Loading...
HomeMy WebLinkAboutMS 2019-0003; BMW OF CARLSBAD; PRIORITY DEVELOPMENT PROJECT (PDP) STORM WATER QUALITY MANAGEMENT PLAN (SWQMP); 2021-05-24ENGINEER OF WORK: I ,tv r 61-ril sixtci PRIORITY DEVELOPMENT PROJECT (PDP) STORM WATER QUALITY MANAGEMENT PLAN (SWQMP) FOR BMW OF CARLSBAD 1060 Auto Center Court Carlsbad, CA 92008 CDP2019-001 3, DEV20 18-0198, MS2019-0003 SWQMP No. TBD Aaron M. Albertson, RCE 65513, Exp. 09/30/21 (Provide Wet Signature and Stamp Above Line) I I [1 I I I I I ESSI OALa NO. 65513 zirn EXP. /3O/21 I I I I Iii I I I I PREPARED FOR: AutoNation Inc. 200 SW 1st Ave, 14th Floor Fort Lauderdale, FL 33301 TEL: (954) 769-6000 PREPARED BY: Cr— Commercial DeWopmert Resources Today's Ideas. Tomorrows Reality. 4121 Westerly Place, Suite 112 Newport Beach, CA 92660 TEL: (949) 610-8997 DATE: May 24th, 2021 0 ECFY\TED JUL 02 2021 LAj LAND DEVELOPMEN IM ENGINEERING (.) I M62M1P3 1 I e0kc,= ftsources Priority Development Project (POP) SWQMP BMW of Carlsbad TABLE OF CONTENTS I of 27 I I I I I I PDPSWQMP CertificationPage ... ............. ................. ............ ............................................ .. ............ 2 Project Vicinity Map...................................................................................................3 FORM E-34: Storm Water Standard Questionnaire...........................................................4 SiteInformation ................. ......... .... . ...................... ......................... ........................... 5 FORM E-36: Standard Project Requirement Checklist......................................................13 Summary of PDP Structural BMPs..............................................................................14 Attachment 1: Backup for PDP Pollutant Control BMPs....................................................21 Attachment la: DMA Exhibit Attachment I b: DMA Summary Attachment Ic: Harvest and Use Feasibility Screening Attachment Id: Categorization of Infiltration Feasibility Condition (Form 1-8) Attachment le: Pollutant Control BMP Design Worksheets / Calculations LID DCV Calculation Summary San Diego County 851h Percentile Isopluvial Map Workseet B.5-I: Simple Sizing Method for Biofiltration BMPs (x4) Worksneet B.4-1: Simple Sizing Method for Infiltration BMPs Works-heet B.6-1: Flow-Thru Design Flows BMP Sizing & Detail Sheets Attachment 2: Backup for PDP Hydromodification Control Measures ....... ............................ 23 Attachment 2a: Hydromodification Management Exhibit Attachment 2b: Management of Critical Coarse Sediment Yield Areas (WMAA Exhibit) Attachment 2c: Not Included Attachment 2d: Flow Control Facility Design Attachment 3: Structural BMP Maintenance Information....................................................25 Attachment 4: Single Sheet BMP (SSBMP) Exhibit .................. ............................ ............ 28 I I I H I I I I I Priority Development Project (PDP) SWQMP cwvblkqn~ Cwmrcw BMW of Carlsbad alfts=cas CERTIFICATION PAGE Project Name: BMW of Carlsbad Project ID: MS2019-0003/CDP20I9-0013 I hereby declare that I am the Engineer in Responsible Charge of design of storm water BMPs for this project, and that I have exercised responsible charge over the design of the project as defined in Section 6703 of the Business and Professions Code, and that the design is consistent with the requirements of the BMP Design Manual, which is based on the requirements of SDRWQCB Order No. R9-2013-0001 (MS4 Permit) or the current Order. I have read and understand that the City Engineer has adopted minimum requirements for managing urban runoff, including storm water, from land development activities, as described in the BMP Design Manual. I certify that this SWQMP has been completed to the best of my ability and accurately reflects the project being proposed and the applicable source control and site design BMPs proposed to minimize the potentially negative impacts of this project's land development activities on water quality. I understand and acknowledge that the plan check review of this SWQMP by the City Engineer is confined to a review and does not relieve me, as the Engineer in Responsible Charge of design of storm water BMPs for this project, of my responsibilities for project design. 65513, Exp. 09/30/21 Engineer of Work's Signature, PE Number & Expiration Date Aaron Albertson Print Name Commercial Development Resources Company 05/24/2021 Date PDPSWQMP 2of27 PROJECT LOCATION 1050 AUTO CENTER DR (.ADI D AD, CA Priority Development Project (POP) SWQMP BMW of Carlsbad PIResources commerdw PROJECT VICINITY MAP am PDPSWQMP 3 of 27 Priority Development Project (POP) SWQMP BMW of Carlsbad C tffimerda L' kpn Routes [Insert City's Storm Water Standard Questionnaire (Form E-34) here] POP SWQMP 4of27 STORM WATER STANDARDS Dev&QPmflt Services (J tv of Development Engineering QUESTIONNAIRE Land Engineering Carlsbad 1635 Faraday Avenue E-34 (760) 602-2750 www,carlsbadca.gov INSTRUCTIONS: To address post-development pollutants that may be generated from development projects, the city requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMPs) into the project design per Carlsbad BMP Design Manual (BMP Manual). To view the BMP Manual, refer to the Engineering Standards (Volume 5). This questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to STANDARD PROJECT' requirements or be subject to PRIORITY DEVELOPMENT PROJECT' (PDP) requirements. Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the city. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A completed and sgned questionnaire must be submitted with each development project application. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. PROJECT INFORMATION PROJECT NAME: BMW OF CARLSBAD PROJECT ID: MS2019.0003/ CDP2019-0013 ADDRESS: 1060 Auto Center Court, Carlsbad, CA 92008 APN: 211-080-11-00 The project is (check one): 0 New Development E1 Redevelopment The total proposed disturbed area is: 161,503 ft2 (__1.71__j acres The total proposed newly created and/or replaced impervious area is: 120,934 ft2 ( 2.78 ) acres If your project is covered by an approved SWOMP as part of a larger development project, provide the project ID and the SWQMP # of the larger development project: Project ID: NIA SWQMP #: N/A Then, go to Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your application to the city. E-34 Page 1of 4 REV 02116 E-34 REV 04/17 1 Page 2 of 4 STEP I TO BE COMPLETED FOR ALL PROJECTS To determine if your project is a "development project", please answer the following question: YES NO Is your project LIMITED TO routine maintenance activity and/or repair/improvements to an existing building El or structure that do not alter the size (See Section 1.3 of the BMP Design Manual for guidance)? If you answered "yes" to the above question, provide justification below then go to Step 5, mark the third box stating "my project is not a 'development project' and not subject to the requirements of the BMP manual" and complete applicant information. Justification/discussion: (e.g. the project includes only interior remodels within an existing building): If you answered "no" to the above question, the project is a 'development project', go to Step 2. - STEP 2 TO BE COMPLETED FOR ALL DEVELOPMENT PROJECTS To determine if your project is exempt from PDP requirements pursuant to MS4 Permit Provision E.3.b.(3), please answer the following questions: Is your project LIMITED to one or more of the following: YES NO 1. Constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria: Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non erodible permeable areas; El M Designed and constructed to be hydraulically disconnected from paved streets or roads; C) Designed and constructed with permeable pavements or surfaces in accordance with USEPA Green Streets guidance? 2. Retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in o IN accordance with the USEPA Green Streets guidance? 3. Ground Mounted Solar Array that meets the criteria provided in section 1.4.2 of the BMP manual? 0 EJ If you answered "yes" to one or more of the above questions, provide discussion/justification below, then go to Step 5, mark the second box stating "my project is EXEMPT from PDP ..." and complete applicant information. Discussion to justify exemption ( e.g. the project redeveloping existing road designed and constructed in accordance with the USEPA Green Street guidance): If you answered "no" to the above questions, your project is not exempt from PDP, go to Step 3. I I I I I I I 1 I I I I I I U I S'1EP3 TO BE COMPLETED FOR ALL NEW OR REDEV€tOPMENT PROJECTS To determine if your project is a PDP, please answer the following questions (MS4 Permit Provision E.3.b.(1)): YES NO Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively over the entire project site? This includes commercial, industrial, residential, mixed-use, 0 KI and public development projects on public or private land. Is your project a redevelopment project creating and/or replacing 5,000 square feet or more of impervious surface collectively over the entire project site on an existing site of 10,000 square feet or more of impervious surface? This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and 0 iXJ refreshment stands selling prepared foods and drinks for immediate consumption (Standard Industrial Classification (SIC) code 5812). Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a hillside development project? A hillside 0 IXI development project an_ any that is_ twenty-five or greater. _includes _development _natural _slope _percent Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a parking lot? A parking lot is El a land area or facility for the temporary parking or storage of motor vehicles used personally for business or for commerce. 6, Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious street, road, highway, freeway or driveway surface collectively over the entire project site? A street, road, highway, freeway or driveway is any paved impervious surface used for the transportation of automobiles, trucks, motorcycles, and other vehicles. Is your project a new or redevelopment project that creates and/or replaces 2,500 square feet or more of impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive Area (ESA)? "Discharging Directly to" includes flow that is conveyed overland a distance of 0 IZJ 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the project to The ESA (i.e. not commingled with flows from adjacent lands) * Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface that supports an automotive repair shop? An automotive repair > shop is a facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013, 5014, 5541, 7532-7534, or 7536-7539. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious area that supports a retail gasoline outlet (RGO)? This category includes RGO'S that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (AD T) of 100 or more vehicles per day. Is your project a new or redevelopment project that results in the disturbance of one or more acres of land and are expected to generate pollutants post construction? Is your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of impervious surface or (2) increases impervious surface on the property by more than 10%? (CIVIC 0 EXJ 21.203.040) If you answered "yes" to one or more of the above questions, your project is a PDP. If your project is a redevelopment project, go to step 4. If your project is a new project, go to step 5, check the first box stating "My project is a POP . . and complete applicant information. If you answered "no" to all of the above questions, your project is a 'STANDARD PROJECT.' Go to step 5, check the second box stating "My project is a 'STANDARD PROJECT'..." and complete applicant information. E-34 Page 3of4 REV 04117 STEP 4 TO BE COMPLETED FOR REDEVELOPMENT PROJECTS THAT ARE PRIORITY DEVELOPMENT PROJECTS (POP) ONLY Complete the questions below regarding your redevelopment project (MS4 Permit Provision E.3.b.(2)): YES NO Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than 50% of the surface area of the previously existing development? Complete the percent impervious calculation below: Existing impervious area (A) = 118,892 sq. ft. 0 FZI Total proposed newly created or replaced impervious area (B) = 120,934 sq. ft. Percent impervious area created or replaced (B/A)* 100 = 102 % If you answered 'yes", the structural BMPs required for PDP apply only to the creation or replacement of impervious surface and not the entire development. Go to step 5, check the first box stating "My project is a PDP ..," and complete applicant information. If you answered "no," the structural BMP's required for PDP apply to the entire development. Go to step 5, check the check the first box stating "My project isaPDP ." and complete applicant information. STEP 5 CHECK THE APPROPRIATE BOX AND COMPLETE APPLICANT INFORMATION EI My project is a PDP and must comply with PDP stormwater requirements of the BMP Manual. I understand I must prepare a Storm Water Quality Management Plan (SWQMP) for submittal at time of application. 0 My project is a 'STANDARD PROJECT' OR EXEMPT from POP and must only comply with 'STANDARD PROJECT' stormwater requirements of the BMP Manual. As part of these requirements, I will submit a "Standard Project Requirement Checklist Form E-36' and incorporate low impact development strategies throughout my project. Note: For projects that are close to meeting the PDP threshold, staff may require detailed impervious area calculations and exhibits to verify if 'STANDARD PROJECT' stormwater requirements apply. My Project is NOT a 'development project' and is not subject to the requirements of the BMP Manual. Applicant Information and Signature Box Applicant Name: Applicant Title: Applicant Signature: Date: nvrunmeniaiiy oensiive ireas inciuoe OUT are not iimrtea to an r.tean vvater Act ectron U3(0) impairea water mates; areas designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their equivalent under the Multi Species Conservation Program within the Cities and County of San Diego; Habitat Management Plan; and any other equivalent environmentally sensitive areas which have been identified by the City. This Box for City Use Only EMMEAM YES NO City Concurrence: o By: I Date; Project ID: I E-34 Page 4 of 4 REV 04117 1 Priority Development Project (POP) SWQMP commmu BMW of Carlsbad b - - SITE INFORMATION CHECKLIST Project Summary Information Project Name BMW of Carlsbad Project ID MS2019-0003, CDP20I9-0013 Project Address 1060 Auto Center Court Carlsbad, CA 92008 Assessor's Parcel Number (APN) 211-080-11-00 Project Watershed (Hydrologic Unit) Carlsbad 904, Agua Hedionda (904.3) Parcel Area 3.708 Acres (161,503 Square Feet) Existing Impervious Area (subset of Parcel Area) Area 2.729 Acres ( 118 892 Square Feet) to be disturbed by the project (Project Area) 3.708 Acres (161,503 Square Feet) Project Proposed Impervious Area (subset of Project Area) 2.776 Acres (120,934 Square Feet) Project Proposed Pervious Area (subset of Project Area) 0.931 Acres (40,568 Square Feet) Note: Proposed Impervious Area + Proposed Pervious Area = Area to be Disturbed by the Project. This may be less than the Parcel Area. POP SWQMP 5 of 27 I I I I I I I I I I I I I I I I I I I Priority Development Project (PDP) SWQMP BMW of Carlsbad C I >1 I Description of Existing Site Condition and Drainaqe Patterns Current Status of the Site (select all that apply): Existing development El Previously graded but not built out El Agricultural or other non-impervious use El Vacant, undeveloped/natural Description /Additional Information: Existing project site is an automotive dealer and repair complex with onsite AC pavement parking lot, drive aisles and landscape areas. Existing Land Cover Includes (select all that apply): Vegetative Cover El Non-Vegetated Pervious Areas Impervious Areas Description / Additional Information: Existing project site is 26% pervious landscape and 74% impervious area (roof, parking lot, sidewalks, etc.) Underlying Soil belongs to Hydrologic Soil Group (select all that apply): El NRCS Type A NRCS Type B O NRCS Type C El NRCS Type D Approximate Depth to Groundwater (OW): El GW Depth <5 feet El 5 feet < GW Depth < 10 feet El 10 feet < GW Depth <20 feet GW Depth >20 feet Existing Natural Hydrologic Features (select all that apply): El Watercourses El Seeps C1 Springs El Wetlands None Description /Additional Information: N/A POP SWQMP 6of27 Priority Development Project (PDP) SWQMP BMW of Car[sbad CIAResaw4s C m2cl on of Existing Site Topography and Drainage: [How is storm wafer runoff conveyed from the site? At a minimum, this description should answer (1) whether existing drainage conveyance is natural or urban; (2) describe existing constructed storm water conveyance systems, if applicable; and (3) is runoff from offsite conveyed through the site? if so, describe] The existing site is an automotive detail and repair complex. Onsite stormwater flows away from the existing building, across the AC pavement parking lot, to curb and gutter around perimeter of site, then flows into onsite catch basin. The onsite catch basins discharge directly to the City's storm drain system. Runoff in the perimeter landscaping flows offsite and into existing catch basins in the public-right-of way before joining the City's storm drain system. The City's storm drain system discharges to Agua Hedionda Lagoon, then to the Pacific Ocean. PDPSWQMP 70f27 Priority Development Project (PDP) SWQMP BMW of Carlsbad C Resawms Description of Proposed Site Development and Drainage Patterns Project Description I Proposed Land Use and/or Activities: The proposed project is the construction of a new BMW dealership with a 2-story building with 1.4 acres of rooftop parking. This will include new onsite AC pavement parking areas, drive aisles, landscape setbacks, landscape islands, and trash enclosure. List/describe proposed impervious features of the project (e.g., buildings, roadways, parking lots, courtyards, athletic courts, other impervious features): Proposed impervious features include a new 2-story building with rooftop parking, AC pavement parking lot with drive aisles, and concrete walkways. The proposed condition will be 75% impervious areas. List/describe proposed pervious features of the project (e.g. landscape areas): Proposed pervious features include landscaped areas along property lines and throughout the project site. In addition, permeable payers are provided in parking areas to reduce the total impervious area for the project site. Permeable payers are not considered treatment control BMPs. The proposed condition will be 25% impervious areas. Does the project include grading and changes to site topography? Yes 0 N Description I Additional Information: The project site will be regraded to construct a 2-story, at-grade building in the center of the site. The surrounding area in the project site will be regraded to capture all rooftop and parking lot flows onsite. The landscape area along Cannon Road will remain as steep slopes from the property line down to the public right-of-way. Landscape areas along the property line on Car County Drive and Auto Center Court will continue to slope as it does in existing condition - part of the area will slope towards the road, and part will slope onto the project site. Project site flows will be directed to biofiltration basins (two with partial retention) for treatment and discharge to the underground detention system. The retaining walls along the western property line will remain in place. The project site does not receive run-on from outside property limits. Does the project include changes to site drainage (e.g., installation of new storm water conveyance systems)? Yes 0 N Description I Additional Information: New storm drain system, biofiltration basins, biofiltration basins with partial retention and underground detention system to capture, treat, and detain stormwater runoff onsite prior to draining offsite to meet LID and hydromodification requirements. Onsite runoff sheetfiows to proposed biofiltration areas (some with partial retention) for treatment prior to discharging to underground detention. Rooftop runoff will be captured and treated via BioClean's Modular Wetland System (MWS) prior to discharging to the underground detention system. Detention vault outlet structure will drain to the existing private storm drain lateral on Cannon Road. PDP SWQMP 8o127 I L I I I I I I F~ I I I F~ I I I I I Priority Development Project (PDP) SWQMP BMW of Carlsbad C cwmwdw alRommes Identify whether any of the following features, activities, and/or pollutant source areas will be present (select all that apply): On-site storm drain inlets o Interior floor drains and elevator shaft sump pumps O Interior parking garages O Need for future indoor & structural pest control Landscape/Outdoor Pesticide Use 0 Pools, spas, ponds, decorative fountains, and other water features 0 Food service Refuse areas 0 Industrial processes 0 Outdoor storage of equipment or materials Vehicle and Equipment Cleaning Vehicle/Equipment Repair and Maintenance O Fuel Dispensing Areas O Loading Docks Fire Sprinkler Test Water Miscellaneous Drain or Wash Water Plazas, sidewalks, and parking lots PDP SWQMP 9 of 27 Priority Development Project (PDP) SWQMP COMINIEL c ommrdw BMW of Carlsbad Identification of Receiving Water Pollutants of Concern Describe path of storm water from the project site to the Pacific Ocean (or bay, lagoon, lake or reservoir, as applicable): The onsite detention system will discharge to the existing private storm drain lateral at the northwest property corner. Runoff from the perimeter landscaping along Cannon Road flows north to the gutter in the public right-of-way, then to an existing public storm drain inlet approximately 600-ft west of the project site. Runoff from the perimeter landscaping along Car County Drive flows east to the gutter in the public right-of-way, then north to an existing public storm drain inlet on Car Country Drive near the northeast property corner. Runoff from the perimeter landscaping along Auto Center Court flows south to the gutter in the public right-of-way, then to an existing public storm drain inlet located west of the project site at the end of the cul-de-sac. The existing private storm drain lateral and public storm drain inlets convey flows to the existing City storm drain line flowing west along Cannon Road. This conveys runoff to the Agua Hedionda Lagoon and ultimately drains to the Pacific Ocean. List any 303(d) impaired water bodies within the path of storm water from the project site to the Pacific Ocean (or bay, lagoon, lake or reservoir, as applicable), identify the pollutant(s)/ stressor(s) causing impairment, and identify any TMDLs for the impaired water bodies: 303(d) Impaired Water Body Pollutant(s)/Stressor(s) TMDLs Agua Hedionda Lagoon Indicator Bacteria Indicator Bacteria Invasive Species, Sedimentation/Siltation Identification of Project Site Pollutants Identify pollutants anticipated from the project site based on all proposed use(s) of the site (see BMP Design Manual Appendix B.6): Commercial Development (>I ac), Parking Lot Pollutant Not Applicable to Anticipated from the Also a Receiving Water Pollutant of the Project Site Project Site Concern Sediment X Nutrients X Heavy Metals X Organic Compounds X Trash & Debris X Oxygen Demanding x Substances Oil& Grease X Bacteria & Viruses X X Pesticides X PDP SWQMP 10 of 27 Priority Development Project (PDP) SWQMP BMW of Carlsbad CW4ECR0Z9=CeS Hydromodification Management Requirements Do hydromodification management requirements apply (see Section 1.6 of the BMP Design Manual)? Yes, hydromodification management flow control structural BMPs required. III No, the project will discharge runoff directly to existing underground storm drains discharging directly to water storage reservoirs, lakes, enclosed embayments, or the Pacific Ocean. LJ No, the project will discharge runoff directly to conveyance channels whose bed and bank are concrete-lined all the way from the point of discharge to water storage reservoirs, lakes, enclosed embayments, or the Pacific Ocean. 0 No, the project will discharge runoff directly to an area identified as appropriate for an exemption by the WMAA for the watershed in which the project resides. Description /Additional Information (to be provided if a 'No' answer has been selected above): N/A Critical Coarse Sediment Yield Areas* *This Section only required if hydromodification management requirements apply Based on the maps provided within the WMAA, do potential critical coarse sediment yield areas exist within the project drainage boundaries? DYes 0 No, No critical coarse sediment yield areas to be protected based on WMAA maps If yes, have any of the optional analyses presented in Section 6.2 of the BMP Design Manual been performed? 0 6.2.1 Verification of Geomorphic Landscape Units (GLUs) Onsite 0 6.2.2 Downstream Systems Sensitivity to Coarse Sediment 0 6.2.3 Optional Additional Analysis of Potential Critical Coarse Sediment Yield Areas Onsite 0 No optional analyses performed, the project will avoid critical coarse sediment yield areas identified based on WMAA maps If optional analyses were performed, what is the final result? 0 No critical coarse sediment yield areas to be protected based on verification of GLUs onsite 0 Critical coarse sediment yield areas exist but additional analysis has determined that protection is not required. Documentation attached in Attachment 8 of the SWQMP. O Critical coarse sediment yield areas exist and require protection. The project will implement management measures described in Sections 6.2.4 and 6.2.5 as applicable, and the areas are identified on the SWQMP Exhibit. Discussion /Additional Information: N/A PDP SWQMP 11 of 27 Priority Development Project (POP) SWQMP BMW of Carlsbad I I Flow Control for Post-Project Runoff* *This Section only required if hydromodification management requirements apply List and describe point(s) of compliance (POCs) for flow control for hydromodification management (see Section 6.3.1). For each POC, provide a POC identification name or number correlating to the project's HMP Exhibit and a receiving channel identification name or number correlating to the project's HMP Exhibit. There is I point of compliance (POC) for flow control for hydromodification management for the proposed project: DMA-1 & DMA-2 - City SD System - POC #1 -* Aqua Hedionda Lagoon DMA-i flows to City SD system via existing private lateral on Cannon Road. DMA-2 flows to City SD system via existing inlets in the public ROW on Auto Center Court, Car Country Drive, and Cannon Road. POC #1 is located at STA 31+80.00 of existing City storm drain line on Cannon Road, east of Paseo Del Norte, per City Drawing No. 285-2 (sheets 6 and 10). The storm drain system conveys flows west along Cannon Road, then discharges north to Agua Hedionda Lagoon. Has a geomorphic assessment been performed for the receiving channel(s)? No, the low flow threshold is 0.1Q2 (default low flow threshold) E Yes, the result is the low flow threshold is 0.1Q2 LJ Yes, the result is the low flow threshold is 0.3Q2 LI Yes, the result is the low flow threshold is 0.5Q2 If a geomorphic assessment has been performed, provide title, date, and preparer: N/A Discussion / Additional Information: (optional) N/A Other Site Requirements and Constraints When applicable, list other site requirements or constraints that will influence storm water management design, such as zoning requirements including setbacks and open space, or City codes governing minimum street width, sidewalk construction, allowable pavement types, and drainage requirements. 25'-wide landscape setback along Cannon Road 10'-wide landscape setback along Car Country Drive 10'-wide landscape setback along Auto Center Court Optional Additional Information or Continuation of Previous Sections As Needed This space provided for additional information or continuation of information from previous sections as needed. N/A I POP SWQMP I2of27 I I I Li I I Li I I I I I I I H I Priority Development Project (PDP) SWQMP BMW of Carlsbad ClAwsmMs ~ cwmtdw [Insert City's Standard Project Requirement Checklist Form E-36 (here)] PDP SWQMP 13 of 27 !~Clty of C Isbad STANDARD PROJECT REQUIREMENT CHECKLIST E36 Land Development Engineering 1635 Faraday Avenue (760) 602-2750 www.carlsbadca.gov Project Information Project Name: BMW of Carlsbad Project ID: MS2019-0003 DWG No. or Building Permit No.: CDP2019-0013/SDP20I9-0005, DWG NO. 529-6A Source Control BMPs All development projects must implement source control BMPs SC-1 through SC-6 where applicable and feasible. See Chapter 4 and Appendix El of the BMP Design Manual (Volume 5 of City Engineering Standards) for information to implement source control BMPs shown in this checklist. Answer each category below pursuant to the following. "Yes" means the project will implement the source control BMP as described in Chapter 4 and/or Appendix El of the Model BMP Design Manual. Discussion/justification is not required. "No" means the BMP is applicable to the project but it is not feasible to implement. Discussion/justification must be provided. Please add attachments if more space is needed. "N/A" means the BMP is not applicable at the project site because the project does not include the feature that is addressed by the BMP (e.g., the project has no outdoor materials storage areas). Discussion/justification may be provided. Source Control Requirement Applied? - SC-1 Prevention of Illicit Discharges into the M54 IZI Yes 0 No 0 N/A Discussion/justification if SC-1 not implemented: -, SC-2 Storm Drain Stenciling or Signage IXl Yes 0 No 0 N/A Discussion/justification if SC-2 not implemented: SC-3 Protect Outdoor Materials Storage Areas from Rainfall, Run-On, Runoff, and Wind o Yes 0 No N/A Dispersal Discussion/justification if SC-3 not implemented: Outdoor material storage areas are not proposed for this project. E-36 Page 1 of 4 Revised 09116 Source Control Requirement (continued) SC-4 Protect Materials Stored in Outdoor Work Areas from Rainfall, Run-On, Runoff, and Wind Dispersal ri Yes .. e Applied? No N/A Discussion/justificaton if SC4 not implemented: Outdoor work areas not proposed for this project. All work areas will be indoor. SC-6 Protect Trash Storage Areas from Rainfall, Run-On, Runoff, and Wind Dispersal j IX Yes 0 No 0 N/A Discussion/justificalion if SC-5 not implemented: SC-6 Additional BMPs based on Potential Sources of Runoff Pollutants must answer for each source listed below and identify additional BMPs. (See Table in Appendix E. 1 of BMP Manual for guidance). IX On-site storm drain inlets IX Yes 0 No 0 N/A IJ Interior floor drains and elevator shaft sump pumps IX Yes 0 No 0 N/A Interior parking garages 0 Yes 0 No IX N/A Need for future indoor & structural pest control IX Yes 0 No 0 N/A IX Landscate/Outdoor Pesticide Use IX Yes 0 No 0 N/A Pools, spas, ponds, decorative fountains, and other water features 0 Yes 0 No IX N/A Food service 0 Yes 0 No IN N/A r.J Refuse areas IX Yes 0 No 0 N/A Industrial processes 0 Yes 0 No IX N/A Outdoor storage of equipment or materials 0 Yes 0 No IX N/A IX Vehicle and Equipment Cleaning J Yes 0 No 0 N/A LX Vehicle/Equipment Repair and Maintenance IX Yes 0 No 0 N/A Fuel Dispensing Areas 0 Yes 0 No IX N/A Loading Docks 0 Yes 0 No IX N/A IX Fire Sprinkler Test Water 0 Yes 0 No 0 N/A IKI Miscellaneous Drain or Wash Water - IX Yes 0 No 0 N/A IX Plazas, -sidewalks, and parking lots M Yes 0 No 0 N/A For "Yes" answers, identify the additional BMP per Appendix El. Provide iustiflcation for "Non answers. - Onsite storm drain inlets will be marked with "NO DUMPING" signs. - Interior floor drains and sum pumps will be plumbed to sanitary sewer. - Landscape areas will be designed to minimize use of fertilizers and pesticides. - Trash enclosure area will be covered and protected form run-on - Vehicle and equipment cleaning is limited to rinsing-cars with only water - Parking lots and sidewalks will be swept regularly and debris will be collected prior to entering the storm drain. E-36 Page 2of4 Revised 09/16 I Li - - ------ - - - - ----- - - ------- Site Design BMPs All development projects must implement site design BMPs SD-1 through SD-8 where applicable and feasible. See Chapter 4 and Appendix E.2 thru E.6 of the BMP Design Manual (Volume 5 of City Engineering Standards) for information to implement site design BMPs shown in this checklist. Answer each category below pursuant to the following. "Yes" means the project will implement the site design BMPs as described in Chapter 4 and/or Appendix E.2 thru E.6 of the Model BMP Design Manual. Discussion/justification is not required. "No" means the BMPs is applicable to the project but it is not feasible to implement. Discussionustification must be provided. Please add attachments if more space is needed. 'NIA" means the BMPs is not applicable at the project site because the project does not include the feature that is addressed by the BMPs (e.g., the project site has no existing natural areas to conserve). Discussion/justification may be provided. Site Design Applied? _Requirement SD-1 Maintain -N—a-tural —Drnage Pathways and Hydrologic Features - - 0 Yes I 0 No fN/A Discussion/justification if SD-1 not implemented: Existing project site has been developed as a commercial center with minimal interior landscaping and no natural drainage pathways or hydrologic features to protect. SD-2 Conserve Natural Areas, Soils, and Vegetation I tl Yes I 0 No I 0 N/A SD-3 Minimize Impervious Area M Yes 0 No I 0 N/A Discussion/justification if SD-3 not implemented: SD-4 Minimize Soil Compaction 191 Yes I 0 No I 0 N/A Discussion/justification if SD-4 not implemented: SD-5 Impervious Area Dispersion 0 Yes I 0 No I 0 N/A Discussion/justification if SD-5 not implemented: I I LII LI I I I I I I I I I I I I I I E-36 Page 3 of 4 Revised 09116 Site Design Rquiremenjçmtinued) SD-6 Runoff Collection I IN Yes 0 NoJD N/A Discussion/justification if SD-6 not implemented: SD-7 Landscaping with Native or Drought Tolerant Species I Yes I 0 No I 0 N/A Discussion/justification if SD-7 not implemented: SD-8 Harvesting and Using Precipitation I 0 Yes I IZI No I 0 N/A Discussion/justification if SD-8 not implemented: Harvest and Use determined infeasible due to low water usage for commercial site. I I E-36 Page 4of4 Revised 09116 . Priority Development Project (PDP) SWQMP I BMW of Carlsbad cl*=- SUMMARY OF PDP STRUCTURAL BMPS PDP Structural BMPs I All POPs must implement structural BMPs for storm water pollutant control (see Chapter 5 of the BMP Design Manual) Selection of POP structural BMPs for storm water pollutant control must be based on the selection process described in Chapter 5 PDPs subject to hydromodification management requirements must also implement structural BMPs for flow control for hydromodification management (see Chapters of the BMP Design Manual). Both storm water pollutant control and flow control for hydromodification management can be achieved within the same structural BMP(s) POP structural BMPs must be verified by the City at the completion of construction. This may include requiring the project owner or project owners representative to certify construction of the structural BMPs (see Section 112 of the BMP Design Manual) PDP structural BMPs must be maintained into perpetuity, and the City must confirm the maintenance (see Section 7 of the BMP Design Manual). Use this form to provide narrative description of the general strategy for structural BMP implementation at the project site in the box below, Then complete the POP structural BMP summary information sheet for each structural BMP within the project (copy the BMP summary information page as many times as needed to provide summary information for each individual structural BMP). Describe the general strategy for structural BMP implementation at the site. This information must describe how the steps for selecting and designing storm water pollutant control BMPs presented in Section 5.1 of the BMP Design Manual were followed, and the results (type of BMPs selected). For projects requiring hydromodification flow control BMPs, indicate whether pollutant control and flow control BMPs are integrated together or separate. The BMP selection process has been developed in accordance with the new MS4 Permit (R9-2013-0001 as amended by R9-2015-0001 and R9-2015-0100). Harvest and re-use is considered impractical for use on the project site due to it being a proposed commercial area with low water usage. Due to inadequate infiltration rates within the upper 5 feet of site soils and the presence of engineered fill and dense to very dense formation, the project geotechnical engineer concluded that full infiltration is infeasible for the entire project site. Infiltration in any capacity is prohibited adjacent to the western property line or in the northwest property corner due to nearby structures and hillside landscaping. However, partial infiltration is feasible at the northeast and southeast property corners. Therefore, biofiltration areas with partial retention (PR-1) are proposed to treat project flows for pollutant control on the eastern half of the site and lined biofiltration areas (BF-1) are proposed to treat runoff from the western half of the site. Proprietary Biofiltration BMP (BF-3) is proposed for runoff from building roof area due to site layout restrictions due to the nature of a car dealership. Permeable payers are provided in parking areas east and south of the proposed building to reduce the project site's total impervious area. The permeable payers are not considered treatment control BMPs. For DMA-IA and DMA-1 B, onsite stormwater will sheetfiow to local biofiltration areas with partial retention for treatment and flow control, then routed to the underground detention vault for hydromodification management flow control prior to discharging from the project site. For DMA-IC and DMA-ID, onsite stormwater will sheetfiow to local biofiltration areas with impermeable liners for treatment and flow control, then routed to the underground detention vault for hydromodification management flow control prior to discharging from the project site. For DMA-I E, stormwater runoff from rooftop area will be collected at a localized inlet and routed thru I BioClean's Modular Wetland System (MWS) for treatment prior to discharging to the underground detention vaults for hydromodification management flow control. DMA-2A is comprised of self-mitigating landscape area and does not require pollutant control. The hydromodification management for this area is accounted for by the underground detention system (flow control BMP). I PDP SWQMP 14 of 27 I I Priority Development Project (POP) SWQMP BMW of Carlsbad cwftllwk~01ROSOWAS Structural BMP Summary Information Structural BMP ID No. I (DMA-IA) DWG: No. 529-6A, Sheets 08 & 11 Type of structural BMP: O Retention by harvest and use (HU-1) O Retention by infiltration basin (IN F-1) U Retention by bioretention (INF-2) O Retention by permeable pavement (INF-3) Partial retention by biofiltration with partial retention (PR-1) U Biofiltration (BF-1) U Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) U Detention pond or vault for hydromodification management U Other (describe in discussion section below) Purpose: U Pollutant control only U Hydromodification control only Combined pollutant control and hydromodification control U Pre-treatment/forebay for another structural BMP U Other (describe in discussion section below) Discussion (as needed): Bioflltration area with partial retention is proposed to treat runoff from DMA-1A and provide flow control for the project site's hydromodification requirement. Geotechnical engineer determined that full infiltration is infeasible for the project site. I 1 III - PDP SWQMP I 15 of 27 Priority Development Project (POP) SWQMP BMW of Carlsbad caft"Wk CcTmerc I I Structural BMP Summary Information -: Structural BMP ID No.2 (DMA-113) DWG: No. 529-6A, Sheets 08 & ii Type of structural BMP: El Retention by harvest and use (HIJ-1) El Retention by infiltration basin (IN F-1) El Retention by bioretention (INF-2) LI Retention by permeable pavement (lNF-3) Z Partial retention by biofiltration with partial retention (PR-1) O Biofiltration (BF-1) O Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which Onsite retention or biofiltration BMP it serves in discussion section below) O Detention pond or vault for hydromodification management 0 Other (describe in discussion section below) Purpose: O Pollutant control only O Hydromodification control only El Combined pollutant control and hydromodification control O Pre-treatment/forebay for another structural BMP O Other (describe in discussion section below) Discussion (as needed): Biofiltration basin with partial retention is proposed to treat runoff from DMA-1 B and provide flow control for the project site's hydromodification requirement. Geotechnical engineer determined that full infiltration is infeasible for the project site. I I I I I I POP SWQMP 16 of 27 I I I J I F I I I I I Priority Development Project (PDP) SWQMP BMW of Carlsbad caftlZah, pn Coerd P1L' Reoutc.es - Structural BMP Summary Information Structural BMP ID No. 3 (DMA-IC) DWG: No. 529-6A, Sheets 08 & ii Type of structural BMP: El Retention by harvest and use (H U-1) El Retention by infiltration basin (lNF-I) El Retention by bioretention (INF-2) El Retention by permeable pavement (INF-3) El Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1) El Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) El Detention pond or vault for hydromodification management El Other (describe in discussion section below) Purpose: El Pollutant control only El Hydromodification control only Combined pollutant control and hydromodification control El Pre-treatmentlforebay for another structural BMP El Other (describe in discussion section below) Discussion (as needed): Biofiltration basin with an impermeable liner is proposed to treat runoff from DMA-i C and provide flow control for the project site's hydromodification requirement. Geotechnical engineer determined that infiltration is infeasible in the project site's northwest corner. I I I — PDPSWQMP 17of27 Priority Development Project (PDP) SWQMP BMW of Carlsbad I I Structural BMP Summary Information Structural BMP ID No.4 (DMA-ID) DWG: No. 529-6A, Sheets 08 & 11 Type of structural BMP: O Retention by harvest and use (HLJ-1) LI Retention by infiltration basin (INF-1) LI Retention by bioretention (INF-2) O Retention by permeable pavement (INF-3) LI Partial retention by biofiltration with partial retention (PR-1) ER Biofiltration (BF-1) LI Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) LI Detention pond or vault for hydromodification management LI Other (describe in discussion section below) Purpose: LI Pollutant control only LI Hydromodification control only Combined pollutant control and hydromodification control LI Pre-treatment/forebay for another structural BMP LI Other (describe in discussion section below) Discussion (as needed): Biofiltration basin with an impermeable is proposed to treat runoff from DMA-1 D and provide flow control for the project site's hydromodification requirement. Geotechnical engineer determined that infiltration is infeasible along the project site's western property line. L I I I I I PDP SWQMP 18 of 27 I I I I I I H I H I I Priority Development Project (PDP) SWQMP BMW of Carlsbad C Coffimerdal VIResources Structural BMP Summary Information Structural BMP ID No. 5 (DMA-11E) DWG: No. 529-6A, Sheets 08 & 11 Type of structural BMP: U Retention by harvest and use (HU-1) U Retention by infiltration basin (lNF-1) O Retention by bioretention (INF-2) 0 Retention by permeable pavement (INF-3) O Partial retention by biofiltration with partial retention (PR-1) 0 Biofiltration (BF-1) 0 Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) 0 Detention pond or vault for hydromodification management Other (describe in discussion section below) Purpose: Z Pollutant control only C Hydromodification control only O Combined pollutant control and hydromodification control O Pre-treatment/forebay for another structural BMP O Other (describe in discussion section below) Discussion (as needed): Other = Proprietary Biofiltration BMP (BF-3) BioClean Modular Wetland System (MWS) flow-thru device proposed to treat rooftop runoff from DMA-1E. Geotechnical engineer determined that full infiltration is infeasible for the project site. Providing an onsite biofiltration basin for this area would require approximately 1,550 sq-ft, which would reduce the parking count by a total of 10 stalls. Due to the nature of the project site as a car dealership and limited non-hillside landscaping, the use of biofiltration basin for treatment of rooftop runoff is infeasible. I PDP SWQMP 19 of 27 Priority Development Project (POP) SWQMP BMW of Carlsbad C Commeda YW Resources Structural BMP Summary Information Structural BMP ID No. 6 (all of DMA-I) DWG: No. 529-6A, Sheets 08 & 12 Type of structural BMP: El Retention by harvest and use (HU-1) El Retention by infiltration basin (INF-1) El Retention by bioretention (lNF-2) El Retention by permeable pavement (INF-3) o Partial retention by biofittration with partial retention (PR-1) El Biofiltration (BF-1) El Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) Detention pond or vault for hydromodification management El Other (describe in discussion section below) Purpose: El Pollutant control only Hydromodification control only El Combined pollutant control and hydromodification control El Pre-treatment/forebay for another structural BMP El Other (describe in discussion section below) Discussion (as needed): Proposed underground detention system (solid 8' dia. CMP by Contech) is proposed for hydromodification management for runoff from entire site. Project site plan shows two vaults (BMP-6A and 613) that are set at the same invert elevation and hydraulically connected to act as one system. Geotechnical engineer determined that full infiltration is infeasible for the project site. PDP SWQMP 20 of 27 Priority Development Project (POP) SWQMP BMW of Carlsbad ATTACHMENT I BACKUP FOR POP POLLUTANT CONTROL BMPS This is the cover sheet for Attachment 1. Check which Items are Included behind this cover sheet: Attachment Sequence Contents Checklist DMA Exhibit (Required) Attachment la See DMA Exhibit Checklist on the 0 Included back of this Attachment cover sheet. (24"x36" Exhibit typically required) Tabular Summary of DMAs Showing El Included on DMA Exhibit in DMA ID matching DMA Exhibit, DMA Attachment la Attachment Area, and DMA Type (Required)* lb *Provide table in this Attachment OR Included as Attachment I b, on DMA Exhibit in Attachment 1 separate from DMA Exhibit Form 1-7, Harvest and Use Feasibility Screening Checklist (Required Attachment unless the entire project will use 0 Included Ic infiltration BMPs) El Not included because the entire project will use infiltration BMPs Refer to Appendix 13.3-1 of the BMP Design Manual to complete Form 1-7. Form 1-8, Categorization of Infiltration Feasibility Condition (Required unless the project will use harvest 0 Included Attachment and use BMPs) El Not included because the entire Id project will use harvest and use Refer to Appendices C and D of the BMPs BMP Design Manual to complete Form 1-8. Pollutant Control BMP Design Worksheets / Calculations (Required) Attachment Included le Refer to Appendices B and E of the BMP Design Manual for structural pollutant control BMP design guidelines U PDPSWQMP 21 of 27 I [1 I I I Priority Development Project (PDP) SWQMP Conmdal BMW of Carlsbad Cl AlRer4trCes Use this checklist to ensure the required information has been included on the DMA Exhibit: The DMA Exhibit must identify: Underlying hydrologic soil group Approximate depth to groundwater Existing natural hydrologic features (watercourses, seeps, springs, wetlands) Critical coarse sediment yield areas to be protected (if present) Existing topography and impervious areas Existing and proposed site drainage network and connections to drainage offsite Proposed grading Proposed impervious features Proposed design features and surface treatments used to minimize imperviousness Drainage management area (DMA) boundaries, DMA ID numbers, and DMA areas (square footage or acreage), and DMA type (i.e, drains to BMP, self-retaining, or self-mitigating) Structural BMPs (identify location and type of BMP) I I I U H I I I I I PDP SWQMP 22o127 I I I I I I I U I ATTACHMENT 1A: [I1kATA1 I -- - - CANNON ROAD LEGEND 4022,492 - - lls$' 22 32032 WNCMTE - M4—U— - or 027, 4-0.04- NISCHARGC~;, To 034 7,)', 'o21-M - - ,[A sT / P 4- 2 tO 34-4-040.00 - '.1— 13 -.0"") 5Ffl ',TI V "4-All tvi I PO L OCIP 4-4-4-A OVA 8,3044-4-AlP N. L,.'J_s l . - 2,,jA2,4204,3..,82Y QUR P14-4-To 00034-1314- - 8- n------o -7— Me R J DMA-11C. .1 DM \ . I P4-4-8210024--A D. ..'. -_-._---. 4- So. ''-r r8,A'o3-r-'w I L 1 I CCSYA ANALYSIS r r°"- O- p Li . 2240022. 4-4- "3 12244-A4-4-4-IM3NILOAA.A81313424'S100010103,IMM4-141 4- I...............................:............................. .. 4- DMA 2A . . BMP DETAILS: 3 DMA SUMMARY: I 11 1 I I - L . . .. . MA4A'+81OF19AflNW/9ET1210909 9130001 's . 4- __._ __ S 4- if ({1 4- 2.1 MW 0401 .2.2 3fl.0-5%) 8.324 0.05% LI] V 'Ed I I z 'S,_ ...- , I . $ OMA.l,9,Iwu,nhlouw/onlura 412(10122 I 4- ii ' I 1.2 (86f4-03v9,,S('t 2.406 0.125 tj , .L_-I]I] ., 1 ,1 - . 2.2 S40$S40,14042l 2.202 12029 F .s / .23 .951199828,5.254-3 14-34 0.1124 4-9, '. ..fl •I5I ,1 ' II 4- . ,,. - " IS . / - /' , 4, / 0A.lC4Bl1106TM120t98693129102 0221 / 2.2 02709599$ 21.611 8,101 - IS "' F / , I / 1.2 695100486(8,04-2,1 1,964 22.036 -. 4- 4- 4' 4'- "' I I 3904841302232(0130390092034130001 531 4- DMA 0340 - l , - OS 06.13,3230.9,9555 2,13 00,3 <)- /lu it .1000,269 3212M02210421936 961399120091 2*1 :;:;II : : 0282 S.31$ 8201311358, 8,3 1104 V$l')i4-AL4-MP.4. S IDMA-18i,4- 911_s'4-F.13F0i(P4-i.4-i4-44011 4- Al I4Y4-1140M04-II22$OAISO.'.I 1 1 'S i . 4- 4 / 0 ,1E03i' •S,..,.__i I--- * ................. --------.--4-'--------------------.----------r.. . 27 JC1u824-LAM4--2- /1 7 / 20 0 20 40 I H /A/ / lcLcA - . Sit 1A-2Al4- -14 , / PREPARED -OR: PREPARED BY: SWQMPAITACHMENT IA: - 86'44-'QD2, 19232,73- 4 L 'T ' - - iT - ------ -- - . / =22tHFL ' DMA EXHIBIT - - FORT LALJOEROALE. FL34-30 Commercial 4- / CONTA,1Cj"-P0V,-LL Development I>lResources BMW OF CARLSBAD AUTO CENTER CT .- / 4-263? 3o3 T14(R01. 5060 AUTO CENTER COURT - -- ---' — ------ - - C/RLSAD, CA 92W8 ATTACHMENT 1B: TTACHMENT ib: DMA SUMMARY Pre-Developed Condition DMA Type ID Area (SF) Area (AC) DMA-1 -* POC #1 1.1 Natural (B, 0-5%) 161,503 3.708 161,503 3.708 POC 41 TOTAL 161,503 3.708 PROJECT: BMW of Carlsbad LOCATION: Carlsbad, CA DATE: 05/21/021 Post-Developed Condition DMA Area Area ID Type (SF) (Ac) DMA-1A 4 BIOFILTRATION W/ RETENTION 9 POC Ui 1.1 Roof/Pavement 19,664 0.451 1.2 Landscape (B, 0-5%) 2,314 0.053 1.3 Landscape (B, 5-15%) 520 0,012 1.4 Landscape (B, >15%) 387 0.009 1.5 Permeable Payers 9,589 0.220 32,474 0.746 DMA-113 4 BIOFILTRATION W/ RETENTION 4 POC #1 1.1 Roof/Pavement 8,486 0.195 1.2 Landscape (B, 0-5%) 1,281 0.029 1.3 Landscape (B, 5-15%) 1,030 0.024 1.4 Landscape (B, >15%) 3,765 0.086 1.5 Permeable Payers 3,874 0.089 18,436 0.423 DMA-1C 4 BIOFILTRATION BASIN 3 POC #1 1.1 Roof/Pavement 21,181 0.486 1.2 Landscape (8, 0-5%) 1,466 0.034 22,647 0.520 DMA-1D4 BIOFILTRATION BASIN .3 POC #1 1.1 Roof/Pavement 13,935 0.320 1.2 Landscape (B, 0-5%) 1,117 0.026 1.3 Landscape (8, 5-15%) 230 0.005 1.5 Permeable Payers 2,312 0.053 17,594 0.404 DMA-1E 4 PROPRIETARY BIOFILT. (MWS) 4 POC #1 1.1 Roof/Pavement 57,558 - 1.321 57,558 1.321 DMA .71 TOTAL 148,710 3,414 DMA-2A 4 SELF-MITIGATING AREA 4 POC #1 2.1 Roof/Pavement 110 0.003 2.2 Landscape (B, 5-15%) 658 0.015 2.3 Landscape (B, >15%) 12,025 0.276 12,793 0.294 DMA-2 TOTAL 12,793 0.294 POC #1TOTAL 161,503 3.709 ATTACHMENT 1C: HARVESTAND USE FEASIBILITY CHECKLIST (FORM 1-7) I 1-2 February 2016 Appendix I: Forms and Checklists - Is there a 1emand for harvested water (check all that apply) at the project site that is reliably presnt during the wet season? E] i oilct and urinal flushing O Landscape irrigation C] Otheri_________ if there is a demand; estimate the anticipated average wet season demand over a period of 36 hours. Guidance for planning level demand calculations for toilet/urinal flushing and landscape irrigation is provided .in Section 13.3.2, Toilet Flushing = 7 gal x 100 employees x 1.5 days= 1,050 gal = 140 cf Irrigation = 1,470 gal/ac x 0.569 ac = 836 gal = 112 cf Total 36-Hour Demand = 252 cf Calculate the D(..V using worksheet B.24. i)CV = 5,391 (cubic feet)) 3a. Is the 36 hour demand greater 3b. Is the 36 hour demand greater than 3c. Is the 36 hour demand than or equal to the MW U.2SDCV but less than the full 1)CV? less than 0.25DCV? Yes / i\ \c' / ' \o Harvest and use appears to be Harvest and use may be feasible. Harvest and use is feasible. Conduct more derailed Conduct more detailed evaluation and considered to be infeasible. evaluation and sizing calculations sizing calculations to determine to confirm that 1)CV can be used feasibility. Harvest and. use may only be at an adequate rate to meet able to be used for a portion of the site, drawdown criteria, or (optionally) the storage may need to he upsized Co meet. long term capture targets while draining in longer than 36 hours. Is harvest and use feasible based on further evaluation? 1 Yes, refer to Appendix E to select and size harvest and use I3Ml>s. iJ. No, select alternate BMPs. I I I I I 1 I I I I I I I I I I I I I ATTACHMENT 1D: INFILTRA11ON FEASIBILITY CHECKLIST (FORM 1-8) Appendix I: Forms and Checklists I - 1u11 lnflltr.unti F:i-ihili rtin Criiri; \\3uld inllltr,ulon f t1w full t1cn uluinc hc I tihlc from a phicul crpcti\: \vlth)ut 111\ ueiruhlc u(Cl!ji, ihat "111111t H bc reainahl\ ttiaiud Yes No — Is the estimated reliable infiltration rate below proposed facility locations greater than 0.5 inches per hour? the rt ponsc 1 to this Screening Question shall be based on a comprehensive X evaluation of the factors presented in Appendix C.2 and Appendix D. Provide basis: Per the geotechnical investigation report by GM1.J dated 12/13/19, infiltration rates within the upper 5 feet of site soils were determined to he 0.02 inch/hour and 0.23 inch/hour (not using a factor of safety), Full Infiltration is not feasible at the project site due to the presence of engineered fill and dense to very dense formation. See Geotechnical Investigation Report by GMU attached to this report. Summarize findings of studies; provide reference to studies, calculations, maps, data sources. etc. Provide narrative discussion of study/data source applicability. Can infiltration greater than 0.5 inches per hour be allowed without increasing risk of geotechnical hazards (slope stability, 2 groundwater mounding, utilities, or other factors) that eatiflot be mitigated to an acceptable level? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.2. Provide basis: N/A Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability. 1-3 February 2016 Appendix I: Forms and Checklists us No Can infiltration greater than 0.5 inches per hour be allowed without increasing risk of groundwater contamination (shallow water tables storm. water pollutants or other factors) that cannot be mitigated to an acceptable level? The response to this Screening Question. shall be based on a comprehensive evaluation of the factors presented in Appendix CS. Provide basis: N/A Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability. Can infiltration greater than 0.5 inches per hour be allowed without causing potential water balance issues such as change of seasonality of ephemeral streams or increased discharge of contaminated groundwater to surface waters? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in. Appendix C.3. Provide basis: N/A Summarize findings of studies; provide reference to studies, calculations, naps, data sources, etc. Provide narrative discussion of study/data source applicability. If all answers to rows 1, - 4 are "Yes" a full infiltration design is potentially feasible. Part 1 The feasibility screening category is Full infiltration Result 'so ife to oil1. . would not ecnunljl b yohk <n d. onhk to 1ch 1 "full ntiltt itiofi k se,n lrud to Put 2 'To be cctmp]cted using gathered site information and best professional judgmeiit considering the definition of .MEP in the MS4 Pertnh - Additional lusting and/or studies may be required by the City to substantiate findings, 1-4 February 2016 I I I I I LI Li I I I I I I I I I I _ Appendix I: Forms and Checklists ri i:l lifi]tr ti, ,v.Xol ritilt rm i i i i I ., i h i Ii S crck, it i ti c ri \\ otild in1tr.tin I \v;lt(r i ll :tiiv .pte&i. III l( tit)iiii kc ph\ '.ica1! 1Uil)Ic uiIiiut ally n2,lti :l'l111' that yalinot he rea.nahl 11ii1tcd Do soil and geologic conditions allow for infiltration in any appreciable rate or volume? 'Ihe rpolse to this Scrtning Question shall be based on a comprehensive evaluation of the X factors presented in Appendix C.2 and Appendix D. Provide baits: Per the gcotechnicai investigation report by (;MU dated 12/13/19, infiltration rates within the upper 5 feet of site soils were determined to be 0.02 inch/hour and 0.23 inch/hour unfactored). Pull infiltration is not feasible at the project site due to the presence of engineered fill and dense to very dense formation. Sec Geotechnical Investigation Report by (iMU attached to this report. An averaged infiltration rate or 0.041 in/hr (with factor of safety = 3) is used for partial infiltration. Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of studs,/data sourc apphcibilit and 'ah it was not ttbk to mitigate low infiltration rates. Can Infiltration in any appreciable quantity be allowed without increasing risk of geotechnical hazards (slope ( stability, groundwater mounding, utilities, or other factors) that cannot be mitigated to an acceptable level? The response X to this Screening Question shall he based on a comprehensive evaluation of the factors presented in Appendix C.2. Provide basis: N/A Summarize findings of studies; provide reference to studies, calculations, maps. data sources. etc. Provide narrative discussion of st:uclv/daia source applicability and why it was not feasible to mitigate low infiltration rates. 1-5 February 2016 Appendix I: Forms and Checklists Can Infiltration in any appreciable quantity be allowed without posing significant risk for groundwater related concerns (shallow water table, storm water pollutants or other factors)? The response to this Screening Question shall be based X on a comprehensive evaluation of the factors presented in Appendix C3. Provide basis: N/A Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability and why it was not feasible to mitigate low infiltration rates. Can infiltration be allowed without violating downstream 8 water rights? The response to this Screening Question shall be x based on a comprehensive evaluation of the factors presented in Appendix (:3. provide basis: N/A Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability and why it was not feasible to mitigate low infiltration rates. If ill an sx hc n pith a n i ration deogn i potrntia IF Idt Part Fhc tdainl i u , Partial Infiltration. Result* If - any answer from row 58 is no, then itthltraion of an' volume is considered to be infeasible within the drainage area. The feasibility screening categc.ry is No Infiltration. TO be completed using gathered site information and best professional iudgmcnt considering the definition of MEl? ii the 'S4 Permit. Additional testing and/or studies may be required by the City to substantiate findings. 1-6 February 2016 ' . I i ill I Ii Soil assessment methods 0.25 2 0.50 Predominant soil texture 0.25 3 0.75 Suitability. Site soil variabiht 0.25 1 0.25 Assessment Depth to groundwater / imperuous 0 layer 0.25 Suitability .\ssccsnlent Safety Factor, SA IEP 1.75 Level of pretreat menu expected sediment loads 0.5 1. 0.50 B Design Redundancy/resiliency 0.25 2 0.50 Compaction during COfl>truCtiufl 0,25 1 0.25 Design Safety Factor, Sli ).p 1.25 Combined Safety Factor, S -1 SB 3.0 ()bscred Infiltration Rare, inch/hr, l<<4r,,a 0.02 + 0.23 = 0,125 (corrected for test-specific bias) 2 Design Infiltration Rate, in/hr, = / s,. 0.041 in/hr Suppri n'' I) t. Briefly describe infiltration Lest and provide reference to test forms: Per geotechnical report by GMU dated 12/13/19: "iwo (2) preliminary infiltration tests were performed in general conformance with the County of Sari Diego Low Impact Development (LID) Uandhook. The infiltration drill holes were excavated to depths ranging from 4 to 5 feet below the existing grade using a hollmv stetmaugcr, truckmounred drill rig.' The calculated unfactored infiltration rates are 0.02 in/br at 5.0' bgs and 0.23 in/hr at 4.0' bgs. L11 I I I I I I I I I I Li] Appendix I: Forms and Checklists I I I '-7 February 2016 Li I May 20, 2021 May Patel Autonation 200 SW 1" Street, 14 Floor Ft. Lauderdale, FL, 33301 GMU Project 18-101-00 Subject: Partial Infiltration of Unlined Biofiltration Basins References: Geotechnical Investigation Report, Auto Nation BMW of Carlsbad, 1050 and 1060 Auto Center Court, Carlsbad, California Dear Mr. Patel: Per our referenced geotechnical report two preliminary infiltration tests were completed hi general accordance with the San Diego Low Impact Development (LID) handbook. These tests were completed at approximately 5 feet below grade. The results presented in our report do not incorporate a factor of safety. The unfactored rates are 0.02 inches per hour and 0.23 inches per hour for drill hole locations 6 and 7, respectively. See our referenced report for these drill hole locations within the site. Although "infiltration" was determined not to be feasible, it is our opinion that partial infiltration may be considered from a geotechnical perspective for the (2) site unlined bioflitration basins given that some infiltration was recorded. provided the following: The infiltration rates contained in our referenced report be utilized for design. How the rates are utilized in the design shall be solely per the basin designer - i.e. project civil engineer or hydromodification consultant. There is an overflow outlet incorporated in the design. Our specifications for the permeable concrete interlocking vehicular payers with respect to subgrade preparation are adapted to the unlined biofiltration basins where partial infiltration is desired. Respectfully submitted, MatjIfw T. Farrington M.Sc., PE 90349 Prcect Engineer Distribution: Aaron Alberts, CDR k ATTACHMENT 1E: POLLUTANT CONTROL BMP DESIGN WORKSHEETS/CALCULATIONS I ATTACHMENT le: LID DESIGN CAPTURE VOLUME (DCV) CALCULATIONS Per Appendix B of the City of Carlsbad AMP Design Monual: DCV 3,630XCXdxA Q= CXIXA DCV - Design Capture Volume (cf) Q - Diversion flow rate (cfs) for off/inc BMP C = Adjusted ru ioff factor (unitfesc) = (IC A, 14EA ) d 85 ' percentile, 24-hr storm event rainfall depth (in) A = Tributary area to AMP (ac) Rainfall intensity - 0.2 in/hr PROJECT: BMW of Carlsbad LOCATION: Carlsbad, CA DATE: 05/21/2021 NOTES: Impervious - Roof/Pavement IC,=0.901 Pervious 4 Landscape (B), Permeable Payers [C=0.10] DCV result used for City Worksheets 9.4-1 & 9.5-1 0% of A*CJ DMA ID Area A (SF) Area A (AC) A (SF) A (SF) A A ( ) - C5A A5 DCV (CF) Minimum Footprint (58) (CFS) 8iDfiltratiDn Basin WI Partial Retention '3 POC 411 1A 32,474 1 0.746 19,664 12,810 60.6% 39.4% 0.584 917 569 0.087 18 18,436 0.423 8,486 9,951 46.0% 54.0% 0.468 417 259 0.040 50,911 1.169 28,149 22,761 55.3% J 44.7% f0trat;on basin wl IthrmeabIe 1,335 Bio Liner-) POC #1 _____ 1C 22,647 0.520 21,181 1,466 93.5% 6.5% 01848 928 576 0.088 10 17,594 0.404 13,935 3,659 1 79.2% 20.8% 0.734 624 387 0.059 40,241 0.924 35,116 5,125 1 87.3% 12.7% 1,552 Proprietary Bofiltration (MWS) 4 POC #1 ZA 1 57,558 I 1.321 1 57,558 I 0 I 10D,0% I 00/ 0,900 2,534 554 0.238 57,558 1.321 1 57,558 0 100.05/. 0.0% 2,534 celf-Mitigát n Areas ->POC 411 ZA f_12,793 I 0,294 I 110 I 12,682 I 0.9%99.1%- - 12,793 0.294 110 12,682 0.9'/ 99.1% TOTAL 1 161,503 3.708 120,934 40,568 74.9% 25.1% 0.699 5,391 3,387 Leg rd I Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods N \ N N z 1 / N N \ \ \ N San Diego County 85 th Percentile lsopluvials ' \ - \\N z;/ H111'\\\ \ N / UU + ---a-- - - + — — - + GS -- Figure B.1-1: 85th Percentile 24-hour isopluvial Map B-5 February 2016 DMA-IA: Biofiltration wl Partial Retention (Structural BMP-I) Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods Worksheet B.5-1: Simple Sizing Method for Biofiltrafion BMPs RemainingDCVaftcr.impnen6ngrtionBM13s 917 cic-feet Partial Retention 2 Infiltration rate from Form 1-9 if partial infiltration is feasible 0.041 in/hr. 3 Allowable drawdown time for aggregate storage below the underdrain 36 hours 4 Depth of runoff that can be infiltrated [Line 2 < Line 3] 1.48 inches 5 Aggregate pore space 0.40 in/in 6 Required depth of gravel below the underdrain. [Line 4/ Line 5.1 3.69 inches 7 Assumed surface area of the biofiltration BMP 812 sq-ft 8 Media retained pore storage 0.1. in/in 9 Volume retained by BMP [[Line 4 ± (Line 12 x Line 8)]/121 x Line 7 242 cubic-feet 10 DCV that requires biotiltration [Line I — Line 9] 675 cubic-feet BMP Parameters ii 1 Surface Ponding 1.6 inch minimum, 12 inch maximum] 6 inches 12 Media Thickness [18 inches minimum], also add mulch layer thickness to . . this line for sizing calculations 18+3=21 inches 13 Aggregate Storage above underdrain invert (12 inches typical) use 0 inches for sizing if the aggregate is not over the entire bottom surface area 3 inches 14 Media available pore space 0.2 in/in 15 Media filtration rate to be used for sizing (5 in/hr. with no outlet control; if the filtration is controlled by the outlet, use the outlet controlled rate) in/hr. Baseline Calculations 16 Allowable Routing 1'inie for sizing 6 hours 17 Depth filtered during storm [line 15 x line 16] 30 inches 18 Depth of Detention Storage ' 12.6 inches - [Line 11 + (Line 12 x Line 14) + (Line 13 x Line 5)] 19 Total Depth Treated [Line 17 + line 181 . 42.6 inches 2p,tion l — Biofilter 1.5 times the DCV 20 Required biofiltered volume [1.5,x Line 101 1,013 cubic-feet 21 Required [Line 20/ Line 191 x 12 285 sq-ft _Footprint 2 SIOTL 0.775 of rrnarnrng DCV_mpw5 incpunding 22 1 Required Storage (surface + pores) Volume [0.75 x line 10] 506 cubic-feet 23 RequiredFootprint [Line 22/ Line 18] x 12 482 sq-ft Footprint of the BMP 24 Area draining to the BMP 32,474 sq-ft 25 Adjusted Runoff Factor for drainage area (Refer to Appendix B.1 and 13.2) 0.584 26 Minimum BMP Footprint [Tine 24 x Line 25 x 0.031 569 sq-ft 27 Footprint of the BMP = l\1 ximum'1inimum(Line 21, Line 23), Line 26) 569 sq-ft Note: line 7 is used to estimate the amount of volume retained by the B.M.P. Update assumed surface area in Line 7 until its equivalent to the requited bioltration footprint (either Line 21 or Line 23 B-26 February 2016 DMA-113: Biofiltration wl Partial Retention (Structural BMP-2) Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods Worksheet B.5-1: Simple Sizing Method for Biofiltration BMPs I Remaining DCV after implementing re Hon BMP - cubic-feet Partial Retention 2 Infiltration rate from Form 1-9 it partial infiltration is feasible 0.041 in/hr. 3 Allowable drawdown time for aggregate storage below the undcrdrain 36 hours 4 Depth of runoff that can be infiltrated [Line 2 x Line 31 1.48 inches 5 Aggregate pore space 0.40 in/in 6 Reqinred depth of gravel below the undcrdrain lIme 4/ Line 5] 3.69 inches 7 Assumed surface area of the biofiltration BMP 359 sq-ft 8 Media retained pore storage 0.1 in/in 9 Volume retained by BMP fl1tne 4 ± (Line 12 x Line 8)1/121 x Line 7 107 cubic-feet 10 DC\' that requires biofiltration [Line I --Line 91 310 cubic-feet U \1 I' Parameters Ii Surface Ponding [6 inch minimum, 12 inch maximum] 6 inches 12 Media Thickness [18 inches minimum], also add mulch layer thickness to - . this line for sr/ing calculations 18+3=21 inches 13 Aggregate Storage above underdrain invert (12 inches tpical) - use 0 - . inches for swing if the aggregate is not over the entire bottom surface area 6 inches 14 Media available pore space 0.2 in/in 15 Media filtration rate to be used for si'ng (3 in/hr. with no outlet control;- ' - it the filtration is controlled by the out let- use the outlet controlled rate) in/hr. Bascliin Calculations 16 Allowable Routing Time for si/ing 6 hours 17 Depth filtered during storm ]1 inc 15 x line 16] 30 inches 18 1. Depth of Detention Storage inches [Line 11 + (Line 12 x Line 14) + ine 13 x 5)] 12.6 19 Total 1)cpth Treated ]Linc 17 + Line 181 42.6 inches Option 1-- Biofilter 1.5 tinies the DCV 20 Required biofiltered volume [1.5,x Line 101 465 cubic-feet 21 Required Footprint [Line 20/ Line 19] x 12 135 sq-ft ption_2- Store 0.75 of renlaining 1)CV in prc. and pondin! - 22 Required Storage (surface + pores) Volume [0.75 x Line 101 233 cubic-feet I 23 Required Footprint ILine 22/ Line 181 x 12 [ 222 sq-ft Footprint of the BMP 24 1 Area draining to the BMP 18,436 sq-ft 25 Adjusted Runoff I 'actor for drainage area (Refer to Appendix B.1 and B.2) 0.468 26 Minimum BMP Footprint jLine 24 x Line 25 x 0.03] 259 sq-ft 27 1 ootprint of the BMP = MaximumMinimum(Line 21, Line 23), line 26) 259 s1-ft Note: Line] is used to estimate the amount of volume retained by the BMP. Update assumed surface area in Line] until its equivalent to the required biofiltrition footprint (either Line 21 or Line 23 B-26 February 2016 VARIES PER PLAN BMP-1 & BMP-2: BASIN CROSS-SECTION (TYR) (NT.S.) WALL WALL FREEBOARD 16 PONDING I 4 I F 3.33 mv 3 MULCH IS AMENDED SOIL 3 SAND (FILTER) 3 PEA GRAVEL (FILTER) 7" GRAVEL (STORAGE) / PVC UNDERDRAIN CLEANOUT OR SQUARE RISER CLEAN OUT (CO.) DETAIL (N.TS.) ------------ NOTE: UNDERDRAIN ENTERS RISER AT ONLY 1 (ONE) SIDE. RISER HC SLOTTED PVC UNDERDRAIN BMP-2 BMP-1 BMP RISER OUTLET DETAIL (N.T.S) ~GPEATER THAN U WI DRILLED HOLE LL 4 WDIAOPENING UNDERDRAIN = BOTTOM OF BASIN FLOW CONTROL ORIFICE PLATE 6 DIA, SLOTTED 7ER 1VALL FLOW CONTROL PVC UNDERDRAIN OR PLATE. EE DETAIL ABOVE FILTER & GRAVEL STORAGEJ - B DIA. ORIFICE 7 JI BMP-i & BMP-2: LID ORIFICE DETAIL (N.T.S.) BMP-1 & BMP-2: PLACEMENT OF UNDERDRAIN DETAIL (NT.S.) BIOFILTRATION WI PARTIAL RETENTION BMP-1 & BMP-2: UNDERDRAIN & RISER OUTLET LOCATION DETAIL (N.TS.) CiPtResources Commercial Development TyG Woos. Tororc.w's Reality- , - ! -j- DMA-IC: Biofiltration Basin (Structural BMP-3) Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods Worksheet B.5-1: Simple Sizing Method for Biofiltration BMPs I Remaining DC\' atter implementing retention BMPs 928 cubic-feet Partial Retention 2 lnfiitration rate from I arm 1-9 if partial infilt;. )fl is feasible 0 in/hr. Allowable drawdown time for aggregate storage below the underdrain 36 hours 4 Depth of runoff that can be infiltrated Il.ine 2 x line 3] () inches 5 Aggregate pore, space 0.40 in/in 6 Required depth of grave] below the underdrain [Line 4/ Line 5] 0 inches 7 Assumed surface area of the biofihtration 13MP 576 sq-ft 8 Media retained pore storage 0.1 in/in 9 Volume retained by BMP IlLine 4 4- (Line 12 x Line 8)1/121 x Line 7 101 cubic-feet 10 DC\' that requires bioliltration [Line I - Line 9] Parameters 828 cubic-feet BMP ii TSurfice Ponding 16 inch minimum, 12 inch maximum] 6 inches 12 Media 1 hickness [18 inches minimum], also add mulch layer thickness to . . this line for sizing calculations 18+3=21 inches 13 \g.grcgate Storage above underdrain invert (12 inches typical) - use (1 inches inches for sizing if the aggregate is not over the entire bottom surface area 6 14 Media available pore space 0.2 in/in 15 Media filtration rate to be used for sizing (5 in/hr. with no outlet control; - . if the filtration is controlled by the outlet, use the outlet controlled rate) Ili/hr./hr. 1Ltdiiie Ca1eulititin., 16 Allowable Routing Timc for sizing 6 hours 1.7 1)epth filtered during storm [Line 15 x I inc 161 30 inches 1$ Depth of Detention Storage . inches [Line 11 + (Line 12 x Line 14) + (Line 13 x line 5)] 12.6 19 Total Depth Treated ]Line 17 + Line 181 42.6 inches Option 1 - Rinlilter 1.3 times the Dc\ 20 Required biofiltered volume 11.5 x Line 10] 1,241 cubic-feet 21 Required Footprint [Line 20/ Line 191 x 12 350 sq-ft Option_2 "ton. 0.7 5 of remaining DC in pores sndponding 22 Required Storage (surface + pores) Volume ]0.75 's Line 10] 621 cubic-feet 23 Required Footprint ILine 22/ Line 11 x 12 591 sq-ft I to) orprint of the BMP 24 Area draining to the BMP 22,647 sq-ft 25 Adjusted Runoff Factor for drainage area (Refer to Appendix 13.1 and 13.2) 0.848 26 Minimum BMP Footprint ]Line 24 x Line 25 x 0.03] 576 sq-ft 27 Footprint of the BMP = MaxirnumMinimumLine 21, Line 23), Line 26) 576 sq-ft Note Line - is used to estimate the amount of volume retained by the BMP 1 Pilate assumed surface area in Line 7 until its equivalent to the required bioMiration footprint (either Line 21 or line 23) B-26 February 2016 DMA-ID: Biofiltration Basin (Structural BMP-4) Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods Worksheet B.5-1: Simple Sizing Method for Biofiltration BMPs I Rernainina DCV mplcrncnting retention 13MPs 624 cubic-feet P.irnal Retention 2 infiltration rate from Form 1-9 if partial infiltration feasible 0 in/hr. 3 Allowable drawdon time for aggregate storage below the underdrain 36 hours 4 Depth of runoff that can be infiltrated tine 2 x Line 31 0 inches 5 Aggregate pore space 0.40 in in 6 Required depth of grave] below the underdrain [Line 4/ Line 5] 0 inches 7 Assumed surface area of the biofiltratinn 13\IP 455 sq-ft 8 Media retained pore storage 0.1 in/in 9 Volume retained by BMP flLinc 4 + (J..ine 12 x Line 8)1/121 x l.nw 7 80 cubic-feet 10 DCV that requires biofiltration inc I -Line 9] 544 cubic-feet U \1 P Parameters 11 .urfacc Ponding [6 inch nhinilmirn, 12 Hch max1n im[ 6 inches 12 - Media Thickness [18 inches minimum[, also add mulch layer thickness to . . . this line for su'ing calculations 18+3=21 inches 13 Aggregate Storage above underdrain invert (12 inches typical) — use 0 i nches for sizing if the aggregate is not over the entire bottom surface area 6 inches 14 Media available pore space 0.2 in/in 15 16 B.t'clinc Media filtration rate to be used for sizing (5 in/hr. with no outlet control; . . the filtration is controlled by the outlet, use the outlet controlled rate) Calculations Allowable Routing Time tot sizing in/hr.ii - 6 hours 17 Depth filtered during storm [Line 15 x i.ine 161 30 inches lb Depth. of 1)crention Storage [Line 11 + (Line 12 x Line 14) + (Line 13 x Line 5)] 12.6 inches 19 Total l)eprh Treated ILine 17 + Line 181 42.6 inches Option 1— Uioffltcr 1.5 time'. the DC\ 20 Required biofiltered volume 11.5 x Line lQJ 816 cubic-feet 21 Required Footprint [Line 20/ Line 191 x 12 230 sq-ft Option 2 - Store 0.75 of rcniainini DCV in pure' kind pondin 22 Required Storage (surface + pores) \'olume [0.75 x Line 101 408 cubic-feet 23 Required footprint ILinc 22/ Line 181 x 12 389 sq-ft Footprint of the BMP 24 Area draining to the BMP 17,594 sq-ft 25 Adjusted Runoff Factor for drainage area (Refer to Appendix 13.1 and 13.2) 0.734 26 Minimum BMP Footprint [Line 24 x Line 25 x 0.031 387 s(4-ft 27 1 'ootprint of the BMP = MaximumMimmumLine 21, Line 23), Line 26) 387 sq-ft Note: Line 7 is used to estimate the amount of volume retained by the BMP. Update assumed surface area in Line 7 until its equivalent to the reqw.red biolltr4tion footprint (either Line 21 or Line 23) B-26 February 2016 BMP-3 & BMP-4: PLACEMENT OF UNDERDRAIN DETAIL (N.T.S.) a a BMP RISER OUTLET DETAIL (N.T.S.) SCREW CAP CLEANcDUT OR SQUARE REA CLEAN OUT (C.O.) DETAIL (N.T.S.) BMP-3 & BMP-4: UNDERDRAIN & RISER OUTLET LOCATION DETAIL (N.T.S) I VARIES PER PLAN RETAINING RETAINING WALL \ WALL 35<3 RISER - —(25<2 INTERNALLY) - - - - - - - - 4' FREEBOARD i 6' PONDING :4 / - 3' MULCH / 3.251 . N 18 AMENDED SOIL - , - 3' ND (FILTER) PEA GRAVEL (FILTER) 6 GRAVEL (STORAGE) PIPE IMPERMEABLE LINER, SEE NOTES NOTE: SLOTTED UNDERDRAIN AND ORIFICE OUTLET NOT SHOWN IMPERMEABLE LINER TO BE 30 MIL GSE HD SMOOTH LINER FROM GSE ENVIRONMENTAL OR APPROVED EQUIVALENT BMP-3 & BMP-4: BASIN CROSS-SECTION (TYP.) (N.T.S.) "J- GREATER THAN U Wi DRILLED HOLE I X'DIA, OPENING ULNU1UP1I' = bU I I UM FLOW CONTROL ORIFICE PLATE FILTER & SEE DETAIL ADO GRAVEL STORAGE DIA. ORIFICE BOTTOM OF BASIN NATURAL IMPERMEABLE LINER SOIL BMP-3 & BMP-4: LID ORIFICE DETAIL (NVT.S.) AMENDED SOIL MEDIA SLOTTED PVC UNDERORAIN 3" SAND FILTER COURSEJ PEA GRAVEL GRAVEL STORAGE 6" IMPERMEABLE LINER AT 8 OM OF BASIN TO BE 30 MIL GSE HD SMOOTH LINER BY GSE SOIL ENVIRONMENTAL OR APPROVED EQUIVALENT BIOFILTRATION BASIN C Commercial Development Resources Today deas. Tomorrow's Reality 4fl W •mii DMA-1 E: Proprietary Biofiltration (MWS) (Structural BMP-5) Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods Worksheet B.5-1: Simple Sizing Method for Biofiltration BMPs Remaining DCV after implementing retention BMPs 2,504 cubr feet Partial Retention 2 h1filtration rare from Form 1-9 if partial infiltration is feasible 0 in/hr. 3 Allowable drawdown time for aggregate storage below the underdrain 36 hours 4 Depth of runoff that can be infiltrated Sine 2 ' Line 3] _(I 0 inches 5 Aggregate pore Space 0.40 in/in 6 Required depth of gravel below the underdrain [Line 4/Line 5] 0 inches 7 Assumed surface area of the biofiltrarion BMI' 1,554 sq-ft 8 Media retained pore storage 0.1 in/in 9 Volume retained by BMP [(Line 4 + (Line 12 x Line 8)1/121 x Line 7 0 cubic-feet 10 DCV that n iuires 1)1 ihration 1 inc I Line 91 2,504 cubic-feet U \1 P P:ir,imctcr'- 11 Surface Ponding 16 irch minimum, 12 inch maximum.] 6 inches 12 Media 'thickness [18 inches Ininimuni(, also add mulch layer thickness to - . . this line for sizing calculations 18+3=21 inches Aggregate Storage above underdrain invert (12 inches typical) - use 013 inches for sizing if the aggregate is not over the entire bottom surface area inches 14 Media available pore space 0.2 in/in 15 Media filtration rate to be used for sizing (5 in/hr. with no outlet control; - if the titration is controlled by the outlet, use the outlet controlled rate) in /hr. R.t..iine C.ticu1.iiion' 16 1 Allowable Routing lime for sizing 6 hours 17 Depth filtered during storm [Line 15 x Line 16] 30 inches lb Depth. of Detention Storage inches (line 11 + (Line 12 x Line 14) + (Line 13 x Line 5)] 13.8 19 lotal Depth Treated ILine 17 + Line 181 43.8 inches Upthni 1 - Biolilter 1.5 times the DCV 20 Required bi.filtered volume (1.5 x Line 10( 3,756 cubic-feet 1 21 Required Footprint [Line 20/ Line 19] x 12 1,029 sq-ft Option 2 - Store 0.75 of remaining DCV in pores and poiiding 22 [ Required Storage (surface + por(.,-s) Volume [0.75 x Line 10] 1,878 cubic-feet 23_Required footprint ILine 22/ Line 18] x 12 1,633 sq-ft Footprint of the B\1P 24 Area draining to the BMP 57,558 sq-ft 25 Adjusted Runoff Factor for drainage area (Refer to Appendi:. BA and B.2) 0.90 26 Minimum BMP Footprint (line 24 x Line 25 x 0.03( 1,554 sq-ft 27 Footprint of the liMP = Maximurn(Minimum(Line 21, Line 23), Line 26) 1,554 sq-ft Note: Line 7 is used to estimate the amount of volume retained by the BMP. Update assumed surface area in Line 7 until its equivalent to the reeuired biofiltration footprint (either Line 21 or Line 23 B-26 February 2016 Appendix B: Storm Water Pollutant Control Hydrologic Calculations and Sizing Methods B.6.3 Sizing Flow-Thru Treatment Control BMPs: Use for Sizing Proprietary Biofiltration BMP Flow-th.ru treatment control BMPs shall be sized to filter or treat the maximum flow rate of runoff produced from a rainfall intensity of 0.2 inch of rainfall per hour, for each hour of every storm event. The required flowth.ru treatment rate should be adjusted for the portion of the i)CV already retained or biofiit.ered onsite as described in Worksheet 13.6-I.. The following hydrologic method shall be used to calculate the flow rate to be filtered or treated: Q = C x i x A Where: Q = Design flow rate in cubic fret per second (. = Runoff factor, area-weighted estimate using Table BA-I = Rainfall intensity of 0.2 in/hr. A = Tributary area (acres) which includes the total area draining to the BMP, including any offsite or onsite areas that comingle with project runoff and drain to the BMP. Refer to Section 3.3.3 for additional guidance. Street projects consult Section. 1.4.2, Worksheet B.6-1: Flow-Thru Design Flows EMEMIM:8 vim OEM _ 1 I DCV I)CV 2,504 cubic-feet 2 l)CV retained DC 0 cubic-feet 3 I)CV biofihered IXNWOfiftemd 0 cubic-feet: I)CV requiring flow-thru 4 . . . (Line I -Line 2-0.67xLine 3) DC\ ro.Thtu 2,504 cubic-feet 5 Adjustment factor (Line 4 / line I)* .A.F I unitless 6 Design. rainfall intensity i (.).20 in/hr 7 Area_tt1iP(s) A— 1.321 acres Area-weighted runoff factor (estimate using S s . - Appendix B.2) C 0.9() unitless 9 Calculate Flow Rate = AF x (C x I x A) 0.238 cfs *Adjustment factor shall be estimated considering only retention and hiofiltration BMPs located upstream of flow-thru BMPs. That is, if the flow-thru BMP is upstream of the project's retention and biofiltration BMPs then the flow-thru BMP shall be sized using an adjustment factor of 1. DMA-i E: Proprietary Biofiltration (MWS) (Structural BMP-5) I I I I I I I I I I I I I I B-36 February 2016 I 9,-0- ELEVATION VIEW RIGHT END VIEW VERJ7C4L-N --I ,—WLILAMVMU UNDERORAIN _______ :.. . BED MANIFOLD PAT ,-ENTED 4 PL1YMETL7? VOID AREA ' ,-PRE--F1LTER rI CARTRIDGE 0 LEFT END VIEW OUTLET PIPE -1 I I '-INLET PIPE SEE NOTES L0PJJN DO$W LINE SEE NOTES PLAN VIEW FLOW COOL RISER IE IN PEAK HUL 121 a LOU a 1. —VEGETATION PL4NT ESTABLISHMENT MED/A "-6" I I SITE SPECIFIC DATA PROJECT NUMBER 8709 ORDER NUMBER PROJECT NAME BMW OF CARLSBAD PROJECT LOCATiON CARLSBADD, CA STRUCTURE ID MWS UNIT TREATMENT REQUIRED VOLUME BASED (CF) FLOW BASED (CFS) N/A 0.239 TREATMENT HGL AVAILABLE (Fr) N/A PEAK BYPASS REQUIRED (Cr5) - IF APPLICABLE 7.62 PIPE DATA I.E. MATER/AL D/AMETER INLET PIPE 1 90.57 N/K N/K INLET PIPE 2 N/A N/A N/A OUTLET PIPE 87.57 N/K N/K PRETREATMENT B1OF1L IRA T/ON DISCHARGE RIM ELEVATION 93.15 93.15 93.15 SURFACE LOAD PEDESTRIAN N/A PEDESTRIAN FRAME & COVER 1 030" OPEN PLANTER 024" WE/L4NDMEDi4 VOLUME (cv) 5.57 ORIFICE SIZE (0/A. INCHES) T-02. 19" NOTES: PRELIMINARY NOT FOR CONSTRUCTION. EOW TO PROI'YDE FOOTiNG DETAILS. INSTALLATION NOTES CONTRACTOR TO PROVIDE ALL LABOR, EQUIPMENT, MATERIALS AND INCIDENTALS REQUIRED TO OFFLOAD AND INSTALL THE SYSTEM AND APPURTENANCES IN ACCORDANCE WITH THIS DRAWING AND THE MANUFACTURERS SPECIFICATIONS, UNLESS OTHERWISE STATED IN MANUFACTURERS CONTRACT. UNIT MUST BE INSTALLED ON LEVEL BASE. MANUFACTURER RECOMMENDS A MINIMUM 6" LEVEL ROCK BASE UNLESS SPECIFiED BY THE PROJECT ENGINEER. CONTRACTOR IS RESPONSIBLE TO VERIFY PROJECT ENGINEERS RECOMMENDED BASE SPECIFICATIONS. CONTRACTOR TO SUPPLY AND INSTALL ALL EXTERNAL CONNECTING PIPES. ALL PIPES MUST BE FLUSH WITH INSIDE SURFACE OF CONCRETE (PIPES CANNOT INTRUDE BEYOND FLUSH). INVERT OF OUTFLOW PIPE MUST BE FLUSH WITH DISCHARGE CHAMBER FLOOR. ALL PIPES SHALL BE SEALED WATER TIGHT PER MANUFACTURERS STANDARD CONNEC77ON DETAIL. CONTRACTOR RESPONSIBLE FOR INSTALLATION OF ALL RISERS, MANHOLES, AND HATCHES. CONTRACTOR TO GROUT ALL MANHOLES AND HATCHES TO MATCH FINISHED SURFACE UNLESS SPECIFIED OTHERWISE VEGETATION SUPPLIED AND INSTALLED BY OTHERS. ALL UNITS WITH VEGETATION MUST HAVE DRIP OR SPRAY IRRIGATION SUPPLIED AND INSTALLED BY OTHERS. CONTRACTOR RESPONSIBLE FOR CONTACTING BIO CLEAN FOR ACTIVATION OF UNIT MANUFACTURERS WARRANTY IS VOID WITH OUT PROPER ACTIVATION BY A BIO CLEAN REPRESENTATIVE. GENERAL NOTES INTERNAL BYPASS DISCLOSURE: THE DESIGN AND CAPACITY OF THE PEAK CONVEYANCE METHOD TO BE REViEWED AND APPROVED BY THE ENGINEER OF RECORD. HGL(S) AT PEAK FLOW SHALL BE ASSESSED TO ENSURE NO UPSTREAM FLOODING. PEAK HGL AND BYPASS CAPACITY SHOWN ON DRAWING ARE USED FOR GUIDANCE ONLY MANUFACTURER TO PROL'7DE ALL MATERIALS UNLESS OTHERWISE NOTED. ALL DIMENSIONS, ELEVATIONS, SPECIFiCATiONS AND CAPACITIES ARE SUBJECT TO CHANGE FOR PROJECT SPECIFIC DRAWINGS DETAILING EXACT DIMENSIONS, WEIGHTS AND ACCESSORIES PLEASE CONTACT SIC CLEAN. Priority Development Project (POP) SWQMP BMW of Carlsbad amobwnwt ATTACHMENT 2 BACKUP FOR PDP HYDROMODIFICATION CONTROL MEASURES [This is the cover sheet for Attachment 2.] Indicate which Items are Included behind this cover sheet: Attachment Contents Checklist Sequence - -- - -- -- Included Attachment Hydromodification Management See Hydromodification Management 2a Exhibit (Required) Exhibit Checklist on the back of this Attachment cover sheet. Exhibit showing project drainage boundaries marked on WMAA Critical Coarse Sediment Yield Management of Critical Coarse Area Map (Required) Sediment Yield Areas (WMAA Optional analyses for Critical Coarse Attachment Exhibit is required, additional Sediment Yield Area Determination: 2b analyses are optional) o 6.2.1 Verification of Geomorphic See Section 6.2 of the BMP Design Landscape Units Onsite Manual. 0 6.2.2 Downstream Systems Sensitivity to Coarse Sediment 0 6.2.3 Optional Additional Analysis of Potential Critical Coarse Sediment Yield Areas Onsite Geomorphic Assessment of Attachment Receiving Channels (Optional) Not performed 2c See Section 6.3.4 of the BMP Design 0 Included Manual. Flow Control Facility Design and Structural BMP Drawdown Included Attachment Calculations (Required) 0 Submitted as a separate stand- 2d See Chapter 6 and Appendix G of alone document the BMP Design Manual POP SWQMP 23 of 27 Priority Development Project (PDP) SWQMP COMAWKW BMW of Carlsbad Use this checklist to ensure the required Information has been included on the Hydromodification Management Exhibit: The Hydromodification Management Exhibit must identify: Underlying hydrologic soil group Approximate depth to groundwater Existing natural hydrologic features (watercourses, seeps, springs, wetlands) Critical coarse sediment yield areas to be protected (if present) Existing topography Existing and proposed site drainage network and connections to drainage offsite Proposed grading Proposed impervious features Proposed design features and surface treatments used to minimize imperviousness Point(s) of Compliance (POC) for Hydromodification Management Existing and proposed drainage boundary and drainage area to each POC (when necessary, create separate exhibits for pre-development and post-project conditions) Structural BMPs for hydromodification management (identify location, type of BMP, and size/detail) I I I Li I I I I H PDP SWQMP 24of27 I I I I I I r] I I I I I H I I I I HYDROMODIFICATION MANAGEMENT EXHIBIT I I H I I I I H I I I AC 004 MNI - f / PREPARED FOR PREPARED BY - I AUTONA 200SW1STSTREET, 14THROO rORruD. Commercial / COtTAGT: GU: ro\..LL - - TEL: (954} 769-6XO C Resources AUTOCENTERCT / I SWQMPATTAHMENT 2,4: HMP EXHIBIT BMW OF CARLSBAD 1060 AUTO CENTER COURT CARLSBAD, CA 92008 -. 4'A 1-41-30 I0'I91 '.44.11 .14. 04.101(01111 .10(1 134410, III (311<10(447, ('4, 4/'44 14'I "OIl-A (41011 3341 I lIlt,:' .7 . rr : Al: all PjAIT '0 A r 1013(1(1 .. 4. 11.11044(41-I 1045 1' 04A1A0'b0A1 DADA I 243011.. 3.01,1 A1I5A44.1.Ls 44. 1.11'00,1141,1-'21'l, 01441-AOl 4414.., <(4101104 41111301,'(1'2T CF 01 C4'TTA 0r'r'2'AflOI'S .-------------------------------------------------------------14 BMP-0 4. A A lJ.'14,114N$AM,...lA RZiot, (113141 It 040' lIt' 10 / / BMP-4 BMP-2 BMP-I UAilN HMP RISER & SLOTTED UNDERDR,I,JN C.O.LAYOUT 0 . I 2 I M'oL IJ Q.I. /'b LITI. 1011 41410 02 4101*. EON 011DI0 / SEE 'IE 4(14*00 1401501.300 - A--. YI4T11A.Tl41Pr1C'l4 - -' / 0 ol'S330U,o A 24'0(k30FE 4 THPIJMETAA,PLATE 4 411010107*. E(I'EEDCED 1,Ci"CRE'FW4i,1 '3. Di' 00130105 '.151, t4ft........ FLOW CONTROL ORIFICE PLATE ME 'F ------ 2,04 CONCRETE 410114 41-411. Tr Tr I RR INFORMATION ] STUB INFORMATION STUB INFORMATION BMP-6A WEST OF PROPOSED BUILDING 1 41(4 BMP-6B NORTH OF PROPOSED BUILDING RISER INFORMATION LI . 414L42- At'4rDS1VS44 I F / I / 84.400114 '.t5D4.D3A I L ADA 010410 .D:1*M$45$It014Q( 2.0 tAN44444440T44.& (NO 'flt04lltsjflwgiolt(A:tW ADO *t1A0001X4*00. O.004* 04'flstottutyw04404li0ldl' Il,At(3P*1lA OTA44IEOIIOACIANOIIIt0AtAA1400- TA*SAtAL5DA01ODAtT0IAL15EP0Dt0C01tT0 XItO,a, 4. (0 10. St 0(0 .010 40 (2 4' 4. O(444440SIIIALL At tOOOF.A114,CM0000(4 .14*1001(4 D4.0AtO0NDD00(04043 44A54041400014441L44410100&1AtAl04fl( 0*044.20400 t1E0i(t4.I400INDACAS100II000 10004114 l0I*'00014AD1040A0.LIAtP05r000100 1* 4.4*014 A'tO MAW 4 01 244*. S 4110 *13 0" TAD. 'IA004S:C4.l0 1(34.4*04*413 _4* 44.0(4(45 4A014401100)40 r(44144.01e.01 i-t005t0tA(10004131100lLtC14000010*04 300 L*oOrI004I044i'T .Ir.ilFOYAPAi1Oli0S 1(40114414.0 200.L10044*1000040E4'0A4At011003ot0440ltsoiotp8000SuPA*0000044. (04.04.4.3 I0010EAt410Tht Flatoow0(Th PIPE STORAGE 5,681 CF DIAMETER 98 MAIM PIPE GAGE 16 WALL TYPF - SOLID ASSEMBLY Er STORAGE sal OF lIPS .4.11t11A1S 4010,3* SIAIiCIIJRAL1.Y (244110000004:O41A<A04.olsttg4.*T4.4*14.44 ,,,, oto>-o o* *. 40 (0 SAWs' 4414.44 4.4.144. 21 0*1,0444. 041 AID 4. 0* .114.,, 34. (044 144(04.14' 30*140, ' 0IPAC41hU40'NOEtlAt1410A1W0 pope oosos 4 ne ?AAMLM PIPE GAGE - 16 O(AMETER W. ASSEMBLY IV PIPE 010*430 4,7,6 OF 04010041 .co . •S0.F1T1104.1014*ii&€111104411044.Jt 0000(00AO010000(4*4*ENTIOIIAM,UA*O0NO <4. 1 1*411 101114. 01 41 14041 AAao1114.Ac<ts'4o<s11,.0 -'14 4. 40041.-MS 1404, 1I All 114W 004(431 .11 1410 44.0410 4.5015430160.02 PPE 11444.057.114.* . FINISMALT2 PIP- 1RV.07.TEA CORRUGATION 5xi toltsto'A3*1v4301111141t( (IC Itp,AIC14*44000<CAr243*o'Met 1404114A*4M4S CORRUGATION 841 14 4'.7 1 011,110 4(041 10 (1. (01L,1211'1*01304414041$1 lAClDS10704lM050000l00407o000 44401'C110W66 01(4(04*3 tArt AA13140LI00100II,41440411.540441yrlEt4*4.tlor4.4*(pl:4.l (A4*01(101.NOI 1'ulltAltA 0(41 150410140005$ 4011L1EA?1000400(4 liD'Il141t1Cl110SlP100€r00501*11Y,00t I NTECH HTEff 960 UNDERGROUND DETENTION SYSTEM 617515-010 ll LJ4(0ND1 cNTECH 960 UNDERGROUND DETENTION SYSTEM 617515-020 _______________________ ooi ..'....I I 6I6G8oa SOWT1OI60 LLC 044. OETRNTO* TISTEMS BMW CARLSBAD s000ess sow000s *c cospopsaros sysosoos BMW CARLSBAD I - CARLSBAO,CA SITE DESIGNATION BMP BA .0*0 14140 14ISAN •04 CARLSBAD,CA SITE DESIGNATION BMP 6B 1 .. . 4 " 4 .4 4* U) -J U-1 0 z U) Co , I J II NDA'OIo'A 414.. : ................ - - '2 / '14(430 A - (I - ' 4'1A(014011? 10 j , ' $3TA001lF0tlGi 2 0414.41,0.4<41........1': 01(4 I IX I'S 1141"'113 - 0(11 : - - --; .404 IIl1-11,AAt1'24 .04.1 ' 0AA'(A.,jliI"1AII'.*4lA(4.11.4I"ll'CI Ill- 1,11 110040 '.' . 1 2921<41*1' "01 04O'1004A40lil0ot 04(4.111 MIII 4)111.1 Il1i> 4.4144011 1111<1 (0)11 0>04>411 (411,1 (7JS4(44101',AA 11<4-," A04l,>l'AI,liOlU - ' 4.' 14 <.0001,. 041001014001 '1.741 BASIN BMP RISER .AIonso,I'S<s'11. OuT_El DETAIL UNDEADRAIN BMP-'I & BMP-2: BIOFILTRATION BASIN BMP ,3 a BMP 4 BIOFILTRATION BASIN CLEANOUT (CO) DETAIL WI PARTIAL RETENTION W/ IMPERMEABLE LINER NOTES: I, SUP-fIR AND BMP 66TO ACT AS ONE DETENTION SYSTEM THAT IS HYORAULICALY CONNECTED VA 12' AI- HOPE PIPE REID SET AT ONE ELEVATION. 2 BMP-6 ,AIHAU. HAVE A MINIMUM. 0A1 STORAGE (i1IMOa I04400LFT 'N4.LL_ I V C 4,01 . : fOFPI'LCAW 410110 A DETEIII(i0NVAiJ1..T (IIA,lI-'-loll) OUTLET STRUCTURE & WEIR DETAIL SHEET 02 OF 02 PREPARED FOR: PREPARED BY: AUTONATION INC. 200 SW 1ST STREET, 1411-I FLOOR P00411 LAUDERDALE, FL 3230l Commercial cl:I~Resources CONTACT CUFF POWELL. Development TEL: (954) 713011-01000 1100?, 414.,. 11.41llA.1111-41214. 41215044(11,70.14(1 141.flA(4*0444.4.14, SWQMPATTACHMENT 2.4: lIMP EXHIBIT BMW OF CARLSBAD 1060 AUTO CENTER COURT CARLSBAD, CA 9208 ATTACHMENT 2B: WMAA EXHIBIT I — — I M — — I — — t.J1fII:1 t Potential Critical Coarse Sediment Yield Areas ..+ Carlsbad Watershed HU 904 00 211 m12 Exhibit DaleSept.8 2014 ATTACHMENT 2C: NOT INCLUDED ATTACHMENT 2D: TECHNICAL MEMORANDUM: SWMM Modeling for Hydromodification Compliance of: BMW Carlsbad Prepared For: CDR Prepared by; Luis P.ujra. Phi), (:Ps\\(., ToR, D.WRE. I R.C.E. 6637 t;\ UZI&/ 'OE 66377 *\ EXP 6/3Q/2( 'y V Oi CM'7 REC Consultants 2442 Second Avenue San Diego, CA 92101 Telephone: (619) 232-9200 TECHNICAL MEMORANDUM TO: CDR, FROM: Luis Parra, PhD, PE, CPSWQ, ToR, D.WRE, CFM. David Edwards, MS, PE, CFM. DATE: December 13, 2019 RE: Summary of SWMM Modeling for Hydromodification Compliance for BMW Carlsbad, City of Carlsbad, CA. INTRODUCTION This memorandum summarizes the approach used to model the proposed commercial site in the City of Carlsbad using the Environmental Protection Agency (EPA) Storm Water Management Model 5.0 (SWMM). SWMM models were prepared for the pre and post-developed conditions at the site in order to determine if the proposed LID HMP bio-filtration and underground detention facilities have sufficient volume to meet Order R9-2013-001 requirements of the California Regional Water Quality Control Board San Diego Region (SDRWQCB), as explained in the Final Hydromodification Management Plan (HMP):, dated March 2011, prepared for the County of San Diego by Brown and Caldwell. SWMM MODEL DEVELOPMENT The BMW Carlsbad project proposes a commercial structure and servicing parking lots on the currently develcped site. Two (2) SWMM models were prepared for this study: the first for the predevelopment and the second for the post-developed conditions. The project site drains to one (1) Point of Compliance (POC-1) located at the existing storm drain system located to the north of the project site. Per Section G1.2 in Appendix G of the 2016 City of Carlsbad BMP Design Manual, the EPA SWMM model was used to perform the continuous hydrologic simulation. For both SWMM models, flow duration curves were prepared to determine if the proposed HMP facilities are sufficient to meet the current HMP requirements. The inputs required to develop SWMM models include rainfall, watershed characteristics, and BMP configurations. The Oceanside Gage from the Project Clean Water website was used for this study since it is the most representative of the project site precipitation due to elevation and proximity to the project site. Per the California Irrigation Management Information System "Reference Evaporation Zones" (ClMIS Elo Zone Map), the project site is located within the Zone 1 Evapotranspiration Area. Thus evapotranspiration vales for the site were modeled using Zone 1 average monthly values from Table G.1-1 from the 2016 BMP Design Manual. Per the site specific geotechnical investigation and NRCS Web Soil Survey, the project site is situated upon Class B soils. Soils have been assumed to be compacted in the existing developed condition while fully compacted in the post developed conditions. Other SWMM inputs for the subareas are discussed in the appendices to this document, where the selection of parameters is explained in detail. BMW Carlsbad HMP Memo December 13, 2019 HMP MODELING PRE DEVELOPED CONDITIONS The current site consists of a developed lot that drains via overland flow to the receiving storm drain system located to the north of the project site within the adjacent Cannon Road. Table 1 below illustrates the pre-developed area to be redeveloped and impervious percentage accordingly. TABLE 1— SUMMARY OF PRE-DEVELOPED CONDITIONS Tributary Area, A - Impervious Percentage, FOC MA (Ac) IPM POC-1 DMA-A 3.71 0% TOTAL -- 3.71 I 0% Notes: (1)— Per the 2013 RWaCB permit, existing condition impervious surfaces are not to be accounted for in existing conditions analysis DEVELOPED CONDITIONS Storm water runoff from the proposed project site is routed to one (1) POC located at the existing storm drain location to the north of the project site. Runoff from the developed project site is drained to five (5) orisite receiving BMPS; four (4) biofiltration LID BMP's and a two (2) underground detention vaults that are hydraulically linked to act as a single detention facility. Once flows are routed via the proposed LID BMPs, developed onsite flows are then conveyed to the POC. A small portion of the site is self- mitigating; this area will bypass the LID BMPs and confluence with flows at the aforementioned POC. TABLE 2— SUMMARY OF POST-DEVELOPED CONDITIONS POC DMA DMA-1A + Payers Tributary Area, A (Ac) 0.726 Impervious Percentage, Ip 61.23 BR-1 0.01843 0% DMA-113 0.325 61.22% DMA-113 (Payers) 0.089 0% BR-2 0.00817 0% DMA-1D 0.341 96.62% POC-1 DMA-iD (Payers) 0.053 0% BR-3 0.01279 0% DMA-1C 0.506 92.52% BR-4 0.01 0% DMA-1E 1.325 100% DMA-2A (Self Mitigating) 0.294 6.73% TOTAL -- 3.71 -- Four (4) LID biofiltration basins and a single underground detention vault are located within the project site and are responsible for handling hydromodification requirements. In developed conditions, the basins will have a surface depth of 0.92 feet and a riser spillway structure (see dimensions in Table 4). Flows will then discharge from the basins via a low flow orifice outlet within the gravel layer. The riser 2 W.0.7063-02 I I L I I I I I I I I I I I I I I I BMW Carlsbad HMP Memo December 13, 2019 structure will act as a spillway such that peak flows can be safely discharged to the receiving underground detention vault. Beneath the basins' invert lies the proposed LID biofiltration portion of the drainage facility. This portion of the basin is comprised of a 3-inch layer of mulch, an 18-inch layer of amended soil (a highly sandy, organic rich composite with an infiltration capacity of at least 5 inches/hr). Two (2) of the BMP's (BR-1 and BR-2) are partial-retention systems; these basins will feature 13-inches of gravel while the remaining two (2) bio-filtration BMPs (BR-3 and BR-4) will be lined and include a 12-inch layer of gravel for additional detention and to accommodate the French drain system. These systems are to be located beneath the biofiltration layers to intercept treated storm water and convey these flows to a single small diameter lower outlet orifice. Once the runoff has been routed by the outlet structure, flows are then drained to the receiving underground detention vaults for additional detention. The two (2) spate vaults are to be constructed at the same elevation and will be linked via the junction box that houses the single outlet structure for the two (2) facilities. Given that the basin elevations are the same and that both basins are constricted by the same outlet structure, these facilities are hydraulically linked and act as a single detention facility for modeling purposes. After these flows have been detained via the detention vault, they will be discharged to the existing storm drain system located within the adjacen: Cannon Road. The biofiltration basins were modeled using the biofiltration LID module within SWMM. The biofiltration module can model the underground gravel storage layer, underdrain with an orifice plate, amended soil layer, and a surface storage pond up to the elevation of the invert of the spillway. It should be noted that detailed outlet structure location and elevations will be shown on the construction plans based on the recommendations of this study. Water Quality BMP Sizing It is assumed all storm water quality requirements for the project will De met by the bio-filtration LID BMPs detailed in the SWQMP and other BMPs included within the site design. However, detailed water quality requirements are not discussed within this technical memo. For further information in regards to storm water quality requirements for the project (including sizing and drawdown) please refer to the site specific Storm Water Quality Management Plan (SWQMP). Porous Payers As an integrated LID BMP design practice, several sections of the project sites parking lots will feature porous pavement/payers. These porous sections will include a 6-inch layer of gravel to be located beneath the paver to allow for storage of intercepted runoff. There will be no French drain located beneath the paver section such that once the volume of voids of the gravel has been filled with stormwater, any excess storm water will continue to surface flow to the receiving storm water quality bio-filtration basin. The paver base will be unlined to allow for infiltration into the underlying soil. In some DMA's, cross gutters prevent run-on from adjacent impervious areas into these pervious sections, such that the only runoff tributary to these LIDs is the direct precipitation that falls upon them. The DMA's located within the north-eastern portion of the site however do not feature cross gutters, thus allowing for run-on from the adjacent impervious areas. 3 W.0.7063-02 BMW Carlsbad HMP Memo December 13, 2019 To represent these differences within the SWMM model, the DMA's that are run-on to the pervious areas (DMA-1A) are modeled as draining to pervious. Whereas for the porous pavement areas that do not receive run-on, these areas are modeled as their own individual catchment within SWMM, allowing for the accurate representation of impervious runoff from adjacent DMA's to bypass these porous pavement sections and drain directly to the BMP. Additionally, to represent the 6-inches of gravel storage located beneath the porous pavement French Drain, the "Dstore-Perv" value for the catchment representing the porous pavement is set to 4.8-inches (as 12 inches of gravel has only 40% of voids space available for storage, thus 6 X 0.4 = 2.4). It should be noted that the payers are not treatment control BMPs and as such no draw-down calculations are required; the 57-year continuous hydrologic SWMM model demonstrates the payers are able to meet their HMP objective. The bio-filtration BMPs downstream of the payers have been sized for the full DCV and have not been reduced due to the volumetric interception provided by the paver. BMP MODELING FOR HMP PURPOSES Modeling of dual purpose Water Quality/HMP BMPs Four (4) HMP BMP biofiltration basins and two (2) underground detention vaults are proposed hydromodification conformance for the project site. Tables 4, 5 and 6 illustrate the dimensions required for HMP compliance according to the SWMM model that was undertaken for the project. TABLE 4— SUMMARY OF DEVELOPED DUAL PURPOSE WQ & HMP BMPs BMP Tributary Area (Ac) DIMENSIONS BMP i Area(') (ft) Gravel Depth121 (in) Lower Orif. Depth Riser D (in)131 Invert (ft)141 Weir Perimeter Length") (ft) Total Surface Depth(61 (ft) BR-1 0.726 803 13 0.875 1 0.75 8.0 0.92 BR-2 0.414 356 13 0.675 0.75 8.0 0.92 BR-3 0.394 557 12 0.75 0.75 8.0 0.92 BR-4 0.506 435 12 0.75 0.75 8.0 0.92 Notes:' (1): Area of amended soil equal to area of gravel Includes filter gravel layer, French Drain is set at an elevation of 3-inchesor 4-inches above the base of the facility. Diameter of orifice in gravel layer with invert at bottom of layer; tied with hydromod min threshold (0.10,). Depth of ponding beneath riser structure's surface spillway. Overflow length, the internal perimeter of the riser is 8 ft (2ft x 2ff internal dimensions). Total surface depth of BMP from top crest elevation to surface invert. TABLE 5— SUMMARY OF DETENTION VAULTS: Basin Area (f't2) Depth (ft) Volume (ft') DETENTION VAULT 1,305 8 10,440 Notes: (1): Volume/area to be distributed between the two (2) individual detention facilities. 4 w.0.7063-02 BMW Carlsbad HMP Memo December 13, 2019 TABLE 6— SUMMARY OF DETENTION VAULT RISER DETAILS: LowerOrifice Emergency Weir BASIN Diameter Number of Elev. 11 (ft) Width (ft) Elev (ft) (in) Orifices DETENTION I1.125 1 0.0 5 7.2083 VAULT I i I Notes: (1): Invert of basin surface assumed to be elevation O.O. FLOW DURATION CURVE COMPARISON The Flow Duration Curve (FDC) for the site was compared at the POC by exporting the hourly runoff time series results from SWMM to a spreadsheet. Q2 and Q10 were determined with a partial duration statistical analysis of the runoff time series in an Excel spreadsheet using the Cunnane plotting position method (which is the preferred plotting methodology in the HMP Permit). As the SWMM Model includes a statistical analysis based on the Weibull Plotting Position Method, the Weibull Method was also used within the spreadsheet to ensure that the results were similar to those obtained by the SWMM Model. The range between 10% of Q2 and 010 was divided into 100 equal time intervals; the number of hours that each flow rate was exceeded was counted from the hourly series. Additionally, the intermediate peaks with a return period "i" were obtained (Q with i=3 to 9). For the purpose of the plot, the values were presented as percentage of time -exceeded for each flow rate. FDC comparison at the POC is illustrated in Figure 1 in both normal and logarithmic scale. Attachment V provides a detailed drainage exhibit for the post-developed condition. As can be seen in Figure 1, the FDC for the proposed condition with the HMP BMPs is within 110% of the curve for the existing condition in both peak flows and durations. The additional runoff volume generated from developing the site will be released to the existing point of discharge at a flow rate below the 10% Q2 lower threshold for POC-1. Additionally, the project will also not increase peak flow rates between the Q2 and the 010, as shown in the peak flow tables in Attachment I. Discussion of the Manning's coefficient (Pervious Areas) for Pre and Post-Development Conditions Typically the Manning's coefficient is selected as n = 0.10 for pervious areas and n = 0.012 for impervious areas. Due to the complexity of the model carried out in pre and post-development conditions, a more accurate value of the Manning's coefficient for pervious areas has been chosen. Taken into consideration the "Handouts on Supplemental Guidance - Handout #2: Manning's "n" Values for Overland Flow Using EPA SWMM V.5" by the County of San Diego (Reference [6]) a more accurate value of n = 0.05 has been selected (see Table 1 of Reference [61 included in Attachment VII). An average n value between pasture and shrubs and bushes (which is also the value of dense grass) has been selected per the reference cited, for light rain (<0.8 in/hr) as more than 99% of the rainfall has been measured with this intensity. WO.7063-02 BMW Carlsbad HMP Memo December 13, 2019 11WiWJ.i 4' This study has demonstrated that the proposed HMP BMPs provided for the BMW Carlsbad project site is sufficient to meet the current HMP criteria if the cross-section areas and volumes recommended within this technical memorandum, and the respective orifice and outlet structure are incorporated as specified within the proposed project site. KEY ASSUMPTIONS Type B Soils is representative of the existing condition site. Two (2) separate detention vaults will be constructed at the same elevation and hydraulically linked, acting as a single detention system. ATTACHMENTS Q to Q10 Comparison Tables FDC Plots (log and natural "x" scale) and Flow Duration Table. List of the "n" largest Peaks: Pre-Development and Post-Development Conditions Elevations vs. Discharge Curves to be used in SWMM Pre & Post Development Maps, Project plan and section sketches SWMM Input Data in Input Format (Existing and Proposed Models) SWMM Screens and Explanation of Significant Variables Geotechnical Documentation Summary files from the SWMM Model REFERENCES - "Review and Analysis of San Diego County Hydromodification Management Plan (HMP): Assumptions, Criteria, Methods, & Modeling Tools - Prepared for the Cities of San Marcos, Oceanside & Vista", May 2012, TRW Engineering. - "Final Hydromodification Management Plan (HMP) prepared for the County of San Diego", March 2011, Brown and Caldwell. - Order 119-20013-001, California Regional Water Quality Control Board San Diego Region (SDRWQCB). - "Handbook of Hydrology", David R. Maidment, Editor in Chief. 1992, McGraw Hill. - "City of Carlsbad BMP Design Manual", February 2016. - "improving Accuracy in Continuous Hydrologic Modeling: Guidance for Selecting Pervious Overland Flow Manning's n Values in the San Diego Region", 2016, TRW Engineering. 6 W.0.7063-02 I BMW Carlsbad POC 1- Flow Duration Curve 035 ftirn WA I I I I I I I I I I I I I I VA I W.0.7063-02 I BMW Carlsbad HMI Memo December 13, 2019 BMW Carlsbad POC 1- Flow Duration curve BMW Carlsbad HMP Memo December 13, 2019 ATTACHMENT I. Q to Qjo Comparison Table - POC 1 Return Period Existing Condition (cfs) Mitigated Condition (cfs) Reduction, Exist - Mitigated (ds) 2-year 1.465 0.811 0.654 3-year 1.820 1.063 0.758 4-year 1.976 1.381 0.595 5-year 2.057 1.590 0.467 6-year 2.227 1.886 0.341 7-year 2.264 1.965 0.299 8-year 2.383 2.060 0.324 9-year 2.490 2.098 0.392 10-year 2.496 2.196 0.300 8 W.0.7063-02 ATTACHMENT II FLOW DURATION CURVE ANALYSIS 1) Flow duration curve shall not exceed the existing conditions by more than 10%, neither in peak flow nor duration. The figures on the following pages illustrate that the flow duration curve in post-development conditions after the proposed BMP is below the existing flow duration curve. The flow duration curve table following the curve shows that if the interval 0.10Q2 - Qio is divided in 100 sub- intervals, then a) the post development divided by pre-development durations are never larger than 110% (the permit allows up to 110%); and b) there are no more than 10 intervals in the range 101%-110% which would imply an excess over 10% of the length of the curve (the permit allows less than 10% of excesses measured as 101-110%). Consequently, the design passes the hydromodification test. It is important to note that the flow duration curve can be expressed in the "x" axis as percentage of time, hours per year, total number of hours, or any other similar time variable. As those variables only differ by a multiplying constant, their plot in logarithmic scale is going to look exactly the same, and compliance can be observed regardless of the variable selected. However, in order to satisfy the City of CarlsbadHMP example, % of time exceeded is the variable of choice in the flow duration curve. The selection of a logarithmic scale in lieu of the normal scale is preferred, as differences between the pre-development and post-development curves can be seen more clearly in the entire range of analysis. Both graphics are presented just to prove the difference. In terms of the "y" axis, the peak flow value is the variable of choice. As an additional analysis performed by REC, not only the range of analysis is clearly depicted (10% of Q2 to Qio) but also all intermediate flows are shown (0.2, Q3, Q, Q5, Q, Q, Qs and 09) in order to demonstrate compliance at any range Q - Q+i. It must be pointed out that one of the limitations of both the SWMM and SDHM models is that the intermediate analysis is not performed (to obtain Q from = 2 to 10). REC performed the analysis using the Cunnane Plotting position Method (the preferred method in the HMP permit) from the "n" largest independent peak flows obtained from the continuous time series. The largest "n" peak flows are attached in this appendix, as well as the values of Q1 with a return period "i", from 1=2 to 10. The Q values are also added into the flow-duration plot. BMW Carlsbad POC 1- Flow Duration Curve Percentage of time exceeded (%) — — — — — — — — — — — — — — — — — — — BMW Carlsbad POC 1- Flow Duration Curve Flow Duration Curve Data for BMW Carlsbad, City of Carlsbad, CA Q2 = 1.47 cfs Fraction Q.10 2.50 cfs Step= 0.0237 cfs Count= 499679 hours 57.00 years Existing Condition Detention Optimized Pass or Interval Q(cfs) Hours >Q %time Hours>Q %time Post/Pre Fail' 1 0.147 222 4.44E02 239 4.78E-02 108% Pass 2 0.170 206 4.12E-02 213 4.26E-02 103% Pass 3 0.194 186 3.72E-02 191 3.82E-02 103% Pass 4 0.218 179 3.58E-02 168 3.36E-02 94% Pass 5 0.241 175 3.50E-02 143 2.86E-02 82% Pass 6 0.265 170 3.40E-02 118 2.36E-02 69% Pass 7 0.289 169 3.38E02 110 2.20E-02 65% Pass 8 0.313 164 3.28E-02 104 2.08E02 63% Pass 9 0.336 152 3.04E-02 99 1.98E-02 65% Pass 10 0.360 149 2.98E-02 93 1.86E-02 62% Pass 11 0.384 146 2.92E-02 90 1.80E-02 62% Pass 12 0.408 141 2.82E-02 84 1.68E-02 60% Pass 13 0.431 141 2.82E-02 81 1.62E-02 57% Pass 14 0.455 135 2.70E-02 80 1,60E-02 59% Pass 15 0.479 132 2.64E-02 79 1.58E-02 60% Pass 16 0.502 126 2.52E-02 71 1.42E02 56% Pass 17 0.526 121 2.42E-02 66 1.32E-02 55% Pass 18 0.550 116 2.32E-02 64 1.28E02 55% Pass 19 0.574 110 2.20E-02 58 1.16E-02 53% Pass 20 0.597 106 2.12E-02 56 1.12E-02 53% Pass 21 0.621 106 2.12E-02 53 1.06E-02 50% Pass 22 0.645 101 2.02E-02 49 9.81E-03 49% Pass 23 0.669 99 1.98E02 48 9.61E-03 48% Pass 24 0.692 94 1.88E-02 46 9.21E-03 49% Pass 25 0.716 92 1.84E-02 44 8.81E03 48% Pass 26 0.740 89 1.78E-02 43 8.61E-03 48% Pass 27 0.763 86 1.72E-02 41 8.21E-03 48% Pass 28 0.787 83 1.66E-02 37 7.40E-03 45% Pass 29 0.811 81 1.62E-02 36 7.20E-03 44% Pass 30 0.835 79 1.58E-02 32 6.40E-03 41% Pass 31 0.858 74 1.48E-02 32 6.40E-03 43% Pass 32 0.882 72 1.44E-02 29 5.80E-03 40% Pass 33 0.906 71 1.42E-02 28 5.60E-03 39% Pass 34 0.930 58 1.16E-02 28 5.60E-03 48% Pass 35 0.953 58 1.16E02 27 5.40E-03 47% Pass 36 0.977 1 57 1.14E-02 26 5.20E-03 46% Pass 10% Existing Condition Detention Optimized Pass or Interval Q (cfs) Hours > Q % time Hours>Q % time Post/Pre Fail? 37 1.001 53 1.06E-02 25 5.00E-03 47% Pass 38 1.025 53 1.06E-02 25 5.00E-03 47% Pass 39 1.048 52 1.04E-02 24 4.80E03 46% Pass 40 1.072 50 1.00E-02 20 4.00E-03 40% Pass 41 1.096 50 1.00E02 20 4OOE-03 40% Pass 42 1.119 50 1.00E-02 19 3.80E-03 38% Pass 43 1.143 48 9.61E-03 19 3.80E-03 40% Pass 44 1,167 47 9.41E-03 18 3.60E-03 38% Pass 45 1.191 47 9.41E03 18 3.60E03 38% Pass 46 1.214 47 9.41E03 18 3.60E-03 38% Pass 47 1.238 43 8.61E-03 18 3.60E-03 42% Pass 48 1 1.262 43 8.61E-03 18 3.60E-03 42% Pass 49 1.286 41 8.21E-03 18 3.60E-03 44% Pass 50 1.309 37 7.40E-03 17 3.40E-03 46% Pass 51 1.333 35 7.00E-03 17 3.40E-03 49% Pass 52 1.357 35 7.00E-03 16 3.20E-03 46% Pass 53 1.380 35 7.00E-03 16 3.20E-03 46% Pass 54 1.404 33 6.60E-03 15 3.00E-03 45% Pass 55 1.428 33 6.60E-03 15 3.00E-03 45% Pass 56 1.452 33 6.60E-03 15 3.00E-03 45% Pass 57 1.475 32 6.40E-03 15 3.00E-03 47% Pass 58 1.499 32 6.40E03 14 2.80E-03 44% Pass 59 1.523 31 6.20E-03 14 2.80E-03 45% Pass 60 1.547 31 6.20E-03 14 2.80E-03 45% Pass 61 1.570 30 6.00E-03 13 2.60E-03 43% Pass 62 1.594 29 5.80E-03 12 2.40E-03 41% Pass 63 1.618 27 5.40E-03 11 2.20E-03 41% Pass 64 1.641 26 5.20E-03 11 2.20E-03 42% Pass 65 1.665 25 5.00E-03 11 2.20E-03 44% Pass 66 1.689 23 4.60E-03 11 2.20E-03 48% Pass 67 1.713 23 4.60E-03 11 2.20E-03 48% Pass 68 1.736 23 4.60E-03 11 2.20E03 48% Pass 69 1.760 23 4.60E-03 11 2.20E-03 48% Pass 70 1.784 23 4.60E-03 11 2.20E-03 48% Pass 71 1.808 23 4.60E-03 11 2.20E-03 48% Pass 72 1.831 22 4.40E-03 11 2.20E-03 50% Pass 73 1.855 21 4.20E-03 11 2.20E-03 52% Pass 74 1.879 19 3.80E-03 11 2.20E-03 58% Pass 75 1.903 18 3.60E-03 10 2.00E-03 56% Pass 76 1.926 18 3.60E-03 9 1.80E-03 50% Pass 77 1.950 18 3.60E-03 9 1.80E-03 50% Pass 78 1.974 17 3.40E-03 9 1.80E-03 53% Pass 79 1.997 17 3.40E-03 9 1.80E-03 53% Pass 80 2.021 16 3.20E03 9 1.80E-03 56% Pass 81 2.045 14 2.80E-03 9 1.80E-03 64% Pass Existing Condition Detention Optimized Pass or interval Q (cfs) Hours > Q % time Hours>Q % time Post/Pre Fail? 82 2.069 12 2.40E-03 7 1.40E-03 58% Pass 83 2.092 12 2.40E-03 7 1.40E-03 58% Pass 84 2.116 12 2.40E-03 7 1.40E-03 58% Pass 85 2.140 10 2.00E-03 7 1.40E-03 70% Pass 86 2.164 10 2.00E-03 7 1,40E03 70% Pass 87 2.187 10 2.00E-03 7 1.40E-03 70% Pass 88 2.211 10 2.00E-03 7 1.40E-03 70% Pass 89 2.235 9 1.80E-03 6 1.20E-03 67% Pass 90 2.258 8 1.60E-03 5 1.00E-03 63% Pass 91 2.282 8 1.60E-03 5 1.00E-03 63% Pass 92 2.306 8 1.60E-03 5 1.00E-03 63% Pass 93 2.330 7 1.40E-03 5 1.00E-03 71% Pass 94 2.353 7 1.40E-03 5 1.00E-03 71% Pass 95 2.377 7 1.40E-03 5 1.00E-03 71% Pass 96 2.401 7 1.40E03 5 1.00E-03 71% Pass 97 2.425 7 1.40E-03 4 8.01E-04 57% Pass 98 2.448 7 1.40E-03 4 8.01E-04 57% Pass 99 2.472 7 1.40E-03 4 8.01E-04 57% Pass 100 2.496 6 1.20E-03 4 8.01E-04 67% Pass Peak Flows calculated with Cunnane Plotting Position Return Period (years) Pre-dev, Q )cfs) Post 0ev. Q (cfs) Redut on (cfs) 10 2.496 2.196 0.300 9 2.490 2.098 0.392 8 2.383 2.060 0.324 7 2.264 1.965 0.299 6 2.227 1.886 0.341 5 2.057 1.590 0.467 4 1.976 1.381 0.595 3 1.820 1.063 0.758 2 1.465 0.811 0.654 I I I I L I I I I I I I I I I I I I I ATTACHMENT Ill List of the "n" Largest Peaks: Pre & Post-Developed Conditions Basic Probabilistic Equation: R = 1/P R: Return period (years). P: Probability of a flow to be equaled or exceeded any given year (dimensionless). Cunnane Equation: Weibull Equation: p=i_o,4 n+O.2 n+1 i: Position of the peak whose probability is desired (sorted from large to small) n: number of years analyzed. Explanation of Variables for the Tables in this Attachment Peak: Refers to the peak flow at the date given, taken from the continuous simulation hourly results of then year analyzed. Posit: If all peaks are sorted from large to small, the position of the peak in a sorting analysis is included under the variable Posit. Date: Date of the occurrence of the peak at the outlet from the continuous simulation Note: all peaks are not annual maxima; instead they are defined as event maxima, with a threshold to separate peaks of at least 12 hours. In other words, any peak P in a time series is defined as a value where dP/dt = 0, and the peak is the largest value in 25 hours (12 hours before, the hour of occurrence and 12 hours after the occurrence, so it is in essence a daily peak). List of Peak events and Determination of Q2 and Q10 (Pre-Development) BMW Carlsbad - POC 1 (Year) Cunnane (cfs) Welbull (cfs) Peaks (cfs) Date Posit Period of Return (Years) 10 2.50 2.59 Weibull Cunnane 9 2.49 2.49 0.908 1/15/1978 57 1.02 1.01 8 2.38 2.44 0.923 9/18/1963 56 1.04 1.03 7 2.26 2.29 0.923 1/11/2005 55 1.05 1.05 6 2.23 2.23 0.926 3/15/1986 54 1.07 1.07 S 2.06 2.07 0.926 12/24/1988 53 1.09 1.09 4 1.98 1.99 0.927 2/19/1958 52 1.12 1.11 3 1.82 1.82 0.929 1/6/1979 51 1.14 1.13 2 1.47 1 1.47 0.986 8/17/1977 50 1.16 1.15 Note: Cunnane is the preferred method by the HMP permit. 0.992 2/22/1998 49 1.18 1.18 0.992 2/12/2003 48 1.21 1.20 0.994 11/8/2002 47 1.23 1.23 1.039 12/31/2004 46 .26 - 1.25 1.053 2/4/1994 45 1.29 1.28 1.069 3/1/1991 44 1.32 1.31 1.123 11/11/1985 43 1.35 1.34 1.137 4/27/1960 42 1.38 1.38 1.157 2/14/1998 41 1,41 1.41 1.226 1/18/1993 40 1.45 1.44 1.237 12/2/1961 39 1.49 1.48 1.277 2/12/1992 38 1.53 1.52 1.292 2/15/1986 37 1.57 1.56 1.296 3/2/1980 36 1.61 1.61 1.304 1/16/1978 35 1.66 1.65 1.304 1/29/1980 34 1.71 1.70 1.32 3/11/1995 33 .76 - 1.75 1.325 1/6/2008 32 .81 - 1.81 1.394 12/30/1991 31 1.87 1.87 1.394 2/17/1998 30 1.93 1.93 1.465 1/27/2008 29 2.00 2.00 1.512 2/23/1998 28 2.07 2.07 1.59 10/20/2004 27 2.15 2.15 1.595 2/16/1980 26 2.23 2.23 1.611 2/10/1978 25 2.32 2.33 1.627 11/22/1965 24 2.42 2.42 1.664 2/27/1983 23 2.52 2.53 1.667 1/29/1983 22 2.64 2.65 1.667 2/3/1998 21 2.76 2.78 1.808 3/17/1982 20 2.90 2.92 1.832 1/16/1952 19 3.05 3.08 1.856 11/15/1952 18 3.22 3.25 1.864 12/19/1970 17 3.41 3.45 1.879 10/27/2004 16 3.63 3.67 1.958 4/1/1958 15 3.87 3.92 2.021 1/14/1993 14 4.14 4.21 2.034 3/1/1978 13 4.46 4.54 2.046 2/20/1980 12 4.83 4.93 2.12 2/18/2005 11 5.27 5.40 2.227 10/29/2000 10 5.80 5.96 2.235 2/25/1969 9 6.44 6.65 2.309 2/4/1958 8 7.25 7.53 2.488 9/23/1986 7 8.29 8,67 2.497 2/25/2003 6 9.67 10.21 3.025 1/4/1995 5 11.60 12.43 3.175 1/15/1979 4 14.50 15.89 3.525 1/4/1978 3 19.33 22.00 3.541 10/1/1983 2 29.00 35.75 3.911 4/14/2003 1 58.00 95.33 I I Li I I Li I I I I Ii I I I I I I I I List of Peak events and Determination of Q2 and Q10 (Post-Development) BMW Carlsbad - POC I T (Year) Cunnane (cfs) Weibull (cfs) Peaks (cfs) Date Posit Period of Return (Years) 10 2.20 2.22 Weibull Cunnane 9 2.10 2.14 0.233 1/14/1993 57 1.02 1.01 8 2.06 2.06 0.237 12/17/1987 56 1.04 1.03 7 1.97 2.01 1 0.237 10/29/2000 55 1.05 1.05 6 1.89 1.89 0.238 3/2/1983 54 1.07 1.07 5 139 1.59 0.238 10/12/1987 53 1.09 1.09 4 1.38 1.41 0.239 2/14/1954 52 1.12 1.11 3 1.06 1.07 0.242 1/6/1977 51 1.14 1.13 2 - 0.81 0.81 0.243 12/19/1967 50 1.16 1.15 Note: Cunnane is the preferred method by the HMP permit. 0.243 2/18/2005 49 1.18 1.18 0.271 9/23/1986 48 1.21 1.20 0.359 4/1/1958 47 1.23 1.23 0.372 10/20/2004 46 1.26 1.25 0.375 1/15/1993 45 1.29 - 1.28 0.376 1/11/2005 44 1.32 - 1.31 0.394 12/29/2004 43 .35 - 1,34 0.426 1/27/1956 42 138 1.38 0.482 12/25/1983 41 1.41 1.41 0.483 1/18/1952 40 1.45 1.44 0.502 1/16/1952 39 1.49 1.48 0.503 2/18/1980 38 1.53 1.52 0.514 1/11/1980 37 1.57 1.56 0.562 1/18/1993 36 1.61 1.61 0.58 10/27/2004 35 1.66 1.65 0.617 1/22/1967 34 1.71 1.70 0.624 3/3/1983 33 1.76 1.75 0.637 1/25/1969 32 1.81 1.81 0.751 3/11/1995 31 1.87 1.87 0.759 11/22/1996 30 1.93 1.93 0.811 12/5/1966 29 2.00 2.00 0.814 1/20/1962 28 2.07 2.07 0.824 3/5/1995 27 2.15 2.15 0.866 11/30/2007 26 2.23 2.23 0.905 1/16/1993 25 2.32 2.33 0.947 1/9/2005 24 2.42 2.42 0.998 1/13/1997 23 2.52 2.53 1.033 2/23/2005 22 2.64 2.65 1.05 3/8/1968 21 2.76 2.78 1.054 1 1/15/1978 20 2.90 2.92 1.071 1/6/1979 19 3.05 3.08 1.1 2/15/1986 18 3.22 3.25 1.149 2/22/2008 17 3.41 3.45 1.299 3/1/1991 16 3.63 3.67 1.336 1/16/1978 15 3.87 3.92 1.494 2/23/1998 14 4.14 4.21 1.56 1/29/1980 13 4.46 4.54 1.588 11/22/1965 12 4.83 4.93 1.6 3/17/1982 11 5.27 5.40 1.885 2/20/1980 10 5.80 5.96 1.905 3/1/1978 9 6.44 6.65 2.056 2/25/1969 8 7.25 7.53 2.065 2/4/1958 7 8.29 8.67 2.217 2/25/2003 6 9.67 10.21 2.237 1/4/1978 5 11.60 12.43 2.606 10/1/1983 4 14.50 15.89 2.766 1/15/1979 3 19.33 22.00 3.323 1/4/1995 2 29.00 35.75 3.7 4/14/2003 1 58.00 95,33 ATTACHMENT IV AREA VS ELEVATION The storage provided beneath the first surface outlet by the LID BMP is entered into the LID Module within SWMM - please refer to Attachment VII for further information. The surface bio- filtration BMPs are bordered by vertical walls, as such the area is constant with depth. Similarly, the underground detention vault has a constant area as the depth increases due to it being a walled structure. DISCHARGE VS ELEVATION The orifices have been selected to maximize their size while still restricting flows to conform with the required 10% of the Q2 event flow as mandated in the Final Hydromodification Management Plan by Brown & Caldwell, dated March 2011. While REC acknowledges that these orifices are small, to increase the size of these outlets would impact the basin's ability to restrict flows beneath the HMP thresholds, thus preventing the BMP from conformance with HMP requirements. In order to further reduce the risk of blockage of the orifices, regular maintenance of the riser and orifices must be performed to ensure potential blockages are minimized. A detail of the orifice and riser structure is provided in Attachment V of this memorandum. The LID low flow orifice discharge relationship is addressed within the LID Module within SWMM - please refer to Attachment VII for further information. I DISCHARGE EQUATIONS 1) Weir: c w_— r'W'L t1 i u3/2 'e 1 2) Slot: As an orifice: Q5 = B c9 J2g (H - As a weir: Q =CW.B'. H 312 For H > h5 slot works as weir until orifice equation provides a smaller discharge. The elevation such that equation (2.a) = equation (2b) is the elevation at which the behavior changes from weir to orifice. 3) Vertical Orifices I As an orifice: Q0 = 0.25 rW2 ,j29 (H - (3.a) I As a weir: Critical depth and geometric family of circular sector must be solved to determined Q as a function of H: Q A A D2 I —=—; H= y+ ; cr 2/ycr(Dycr); Acr g cr cr I Ycr = [1 - sin(0.5 . ac,)] (3.b.1, 3.b.2, 3.b.3, 3.b.4 and There is a value of H (approximately H = 110% D) from which orifices no longer work as weirs as critical depth is I not possible at the entrance of the orifice. This value of H is obtained equaling the discharge using critical equations and equations (3.b). A mathematical model is prepared with the previous equations depending on the type o discharge. The following are the variables used above: = Discharge of weir, slot or orifice (cfs) I C, c8 : Coefficients of discharge of weir (typically 3.1) and orifice (0.61 to 0.62) L, B, D, h: Length of weir, width of slot, diameter of orifice and height of slot, respectively; (ft) H: Level of water in the pond over the invert of slot, weir or orifice (ft) Acr, Tcr, Ycr, acr: Critical variables for circular sector: area (sq-ft), top width (ft), critical depth (ft), and angle to the center, I respectively. Outlet structure for Discharge of Underground Vault Discharge vs Elevation Table Low orifice: 1.125 1, Lower slot Number: 1 Invert: 0.00 ft Cg-low: 0.61 B 0.00 ft Middle orifice: I " h 0.000 ft number of orif: 0 Upper slot Cg-middle: 0.62 Invert: 0.000 ft invert elev: 0.25 ft B: 0.00 ft h 0167 ft Emergency Weir Invert: 7.208 ft B: 5 f h (ft) HID-low - HID-mid - Qiow-orif (cfs) Ojow-weir (cfsl Qtot-low (cfs) Qmid-orlf (cfs) Qmld-weir (cfs) Qtot-med (cfs) Qslot-low (cfs) Qslot-upp (cfs) Qemer (cfs) Qtot (cfs) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.250 2.667 0.000 0.015 0.019 0.015 0.000 0.000 0.000 0.000 0.000 0.000 0.015 0.500 5.333 3.000 0.023 0.202 0.023 0.000 0.000 0.000 0.000 0.000 0.000 0.023 0.750 8.000 6.000 1 0.028 0.283 1 0.028 0.000 0.000 1 0.000 0.000 0.000 1 0.000 0.028 1.000 10.667 9.000 0.033 0.330 0.033 0.000 0.000 0.000 0.000 0.000 0.000 0.033 1.250 13.333 12.000 0,037 0.371 0.037 0.000 0.000 0.000 0.000 0.000 0.000 0.037 1.500 16.000 15.000 0.041 0.407 0.041 0.000 0.000 0.000 0.000 0.000 0.000 0.041 1.750 18.667 18.000 0.044 0.441 0.044 0.000 0.000 0.000 0.000 0.000 0.000 0.044 2.000 21.333 21.000 0.047 0.472 0.047 0.000 0.000 0.000 0.000 0.000 0.000 0.047 2.250 24.000 24.000 0.050 0.502 0.050 0.000 0.000 1 0.000 0.000 0.000 1 0.000 0.050 2.500 26.667 27.000 0.053 0.529 0.053 0.000 0.000 0.000 0.000 0.000 0.000 0.053 2.750 29.333 30.000 0.056 0.556 0.056 0.000 0.000 0.000 0.000 0.000 0.000 0.056 3.000 32.000 33.000 0.058 0.581 0.058 0.000 0.000 0.000 0.000 0.000 0.000 0.058 3.250 34.667 36.000 0.060 0.605 0.060 0.000 0.000 0.000 0.000 0.000 0.000 0.060 3.500 37.333 39.000 0.063 0.628 0,063 0.000 0.000 0.000 0.000 0.000 0.000 0.063 3.750 40.000 42.000 0.065 0.650 0.065 0.000 0.000 1 0.000 0.000 0.000 0.000 0.065 4.000 42.667 45.000 0.067 0.672 0.067 0.000 0.000 0.000 0.000 0.000 0.000 0.067 4.250 45.333 48.000 0.069 0.693 0.069 0.000 0.000 0.000 0.000 0.000 0.000 0.069 4.500 48.000 51.000 0.071 0.713 0.071 0.000 0.000 0.000 0.000 0.000 0.000 0.071 4.750 50.667 54.000 0.073 0.733 0.073 0.000 0.000 OMOO 0.000 0.000 0.000 0.073 5.000 53.333 57.000 0.075 0.752 0.075 0.000 0.000 0.000 0.000 0.000 0.000 0.075 5.250 56.000 60.000 1 0.077 0.771 0.077 0.000 0.000 1 0.000 0.000 0.000 0.000 0.077 5.500 58.667 63.000 0.079 0.789 1 0.079 0.000 0.000 0.000 0.000 0.000 0.000 0.079 5.750 61.333 66.000 0.081 0.807 0.081 0.000 0.000 0.000 0.000 0.000 0.000 0.081 6.000 64.000 69.000 0.082 0.824 0.082 0.000 0.000 0.000 0.000 0.000 0.000 0.082 6.250 66.667 72.000 0.084 0.842 0.084 0.000 0.000 0.000 0.000 0.000 1 0.000 0.084 6.500 69.333 75.000 0.086 0.858 0.086 0.000 0.000 0.000 0.000 0.000 0.000 0.086 6.750 72.000 78.000 0.087 0.875 0.087 0.000 0.000 1 0.000 0.000 0.000 0.000 0.087 7.000 74.667 81.000 0.089 0.891 1 0.089 0.000 0.000 0.000 0.000 0.000 0.000 0.089 7.208 76.885 83.496 0.090 0.904 0.090 0.000 0.000 0.000 0.000 0.000 0.000 0.090 7.500 80.000 87.000 0.092 0.923 0.092 0.000 0.000 0.000 0.000 0.000 2.442 2.534 7.750 82.667 90.000 0.094 0.938 0.094 0.000 0.000 0.000 0.000 0.000 6.180 6.273 8.000 85.333 93.000 0.095 0.953 0.095 0.000 0.000 0.000 0.000 0.000 1 10.919 11.014 8 8 4 4 * 8 88 "8 8,8 "44 * 'c g - AW Ta As fm 88 AV '- -"8 4 88 -8 8 -'8 Lot : '8 ,, U TV 8. '88 Nos ;84l 8'88 5 48 -1-815 .:: 05 :..:1 - 8,,:88 -:8 BROW\ AND (..A 1 1) W E 1, I - - - - - - - - - - - - - - - - - - - ATTACHMENT V Pre & Post-Developed Maps, Project Plan and Detention Section Sketches I I I I I I I I I II I I I LEGEND: '. C54114510414'533v11s35,: 005030.A18OE ISWFP.S —541— 90410415<1) S .33,3418544509010.1) ILIED 1343505 505510 051-550505 1).i1)M'55 K..)- P410-c) 415X544405143 880)545<90)3055 5053411 8418 < GEOTECHNICAL INFO. 41"•05454 0413' 5434" 48 3551.481405 5 83.4103 5414,3.54354515550 5)544.90480141W .I,'83"44 i413ojuMiW51h0i >541 CCSYA ANALYSIS: /4_c .41:0414135<345541>543090).': 4010''8 3) 14. 5,30, 4143,9041 BMP DETAILS: 5041 50, 13355 51)Ao41 :34031541)430504 3.04 00501)3' DMA SUMMARY 00109, 8: 333 54n 041 334*30*38051 3303804 0513*1543304 430(81 4 3* 5354 35 30','94539 44303 9,8334 01 8 143 #4L30441033019013034W/AFT4N1004 '1 90(41 33 3083834',',, " 84031 8183, 02 1l143' 0* 1 OS'S! 1,21' 0829 II 54o'r. 34,3', 3,340' 0834 34 11.141*30* .33,3,! 3,1305 34743, 330',147,540o9,, 3,304 3038 30,1, ' 85,21 M*.1C+ POOIOLIUOO** 00149 4909,331 41 33,,'JP**,,*! 2.031 0135 31 134330,3,, 58., lOSS 3834 0 ,3"hl 31)8 140.1043 $1063313431034 401331490<31 34 83,4*303,33,3:0 13,53s 0540 43*1941 . 54, 33'' 833)3. 13 3, 1)17453,0143, I'S 0315$ 3' 319"011, 0,430 .....03 0.33 140.16*0310103433,9,1303101 3143053 '3 904*4 (144.7,44 1330014333541044 493A,P01I1 1/54 :31 40 -38%! , 3',33 #0< #0 30300 143.1/13 3354 20 0 20 40 GRAPHIC SCALE SCALE' 7"= 20' I I I I I I I I I I I I I I I I I I I 1 I4or:Ioc.IIX,wlrnpoAT: .,"20i1IrTop 'hA'. .4 '001141--lI 113 II. 14.1) -1(41 7044.11*10)114 II 1' 7 4-70 $14111. 13140111 131 114,401 20±111'. Galv ,-OW,CA11'0(1A054,0 011*11- . 70004,,?' ,ll TOo 111300.1 -01015-ok,' 114€'. :. 114.l4-40111,115 11 rV4*.o4L, "t,-,C4'11 4E) 111111171,041)0101200104 4-4-01131011-701114 If 1 f -C <'*1614' I 6201 II '11171 $11101 I0'*4.1,11401' XIII 4.7<51*11 13)11347*7* 1170,,- 11,4,1*40 401112.111101'.U"I BMP-1 & BMP-2; BIOFILTRATION BASIN W/ PARTIAL RETENTION 021.011.000001*3.70 0' 41)11171±01 - - * 211 1)116144-CO r' 4' 111754. I IT2X.11,16 6 '1III' 'Fl/I *412' 44 71111.' :' tZ4-'4 L -- .0 0,1 .1111711. 1. )i4-Xii11.310110V3'/Aii*O 111.1*11111' 11; *102011 1. T4I'001/E4-OIELEIEO.2001$4iI.OIS00921400111111111110001 1AI1iI1*V00*lh117701.414i 1iE>111il>E007114.ECV l'YPIOAo 041112, 0020" SF0111120 BMP-3 & BMP-4: BIOFILTRATION BASIN W/ IMPERMEABLE LINER LZ 14 / .24-0,01 4-)' 441.1 UNDERDRAIN CLEAJOU1 (CO) DETAIL BASIN BMP RISER OUTLET DETAIL 1 I íJ I U w a w I- U) >- C/) z N o z U-1 I- w a RISER INFORMATION STUB INFORMATION I STUB INFORMATION BMP-6A: WEST OF PROPOSED BUILDING -- > NORTH 00 PROPOSED BUILDING BMP-6B: RISER INFORMATION It I AlP ,/ k.TC. ,,,/ APP ElLA 04 LAC04AA'. 2004 1141. 1110418$ NEOIIZIIVISO 0117*20615 74*. ArVAGNE, 41 PACES 611000±60 TIlE 10100*460; P015 STORAGE 41 CF M4W PIPE GAGE DIAMETER *IC FINIS*IALT2 CORRUGATION 501 TYPE -so ID ASSEMBLY PIPEwALL STORAGE 6,681 Cl LOAOlNG; 1120 PiPE 1071. 07.50* 61 Er 100NZ*A6$APVL AMP AAAAtlA04wii.64041140 47ltDOfl)C0A.PJC &IJ70SIIPACE 8H*]_l.PE70tWAL74jOt,'rfl 04lAtwrrr 6700.01111 070 V674%ORIE, lilt Snip 810700'71'll VVII.1 P'0111C111707. '11,411110704-, 41100 411 0 111 1$ 11.44, 0*4 14. *4 II VA 114' 1€ 10170 A464tERCPII700L'Ao*OVWOcIONAEAEOI. .&, P0*6416501ST *1CTiI7*$.V10000*110r,*RE;01flVt4Llt7IOVc*411*spW4ACS , '5 ,. 0* '*0' 070*0000 0,400 VA 174.4 0$A.4041*V410 ' 4-48*108*4*0.0641141 11$ 051.A,L0 ,WC11*IO4A*14I1*Ebi 41±ERU4*1111$t$1$ '.. ro€ : ''- "0' 101.? 001011*34* 18OCT11 *EP*70-0CLfl.3Sw4j5E.AOtrO7*Q467* €70 202000 0104.16*106 ATTACIlO 41PAGE$441100140 V EIE$.i.OWISIO: PIPE STORAGE 4714 MAIIIUNEPIPEGAGE 16 DIAMETER 967 PINISII*ALT2 COOCRUGATIOII si PIPE 81011404 4.776 CE LOAO1NG: 4120 PIPE NV. 4- 87.0071 ASSEMBLY 7.4*17* .1AJ(K€POSCP&L Vt ?G6AtOfl,fAPt6 Sltlt,M<3 COCVCCW6L 61701104 117 t7E)1AI*A27000 WA OACSSIALLSE F'JACPE.0ON04Y.04OZ49PH 11171$ 70161116117*7610111702 1116 67001.qtl1uC0'UAC.lEpO11700*rEC * *1 44 11 SI 11*0*. 4$.4 '644.. CCIII P Vt* 4-LAO. 7067070047011417060*1 .04.114.1. .040 liv *r5S*4$107447111701414J.7 000C000410100610201101610001151644-04'flO 77* 4*41160 *4*1 6*41 -' 46411'*$l,t*OIIESSAASLIAOIIIH *0807006±$liLS'000IO2*lA11A1i 'HUiSIEIIO,*l**I. *44170*1 480.1 44*000*0 14460*1 611 I051000A114A*A*0 15*0 Th0*144$I010MAA00000*7040844L01 *004115*440 "'T20iI04r 720r'" -n -w-At 41T.CA0C11YVIIt'.*4*1A*0.501I10'1 I00061ACT ''wuor' 71o'r,, .ACC*0$L$*04I1* OIALLSTAVIAGIEOWI L CNTECH 960 UNDERGROUND DETENTION SYSTEM -617515010 IT ,]0A0 . CNTECH 960 UNDERGROUND DETENTION SYSTEM -617515-020 _______________________ INGRR70EDSOUJTION8 UC 1P5E20IO1OR04T9MS [PROPOSAL] BMW CARLSBAD o SITE DESIGNATION BMP 6A CARLSBAD,CA TX S3N70MD sunop .61 '6 1 BMW CARLSBAD CARLSBAD,CA SITE DESIGNATION BMP 69 P1 4 '5*0*4*01.71* C/) -J w a z J) NOTES: I. EMP-SA AND BMP.SB TC)ACT AS ONE DETENTION SYSTEM THAT IS HYDRAULICALY CONNECTED VP, 12' HOPE PIPE AND SET AT ONE ELEVATION. 2. BMP-11 SHALL HAVE A MINIMUM TOTAL STORAGE VOLUME OF 10,440 CU-FT. / THAN 0111 011*42 I-' P201 PEE EMPEXXED 4-"1p,4 0100080T 1040 '2X1'D,$ C0EI0 fu4 FLOW CONTROL ORIFICE PLATE A 47 4 T1-1513 METAL PLATE '4' I 24. IIIE _• L 12' 014, 10-PC Ni 111 RUM OIITFISTUN VAuLT OUTLET STRUCTURE & WEIR DETAIL PREPARED FOR; PREPARED BY: AUTOIOATICJN ING. 200 SW 1STSTITEE7, I4THFLOO11 FORTLAUDILIIDALC. PL 33301 •:--. Commercial CONTACT: CLIFF POWELL ;' Development TEL: I904 760-206140 C Resources Tols,'• 10*35, T$17*I100'S T*S$tY. 11.661 A 11 MET,4LTL30EDIi'... 4 -LJILETTI000FA F / 5000004149000 I 0004011010 SIP0ICILJ$16 SHEET 02 OF 02 SWQMPATTAcIIMENT 2A: HMP EXHIBIT BMW OF CARLSBAD 1060 AUTO CENTER COURT CARLSBAD, CA 92008 ATTACHMENT VI SWMM Input Data in Input Format (Existing & Proposed Models) PREDEV [OPTIONS'; FLOW U. ITS CFS INF11.TRAT1ON GREEN AMPT FLOW ROUTING KINWAVE START DATE 10/01/1951 START TIME 00:00:80 REPORT START DATE 10/01/1951 REPORT—START—TIME 00:00:00 END DATE 09/30/2009 END TINE 23:00:80 SWEEP START 01/01 SWEEP END 12/31 DRY DAYS 0 REPORT STEP 01:00:00 WET STEP 00:15:00 DRY STEP 04:00:00 ROUTING STEP 0:01:00 ALLOW PONDING NO INERTIAL DAMPING PARTIAL VARIABLE STEP 0.75 LENGTHENING STEP 0 WIN SURFAREA 0 NORMAL FLOW LIMITED BOTH SKIP STEADY STATE NO FORCE MAIN EQUATION H-N LINK OFFSETS DEPTH WIN SLOPE 0 LEVAPORATION ;Type Parameters MONTHLY 0.03 0.05 0.08 0.1.1 0.13 0.15 0.15 0.1.3 0.11 0.08 0.04 0.02 DRY ONLY NO [RAINGAGESI Rain Time Snow Data Name Type Intrv1 Catch Source Oceanside INTENSITY 1:00 1.0 TIMESERIES Oceanside I SUECATCHMEN IS Total PCnt. Pent. Curb Snow ;Name Raingage Outlet Area Lmpery Width Slope Length Pack DMA-A Oceanside POC-1 3.71 0 979 3 - 0 [SUBAREAS] Subcatchment N-Impery N-.Pery S-Imoery S-Pery PctZe.ro Rote.To PctRouted DMA-A 0.012 0.05 0.05 0.1 25 OUTLET [INFILTRATION] ;Suhcatchment. Suction HydCcn INDmax DMA-A 3 0.15 0.31 [OUTFALLS I Invert; Outfall Stage/Table Tide ;;Name Elev. Type Time Series Gate P00-1 0 FREE NO [TIMESERIES] Name Date Time Value Oceanside FILE "OsideRain.prn" [REPORT] INPUT. NO PREDEV CONTROLS NO SUBCATCHNENTS ALL NODES ALL LINKS ALL 1TAGS (MAP) DIMENSIONS -8510.915 4908.181 -8482.307 8731.478 Units None (COORDINATES Node X-coord Y-Coord P00-i -8483.907 5081.967 (VERTICES) Link X-Coora Y-Coord [Polygons) Subcatchrnent X-Coord Y-Coord DMA-A -8483.607 6622.951 [SYMBOLS] Gage X-Coord Y-Coord Oceanside -8489.868 7908.829 POST DEV [TITLE [OPTIONS] FLOW UNITS CFS INFILTRATION GREEN AMPT FLOW ROUTING KINWAVE START DATE 10/01/1951 START TIME 00:00:00 REPORT START DATE 10/01/1951 REPORT START TIME 00:00:00 END DATE 09/30/2008 END TINE 23:00:00 SWEEP START 01/01 SWEEP END 12/31 DRY DAYS 0 REPORT STEP 01:00:00 WET STEP 00:15:00 DRY STEP 04:00:00 ROUTING STEP 0:01:00 ALLOW PONDING NO INERTIAL DAMPING PARTIAL VARIABLE STEP 0.75 LENGTHENING STEP 0 WIN SURFAREA 0 NORMAL FLOW LIMITED BOTH SKIP STEADY-STATE NO FORCE MAIN EQUATION H-N LINK OFFSETS DEPTH WIN SLOPE 0 [EVAPORATION) Type Parameters MONTHLY 0.03 0.03 0.08 0.11 0.13 0.15 0.15 0.13 0.11 0.08 0.04 0.02 DRY ONLY NO [RAINGAGES.J Rain Time Snow Data Type Intrv1 Catch Source Oceanside INTENSITY 1:00 1.0 TIMESERIES Oceanside [SUBCATCHMENTS] Total Pont. Pont. Curb Snow ;;Narne Raingage Outlet Area Irnpery Width Slope Length Pack DMA-ID Oceanside DR-3 0.341 96.62 52 1 0 DMA-2A(SN) Oceanside POC-1 0.294 6.73 128 1 0 BR-3 Oceanside Vault 0.01279 0 10 0 0 DMA-1B Oceanside BR-2 0.325 61.22 71 1 0 DMA-IC Oceanside BR-4 0,506 92.52 78 1 0 BR-2 Oceanside Vault 0.00817 0 10 C. 0 BR-1 Oceanside Vault 0.01843 0 10 0 0 BR-4 Oceanside Vault 0.009986 0 10 0 0 DMA-lBPavere) Oceanside BR-2 0.089 0 77 1 0 DMA-iD(Favers) Oceanside BR-3 0.053 0 46 1 0 DMA -lB Oceanside VAULT 1.325 100 124 1 0 DMA-IA-fPavers Oceanside BR-1 0.726 61.23 86 1 0 (SUBAREAS) Subcatchmert N-Impery N-Pery S-Iapery S-Pery Pctlero RouteTo PctRouted DMA-ID 0.012 0.05 0.05 0.1 25 OUTLET DMA-2A(SM) 0.012 0.05 0.05 0.1 25 OUTLET BR-3 0.012 0.05 0.05 0.1 25 OUTLET DMA-lB 0.012 0.05 0.05 0.1 25 OUTLET DMA-IC 0.012 0.05 0.05 0.1 25 OUTLET BR-2 0.012 0.05 0.05 0.1 25 OUTLET BR-1 0.012 0.05 0.05 0.1 25 OUTLET BR-4 0.012 0.05 0.05 0.1 25 OUTLET DNA-IBPavers) 0.012 0.05 0.05 2.4 25 PERVIOUS 100 POST_DEV DMA-1D(Pavers) 0.012 0.05 0.05 2.4 25 .PERVIOUS 100 DMA-11- 0.012 0.05 0,05 0.1 25 OUTLET DMA-iA+Pavers 0.012 0.05 0.05 2.4 25 PERVIOUS 100 [INFILTRATION] ;;Subcatchment Suction HydCon Ir.lornax DMA-iD 3 0.15 0.31 DMA-2A(SN) 3 0.15 0.31 BR-3 3 0.15 0.31 DMA-lB 3 0.15 0.31 DMA-IC 3 0.15 0.31 BR-2 3 0.15 0.31 BR-1 3 0.15 0.31 BR-4 3 0.15 0.31 DMA-lB Payers) 3 0.15 0.31 Dr-M-11, (Pavers) 3 0.15 0.31 DMA-it 3 0.15 0.31 DMA-1A±?avers 3 0.15 0.31 [LID CONTROLS] Type/Layer Parameters BR-i BC PR-1. SURFACE 7.2 0.00 0.0 0.0 5 BR-1 SOIL 18 0.4 0.2 0.1 5 5 1.5 BR-1 STORAGE 13 0.67 0.041. 0 BR-1 " DRAIN 0.3175 0.5 4 6 BR-2 BC BR-2 SURFACE 7.2 0.00 0 0 5 BR-2 SOIL 18 0.4 0.2 0.1 5 5 1.5 BR-2 STORAGE 13 0.67 0.041 0 BR-2 DRAIN 0.4261 0.5 4 6 BR-3 BC BR-3 SURFACE 7.2 0.00 0.0 0.0 5 BR-3 SOIL 18 0.4 0.2 0.1 5 5 1.5 BR-3 STORAGE 12 0.67 0 0 BR-3 DRAIN 0.3362 0.5 3 6 BR-4 BC BR-4 SURFACE 7.2 0.00 0.0 0.0 5 ER-4 SOIL 13 0.4 0.2 0.1 5 5 1.5 BR-4 STORAGE 12 0.67 0 0 BR-4 DRAIN 0.4306 0.5 3 6 [LID USAGE] Subcatchment LID Process Number Area Width InitSatur Fromlmpry ToPery Report File BR-3 BR-3 1 557 0 0 100 0 BR-2 BR-2 1 356 0 0 100 0 BR-1 SR-1 1 803 0 0 100 0 BR-4 BR-4 1 435 0 0 100 0 [OUTFALLS Invert Outfall Stage/Table Tide ;;Name Elev. Type Time Series Gate DCC- 1 0 FREE NO [STORAGE) Invert Max. Init. Storage Curve Ponded Evap. ;;Name Elev. Depth Depth Curve Params Area Frac. Infiltration Parameters VAULT 0 3 0 TABULAR UBASIN 0 0 [OUTLETS] Inlet Outlet Outflow Outlet Ocoeff! Flap POST_DEV Name Node Node Height Type OTable Qexpon Gate OUTLET VAULT POD-i 0 TABULAR/HEAD OUTLET NO (CURVES] ;;Name Type X-Value Y-Vaiue OUTLET Rating 0.000 0.000 OUTLET 0.250 0.015 OUTLET 0.500 0.023 OUTLET 0.750 0.028 OUTLET 1.000 0.033 OUTLET 1.250 0.037 OUTLET 1.500 0.041 OUTLET 1.750 0.044 OUTLET 2.000 0.047 OUTLET 2.250 0.050 OUTLET 2.500 0.053 OUTLET 2.750 0.056 OUTLET 3.000 0.858 OUTLET 3.250 0.060 OUTLET 3.500 0.063 OUTLET 3.750 8.065 OUTLET 4.000 0.067 OUTLET 4.250 0.869 OUTLET 4.500 0.071 OUTLET 4.750 0.073 OUTLET 5.000 0.075 OUTLET 5.250 0.077 OUTLET 5.500 0.079 OUTLET 5.758 0.081 OUTLET 6.000 0.082 OUTLET 6.250 0.084 OUTLET 6.500 0.086 OUTLET 6.750 0.087 OUTLET 7.000 0.089 OUTLET 7.250 0.090 OUTLET 1.500 2.534 OUTLET 7.750 6.273 OUTLET 8.000 1.1.014 UBASIN Storage 0 1.305 UBASIN 8 1305 T IMESERI ES] Naine Date Time Value Oceanaide FILE "OsideRain.rn' [REPORT] INPUT NC CONTROLS NC SUBCATCHMENTS ALL NODES ALL LINES ALL [TAGS] (NAP] DIMENSIONS -11502.645 3423.967 -5798.942 8802,155 Units None [COORDINATES] ;;Node X-Coord Y-Coord PCC-1 -8925.024 4095.217 VAULT -8933.210 5413.160 [VERTICES] ;;Link X-Coord Y-Coord POST_DEV [Polygons] Subcatchment X-Coord DMA -iD -8483.607 DMA-27-.(514) -60o8.201 BR-3 -8500.000 DMA-ID --10169.293 DMA-iC -6798.942 BR-2 -9761.905 BR-1 -11225.284 BR-4 -6781.305 DMA-1B(Pavers) -9547.158 DMA-ID (Pavers) -7877.219 DMA-J.E -6780.29; DMA-IA+Pavers -11217.098 SYMEOLS] Y-Cc,ord 7590.164 4832.451 6590.164 7631.560 7548.501 6613.757 6616.499 6634.303 7631.560 7598.816 5707.855 7656.118 ;G-sge X-Coord Y-Coord Oceanside -8509.615 8557.692 ATTACHMENT VII EPA SWMM FIGURES AND EXPLANATIONS Per the attached, the reader can see the screens associated with the EPA-SWMM Model in both pre-development and post-development conditions. Each portion, i.e., sub-catchments, outfalls, storage units, weir as a discharge, and outfalls (point of compliance), are also shown. Variables for modeling are associated with typical recommended values by the EPA-SWMM model, typical values found in technical literature (such as Maidment's Handbook of Hydrology). Recommended values for the SWMM model have been attained from Appendix G of the 2016 City of Carlsbad BMP Design Manual. Soil characteristics of the existing soils were determined from the site specific geotechnical investigation (located in Attachment VIII of this report). A Technical document prepared by Tory R Walker Engineering for the Cities of San Marcos, Oceanside and Vista (Reference [1]) can also be consulted for additional information regarding typical values for SWMM parameters. Manning's roughness coefficients have been based upon the findings of the "Improving Accuracy in Continuous Hydrologic Modeling: Guidance for Selecting Pervious Overland Flow Manning's n Values in the San Diego Region" date 2016 by TRW Engineering (Reference (61). I I I - Flc,~~ Uz0v 088 ZonLeL 1840 >Y 980 404 8731 478 PRE-DEVELOPED CONDITIONS ij XMs4 5 PEDEVinp [Study Ariv, Mepi Date Mar, 0 Climatology C if. Hydiology Hythacs --3 i Coves Time Series Time Paitrw Map Labels K? T C Fdm Edit Vi Piest Re;crt Tools Window Help 29 lb 19 q k Lut8H Psc-i Hoperty ime POD-i Coordinate 2500.000 '700,000 [ escnption Tag Inflows NO Treatment NO Invert El. 0 Tide Gate NO Tp FREE Fixed Stage 0 urve Name Kerres Name Property Value Nan-ic Ocean re -Coordinate -9509.615 i -Coordinate 8557.692 Description Tac Rain Form-at INTENSITY Time lrtery 100 :,now Catch Factor 1.0 Data Source TIMESERIES $ Series Name Oceanside -File Name Station ID Rain Jruts IN User-assigned name of rain gage I I I I I I I I I Oceanside DMA-A I I I I I I I Subctchnient DMA-A Property ~ Value Name DMA•A ><-Coordinate -848a607 Coordinate 6622 951 Description Tag Rain Gage Oceanside Outlet PCIC-1 Area 371 Width 979 Slope 3 lmpery 0 Nmpery 0012 N-Pery 005 Dtoreirnpery 005 DtorePery 0,1 Zerolmpery 25 Subarea Routing OUTLET Percent Routed 100 Infiltration GRE E NAMPT Groundwater NO Snor Pack LID Controls 0 Land Uses 0 Initial Buildup NONE Curb Length U User-assigned name of subcatchment tnfiItratin Editor X lntiltration Method Prope-ty Value Suction Head 3 Conductivity 0.15 Initial Deficit 0.31 POST-DEVELOPED CONDITIONS / H -:T <±k Lj Hyo DNW1A+Pwv U DMA, 18 D1e' DMA-l) Dt1-1C LID Coramis U U I OLOA BR-3 I I Cms - DMA-1E VAULT MA-1 D )ItA-2ASMJ - - OUTLET MIC 3R- - 11111 .-- A-1(Per) k-1A.Pve* A/Dke D Ppit Name P0 C-i Cooidinate -290,792 -. -Coocdinate 4991.922 DecripLion Tag IrfIov Treatment NO rivet El 0 Tide-Gate NO Lpe FREE ...... the-i-assigned name of outfall Rirr Gqe Ce rf 10 {1 kue ..................... Name Oceandde :-Coordnate -8509.615 '-Coordinate 8557 692 Description Tag Rain Format INTENSITY Time Interval 1:00 now Catch Factor 1.0 Data Source TIMESERIES SerieT Name 0 c File Name - Station ID Rain Units IN Name of rainfall data file r t I Sr. :tchriier,t DR-1 FIwIptity alue property Value Name DMA1+F Li Name BR-1 ',,'-Coordinate -11217.098 >2 Crjne -11225,284 f-Coordinate 7656 118 Y-Coordinate 6616 499 Description Description Tag Tag Rain Gage Oceanside Rain Gage Oceanside Outlet BR-1 Outlet Vault Area 0.726 Area 0.01843 vidrh 86 Width 10 XSlope 1 lope U Xlmpery 61.23 lrrr Pee ry 0 N-Impery 0.012 N-lmpery 0.012 N-Pery 0,05 NPry 0,05 Dstore-lmpery 0.05 Dstore'Irnpery 005 Dstore-Pery 2.4 Dstore-Fery 0.1 2ero-lrripery 25 ero1rnpery 25 Subarea Routing PERVIOUS Subarea Routing OUTLET Percent Routed 100 Percent Routed 100 Infiltration GREEN_AMPT Infiltration GREEN AMPT Groundwater NO Groundwater NO ,now Pack Snow Pack LID Controls 0 LID Controls 1 Land Uses 0 Land Uses 0 Initial Buildup NONE Initial Buildup NONE Curb Length 0 Cb Length 0 User-assigned name of subcatchmenit Infiltration parameters (click to edit) [irItratton Edit '1 iinfiltration Editor IriMtraticn Method Property Value Suction Head 3 Conductivity 015 Initial Deficit 0,31 Infiltration Method Property Value Suction Head Conductivity 0.15 Initial Deficit 0,31 iN . lirnt rrr,.l-in Property Value Nanie DMA-lB Coordinate -10169.293 'LCoordiriae 7631.560 Description Tag Rain Gace Oceanside 0tIei BR-2 rea 0.325 idth 71 Slope 1 lmpery 61 22 N-lrnpeni 0.012 N Pent 0,05 It riore-lrnpery 0'C6 U rlore-Pery 0.1 NZero-lmpery 25 - ubarea Routing OUTLET Percent Routed 100 I nfiltration GRE E N_AM PT N oundwater NO S no, Pack LID Controls 0 Land lJes 0 Initial Buildup NONE C1.6 Length 0 Uaer-aiqned name of subcatchment nv- Property Value Name DMA-i BEPavers] -Coordinate -9547.158 'i-Coordinate 7631560 Description Tag Rain GaQe Oceanside Outlet BR-2 .rea 0,089 /rdth 77 Slope I lmpery 0 N-lmpery 0.012 N-Pery 0.05 ['Vore-lmpery 0.05 [tore-Per- 2.4 N2ero-lmpery 25 C ubarea Routing PERVIOUS Percent Routed 100 Infiltration GREEN_AMPT Grourrdaatef NO Snow Pack LID Controlo 0 Land Uses 0 iVial Buildup NONE Curb Length 0 User-assigned name of subratchmerut I I I I I I I I I I I I I Infiltration Editor Infiltration Editor nhftratiori Method Infiltration Methcnj I Properly Value Suction Head Conductivity 0.15 Initial Deficit 0,31 Properly Value Suction Head Conducliiy 0.15 Initial Deficit 0,31 I I I I I I..0 t:l'uir t LR-2 Hupt t arne 8R-2 -Coordinate 9761 .905 '(Coordrnate 6613 757 Description Rain Ciae Oceanside Outlet Vault ea 000817 idth 10 Slope U Impery U N-Irnpery 0.012 NPery 0,05 Dstor&rrrpecv 0.05 Dstoe-Fery 0.1 2ero-lmpery 25 ubarea Routing OUTLET Percent Routed 100 Infiltration GRE E N_AM PT 13roundvater NO "now Pack LID Controls 1 Land Uses 0 Initial Buildup NONE Curb Length 0 User-assigned name of subcatchmerit Ppty Name DMA-1 Dave) X'-Coordinate -7077,219 (Cooinate 7598.816 Description Tag Rain GaQe Oceanside Outlet BR-3 Area 0,053 Width 46 Slope 1 lmpery 0 N-Impery 0.012 N-Pery 005 Dstore-lmpery 005 Dstore-Fery 2,4 2ero1mpery 25 Subarea Routing PERVIOUS Percent Routed 100 Infiltration GREEN_AMPT Groundwater NO Snore Pack LID Controls 0 Land Uses 0 Initial Buildup NONE Curb Length 0 User-assigned name of subcatchment Infiltration Editor X 1 Infiltration Method property Value Suction Head Conductivity 0.15 Initial Deficit 0.31 Infiltration Editor X Infiltration Method Property Value Suction Head ConductiWy 0.15 Initial Deficit 0,31 luji t Drvl-1D Property Value Name DMA-iD Coordinate -8483.607 Coordinate 7590.164 2 ecription Tag RnGage Oceanside U 4let BR-3 crea 0,341 fidth 52 Slope 1 Impery 96.82 Nlmpery 0.012 UPery 005 Dtore-lmpery 0,05 [slore-Fery 0.1 L2ero-lmpery 25 uharea Routing OUTLET Percent Routed 100 Infiltration GREEN AMPT Groundwater NO Snow Pack LID Controls 0 Land Uses 0 lvaI Buildup NONE rub Lenctth 0 User-assigned name of subcatchment Infiltration Editor Infiltration Method Property Value Suction Head Conductivity 0,15 Initial Deficit 0.31 I pert valwe Name 8R-21 -Coordinate -8500 000 -Coornate 6590164 Description Tag I Rain GaQe Oceanside Outlet Vault Area 0,01279 Width 10 Slope U I Impery 0 lJ-Impery 0.012 N-Pew 005 [store-lmpery 005 Listore-Pery 0.1 2ero1mpery 25 uhareaRouting OUTLET Percent Routed 100 I Infiltration GREEN AMPT Hroundwates NO now Pack LID Controb 1 Land Uses 0 I vitial Buildup NONE Curb Length 0 ---------- User-assigned name of subcatchment I Infiltration Editor x Infiltration Method Property Value Suction Head i3 Conductivity 015 Initial Deficit 0+31 I I I I rE ti riirit 1A-1i Mame DMA-1L Coordinate -6798,942 Coordinate 7548. 501 Description Tag Rain GaQe Oceanside Outlet BR-4 Area 0,506 Width 73 Slope 1 X Irnpery 92.52 N-Impent 0,012 N-Pery 0,05 Dstore-Irnpery 0,05 Dslore.-Pery 0.1 2ero-Irnpery 25 ubarea Routing OUTLET Percent Routed 100 Infiltration GREEN_AM PT Groundwater NO Snow Pack LID Controls 0 Land Uses 0 Initial Buildup NONE Curb Lenath 0 User-assigned name of subcatchrnent LI Name BR-4j -Coordinate -6781 305 i-Coordinate 6684.303 Description Tag Rain Gage Oceanside Outlet Vault Area 0,009986 Width 10 iSIops 0 lmpery 0 N-lmpery 0.012 N-Pery 0.05 Dstore-Impe.iv 0.05 Dstore-Peiv 0,1 2ero-lmpery 25 Subarea Routing OUTLET Percent Routed 100 Infiltration GREEN _AMPT Groundwater NO Snow Pack LID ControLs 1 Land Uses 0 Initial Buildup NONE Curb Length 0 User-assigned name of subcatchment Infiltration Editor X Infiltration t1etliod F. F Property Value Suction Head Conductivity 015 Initial Deficit 0.31 Infiltration Editor x Infiltration Method Pioperty ** Value _J Suction Head ConductiWy 0.15 Initial Deficit 0.31 L t +l rr it DlA-1F Properly Value N rne DMA-i E X-Coordinate -67,90,297 Y-Coordrnate 5707 855 Description Tag Rain liaae Oceanside Outlet VAULT Area 1.325 idth 124 Slope 1 lmpery 100 Nlmpery 0012 N-Pery 0.05 O Uore-lmpery 0,05 Drlore-Pery 0.1 Zero-lmpery 25 ,jbarea Routing OUTLET Percent Routed 100 Infiltration GREEN_AMPT N-oundwater NO now Pack LID ControP 0 nd Ue 0 I ritral Buildup NONE C Arb Length 0 - ---- -------------- ------- - - User-assigned name of subcatchment irL .i rr tit rr111 -21 Property Value Name DMA-2.- .HI X-Coordinate -6058,201 Y-Coordate 4832+451 Description Tag Rain Gage Oceanrrde Outlet P00-1 Area 0,294 Width 128 Slope 1 lmpery 6,73 N-lmpery 0.012 N -Fery 0,05 Dstore-Impery 0.05 Ctore-Pery 0.1 Zero-lrnpery 25 subarea Routing OUTLET Fercent Routed 100 I nliltratjn GREEN AM PT P roundwater NO snow Pack LID ContioLs 0 Land Uer 0 Initial Buildup NONE r urb Length 0 User-assigned name of subcatchment L I I I I I I I I I I I I Infiltration Editor Infiltration Editor . X Infiltration Method Infiltration Method . I Property Value Suction Head Conductivity 0.15 Initial Deficit 0.31 Property Value Suction Head Conductity 0.15 Initial Deficit 0+31 I I I I I Detention Vault Storage Unit VAULT Storage Curse Edic L - [operty Value Curve Name Name VAULT Em X-Coordinate 8933.210 Description Coordinate 5413 160 Dscnption T - Tag Depth Psea fff (ff2) :InfIorvr NO U Load Treatment NO - - — - 2 8 1305 Invert El 0 3 Save... Max. Depth 8 . Initial Depth 0 PoridedArea 0 5 r OK Evap. Factor 0 6 Infiltration NO . Cancel I Storage Curve TABULAR .............i Help Coefficient 1000 Exponent 0 Conant 0 Rating Curie Ei.tc + I. * Curve N1O Cure Name Description ............................................. Outlet OUTLET ... Head out Property Value )ft) (9) Name tOUTLET a080 Inlet Node VAULT 0000 Load— 2 0.258 0.G1 5 Outlet Node POC-1 3 0.500.0,023 have... Description — Tag 4 0.750 0.028 Inlet Offset 0 1.000 0.033 +. ..- Flap Gate NO 6 1.258 0.837 Rating Curve TABULAR/HEAD 1.500 .8.041 Cancel -V Coefficient 10.0 8 1 750 2080 8 044 .(3(347 eIp Exponent 0.5 ....,,,,..+._+.+\........................ Curve Name OUTLET User-assigned name of outlet EXPLANATION OF SELECTED VARIABLES Sub Catchment Areas: Please refer to the attached diagrams that indicate the DMA and Bio-Retention BMPs (BMP) sub areas modeled within the project site at both the pre and post developed conditions draining to the POC. Parameters for the pre- and post-developed models include soil type B as determined from the site specific geotechnical investigation (attached at the end of this appendix). Suction head, conductivity and initial deficit corresponds to average values expected for these soils types, according to Appendix G of the 2016 City of Carlsbad BMP Design Manual. For surface runoff infiltration values, REC selected infiltration values per Appendix G of the 2016 City of Carlsbad BMP Design Manual corresponding to hydrologic soil type. Selection of a Kinematic Approach: As the continuous model is based on hourly rainfall, and the time of concentration for the pre-development and post-development conditions is significantly smaller than 60 minutes, precise routing of the flows through the impervious surfaces, the underdrain pipe system, and the discharge pipe was considered unnecessary. The truncation error of the precipitation into hourly steps is much more significant than the precise routing in a system where the time of concentration is much smaller than 1 hour. Sub-catchment BMP: The area of biofiltration must be equal to the area of the development tributary to the biofiltration facility (area that drains into the biofiltration, equal external area plus bio-retention itself). Five (5) decimal places were given regarding the areas of the biofiltration to insure that the area used by the program for the LID subroutine corresponds exactly with this tributary. LID Usage Editor X Control Name Number of Replicate Units i Area of Each Unit (sq ft or sq m( .803 of Subcatchment Occupied 100.0 Top Width of Overland Flow Surface of Each Unit, (ft of ' Initially Saturated U Z of Imperviouc Area Treated 100 LtD Usage Editor x Control Name [. . ._...:.................... Number of Replicate Unite Area of Each Unit (q It or sq m) 557 of Subcatchment Occupied 100.0 Top Width of Overland Flow Surface of Each Unit (It or rn) Initially Saturated . 0 of Impervious Area Treated 100 LID Usage Editor X Control Name Number of Replicate Units 1 Area of Each Unit (q ft or sq m) 356 of Subcatchment 0ccupd 1000 Top Width of Overland Flow Surface of Each Unit ft or X Initially Saturated of Impervious Area Treated 100 LID Usage Editor X Control Name .. ........................................1] Number of Replicate Units 1 Area 01 Each Unit (sq ft or sq in) 435 ------ of Subcatchment Occupied 1000 Top Width of Overland Flo Surface of Each Unit (it or m) Initially Saturated 0 %of Impervious Area Treated 100 LID ContrcEditor X CoNfol Name LID Type. Eo Rater Cat Process Leyerc Surface soil Storage Underdrairr Storage Depth (in. or mm) Vegetation Volume Q Fraction Surface Roughness 10 thtarrnings ni Surface Slope (percent) LID Control Editor x Control Name 1 LID Type Bm-Retentajn Cell Proces Layarc Surface Sot Storage Urtderdrair. Height (in or mm) Void Ratio I:1 (Voids / Solids) Conductivity L............................ (in/hr or mm/is) Clogging Factor Note: use a Conductivity of Oil the LID unit has an impermeable bottom. oelp : LID Controldtcr Car/ret Harms LID Type BroReter/ica Cell Proce.o: Layers Surface Soil Storage Urdrdrin Thickness (in. or mm) Porosity 104 (volume traction) Field Capacity lxxii:. (volume traction) Wilting Point 1 (volume traction) Conductivity ....... (in/hronmmihr) Conductivity Slope [IllIIIIIIIIi. Suction Head [1,5 1 (in or mm] Help LID Control Editor X ContrI Name LID Type EtoHetentron Cell Process Layarrm Surface Soil Storage Undendrarn Drain Coefficient 10.3175 (in/hr or mm/is] Drain Exponent EIIIIIIIIIIlII1 Drain Offset Height (in or mm] LID Control Editor Xi CorroI Name, U) Type Sic Rereryion Pr xerr tyer Surface SOjj Store Underdrn Storage Depth 1 (in. or mm) Vegetation Volume Fraction Surface Roughness Mannings n) ------------------ Surface Slope [uIIII1IJ LID Control Salter X Cctrci Name LID Type: Reerin Cell Pioces: Layer Surface Soil Storage Underdiern (in, or mm) Porosity, 0.4 (volume traction) Field Capacity F0.2 [volume fraction) Wilting Point 0.1 (volume fraction) Condictivity (in/hrormm/hr) "" ........ Conthctivity Slope Suction Head 5 (in or mm) UDControl Editor X o:troI Name LIC Type - Picceso Leis. S.efece Soil Storage Underdreir, H eight Void Ratio (Voids / Solids) Conductivity (in/hr or mm/hr) ........ Clogging Factor ZTIIIII1 Note: use a Conductivity of 0 i the LID unit has an impermeable bottom. LID Control Editor X Corrtroi Name LID Type SicRetenton Cell Process Lasers' Surface Soil Siorege Underdrarn ran .,Uc,IIkIc3R lLJ.4.b1 (in/hr or mm/fir) Drain Exponent Drain Offset Height (eiormm) Note: use a Drain Coefficient of 0 if the UP unit has no underdrain, Hp UO Control Editor X Control Name, LID Type Eo Rerention C Froce Leyer uiface 561 Storage Undeidrein Storage Depth i721 (in. or mm) Vegetation Volume Fraction Surface Roughness EoiITX1 tvfannings n) Surface Slope (percent) LID Control Editor x Control Name ..- LID Type oReIenIion Cad Proces Laysis. Surface Sad Storage Uraderdar Height 112 fin, or mm) IIiIIIIIII1 (Voids / Solids) Conductivity (in/hr or mm/hi) L .............. Clogging Factor LTiiIIJ Note; use a Conductivity of 0 if the LID unit has an impermeable bottom. LID Control Editor X Control Name LID Type: BrmRerenlion C Procem Layer Surface Soil Storage Urdeidrarn = Porosity 0.4 (volume fraction) Field Capacity [.0.2 IIIiII] (volume fraction) Wilting Point (volume fraction) Conductivity (in/hr or mm/hi) .-. ................ Conductivity Slope Suction Head [i LID Control Editor X CcntrdNam LID Type Bic-Retention Cad Procecc Layers. Surtce Sad Storage lJnderdrain Drain Coefficient (inihr or mm/hi) Drain Exponent [5IIIIIII1] Drain Offset Height (inormm) Note; use a Drain Coefficient of 0 if the LID unit has no underdrain. flt Carrc.e.l (in. or mm) I Li I I I I I I I I LID Cont ,a) Editor X Control Name LID Type: Bio.Rere Pr Pa:e: Layerr. Surface Soil Stoage Underdiain Storage Depth (in, or firm) Vegetation Volume [o 'i Fraction Surface Roughness [Mannings n) Surface Slope 0.0 (percent) LID Control Editor X Control Name LID Type: SioiRetr-/icrr Get Proce: Lmrerr Surface Soil Storage Urrdrmn Thickness (in. or mm) Porosity .... 4 (volume fraction) 0.2 Field Capacity (volume traction) Wilting Point (volume traction) Conductivity (in/hr or mm/hi) Conductivity Slope Suction Head [5 "] (inormm) LID Control itor X Coritol Name LID Type Bio .ir - Procer Layerc Surface Soil Storage LIrdedrmn ClJhir mm) Void Patio (Voids /Sohds) Coridudivity, [IIIII1 (in/hr or mm/hr) Clogging Factor CI j Note: use a Conductivity of 0 it the LID unit has an impermeable bottom. LID Control Editor X Control Name: LlDlirpe. Sic-Pete Ci'l Proce:" Layers: Surface Soil Storage Undardrairr Drain Coefficient (ir/hr or mm/hi) Drain Exponent F6-5 Drain Offset Height 13 (in. or ram) Note: use a Drain Coefficient of Of the LID unit has no unde;drain. [1K C~3j 11 LID Control Editor: Explanation of Significant Variables Storage Depth: The storage depth variable within the SWMM model is representative of the storage volume provided beneath the surface riser outlet and the surface of the bio filtration facility. In those cases where the surface storage has a variable area that is also different to the area of the gravel and amended soil, the SWMM model needs to be calibrated as the LID module will use the storage depth multiplied by the BMP area as the amount of volume stored at the surface. Let ABMP be the area of the BMP (area of amended soil and area of gravel). The proper value of the storage depth SD to be included in the LID module can be calculated by using geometric properties of the surface volume. Let A0 be the surface area at the bottom of the surface pond, and let Ai be the surface area at the elevation of the invert of the first row of orifices (or at the invert of the riser if not surface orifices are included). Finally, let hi be the difference in elevation between A0 and A. By volumetric definition: ABMP SD = (A0+A1) h1 2 (1) Equation (1) allows the determination of SD to be included as Storage Depth in the LID module. The 3-inches of gravel volume (3-inches x volume of solids (0.6) = 1.8-inches) is then subtracted from this volume. Porosity: A porosity value of 0.4 has been selected for the model. The amended soil is to be highly sandy in content in order to have a saturated hydraulic conductivity of approximately 5 in/hr. REC considers such a value to be slightly high; however, in order to comply with the HMP Permit, the value recommended by the Copermittees for the porosity of amended soil is 0.4, per Appendix A of the Final Hydromodification Management Plan by Brown & Caldwell, dated March 2011. Such porosity is equal to the porosity of the gravel per the same document. Void Ratio: The ratio of the void volume divided by the soil volume is directly related to porosity as n/(1-n). As the underdrain layer is composed of gravel, a porosity value of 0.4 has been selected (also per Appendix A of the Final HMP document), which results in a void ratio of 0.4/(1-0.4) = 0.67 for the gravel detention layer. Conductivity: Per the site-specific geotechnical investigation for the project site infiltration is only feasible for basins to the east of the project site, a factored infiltration rate of 0.041 in/hr has been used for these facilities. For the western basins, a value of 0 has been assigned for conductivity accordingly. I I I I I I I I I I I I I I I I C/caging factor: A clogging factor was not used (0 indicates that there is no clogging assumed within the model). The reason for this is related to the fairness of a comparison with the SDHM model and the HMP sizing tables: a clogging factor was not considered, and instead, a conservative value of infiltration was recommended. Drain (Flow) coefficient: The flow coefficient C in the SWMM Model is the coefficient needed to transform the orifice equation into a general power law equation of the form: q=C(H—H0)n (2) where q is the peak flow in in/hr, n is the exponent (typically 0.5 for orifice equation), H0 is the elevation of the centroid of the orifice in inches (assumed equal to the invert of the orifice for small orifices and in our design equal to 0) and H is the depth of the water in inches. The general orifice equation can be expressed as: - ir D2 ~2,9 QCg 144 where Q is the peak flow in cfs, D is the diameter in inches, cg is the typical discharge coefficient for orifices (0.61-0.63 for thin walls and around 0.75-0.8 for thick walls), g is the acceleration of gravity in ft/s2, and H and H0 are defined above and are also used in inches in Equation (3). It is clear that: q () X ABMp 12X%O0 = Q (cfs) (4) Cut-Off Flow: 0 (cfs) and q (in/hr) are also the cutoff flow. For numerical reasons to insure the LID is full, the model uses cut-off = 1.01 Q. (3) Overland Flow Manning's Coefficient per TRWE (Reference [6]) appeal of a de facto value, we anticipate that jurisdictions will not be inclined to approve land surfaces other than short prairie grass. Therefore, in order to provide SWMM users with a wider range of land surfaces suitable for local application and to provide Copermittees with confidence in the design parameters, we recommend using the values published by Yen and Chow in Table 3-5 of the EPA SWMM Reference Manual Volume I - Hydrology. SWMM-Endorsed Values Will Improve Model Quality In January 2016, the EPA released the SWMM Reference Manual Volume I - Hydrology (SWMM Hydrology Reference Manual). The SWMM Hydrology Reference Manual complements the SWMM 5 User's Manual and SWMM 5 Applications Manual by providing an in-depth description of the program's hydrologic components (EPA 2016). Table 3-5 of the SWMM Hydrology Reference Manual expounds upon SWMM 5 User's Manual Table A.6 by providing Manning's n values for additional overland flow surfaces3. The values are provided in Table 1: Table 1: Manning's n Values for Overland Flow (EPA, 2016; Yen 2001; Yen and Chow, 1983). Overland Surface Light Rain (<0.8 in/hr) Moderate Rain (0.8-1.2 in/hr) Heavy Rain (>1.2 in/hr) Smooth asphalt pavement Smooth impervious surface 0010 0.011 0.012 0.013 0.015 0.015 Tar and sand pavement 0,012 0.014 0,016 Concrete pavement 0.014 0.017 0.020 Rough impervious surface 0.015 01019 0.023 Smooth bare packed soil 0.017 0.021 - 0.025 Moderate bare packed soil 0.025 0.030 0.035 Rough bare packed soil 0.032 0.038 0.045 Gravel soil 0.025 0.032 0.045 Mowed poor grass 0.030 0.038 0.045 Average grass, closely clipped sod 0.040 0.050 0,060 Pasture 0.040 0.055 0.070 Timberland 0.060 0.090 0.120 Dense grass 0.060 0.090 0.120 Shrubs and bushes 0.080 0.120 0.180 Land Use Business 0.014 0.022 0.035 Semibusiness 0.022 0.035 0.050 Industrial 0.020 0.035 0.050 Dense residential 0.025 0.040 0.060 Suburban residential Parks and lawns 0.030 0.040 0.055 0.075 0.080 0.120 For purposes of local hydromodification management BMP design, these Manning's n values are an improvement upon the values presented by Engman (1986) in SWMM S User's Manual Table A.6. Values from SWMM 5 User's Manual Table A.6, while completely suitable for the intended application to certain agricultural land covers, comes with the disclaimer that the provided Manning's n values are valid for shallow-depth overland flow that match the conditions in the experimental plots (Engman, Further discussion is provided on page 6 under "Discussion of Differences Between Manning's n Values" ATTACHMENT VIII Geotechnical Documentation LIM Hydrologic Sot Group—San Diego County Area, California MAP LEGEND MAP INFORMATION Area of Interest (AOl) o C The soil surveys that comprise your AOl were mapped at Area of Interest (AOl) J3 CID 1:24,000. Soils o Warning: Soil Map may not be valid at this scale. Soil Rating Polygons ""'" A L_J 0 Not rated or not available Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil Lii ND Water Features line placement. The maps do not show the small areas of Streams and Canals contrasting soils that could have been shown at a more detailed Li B scale. Transportation LI BID *44 Rails Please rely on the bar scale on each map sheet for map Li C .. Interstate Highways measurements. Li C/I) US Routes Source of Map: Natural Resources Conservation Service Li DWeb Soil Survey URL: Major Roads Coordinate System: Web Mercator (EPSG:3857) Li Not rated or not available Local Roads Maps from the Web Soil Survey are based on the Web Mercator Soil Rating Lines Background projection, which preserves direction and shape but distorts A Aerial Photography distance and area, A projection that preserves area, such as the IN Albers equal-area conic projection, should be used if more AID accurate calculations of distance or area are required. B This product is generated from the USDA-NRCS certified data as B/D of the version date(s) listed below. Soil Survey Area: San Diego County Area, California Survey Area Data: Version 13, Sep 12, 2018 C/I) Soil map units are labeled (as space allows) for map scales I) 1:50000 or larger. Not rated or not available Date(s) aerial images were photographed: Nov 3, 2014—Nov Soil Rating Points 22, 2014 A The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background 0 ND imagery displayed on these maps. As a result, some minor B . shifting of map unit boundaries may be evident. B/D USDA Natural Resources Web Soil Survey 7/19/2019 Conservation Service National Cooperative Soil Survey Page 2 of 4 - - - - - - - - - - - - - - M - - - Hydrologic Soil Group—San Diego County Area, California Hydrologic Soil Group Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (ND, BID, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (AID, B/D, or CID), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Q Natural Resources Web Soil Survey 7/19/2019 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—San Diego County Area, California Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff. None Specified Tie-break Rule: Higher uo Natural Resources Web Soil Survey 7119/2019 Conservation Service National Cooperative Soil Survey Page 4 of 4 ATTACHMENT IX Summary Files from the SWMM Model PRE_DEV EPA STORM WATER MANAGEMENT MODEL - VERSION 5.0 (Build 5.0.022) -------------------------------------------------------------- * * * * * * * * **.*+. * * * * * * * * * * * *+ * * * * * * * * * * * * * * * * * * * * * * * k* * * * * * NOTE: The summary statistics displayed in this report are based on results found at every computational time step, not lust on results from each reporting tine step. * * * * * * * * * .* .* * * A, * 'A Analysis Options. ****** ********** Flow Units ...............CFS Process Models: Rainfall/Runoff ........YES Snowmeit ...............NO Groundwater ............NO Flow Routing ...........NO Water Quality ..........NO Infiltration Method ......GREEN AMPT Starting Date ............00T-01-1951 00:00:00 Ending Date ....... ....... SEP-30-2038 23:00:00 Antecedent Dry Days ......0.0 Report Tine Step .........01:00:00 Wet Time Step ............00:15:00 Dry Time Step ............04:00:00 Volume Depth Runoff Quantity Continuity ** * ** * ** * 'A •***. *• *•* * * A * * ****-* acre-feet inches Total Precipitation 208.490 674.360 Evaporation Lose 0.768 2.485 Infiltration Lose 197.677 639.388 Surface Runoff 10.899 3..2.51 Final Surface Storage 0.000 0.000 Continuity Error (%) -0.410 Volume Volume - Flow Routing Continuity acre-feet 10"6 gal. Dry Weather Inflow 0.000 0.000 Wet Weather Inflow 101899 3.551 Groundwater Inflow 0.000 0.008 ROIl Inflow ..............0.000 0.000 External Inflow 0.000 0.000 External Outflow 10.899 3.5.51 Internal Outflow 0.000 0.000 Storage Losses 0.000 0.000 initial Stored Volume . . . 0.000 0.000 Final Stored Volume ..... 0.000 0.000 Continuity Error (I) 0.000 ***t**********W** ***w**** ** Subcatchment Runoff Summary ** *** * * * ******* * ** ****t Total Total -------------------------------------------------------------------------------------------------------- Total Total Total Total Peak Runoff Precip Nunon Evap infil Runoff Runoff Runoff Coeff Subcatchneat in in in in in 10"6 gal CFS DMA-A 634.36 0.00 2.48 639.39 35.25 3.55 3.91 0.052 Analysis begun on: Tue Jul 16 12:54:08 2019 Analysis ended on: Tue Jul 16 12:54:24 2019 Total elapsed time: 00:00:16 POST_DEV EPA STORM WATER MANAGEMENT MODEL - VERSION 5.0 (Build 5.0.022) -------------------------------------------------------------- NOTE: The summary statistics displayed in this report are based on results found at every computational time step, not just on results from each reporting time step. Analysis Options Flow Units ...............OWE Process Models: Rainfall/Runoff ........YES Snowrnelt ...............NO Groundwater ............NO Flow Routing ...........YES Ponding Allowed ........NO Water Quality ..........NO Infiltration Method ......GREEN AMPT Flow Routing Method ......KINWAVE Starting Date ......... ...00T-01-1951 00:00:00 Ending Date ..............SEP-30-2008 23:00:00 Antecedent Dry Days ......0.0 Report Time Step .........01:00:00 Met Time Step ............00:15:00 Dry Time Step ............04:00:00 Routing Time Step ........60.00 sec Volume Depth Runoff Quantity Continuity acre-feet inches Total Precipitation 208.398 674.360 Evaporation Loss 22.933 74.210 Infiltration Loss 70.572 228.365 Surface Runoff ...........116.713 377.673 Final Surface Storage ... 0.000 0.000 Continuity Error ( -0.873 Volume Volume Flow Routing Continuity acre-feet 106 gal Dry Weather Inflow 0.000 0.000 Wet Weather Inflow 116.713 36.033 Groundwater Inflow 0.000 0.000 ROIl Inflow ..............0.000 0.000 External Inflow 0.000 0.000 External Outflow 116.685 38.023 Internal Outflow 0.000 0.000 Storage Losses 0.000 0.000 Initial Stored Volume . . . 0.000 0.000 Final Stored Volume 0.000 0.000 Continuity Error Ct) 0.024 Highest Flow Instability Indexes ****** t*********** *** ******* 4* All links are stable. * * * * * * * 44 * * * * * * * * * * * * -* * * A. Routing Time Step Summary Minimum Time Step : 60.00 sec Average Time Step : €0.00 sec POST_DEV Maximum Time Ste? : 60.00 sec Percent in Steady State : 0.00 Average Iterations per Step : 1.00 ** *******k,***,******* Subcatchment Runoff Summary Total Total -------------------------------------------------------------------------------------------------------- Total Total Total Total Peak Runoff Precip Runon Evan miii Runoff Runoff Runoff Coeff Subcatchment in in in in in 10"6 gal CFS DMA-iD 674.36 0.00 --------------------------------------------------------------------------------------------------------- 81.95 21.50 577.72 5.35 0.41 0.857 DMA-2A(SM) 674.36 0.90 6.88 596.04 74.05 0.59 0.31 0.110 BR-3 674.36 15402.89 822.89 0.00 15312.70 5.32 0.42 0.952 DMA-lB 674.36 9.00 50.94 247.65 382.23 3.37 0.37 0.567 DMA-iC 674.36 0.90 78.35 47.62 555.20 7.63 0.60 0.823 BR-2 674.36 15205.17 694.80 2950.69 13156.94 2.92 0.38 0.829 BR-1 674.36 557.47 412.72 276.03 546.16 0.27 0.74 0.443 BR-4 674.36 28132.37 871.74 0.00 28059.63 7.61 0.62 0.974 DMA-iB(Pavers) 674.36 0.00 2.27 672.29 0.01 9.90 0.90 0.090 DMA-1D(?avers) 674.36 0.99 2.27 672.29 0.01 0.09 0.00 0.000 DMA-1E 674.36 0.99 87.11 0.00 592.58 21.32 1.60 0.879 01,!A-IA±Favers 674.36 0.00 56.17 609.37 14.15 0.28 0.83 0.021 LID Performance Summary Total ------------------------------------------------------------------------------------------------------------------ Evap Infil Surface Drain Init. Final Pont. Inflow Loss Loss Outflow Outflow Storage Storage Error Suhcatchment LID Control in in in in in in in BR-3 ER-3 16077.25 ------------------------------------------------------------------------------------------------------------------ 823.12 0.00 2641.89 12675.01 0.00 0.09 -0.39 BR-2. BR-2 15879.53 694.60 2950.11 2268.89 10884.29 0.00 0.00 -0.12 BR-1 BR-1 1231.83 412,64 275.98 220.41 325.64 0.00 9.09 -0.23 BR-4 BR-4 28806.73 871.75 0.00 9388.01 18672.01 0.00 0.09 -0.43 Node Depth Summary --------------------------------------------------------------------- Average Maximum Maximum Time of Max Depth Depth HG-1 Occurrence Node Type Feet Feet Feet days hr:min POC-1 OUTFALL --------------------------------------------------------------------- 0.00 0.00 9.90 0 09:00 VAULT STORAGE 0.12 7.56 7.56 18823 17:01 Node Inflow Summary --------------------------------------------------------------------------------------- M5ximum Maximum Lateral Total Lateral Total Time of Max inflow inflow Inflow inflow Occurrence Volume Volume Node Type CFS CFS days hr:mi.n 106 gal 106 gal POC-1 OUTFALL ------------------------------------------------------------------------------------- 0.31 3.79 18823 17:09 0.591 38.021 VAULT STORAGE 3.41 3.41 18823 17:09 37.439 37.439 ***************,,****** Node Surcharge Summary I I I I I n I I I I I I I I I I I I I POST_DEV * ** * * * * * * *** * ** * * * ** * * Surcharging occurs when water rises above the top of the highest conduit. --------------------------------------------------------------------- Max. Height Mm. Depth Hours Above Crown Below Rim Node Type Surcharged Feet Feet --------------------------------------------------------------------- VAULT STORAGE 499679.02 7.558 0.442 ** ** * * * t ** * * * * * Node Flooding Summary ****** ** * n*** **** **t No nodes were flooded. * * * -* .* * * * * * .* * * * * * * * * A. * .* Storage Volume Summary Average ------------------------------------------------------------------ Avg E&l Maximum Max Volume Pcnt Pcnt Volume Pcnt Storage Unit 1000 ft3 Full Loss 1000 ft3 Full VAULT 0.151 ------------------------------------------------------------------ 1 0 9.864 94 **** ** ** * *** ****** ***** Outfall Loading Summary ----------------------------------------------------------- Flow Avg. Max. Total Freq. Flow Flow Volume Outfall Node Pcnt. CFS CFS 106 gal POC-1 9.66 0.03 3.70 38.021 ----------------------------------------------------------- System 9.66 0.03 3.70 38,021 ---------------------- Time of Max Maximum Occurrence Outflow days hr:rrun CFS ---------------------- 18823 17:00 3.40 Link Flow Summary Maximum Time of Max Maximum Max! Max! .Flowj Occurrence Veloci Full Full Link Type CFS days hr:min ft/sac Flow Depth OUTLET DUMMY 3.40 18823 17:01 *44*4* ******************* Conduit Surcharge Summary No conduits were surcharged. Analysis begun on: Mon Dec 16 16:34:54 2019 Analysis ended on: Mon Dec 16 16:35:21 2019 Total elapsed time: 00:00:27 Priority Development Project (PDP) SWQMP BMW of Carlsbad CO M40L tnrdl P.eBUrce ATTACHMENT 3 Structural BMP Maintenance Information Use this checklist to ensure the required information has been included in the Structural BMP Maintenance Information Attachment: Preliminary Design/Planning/CEQA level submittal: Attachment 3 must identify: El Typical maintenance indicators and actions for proposed structural BMP(s) based on Section 7.7 of the BMP Design Manual Final Design level submittal: Attachment 3 must identify: Specific maintenance indicators and actions for proposed structural BMP(s). This shall be based on Section 7.7 of the BMP Design Manual and enhanced to reflect actual proposed components of the structural BMP(s) How to access the structural BMP(s) to inspect and perform maintenance Features that are provided to facilitate inspection (e.g., observation ports, cleanouts, silt posts, or other features that allow the inspector to view necessary components of the structural BMP and compare to maintenance thresholds) Manufacturer and part number for proprietary parts of structural BMP(s) when applicable Maintenance thresholds for BMPs subject to siltation or heavy trash(e.g., silt level posts or other markings shall be included in all BMP components that will trap and stc-re sediment, trash, and/or debris, so that the inspector may determine how full the BMP is, and the maintenance personnel may determine where the bottom of the BMP is. If required, posts or other markings shall be indicated and described on structural BMP plans.) Recommended equipment to perform maintenance When applicable, necessary special training or certification requirements for inspection and maintenance personnel such as confined space entry or hazardous waste management PDP SWQMP 25 of 27 Priority Development Project (PDP) SWQMP BMW of Carlsbad COMOML Summary of BMP Inspection/Maintenance BMP Reponsible Inspection! Maintenance Minimum Frequency Party(s) Activities Required of Activities Biofiltration Inspect for and remove accumulated Maintain at least once Basin wl Partial trash, sediment, and debris as necessary. per year. Inspect at least Retention Project Inspect for poor vegetation establishment twice per year, prior to Owner or erosion, and overgrown vegetation, start of rainy season BMP No. I Inspect for standing water and repair or (Oct. 1st) and after BMP No. 2 de-clog as needed. significant storm events. Biofiltration Inspect for and remove accumulated Maintain at least once Basin trash, sediment, and debris as necessary. per year. Inspect at least Project Inspect for poor vegetation establishment twice per year, prior to BMP No. 3 Owner or erosion, and overgrown vegetation, start of rainy season BMP No. 4 Inspect for standing water and repair or (Oct. 1st) and after de-clog as needed. significant storm events. Maintain at least once Modular Inspect for and remove accumulated per year. Inspect at least Wetland System Project trash, sediment, and debris as necessary. twice per year, prior to Owner Clear obstructions if standing water or start of rainy season BMP No. 5 inlet clogged. (Oct. 1st) and after significant storm events. Underground Maintain at least once Detention Inspect for and remove accumulated per year. Inspect at least System Project trash, sediment, and debris as necessary. twice per year, prior to Owner Clear obstructions if standing water or start of rainy season BMP No. 6 inlet clogged. (Oct. 1st) and after significant storm events. PDP SWQMP 26of27 I I 'fi ts 'tj'iflL'flt dchi-s Rcriit :i'd flpcd\ p)m f .ic& :ritiLiir'ti wIIiuut litli fl I I I Chapter 7: Long Term Operation and Maintenance svale in Appendix E.15)*. The vegetated BMP may or may not include amended soils, subsurface gravel layer, underdrain, and./or impermeable liner. The project civil engineer is responsible for determining which maintenance indicators and actions shown below are applicable based on the components of the structural. BMP. TABLE 7-2. Maintenance Indicators and Actions for Vegetated BMPs \flCiliiuIt FId:ifti': FL cc(i, i}Imi, i -t.di:di \ YIIII)II ir ric:ii11 nliiiu ()\uisn \c:Itiltsfl \is's; ur ifllVi :i :iTimr'I( Nifl flfll (S IIi:ifl iFL ksin Pcht itt Ilic ' ctc fl pci r:iiIIi: i'i:iu \ mn IIc,sHic cl i. cit ill If r III:' ,I flllflln :flfl \ c lctIi,fl Erosion due to concentrated irrigation Repair/re-seed/re-plant eroded areas and adjust the i rn nation flow system. flIt fl inn It c(nccnrr:lni flurni Rrpinr rc.c cii c Him ciuind niu:i', JI d ii ic :Iitpusr inc unutt tlts'i c)rrcct\ fl:.1'ulc ,cui i id nc ifiIfl cuntrui Ini,cit, Isilc Ill flu" LIlfl' p'tII1K, stI fltlfl'si ft n,1flfli si nIper (irallsitc iccisislitin ss tii,iI plin. ii iFLsnc fi nut Cs s sCiCsi i)\ icriflriflJ us h\1P Is Pc iflCfls:ii din ITusi r:Rlr, (.ui\ I ri mcd Iiii In: C n:tictyl pr: n is inc :idditissn:ii rcilnuiin fir 1cm 'Ii tr:ic' Standing water in vegetated swales used Make appropriate corrective measures such as adjusting irrigation for pretreatment and/or site design. system, removing obstructions of debris or invasive vegetation, BMPs loosening or replacing top soil to allow for better infiltration, or minor re-grading for proper drainage, if the issue is not corrected by restoring the BMP to the original plan and grade, the City Engineer shall be contacted prior to any additional repairs or reconstruction. iiniitii: \mflcr iii i'l )rcuii'ius ,':, \ltLc ;ippsfisprdilC (s)rrcct]\ c flIt u.tircs ruch list It i in \ fi ii ii t ' ii I I ii ci fi im is n sri t inn iii id 1 It fi fiS r In fi I isiltritsu ircm, 'n flss' tiwtnHi rnlnsuitin I)nIruct5ssn st dchri' 5 51 lii's misc cni'Inns,n, cicirns r hss,i'' fur I dIn is Insi i indmIr.iin. Pt 11c 1-c tppI:cusk:. m pllnci rcpl.sdlcic ci it fiiiiss\d:nn 1 Slisrili ccnnl Csr.:p;cIci tssik, Obstructed inlet or outlet structure Clear obstructions. l)5im:fc Is nlrricttir ii Cs siliftint It sicIi Rnp.in fir Is]uccin;ippilsnldc. in ',cc:rl 1*1 sr mulct 'itrtuctnrn **These BMPs typically include a surface ponding layer as part of their function which may take 96 hours to drain following a storm event. Vegetated swales and flow-through planter boxes in regards to flow-thru treatment control BMPs are not options as structural BMPs. Carlsbad has not adopted. an Alternative Compliance Program. 7-8 February 2016 I I Chapter 7: Long Term Operation and Maintenance TABLE 7-5. Maintenance Indicators and Actions for Detention BMPs Overgrown vegetation T rosion clue to concentrated storm Repair/re-seed/re-plant eroded areas and make appropriate water runoff flow corrective measures such as adding erosion control blankets, adding stone at flow entry points, or re-grading where necessary. .i I Make appropriate corrective measures such as adjusting irrigation Standing water system, removing obstructions of debris or invasive vegetation, or minor re-grading for proper drainage. Damage to structural components such as weirs, inlet or outlet structures Repair or replace as applicable. I I I I I I U I I ..1 I I I I I I 7-11 February 2016 Inspection Summary Inspect Pre-Treatment, Biofiltration and Discharge Chambers - average inspection interval is 6 to 12 months. (15 minute average Inspect/on t,'ne, NOTE: Pollutant loading varies greatly from site to site and no two sites are the same. Therefore, the first year requires inspection monthly during the wet season and every other month during the dry season in order to observe and record the amount of pollutant loading the system is receiving. System Diagram Access to separation chamber aid pre-filter cartridges Pre-treatment Chamber 2) Biofiltration Chamber :) Discharge Chamber Access to discharge chamber and orifice control / ia I www.modularwetlands.com A M c.. U L A R Inspection Overview As with all stormwater BMPs inspection and maintenance on the MWS Linear is necessary. Stormwater regulations require that all BMPs be inspected and maintained to ensure they are operating as designed to allow for effective pollutant removal and provide protection to receiving water bodies. It is recommended that inspections be performed multiple times during the first year to assess the site specific loading conditions. This is recommended because pollutant loading and pollutant characteristics can vary greatly from site to site. Variables such as nearby soil erosion or construction sites, winter sanding on roads, amount of daily traffic and land use can increase pollutant loading on the system. The first year of inspections can be used to set inspection and maintenance intervals for subsequent years to ensure appropriate maintenance is provided. Without appropriate maintenance a BMP will exceed its storage capacity which can negatively affect its continued performance in removing and retaining captured pollutants. Inspection Equipment Following is a list of equipment to allow for simple and effective inspection of the MWS Linear: . Modular Wetland Inspection Form Flashlight Manhole hook or appropriate tools to remove access hatches and covers Appropriate traffic control signage and procedures Measuring pole and/or tape measure. Protective clothing and eye protection. 7/16" open or closed ended wrench. Large permanent black marker (initial inspections only - first year) Note: entering a confined space requires appropriate safety and certification. It is generally not required for routine inspections of the system. www.modularwetlandscom M 0 D U L A R \JF)S Inspection Steps The core to any successful stormwater BMP maintenance program is routine inspections. The inspection steps required on the MWS Linear are quick and easy. As mentioned above the first year should be seen as the maintenance interval establishment phase. During the first year more frequent inspections should occur in order to gather loading data and maintenance requirements for that specific site. This information can be used to establish a base for long term inspection and maintenance interval requirements. The MWS Linear can be inspected though visual observation without entry into the system. All necessary pre-inspection steps must be carried out before inspection occurs, especially traffic control and other safety measures to protect the inspector and near-by pedestrians from any dangers associated with an open access hatch or manhole. Once these access covers have been safely opened the inspection process can proceed: Prepare the inspection form by writing in the necessary information including project name, location, date & time, unit number and other info (see inspection form). . Observe the inside of the system through the access hatches. If minimal light is available and vision into the unit is impaired utilize a flashlight to see inside the system and all of its chambers. . Look for any out of the ordinary obstructions in the inflow pipe, pre-treatment chamber, biofiltration chamber, discharge chamber or outflow pipe. Write down any observations on the inspection form. Through observation and/or digital photographs estimate the amount of trash, debris and sediment accumulated in the pre-treatment chamber. Utilizing a tape measure or measuring stick estimate the amount of trash, debris and sediment in this chamber. Record this depth on the inspection form. www.modularwetlands.com Through visual observation inspect the condition of the pre-filter cartridges. Look for excessive build-up of sediments on the cartridges, any build-up on the top of the cartridges, or clogging of the holes. Record this information on the inspection form. The pre-filter cartridges can further be inspected by removing the cartridge tops and assessing the color of the BioMediaGREEN filter cubes (requires entry into pre-treatment chamber - see notes above regarding confined space entry). Record the color of the material. New material is a light green in color. As the media becomes clogged it will turn darker in color, eventually becoming dark brown or black. Using the below color indicator record the percentage of media exhausted. New Exhausted RinMc1taRFFN _______ BioMediaGREEN 0% -- Percent Clogged -- 100% The biofiltration chamber is generally maintenance free due to the system's advanced pre- treatment chamber. For units which have open planters with vegetation it is recommended that the vegetation be inspected. Look for any plants that are dead or showing signs of disease or other negative stressors. Record the general health of the plants on the inspection and indicate through visual observation or digital photographs if trimming of the vegetation is needed. The discharge chamber houses the orifice control structure, drain down filter and is connected to the outflow pipe. It is important to check to ensure the orifice is in proper operating conditions and free of any obstructions. It is also important to assess the condition of the drain down filter media which utilizes a block form of the BioMediaGREEN. Assess in the same manner as the cubes in the Pre-Filter Cartridge as mentioned above. Generally, the discharge chamber will be clean and free of debris. Inspect the water marks on the side walls. If possible, inspect the discharge chamber during a rain event to assess the amount of flow leaving the system while it is at 100% capacity (pre-treatment chamber water level at peak HGL). The water level of the flowing water should be compared to the watermark level on the side walls which is an indicator of the highest discharge rate the system achieved when initially installed. Record on the form is there is any difference in level from watermark in inches. www.modularwetlands.com I I I i I I I I I I I I I I I I I M 0 D U L A R W TLANJDS NOTE: During the first few storms the water level in the outflow chamber should e observed and a 6" long horizontal watermark line drawn (using a large permanent marker) ci the water level in the discharge chamber while the system is operating at 100% capacity. The diagram below illustrates where a line should be drawn. This line is a reference point for future inspections of the system: Using a permanent marker draw a 6 inch long horizontal the, as shown, a: The All- higher water level in the MVVS Linear discharge chamber. Water level in the discharge chamber s a function of flow rate and pipe size. 0bsrvation of water level during the first few months of operation can be used as a benchmark level for future inspections. The initial mark anc all future observations shall be made when system is at 100% capacity (water level at maximum level in pre-treatment chamber). If futura water levels are below this mark when system is at 100% capacity this is an indicator that maintenance to the pre-filter cartridges may be needed. 41 Finalize inspection report for analysis by the maintenance manager to determine if maintenance is required. www.modutarwetlands.com I L I I I I I I I I I I I I I I I I Maintenance Indicators Based upon observations made during inspection, maintenance of the system may be required based on the following indicators: Missing or damaged internal components or cartridges. Obstructions in the system or its inlet or outlet. Excessive accumulation of floatables in the pre-treatment chamber in which the lengti and width of the chamber is fully impacted more than 18". Excessive accumulation of sediment in the pre-treatment chamber of moe than 6" in depth. www.modularwetlands.com www.modularwetlands.com I I M 0 ) U L A R WET LANDS Excessive accumulation of sediment on the BioMediaGREEN media housed within the pie- filter cartridges. The following chart shows photos of the condition of the BioMeiiaGREEN contained within the pie-filter cartridges. When media is more than 85% cloggec replacement is required. New Exhausted BioMediaGREEN BioMediaGREEN -- Percent Clogged -- 100% Excessive accumulation of sediment on tl-e BioMediaGREENJ media housed w thin the drain down filter. The following photos show of the condition of the BioMediaGREEN contained within the drain down fil:er. When media is more than 85% clogged replacemen: is required. I I I I I 1 I I I I I I I I I I I I I Overgrown vegetation. Water level in discharge chamber during 100% operating capacity (pre-treatment chamber water level at max height) is lower than tFe watermark by 20%. wwwniodularwetlandscom I I I Inspection Notes Following maintenance and/or inspection, it is recommended the maintenance operator prepare a maintenance/inspection record. The record should include any maintenance activities performed, amount and description of debris collected, and condition of the system and its various filter mechanisms. The owner should keep maintenance/inspection record(s) for a minimum of five years from I the date of maintenarce. These records should be made available to the governing municipality for inspection upon request at any time. I Transport all debris, trash, organics and sediments to approved facility for disposal in accordance with local and state requirements. Entry into chambers may require confined space training based on state and local regulations. No fertilizer shall be Lsed in the Biofiltration Chamber. rrigation should be provided as -ecommended by manufactu-er and/or landscape architect. Amount of irigation required is dependent on plant species. Some plants may iot require irrigation after initial establishment. I I I I www.modularwetlands.com I I 1 I I I 1 I I UloMedIaGREEN r Vert U' / 2 c ' Flay, Co'tr r E DIA 3 0~9(et Pipe Cart Maintenance Summary Remove Sediment from Pre-Treatment Chamber - average maintenance interval is 12 to 24 months. ( 10 minute average service time). Replace Pre-Filter Cartridge Media -average maintenance interval 12 to 24 months. ( 10- 15 mInute per cartridge average service time). Trim Vegetation - average maintenance interval is 6 to 12 months. (Service time varies) System Diagram Access to separation chamber and pre-filter cartridge Cw Pre-treatment Chamber Biofiltration Chamber Discharge Chamber www.modularwetlands.com I I I Maintenance Overview n www.modularwetlands.com I The time has cone to maintain your Modular Wetland System Linear (MWS Linear). To eisure sLccessfu and efficient maintenance on the system we recommend the o11ow1ng. The V1WS Linear can be maintained by removing the access natches over the systems various chambers. A!l necessary pre-maintenance steps must be carried out before maintenance occurs, espcially traffic control and other safety measures to protect the inspector and near-by pedestrians from any dangers associated with an open access hatch or manhole. Once traffic control has been set up per local and state regulations and access covers have been safely opened the maintenance process can begin. It should be roted that some maintenance activities require confined space entry. All con9ned space requirements must be strictly followed before entry into the system. In addition the following is recommended: Prepare the maintenance form by witing in the necessary information including project name, location, date & time, unit number and other info (see maintenance form). Set up all appropriate safety and cleaning equipment. Ensure traffic control is set up and properly positioned. Prepare a pre-checks (OSHA, safety, confined space entry) are performed. Maintenance Equipment Following is a list of equipment required for maintenance of the MWS Linear: Modular Wetland Maintenance Form Manhole hook or appropriate tools to access hatches and covers Protective clothing, flashlight and eye protection. 7/16" open or closed erded wrench. Vacuum assisted truck with pressurE washer. Replacement BioMediaGREEN for Pre-Filter Cartridges if required (order from man .jfacturer). I I I I I I I I I I I I I Maintenance Steps 1. Pre-treatment Chamber (bottom of chamber) Remove access hatch or manhole cover over pre-treatment chamber and position vacuum truck accordingly. With a pressure washer spray down pollutants accumulated on walls and pie-filter cartridges. Vacuum out Pre-Treatment Chamber and remove all accumulated pollutants including trash, debris and sediments. Be sure to vacuum the floor until pervious payers are visible and clean. If Pre-Filter Cartridges require media replacement move onto step 2. If not, replace access hatch or manhole cover. Removal of access hatch to gain access below. Insertion of vacuum hose into separation hamber. Fully cleaned separation chambe. wwwmodularwetlandscom : Pre-filter cartridges with tops on. Inside cartridges showing rredia filters ready for replacement. 2. Pro-Filter Cartridges (attached to wall of pre-t-eatment chamber) After finishing step 1 enter pre-treatment chamber. Unscrew the two bol:s holding the lid on each cartridge filter and rerrove lid. Place the vacuum hose over eac' individual media filter to suck out filter media. Vacuuming out of media filters. Once filter media has been sucked use a pressure washer to spray cown iiside of t'ie cartridge and it's containing medi- cages Remove cleaned media cages and place to the side. Once removed the vacuum hose can be inserted into the cartridge to vacuum out any remaining material near the bottom or the cartridge. www.modularwetlands.com I I I I I I I I I I I I I I I I I I I Refilling trey for media replacement. Reinstall media cages and fill with new media from manufacturer or outside supplier. Manufacturer will provide specification of media and sources to purchase. Utilize the manufacture provided refilling trey and place on top of cartridge. Fill trey with new bulk media and shake down into place. Using your hands slightly compact media into each filter cage. Once cages are full removed refilling trey and replace cartridge top ensuring bolts are properly tightened. Exit pretreatment chamber. Replace access hatch or manhole cover. 3. Biofiltration Chamber (middle vegetated chamber) A. In general, the biofiltration chamber is maintenance free with the exception of maintaining the vegetation. Using standard gardening tools properly trim back the vegetation to healthy levels. The MWS Linear utilizes vegetation similar to surrounding landscape areas therefore trim vegetation to match surrounding vegetation. If any plants have died replace plants with new ones: -. wwwmodularwetlands.com U I 1 4. Discharge Chamber (contains drain down cartridge & connected to pipe) Remove access hatch or manhole cover over discharge chamber. Enter chamber to gain access to the drain down filter. Unlock the locking mechanism and left up drain down filter housing to remove used BioMediaGREEN filter block as shown below: Insert new BioMedia3REEN filter block and lock drain down filter housing back in place. Replace access hatch or manhole cover over discharge chamber. I I I I I I wwwmodularwetlandscom I I I I I I I I I I Inspection Notes Following maintenance and/or inspection, it is recommended the maintenance operator prepare a maintenance/inspection record. The record should include any mainterance activities performed, amount and description of debris collected, and condition of the system and its various filter mechanisms. The owner should keep maintenance/inspection record(s) for a minimum of five years from the date of maintenance. These records should be made available to The governing municipality for inspection upon request at any time. Transport all debris, trash, organics and sediments to approved facility for disposal in accordance with local and state requirements. Entry into chambers may require confined space training based on sta:e and local regulations. No fertilizer shall be used in the Biofiltration Chamber. Irrigation should be provided as recommended by manufacturer and/or landscape architect. Amount of irrigation required is dependent on plant species. Some plants may not require irrigation after initial establishment. www.modularwetlands.com Inspection Form I I I I I I Modular Wetland System, Inc P 760.433-7640 F 760-433-3176 E. Info@modularwetlands.com www.modularwetiands.com Inspection Report +•• Modular Wetlands System r Project Name Project Address (city) Zip code) Owner / Management Company Contact Phone ( ) - Inspector Name Date ______! ______/ Time AM / PM Type of Inspection 0 Routine LI Follow Up 0 Complaint 0 Storm Storm Event in Last 72-hours? 0 No 0 Yes Weather Condition Additional Notes Inspection Checklist Modular Wetland System Type (Curb, Grate or UG Vault): Size (22, 14 or etc.): Structural Integrity: Yes No Comments Damage to pre-treatment access cover (manhole cover/grate) or cannot be opened using normal lifting pressure? Damage to discharge chamber access cover (manhole cover/grate) or cannot be opened using normal lifting pressure? Does the MWS unit show signs of structural deterioration (cracks in the wall, damage to frame)? Is the inlet/outlet pipe or drain down pipe damaged or otherwise not functioning properly? Working Condition: Is there evidence of illicit discharge or excessive oil, grease, or other automobile fluids entering and clogging th unit? Is there standing water in inappropriate areas after a dry period? Is the filter insert (if applicable) at capacity and/or is there an accumulation of debris/trash on the shelf system? Does the depth of sediment/trash/debris suggest a blockage of the inflow pipe, bypass or cartridge filter? If yes specify which one in the comments section. Note depth of accumulation in in pre-treatment chamber. Does the cartridge filter media need replacement in pre-treatment chamber and/or discharge chamber? Chamber Any signs of improper functioning in the discharge chamber? Note issues in comments section. Other Inspection Items: Is there an accumulation of sediment/trash/debris in the wetland media (if applicable)? Is it evident that the plants are alive and healthy (if applicable)? Please note Plant Information below, Is there a septic or foul odor coming from inside the system? Waste: Yes No Sediment! Silt I Clay Trash / Bags / Bottles Green Waste / Leaves / Foliage Recommended Maintenance No Cleaning Needed Schedule Maintenance as Planned Needs Immediate Maintenance Plant Information Damage to Plants Plant Replacement Plant Trimming Additional Notes: 2972 San Luis Rey Road, Oceanside, CA 92058 P (760) 433-7640 F (760) 433-3176 Maintenance Report E Modular Wetland System, Inc. P 760.433-7640 F. 760-433-3176 1 E. lnfo@modularwetlands.com www.modularwetlands.com CLEAN fl(C Cleaning and Maintenance Report Modular Wetlands System Project Name Project Address Owner I Management Company Contact Inspector Name Type of Inspection 0 Routine LI Follow Up LI Complaint Weather Condition Phone Date / 0 Storm Additional Notes (ATJ(e Gv (City) (Zip Cod 'e1 - Time AM/PM Storm Event in Last 72-hours? LI No LI Yes Site Map # GPS Coordinates of Insert Manufacturer / Description / Sizing Trash Accumulation Foliage Accumulation Sediment Accumulation Total Debris Accumulation Condition of Media 25/50/75/100 (will be changed @ 75%) Operational Per Manufactures' Specifications (If not, why?) Lot: MWS Catch Basins Long: MWS Sedimentation Basin Media Filter Condition Plant Condition Drain Down Media Condition Discharge Chamber Condition Drain Down Pipe Condition Inlet and Outlet Pipe Condition - Comments. 2972 San Luis Rey Road, Oceanside, CA 92058 P. 760433.7640 F. 760.433.3176 Under qro ur H stormwoter cetentiort crrrd infirno systems must I uer PC, csd and MCI atone:: ci I f intervab ior purposes nertormarice arrd loevhe. Inspection I uspectiort is the key toeffective Mai ntfenorive 0 CMP aete lion systems and is easily perfonred. Canted' recommends, ogoir:, armual inspections. Sites with high tash load or stall outlet I control onfices may need more frequent pecteens. The rate or "'which she system collecrs rrollutanrs will aepead more ran- site sorscific ocees rather than the size or configuration of the system. should be perth-ed more often in equipment wcshdown areas, in climates where sanding and/or salting operations take place, and in other various instances if-, which I one would expect h pher ocrmmutatioas of sediment or ahrasiva/ cam osive corrdihcrns. A macrd of is to be oinioir:srdto rae Ideal tn system. I I I V V VVVV eV -VVV VVVVVV'. :. V:V, VVVV55V K V V VVV VVV •VV ,V,V:VVVVVVV :V V<V:V VII: V Vu s V 5. r/VV VV,E,,VVVVVI, VVuV,,Va VV fiVV) VV VVV 'a CVvIIIVVIV. V VV V I ) 3 ;VV3VVVVVVV ,VVV:VVVVV;,;VIV:IVIV V 'V V VV V V V VV IV VV V VV Vi 0 V CON VV:V35V VV VVVV V CMPahstentiorr systems efrould be r:lrcmws :hen on 5a5pec3i05t -siveals accumulated sediment or trash is cioqqiap she discharge C.C. Accumulated sediment and rrasn can typcally no evncr.ared through tie monhore over tie outset onfice, if moirrenance is not performed as recommended, sediment and trash may oc:umulate in front of the outlet orifice. Manhole covers should be s'ssutely seated foikrwng cteanng ctivlties. >nteinh suggests that all systems he designed with an ac.cess/insper:ton manhole situated at sr near the inlet and the outlet orifice. Should it tie necessary to get inside tnr system to perform nVramtenmuVrce ac.trvtiies, tl oporopriate precVarVrtrons regarding confined space entry and OStIA regulations should ne followed. Annual inspections are nest practice for alt unde'qraund systen-s. Dr; ing this inspection it evidence of saltinaide-icna agents is observed within the system, it is best practice tar the .aysVert to he rinsed, including above the sar ng line soon after mEVV St5VV1n9 thaw as part at the maintenance program for the system. Maintuirring an urrderqrcurrd detention or nI trotior system is easiest when there 5 no tlow enterrng the system, or this reason, it is a good idea to schedule the cicanout during dry w-ea'he: T he foregoing Inspection and mainlenancc ettorts nalp ensure nUeiyrOuIia p;pa systems used lot sorrusroter storage continue to function as intended by identifyirry recornir ended regular ;rrspecticrrr and maintenance crocI ces. inspection and maintenance related to the siruvtui al meqtty ut inc pipe or I tie soundness ml oce oirnt (Varnections is beyond the scope of 'hs guide. Vi.*I3V VtV <3 ItI r1 4c CMP DETENTION SYSTEMS CONTECH ENGINSERED SOW(ONS I I I I Li I I I I I Priority Development Project (PDP) SWQMP BMW of Carlsbad ATTACHMENT 4 City standard Single Sheet BMP (SSBMP) Exhibit [Use the City's standard Single Sheet BMP Plan.] C Commerda1 Rou,es I I I I I I I I I I I I I I PDP SWQMP 27 of 27 I CON ROAD :...• . . CDk fit - Resources 40 SWMPNO. TED IL L / [.2A •.... . .. / . PARTY RESPONSIBLE FOR MA1NTENA1PCE: '_.'• . <.< ç . E AU28ONA8C. r -------------------------------------- tiic CONTACT rA.IFFWrWFLs. NAM j- -- - - — .----- .. . 1 rTT• I I ocss______RLY PLACE _______ I i 131 O8 DMA-IC J.74bAC NEWPORT BEACH .CA82NO / r 0 '320 AC PHONE NO 41S37 CERT78CATION AC P IJ - —t. N --. . . . I 1 .8 l . . ESE PS SEEN 8541CR? TO BE INSTALLED PAIN MUNJFACOJREIFS I RACOMMENCA ICNSO8NTAESPPLANS, NO CHANGES TOTNC PROPOSED SMP ONTNSSINEBMOJOUTPRIOR APPROVAL FROM THE CEHG8R. 3 NO SUBSTITUTIONS TO -.ME MATERIAL OR TYPES OR PLANTING ES ?STHOUT PRIORSFPROV#1. FROM THE CII? ENGINE—EA. 0 023 AC 4 NO OCCUPANCY PAIL BE GRANTED UNTIL TK CITY INSPECTION STAFF S / 1 HAS INSPECTED 148$ PROJECT FOR APPROPRIATE AMP CONSTRUCTION /, rjl 1 ANDITSTALLNT'ON ' I 5 REFER TO MAINTENANCE AG REZMENT DOCUMENT P SEE PROJEG '77W FOR ADDITIONAL INFORMATION. I . GE0TECHNICAL0TES: HYDROLOWSO&GROURS INFLTSSTIONIINAlR SOIL (SF4851/A OTENIAL PER' LOW DMA -11E .- 3 O2.EONTOGROIJNSWAIEk'411 LL4±AC . >/(N3.J. it IL/X.j I 20 0 20 40 / ______ 71 H A i GRAPHIC SCALE L_ / SCALE: 1 20 4/.7 I BMP TA 7 — BUFIDA NMFTYPE I SYMBOL LA&SA N04 OMANTITY [ DR .11 HYDROMOD WCATN&TREATMENT CONTROL 82SF Y i 1 8 - o X-9 SF ........+......... .. 7............................ . ................. (1) WTNNp&H8A3 378SF 10-32 T ( CONTROL TREATMENT 1am U[3__ "1 / () D 1 -/' , / - - HYDROMODIFICATION I DMA gO / 'Z,. / ® SEEATION 4IcL/2 $ 31/N. 3 H 0.404AC LOW IMPACT DESIGN (1.LD.) DMA 181 I 10423AC I 1? I / 1 .76 ®3PERNE7AtSFS/ERS..L.4$OI/A2 15.7 $0115 78 '7 I C . ••__ L /!--------_ - ...... ...................................................... .... SIIEETH CITY OF CARlSBAD SHEETS 01 5NS8ER51/5 DEPARTMENT 01 srrs pxjs - BMW OF CARLSBAD I7A1A'UTIJCANIIIIlCOIIl-IT . . (ALSlWi,CT32crW IT.lIT/C-----II :::::4:3113. -RECORD COPY H PRCT -NO. H: MS2019-OIiOi ~hui~~L PATE -INITIAL REVISION DESCR1P110N OTHER CITY APPROVAL INITIAL DAIS TBD