HomeMy WebLinkAboutPD 2023-0012; VALLEY MIDDLE SCHOOL CAMPUS MODERNIZATION; STANDARD PROJECT REQUIREMENT FOR VALLEY MIDDLE SCHOOL CAMPUS MODERNIZATION; 2023-08-01I
_.,_
_ ( City of
Carlsbad.
-~
STANDARD PROJECT
REQUIREMENT
CHECKLIST
E-36
Project Information '·
De velop ment Servi ces
land Development Engineering
1635 Faraday Avenue
442-339-2750
www.carlsbadca.gov
' "
Project Name:Valley Middle School Campus Modernization
Project ID: PD2023-0012 I GR2023-0021
. DWG No. or Building Permit No.:542-9A
Baseline BMPs for Existing and Proposed Site Features
Complete the Table 1 -Site Design Requirement to document existing and proposed srte features and the BMPs to be
implemented for them. All BMPs must be implemented where applicable and feasible. Applicability is generally
assumed if a feature exists or is proposed.
BMPs must be implemented for site design features where feasible. Leaving the box for a BMP unchecked means it
will not be implemented (either partially or fully) either because it is inapplicable or infeasible. Explanations must be
provided in the area below. The table provides specific instructions on when explanations are required.
~
~ Table 1 -Site D.esign Requirement
A. Existing Natural Site Features (see Fact Sheet BL-1)
1. Check the boxes below for each existing feature on 1 Select the BMPs to be implemented for each identified feature. Explain
the site. why any BMP not selected is infeasible in the area below.
SD-G SD-H
ConseNe natural Provide buffers around waterbodies
features
□ Natural waterbodies □ □
□ Natural storage reservoirs & drainaqe corridors □ --
□ Natural areas, soils, & vegetation (incl. trees) □ --
B. BMPs for Common Impervious Outdoor Site Features (see Fact Sheet BL-2)
1. Check the boxes below for each 2. Select the BMPs to be implemented for each proposed feature. If neither BMP SD-8 nor
proposed feature. SD-I is selected for a feature, explain why both BMPs are infeasible in the area below.
SD-B SD-I Minimize size of
Direct runoff to pervious Construct surfaces from impervious areas
areas oermeable materials
□ Streets and roads □ □ ~ Check this box to confirm
Iii Sidewalks & walkways ~ □ that all impervious areas on
the site will be minimized
□ Parking areas & lots □ □ where feasible.
D Driveways □ □ If this box is not checked,
□ Patios, decks, & courtyards □ □ identify the surfaces that
cannot be minimized in area
□ Hardcourt recreation areas □ u below, and explain why it is
E-36 Page 1 of 4 Revised 04/23
-
D Other: ______ _ □ □ infeasible to do so.
C. Ii] BMPs for Rooftop Areas: Check this box if rooffop areas are proposed and select al least one BMP
below.
(see Fact
Sheet BL-3)
If no BMPs are selected, explain why they are infeasible in the area below.
Trash area is proposed to be covered. Roof to drain to adjacent pervious area.
Iii SD-B
Direct runoff to pervious areas
D SD-C
Install green roofs
OSD-E
Install rain barrels
D. □ BMPs for Landscaped Areas: Check this box if landscaping is proposed and select the BMP below
Iii SD-K Sustainable Landscaping
(see Fact
Sheet BL-4)
If SD-K is not selected, explain why it is infeasible in the area below.
Provide discussion/justification for site design BMPs that will not be implemented (either partially or fully):
Project landscaping will include both sustainable landscaping and groundcovers, as well as areas of
turf/sod along the school entry area.
Baseline BMPs for Pollutant-generatin~ Sources
All development projects must complete Table 2 -Source Control Requirement to identify applicable requirements for
documenting pollutant-generating sources/ features and source control BMPs.
BMPs must be implemented for source control features where feasible. Leaving the box for a BMP unchecked means it
will not be implemented (either partially or fully) either because it is inapplicable or infeasible. Explanations must be
provided in the area below. The table provides specific instructions on when explanations are required .
Table 2 -Source Control Requirement
A. Management of Storm Water Discharges
1. Identify all proposed outdoor
work areas below
□ Check here if none are proposed
Iii Trash & Refuse Storage
□ Materials & Equipment Storaoe
E-36
2. Which BMPs will be used to prevent
materials from contacting rainfall or
runoff?
(See Fact Sheet BL-5)
Select all feasible BMPs for each work area
SC-A SC-B SC-C
Overhead Separation Wind
covering flows from protection
adjacent
areas
[!I I!] (!)
□ □ □
Page 2 of 4
3. Where will runoff from the
work area be routed?
(See Fact Sheet BL-6)
Select one or more option for each
work area
SC-D SC-E Other
Sanitary
sewer
□ □
Containment
system
□ □
Revised 04/23
u
D Loadino & Unloadino □ □ □ □ □ □
0 Fueling □ □ D □ □ □ D Maintenance & Repair □ D □ □ □ □ D Vehicle & Eouioment Cleanino D □ □ D □ □ D Other: □ □ □ □ □ □
B. Management of Storm Water Discharges (see Fact Sheet BL-7)
Select one ootion for each feature below:
• Storm drain inlets and catch basins ... D are not proposed l!l will be labeled with stenciling or signage to
discourai:ie dumpini:i (SC-F)
• Interior work surfaces, floor drains & Ii] are not proposed D will not discharge directly or indirectly to the MS4
sumps ... or receiving waters
• Drain lines (e.g. air conditioning, boiler, Ii] are not proposed D will not discharge directly or indirectly to the MS4
etc.) ... or receiving waters
• Fire sprinkler test water ... lil. are not proposed D will not discharge directly or indirectly to the MS4
or receivinQ waters
Provide discussion/justification for source control BMPs that will not be implemented (either partially or fully):
Interior floor drains, drain lines and fire sprinklers are not applicable.
E-36 Page 3 of 4 Revised 04/23
Fo,m Certiflcatien ,
This E-36 Form is intended to comply with applicable requirements of the city's BMP Design Manual. I certify that it has
been completed to the best of my ability and accurately reflects the project being proposed and the applicable BMPs
proposed to minimize the potentially negative impacts of this project's land development activities on water quality. I
understand and acknowledge that the review of this form by City staff is confined to a review and does not relieve me as
the person in charge of ove elng the lection and design of storm water BMPs for this project, of my responsibilities for
ro ·ect desi n. '
Date: 08/01/2023
E-36 Page 4 of 4 Revised 04/23