HomeMy WebLinkAboutCDP 16-26; TABATA RANCH; UPDATED GEOTECHNICAL RECOMMENDATIONS; 2018-03-05CIE. lillrc
0
Construction Testing & Engineering, Inc.
Inspection I Testing I Geotechnical I Environmental & Construction Engineering I Civil Engineering I Surveying
August 26, 2016 (Revised March 5, 2018) CTE Project No. 10-13292G
Tabata Family Trust
C/O: WMC General Contractors, Inc.
Attention: Mr. Bruce Wiegand
760 Garden View Ct., Suite 200
Encinitas, California 92024
Telephone: (760)803-2427 Via Email: bruce@wncommunities.com
Subject: Update Geotechnical Recommendations for
Proposed Tabata Ranch Subdivision Lot-4
Lemon Leaf Drive
Carlsbad California
RECflVED
MAR 21 2018
LAND DEVELOPMENT
ENGINEERING
References: At end of document
Mr. Wiegand:
In accordance with your request, Construction Testing & Engineering, Inc. (CTE) has completed a
review of the previously prepared geotechnical reports and documentation for Lot 4 at the subject site,
as referenced herein. We also visited the site on August 23, 2016 to confirm current conditions.
Recommendations are based on prior site documentation referenced herein, new and/or updated
regulatory requirements, review of current site conditions, and the scope of work we agreed to perform
at this time.
Based on the project improvement plans, the proposed construction is to consist of a two-story, light-
framed, residential structure with conventional continuous and/or spread footings. Associated utilities,
flatwork, paving, landscaping, and other minor improvements may also be constructed.
CTE has found the recommendations in the referenced geotechnical documents to be in compliance
with common geotechnical engineering practices and should be considered valid unless revised herein.
However, CTE reserves the right to further modify recommendations and/or provide additional
recommendations based on the actual conditions encountered at the site during earthwork and/or
construction. Updated seismic loading parameters are also provided herein in accordance with the
requirements of the current California Building Code. Updated standard grading recommendations
(Appendix D) are also attached herewith, though additional grading is anticipated to be relatively
minor.
1441 Montiel Road, Suite 115 1 Escondido, CA 92026 I Ph(760)7464955 f Fax(760)746-9806 I www.cte-inc.net
Update Geotechnical Recommendations Page 2
Proposed Tabata Ranch Subdivision Lot-4
Lemon Leaf Drive, Carlsbad California
August 26, 2016 (Revised March 5, 2018) CTE Job No. 10-13292G
Based on our review, the existing building pad at the subject site was previously graded in accordance
with the referenced reports. It appears that site conditions have remained generally consistent to those
described in the original and as-graded reports. Significant changes, distress, and/or erosion in the
building pad areas was not noted. Therefore, based on this information and on reference review, we
provide the following update recommendations.
1.0 SITE PREPARATION
Based on the limited preliminary plans and information provided, as well as our understanding of the
proposed development, the following remedial recommendations are believed to be appropriate at this
time.
All proposed building footprints and other distress sensitive improvement areas should be cleared of
existing vegetation, construction debris, stockpiled, deleterious, and other loose materials.
Objectionable materials, such as construction debris and vegetation, not suitable for structural backfill
should be properly disposed of offsite.
Following removal of loose and unsuitable soils and approval from the geotechnical representative,
exposed areas should be scarified a minimum of eight inches, moisture conditioned, and compacted to a
minimum relative compaction of 90 percent, as evaluated by ASTM D 1557, at a minimum two percent
above optimum.
Fill and backfill should be compacted to a minimum relative compaction of 90 percent as evaluated by
ASTM D 1557, at a minimum two percent above optimum. Minimum relative compaction of 95
percent (per ASTM D- 1557) should be conducted for the minimum top 12 inches of subgrade beneath
proposed pavement and drive areas, and for all/any aggregate base. The optimum lift thickness for
backfill soil will depend on the type of compaction equipment used. Generally, fill soil should be
placed in uniform lifts not exceeding eight inches in loose thickness. Fill placement and compaction
should be performed in overall conformance with the geotechnical recommendations and project
specifications in conformance with local ordinances.
A CTE geotechnical representative should observe and test the bottom of overexcavation and
compaction of soils within the proposed building footprints and other distress sensitive improvement
areas.
2.0 SEISMIC LOADING PARAMETERS
I
The seismic ground motion values listed in the table below were derived in accordance with the ASCE
7-10 Standard that is incorporated into the California Building Code, 2016. This was accomplished by
establishing the Site Class based on the soil properties at the site, and then calculating the site
I coefficients and parameters using the United States Geological Survey Seismic Design Maps
application. These values are intended for the design of structures to resist the effects of earthquake
ground motions.
\\ESC_SERVER\Projects\10-13000 to 10-13999 Projects\10-13292G\Ltr_Updat Recommendations Lot 4 - 10-13292G.doc
Update Geotechnical Recommendations Page 3
Proposed Tabata Ranch Subdivision Lot-4
Lemon Leaf Drive, Carlsbad California
August 26, 2016 (Revised March 5, 2018) CTE Job No. 10-13292G
TABLE 2.0
SEISMIC GROUND MOTION VALUES
2013 CBC AND ASCE 7-10
PARAMETER VALUE CBC REFERENCE (2016)
Site Class D ASCE 7, Table 20.3-1
Mapped Spect?al Response
Acceleration Parameter, S5 1.108g Figure 1613.3.1 (1)
Mapped Spectral Response
Acceleration Parameter, S 0.426g Figure 1613.3.1 (2)
Seismic Coefficient, Fa 1.057 Table 1613.3.3 (1)
Seismic Coefficient, F 1.574 Table 1613.3.3 (2)
MCE Spectral Response
Acceleration Parameter, 5MS
1.171g Section 1613.3.3
MCE Spectral Response
Acceleration Parameter, SMI
0.6719 Section 1613.3.3
Design Spectral Response
Acceleration, Parameter S0 0.780g Section 1613.3.4
Design Spectral Response
Acceleration, Parameter S01 0.447g Section 16 13.3.4
Peak Ground Acceleration PGAM 0.466g ASCE 7, Section 11.8.3
3.0 FOUNDATION WALL AND SLOPE SETBACK
I
Footings for structures should be designed such that the horizontal distance from the face of adjacent
descending slopes to the outer edge of the footing is a minimum of 10 feet. In addition, foundations
should bear beneath an imaginary 1:1 plane extended up from the nearest bottom edge of adjacent
I parallel trenches or excavations located within 10 feet. Deepening of affected footings should be a
suitable means of attaining the prescribed setbacks.
In addition, footings located adjacent to retaining walls should bear beneath an imaginary 1:1 plane
extending upward from the base of the wall retaining soil in order to minimize additional surcharge load
to the wall itself.
4.0 WALLS BELOW GRADE
If retaining walls are to be constructed in association with the proposed development, the following
parameters are anticipated to be applicable. For the design of subterranean walls where the surface of
I the backfill is level, it may be assumed that the soils will exert a lateral pressure equal to that developed
by a fluid with a density of 35 pcf. The active pressure should be used for walls free to yield at the top
at least 0.2 percent of the wall height. For walls restrained so that such movement is not permitted, an
I equivalent fluid pressure of 60 pcf should be used, based on at-rest soil conditions. The recommended
\\ESC_SERVER\Projects\10-13000 to 10-13999 Projects\10.13292G\Ltr_Update Recommendations Lot 4- 10-132920.doc
Update Geotechnical Recommendations Page 4
Proposed Tabata Ranch Subdivision Lot-4
Lemon Leaf Drive, Carlsbad California
August 26, 2016 (Revised March 5, 2018) CTE Job No. 10-13292G
I equivalent fluid pressures should be increased according to Table 4.0 below for walls retaining soils
inclined at 2:1 (horizontal: vertical). Walls below the water level are not anticipated for the subject site.
I In addition to the recommended earth pressure, subterranean structure walls adjacent to traffic loads
should be designed to resist a uniform lateral pressure of 100 psf. This is the result of an assumed 300-
psf surcharge behind the walls due to normal street traffic. If the traffic is kept back at least 10 feet or a
I distance equal to the retained soil height from the subject walls, whichever is less, the traffic surcharge
may be neglected. The project architect or structural engineer should determine the necessity of
waterproofing retaining walls to reduce moisture infiltration.
Retaining wall backfill located within a 45-degree wedge extending up from the heel of the wall should
consist of soil having an Expansion Index of 30 or less (ASTM D 4829) with less than 30 percent
passing the No. 200 sieve. The upper 12 to 18 inches of wall backfill should consist of lower
permeability soils, in order to reduce surface water infiltration behind walls. The project structural
engineer and/or architect should detail proper wall backdrains, including gravel drain zones, fills, filter
fabric and perforated drain pipes.
TABLE 4.0
EQUIVALENT FLUID UNIT WEIGHTS
(pounds per cubic foot)
SLOPE BACKFILL
WALL TYPE LEVEL BACKFILL 2:1 (HORIZONTAL:
VERTICAL)
CANTILEVER WALL
(YIELDING) 35 45
RESTRAINED WALL 60 80
Lateral pressures on cantilever retaining walls (yielding walls) due to earthquake motions may be
calculated based on work by Seed and Whitman (1970). The total lateral thrust against a properly
drained and backfilled cantilever retaining wall above the groundwater level can be expressed as:
PAE = PA + APAE
For non-yielding (or "restrained") walls, the total lateral thrust may be similarly calculated
based on work by Wood (1973):
PKE = PK + AP1
Where PA = Static Active Thrust (given previously Table 4.0)
PK = Static Restrained Wall Thrust (given previously Table 4.0)
APAE = Dynamic Active Thrust Increment = (3/8) kh yH2
APKE = Dynamic Restrained Thrust Increment = kh yH2
\\ESC_SERVER\Projects\10-13000 to 10-13999 Projects\10-1 3292G\Ltr_Update Recommendations Lot 4 - 10-13292G.doc
Update Geotechnical Recommendations Page 5
Proposed Tabata Ranch Subdivision Lot-4
Lemon Leaf Drive, Carlsbad California
August 26, 2016 (Revised March 5, 2018) CTE Job No. 10-13292G
kh = 2/3 Peak Ground Acceleration = 2/3 (PGAM)
H = Total Height of the Wall
= Total Unit Weight of Soil z 135 pounds per cubic foot
The increment of dynamic thrust in both cases should be distributed triangularly with a line of action
located at H/3 above the bottom of the wall (SEAOC, 2013).
These values assume non-expansive backfill and free-draining conditions. Measures should be taken to
prevent moisture buildup behind all retaining walls. Drainage measures should include free-draining
backfill materials and sloped, perforated drains, as designed and detailed by the wall engineer or
architect of record. These drains should discharge to an appropriate off-site location. Any necessary
waterproofing should be as specified by the project architect.
5.0 LIMITATIONS
As indicated, the updated recommendations herein are based on our evaluation performed to date and
could require modification as project improvement plans further progress and/or based on conditions
encountered during construction.
The field evaluation and geotechnical analysis referenced in our geotechnical documents was conducted
according to current engineering practice and the standard of care exercised by reputable Geotechnical
Consultants performing similar tasks in this area. No other warranty, expressed or implied, is made
regarding the conclusions, recommendations and opinions expressed. Variations may exist and
conditions not observed or described may be encountered during construction.
Our conclusions and recommendations are based on an analysis of the observed conditions. If
conditions different from those described are encountered, our office should be notified and additional
recommendations, if required, will be provided upon request.
We appreciate the opportunity to be of service on this project. Should you have questions, please
contact the undersigned at your convenience.
Respectfully submitted,
CONSTRUCTION TESTING & ENGINEERING, INC.
ESSI
T.
Dan T. Math, GE #2665 0 Rodney J. Jones, RC #84232 EXP, 9/30/17 ) p 12
Rodne
Principal Engineer * Project Engineer
oi
RJJ/JFLIDTM:nri
Appendix D Standard Grading Recommendations
\\ESC_SERVER\Projects\10-13000 to 10-13999 Projects\10-13292G\Ltr_Update Recommendations Lot 4- 10-13292G.doc
Update Geotechnical Recommendations Page 6
Proposed Tabata Ranch Subdivision Lot-4
Lemon Leaf Drive, Carlsbad California
August 26, 2016 (Revised March 5, 2018) CTE Job No. 10-13292G
I References: Interim As-Greaded Geotechnical Report
Proposed Tabata Ranch Subdivision
Lemon Leaf Drive
I Carlsbad, California
CTE Project No. 10-12101G, dated August 2, 2015
I Lot 3 Subdrain Recommendations and Elimination of Retaining Wall
Proposed Tabata Ranch Subdivision
Lemon Leaf Drive
I Carlsbad California
CTE Pro ect No. 10-12101G, dated July 14, 2014
I Transfer of Geotechnical Responsibility Letter
Proposed Tabata Ranch Subdivision
Lemon Leaf Drive
I Carlsbad, California
CTE Project No. 10-12101G, dated July 1, 2014
I Geotechnical and Update Report and Grading Plan Review
Proposed Tabata Ranch Subdivision
Lemon Leaf Drive, Carlsbad, California
I Vinje & Middleton Engineering Job # 01-364-P, dated August 2, 2006
Preliminary Geotechnical Investigation
I Proposed 4-Lot Subdivision, Tabata Ranch
Off Camino De Las Ondas and Lonicera Street, Carlsbad, California
Vinje & Middleton Engineering Job # 01-364-P, dated October 24, 2001
I
\\ESC_SERVER\Projects\10-13000 to 10-13999 Projects\10-13292G\Ltr_Update Recommendations Lot 4- 10-13292G.doc
APPENDIX D
STANDARD SPECIFICATIONS FOR GRADING
Appendix Page D-i
Standard Specifications for Grading
Section 1 - General
Construction Testing & Engineering, Inc. presents the following standard recommendations for
grading and other associated operations on construction projects. These guidelines should be
considered a portion of the project specifications. Recommendations contained in the body of
the previously presented soils report shall supersede the recommendations and or requirements as
specified herein. The project geotechnical consultant shall interpret disputes arising out of
interpretation of the recommendations contained in the soils report or specifications contained
herein.
I Section 2 - Responsibilities of Project Personnel
The geotechnical consultant should provide observation and testing services sufficient to general
I conformance with project specifications and standard grading practices. The geotechnical
consultant should report any deviations to the client or his authorized representative.
I The Client should be chiefly responsible for all aspects of the project. He or his authorized
representative has the responsibility of reviewing the findings and recommendations of the
I
geotechnical consultant. He shall authorize or cause to have authorized the Contractor and/or
other consultants to perform work and/or provide services. During grading the Client or his
authorized representative should remain on-site or should remain reasonably accessible to all
concerned parties in order to make decisions necessary to maintain the flow of the project.
The Contractor is responsible for the safety of the project and satisfactory completion of all
grading and other associated operations on construction projects, including, but not limited to,
earth work in accordance with the project plans, specifications and controlling agency
requirements.
Section 3 - Preconstruction Meeting
A preconstruction site meeting should be arranged by the owner and/or client and should include
the grading contractor, design engineer, geotechnical consultant, owner's representative and
representatives of the appropriate governing authorities.
Section 4 - Site Preparation
The client or contractor should obtain the required approvals from the controlling authorities for
the project prior, during and/or after demolition, site preparation and removals, etc. The
appropriate approvals should be obtained prior to proceeding with grading operations.
STANDARD SPECIFICATIONS OF GRADING
Page 1 of 26
I Appendix D Page D-2
I
Standard Specifications for Grading
- Clearing and grubbing should consist of the removal of vegetation such as brush, grass, woods,
stumps, trees, root of trees and otherwise deleterious natural materials from the areas to be
I graded. Clearing and grubbing should extend to the outside of all proposed excavation and fill
areas.
I Demolition should include removal of buildings, structures, foundations, reservoirs, utilities
(including underground pipelines, septic tanks, leach fields, seepage pits, cisterns, mining shafts,
I
tunnels, etc.) and other man-made surface and subsurface improvements from the areas to be
graded. Demolition of utilities should include proper capping and/or rerouting pipelines at the
project perimeter and cutoff and capping of wells in accordance with the requirements of the
I governing authorities and the recommendations of the geotechnical consultant at the time of
demolition.
I Trees, plants or man-made improvements not planned to be removed or demolished should be
protected by the contractor from damage or injury.
I Debris generated during clearing, grubbing and/or demolition operations should be wasted from
areas to be graded and disposed off-site. Clearing, grubbing and demolition operations should be
I
performed under the observation of the geotechnical consultant.
Section 5 - Site Protection
I Protection of the site during the period of grading should be the responsibility of the contractor.
S Unless other provisions are made in writing and agreed upon among the concerned parties,
I completion of a portion of the project should not be considered to preclude that portion or
adjacent areas from the requirements for site protection until such time as the entire project is
I
complete as identified by the geotechnical consultant, the client and the regulating agencies.
- Precautions should be taken during the performance of site clearing, excavations and grading to
I
protect :he work site from flooding, ponding or inundation by poor or improper surface drainage.
Temporary provisions should be made during the rainy season to adequately direct surface
drainage away from and off the work site. Where low areas cannot be avoided, pumps should be
kept on hand to continually remove water during periods of rainfall.
Rain related damage should be considered to include, but may not be limited to, erosion, silting,
I saturation, swelling, structural distress and other adverse conditions as determined by the
geotechnical consultant. Soil adversely affected should be classified as unsuitable materials and
should be subject to overexcavation and replacement with compacted fill or other remedial
I grading as recommended by the geotechnical consultant.
I STANDARD SPECIFICATIONS OF GRADING
Page 2 of 26
I
Appendix Page D-3
Standard Specifications for Grading
The contractor should be responsible for the stability of all temporary excavations.
Recommendations by the geotechnical consultant pertaining to temporary excavations (e.g.,
backcuts) are made in consideration of stability of the completed project and, therefore, should
not be considered to preclude the responsibilities of the contractor. Recommendations by the
geotechnical consultant should not be considered to preclude requirements that are more
restrictive by the regulating agencies. The contractor should provide during periods of extensive
rainfall plastic sheeting to prevent unprotected slopes from becoming saturated and unstable.
When deemed appropriate by the geotechnical consultant or governing agencies the contractor
shall install checkdams, desilting basins, sand bags or other drainage control measures.
In relatively level areas and/or slope areas, where saturated soil and/or erosion gullies exist to
depths of greater than 1.0 foot; they should be overexcavated and replaced as compacted fill in
accordance with the applicable specifications. Where affected materials exist to depths of 1.0
foot or less below proposed finished grade, remedial grading by moisture conditioning in-place,
followed by thorough recompaction in accordance with the applicable grading guidelines herein
may be attempted. If the desired results are not achieved, all affected materials should be
overexcavated and replaced as compacted fill in accordance with the slope repair
recommendations herein. If field conditions dictate, the geotechnical consultant may
recommend other slope repair procedures.
Section 6 - Excavations
6.1 Unsuitable Materials
Materials that are unsuitable should be excavated under observation and
recommendations of the geotechnical consultant. Unsuitable materials include, but may
not be limited to, dry, loose, soft, wet, organic compressible natural soils and fractured,
weathered, soft bedrock and nonengineered or otherwise deleterious fill materials.
Material identified by the geotechnical consultant as unsatisfactory due to its moisture
I conditions should be overexcavated; moisture conditioned as needed, to a uniform at or
above optimum moisture condition before placement as compacted fill.
If during the course of grading adverse geotechnical conditions are exposed which were
not anticipated in the preliminary soil report as determined by the geotechnical consultant
additional exploration, analysis, and treatment of these problems may be recommended.
STANDARD SPECIFICATIONS OF GRADING
Page 3 of 26
Appendix D Page D-4
Standard Specifications for Grading
6.2 Cut Slopes
Unless otherwise recommended by the geotechnical consultant and approved by the
regulating agencies, permanent cut slopes should not be steeper than 2:1 (horizontal:
vertical).
The geotechnical consultant should observe cut slope excavation and if these excavations
expose loose cohesionless, significantly fractured or otherwise unsuitable material, the
materials should be overexcavated and replaced with a compacted stabilization fill. If
encountered specific cross section details should be obtained from the Geotechnical
Consultant.
When extensive cut slopes are excavated or these cut slopes are made in the direction of
the prevailing drainage, a non-erodible diversion swale (brow ditch) should be provided
at the top of the slope.
I;'l P1 Arpnc
All lot pad areas, including side yard terrace containing both cut and fill materials,
transitions, located less than 3 feet deep should be overexcavated to a depth of 3 feet and
replaced with a uniform compacted fill blanket of 3 feet. Actual depth of overexcavation
may vary and should be delineated by the geotechnical consultant during grading,
especially where deep or drastic transitions are present.
For pad areas created above cut or natural slopes, positive drainage should be established
away from the top-of-slope. This may be accomplished utilizing a berm drainage swale
and/or an appropriate pad gradient. A gradient in soil areas away from the top-of-slopes
of 2 percent or greater is recommended.
U Section 7 - Compacted Fill
All fill materials should have fill quality, placement, conditioning and compaction as specified
below or as approved by the geotechnical consultant.
7.1 Fill Material Quality
Excavated on-site or import materials which are acceptable to the geotechnical consultant
may be utilized as compacted fill, provided trash, vegetation and other deleterious
materials are removed prior to placement. All import materials anticipated for use on-site
should be sampled tested and approved prior to and placement is in conformance with the
requirements outlined.
STANDARD SPECIFICATIONS OF GRADING
Page 4 of 26
Appendix D Page D-5
Standard Specifications for Grading
Rocks 12 inches in maximum and smaller may be utilized within compacted fill provided
sufficient fill material is placed and thoroughly compacted over and around all rock to
effectively fill rock voids. The amount of rock should not exceed 40 percent by dry
weight passing the 3/4-inch sieve. The geotechnical consultant may vary those
requirements as field conditions dictate.
Where rocks greater than 12 inches but less than four feet of maximum dimension are
generated during grading, or otherwise desired to be placed within an engineered fill,
special handling in accordance with the recommendations below. Rocks greater than
four feet should be broken down or disposed off-site.
7.2 Placement of Fill
Prior to placement of fill material, the geotechnical consultant should observe and
approve the area to receive fill. After observation and approval, the exposed ground
surface should be scarified to a depth of 6 to 8 inches. The scarified material should be
conditioned (i.e. moisture added or air dried by continued discing) to achieve a moisture
content at or slightly above optimum moisture conditions and compacted to a minimum
of 90 percent of the maximum density or as otherwise recommended in the soils report or
by appropriate government agencies.
I
Compacted fill should then be placed in thin horizontal lifts not exceeding eight inches in
loose thickness prior to compaction. Each lift should be moisture conditioned as needed,
thoroughly blended to achieve a consistent moisture content at or slightly above optimum
l and thoroughly compacted by mechanical methods to a minimum of 90 percent of
laboratory maximum dry density. Each lift should be treated in a like manner until the
desired finished grades are achieved.
The contractor should have suitable and sufficient mechanical compaction equipment and
I
watering apparatus on the job site to handle the amount of fill being placed in
consideration of moisture retention properties of the materials and weather conditions.
I When placing fill in horizontal lifts adjacent to areas sloping steeper than 5:1 (horizontal:
vertical), horizontal keys and vertical benches should be excavated into the adjacent slope
area. Keying and benching should be sufficient to provide at least six-foot wide benches
I and a minimum of four feet of vertical bench height within the firm natural ground, firm
bedrock or engineered compacted fill. No compacted fill should be placed in an area
after keying and benching until the geotechnical consultant has reviewed the area.
Material generated by the benching operation should be moved sufficiently away from
STANDARD SPECIFICATIONS OF GRADING
Page 5 of 26
Appendix D Page D-6
Standard Specifications for Grading
the bench area to allow for the recommended review of the horizontal bench prior to
placement of fill.
Within a single fill area where grading procedures dictate two or more separate fills,
temporary slopes (false slopes) may be created. When placing fill adjacent to a false
slope, benching should be conducted in the same manner as above described. At least a
3-foot vertical bench should be established within the firm core of adjacent approved
compacted fill prior to placement of additional fill. Benching should proceed in at least
3-foot vertical increments until the desired finished grades are achieved.
Prior to placement of additional compacted fill following an overnight or other grading
delay, the exposed surface or previously compacted fill should be processed by
scarification, moisture conditioning as needed to at or slightly above optimum moisture
content, thoroughly blended and recompacted to a minimum of 90 percent of laboratory
maximum dry density. Where unsuitable materials exist to depths of greater than one
foot, the unsuitable materials should be over-excavated.
Following a period of flooding, rainfall or overwatering by other means, no additional fill
I should be placed until damage assessments have been made and remedial grading
performed as described herein.
Rocks 12 inch in maximum dimension and smaller may be utilized in the compacted fill
provided the fill is placed and thoroughly compacted over and around all rock. No
I oversize material should be used within 3 feet of finished pad grade and within 1 foot of
other compacted fill areas. Rocks 12 inches up to four feet maximum dimension should
be placed below the upper 10 feet of any fill and should not be closer than 15 feet to any
slope face. These recommendations could vary as locations of improvements dictate.
Where practical, oversized material should not be placed below areas where structures or
I
deep utilities are proposed. Oversized material should be placed in windrows on a clean,
overexcavated or unyielding compacted fill or firm natural ground surface. Select native
or imported granular soil (S.E. 30 or higher) should be placed and thoroughly flooded
I over and around all windrowed rock, such that voids are filled. Windrows of oversized
material should be staggered so those successive strata of oversized material are not in
I
the same vertical plane.
It may be possible to dispose of individual larger rock as field conditions dictate and as
recommended by the geotechnical consultant at the time of placement.
I STANDARD SPECIFICATIONS OF GRADING
Page 6 of 26
I
Appendix D Page D-7
Standard Specifications for Grading
The contractor should assist the geotechnical consultant and/or his representative by
digging test pits for removal determinations and/or for testing compacted fill. The
contractor should provide this work at no additional cost to the owner or contractor's
client.
Fill should be tested by the geotechnical consultant for compliance with the
recommended relative compaction and moisture conditions. Field density testing should
conform to ASTM Method of Test D 1556-00, D 2922-04. Tests should be conducted at
a minimum of approximately two vertical feet or approximately 1,000 to 2,000 cubic
yards of fill placed. Actual test intervals may vary as field conditions dictate. Fill found
not to be in conformance with the grading recommendations should be removed or
otherwise handled as recommended by the geotechnical consultant.
7.3 Fill Slopes
Unless otherwise recommended by the geotechnical consultant and approved by the
regulating agencies, permanent fill slopes should not be steeper than 2:1 (horizontal:
vertical).
Except as specifically recommended in these grading guidelines compacted fill slopes
should be over-built two to five feet and cut back to grade, exposing the firm, compacted
fill inner core. The actual amount of overbuilding may vary as field conditions dictate. If
the desired results are not achieved, the existing slopes should be overexcavated and
reconstructed under the guidelines of the geotechnical consultant. The degree of
Dverbuilding shall be increased until the desired compacted slope surface condition is
achieved. Care should be taken by the contractor to provide thorough mechanical
compaction to the outer edge of the overbuilt slope surface.
At the discretion of the geotechnical consultant, slope face compaction may be attempted
by conventional construction procedures including backrolling. The procedure must
create a firmly compacted material throughout the entire depth of the slope face to the
surface of the previously compacted firm fill intercore.
During grading operations, care should be taken to extend compactive effort to the outer
edge of the slope. Each lift should extend horizontally to the desired finished slope
surface or more as needed to ultimately established desired grades. Grade during
construction should not be allowed to roll off at the edge of the slope. It may be helpful
to elevate slightly the outer edge of the slope. Slough resulting from the placement of
individual lifts should not be allowed to drift down over previous lifts. At intervals not
STANDARD SPECIFICATIONS OF GRADING
Page 7 of 26
I Appendix D Page D-8
Standard Specifications for Grading
exceeding four feet in vertical slope height or the capability of available equipment,
whichever is less, fill slopes should be thoroughly dozer trackrolled.
For pad areas above fill slopes, positive drainage should be established away from the
top-of-slope. This may be accomplished using a berm and pad gradient of at least two
percent.
I
Section 8 - Trench Backfill
Utility and/or other excavation of trench backfill should, unless otherwise recommended, be
I compacted by mechanical means. Unless otherwise recommended, the degree of compaction
should be a minimum of 90 percent of the laboratory maximum density.
I Within slab areas, but outside the influence of foundations, trenches up to one foot wide and two
feet deep may be backfilled with sand and consolidated by jetting, flooding or by mechanical
I
means. If on-site materials are utilized, they should be wheel-rolled, tamped or otherwise
compacted to a firm condition. For minor interior trenches, density testing may be deleted or
spot testing may be elected if deemed necessary, based on review of backfill operations during
I construction.
If utility contractors indicate that it is undesirable to use compaction equipment in close
I proximity to a buried conduit, the contractor may elect the utilization of light weight mechanical
compaction equipment and/or shading of the conduit with clean, granular material, which should
I
be thoroughly jetted in-place above the conduit, prior to initiating mechanical compaction
procedures. Other methods of utility trench compaction may also be appropriate, upon review of
the geotechnical consultant at the time of construction.
In cases where clean granular materials are proposed for use in lieu of native materials or where
flooding or jetting is proposed, the procedures should be considered subject to review by the
geotechnical consultant. Clean granular backfill and/or bedding are not recommended in slope
areas.
Section 9 - Drainage
Where deemed appropriate by the geotechnical consultant, canyon subdrain systems should be
installed in accordance with CTE's recommendations during grading.
Typical subdrains for compacted fill buttresses, slope stabilization or sidehill masses, should be
installed in accordance with the specifications.
STANDARD SPECIFICATIONS OF GRADING
Page 8 of 26
Appendix D Page D-9
I
Standard Specifications for Grading
Roof, pad and slope drainage should be directed away from slopes and areas of structures to
I
suitable disposal areas via non-erodible devices (i.e., gutters, downspouts, and concrete swales).
For drainage in extensively landscaped areas near structures, (i.e., within four feet) a minimum ' of 5 percent gradient away from the structure should be maintained. Pad drainage of at least 2
percent should be maintained over the remainder of the site.
I Drainage patterns established at the time of fine grading should be maintained throughout the life
of the project. Property owners should be made aware that altering drainage patterns could be
I
detrimental to slope stability and foundation performance.
Section 10 - Slope Maintenance
10.1 - Landscape Plants
To enhance surficial slope stability, slope planting should be accomplished at the
I
completion of grading. Slope planting should consist of deep-rooting vegetation
requiring little watering. Plants native to the southern California area and plants relative
to native plants are generally desirable. Plants native to other semi-arid and and areas
I may also be appropriate. A Landscape Architect should be the best party to consult
regarding actual types of plants and planting configuration.
1 10.2 - Irrigation
Irrigation pipes should be anchored to slope faces, not placed in trenches excavated into
slope faces.
Slope irrigation should be minimized. If automatic timing devices are utilized on
I irrigation systems, provisions should be made for interrupting normal irrigation during
periods of rainfall.
10.3
- Repair
As a precautionary measure, plastic sheeting should be readily available, or kept on hand,
to protect all slope areas from saturation by periods of heavy or prolonged rainfall. This
measure is strongly recommended, beginning with the period prior to landscape planting.
I
If slope failures occur, the geotechnical consultant should be contacted for a field review
of site conditions and development of recommendations for evaluation and repair.
I If slope failures occur as a result of exposure to period of heavy rainfall, the failure areas
and currently unaffected areas should be covered with plastic sheeting to protect against
additional saturation.
STANDARD SPECIFICATIONS OF GRADING
Page 9 of 26
I
Appendix D Page D- 10
Standard Specifications for Grading
In the accompanying Standard Details, appropriate repair procedures are illustrated for
superficial slope failures (i.e., occurring typically within the outer one foot to three feet of
a slope face).
STANDARD SPECIFICATIONS OF GRADING
Page 10 of 26
BENCHING FILL OVER NATURAL
SURFACE OF FIRM
EARTH MATERIAL
FILL SLOPE
;MIN 2%MIN ol 10, LJ TYPICAL
15' MIN. (INCLINED 2% MIN. INTO SLOPE)
BENCHING FILL OVER CUT
SURFACE OF FIRM
EARTH MATERIAL
FINISH FILL SLOPE
FINISH CUT
SLOPE
je~2% MIN 10,
TYPICAL
15' MIN OR STABILITY EQUIVALENT PER SOIL
ENGINEERING (INCLINED 2% MIN. INTO SLOPE)
NOT TO SCALE
BENCHING FOR COMPACTED FILL DETAIL
STANDARD SPECIFICATIONS FOR GRADING
Page 11 of 26
TOE OF SLOPE SHOWN
ON GRADING PLAN
FILL
- -
00,
------- I I'
/
MINIMUM _/ - 15 MINIMUM BASE KEY WIDTH
DOWNSLOPE
KEY DEPTH
TYPICAL BENCH
HEIGHT
PROVIDE BACKDRAIN AS REQUIRED
PER RECOMMENDATIONS OF SOILS
ENGINEER DURING GRADING
WHERE NATURAL SLOPE GRADIENT IS 5:1 OR LESS,
BENCHING IS NOT NECESSARY. FILL IS NOT TO BE
PLACED ON COMPRESSIBLE OR UNSUITABLE MATERIAL.
NOT TO SCALE
FILL SLOPE ABOVE NATURAL GROUND DETAIL
STANDARD SPECIFICATIONS FOR GRADING
Page 12 of 26
10' TYPICAL BENCH
WIDTH VARIES
COMPETENT EARTH
MATERIAL
REMOVE ALL TOPSOIL, COLLUVIUM,
AND CREEP MATERIAL FROM
TRANSITION
CUT/FILL CONTACT SHOWN
ON GRADING PLAN
FILL
cn
Z CUT/FILL CONTACT SHOWN - C ON "AS-BUILT"
C C0
o0'_
TYPICAL C,) 1ps
p) C•)
- NATURALCD _____________
o TOPOGRAPHY" 2% MIN 10 10' TYPICAL
15' MINIMUM C) Q5 CUT SLOPE* BEDROCK OR APPROVED m FOUNDATION MATERIAL 0
C,
C
Z *NOTE: CUT SLOPE PORTION SHOULD BE C) MADE PRIOR TO PLACEMENT OF FILL
NOT TO SCALE
FILL SLOPE ABOVE CUT SLOPE DETAIL
j- SURFACE OF
/ COMPETENT
------------------
C
MATERIAL
OMPACTED FILL
\\
TYPICAL BENCHING
REMOVE UNSUITABLE
MATERIAL
SEE DETAIL BELOW
INCLINE TOWARD DRAIN
AT 2% GRADIENT MINIMUM
DETAIL
-------------
MINIMUM 9 FT PER LINEAR FOOT MINIMUM 4" DIAMETER APPROVED
OF APPROVED FILTER MATERIAL PERFORATED PIPE (PERFORATIONS
DOWN)
6" FILTER MATERIAL BEDDING
14"
MINIMUM
CALTRANS CLASS 2 PERMEABLE MATERIAL APPROVED PIPE TO BE SCHEDULE 40 FILTER MATERIAL TO MEET FOLLOWING POLY-VINYL-CHLORIDE (P.V.C.) OR SPECIFICATION OR APPROVED EQUAL: APPROVED EQUAL. MINIMUM CRUSH
SIEVE SIZE PERCENTAGE PASSING STRENGTH 1000 psi
1 100 PIPE DIAMETER TO MEET THE
FOLLOWING CRITERIA, SUBJECT TO
90-100 FIELD REVIEW BASED ON ACTUAL
GEOTECHNICAL CONDITIONS
40-100 ENCOUNTERED DURING GRADING
NO. 4 25-40 LENGTH OF RUN PIPE DIAMETER
NO.8 18-33 INITIAL 500' 4"
NO. 30 5-15 500' TO 1500' 6"
NO. 50 0-7 1500' 8"
NO. 200 0-3 NOT TO SCALE
TYPICAL CANYON SUBDRAIN DETAIL
STANDARD SPECIFICATIONS FOR GRADING
Page 14 of 26
CANYON SUBDRAIN DETAILS
SURFACE OF
COMPETENT f MATERIAL
-----------------
COMPACTED FILL
TYPICAL BENCHING
REMOVE UNSUITABLE
MATERIAL
SEE DETAILS BELOW
INCLINE TOWARD DRAIN
AT 2% GRADIENT MINIMUM
TRENCH DETAILS
6" MINIMUM OVERLAP
MINIMUM 9 FT PER LINEAR FOOT OPTIONAL V-DITCH DETAIL
OR APPROVED EQUAL - -
OF APPROVED DRAIN MATERIAL
MIRAFI 140N FABRIC
MIRAFI 140N FABRIC
OR APPROVED EQUAL
6" MINIMUM OVERLAP
L2j. APPROVED PIPE TO BE
24" SCHEDULE 40
7
POLY-
01 (P.V.C.)
0
MINIMUM OR APPROVED EQUAL.
MINIMUM CRUSH STRENGTH
MIMtM9 P PER LINEAR FOOT 1000 PSI.
MINIMUM \ OF APPROVED DRAIN MATERIAL
600 TO 90°
DRAIN MATERIAL TO MEET FOLLOWING PIPE DIAMETER TO MEET THE
SPECIFICATION OR APPROVED EQUAL: FOLLOWING CRITERIA, SUBJECT TO
FIELD REVIEW BASED ON ACTUAL
SIEVE SIZE PERCENTAGE PASSING GEOTECHNICAL CONDITIONS
ENCOUNTERED DURING GRADING
88-100 LENGTH OF RUN PIPE DIAMETER
1" 5-40
INITIAL 500 4"
3/4 0-17 500' TO 1500' 6"
0-7 1500' 8"
NO. 200 0-3
NOT TO SCALE
GEOFABRIC SUBDRAIN
STANDARD SPECIFICATIONS FOR GRADING
Page 15 of 26
FRONT VIEW
CONCRETE
CUT-OFF WALL
SUBDRAIN PIPE
6" Min.
-•-.
- 6" Mm.
24 'in' . -I
6" Mm.
SIDE VIEW
-112 Mm. F- CONCRETE ,- - - -
CUT-OFF WALL J 6" Mm.
SOILD SUBDRAIN PIPE b. PERFORATED SUBDRAIN PIPE
NOT TO SCALE
RECOMMENDED SUBDRAIN CUT-OFF WALL
STANDARD SPECIFICATIONS FOR GRADING
Page 16 of 26
FRONT VIEW
! _• - , S S S
S S S
,
24" Mm.
S S S
S S
S S S I
S S • 5
24" Min.-
SUBDRAIN OUTLET
PIPE (MINIMUM 4" DIAMETER)
SIDE VIEW
ALL BACKFILL SHOULD BE COMPACTED
IN CONFORMANCE WITH PROJECT
SPECIFICATIONS. COMPACTION EFFORT
SHOULD NOT DAMAGE STRUCTURE
6"
CONCRETE
HEADWALL - 4" \
"
S
Mm
NOTE: HEADWALL SHOULD OUTLET AT TOE OF SLOPE
OR INTO CONTROLLED SURFACE DRAINAGE DEVICE
ALL DISCHARGE SHOULD BE CONTROLLED
THIS DETAIL IS MINIMUM DESIGN AND MAY BE
MODIFIED DEPENDING UPON ENCOUNTERED
CONDITIONS AND LOCAL REQUIREMENTS
NOT TO SCALE
TYPICAL SUBDRAIN OUTLET HEADWALL DETAIL
STANDARD SPECIFICATIONS FOR GRADING
Page 17 of 26
4" DIAMETER PERFORATED
PIPE BACKDRAIN
4" DIAMETER NON-PERFORATED
PIPE LATERAL DRAIN
SLOPE PER PLAN —s.
15' MINIMUM
FILTER MATERIAL ENCHING
i/V
H/2
AN ADDITIONAL BACKDRAIN
AT MID-SLOPE WILL BE REQUIRED FOR
SLOPE IN EXCESS OF 40 FEET HIGH.
KEY-DIMENSION PER SOILS ENGINEER
(GENERALLY 1/2 SLOPE HEIGHT, 15' MINIMUM)
DIMENSIONS ARE MINIMUM RECOMMENDED
NOT TO SCALE
TYPICAL SLOPE STABILIZATION FILL DETAIL
STANDARD SPECIFICATIONS FOR GRADING
Page 18 of 26
4" DIAMETER PERFORATED
PIPE BACKDRAIN
4' DIAMETER NON-PERFORATED
PIPE LATERAL DRAIN
15' MINIMUM
SLOPE PER PLAN
2.0%
FILTER MATERIAL BENCHING
4±HI H/2
1
2'
ADDITIONAL BACKDRAIN AT
MID-SLOPE WILL BE REQUIRED
FOR SLOPE IN EXCESS OF 40
FEET HIGH.
KEY-DIMENSION PER SOILS ENGINEER
DIMENSIONS ARE MINIMUM RECOMMENDED
NOT TO SCALE
TYPICAL BUTTRESS FILL DETAIL
STANDARD SPECIFICATIONS FOR GRADING
Page 19 of 26
FINAL LIMIT OF DAYLIGHT
EXCAVATION LINE
FINISH PAD
OVEREXCAVATE 3'
AND REPLACE WITH
COMPACTED FILL
OVEREXCAVATE
20' MA)(IMUM SNAVAMAVAVAM MAN
COMPETENT BEDROCK
2% MIN
2' MINIMUM \\ 'L TYPICAL BENCHING
OVERBURDEN LOCATION OF BACKDRAIN AND
(CREEP-PRONE) \ OUTLETS PER SOILS ENGINEER
\ AND/OR ENGINEERING GEOLOGIST
\ DURING GRADING. MINIMUM 2%
\ FLOW GRADIENT TO DISCHARGE
LOCATION.
EQUIPMENT WIDTH (MINIMUM 15')
NOT TO SCALE
DAYLIGHT SHEAR KEY DETAIL
STANDARD SPECIFICATIONS FOR GRADING
Page 20 of 26
PROPOSED GRADING
liz -
15
1 -
COMPACTED FILL
1.5
_
nw,1 PROVIDE BACKDRAIN, PER
BACKDRAIN DETAIL. AN
ADDITIONAL BACKDRAIN
AT MID-SLOPE WILL BE
REQUIRED FOR BACK
BASE WIDTH 'W' DETERMINED SLOPES IN EXCESS OF
BY SOILS ENGINEER 40 FEET HIGH. LOCATIONS
OF BACKDRAINS AND OUTLETS
PER SOILS ENGINEER AND/OR
ENGINEERING GEOLOGIST
DURING GRADING. MINIMUM 2%
FLOW GRADIENT TO DISCHARGE
LOCATION.
NOT TO SCALE
TYPICAL SHEAR KEY DETAIL
STANDARD SPECIFICATIONS FOR GRADING
Page 21 of 26
FINISH SURFACE SLOPE
3 FT MINIMUM PER LINEAR FOOT
APPROVED FILTER ROCK*
CONCRETE COLLAR
PLACED NEAT COMPACTED FILL
A
4" MINIMUM DIAMETER
SOLID OUTLET PIPE
SPACED PER SOIL
ENGINEER REQUIREMENTS
DURING GRADING TYPICAL
BENCHING
- 4" MINIMUM APPROVED
PERFORATED PIPE**
(PERFORATIONS DOWN)
MINIMUM 2% GRADIENT
TO OUTLET
BENCH INCLINED
TOWARD DRAIN
TEMPORARY FILL LEVEL
MINIMUM
12" COVER BACKFILL MINIMUM 4" DIAMETER APPROVED
SOLID OUTLET PIPE
**APPROVED PIPE TYPE:
SCHEDULE 40 POLYVINYL CHLORIDE
(P.V.C.) OR APPROVED EQUAL.
MINIMUM CRUSH STRENGTH 1000 Ps
12"
MINIMUM
*FILTER ROCK TO MEET FOLLOWING
SPECIFICATIONS OR APPROVED EQUAL:
SIEVE SIZE PERCENTAGE PASSING
1" 100
90-100
40-100
NO.4 25-40
NO. 30 5-15
NO. 50 0-7
NO. 200 0-3
NOT TO SCALE
L TYPICAL BACKDRAIN DETAIL
STANDARD SPECIFICATIONS FOR GRADING
Page 22 of 26
FINISH SURFACE SLOPE
MINIMUM 3 FT PER LINEAR FOOT
OPEN GRADED AGGREGATE*
TAPE AND SEAL AT COVER
CONCRETE COLLAR
PLACED NEAT -... COMPACTED FILL
1 '''
"- MIRAFI 140N FABRIC OR 4J APPROVED EQUAL
4" MINIMUM APPROVED
PERFORATED PIPE
(PERFORATIONS DOWN)
\ MINIMUM 2% GRADIENT \ TO OUTLET
TYPICAL "— BENCH INCLINED
BENCHING TOWARD DRAIN
-"-------- 2.0%
A
MINIMUM 4" DIAMETER
SOLID OUTLET PIPE
SPACED PER SOIL
ENGINEER REQUIREMENTS
TEMPORARY FILL LEVEL
MINIMUM MINIMUM 4" DIAMETER APPROVED
12" COVER SOLID OUTLET PIPE
L 12"
MINIMUM *NOTE: AGGREGATE TO MEET FOLLOWING
SPECIFICATIONS OR APPROVED EQUAL:
SIEVE SIZE PERCENTAGE PASSING
100
1" 5-40
3/4 0-17
0-7
NOT TO SCALE
NO. 200 0-3
BACKDRAIN DETAIL (GEOFRABIC)
STANDARD SPECIFICATIONS FOR GRADING
Page 23 of 26
.
FILL SLOPE
CLEAR ZONE —/
Icoc 3
SOIL SHALL BE PUSHED OVER I EQUIPMENT WIDTH
ROCKS AND FLOODED INTO J / VOIDS. COMPACT AROUND S
AND OVER
STACK BOULDERS END TO END.
DO NOT PILE UPON EACH OTHER.
10,
FILL SLOPE ol
STAGGER 10' MIN ROWS
iCOMPETE
NOT TO SCALE
ROCK DISPOSAL DETAIL
STANDARD SPECIFICATIONS FOR GRADING
Page 24 of 26
FINISHED GRADE BUILDING I
- NO OVERSIZE, AREA FOR
10, FOUNDATION, UTILITIE
AND SWIMMING POOLSS,
1
-
0
WINDROW J
5' MINIMUM OR BELOW
DEPTH OF DEEPEST
UTILITY TRENCH
(WHICHEVER GREATER)
TYPICAL WINDROW DETAIL (EDGE VIEW
PROFILE VIEW
NOT TO SCALE
ROCK DISPOSAL DETAIL
STANDARD SPECIFICATIONS FOR GRADING
Page 25 of 26
SLOPE F
STREET
15'
GENERAL GRADING RECOMMENDATIONS
CUT LOT
—ORIGINAL
GROUND
- - -
- - -
- -
TOPSOIL, COLLUVIUM AND
WEATHERED BEDROCK
-_ 5' MIN
OVEREXCAVATE
- - UNWEATHERED BEDROCK AND REGRADE
CUT/FILL LOT (TRANSITION)
ORIGINAL
...—GROUND
- -• - - -
-'MIN 01 .00 lo
' M IN
OVEREXCAVATE
AND REGRADE -rI'IJ VVL.rtll ILrLLJ I BEDROCK
UNWEATHERED BEDROCK
- NOT TO SCALE
TRANSITION LOT DETAIL
STANDARD SPECIFICATIONS FOR GRADING
Page 26 of 26
COMPACTED FILL
TOPSOIL, COLLUVIUM
AkIF, AIA1JDr,