December 11, 2018 W.O. 284018
TMS Highland Investments 8, LLC
Tony Sfreddo
29250 Paseo Sedano
San Juan Capistrano, California 92675
tsfreddo@icloud.com
RECEWD
DEC 15 2OI
LAND DEVELOPMENT
ENGt1EERJNG
Subject: Memorandum Response , Plan Check Review
Proposed 8 Townhouse Development, "Village
Walk", 341-347 Oak Avenue, Carlsbad, California.
Ref: 1. STRATA-TECH, Inc.; Preliminary Geotechnical Engineering Investigation, Proposed 8
Townhouse Developments, 341-347 Oak Avenue, Carlsbad, California. January 18,
2018
2. HETHERINGTON ENGINEERING, INC.; Third Party Review, Proposed 8 Townhouse
House Development, 341-3-47 Oak Avenue, Carlsbad, California, September 11, 2018
3. STRATA-TECH, Inc. ; Memorandum Response , Third Party Review (Sept 11,
2018),Proposed 8 Townhouse Development, "Village Walk", 341-347 Oak Avenue,
Carlsbad, California. (10/15/18)
Gentlemen:
Pursuant to your request and authorization, Strata-Tech, Inc., provides response to RFI from DMS
Consultants, Inc. Surender Dewan, addressing Pavement section and geotechnical parameters for
proposed shoring.
1920 Pacific Avenue, #16060, Long Beach, CA 90806
Ii
STRATA - TECH,INC.
GE 0 CONSULTANTS
TMS Highland Investments, LLC 2 W. 0. 284018
Plan Check Memorandum December It, 2018
Geotechnical parameters for the shoring are based on six foot spacing , center to center, for a mm
one foot diameter piles. Before any shafts are drilled a photo log of adjacent wall together with
survey monuments (points) shall be conducted. The shafts will be drilled and wide flange cast
into the shaft in 2-sach slurry mix to create the piles.
As the excavation is made lagging will be installed and follow the excavation downward to the
intended level under continuous observation of the geotechnical consultant in orser to verify
acceptable conditions.
The top of pile, in the calculation has a negative moment of (-0.2kipsf) therefore no deflection is
expected under the design criteria.
With regards to pavement for drive surface, P.C.0 Pavement is planned. Given the R-Value, of
a representative sample with R = 49 and an signed Traffic Index (TI =5.0) and using the Portland
Cement Association P.C.C. PAVEMENT DESIGN CHART it is concluded that a mm 6-inch
slab cast on firm unyielding smooth subgrade compacted to a min of 95% relative compaction
Per (ASTM: D1557) is required.
This report is issued with the understanding that it is the responsibility of the owner, or of his
representative, to ensure that the information and recommendations contained herein are called to
the attention of the Architects and Engineers for the project and incorporated into the plans and that
the necessary steps are taken to see that the contractors and subcontractors carry out such
recommendations in the field.
This report is subject to review by the controlling authorities for this project.
V
STRATA - TECH,INC.
0 ED CONSULTANTS
TMS Highland Investments, LLC 3 W. 0. 284018
Plan Check Memorandum December 11, 2018
We appreciate this opportunity to be of service to you.
Respectfully submitted,
STRATA-TECH, INC.
,1
Roland Acuna, PG
CEG 2113
President
Enclosures:
Revised soldier pile calculation
Larry Finley, PE
RCE 46606
I
I
SOLDIER PILE DESIGN
Bearing Material: Terrace
Section: F-F
Properties of Bearing Material:
Wet Density (g) = 120 pcf
Cohesion (C) = 110 psf
Angle of Friction (f ) = 34 degrees
Ka = 0.283
Kp = 3.537
Design Parameters:
g 1 = 120.0 pcf
Hi = 6.5 feet
H2 = 0.0 foot
Design EFP = 20.0 pcf
Spacing = 6.0 D
Solve M and N by Trial and Error Method:
M = 5.740 feet
N = 0.992 foot
Active Pressures at C, D, E, F, per Diameter of Pile:
C = 77.8 psf D = 111.4 psf
E = 103.5 psf F = 298.3 psf
Passive Pressures at A, B, G, H, per Diameter of Pile:
A = 413.8 psf B = 2850.1 psf
G = 5609.1 psf H = 6030.2 psf
Check Shear Force, per Diameter of Pile:
RHS = 9.5 psf
LHS = 9.5 psf
Unbalanced Force = 0.0 psf
Check Moment at Tip of Pile, per Diameter of Pile:
RHS = 29.3 kips-ft
LHS = 29.5 kips-ft
Unbalanced Moment = -0.2 kips-ft
Maximum Moment Occurs at Point of Fixity, Where V = 0
Point of Fixity from Top of Bearing Material = 2.9 feet
Maximum Moment per Diameter of Pile = 10.0 kips-ft
Embedment Depth into Bearing Material = 7.0 feet
Total Depth of Pile = 13.5 feet
Geotechnical Engineering Investigation I Work Order 284018 I
I 341-347 Oak Ave
I I i I Carlsbad, California Plate No.
STRATA - TECH, INC.
STRATA-TECH,INC.
GE DC ON S LTA NT 8
TMS Highland Investments, LLC 3 W. 0. 284018
Plan Check Memorandum December 11, 2018
We appreciate this opportunity to be of service to you.
Respectfully submitted,
STRATA-TECH, INC.
Roland Acufla, PG
CEG 2113
President
Enclosures:
Revised soldier pile calculation
Larry Finley, PE
RCE 46606