HomeMy WebLinkAbout2721 LA GOLONDRINA ST; ; CBR2022-4539; PermitBuilding Permit Finaled
Residential Permit
Print Date: 02/09/2024
Job Address: 2721 LA GOLONDRINA ST, CARLSBAD, CA 92009-4326
Permit Type: BLDG-Residential Work Class: Cogen
Parcel#: 2155420600 Track#:
Valuation: $3,500.00 Lot#:
Occupancy Group: Project#:
#of Dwelling Units: Plan#:
Bedrooms: Construction Type:
Bathrooms: Orig. Plan Check#:
Occupant Load: Plan Check#:
Code Edition:
Sprinkled:
Project Title:
Description: NEW PV ROOF MOUNT 10 MODS 3.550KW 1 INVERTER (E-REVIEW)
Applicant:
FREEDOM FOREVER LLC
PARISA DANESH
43445 BUSINESS PARK DR, # 110
TEMECULA, CA 92590-3671
FEE
Property Owner:
CESENA
17015 EL SOL RD
RAMONA, CA 92065
SB1473 -GREEN BUILDING STATE STANDARDS FEE
SOLAR-RESIDENTIAL: per kW
STRONG MOTION -RESIDENTIAL (SMIP)
Total Fees: $290.50 Total Payments To Date: $290.50
(city of
Carlsbad
Permit No: CBR2022-4539
Status: Closed -Finaled
Applied: 12/07/2022
Issued: 12/20/2022
Finaled Close Out: 02/09/2024
Final Inspection: 06/12/2023
INSPECTOR: Renfro, Chris
Kersch, Tim
Contractor:
FREEDOM FOREVER LLC
43445 BUSINESS PARK DR, # STE 110
TEMECULA, CA 92590-3669
(800) 885-9450
Balance Due:
AMOUNT
$1.00
$289.00
$0.50
$0.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
Building Division Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov
( City of
Carlsbad
RESIDENTIAL
BUILDING PERMIT
APPLICATION
B-1
Plan Check
Est. Value
PC Deposit
Date
Job Address 2721 La Golondrina St , Carlsbad, CA 92009 Unit: APN: 2155420600 ·-----·
CT/Project #: __________________ Lot #: ____ Year Built: _________ _
BRIEF DESCRIPTION OF WORK: New PV roof mount 10 mods 3.550kW 1 Inverter
□ New SF: Living SF, _____ Deck SF, ____ Patio SF, _____ Garage SF __ _
Is this to create an Accessory Dwelling Unit? O Y O N New Fireplace? O YO N, if yes how many? ___ _
D Remodel: _____ SF of affected area Is the area a conversion or change of use? O YO N
Additional Gas or Electrical Features? □ Pool/Spa: ____ SF --------------
□ Solar:3-550 KW, 10 Modules, Mounted:CS(Roof 0Ground, Tilt: 0 Y" N, RMA: 0 Y 0: N,
Battery:OV~ N, Panel Upgrade: O v OlN Electric Meter number: ____________ _
Other:
APPLICANT (PRIMARY CONTACT) PROPERTY OWNER
Name: Evan Ramirez Name: Harry Cesena
Address:43445 Business Park Dr. Address: 2721 La Golondrina St Carlsbad CA 92009
City:Temecula State:~Zip:.""9"'2""5""90"-__ City:Carlsbad State:.f6......_Zip:""9..,20::.:0:.:a9'-----
Phone: 626-698-2576 Phone: ____________________ _
Email: PermitsSD@freedomforever.com Email: ____________________ _
DESIGN PROFESSIONAL CONTRACTOR OF RECORD
Name: ___________________ Business Name: Freedom Forever
Address: Address: 43445 Business Park Dr.
City: ________ State: ___ Zip:_____ City: Temecula State:~Zip:_9,..2...,59"'0.__ ___ _
Phone: Phone: 626-698-2576
Email: Email:PermitsSD@freedomforever.com
Architect State License: CSLB License #: 1029644 Class:_c_4_6 _____ _
Carlsbad Business License# (Required):BLOS003053-04-2018
APPLICANT CERT/FICA TION: I certify that I have read the application and state that the above information is correct and that the information of the plans is accurate. I
agree to comply with all City ordinances and State laws relating to building construction.
NAME (PRINT): _E_v_a_n_R_a_m_ir_ez ______ _ SIGN: C'v-aH--~ DATE: 12/07 --------
1635 Faraday Ave Carlsbad, CA 92008 Ph: 442-339-2719 Em a i I: Building@carlsbadca.gov
REV. 04/22
THIS PAGE REQUIRED AT PERMIT ISSUANCE PLAN CHECK NUMBER: ______ _
A BUILDING PERMIT CAN BE ISSUED TO EITHER A STATE LICENSED CONTRACTOR OR A PROPERTY OWNER. IF THE PERSON SIGNING
THIS FORM IS AN AGENT FOR EITHER ENTITY AN AUTHORIZATION FORM OR LETTER IS REQUIRED PRIOR TO PERMIT ISSUANCE.
(OPTION A): LICENSED CONTRACTOR DECLARATION:
I herebyaffirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division]
of the Business and Professions Code, and my license is in full force and effect. I alsoaffirm under penalty of perjury one of the
following declarations (CHOOSE ONE):
D I have and will maintain a certificate of consent to self-insure for workers' compensation provided by Section 3700 of the Labor Code, for the performance of the
work which this permit is issued. Policy No. ___________________________________________ _
-OR-
D I have and will maintain worker's compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.
My workers' compensation insurance carrier and policy number are: Insurance Company Name: National Casualty Company
Policy No. WCC334024A Expiration Date: _6_/_1_/2_3 _____________ 1 -OR-D Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become
subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage is unlawful and shall subject an employer to
criminal penalties and civil fines up to $100,000.00, in addition the to the cost of compensation, damages as provided for in Section 3706 of the Labor Code,
interest and attorney's fees.
CONSTRUCTION LENDING AGENCY, IF ANY:
I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code).
Lender's Name: _______________________ Lender's Address: ______________________ _
CONTRACTOR CERTIFICATION: The applicant certifies that all documents and plans clearly and accurately show all existing and proposed buildings, structures, access roads, and
utilities/utility easements. All proposed modifications and/or additions are clearly labeled on the site plan. Any potentially existing detail within these plans inconsistent with the site plan are
not approved for construction and may be required to be altered or removed. The city's approval of the application is based on the premise that the submitted documents and plans show
the correct dimensions of; the property, buildings, structures and their setbacks from property lines and from one another; access roads/easements, and utilities. The existing and proposed
use of each building as stated is true and correct; all easements and other encumbrances to development have been accurately shown and labeled as well as all on-site grading/site preparation.
All improvements existing on the property were completed in accordance with all regulations in existence at the time of their construction, unless otherwise noted.
NAME (PRINT}: Evan Ramirez ------------Note: If the person signing above is an authorized agent for the contractor actor letterhead.
(OPTION B): OWNER-BUILDER DECLARATION:
I hereby affirm that I am exempt from Contractor's License Law for the following reason: D I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec.
7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such
work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold
within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
-OR-
D I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed
pursuant to the Contractor's License Law).
-OR-
D I am exempt under Business and Professions Code Division 3, Chapter 9, Article 3 for this reason:
AND,
D FORM B-61 "Owner Builder Acknowledgement and Verification Form" is required for any permit issued to a property owner.
By my signature below I acknowledge that, except for my personal residence in which I must have resided for at least one year prior to completion of the
improvements covered by this permit, I cannot legally sell a structure that I have built as an owner-builder if it has not been constructed in its entirety by licensed
contractors./ understand that a copy of the applicable law, Section 7044 of the Business and Professions Code, is available upon request when this application is
submitted or at the following Web site: http: I lwww.leginfo.co.gov/ ca/aw.html.
OWNER CERTIFICATION: The applicant certifies that all documents and plans clearly and accurately show all existing and proposed buildings, structures, access roads, and utilities/utility
easements. All proposed modifications and/or additions are clearly labeled on the site plan. Any potentially existing detail within these plans inconsistent with the site plan are not approved
for construction and may be required to be altered or removed. The city's approval of the application is based on the premise that the submitted documents and plans show the correct
dimensions of; the property, buildings, structures and their setbacks from property lines and from one another; access roads/easements, and utilities. The existing and proposed use of each
building as stated is true and correct; all easements and other encumbrances to development have been accurately shown and labeled as well as all on-site grading/site preparation. All
improvements existing on the property were completed in accordance with all regulations in existence at the time of their construction, unless otherwise noted.
NAME (PRINT}: _E_va_n_R_a_m_i_re_z ______ _ SIGN:
Note: If the erson si nin above is an authorized a ent for the ro ert owner include form B-62 si ned b owner.
1635 Faraday Ave Carlsbad, CA 92008 Ph: 442-339-2719 Email: Building@carlsbadca.gov
REV. 04/22
Building Permit Inspection History Finaled
{city of
Carlsbad
PERMIT INSPECTION HISTORY for (CBR2022-4539)
Permit Type: BLDG-Residential Application Date: 12/07/2022 Owner: TRUST CESENA
Work Class: Cogen Issue Date: 12/20/2022 Subdivision: CARLSBAD TCT#73-29
Status: Closed -Finaled Expiration Date: 12/11/2023 Address: 2721 LA GOLONDRINA ST
IVR Number: 45107 CARLSBAD, CA 92009-4326
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
05/30/2023 05/30/2023 BLDG-35 Solar Panel 212346-2023 Failed Tim Kersch Re inspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
BLDG-Final Inspection 212347-2023 Failed Tim Kersch Reinspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
BLDG-Plumbing Final No
BLDG-Mechanical Final Failed no tools to open panel. No
BLDG-Structural Final No
BLDG-Electrical Final No
06/12/2023 06/12/2023 BLDG-35 Solar Panel 214045-2023 Passed Chris Renfro Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-Final Inspection 214046-2023 Passed Chris Renfro Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-Structural Final Yes
BLDG-Electrical Final Yes
Monday, June 12, 2023 Page 1 of 1