CITY OF CARLSBAD
TRAFFIC SAFETY COMMISSION
STAFF REPORT
COMMISSION MEETING OF: June 6, 2011 ITEMNO.6A
LOCATION:
INITIATED BY:
Kelly Drive from Hillside Drive to Park Drive (at Kelly Elementary
School)
Michelle Dastyck
Kelly Elementary School PT A and Safety Committee Member
5099 Frost A venue
Carlsbad, CA 92008
REQUESTED ACTION: Request for a FY 2011-2012 Capital Improvement Program (CIP)
project to construct traffic improvements on Kelly Drive to
enhance school pedestrian crossing access, safety, and traffic
circulation at Kelly Elementary School.
BACKGROUND:
In January 2011, staff submitted a Capital Improvement Program (CIP) Project Request
for traffic improvements on Kelly Drive to be included in the pending FY 2011-2012
CIP. The CIP Committee has requested that this proposed project be submitted to the
Traffic Safety Commission for their recommendation.
DATA:
Kelly Drive provides access to El Camino Real from the adjacent residential
neighborhoods, and Kelly Elementary School which is located on the west side of Kelly
Drive between Hillside Drive and Park Drive. Kelly Elementary School has two·one-way
access driveways ( one entry only and one exit only) on Kelly Drive, creating a looped
ingress and egress to the school's parking lot and limited student drop-off /pick-up area
(see Exhibit 1 ). During school hours, the limited drop-off/pick-up area backs up with
vehicles, causing parents to park on both sides of Kelly Drive to drop-off or pick-up their
children. Parents dropping off or picking up their children on the east side of Kelly
Drive typically park their vehicle, and cross the street (mid-block) with their children.
This causes pedestrian safety crossing concerns due to the lack of a nearby controlled
pedestrian crossing.
Kelly Drive is unclassified on the Circulation Element of the General Plan; however, it
functions as a residential collector street. Kelly Drive is fully improved with curb and
gutter, sidewalks and street lights on both sides of the street. Kelly Drive was built in
1967 to secondary arterial street standards, having a curb to curb width of 64 feet. At that
time, Kelly Drive was projected to be extended across the wetlands east of Agua
Hedionda Lagoon to Cannon Road. However, establishment of the Coastal Commission
and environmental laws in 1972 ended the plans to ever extend Kelly Drive south of Park
Drive. Striping has been used to narrow the 64 foot wide roadway by providing a single
travel lane, a bike lane, and a parking lane in each direction with a two-way left tum lane
in the center of the street.
Page I
CITY OF CARLSBAD
TRAFFIC SAFETY COMMISSION
STAFF REPORT
COMMISSION MEETING OF:
( continued)
June 6, 2011 ITEM NO. 6A
Traffic control on Kelly Drive is provided by a traffic signal at the intersection of El
Camino Real/Kelly Drive and a stop sign at the intersection of Kelly Drive/Park Dr. The
intersection of Hillside Drive/Kelly Drive is controlled by a stop sign on Hillside Drive.
There is a painted school crosswalk on Hillside Drive at Kelly Drive. An adult crossing
guard assists school pedestrians crossing Hillside Drive at Kelly Drive during the
morning school arrival and the afternoon school departure times. Kelly Drive has been
posted with a 25 mph speed limit sign in each direction, but is considered non-
enforceable since there is no Engineering and Traffic Survey supporting the 25 mph
speed limit. The Kelly Elementary school zone is appropriately posted with school zone
s1gnage.
A request for improvements on Kelly Drive at Kelly Elementary School was made by
Michelle Dastyck who is on the Kelly Elementary School PT A and is a member of the
Kelly Elementary School Safety Committee. The request was made in a letter sent to
staff dated October 1, 2010 and included a petition signed by 28 people (see Exhibit 2).
Ms. Dastyck requested that three improvements be considered:
1. A raised pedestrian crosswalk across Kelly Drive directly adjacent to Kelly
Elementary School, including curb extensions and a raised median.
2. A RIGHT TURN ONLY condition out of the exit-only school driveway.
3. A traffic circle at the intersection of Kelly Drive and Park Drive to better
facilitate u-tums.
Based on staffs evaluation of the request and discussions with the Transportation
Director, a request for funding via the Capital Improvement Program was initiated. The
improvements requested in the Kelly Drive Improvements CIP Project include
constructing the following improvements on Kelly Drive: mid-block curb extensions on
both sides of the street, a raised median, and stop-controlled painted school crosswalk on
Kelly Drive at the school exit only driveway, and a traffic circle at the intersection of
Kelly Drive/Park Drive.
The proposed improvements will provide the following benefits:
• The mid-block curb extensions and raised median will reduce the roadway width
and thereby reduce the crossing distance for pedestrians.
• The raised median will provide a "safe haven/pedestrian refuge" half-way across
the street for pedestrians crossing Kelly Drive.
• The stop-control will provide a controlled pedestrian crossing between the
parking area on the east side of Kelly Drive and Kelly Elementary School.
Page 2
CITY OF CARLSBAD
TRAFFIC SAFETY COMMISSION
STAFF REPORT
COMMISSION MEETING OF:
( continued)
June 6, 2011 ITEMN0.6A
• The raised median constructed across the school exit driveway will improve
overall circulation by physically restricting left turns and requiring a RIGHT
TURN ONLY for vehicles exiting the school driveway.
• The traffic circle at the intersection of Kelly Drive/Park Drive will facilitate
overall traffic circulation at the intersection and at the school exit driveway during
student drop-off and pick-up times by providing a U-tum movement for the
vehicles forced to tum right from the school exit driveway who want to go back
northbound on Kelly Drive.
Staff cannot support the request to install a raised crosswalk across Kelly Drive at the
school exit driveway due to concerns by the Carlsbad Fire Department for potential
impacts to emergency response times. The proposed stop-condition on Kelly Drive
would make the raised crosswalk unnecessary.
Based on the above findings, staff recommends approval of a FY2011-2012 CIP Project
to construct the proposed traffic improvements on Kelly Drive to enhance school
pedestrian crossing access, safety and traffic circulation at Kelly Elementary School as
requested by the Kelly Elementary School PT A and Safety Committee.
The proposed traffic improvements have been estimated to cost approximately $267,500,
which includes the design and construction inspection costs.
RECOMMENDATION:
Based on the findings contained in this report, the Traffic Safety Coordinating Committee
recommends approval of a FY 2011-2012 CIP Project to construct traffic improvements
on Kelly Drive to enhance school pedestrian crossing access, safety, and traffic
circulation at Kelly Elementary School.
NECESSARY CITY COUNCIL ACTION:
The City Council must approve and include a CIP Project to construct the traffic
improvements on Kelly Drive in the FY 2011-2012 CIP Program which is part of the
City's FY 2011-2012 Budget as recommended.
Page 3
Kelly Drive Proposed Improvements Exhibit
1
JimMurrary
Engineering Department
City Of Carlsbad
1635 Faraday Ave.
Carlsbad, CA 92008
Dear Mr. Murray,
Michelle & William Dastyck
5099 Frost Avenue, Carlsbad CA 92008
RECEIVED
OCl O 1 1819
TRANSPOllTATION
DEPARTMENT
oetober1,2010
The is a request for a school crossing zone at Kelly Elementary School as well as traffic flow and traffic
cafmtng measures. After discussions with many other PTA members (please see attached petition) as well as
school officials, there is a desperate need for a complete plan/solution rather than a band aide to pedestrian
crossing and traffic calming on Kelly Drive in the areas in front of and surrounding Kelly Elementary.
With the current traffic flow and road conditions, it is only a matter of time before a serious injury occurs to a
child. Upon researching I discovered that there have already been traffic accidents Involving vehicles. And a
vehicle, while on Kelly drive near Kelly Elementary, struck at least one adult pedestrian. Therefore, the
argument that you have presented to others and myself stating, "there have not been any incidents" is not at
all accurate.
The Car1sbad City Council and your department are asked to determine an all inclusive solution that will
remediate the unsafe crossing conditions, excessive vehicle speeds (due to the width of Kelly Drive) along
with the problem of vehicles having perform u-tums with great caution due to the unsafe conditions at the
intersection of Kelly Drive and Park Drive.
We see this being accomplished by
1.) Adding a pedestrian crosswalk across Kelly Drive in front of Kelly Elementary with curb extensions, a
raised crosswalk and a median. (This crosswalk woufd loOk much like the one already constructed on
Chestnut Avenue between Harding Street and Jefferson Street).
2.) Creating a Right Tum Only out of the Kelly Elementary parking lot. (Much like the one already
constructed at Chestnut Avenue and Jefferson Street).
3.) Adding a roundabout at the intersection of Kelly Drive and Park Drive to create a safe intersection for
making au-turn.
PLEASE SEE ATTACHED RENDERINGS Of ABOVE
Our goal as parents and community members is to reduce speeds in the Kelly School zone and provide a
safe school crosswalk for pedestrians to cross Kelly Drive in front of Kelly Elementary. Please help us by
creating a workable solution to this important safety matter.
Th~~y~
~IGh lie Dastyck -
509 rost Avenue
Cerlsbad, CA 92008
760-458-0278
CC: Tressie Armstrong, Principle, Kefly Elementary School
Carllbad City Councfl
Kim Blaylock, Kelley Elementary Safety Advisor
Exhibit 2
Rendering of Chesnut Avenue Crosswalk at Kelly
Rendering of Chesnut Avenue Crosswalk at Kelly
PETITION
Kelly Elementary School Crosswalk and Traffic Calming
I/We the undersigned, herby petition the City Council of the City of Carlsbad to provide a pedestrian
cross walk and traffic calming solution on Kelly Drive in front of Kelly Elementary School as well as
the intersection of Kelly Drive and Park.
1 lwe request this traffic calming and cross walk for the following reasons.
1. Current street crossing conditions are unsafe.
2. Due to the wide width of Kelly Drive, vehicles often travel over the 25 mph speed limit.
3. V~hicles who make a U-turn at Kelly Drive and Park are forced to do so with great caution
due to unsafe conditions at that intersection.
I/We request that the City Council take this petition request under consideration at its earliest
opportunity and that we be informed as to whether it is scheduled at a regular Council meeting so that
we may appear in person if we so choose.
Name (Please PRINT and INITIAL) ADDRESS
1. n lt:t ~ C Ev; l h} ~ l\l8Z rete;'£.o~A\£.Co." l~W 9,.-? ~
2. Gse:,c,, Gt:zrtt?(/ (af,,-j !\•ni..'-(?;2t." 4ie (,.s-.i-\\b,..p_ ·~c.k~"r
3. _L-_.-._c_J c_l~_,'·v__._0,.._,/_V~...a. (_(._v\_r __ ....::CJ_\J.,.;:;11~....;.......---i.f ~70 ,)e.C:.. /?)U.A.J',: 'L,( A iJ I utrl :,h(),j t12CL
. .J 11 ii.? -C 0
4 a.. • f'-. • rV-• _UJ_ . ...,."·..._(:...,\'.:_· .... w ......... ,c .... ~=: R .... i ..... '-....,.,G,...,·f/...__) ___ ).;...,a.\ ..... '\'------~7{, \ f·,f ! \{ .. ~--;/. ,\ I ,,, \:; \~· ;;;-:\,c'' ,".:t.1{'1~:-0·
PETITION
Kelly Elementary School Crosswalk and Traffic Calming
I/We the undersigned, herby petition the City Council of the City of Carlsbad to provide a pedestrian
cross walk and traffic calming solution on Kelly Drive in front of Kelly Elementary School as well as
the intersection of Kelly Drive and Park.
1/we request this traffic calming and cross walk for the following reasons.
1. Current street crossing conditions are unsafe.
2. Due to the wide width of Kelly Drive, vehicles often travel over the 25 mph speed limit.
3. Vehicles who make a U-turn at Kelly Drive and Park are forced to do so with great caution
due to unsafe conditions at that intersection.
I/We request that the City Council take this petition request under consideration at its earliest
opportunity and that we be informed as to whether it is scheduled at a regular Council meeting so that
we may appear in person it we so choose.
m ~-~ MD~$
1. ·-QtJWA} ;J:k111 <~ _jL/1 S 't!yJl.)l t '/. ( ;\ ~£Lk~( ;')t"t.'~
2. ;Tt.Mif,r C-etv#lbr$ J:c:, 'tl8f ~t¥II& lc/11,y Cw:•bNI "llm•
3-'Kv:-, (.l(l '/ ~oc {( ·z 7 20 w ~ LScAi _ -.;;; ·, c 5&) qzc1:"8
4. r;ebJ:Ct:~ (vLu;tJti&\ 31s-=, ~ <' o--O~;Q q x90
:---JlR J1 , f1,.-tdr9 -31'.'; I ~ vU-lt 1.1vvj C ;✓J.JL,.i.. ' ll tp-oc:6
· _Q,.._.._m ..... 4..____,Q ............ ,il-=--."-'--fl{Y\ _____ ~-> _____ ci ¾E? ,s~\.QL)~ ~1. Clu-k1>J( ,.>+ (1:Lcf()
1
• Lao~ M\ \en w;c.10 Va.\eociL A:oc-,Chr\:h:\,d.cP{\uo~
a. ..~v\ u t'h.l!-S\..kvl U:. \c~vt-<ft ) 3 A:-rJ 11 ~ ~ L.. .-..:L (:q..,..{JL,N\_, v) i )A)'C ~
s. C\kw'\Sbnf-• (\. 'T')Ai,~ C'C> '18o S ~.\t: .. :Hc<._,~:Dv~,Jc (~h-\,Sl,~rl C'tl~,~.:.:~
10
• Ctuoo k'.2,le\l-• eB--JC\ IJ:2.4ok ct ciu~,m 'w~ 11
• Al--er-ea/,'l1a::;"4 cibn s SS1/ Coy. le cf C4rl-r 1:_ J.a/ o
::: ro 1chet\e.J).s½J: d~ 5."'/9 nr:st Awe I ('41 !sh::& 7~~
14.-------------------------------
15. ______________________________ _
C~ital Improvement Proiram
Project Request Form
FY 2011--2012
CONTACT INFORMATION
1. Requester _J_o_h_n_K_i_m ______________ 2. Phone. Number 602-2757
3. Requester Department Transportation ---'---------------------------
4. Requester Department Director's Signature Date
5. Sponsor Department Transportation ---'---------------------------
6. Sponsor Department Director's Signature Date
PROJECT DESCRIPTION
7. Project Name Kelly Drive Traffic Calming 8. Project Number ----
9. Project Budget _$.;...2_6_7..;.._,s_o_o_.o_o ___ _ 10. Annual Operating Budget -------
11. Pro·ect Location:
Kelly Drive at Kelly Elementary School and the intersection of Kelly Drive and Park Drive
12. Pro·ect Descri tion:
Traffic calming features such as narrowing the street via chokers. raised median to restrict left turns out
of the school drive, STOP-controlled crosswalk across Kelly Drive and a traffic circle at Kelly Drive and
Park Drive to enhance access to and from the school.
13. Brief Summa of Pro·ect Need and Priorit Level:
This project has been requested by residents and supported by the staff at Kelly School to provide a safe
crossing across Kelly Drive for parents/children.
ESTIMATED PERMITTING/ENVIRONMENTAL REQUIREMENTS
14. Permits:
D City Issued D Agency Issued D California Coastal Commission Issued
15. Environmental:
D Negative Declaration D Mitigated Negative Declaration D Environmental Impact Report
D Exempt
SUBMITTAL$ ARE DUE NO LATER THAN: JANUARY 31, 2011 Date Received:
-'-'-
Exhibit 3
CIP PROJECT BUDGET WORKSHEET: FY 2011-2012
Prol. Reouester:
ProJect Name:
New Protect/ UDdated Costs / Undated Schedule lnlease circle or hlnhllnhtl
Object Code
9080
9081
COST ESTIMATES:
Job Ladger Activities
Subtotal Studies & Re
9072 Environmental-Consultants
9073 Environmental-Staff Labor
9074 Environmental-Miscellaneous
9075 Environmental-Maintenance
Sub otal Environmental
9063
9064
9065
9076 uisition-Consultants
9077 uisition-Staff Labor
9078 uisition-Miscellaneous
uisitlon-Purchase
9067 Construction-Consultants
9068 Construction-Staff Labor
9069 Construction-Miscellaneous
9070 Construction-Maintenance
Subtotal Miscellaneous
PROJECT T()TAL..
Current
A ro
•it over $5,000, complete GOAL/ CIP Operating Budget Request
Canffal Proiect Budaet Wortc:sheet
I Proiect Number:
I Estimated In Service Date:
FY 11-12 FY 12-13 FY 13-14 FY 14-15 FY 15-16
s
FY 17•21 FY22-BO Project Total
42,500
200,000
25,000
$ 267,500
267 500
s s s 267,500