------•-------◄--------• I I I I I I I -------►-------♦-------♦-------◄-------• I I I I I I I --------L-------J. _______ J. _______ .J _______ _ I I I I :~~~~~r :~~~r :~~~r:~~~1:~~~: --------~-------t-------t-------i-------- --------~-------t-------t-------i-------- -------~-------t-------t-------i-------- --------~-------t-------t-------i------- :::1::1::1::1:::::::1:::::::1::::::: :::1::1::1::1:::::::1:::::::1:;::; --------~-------t-------t-------i-------- --------~-------t-------t-------i-------- --------~-------t-------t-------i-------- --------~-------t-------t-------i-------- -:::::::~:::::::t:::::::t::::::~:::::::: ::::::1::::::]::::::]::::::]:::::::: This software is licensed to: NOVA Services CPT name: CPT-2 Cone resistance qt (tsf) 400300200100 De pt h ( f t ) 78 76 74 72 70 68 66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Cone resistance SBTn Plot Ic (Robertson 1990) 4321 De pt h ( f t ) 78 76 74 72 70 68 66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 SBTn Plot FS Plot Factor of safety 21.510.50 De pt h ( f t ) 78 76 74 72 70 68 66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 FS Plot During earthq. Vertical settlements Settlement (in) 0.080.060.040.020 De pt h ( f t ) 78 76 74 72 70 68 66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Vertical settlements E s t i m a t i o n o f p o s t - e a r t h q u a k e s e t t l e m e n t s Strain plot Volumentric strain (%) 6543210 De pt h ( f t ) 78 76 74 72 70 68 66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Strain plot CLiq v.3.4.1.4 - CPT Liquefaction Assessment Software - Report created on: 1/3/2023, 3:46:59 PM 16 Project file: C:\Users\obrie\OneDrive\Documents\b GeoRisk\3 Projects\NOVA San Diego\3. Projects\Aviara Oaks Elem School\e. Evaluation\Seismic Compression\Analysis CPT\Seismic compression gwl 30 ft.clq Abbreviations qt: Ic: FS: Volumentric strain: Total cone resistance (cone resistance q c corrected for pore water effects) Soil Behaviour Type Index Calculated Factor of Safety against liquefaction Post-liquefaction volumentric strain ' ' ' ' --------►---------+--' ' ' ' --------►---------+--' ' ' ' --------►---------+--' ' ' ' ---------►---------+--' ' ' ' ' ' ---------►---------+--' ' ' i::::tttJ: ---------~---------1-----------~---------1-- • ---------~---------!---i---------~---------1----~-~_~::l~~~~l~~~~I~ ----i---------~---------!-- ----i---------~---------1-- ----i---------~---------1-- ----i---------~---------1-- ----1---------r--------+- ----,---------:--------:- ---i--------f :::::::r -----r--------T- I I I I I I I I I I -----◄------◄------•------►------►------• I I I I I I I I I ------1-------1------+------►------►------I I I I I I I I I I -----◄------◄------•------►------►------• I I I I I I I I I ------1-------1------+------►------►------I I I I I I I I I I -----◄------◄------•------►------►------• I I I I ::rn~::1~::1:::J::::1t: -----i------i------+------~------~-----------i------i------t------~------~------ -----i------i------t------~------~-----------i------i------t------~------~------ :::::~::::::t::::t:::::~::::::~:::::: ~::~i:~::~::~:r:~:i::::1::::: -----i------i------t------~------~------ ------i------i------t------~------~------ -----i------i------t------~------~------ -----i------i------t------~------~------ -----1------1------t------r------r------ -----,------,------y------:------:------ :::::r::::r::::F:::r::::r::::: -----,------,------:------:------:------ I I I I I I I I -------1--------1--------►-------►-----I I I I I I I I -------1--------1--------►-------►-----I I I I I I I I -------1--------1--------►-------►-----I I I I I I I I -------1--------1--------►-------►-----I I I I I I I I -------1--------1--------►-------►------1 I I I :~::1::::1::::J/I/: --------1--------1--------~-----~--------------1--------1--------~-----~------- -------1--------1--------~------~--------------1--------1--------~ -----~------- ::::::t::::::t:::::::~ ::::::~::::::: ~~~~~]~~~~~]~~~~~] ~~~~~~[~~~~: :: • 0 t :::j ::::::1:::::t:::::. --1--------1--------~-------~------- --1--------1--------~-------~------- --1--------1--------~-------~------- --1--------1--------~-------~------- -+------+-------r-------r------- -:------:-------:-------:------- :r:::::r:::::r:::::r:::::: -:------:-------:-------:------- LIQUEFACTION ANALYSIS REPORT Input parameters and analysis data Analysis method: Fines correction method: Points to test: Earthquake magnitude Mw: Peak ground acceleration: NCEER (1998) NCEER (1998) Based on Ic value 7.00 0.54 . G.W.T. (in-situ): G.W.T. (earthq.): Average results interval: Ic cut-off value: Unit weight calculation: Project title : Aviara Oaks Elementary School Location : 6900 Ambrosia Ln, Carlsbad, CA NOVA Services, Inc. 4373 Viewridge Ave, Suite B San Diego, CA 92123 www.usa-nova.com CPT file : CPT-3 30.00 ft 30.00 ft 3 2.60 Based on SBT Use fill: Fill height: Fill weight: Trans. detect. applied: Kσ applied: No N/A N/A No Yes Clay like behavior applied: Limit depth applied: Limit depth: MSF method: Sands only No N/A Method based Cone resistance qt (tsf) 4002000 De pt h ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Cone resistance SBTn Plot Ic (Robertson 1990) 4321 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 SBTn Plot CRR plot CRR & CSR 0.60.40.20 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 CRR plot During earthq. Qtn,cs 200180160140120100806040200 Cy cl i c S t r e s s R a t i o * ( C S R * ) 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0 Liquefaction No Liquefaction Normalized friction ratio (%) 0.1 1 10 No rm a l i z e d C P T p e n e t r a t i o n r e s i s t a n c e 1 10 100 1,000 Friction Ratio Rf (%) 1086420 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Friction Ratio Mw=71/2, sigma'=1 atm base curve Summary of liquefaction potential FS Plot Factor of safety 21.510.50 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 FS Plot During earthq. Zone A1: Cyclic liquefaction likely depending on size and duration of cyclic loading Zone A2: Cyclic liquefaction and strength loss likely depending on loading and ground geometry Zone B: Liquefaction and post-earthquake strength loss unlikely, check cyclic softening Zone C: Cyclic liquefaction and strength loss possible depending on soil plasticity, brittleness/sensitivity, strain to peak undrained strength and ground geometry CLiq v.3.4.1.4 - CPT Liquefaction Assessment Software - Report created on: 1/3/2023, 3:46:56 PM 17 Project file: C:\Users\obrie\OneDrive\Documents\b GeoRisk\3 Projects\NOVA San Diego\3. Projects\Aviara Oaks Elem School\e. Evaluation\Seismic Compression\Analysis CPT\Seismic compression gwl 30 ft.clq I I -----::~:{\\[ ::::+~::~+: --:----------:---c _:::r::::::::r: __ :::i::::::::::i::: -~-------:----------:--- -_:::::::r::::::::r: ________ t __________ t __ _ -·-------:----------:--- :---_::::r=::=:r: --------:t::::::::r: I ---------+--1 I I I I I I I -------r------r------r------r------r------r------1-----1------l------ ------r------r------r------r------r------r------1-----1------r------- ------r---r r-1 1 r---1 : ---r-- ------r-----r---! -----r-----r-----r-----r ---i------r------ I I :\\[ ::~t::~:: :~::::+: ::~!~::~:: --------:------:-------- :::::::::r:-:::r::::::: :::::::::r:: :::r:::::::. I I I I ---------i-----::r::::::: _ ________ ! _____ --+-------- ---------:-------:--------· ::::::::r::: =!=::=:: :::::::::r::: ::r::::::: --------_I_------t-------- This software is licensed to: NOVA ServicesCPT name: CPT-3 Cone resistance qt (tsf) 400 200 0 De pt h ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Cone resistance C P T b a s i c i n t e r p r e t a t i o n p l o t s Friction Ratio Rf (%) 1086420 De pt h ( f t ) 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Friction RatioPore pressure u (psi) 86420 De pt h ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Pore pressure Insitu SBT Plot Ic(SBT) 4 3 2 1 De pt h ( f t ) 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 SBT PlotSoil Behaviour Type SBT (Robertson et al. 1986) 1817161514131211109876543210 De pt h ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Soil Behaviour Type Clay Silty sand & sandy silt Clay & silty clay Silty sand & sandy silt Clay & silty clay Clay Clay & silty clay Clay & silty clay Clay & silty clay Silty sand & sandy silt Silty sand & sandy silt Silty sand & sandy silt Very dense/stiff soil Very dense/stiff soil Silty sand & sandy silt Silty sand & sandy silt Clay & silty clay Silty sand & sandy silt Very dense/stiff soil Clay & silty clay Clay & silty clay Clay & silty clay ClayClay Clay Clay & silty clay Clay Clay & silty clay Very dense/stiff soil Very dense/stiff soil Very dense/stiff soil Very dense/stiff soil CLiq v.3.4.1.4 - CPT Liquefaction Assessment Software - Report created on: 1/3/2023, 3:46:56 PM18 Project file: C:\Users\obrie\OneDrive\Documents\b GeoRisk\3 Projects\NOVA San Diego\3. Projects\Aviara Oaks Elem School\e. Evaluation\Seismic Compression\Analysis CPT\Seismic compression gwl 30 ft.clq Input parameters and analysis data Analysis method: Fines correction method: Points to test: Earthquake magnitude Mw: Peak ground acceleration: Depth to water table (insitu): NCEER (1998) NCEER (1998) Based on Ic value 7.00 0.54 30.00 ft Depth to water table (erthq.): Average results interval: Ic cut-off value: Unit weight calculation: Use fill: Fill height: 30.00 ft 3 2.60 Based on SBT No N/A Fill weight: Transition detect. applied: Kσ applied: Clay like behavior applied: Limit depth applied: Limit depth: N/A No Yes Sands only No N/A SBT legend 1. Sensitive fine grained 2. Organic material 3. Clay to silty clay 4. Clayey silt to silty clay5. Silty sand to sandy silt 6. Clean sand to silty sand 7. Gravely sand to sand 8. Very stiff sand to clayey sand 9. Very stiff fine grained ' ' ' I I I I I I I I ---1---1---1---1---1---1---1---1--! ! ! ! ! ! ! ! =i:lri=i:rri= --r-,--,--,--,--,--,--,-- □ □ □ :ttttttlll-+-+-+-+- : : : : : : : : : I I I I i --,--,--,--,--,--,--,--,--,--:-:-:-:-:- --➔--➔--➔--➔--➔--➔--➔--➔--➔--+-+-+-+-+- -+++++++++-t-t-t-t----,--,--,--,--,--,--,--,--,--:-:-:-------f-i--f-i--f-i--f-i--' • • • --1--1--1--1--1--1--1--1--1---.-.---.-I ! ! ! ! ! ! ! ! ! I I I --r-,--,--,--,--,--,--,--,--r-r-r-, ::j::j::j::j::j::j::tj::tt:t:t: ' --1--1--1--1--1--1--1--1--1--t-t-t--t=;l::::::;i,-----tl- --1--1--1--1--1--1--1--1--1--t-t-t-... ,. ... ,. __, ... __, ,. __, □ □ ■ ■ ■ ■ ' _ .. ______ ,.. __ ' ' ' ' I I I I I -----+------------~-----------+--' ' ' ' ' ' ' ' ' I I I I -----:------,-----:------. ------:--, :::::1:::::l:::_t--::+--::l -----:------,------:----r-----r·' -----1------r---+------r --+ :7 :::::t::::::j::::::i::::::t: : : : : I I I I I -----r------1------r------r-c --tH :::::t::::::l::::::t::::::~::t t:: -----f------1------+------~---l l-.. -----t------1------t------t------•-· ' ' ' -------1-, -------r . =::=:f =::=;:=---t:=::r:: -------:------,---:------:------ -------~----------: ------t------- -----;:::~:----~----r--- =::l::=1:: 1-=::r:: ---1---r---i--- =::=t::J=::: :::t:: =::1:::-· :~ -------t--• =::=:~=::=1:=:: -------1------1------r-----H-------I C , ' ' -----~---------------~ ! ! -----:---------------: ' -:::::~:::::::::::::::~:·::::::_:::: -----r---------------r-- :::::f :::::::::::::::f :::::::-_:: ---~-------~-------_____ t _______________ t ____________ _ -----1---------------1----------~- -----r---------------r----------.. -- -----t---------------t-------~ -- ::::T:::::::::::::T::: - ==:~=======~=-: ___ _ ---r-------r--~ ---~-------~--- c c This software is licensed to: NOVA Services CPT name: CPT-3 Norm. cone resistance Qtn 200150100500 De pt h ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Norm. cone resistance C P T b a s i c i n t e r p r e t a t i o n p l o t s ( n o r m a l i z e d ) Norm. friction ratio Fr (%) 1086420 De pt h ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Norm. friction ratio Nom. pore pressure ratio Bq 10.80.60.40.20-0.2 De pt h ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Nom. pore pressure ratio SBTn Plot Ic (Robertson 1990) 4321 De pt h ( f t ) 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 SBTn Plot Norm. Soil Behaviour Type SBTn (Robertson 1990) 1817161514131211109876543210 De pt h ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Norm. Soil Behaviour Type Clay Silty sand & sandy siltSand & silty sand Very dense/stiff soil Very dense/stiff soilSilty sand & sandy siltSand & silty sandVery dense/stiff soilVery dense/stiff soilClay & silty clayClay & silty claySilty sand & sandy siltSilty sand & sandy silt Silty sand & sandy silt Silty sand & sandy silt Silty sand & sandy silt Very dense/stiff soilClay & silty clayClay & silty claySilty sand & sandy siltClay & silty claySilty sand & sandy siltClay & silty clayClay & silty clayClay & silty clay ClayClay & silty clay Clay Clay & silty clayClayClay & silty clayClay & silty clayClay Clay Clay & silty clay Very dense/stiff soil ClayVery dense/stiff soilVery dense/stiff soil CLiq v.3.4.1.4 - CPT Liquefaction Assessment Software - Report created on: 1/3/2023, 3:46:56 PM 19 Project file: C:\Users\obrie\OneDrive\Documents\b GeoRisk\3 Projects\NOVA San Diego\3. Projects\Aviara Oaks Elem School\e. Evaluation\Seismic Compression\Analysis CPT\Seismic compression gwl 30 ft.clq SBTn legend 1. Sensitive fine grained 2. Organic material 3. Clay to silty clay 4. Clayey silt to silty clay5. Silty sand to sandy silt 6. Clean sand to silty sand 7. Gravely sand to sand 8. Very stiff sand to clayey sand9. Very stiff fine grained Input parameters and analysis data Analysis method: Fines correction method: Points to test: Earthquake magnitude Mw: Peak ground acceleration: Depth to water table (insitu): NCEER (1998) NCEER (1998) Based on Ic value 7.00 0.54 30.00 ft Depth to water table (erthq.): Average results interval: Ic cut-off value: Unit weight calculation: Use fill: Fill height: 30.00 ft 3 2.60 Based on SBT No N/A Fill weight: Transition detect. applied: Kσ applied: Clay like behavior applied: Limit depth applied: Limit depth: N/A No Yes Sands only No N/A ' ' ' :::=::r= ::=t : ___ :::~::: --------~--------l----, ---- _:::=:r::::::: --i--------t-------- :::::r::::::r::::::: -----l-------1-------- -:::f ::::::f ::::::: --+-------t-------- ::_ --:::::l::::::: -----------y-------- _______ J_ _______ _ ' ' ' ' ' ---· -----r--r---- ----- ' ' ' ------+-' ' ' ' -------T- O ' ------t- ·::::::r_ -------t---- • ------➔------- ::::r =:: --t------ --:r::::: ===~== ' -- -------t-----':""------t------ -::::::I:::: ::r::::: ------r----:------- -----+---(---- ' ' ------------t-----(---(---t----- ------------r-----1-----1-----r----- ------------r-----,-----,-----r----- ------------+-----~-----~-----+----- ! ! ! ! ------------r-----1-----1-----r----- ------------1-----1-----1-----r----- ------------t-----1-----1-----1----- ------------r-----1-----1-----r----- ------------1-----1-----1-----r----- ------------r-----1-----1-----r----- ------------t-----(---(---t----- ------------1-----1-----1-----r----- ------------r-----1-----1-----r----- ------------t-----(---(---t----- ------------r-----1-----1-----r----- ------------r-----1-----1-----r----- ------------t-----(---(---t----- : ::::: :::::r:::r:::r:::r:::: ------------t-----(---(---t----- ------------r-----1-----1-----r----- -----------r-----1-----1-----r----- ------------t-----1-----1-----1-----------------r-----1-----1-----r----- • I I I ------------1-----1-----1-----r----- , I I I ■ ■ ■ ■ □ □ I I I I I I I I I I I I I I I I I I :t~:tr lt ~llt ~:f - - ---~--~--~--~--~--~--~--~--~-- 1 I I I I I I I I l!Uf ~lr r r ~l: -t-t-t-t-l-t-l-t-l-t--t--t--t-- -~:+:+:+:+::~::~::~::~::~::~::~::~::~:: -t-t-t-t-t--t--t--t--t--t--t--t--t--t-- :;:+:+:+:+::~::~::~::~::~::~::~::~::~:: ' -t-t-t-t--t--t--t--t--t--t--t--t--t-- -+:+:+:+:+::~::~::~::~::~::~::~::~::~:: ' ' ' ' 1 : : : : : : : : □ □ □ ~--r--r--r--r--r--r--r--r-- '---L--L--L--L--L--L--L--L--! ! ! ! ! ! ! ! ! 1 I I I I I I I I 1---~--~--~--~--~--~--~--~--J I I I I I I I I 1 I I I I I I I I l : : : : : : : : This software is licensed to: NOVA Services CPT name: CPT-3 Total cone resistance qt (tsf) 4003002001000 De pt h ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Total cone resistance L i q u e f a c t i o n a n a l y s i s o v e r a l l p l o t s ( i n t e r m e d i a t e r e s u l t s ) SBTn Index Ic (Robertson 1990) 4321 De pt h ( f t ) 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 SBTn Index Norm. cone resistance Qtn 200150100500 De pt h ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Norm. cone resistance Grain char. factor Kc 109876543210 De pt h ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Grain char. factor Corrected norm. cone resistance Qtn,cs 200150100500 De pt h ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Corrected norm. cone resistance CLiq v.3.4.1.4 - CPT Liquefaction Assessment Software - Report created on: 1/3/2023, 3:46:56 PM 20 Project file: C:\Users\obrie\OneDrive\Documents\b GeoRisk\3 Projects\NOVA San Diego\3. Projects\Aviara Oaks Elem School\e. Evaluation\Seismic Compression\Analysis CPT\Seismic compression gwl 30 ft.clq Input parameters and analysis data Analysis method: Fines correction method: Points to test: Earthquake magnitude Mw: Peak ground acceleration: Depth to water table (insitu): NCEER (1998) NCEER (1998) Based on Ic value 7.00 0.54 30.00 ft Depth to water table (erthq.): Average results interval: Ic cut-off value: Unit weight calculation: Use fill: Fill height: 30.00 ft 3 2.60 Based on SBT No N/A Fill weight: Transition detect. applied: Kσ applied: Clay like behavior applied: Limit depth applied: Limit depth: N/A No Yes Sands only No N/A -----y----,---- ' ' ' ' ' ' ' _______ ;::::::=!:= ::=:1=::=:1=: :: :::=::i::=:::i:::::::::r =::= '--------+--------~-------~---------------~---------+---------~------- _______ : _:::::r:::=:t=::=:r :: -r::=::r:::::::: :::=::=r ::::::r:::::::r ~--------t--------t-------1---------t---------1-------------------t---------t---------1------- :::t::::::l::::::::~:::::::j::::: ::::::1:::::::::j:::::::::. _:::::::::~:::::::::I::::::_ ·_-_:;-... -.,-~-~-~-~-= : __ ::::r :::=1:= ::=:t=::=i::: ____ --:i::=::f ::=: :::=::i::=:::1::::::::.::,.1 ________ 1 ----iIIlIII This software is licensed to: NOVA Services CPT name: CPT-3 CRR plot CRR & CSR 0.60.40.20 De pt h ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 CRR plot During earthq. L i q u e f a c t i o n a n a l y s i s o v e r a l l p l o t s FS Plot Factor of safety 21.510.50 De pt h ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 FS Plot During earthq. Liquefaction potential LPI 20151050 De pt h ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Liquefaction potential Vertical settlements Settlement (in) 0.040.030.020.010 De pt h ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Vertical settlements Lateral displacements Displacement (in) 0 De pt h ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Lateral displacements CLiq v.3.4.1.4 - CPT Liquefaction Assessment Software - Report created on: 1/3/2023, 3:46:56 PM 21 Project file: C:\Users\obrie\OneDrive\Documents\b GeoRisk\3 Projects\NOVA San Diego\3. Projects\Aviara Oaks Elem School\e. Evaluation\Seismic Compression\Analysis CPT\Seismic compression gwl 30 ft.clq F.S. color scheme LPI color schemeInput parameters and analysis data Analysis method: Fines correction method: Points to test: Earthquake magnitude Mw: Peak ground acceleration: Depth to water table (insitu): NCEER (1998) NCEER (1998) Based on Ic value 7.00 0.54 30.00 ft Depth to water table (erthq.): Average results interval: Ic cut-off value: Unit weight calculation: Use fill: Fill height: 30.00 ft 3 2.60 Based on SBT No N/A Fill weight: Transition detect. applied: Kσ applied: Clay like behavior applied: Limit depth applied: Limit depth: N/A No Yes Sands only No N/A Almost certain it will liquefy Very likely to liquefy Liquefaction and no liq. are equally likely Unlike to liquefy Almost certain it will not liquefy Very high risk High risk Low risk ------,--' ' ' ' ::::::::::::1:=:: _::=+:=::=::: ------------~------------~------------ ::::::::::::1:::::: ::=+:=::=::: ------------1------------~------------ 1 I ' ' ' ' ' -------------,------------r-------------' ' ' ' ::::::::::::1:=::=: =:f :=::=::: ■ □ □ □ ■ ---------------------------------------- --------------------- -------------------- ---------------------------------------- --------------------- -------------------- --------------------- -------------------- ---------------------------------------- ---------------------------------------- --------------------- -------------------- --------------------- -------------------- ---------------------------------------- --------------------- -------------------- --------------------- -------------------- ---------------------------------------- ---------------------------------------- --------------------- -------------------- --------------------- -------------------- ■ □ □ This software is licensed to: NOVA Services CPT name: CPT-3 Normalized friction ratio (%) 0.1 1 10 No rm a l i z e d C P T p e n e t r a t i o n r e s i s t a n c e 1 10 100 1,000 L i q u e f a c t i o n a n a l y s i s s u m m a r y p l o t s Qtn,cs 200180160140120100806040200 Cy cl i c S t r e s s R a t i o * ( C S R * ) 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0 Liquefaction No Liquefaction Thickness of surface layer, H1 (m) 109876543210 Th ic k n e s s o f l i q u e f i a b l e s a n d l a y e r , H 2 ( m ) 12.0 11.0 10.0 9.0 8.0 7.0 6.0 5.0 4.0 3.0 2.0 1.0 0.0 Analysis PGA: 0.54 PG A 0 . 4 0 g - 0 . 5 0 g CLiq v.3.4.1.4 - CPT Liquefaction Assessment Software - Report created on: 1/3/2023, 3:46:56 PM 22 Project file: C:\Users\obrie\OneDrive\Documents\b GeoRisk\3 Projects\NOVA San Diego\3. Projects\Aviara Oaks Elem School\e. Evaluation\Seismic Compression\Analysis CPT\Seismic compression gwl 30 ft.clq Input parameters and analysis data Analysis method: Fines correction method: Points to test: Earthquake magnitude Mw: Peak ground acceleration: Depth to water table (insitu): NCEER (1998) NCEER (1998) Based on Ic value 7.00 0.54 30.00 ft Depth to water table (erthq.): Average results interval: Ic cut-off value: Unit weight calculation: Use fill: Fill height: 30.00 ft 3 2.60 Based on SBT No N/A Fill weight: Transition detect. applied: Kσ applied: Clay like behavior applied: Limit depth applied: Limit depth: N/A No Yes Sands only No N/A ' ' -jf-....1..---1r....1..7~....l..i '--'-i --'-7 --! · · · I I I I : : i i ! ! ! ! i I !, !, !, I I I 1 : : ~:-------~: ------r::. ------! ! l------~------+-----1 __ _.___ : : : : : ---1, ----!, I I I I 1 : : : ! : : ! ! i ! : ' : --~------L---+----+---7-----1-----r--r-! ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' i i i ~--~---t---~--: ' -----+------1 : : : ------+-----t : : : : : ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' -------L---+----+-----1----t----r--- • ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' --•---' ' ' ' ' ' ' ' ' ----1------+----+----7----l---· ! i ' ' ' ' ' ' ' ' i : i i ; ---~----+---+-----r----------l----+---+-----r---i i ! i ' ' ' ' ' ' ' ' : : : ' ' ' ' 1 1 1 __ ! ______ _l, ------~.-------~. ------t. ------r. ---!. : --; ' ' ' ' ' ' ' ' ' ' ' -•---' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' I I I I I ! ! ! I ' ' ' : ! j _____ +-----+----+-----+-----t------r---• _._____ ' ' ' ' ' ' ' O O •1~ -----,---I • t ' ' ----' ' ,· : : ·-,; :; 1 • : I -1 -+-,--• ---·.r• ---i-----+--:,'· :~~ ; : c._.cl------+-...- ! ,I I •i , ~~~-7~;w , ---i--_, ---+--- ' ' ' ' ' ' ' ' ' ' ---! ---+---' ' ' ' ' ' ' ' ' ' ' ' ' ' --, --+----,--' ' ' ' ' ' ' ' ' ' ' ' ---+-----i-----+----1------r- • I I I I ·-' : : : : ! -' ' ' ' I I I . : ! ' ' This software is licensed to: NOVA Services CPT name: CPT-3 Norm. cone resistance Qtn 200150100500 De pt h ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Norm. cone resistance C h e c k f o r s t r e n g t h l o s s p l o t s ( R o b e r t s o n ( 2 0 1 0 ) ) Grain char. factor Kc 109876543210 De pt h ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Grain char. factor Corrected norm. cone resistance Qtn,cs 200150100500 De pt h ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Corrected norm. cone resistance SBTn Index Ic (Robertson 1990) 4321 De pt h ( f t ) 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 SBTn Index Liquefied Su/Sig'v Su/Sig'v 0.50.40.30.20.10 De pt h ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Peak Su ratio Liq. Su ratio Liquefied Su/Sig'v CLiq v.3.4.1.4 - CPT Liquefaction Assessment Software - Report created on: 1/3/2023, 3:46:56 PM 23 Project file: C:\Users\obrie\OneDrive\Documents\b GeoRisk\3 Projects\NOVA San Diego\3. Projects\Aviara Oaks Elem School\e. Evaluation\Seismic Compression\Analysis CPT\Seismic compression gwl 30 ft.clq Input parameters and analysis data Analysis method: Fines correction method: Points to test: Earthquake magnitude Mw: Peak ground acceleration: Depth to water table (insitu): NCEER (1998) NCEER (1998) Based on Ic value 7.00 0.54 30.00 ft Depth to water table (erthq.): Average results interval: Ic cut-off value: Unit weight calculation: Use fill: Fill height: 30.00 ft 3 2.60 Based on SBT No N/A Fill weight: Transition detect. applied: Kσ applied: Clay like behavior applied: Limit depth applied: Limit depth: N/A No Yes Sands only No N/A --y---y---,----' ' ' ' ' ' --=::f =::=:1=::=::1=::=:: :::=::r= ::r:::::1:::::::1:=::= --~----~----~------------~-------+-------+-------~-------- --=::r =::=:1=::=::l_ :::=::r =::r::::r::::l::::: -----t---------t---------1---------------t-------t-------t-------1------- _ ,,_ ·:::::~:::::::::j::::::_-_-;;,,.·-.,-.. -~-':'-':".-:: _:::::::~:::::::j:::::::j :::::::j::::::: _ --=:1:=::=:1=::=::_:T"1: _______ 1 :::=::r= ::r::::r:::::1:=::= :~~(I(I(~l~~(~I~~(~ This software is licensed to: NOVA Services CPT name: CPT-3 Cone resistance qt (tsf) 4003002001000 Dep t h ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Cone resistance SBTn Plot Ic (Robertson 1990) 4321 Dep t h ( f t ) 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 SBTn Plot FS Plot Factor of safety 21.510.50 Dep t h ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 FS Plot During earthq. Vertical settlements Settlement (in) 0.040.030.020.010 Dep t h ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Vertical settlements E s t i m a t i o n o f p o s t - e a r t h q u a k e s e t t l e m e n t s Strain plot Volumentric strain (%) 6543210 Dep t h ( f t ) 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Strain plot CLiq v.3.4.1.4 - CPT Liquefaction Assessment Software - Report created on: 1/3/2023, 3:46:56 PM 24 Project file: C:\Users\obrie\OneDrive\Documents\b GeoRisk\3 Projects\NOVA San Diego\3. Projects\Aviara Oaks Elem School\e. Evaluation\Seismic Compression\Analysis CPT\Seismic compression gwl 30 ft.clq Abbreviations qt: Ic: FS: Volumentric strain: Total cone resistance (cone resistance q c corrected for pore water effects) Soil Behaviour Type Index Calculated Factor of Safety against liquefaction Post-liquefaction volumentric strain Procedure for the evaluation of soil liquefaction resistance, NCEER (1998) Calculation of soil resistance against liquefaction is performed according to the Robertson & Wride (1998) procedure. The procedure used in the software, slightly differs from the one originally published in NCEER-97-0022 (Proceedings of the NCEER Workshop on Evaluation of Liquefaction Resistance of Soils). The revised procedure is presented below in the form of a flowchart1: 1 "Estimating liquefaction-induced ground settlements from CPT for level ground", G. Zhang, P.K. Robertson, and R.W.I. Brachman CLiq v.3.4.1.4 - CPT Liquefaction Assessment Software 25 Q= (]le : tip resi tance, f ~ : sl ev friction cr,,;i:)• O'vo : ju-situ· ,1 ical total and ffeoti st. s 'llllits : aH in kPa 111ii ial str, ss. ex:ponent0 : n = LO andl calcuJat Q, F, and 1 if Jc: s L64, n = 0.5 if 1.64 < , < .,, 0,, 11 "' .-1.64)0. + 0. • Ic. ~· • .3·0, = 1.0 iiterate mil the chain «e in n, n < 0.0 if c,vo, > 3,( 0 kPa let 11 = • .0 for all :i:.oit aupdared fro Roh rts u an Wride O 98 ' • = [ 1. 00 J JI 1.1 ' O'l-"O if le S: 1.64, Kc -1.0 i L64 < < 2.60 Kc =-0 , Qr3 c4 + .58 /-2L6 , 2 + .75 le -17.88 ff le 2.60, •v< uate u:o;;ing other criteria· li.kely non]iq111efiaible ifF > I% BUT. if 1.64 <Jc< • .36 and f < 0.5%,, c,t ~ = 1.0 3 ' ~R'7 _5 = 9-' •• [ ( ~ fZi)d T 0.08, if 0 :S: 1 qd r CS < 160 'RR'75 -0,8' 3,[ •• , ]+o.o , 1 ~4c1N)c, < 50 • 1000 if F> % Procedure for the evaluation of soil liquefaction resistance (all soils), Robertson (2010) Calculation of soil resistance against liquefaction is performed according to the Robertson & Wride (1998) procedure. This procedure used in the software, slightly differs from the one originally published in NCEER-97-0022 (Proceedings of the NCEER Workshop on Evaluation of Liquefaction Resistance of Soils). The revised procedure is presented below in the form of a flowchart1: 1 P.K. Robertson, 2009. “Performance based earthquake design using the CPT”, Keynote Lecture, International Conference on Performance-based Design in Earthquake Geotechnical Engineering – from case history to practice, IS-Tokyo, June 2009 CLiq v.3.4.1.4 - CPT Liquefaction Assessment Software 26 CPT qi, fs, O'vo, cr' vo, Pa = I atm all same units as Pll • Initial stress exponent: 11 = 1.0; Calculate Qbi, Fr, le n=0.38I(lc)+O.Os( ::" )-0.15 n~l.O Iterate unti l change u1 n, lln $ 0.0 I .. .. C }I =(~)n CJ VO • 0 =[(q, -a,o)].c F,. = ( f , )•100 -tn N Pc q, -a ,o r I C = ~3.47 -log Qi,, )2 + (1.22 + logF, )2 r ·s -I _j_ le$ 2.50 2.50 <le< 2.70 le ~ 2.70 -- Iflc $ 1.64, Kc = 1.0 ' Wlten 1.64 < le $ 2.60 Kc = 5.58Ic3 -0.403 Ic4 -21.63 I/+ 33 .751c -17.88) Kc =G xlO-'(IJ 16.76 If 1.64 <le < 2.36 AND Fr < 0.5%, set Kc = 1.0 ~ Qtn.cs = Kc • Qm ~ ' 1 CRR = 93[Q:np ]3 + 0.08 ?.S 1000 CRR,_5 = 0.053Q1 50 ~ Qin.CS ~ I 60 Procedure for the evaluation of soil liquefaction resistance, Idriss & Boulanger (2008) CLiq v.3.4.1.4 - CPT Liquefaction Assessment Software 27 qc: tip resistance, f5: sleeve friction Ova, Ova': in situ vertical total and effective stress m = 1.338 -0.249 x (qclN)°-264 iterate until change in m, flm < 0.01 qclNcs = qclN + ~qclN where: (I 63 I 9.7 I' ~)21 A -(5 4 qclN) l • FC+0.01,FC+O.Ol . L.lqclN - . + Xe 16 ( q,!.V,, I ( qc!Nc, )" ( qc!Nc, )J I ( qc!N" 0)4 3j' CRR . = / s40 , 67 so 114 • M~7.5, 0v0~1 CRRM-l 5 , _1 = 0.80 x+xK0 - • ,avo-Ovn Procedure for the evaluation of soil liquefaction resistance (sandy soils), Moss et al. (2006) CLiq v.3.4.1.4 - CPT Liquefaction Assessment Software 28 CPT Initial estimate using raw tip measurements, friction ratio. Calculate q,1. Repeat until an acceptable convergence tolerance is achieved. Procedure for the evaluation of soil liquefaction resistance, Boulanger & Idriss(2014) CLiq v.3.4.1.4 - CPT Liquefaction Assessment Software 29 r FSr = CRRM=7.5,u:=lmm -,~ ~ , iq CSR,\1=7.5,u; =latm " I '- r .... O"v ~ 1 1 CRR = '= =exp [qclNcs +(qcLVcs)2 -(qcLVcs )3 +(qcLVcs)4 -2.80] CSR\{ 15 ·=1 =0.65 ---r ----' = • ,u, mm ~ d MSF K M 7•5•<T, latm 113 1000 140 137 V g (T \. .J I I , rd= exp[ a(z)+ ,B(z)-M] I qcLVcs = qcLV + D.qcLV a(z) =-l.012-l.126sin (-2 -+ 5.133) D. = (11.9+ qc!N }ex (1.63-_2_2__-(___!22___)2 ] 11.73 qcLV 14.6 p FC+2 FC +2 ,B(z) = 0.106 + 0.118 sin (-2 -+ 5.142) -C qc 11.28 qcLV -N•p a '" I ~v. =( ~r ~1.7 , '" K u = 1-Cu In ( ;~) ~ 1.1 l-) ( )0.264 liith -m = 1.338-0249 qcLVcs 0.264 ~ m ~ 0.782 1 , c(T = 0264 ~ 03 \. .J I 37.3-827(qclJ\cs) FC =80(1c+CFc)-137 --with 0%~FC~100% I MSF = l+(MSF-. -1)( 8.64exp(-:)-J.325) u le =[(3.47-log(Q))2 +(1.22+log(F))2r 5 MSF = J.09+(qC1/,cs )J s; 2.2 (q -O". )( p )n . -. 180 Q = c ~ "' ~c wzth 0.5 ~ n ~ 1.0 per Robertson & Wride(1998) T F =( f, )-100% ( ~ and a-,. at start of earthquake shaking qc -0",.- I ( ~ at time of CPT sounding Procedure for the evaluation of liquefaction-induced lateral spreading displacements Site investigation with SPT or CPT Design earthquake Ground geometry SPT data with fines content measurementsor CPT data Moment magnitude of earthquake (M w ) and peak surface acceleration ( a max ) Geometric parameters for each of different zones in level (or gently sloping) ground with (or without) a free face Liquefaction potential analysis to calculate FS, (N 1 ) 60cs or (q c1N ) cs ( using the NCEER SPT- orCPT-based method ( Youd et al. 2001)) Calculation of the lateral displacement index (LDI) ( using Figure 1 and Equation [3]) Zones with three major geometric parameters or less - free face height (H), the distance to a free face (L), or/and slope (S) Zones with more than three major geometric parameters L/H or/and S Estimated lateral displacement, LD For gently sloping ground without a free face, LD = (S + 0.20) · LDI (for 0.2% < S < 3.5%) For level ground with a free face, ( LD = 6 · (L/H)-0.8 · LDI (for 5 < L/H < 40) Evaluation of lateral displacements based on other approaches and engineering judgment If (N 1 ) 60cs < 14 or ( q c1N ) cs < 70 evaluate potential of flow liquefaction 1 Flow chart illustrating major steps in estimating liquefaction-induced lateral spreading displacements using the proposed approach 1 Figure 1 1 Equation [3] CLiq v.3.4.1.4 - CPT Liquefaction Assessment Software 30 1 "Estimating liquefaction-induced ground settlements from CPT for level ground", G. Zhang, P.K. Robertson, and R.W.I. Brachman 60 -~ o,-40% ...... 50 --·--·' ! .:-..; \ c-40 ·e \ 0 SC¾ f Zmsax LDI -0 'Ymaxdz ,_ \ (Iii m 30 .c Uj, \ .2 60'% ~ 20 --\ \ u E 70% \ \ ;::I E 80% ")i' 0 ~· «l 00% :::E 0 0.0 ,0.5 1.0 1.5 2.0 Factor of safety; FS Procedure for the estimation of seismic induced settlements in dry sands Robertson, P.K. and Lisheng, S., 2010, “Estimation of seismic compression in dry soils using the CPT” FIFTH INTERNATIONAL CONFERENCE ON RECENT ADVANCES IN GEOTECHNICAL EARTHQUAKE ENGINEERING AND SOIL DYNAMICS, Symposium in honor of professor I. M. Idriss, San Diego, CA CLiq v.3.4.1.4 - CPT Liquefaction Assessment Software 31 Average shear sh'ess, -r0 -. '_ ~ "!Ill' -CSR • O"uo -0.65 • --• O"uo • •a g • Estimate small shear sh'ain moclulus, ~ G0 = 0.0188 -l10(0j5l -l.68)J-cqt -cru) • Estimate shear sh-ain amJ)litmle, 'f (based on Pra del (1998)) y = · R • 100 ('lo) 11 + er.. eb-R l 1 + er. "!Ill' . R = -(Note "!Ill' endG0 same uruts) Go er. = 0.0389 • [ :: l + 0.124 b = 6400 • f ;: 1 • Estim,,te volumehic sh'ain in 15 cycles _ (N 1)6oi::s [ l-120 euol(l5) -"'I· 20 (N 1)60.,cs = Qtn..,cs 8.5 -[1 -~1 4.6 • Volumehic sh<1h1 h1 clesig:n emthquake [ N ]0.45 Iuol = euol( 15) • Tf NC = (Iv1 -4):l.11 • Seismic settlement, s GVIT s = 2 • [Iuol • dz Liquefaction Potential Index (LPI) calculation procedure Graphical presentation of the LPI calculation procedure Calculation of the Liquefaction Potential Index (LPI) is used to interpret the liquefaction assessment calculations in terms of severity over depth. The calculation procedure is based on the methology developed by Iwasaki (1982) and is adopted by AFPS. To estimate the severity of liquefaction extent at a given site, LPI is calculated based on the following equation: LPI = where: FL = 1 - F.S. when F.S. less than 1 FL = 0 when F.S. greater than 1 z depth of measurment in meters Values of LPI range between zero (0) when no test point is characterized as liquefiable and 100 when all points are characterized as susceptible to liquefaction. Iwasaki proposed four (4) discrete categories based on the numeric value of LPI: ⦁ LPI = 0 : Liquefaction risk is very low ⦁ 0 < LPI <= 5 : Liquefaction risk is low ⦁ 5 < LPI <= 15 : Liquefaction risk is high ⦁ LPI > 15 : Liquefaction risk is very high CLiq v.3.4.1.4 - CPT Liquefaction Assessment Software 32 20 [ (10 -0,5z) X F1 x dz Fr W(z) 10 0.0 LO 2J0 0 0 0 _s__ 5 5 ] "llO 10 _c i 0 15 15 20 '----~--- Shear-Induced Building Settlement (Ds) calculation procedure The shear-induced building settlement (Ds) due to liquefaction below the building can be estimated using the relationship developed by Bray and Macedo (2017): where Ds is in the units of mm, c1= -8.35 and c2= 0.072 for LBS ≤ 16, and c1= -7.48 and c2= 0.014 otherwise. Q is the building contact pressure in units of kPa, HL is the cumulative thickness of the liquefiable layers in the units of m, B is the building width in the units of m, CAVdp is a standardized version of the cumulative absolute velocity in the units of g-s, Sa1 is 5%-damped pseudo-acceleration response spectral value at a period of 1 s in the units of g, and ε is a normal random variable with zero mean and 0.50 standard deviation in Ln units. The liquefaction-induced building settlement index (LBS) is: where z (m) is the depth measured from the ground surface > 0, W is a foundation-weighting factor wherein W = 0.0 for z less than Df, which is the embedment depth of the foundation, and W = 1.0 otherwise. The shear strain parameter (ε_shear) is the liquefaction-induced free-field shear strain (in %) estimated using Zhang et al. (2004). It is calculated based on the estimated Dr of the liquefied soil layer and the calculated safety factor against liquefaction triggering (FSL). CLiq v.3.4.1.4 - CPT Liquefaction Assessment Software 33 Ln(Ds) =cl + c2 *LBS + 0.58 * Ln (Tanh (:L)) + 4.59 * Ln(Q) -0.42 * Ln(Q)2 -0.02 * B + 0.84 * Ln(CAVdp) + 0.41 * Ln(Sal) + E LBS = L W * Sshear d= z References ⦁ Lunne, T., Robertson, P.K., and Powell, J.J.M 1997. Cone penetration testing in geotechnical practice, E & FN Spon Routledge, 352 p, ISBN 0-7514-0393-8. ⦁ Boulanger, R.W. and Idriss, I. M., 2007. Evaluation of Cyclic Softening in Silts and Clays. ASCE Journal of Geotechnical and Geoenvironmental Engineering June, Vol. 133, No. 6 pp 641 -652 ⦁ Boulanger, R.W. and Idriss, I. M., 20 14. CPT AND SPT BASED LIQUEFACTION TRIGGERING PROCEDURES. DEPARTMENT OF CIVIL & ENVIRONMENTAL ENGINEERING COLLEGE OF ENGINEERING UNIVERSITY OF CALIFORNIA AT DAVIS ⦁ Robertson, P.K. and Cabal, K.L., 2007 , Guide to Cone Penetration Testing for Geotechnical Engineering. Available at no cost at http://www.geologismiki.gr/ ⦁ Robertson, P.K. 1990. Soil classification using the cone penetration test. Canadian Geotechnical Journal, 27 (1), 151 -8. ⦁ Robertson, P.K. and Wride, C.E., 1998. Cyclic Liquefaction and its Evaluation based on the CPT Canadian Geotechnical Journal, 1998, Vol. 35, August. ⦁ Youd, T.L., Idriss, I.M., Andrus, R.D., Arango, I., Castro, G., Christian, J.T., Dobry, R., Finn, W.D.L., Harder, L.F., Hynes , M.E., Ishihara, K., Koester, J., Liao, S., Marcuson III, W.F., Martin, G.R., Mitchell, J.K., Moriwaki, Y., Power, M.S., Robertson, P.K., Seed, R., and Stokoe, K.H., Liquefaction Resistance of Soils: Summary Report from the 1996 NCEER and 1998 NCEER/NSF Workshop on Evaluation of Liquefaction Resistance of Soils, ASCE, Journal of Geotechnical & Geoenvironmental Engineering, Vol. 127, October, pp 817-833 ⦁ Zhang, G., Robertson. P.K., Brachman, R., 2002, Estimating Liquefaction Induced Ground Settlements from the CPT, Canadian Geotechnical Journal, 39: pp 1168-1180 ⦁ Zhang, G., Robertson. P.K., Brachman, R., 2004, Estimating Liquefaction Induced Lateral Displacements using the SPT and CPT, ASCE, Journal of Geotechnical & Geoenvironmental Engineering, Vol. 130, No. 8, 861 -871 ⦁ Pradel, D., 1998, Procedure to Evaluate Earthquake -Induced Settlements in Dry Sandy Soils, ASCE, Journal of Geotechnical & Geoenvironmental Engineering, Vol. 124, No. 4, 364-368 ⦁ Iwasaki, T., 1986, Soil liquefaction studies in Japan: state -of-the-art, Soil Dynamics and Earthquake Engineering, Vol. 5, No. 1, 2-70 ⦁ Papathanassiou G., 2008, LPI-based approach for calibrating the severity of liquefaction -induced failures and for assessing the probability of liquefaction surface evidence, Eng. Geol. 96:94 –104 ⦁ P.K. Robertson, 2009, Interpretation of Cone Penetration Tests - a unified approach., Canadian Geotechnical Journal, Vol. 46, No. 11, pp 1337-1355 ⦁ P.K. Robertson, 2009. “Performance based earthquake design using the CPT”, Keynote Lecture, International Conference on Performance-based Design in Earthquake Geotechnical Engineering - from case history to practice, IS-Tokyo, June 2009 ⦁ Robertson, P.K. and Lisheng, S., 2010, “Estimation of seismic compression in dry soils using the CPT” FIFTH INTERNATIONAL CONFERENCE ON RECENT ADVANCES IN GEOTECHNICAL EARTHQUAKE ENGINEERING AND SOIL DYNAMICS, Symposium in honor of professor I. M. Idriss, SAN diego, CA ⦁ R. E. S. Moss, R. B. Seed, R. E. Kayen, J. P. Stewart, A. Der Kiureghian, K. O. Cetin, CPT -Based Probabilistic and Deterministic Assessment of In Situ Seismic Soil Liquefaction Potential, Journal of Geotechnical and Geoenvironmental Engineering, Vol. 132 , No. 8, August 1, 2006 ⦁ I. M. Idriss and R. W. Boulanger, 2008. Soil liquefaction during earthquakes, Earthquake Engineering Research Institute MNO-12 ⦁ Jonathan D. Bray & Jorge Macedo, Department of Civil & Environmental Engineering, Univ. of California, Berkeley, CA, USA, Simplified procedure for estimating liquefaction -induced building settlement, Proceedings of the 19th International Conference on Soil Mechanics and Geotechnical Engineering, Seoul 201 CLiq v.3.4.1.4 - CPT Liquefaction Assessment Software 34