HomeMy WebLinkAboutSDP 01-10A; ENCINAS CREEK APARTMENT HOMES; DRAINAGE STUDY; 2012-04-05DRAINAGE STUDY
FOR
ENCINAS CREEK
APARTMENT HOMES
S.D.P. 01-10(A)
Job No. 10-1302
February 8, 2011
rT
I
I
L,
I
Prepared by:
O'DAY CONSULTANTS, INC.
2710 Lc•ker Avenue West
Suite 100
Carlsbad, California 92010
Tel: (760) 931-7700
Fax: (760) 931-8680
I
2v±
George O'D' RCE 32014
Exp. 12/31/12 / Date
TABLE OF CONTENTS
SECTION 1
I
INTRODUCTION AND PROJECT DESCRIPTION
HYDROLOGIC CALCULATIONS
Existing Condition Analysis
Proposed Condition Analysis
HYDROLOGY
Modified Rational Method Description
Program Process
SECTION 2
Vicinity Map
Runoff Coefficients
Isopluvial Maps
100-Year, 6-Hour
100-Year, 24-Hour
Intensity-Duration Design Chart - Figure 3-2
Overland Time of Flow Nomograph - Figure 3-3
Maximum Overland Flow Length & Initial Time of Concentration - Table 3-2
Nomograph for Determination of Tc for Natural Watersheds - Figure 3-4
San Diego County Soils Interpretation Study
SECTION 3
Hydrology
100 year Analysis
Existing Condition
SECTION 4
Hydrology
100 year Analysis
Proposed Condition
fctionj
SECTION 5
Exhibit A Existing Condition Drainage Map
Exhibit B Proposed Condition Drainage Map
SECTION 1
I
INTRODUCTION AND PROJECT DESCRIPTION
I The following Hydrology Study has been prepared to support the proposed Site Development
Plan for S.D.P. 01-10(A), Enemas Creek Apartment Homes. The project (Site) is located
I
adjacent to the easterly side of College Blvd and just south of Cannon Road in the City of
Carlsbad. The site is 7.54 gross acres, and is comprised of 0.98 acre Open Space Lot and 6.21
acres of graded area. A Preliminary Storm Water Management Plan dated February 1, 2011 was
I
prepared for the Site by O'Day Consultants. A drainage study titled "Preliminary Hydrology
Report for Cantarini Tentative Map CT 00-18" revised January 14, 2003 has also been prepared
for the mass grading of the site by Buccola Engineering. The planned mass graded site is
I
assumed to be the "existing conditions" for this project
The proposed project will consist of five apartment buildings with attached garages, a recreation
center, drive aisles, open and covered parking spaces, and landscaped areas. The Site will be
bordered by College Blvd to the west, Street 'C' to the south and open space to the north and
east.
HYDROLOGIC CALCULATIONS
Existing Condition Analysis
The project is located in the Los Monos Hydrologic Subarea (904.31) of the Agua Hedionda
Watershed in the Carlsbad Hydrologic Unit in the San Diego Region.
The site was analyzed assuming the mass grading has been completed. The mass graded pad
surface drains into a storm drain in Street 'C', which connects the storm drain system in College
Blvd and outlets a short distance away into a natural drainage course to the west of College Blvd.
The Open Space Lot follows a natural drainage course to the north.
See Section 3 for hydrologic calculations for existing conditions and Section 5 for a depiction of
the hydrologic nodes and subbasins for the existing site.
Proposed Condition Analysis
Five apartment buildings, a recreation center and associated parking are planned for the Site.
The Open Space Lot to the north will remain ungraded and retain its natural drainage patterns.
The developed site utilizes numerous BMP's throughout the project. Runoff from impervious
areas is directed to bioretention basins and pervious concrete before entering the storm drain
system. This analysis is based on the very conservative assumption that runoff from the site is
minimally affected by the infiltration that will occur from the use of these BMP's. This
- assumption will ensure that the storm drain system will still be adequately sized should these
BMP's become clogged or ineffective. Ultimately, all runoff from the developed areas will be
directed to the storm drain system in Street 'C', as in the existing condition. See Section 4 for
these calculations and Section 5 for a depiction of the hydrologic nodes and sub-basins for the
proposed site.
I
I
i HYDROLOGY
The hydrologic analyses are being performed according to the 2003 San Diego County
I Hydrology Manual. The overall drainage area is less than one square mile and includes junctions
of independent drainage systems; therefore, the Modified Rational Method is being used for the
analyses. The Modified Rational Method is applicable to a 6-hour storm duration because the
I procedure uses intensity-Duration Design Charts that are based on a 6-hour storm duration. In
some cases, the 6-hour precipitation must be adjusted based on the ratio of the 6- to 24-hour
precipitation. This will be performed where necessary.
I Modified Rational Method Description
The modified rational method, as described in the 2003 San Diego County Flood
Control/Hydrology Manual, is used to estimate surface runoff flows.
The basic equation: Q = CIA
C = runoff coefficient (varies with surface)
I = intensity (varies with time of concentration)
A = area in acres
For the 100-year design storm, the 6-hour rainfall amount is 2.6 inches and the 24-hour rainfall
amount is 4.5 inches.
-
I
I
File: G:\103 102\Hydrology\120405MF\ HollySpringslvlF.doc
I
SECTION 2
- - - - - - - - - - - - - - - - - - -
CITY OF OCEANSIDE
SITE
CITY OF VISTA
CITY OF ENCINITAS
[lfo>"ITY OF
SAN MARCOS
7. jJJf
VICINITY A114P
NO SCALE
- - - - - - - - - - - I - - - - U ___
San Diego County 1-lyclr010gy Miiiiu:il Section: 3 Dale: June 2003 Page: 6 ot 26
Table 3-I
RUNOFF COEFFICIENTS FOR URBAN AREAS
Land Use RunolTCoellicient C"
Soil Type
NRCS Elements County Elements I NeIPER A B C 1)
Undisturbed 1"latural Terrain (Natural)
Low Density Residential (LDR)
Low Density Residential (LDR)
Low Density Residential (LDR)
Medium Density Residential (MDR
Medium Density Residential (MDR)
Medium Density Residential (MDR)
Medium Density Residential (MDR)
High Density Residential (llDR)
High Density Residential (I-I DR )
Co in nerc a I/I ii do stri at (N. Corn)
Commercial/Industrial (G. Coin)
Commercial/i nclustrial (0.1'. Corn
Coinniercial/lndustrial (Limited I.)
Coninereiaifl ndustrial (General
Permanent Open Space 0* 0.20 0.25 0.30 0.35
Residential, 1.0 DU/A or less 10 0.27 0.32 0.36 0.41
Residential, 2.0 DU/A or less 20 0.34 0.38 0.42 0.46
Residential. 2.9 DU/A or less 25 0.38 0.41 0.45 0.49
Residential, 4.3 DU/A or less 30 041 0.45 0.48 0.52
Residential, 7.3 DU/A or less 40 0.48 0.51 0.54 0,57
Residential. 10.9 DU/A or less 45 0.52 0.54 0.57 0.60
Residential, 14.5 DU/A or less 50 0.55 0.58 0.60 063
Residential, 24.0 DU/A or less 65 0.66 0.67 0.69 0.71
Residential, 43.0 DU/A or less 80 0.76 0.77 0.78 0.71)
Neighborhood Commercial 80 ((.76 0.77 (1.78 1). 71)
General Commercial 85 0.80 0.80 0.81 0.82
Office Professional/Comrnereial 90 0.83 0.84 0.84 0.85
Limited Industrial 90 0.83 0.84 0.84 0.85
General Industrial 95 0.87 0.87 0,87 0.87
i te vitiucs il5SUCIilICU vnn U Zo IniperViOuS may Dc used or direct calculation Ut the nmnotl coct!iciciil is described in Section 3. I .2 (m'eprcseiltimlg tIle pervious run(lt
eoeltieient. Cp, br the soil type), or ha areas that will remain undisturbed in perpetuity. Justification mist he given that the area will renialmi natural 6rever (e.g., the area
is located in Cleveland National 1orcst).
DC/A dwelling units per acre
NRCS National Resources (,'onservatioit Service
3-6
— — — — — — — — — I — —
U
County of San Diego Hydrology Manual
33'30-
i i
dig
Rainjall JopIuvia/
33 15
- - IOU Year 1UinfiII Lvt.jit 24 hours 0 ' ....- .. . . .. OCEANSIDE VIS ¶
-. ,, .
....• S... :-.. 60pIuviI (fl1fl55) ..i I ...... S.,:
. .
GARLSBAO\ I 0
50
_S q p-00
OLLMA I
;,_ .-. . 1 .............. • ................ . IL
NTE i '1
I) . •. .
. t ... .,.
' .r ,p ....• •... ...•-: '...
___ .. ..... 3245 . . - .. ... . . ... 45 'c .--.lb -
UPON
GIS
tE
IMEERL
ie x c :1
3230 - ____________ _______
3230
3 0 3 Miles
I.
- - --
ITri,i IN I
• -
"
-.
1•0 1i1I!I!!illhIlIllllllhIfflIHhIllhIIIIIft EQUATION 1111111 • Is S S ''i' IIll A 5.0:q WSW
= Intensity (In/hr)
1111mill 6 = 6-Hour Precipitation 1rniii
____________________________
4.01
•
1washm V .- S. S I - a • • URWUHhIflb 3.0
IauurnJ
UII1I!IIIi!111i !HII 1111111111
-
- • • • .1 I!L S
2.0'kk Hill lull Nq
"Sh.00 NUNN
• • I1IIUlI1UIliuI
flRRi!lh II$I1IIUUUIIIH IflIllh!1JllHMIllIh1IflHMUI llIhfl • I • ___
Uh1UIIU1UhIIIII1llllIftulIfthIIHhIMfflllflhI U!IhKh!!ti1
••
HhIHhImIIIIIIlOhl1l11I1OhI1111l11llHhlPIDhi!LU1lliL
- - - IIIIIIIIIIIIIIII L
Ira 112=4 N r=1
MINilHiIm am •
1111
.uunImIunuuuuustn,uuuuwuuluuuiuniIuul
nil Im. 111111.1
111
iløøi ul umuuim aç• ___________ 1111 011111111 I
______ ____________
____
1Tl.i*
Intensity-Duration Design Chart - Example
FIGURE
LI3-2 ü
- - - - - - - - - - - - - - - - - - -
100 30
(I)
w
1-u I-
w IL z 0 20
w Z o z w
C')
0 -i C')
10
0 -J
w
I- 0
0
EXAMPLE:
Given: Watercourse Distance (0) = 70 Feet
Slope(s)=1.3% 11.8(1.1-c)V Runoff Coefficient (C) = 0.41
Overland Flow Time (T) = 9.5 Minutes
SOURCE: Airport Drainage, Federal Aviation Administration, 1965
F I G U R E
Rational Formula - Overland Time of Flow Nomograph
- L
3111111113
2.5 % I slope or
00000000o
r
2.
/ZOF
wIL #w
W >
San Diego County Hydrology Manual Section: 3 I Date: June 2003 Page: 12 of 26
Note that the Initial Time of Concentration should be reflective of the general land-use at the
upstream end of a drainage basin. A single lot with an area of two or less acres does not have
a significant effect where the drainage basin area is 20 to 600 acres.
Table 3-2 provides limits of the length (Maximum Length (LM)) of sheet flow to be used in
hydrology studies. Initial Tj values based on average C values for the Land Use Element are
also included. These values can be used in planning and design applications as described
below. Exceptions may be approved by the "Regulating Agency" when submitted with a
detailed study.
Table 3-2
MAXIMUM OVERLAND FLOW LENGTH (L 1)
& INITIAL TIME OF CONCENTRATION (Ti)
Element* DU/
Acre
.5% 1% 2% 3% 5% 10%
LM T! LM TiL 1 Tj LM Ti LM Tj LM T
Natural 50 13.2 70 12.5 85 10.9 100 10.3 100 8.7 100 6.9
LDR 1 1 50 12.2 1 70 11.5 1 85 10.0 1 100 9.5 1 100 8.0 1 100 6.4
LDR 2 50 11.3 70 10.5 85 9.2 100 8.8 100 7.4 100 5.8
LDR 2.9 1 50 10.7 70 10.0 85 8.8 95 8.1 100 7.0 100 5.6
MDR 4.3 50 10.2 70 9.6 80 8.1 95 7.8 100 6.7 100 5.3
MDR 7.3 50 9.2 1 65 8.4 80 7.4 95 7.0 1 100 6.0 100 4.8
MDR 10.9 50 8.7 65 7.9 80 6.9 90 6.4 100 5.7 1 100 4.5
MDR 14.5 50 8.2 65 7.4 80 6.5 90 6.0 100 5.4 100 4.3
HDR 24 50 6.7 65 6.1 75 5.1 90 4.9 95 4.3 100 3.5
HDR 43 50 5.3 1 65 4.7 75 4.0 85 3.8 1 95 3.4 100 2.7
N. Corn 50 5.3 60 4.5 75 4.0 85 3.8 95 3.4 100 2.7
G. Corn 50 4.7 60 4.1 75 3.6 85 3.4 90 2.9 100 2.4
O.P./Cc•m 50 4.2 60 3.7 70 3.1 80 2.9 90 2.6 100 2.2
Limited I. 50 4.2 60 3.7 70 3.1 80 2.9 90 2.6 100 2.2
Genera' I. 50 3.7 60 3.2 70 2.7 80 2.6 90 2.3 100 1.9
*See Table 3-1 for more detailed description
3-12
I
)
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
EQUATION AE 119L3\0385
Feet Tc
=
5000 Tc = Time of concentration (hours) 1- L = Watercourse Distance (miles)
4000 LE = Change in elevation along
effective slope line (See Figure 3-5)(teet)
F—aeon Tc, F— Hours: Minutes -2000 4 240
3 180
1000
900
800 2 120
60'\
100
90
500 80
400 \ 70
\% 1 60
300
50
r4o 200
\ I Miles Feet
\ 30
100
4000 20
ia
3000 16
50 0.5--14
\ 40 2000 12
1800
30 1600 10
1400 \ g
1200 8
20 1000
900
800 6
700
600
10 500 4
400
oo
5
1200
ZE L Tc
SOURCE: California Division of Highways (1941) and Kirpich (1940)
Nomograph for Determination of
Time of Concentration (Tc) or Travel Time (It) for Natural Watersheds
F I G U R E
— — — — — — — — — — — — — — — — — - —
rij
Orange I
County -- 3330
- Riverside County
--- -
- .*- 4' -
3315 33Ib
OCEANSIDE
I
oo
CARLS~) BAD
- — 0 ENCINITAD \- - - ) -• -
- ¶ /
3300 -- _________________ ____________ 3300' C) SOL NA BE.A iC,
—POVVAY So coo-v -
DELMAR /
SAN DIE09
4L C"ON
I
( (
3245 3245 -J. )EMáNGROVS
CFV~JLAVIST \A
IMPERIAL BEACH b MeX 1
32°30' 1 - 3230' aED a B)
County of San Diego Hydrology Manual
Soil Hydrologic Groups
Legend
Soil Groups
Group A
(rrp
Group C
Giuup D
Undetermined
Data Unavailable
1-1— S..
N T oe
cfiAhts$OItNpRAM*k....d.
E
S
3 0 3Miles
SECTION 3
- m mm I - - - - - - I - - - mm -
I
I Existing Conditions 0100 Calculations
Draining to Storm Drain in Street 'C'
Flow Type: Overland Flow
Analysis: Nodes 100 - 101
From San Diego County Hydrology Manual (2003) Soil Hydologic Groups Map
Soil Group D
From San Diego County Hydrology Manual (2003) Table 3-1
0% lmpeevious
C = 0.35
Hydrology Calculations:
C= 0.35
A= 4.81 acres
L = 770 feet
use 100 feet (max. length per San Diego County Hydrology Manual (2003) Table 3-2)
AE= 20.5 feet
S= 2.7 %
From San Diego County Hydrology Manual (2003) Figure 3-3
T= 1.8(1.1-C)D112
s113
T= 9.8 minutes
From San Diego County Hydrology Manual (2003) Figure 3-4
L= 670 feet = 0.13 miles
L\E= 18.1 feet
T = (11.9L3/\E)1'385
Tt = 0.078 hours = 4.7 minutes
- Total T = 14.5 minutes
From San Diego County Hydrology Manual (2003) Figure 3-1
P6 = 2.6 inches
'D24 4.5 inches
P6/P24= .58 %
Use P6 = 2.6 inches
C= C.35
= 7.44P6D 0645
= 3.45 inches/hour
Q=CxlxA = 58 cfs
Flow Type: Pipe flow
Analysis: Nodes 101 -102
0= 5.81 cfs
Diameter = 18'
L = 280 feet
S = 4 %
V= 9.8 fps
T= 0.48 minutes
T= 15.0 minutes
= 3.38 inches/hour
0= 5.7 cfs
SECTION 4
I
San Diego County Rational Hydrology Program
CIVILCADD/CIVILDESIGN Engineering Software, (c)1991-2004 Version 7.4
Raticnal method hydrology program based on
San Diego County Flood Control Division 2003 hydrology manual
Rational Hydrology Study Date: 04/06/12
------------------------------------------------------------------------
Encinas Creek Apartment Homes
Preliminary Hydrology Study - Proposed Condition
AprIL 6, 2012
------------------------------------------------------------------------
Hydrology Study Control Information **********
Program License Serial Number 5007
------------------------------------------------------------------------
Rational hydrology study storm event year is 100.0
English (in-lb) input data Units used
Map data precipitation entered:
6 hour, precipitation(inches) = 2.600
24 hour precipitation(inches) = 4.500
P6/P24 = 57.8%
San Diego hydrology manual 'C values used
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++.+++
Process from Point/Station 100.000 to Point/Station 101.000
INITIAL AREA EVALUATION ****
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[HIGH DENSITY RESIDENTIAL I
(24.0 DU/A or Less
Impervious value, Al = 0.650
Sub-Area C Value = 0.710
Initial subarea total flow distance = 30.000(Ft.)
Highest elevation = 154.500(Ft.)
Lowest elevation = 152.500(Ft.)
Elevation difference = 2.000(Ft.) Slope = 6.667 %
Top of Initial Area Slope adjusted by User to 2.000 %
INITIAL AREA TIME OF CONCENTRATION CALCULATIONS:
The maximum overland flow distance is 75.00 (Ft)
for the top area slope value of 2.00 %, in a development type of
24.0 DU/A or Less
In Accordance With Figure 3-3
Initial Area Time of Concentration = 4.83 minutes
TC = [1.8*(1.1_C)*distance(Ft.).5)/(% slope"(1/3)]
TC = [1.8*(1.1_0.7100)*( 75.000".5)/( 2.000"(1/3)1= 4.83
1
Rainfall intensity (I) = 7.009(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.710
Subarea runoff = 0.050(CFS)
Total initial stream area = 0.010 (Ac.)
+++++++++++++++++++++-1-++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 101.000 to Point/Station 102.000
STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION kkk
Top of street segment elevation = 152.500(Ft.)
End of street segment elevation = 131.700 (Ft.)
Length of street segment = 230.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 24.000(Ft.)
Distance from crown to crossfall grade break = 22. 500 (Ft
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.020
Gutter width = 1.500(Ft.)
Gutter hike from flowline = 2.000(In.)
Mannings N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 0.338 (CFS)
Depth of flow = 0.130(Ft.), Average velocity = 4 465 (Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 1.500 (Ft.)
Flow velocity = 4.47 (Ft/s)
Travel time = 0.86 mm. TC = 5.68 mm.
Adding area flow to street
Decimal fraction scil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[HIGH DENSITY RESIDENTIAL I
(24.0 DU/A or Less
Impervious value, Ai = 0.650
Sub-Area C Value = 0.710
Rainfall intensity = 6.307(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.710 CA = 0.114
Subarea runoff = 0.667(CFS) for 0.150 (Ac.)
Total runoff = 0.716(CFS) Total area = 0.160(Ac.)
Street flow at end of street = 0.716(CFS)
Half street flow at end of street = 0.716(CFS)
Depth of flow = 0.181(Ft.), Average velocity = 4.713(Ft/s)
Flow width (from curb towards crown)= 2.225(Ft.)
+++++++++++++++++-f++++++++++++++++++++++++++++++++++++++++++++++.+++++
Process from Point/Station 102.000 to Point/Station 103.000
kA'k IMPROVED CHANNEL TRAVEL TIME
Upstream point elevation = 131.700 (Ft.)
2
I
Downstream point elevation = 127.300 (Ft.)
Channel length thru subarea = 25.000 (Ft.)
Channel base width 3.000(Ft.)
Slope or Z' of left channel bank = 1.000
Slope or Z' of right channel bank = 1.000
Manning's 'N = 0.015
Maximum depth of channel = 1.000 (Ft.)
Flow(q) thru subarea = 0.716(CFS)
Depth of flow = 0.045(Ft.), Average velocity =
Channel flow top width = 3.091(Ft.)
Flow Velocity = 5.19 (Ft/s)
Travel time = 0.08 mm.
Time of concentration = 5.76 mm.
Critical depth = 0.119(Ft.)
5. 190 (Ft/s)
Process from Point/Station 102.000 to Point/Station 103.000
kk SUBAREA FLOW ADDITION
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[HIGH DENSITY RESIDENTIAL I
(24.0 DU/A or Less
Impervious value, Ai = 0.650
Sub-Area C Value = 0.710
Time of concentration = 5.76 mm.
Rainfall intensity = 6.250(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for total area
(Q=KCIA) is C= 0.710 CA= 0.440
Subarea runoff = 2.035(CFS) for 0.460(Ac.)
Total runoff = 2.751(CFS) Total area = 0.620(Ac.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 103.000 to Point/Station 104.000
PIPEFLOW TRAVEL TIME (User specified size) -7 Af (2Lt1
Upstream point/station elevation = 120.000 (Ft.)
Downstream point/station elevation = 117.000 (Ft.)
Pipe length = 275.00(Ft.) Manning's N = 0.011
No. of pipes = 1 Required pipe flow = 2.751(CFS)
Given pipe size = 12.00(In.)
Calculated individual pipe flow = 2.751(CFS)
Normal flow depth in pipe = 6.88(In.)
Flow top width inside pipe = 11.87(In.)
Critical Depth = 8.53 (In.)
Pipe flow velocity = 5.91(Ft/s)
Travel time through pipe = 0.78 mm.
Time of concentration (TC) = 6.54 mm.
++++++++++++++++++++++++++++++++++++++++++++-4-+++++++++++++++ +++++++++
Process from Point/Station 103.000 to Point/Station 104.000
CONFLUENCE OF MINOR STREAMS ****
41
I
I
Along Main Stream number: 1 in normal stream number 1
I Stream flow area = 0.620 (Ac.)
Runoff from this stream = 2.751(CFS)
Time of concentration = 6.54 mm.
Rainfall intensity = 5.761(In/Hr)
I
++++±+++++++.+++++++++++++++++++++++.+++++++++++++++++++++++++++++++++
Process from Point/Station 105.000 to Point/Station 106.000
INITIAL AREA EVALUATION -
I
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fractionsoil group D = 1.000
[HIGH DENSITY RESIDENTIAL
(24.0 DU/A or Less
Impervious value, AL = 0.650
Sub-Area C Value = 0.710
Initial subarea total flow distance = 50.000(Ft.)
Highest elevation = 128.400(Ft.)
Lowest elevation = 127.300(Ft.)
Elevation difference = 1.100(Ft.) Slope = 2.200 %
INITIAL AREA TIME OF CONCENTRATION CALCULATIONS:
The maximum overland flow distance is 75.00 (Ft)
for the top area slope value of 2.20 %, in a development type of
24.0 DU/A or Less
In Accordance With Figure 3-3
Initial Area Time of Concentration = 4.67 minutes
TC = [1.8*(1.1_C)*distance(Ft.).5)/(% slope"(1/3)]
TC = [1.8*(1.1_0.7100)*( 75.000".5)/( 2.200'(1/3)1= 4.67
Rainfall intensity (I) = 7.154(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.710
Subarea runoff = 1.067(CFS)
Total initial stream area = 0.210(Ac.)
Process from Point/Station 106.000 to Point/Station 104.000
k PIPEFLOW TRAVEL TIME (User specified size) kk
Upstream point/station elevation = 121.900 (Ft.)
Downstream point/station elevation = 117.000 (Ft.)
Pipe length = 125.00 (Ft.) Manning's N = 0.011
No. of pipes = 1 Required pipe flow. = 1.067(CFS)
Given pipe size = 12.00(In.)
Calculated individual pipe flow = 1.067(CFS)
Normal flow depth in pipe = 2.90(In.)
Flaw top width inside pipe = 10.27(In.)
Critical Depth = 5.21(In.)
Pipe flow velocity = 7.29 (Ft/s)
Travel time through pipe = 0.29 mm.
Time of concentration (TC) = 4.96 mm.
++++++++++++++++++++++++++++++++++++++++++.+++++++++++++++++++++++++++
I
I
I
I
I
I
I
I
I
I
I
I
I
Process from Point/Station 106.000 to Point/Station 104.000
kk CONFLUENCE OF MINOR STREAMS
Along Main Stream number: 1 in normal stream number 2
Stream flow area = 0.210 (Ac.)
Runoff from this stream = 1.067(CFS)
Time of concentration = 4.96 mm.
Rainfall intensity = 6.886(In/FIr)
Summary of stream data:
Stream Flow rate TC Rainfall Intensity
No. (CFS) (mm) (In/Hr)
1 2.751 6.54 5.761
2 1.067 4.96 6.886
Qmax(l)
1.000 * 1.000 * 2.751) +
0.837 * 1.000 * 1.067) + = 3.644
Qmax(2) =
1.000 * 0.758 * 2.751) +
1.000 * 1.000 * 1.067) + = 3.153
Total of 2 streams to confluence:
Flcw rates before confluence point:
2.751 1.067
Maximum flow rates at confluence using above data:
3.644 3.153
Area of streams before confluence:
0.620 0.210
Results of confluence:
Total flow rate = 3.644(CFS)
Time of concentration = 6.540 mm.
Effective stream area after confluence = 0.830(Ac.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++.+++++++
Process from Point/Station 104.000 to Point/Station 107.000
PIPEFLOW TRAVEL TIME (User specified size) ****
Upstream point/station elevation = 117.000 (Ft.)
Downstream point/station elevation = 113.400 (Ft.)
Pipe length = 135.00(Ft.) Manning's N = 0.011
Nc. of pipes = 1 Required pipe flow = 3.644(CFS)
Given pipe size = 12.00(In.)
Calculated individual pipe flow = 3.644(CFS)
Normal flow depth in pipe = 6.21 (In.)
Flow top width inside pipe = 11.99 (In.)
Critical Depth = 9.77(In.)
Pipe flow velocity = 8.88(Ft/s)
Travel time through pipe = 0.25 mm.
Time of concentration (TC) = 6.79 mm.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 104.000 to Point/Station 107.000 kkk CONFLUENCE OF MINOR STREAMS ****
I hi
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Along Main Stream number: 1 in normal stream number 1
Stream flow area = 0.830(Ac.)
Runoff from this stream = 3.644(CFS)
Time of concentration = 6.79 mm.
Rainfall intensity = 5.622 (In/FIr)
Process from Point/Station 108.000 to Point/Station 109.000 kk INITIAL AREA EVALUATION
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[HIGH DENSITY RESIDENTIAL I
(24.0 DU/A or Less
Impervious value, Ai = 0.650
Sub-Area C Value = 0.710
Initial subarea total flow distance = 50.000(Ft.
Highest elevation = 122.300(Ft.)
Lowest elevation = 121.000(Ft.)
Elevation difference = 1.300(Ft.) Slope = 2.600 %
INITIAL AREA TIME OF CONCENTRATION CALCULATIONS:
The maximum overland flow distance is 90.00 (Ft)
for the top area slope value of 2.60 %, in a development type of
24.0 flU/A or Less
In Accordance With Figure 3-3
Initial Area Time of Concentration = 4.84 minutes
TC = [1.8*(1.1_C)*distance(Ft.).5)/(% slope'(1/3)]
TC= [1.8*(1.1_0.7100)*( 90.000".5)/( 2.600'(1/3)1= 4.84
Rainfall intensity (I) = 6.993(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.710
Subarea runoff = 0.695(CFS)
Total initial stream area = 0.140(Ac.)
I +++±++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 109.000 to Point/Station 107.000
PIPEFLOW TRAVEL TIME (User specified size)
I Upstream point/station elevation = 114.400(Ft.)
Downstream point/station elevation = 113.400 (Ft.)
Pipe length = 100.00(Ft.) Mannings N = 0.011
I No. of pipes = 1 Required pipe flow = 0.695(CFS)
Given pipe size = 12.00(In.)
Calculated individual pipe flow = 0.695(CFS)
I Normal flow depth in pipe = 3.30(In.)
Flow top width inside pipe = 10.72 (In.)
Critical Depth = 4.17(In.)
Pipe flow velocity = 3.96 (Ft/s)
I Travel time through pipe = 0.42 mm.
Tirre of. concentration (TC) = 5.26 mm.
++-f+++-4--t-++++++++++f+++++++++++++++++++++++++++++++++++++.++++++.+.+.++
I
I
I
I
I
I
I
I
L
I
L
Process from Point/Station 109.000 to Point/Station 107.000
kk CONFLUENCE OF MINOR STREAMS kkk
Along Main Stream number: 1 in normal stream number 2
Stream flow area = 0.140 (Ac.)
Runoff from this stream = 0.695(CFS)
Time of concentration = 5.26 mm.
Rainfall intensity = 6.627(In/Hr)
Summary of stream data:
Stream Flow rate TC Rainfall Intensity
No. (CFS) (mm) (In/Hr)
1 3.644 6.79 5.622
2 0.695 5.26 6.627
Qmaxl) =
1.000 * 1.000 * 3.644) +
0.848 * 1.000 * 0.695) + = 4.233
Qmax2) =
1.000 * 0.775 * 3.644) +
1.000 * 1.000 * 0.695) + = 3.518
Total of 2 streams to confluence:
Flow rates before confluence point:
3.644 0.695
Maximum flow rates at confluence using above data:
4.233 3.518
Area of streams before confluence:
0.830 0.140
Results of confluence:
Total flow rate = 4.233(CFS)
Time of concentration = 6.793 mm.
Effective stream area after confluence = 0.970 (Ac.)
+++.++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 107.000 to Point/Station 110.000
kkk PIPEFLOW TRAVEL TIME (User specified size) ****
Upstream point/station elevation = 113.400 (Ft.)
Downstream point/station elevation = 110.000 (Ft.)
Pipe length = 73.00 (Ft.) Mannings N = 0.011
No. of pipes = 1 Required pipe flow = 4.233(CFS)
Given pipe size = 12.00(In.)
Calculated individual pipe flow = 4.233(CFS)
Normal flow depth in pipe = 5.76(In.)
Flow top width inside pipe = 11.99(In.)
Critical Depth = 10.40(In.)
Pipe flow velocity = 11.37 (Ft/s)
Travel time through pipe = 0.11 mm.
Time of concentration (TC) = 6.90 mm.
Process from Point/Station 107.000 to Point/Station 110.000
CONFLUENCE OF MINOR STREAMS ****
7
I
Along Main Stream number: 1 in normal stream number 2.
I
Stream flow area = 0.970(Ac.)
Runoff from this stream = 4.233(CFS)
Time of concentration = 6.90 mm.
Rainfall intensity = 5.565(In/Hr)
++++f+++++++++++++++++++++++++++++.+++++++++++++++++++++++++++++++++++
I
Process from Point/Station 111.000 to Point/Station 112.000
INITIAL AREA EVALUATION
Decimal fraction soil group A = 0.000
I Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
I
[HIGH DENSITY RESIDENTIAL
(24..0 DU/A or Less
Impervious value, A± = 0.650
Sub-Area C Value = :0.710
I Initial subarea total flow distance = 40.000(Ft.)
Highest elevation 117.800(Ft.)
Lowest elevation = 116.200(Ft.)
I
Elevation difference = 1.600(Ft.) Slope = 4.000 %
INITIAL AREA TIME OF CONCENTRATION CALCULATIONS:
The maximum overland flow distance is 95.00 (Ft)
for the top area slope value of 4.00 %, in a development type of
I 24.0 DU/A or Less In Accordance With Figure 3-3
Initial Area Time of Concentration = 4.31 minutes
I
TC=
TC = [1.8*(1.1_0.700)*( 95.000".5)/( 4.000'(1/3)1= 4.31
Rainfall intensity (I) = 7.539(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.710
I
Subarea runoff = 1.606(CFS)
Total initial stream area = 0.300 (Ac.)
I Process from Point/Station 112.000 to Point/Station 110.000
PIPEFLOW TRAVEL TIME (User specified size) kk
- M frkv? /0
I Upstream point/station elevation = 110.800(Ft.)
Downstream point/station elevation = 110.000 (Ft.)
Pipe length = 80.00 (Ft.) Manning's N = 0.911
I No. of pipes = 1 Required pipe flow = 1.606(CFS)
Given pipe size = 12.00(In.)
Calculated individual pipe flow = 1.606(CFS)
I
Normal flow depth in pipe = 5.14(In.)
Flow top width inside pipe = 11.88(In.)
Critical Depth = 6.46(In.)
Pipe flow velocity = 5.00(Ft/s)
I
Travel time through pipe = 0.27 min.
Time of concentra:ion (TC) = 4.58 mm.
+++++++++++++4-+++++++++++++++++-4-++++++++++++++++++++++++++++++++++++++
Process from Point/Station 112.000 to Point/Station 110.000
CONFLUENCE OF MINOR STREAMS
Alonc Main Stream number: 1 in normal stream number 2
Stream flow area = 0.300 (Ac.)
Runoff from this stream = 1.606(CFS)
Time of concentration = 4.58 mm.
Rainfall intensity = 7.252(In/Hr)
Summary of stream data:
I Stream Flow rate TC Rainfall Intensity
No. (CFS) (mm) (In/Er)
1 4.233 6.90 5.565
2 1.606 4.58 7.252
I
Qmax(l) =
1.000 * 1.000 * 4.233) +
0.767 * 1.000 * 1.606) + = 5.466
Qmax(2) =
I 1.000 * 0.663 * 4.233) +
1.000 * 1.000 * 1.606) + = 4.414
I
Total of 2 streams to confluence:
Flow rates before confluence point:
4.233 1.606
Maximum flow rates at confluence using above data:
I 5.466 4.414
Area of streams before confluence:
0.970 0.300
I
Results of confluence:
Total flow rate = 5.466(CFS)
Time of concentration = 6.900 mm.
Effective stream area after confluence = 1.270 (Ac.)
I ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 110.000 to Point/Station 113.000
I PIPEFLOW TRAVEL TIME (User specified size) kk
Upstream point/station elevation = 110.000 (Ft.)
I
Downstream point/station elevation = 109.100 (Ft.)
Pipe length = 69.00(Ft.) Mannings N = 0.011
No. of pipes = 1 Required pipe flow = 5.466(CFS)
Given pipe size = 18.00(In.)
I Calculated individual pipe flow = 5.466(CFS)
Normal flow depth in pipe = 7.76(In.)
Flow top width inside pipe = 17.83(In.)
I
Critical Depth = 10.81(In.)
Pipe flow velocity = 7.50(Ft/s)
Travel time through pipe = 0.15 mm.
Time of concentration (TC) = 7.05 mm.
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
I
Process from Point/Station 110.000 to Point/Station 113.000
kk CONFLUENCE OF MINOR STREAMS ****
Along Main Stream number: 1 in normal stream number I
Stream flow area = 1.270 (Ac.)
Runoff from this stream = 5.466(CFS)
Time of concentration = 7.05 mm.
Rainfall intensity = 5.487(In/Hr)
+++++4-++++++++++++++++++++++++++++++++++++++++++++++++++++-f+4-++f++++4-+
Process from Point/Station 114.000 to Point/Station 115.000
INITIAL AREA EVALUATION
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[HIGH DENSITY RESIDENTIAL
(24.0 flU/A or Less
Impervious value, Ai = 0.650
Sub-Area C Value = 0.710
Initial subarea total flow distance = 50.000(Ft.)
Highest elevation = 128.750(Ft.)
Lowest elevation = 128.400(Ft.)
Elevation difference = 0.350(Ft.) Slope = 0.700 %
INITIAL AREA TIME OF CONCENTRATION CALCULATIONS:
The maximum overland flow distance is 50.00 (Ft)
for the top area slope value of 0.70 %, in a development type of
24.0 DU/A or Less
In Accordance With ?igure 3-3
Initial Area Time of Concentration = 5.59 minutes
TC = [1.8*(l.l_C)*distance(Ft.)S.5)/(% slope"(1/3)1,
TC = [1.8*(1.1_0.7100)*( 50.000'.5)/( 0.700"(1/3)1= 5.59
Rainfall intensity (I)= 6.374(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.710
Subarea runoff = 0.045(CFS)
Total initial stream area = 0.010 (Ac.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 115.000 to Point/Station 116.000 k'k IMPROVED CHANNEL TRAVEL TIME
Upstream point elevation = 128.400 (Ft.)
Downstream point elevation = 115.400 (Ft.)
Channel length thru subarea = 520.000 (Ft.)
Channel base width = 0.500(Ft.)
Slope or 'Z' of left channel bank = 2.000
Slope or 'Z' of right channel bank = 2.000
Estimated mean flow rate at midpoint of channel =
Manning's 'N' = 0.040
Maximum depth of channel = 1.000 (Ft.)
Flow(q) thru subarea = 1.857(CFS)
-Depth of flow = 0.500(Ft.), Average velocity =
— Channel flow top width = 2.499 (Ft.)
Flow Velocity = 2.48(Ft/s)
Travel time = 3.50 mm.
Time of concentration = 9.09 mm.
1.857 CFS)
2.478 (Ft/s)
10
Critical depth = 0.449(Ft.)
Adding area flow to channel
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[HIGH DENSITY RESIDENTIAL
(24.0 DU/A or Less
Impervious value, Ai = 0.650
Sub-Area C Value = 0.710
Rainfall intensity = 4.660(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.710 CA = 0.767
Subarea runoff = 3.528(CFS) for 1.070(Ac.)
Total runoff = 3.573(CFS) Total area = 1.080(Ac.)
Depth of flow = 0.667(Ft.), Average velocity = 2.923(Ft/s)
Critical depth = 0.609(Ft.)
++++++++++++++++-I-+++++++++++-}-+++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 116.000 to Point/Station 113.000
PIPEFLOW TRAVEL TIME (User specified size)
Upstream point/station elevation = 110.000(Ft.)
Downstream point/station elevation = 109.100(Ft.)
Pipe length = 20.00(Ft.) Mannings N = 0.011
No. of pipes = 1 Required pipe flow = 3.573(CFS)
Given pipe size = 12.00(In.)
Calculated individual pipe flow = 3.573(CFS)
Nornal flow depth in pipe = 5.28 (In.)
Flow top width inside pipe = 11.91(In.)
Critical Depth = 9.68(In.)
Pipe flow velocity = 10.74 (Ft/s)
Travel time through pipe = 0.03 mm.
Time of concentration (TC) = 9.12 mm.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 116.000 to Point/Station 113.000
kk CONFLUENCE OF MINOR STREAMS ****
I
Along Main Stream number: 1 in normal stream number 2
Stream flow area = 1.080 (Ac.)
Runoff from this stream = 3.573(CFS)
Tine of concentration = 9.12 mm.
I Rainfall intensity = 4.649(In/Hr)
Summary of stream data:
I
Stream Flow rate TC Rainfall Intensity
N.D. (CFS) (mm) (In/Hr)
I l 5.466 7.05 5.487
2 3.573 9.12 4.649
Qmax(l) =
1.000 * 1.000 * 5.466) -i-
1 1.000 * 0.773 * 3.573) + = 8.229
1 11
Qmax(2) =
0.847 * 1.000 * 5.466) +
1.000 * 1.000 * 3.573) + = 8.204
Total of 2 streams to confluence:
Flow rates before confluence point:
5.466 3.573
Maximum flow rates at confluence using above data:
8.229 8.204
Area of streams before confluence:
1.270 1.080
Results of confluence:
Total flow rate = 8.229(CFS)
Time of concentration = 7.053 mm.
- Effective stream area after confluence = 2.350 (Ac.)
+++++++++++++++++++++++++++.++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 113.000 to Point/Station 117.000 k' PIPEFLOW TRAVEL TIME (Program estimated size) ****
Upstream point/station elevation = 109.100 (Ft.)
Downstream point/station elevation = 106.400 (Ft.)
Pipe length = 255.00 (Ft.) Mannings N = 0.011
No. of pipes = 1 Required pipe flow = 8.229(CFS)
Nearest computed pipe diameter = 18.00(In.)
Calculated individual pipe flow = 8.229(CFS)
Normal flow depth in pipe = 10.51(In.)
Flow top width inside pipe = 17.74(In.)
Critical Depth = 13.33(In.)
Pipe flow velocity = 7.68(Ft/s)
Travel time through pipe = 0.55 mm.
Time of concentration (TC) = 7.61 mm.
+++++++++++++++++++++++++++++++++++++++++++++++++++++++.++++++++++++++
Process from Point/Station 113.000 to Point/Station 117.000
CONFLUENCE OF MINOR STREAMS ****
Along Main Stream number: 1 in normal stream number 1
Stream flow area = 2.350 (Ac.)
Runoff from this stream = 8.229(CFS)
Time of concentration = 7.61 mm.
Rainfall intensity = 5.226(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++.+++++++++++++++++++++
Process from Point/Station 118.000 to Point/Station 119.000
INITIAL AREA EVALUATION ****
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[HIGH DENSITY RESIDENTIAL
(24.0 DU/A or Less
Impervious value, Ai = 0.650
12
Sub-Area C Value = 0.710
Initial subarea total flow distance = 48.000(Ft.)
Highest elevation = 118.900(Ft.)
Lowest elevation = 116.400(Ft.)
Elevation difference = 2.500(Ft.) Slope = 5.208 %
INITIAL AREA TIME OF CONCENTRATION CALCULATIONS:
The maximum overland flow distance is 95.00 (Ft)
for the top area slope value of 5.21 %, in a development type of
24.0 DU/A or Less
In Accordance With Figure 3-3
Initial Area Time of Concentration = 3.95 minutes
TC = [1.8*(1.1_C)*distance(Ft.).5)/(% slope"(1/3)]
TC = [1.8*(1.1_0.7100)*( 95.000.5)/( 5.208"(1/3)]= 3.95
Rainfall intensity (I) = 7.979(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.710
Subarea runoff = 0.057(CFS)
Total initial stream area = 0.010 (Ac.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 119.000 to Point/Station 120.000
STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION kk
Top of street segment elevation = 116.400(Ft.)
End of street segment elevation = 114.800(Ft.)
Length of street segment = 158.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 44.000(Ft.)
Distance from crown to crossfall grade break = 42.500(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.020
Gutter width = 1.500(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 1.529(CFS)
Depth of flow = 0.299(Ft.), Average velocity = 2.008(Ft/s)
Streetfiow hydraulics at midpoint of street travel:
Haifstreet flow width = 8.119 (Ft.)
Flow velocity = 2.01 (Ft/s)
Travel time = 1.31 mm. TC = 5.26 mm.
Adding area flow to street
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[HIGH DENSITY RESIDENTIAL I
(24.0 DU/A or Less
Impervious value, Ai = 0.650
Sub-Area C Value = 0.710
Rainfall intensity = 6.631(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.710 CA = 0.461
13
Subarea runoff = 3.003(CFS) for 0.640(Ac.)
Total runoff = 3.060(CFS) Total area = 0.650(Ac.)
Street flow at end of street = 3.060(CFS)
Half street flow at end of street = 3.060(CFS)
Depth of flow = 0.355(Ft.), Average velocity = 2.356(Ft/s)
Flow width (from curb towards crown)= 10.937(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++-fr+++++++
Process from Point/Station 120.000 to Point/Station 117.000
'kk IMPROVED CHANNEL TRAVEL TIME A, to
Upstream point elevation = 114.800(Ft.)
Downstream point elevation = 112.800(Ft.)
Channel length thru subarea = 30.000 (Ft.)
Channel base width = 3.000(Ft.)
Slope or 'Z' of left channel bank = 1.000
Slope or 'Z' of right channel bank = 1.000
Manning's 'N' = 0.015
Maximum depth of channel = 1.000(Ft.)
Flo(q) thru subarea = 3.060(CFS)
Depth of flow = 0.145(Ft.), Average velocity = 6.697(Ft/s)
Channel flow top width = 3.291 (Ft.)
Flow Velocity = 6.70(Ft/s)
Travel time = 0.07 mm.
Time of concentration = 5.33 mm.
Critical depth = 0.309(Ft.)
Process from Point/Station 120.000 to Point/Station 117.000
CONFLUENCE OF MINOR STREAMS ****
Along Main Stream number: 1 in normal stream number 2
Stream flow area = 0.650(Ac.)
Runoff from this stream = 3.060(CFS)
Time of concentration = 5.33 mm.
Rainfall intensity = 6.571(In/Hr)
Summary of stream data:
Stream Flow rate TC Rainfall Intensity
No. (CFS) (mm) (In/Hr)
1 8.229 7.61 5.226
2 3.060 5.33 6.571
Qmax(1) =
1.000 * 1.000 * 8.229) +
0.795 * 1.000 * 3.060) + = 10.663
Qrnax(2) =
1.000 * 0.701 * 8.229) +
1.000 * 1.000 * 3.060) + = 8.830
Total of 2 streams to confluence:
Flow rates before confluence point:
8.229 3.060
Maximum flow rates at confluence using above data:
14
10.663 8.830
Area of streams before confluence:
2.350 0.650
Results of confluence:
Total flow rate = 10.663(CFS)
Time of concentration = 7.607 mm.
Effective stream area after confluence = 3.000(Ac.)
++++++++++++++++++++++++++++++++++++++++++4-+++++++++++++++4-+++++++++++
Process from Point/Station 117.000 to Point/Station 121.000
PIPEFLOW TRAVEL TIME (User specified size) ****
Upstream point/station elevation = 106.400(Ft.)
Downstream point/station elevation = 105.000(Ft.)
Pipe length = 128.00 (Ft.) Mannings N = 0.011
No. of pipes = 1 Required pipe flow = 10.663(CFS)
Given pipe size = 18.00(In.)
Calculated individual pipe flow = 10.663(CFS)
Normal flow depth in pipe = 12.42 (In.)
Flow top width inside pipe = 16.65(In.)
Critical Depth = 15.03(In.)
Pipe flow velocity = 8.20(Ft/s)
Travel time through pipe = 0.26 mm.
Time of concentration (TC) = 7.87 mm.
+++++++++++++++++-1-++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 117.000 to Point/Station 121.000
CONFLUENCE OF MINOR STREAMS ****
Along Main Stream number: 1 in normal stream number 1
Stream flow area = 3.000 (Ac.)
Runoff from this stream = 10.663(CFS)
Time of concentration = 7.87 mm.
Rainfall intensity = 5.114(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 122.000 to Point/Station 123.000
INITIAL AREA EVALUATION ****
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[HIGH DENSITY RESIDENTIAL I
(2.0 DU/A or Less
Impervious value, Ai = 0.650
Sub-Area C Value = 0.710
Initial subarea total flow distance = 32.000 (Ft.)
Highest elevation = 119.100(Ft.)
Lowest elevation = 117.300(Ft.)
Elevation difference = 1.800(Ft.) Slope = 5.625 %
INITIAL AREA TIME OF CONCENTRATION CALCULATIONS:
The maximum overland flow distance is 95.00 (Ft)
for the top area slope value of 5.63 %, in a development type of
15
24.0 DU/A or Less
In Accordance With Figure 3-3
Initial Area Time of Concentration = 3.85 minutes
- TC = [1.8*(1.1_C)*distance(Ft.).5)/(% slope"(1/3)]
TC= [1.8*(1.1_0.7100)*( 95.000.5)/( 5.625"(1/3)1= 3.85 ' Rainfall intensity (I) = 8.112(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.710
Subarea runoff = 0.058(CFS)
Total initial stream area = 0.010 (Ac.)
Process from Point/Station 123.000 to Point/Station 124.000
IMPROVED CHANNEL TRAVEL TIME "kkk
Upstream point elevation = 117.300(Ft.)
Downstream point elevation = 116.000 (Ft.)
Channel length thru subarea = 165.000 (Ft.)
Channel base width = 6.000 (Ft.)
Slope or 'z' of left channel bank = 2.000
Slope or 'z' of right channel bank = 2.000
Estimated mean flow rate at midpoint of channel = 1.351(CFS)
Manning's 'N' = 0.040
Maximum depth of channel = 1.000(Ft.)
Flow(q) thru subarea = 1.351(CFS)
of flow = 0.198(Ft.), Average velocity = 1.067(Ft/s)
Channel flow top width = 6.792 (Ft.)
Flow Velocity = 1.07 (Ft/s)
Travel time = 2.58 mm.
Time of concentration = 6.43 mm.
Critical depth = 0.115 (Ft.)
Adding area flow to channel
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[HIGH DENSITY RESIDENTIAL
(24.0 DU/A or Less
Impervious value, Ai = 0.650
Sub-Area C Value = 0.710
Rainfall intensity = 5.827(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.710 CA = 0.440
Subarea runoff = 2.507(CFS) for 0.610(Ac.)
Total runoff = 2.565(CFS) Total area = 0.620Ac.)
Depth of flow = 0.289(Ft.), Average velocity = 1.347(Ft/s)
Critical depth = 0.176(Ft.)
+++++++++++++++++-'-++++++++++++++++++++++++++++++++++++++++++f+++++++++
Process from Point/Station 124.000 to Point/Station 121.000
PIPEFLOW TRAVEL TIME (User specified size)
Upstream point/station elevation = 110.600 (Ft.)
Downstream point/station elevation = 105.000 (Ft.)
Pipe length = 95.00 (Ft.) Manning's N = 0.011
No. of pipes = 1 Required pipe flow = 2.565(CFS)
10
Given pipe size = 12.00(In.)
Calculated individual pipe flow = 2.565(CFS)
Normal flow depth in pipe = 4.10 (In.)
Flow top width inside pipe = 11.38(In.)
Critical Depth = 8.24(In.)
Pipe flow velocity = 10.83 (Ft/s)
Travel time through pipe = 0.15 mm.
Time of concentration (TC) = 6.57 mm.
++++-++++++++++++++++++++++++++++++++++++++++++++++-+++++++++++.++++++
Process from Point/Station 124.000 to Point/Station 121.000
CONFLUENCE OF MINOR STREAMS
Along Main Stream number: 1 in normal stream number 2
Stream flow area = 0.620(Ac.)
Runoff from this stream = 2.565(CFS)
Time of concentration = 6.57 mm.
Rainfall intensity = 5.743(In/Hr)
Summary of stream data:
Stream Flow rate TC Rainfall Intensity
No. (CFS) (mm) (In/Hr)
1 10.663 7.87 5.114
2 2.565 6.57 5.743
Qmax(l) =
1.000 * 1.000 * 10.663) +
0.890 * 1.000 * 2.565) + = 12.947
Qmax(2) =
1.000 * 0.835 * 10.663) +
1.000 * 1.000 * 2.565) + = 11.473
Total of 2 streams to confluence:
Flow rates before confluence point:
10.663 2.565
Maximum flow rates at confluence using above data:
12.947 11.473
Area of streams before confluence:
3.000 0.620
Results of confluence:
Total flow rate = 12.947(CFS)
Time of concentration = 7.867 mm.
Effective stream area after confluence = 3.620(Ac.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 121.000 to Point/Station 125.000
PIPEFLOW TRAVEL TIME (User specified size) kk
Upstream point/station elevation = 105.000(Ft.)
Dcwnstream point/station elevation = 103.700 (Ft.)
Pipe length = 110.00 (Ft.) Manning's N = 0.011
No. of pipes = 1 Required pipe flow = 12.947(CFS)
Given •pipe size = 18.00(In.)
Calculated individual pipe flow = 12.947(CFS)
17
Normal flow depth in pipe = 14.13(In.)
Flow top width inside pipe = 14.79(In.)
Critical Depth
= 16.19(In.)
Pipe flow velocity = 8.70 (Ft/s)
Travel time through pipe = 0.21 mm.
Time of concentration (TC) = 8.08 mm.
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++.++++++++
Process from Point/Station 121.000 to Point/Station 125.000
'" CONFLUENCE OF MAIN STREAMS ****
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 3.620(Ac.)
Runoff from this stream = 12.947(CFS)
Time of concentration = 8.08 mm.
Rainfall intensity = 5.028(In/Hr)
Program is now starting with Main Stream No. 2
Process from Point/Station 200.000 to Point/Station 201.000
INITIAL AREA EVALUATION ****
Decimal fraction soil group A = 0.000
Dec:mal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[HIGH DENSITY RESIDENTIAL
(24.0 DU/A or Less
Impervious value, Al = 0.650
Sub-Area C Value = 0.710
Initial subarea total flow distance = 40.000(Ft.)
Highest elevation = 128.800(Ft.)
Lowest elevation = 128.000(Ft.)
Elevation difference = 0.800(Ft.) Slope = 2.000 %
INITIAL AREA TIME OF CONCENTRATION CALCULATIONS:
The maximum overland flow distance is 75.00 (Ft)
for the top area slope value of 2.00 %, in a development type of
24.0 DU/A or Less
In Accordance With Figure 3-3
In:tial Area Time of Concentration = 4.83 minutes
TC = [1.8* (1.1-C) *distance(Ft.) .5) / (% slope" (1/3)]
TC = [1.8*(1.1_0.7100)*( 75.000".5)/( 2.000"(1/3)1= 4.83
Rainfall intensity (I) = 7.009(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.710
Subarea runoff = 0.050(CFS)
Total initial stream area = 0.010(Ac.)
+++++++++++++++++++++++++++++++++++++++++++++++++++++4.++++++++++++++++
Process from Point/Station 201.000 to Point/Station 202.000
IMPROVED CHANNEL TRAVEL TIME ****
Upstream point elevation = 128.000 (Ft.)
Downstream point elevation = 126.700 (Ft.)
lip
Channel length thru subarea = 121.000 (Ft.)
Channel base width = 3.000(Ft.)
Slope or 'Z' of left channel bank = 0.500
Slope or 'Z of right channel bank = 0.500
Estimated mean flow rate at midpoint of channel = 0.877 (CFS)
Manning's 'N = 0.015
Maximum depth of channel = 0.500 (Ft.)
Flow(q) thru subarea = 0.877(CFS)
Depth of flow = 0.120(Ft.), Average velocity = 2 390 (Ft/s)
Channel flow top width = 3.120(Ft.)
Flow Velocity = 2.39 (Ft/s)
Travel time = 0.84 mm.
Time of concentration = 5.67 mm.
Critical depth = 0.137(Ft.)
Adding area flow to channel
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[HIGH DENSITY RESIDENTIAL
(24.0 DU/A or Less
Impervious value, Ai = 0.650
Sub-Area C Value = 0.710
Rainfall intensity = 6.317(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.710 CA = 0.256
Subarea runoff = 1.565(CFS) for 0.350(Ac.)
Total runoff = 1.615(CFS) Total area = 0.360(Ac.)
Depth of flow = 0.174(Ft.), Average velocity = 3.007(Ft/s)
Critical depth = 0.205(Ft.)
+++++-1-++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 202.000 to Point/Station 203.000
IMPROVED CHANNEL TRAVEL TIME
Upstream point elevation = 126.700 (Ft.)
Downstream point elevation = 123.700 (Ft.)
Channel length thru subarea = 75.000 (Ft.)
Channel base width = 5.000(Ft.)
Slope or 'Z of left channel bank = 2.000
Slope or 'Z' of right channel bank = 2.000
Manning's 'N' 0.040
Maximum depth of channel = 1.000 (Ft.)
Flow(q) thru subarea = 1.615(CFS)
..._.Depth of flow = 0.151(Ft.), Average velocity =
Channel flow top width = 5.605 (Ft.)
Flow Velocity = 2.01 (Ft/s)
Travel time = 0.62 mm.
Time of concentration = 6.29 mm.
Critical depth = 0.145(Ft.)
2.015 (Ft/s)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 203.000 to Point/Station 204.000
Fl
PIPEFLOW TRAVEL TIME (User specified size)
19
Upstream point/station elevation = 118.300 (Ft.)
Downstream point/station elevation = 116.200 (Ft.)
Pipe length = 90.00(Ft.) Mannings N = 0.011
No. of pipes = 1 Required pipe flow 1.615(CFS)
Given pipe size = 12.00(In.)
Calculated individual, pipe flow = 1.615(CFS)
Normal flow depth in pipe = 4.10(In.)
- Flow top width inside pipe = 11.38(In.)
Critical Depth = 6.48(In.)
Pipe flow velocity = 6.82(Ft/s)
Travel time through pipe = 0.22 mm.
Time of concentraticn (TC) = 6.51 mm.
Process from Point/Station 203.000 to Point/Station 204.000
**** CONFLUENCE OF MINOR STREAMS ****
Along Main Stream number: 2 in normal stream number 1
Stream flow area = 0.360 (Ac.)
Runcff from this stream = 1.615(CFS)
Time of concentratiDn = 6.51 mm.
Rainfall intensity = 5.778(In/Hr)
+++-+++++++++++++++++++++++++++++++++++++++++++++++++++++.+++-++++++++
Process from Point/Station 205.000 to Point/Station 206.000
kk INITIAL AREA EVALUATION "k
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[HIGH DENSITY RESIDENTIAL
(24.0 DU/A or Less
Impervious value, Ai = 0.650
Sub-Area C Value = 0.710
Initial subarea total flow distance = 40.000(Ft.)
Highest elevation = 127.400(Ft.)
Lowest elevation = 126.600(Ft.)
Elevation difference = 0.800(Ft.) Slope = 2.000 %
INITIAL AREA TIME OF CONCENTRATION CALCULATIONS:
The maximum overland flow distance is 75.00 (Ft)
for the top area slope value of 2.00 %, in a development type of
2.0 DU/A or Less
In Accordance With Figure 3-3
Initial Area Time of Concentration = 4.83 minutes
TC = [1.8*(1.1_C)*distance(Ftj.5)/(% slope(1/3)]
TC= [1.8*(1.1_0.7100)*( 75.000".5)/( 2.000"(1/3)1= 4.83
Rainfall intensity (I) = 7.009(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = C.710
Subarea runoff = 0.050(CFS)
Total initial stream area = 0.010 (Ac.)
+-++++++++++++++++++++.+++++++++++++++++++++++++++-I-++++++++-++++++++++
Process from Point/Station 206.000 to Point/Station 207.000
20
IMPROVED CHANNEL TRAVEL TIME
Upstream point elevation = 126.600 (Ft.)
Downstream point elevation = 125.200 (Ft.)
Channel length thru subarea = 140.000(Ft.)
Channel base width = 0.500(Ft.)
Slope or 'Z' of left channel bank = 0.500
- Slope or 'Z' of right channel bank = 0.500
Estimated mean flow rate at midpoint of channel = 0.348(CFS)
Manning's 'N' = 0.015
Maximum depth of channel 0.500(Ft.)
- Flow(q) thru subarea = 0.348(CFS)
Depth of flow = 0.219(Ft.), Average velocity = 2.607(Ft/s)
Channel flow top width = 0.719 (Ft.)
Flow Velocity = 2.61 (Ft/s)
Travel time = 0.90 mm.
Time of concentration = 5.72 mm.
Critical depth = 0.229 (Ft.)
Adding area flow to channel
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[HIGH DENSITY RESIDENTIAL
(24.0 DU/A or Less
Impervious value, Ai = 0.650
Sub-Area C Value = 0.710
Rainfall intensity = 6.281(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.710 CA = 0.092
Subarea runoff = 0.530(CFS) for 0.120(Ac.)
Total runoff = 0.580(CFS) Total area = 0.130(Ac.)
Depth of flow = 0.298(Ft.), Average velocity = 2.992(Ft/s)
Critical depth = 0.313(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 206.000 to Point/Station 207.000
SUBAREA FLOW ADDITION
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group U = 1.000
[HIGH DENSITY RESIDENTIAL
(24.0 DU/A or Less
Impervious value, Ai = 0.650
Sub-Area C Value = 0.710
Time of concentration = 5.72 mm.
Rainfall intensity = 6.281(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.710 CA = 0.177
Subarea runoff = 0.535(CFS) for 0.120(Ac.)
Total runoff = 1.115(CFS) Total area = 0.250 (Ac.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
21
I
F
Process from Point/Station 207.000 to Point/Station 208.000
IMPROVED CHANNEL TRAVEL TIME
Upstream point elevation = 125.200(Ft.)
Downstream point elevation = 122.100(Ft.)
Channel length thru subarea = 60.000(Ft.)
Channel base width = 6.000(Ft.)
Slope or 'Z' of left channel bank = 2.000
Slope or 'Z' of right channel bank = 2.000
Manning's 'N' = 0.040
Maximum depth of channel = 1.000 (Ft.)
Flow'q) thru subarea = 1.115(CFS)
—Depth of flow = 0.101(Ft.), Average velocity = 1.782(Ft/s)
Channel flow top width = 6.403 (Ft.)
Flow Velocity = 1.78 (Ft/s)
Travel time = 0.56 mm.
Time of concentration = 6.28 mm.
Critical depth = 0.102 (Ft.)
Process from Point/Station 208.000 to Point/Station 204.000
PIPEFLOW TRAVEL TIME (User specified size) ****
Upstream point/station elevation = 116.700 (Ft.)
Downstream point/station elevation = 116.200(Ft.)
Pipe length = 10.00 (Ft.) Manning's N = 0.011
No. of pipes = 1 Required pipe flow = 1.115(CFS)
Given pipe size = 12.00(In.)
Calculated individual pipe flow = 1.115(CFS)
Normal flow depth in pipe = 2.79(In.)
Flow top width inside pipe = 10.14(In.)
Critical Depth = 5.33(In.)
Pipe flow velocity = 8.05 (Ft/s)
Travel time through pipe = 0.02 mm.
Time of concentration (TC) = 6.30 mm.
+++++++++++-1-+++++++++++++++++++++++++++++++++++++++4-++++++++++++++++++
Process from Point/Station 208.000 to Point/Station 204.000
CONFLUENCE OF MINOR STREAMS
Along Main Stream number: 2 in normal stream number 2
Stream flow area = 0.250 (Ac.)
Runoff from this stream = 1.115(CFS)
Time of concentration = 6.30 mm.
Rainfall intensity = 5.900(In/Hr)
Summary of stream data:
Stream Flow rate TC Rainfall Intensity
No. (CFS) (mm) (In/Hr)
1 1.615 6.51 5.778
2 1.115 6.30 5.900
Qmax(l) =
1.000 * 1.000 * 1.615) +
I 22
I
U
U
U
I
0.979 * 1.000 * 1.115) + = 2.736
Qmax(2) =
1.000 * 0.968 * 1.615) +
1.000 * 1.000 * 1.115) + = 2.678
Total of 2 streams to confluence:
Flow rates before confluence point:
1.615 1.115
Maximum flow rates at confluence using above data:
2.706 2.678
Area of streams before confluence:
0.360 0.250
Results of confluence:
Total flow rate = 2.706(CFS)
Time of concentration = 6.510 mm.
Effective stream area after confluence = 0.610 (Ac.)
+++++++++++++++++++-i-++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 204.000 to Point/Station 209.000
PIPEFLOW TRAVEL TIME (User specified size) ****
Upstream point/station elevation = 116.200(Ft.)
Downstream point/station elevation = 111.600(Ft.)
Pipe length = 150.00 (Ft.) Manning's N = 0.011
No. of pipes = 1 Required pipe flow = 2.706(CFS)
Given pipe size = 12.00(In.)
Calculated individual pipe flow = 2.706(CFS)
Normal flow depth in pipe = 5.03(In.)
Flow top width inside pipe = 11.84(In.)
Critical Depth = 8.47(In.)
Pipe flow velocity = 8.67(Ft/s)
Travel time through pipe = 0.29 mm.
Time of concentration (TC) = 6.80 mm.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 204.000 to Point/Station 209.000
CONFLUENCE OF MINOR STREAMS ****
Along Main Stream number: 2 in normal stream number 1
Stream flow area = 0.610 (Ac.)
Runoff from this stream = 2.706(CFS)
Time of concentration = 6.80 mm.
Rainfall intensity = 5.619(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 210.000 to Point/Station 211.000
*kk INITIAL AREA EVALUATION
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[HIGH DENSITY RESIDENTIAL
(24.0 DU/A or Less
23
Impervious value, Ai = 0.650
Sub-Area C Value = 0.710
Initial subarea total flow distance = 45.000 (Ft.)
Highest elevation = 120.300(Ft.)
Lowest elevation = 119.350(Ft.)
Elevation difference = 0.950(Ft.) Slope = 2.111 %
INITIAL AREA TIME OF CONCENTRATION CALCULATIONS:
The maximum overland flow distance is 75.00 (Ft)
for the top area slope value of 2.11 %, in a development type of
24.0 DU/A or Less
In Accordance With Figure 3-3
Initial Area Time of Concentration = 4.74 minutes
TC = [1.8*(1.1_C)*distance(Ft.).5)/(% slope"(1/3)]
TC = [1.8*(1.1_0.7100)*( 75.000".5)/( 2.111(1/3)1= 4.74
Rainfall intensity (I) = 7.091(In/I-Ir) for a 100.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.710
Subarea runoff = 0.050(CFS)
Total initial stream area = 0.010 (Ac.)
++++-++++++++++++++++++-l-++++++++++++++++++++++-}-+++++++++++++++++++++++
Process from Point/Station 211.000 to Point/Station 212.000
IMPROVED CHANNEL TRAVEL TIME 'k
Upstream point elevation = 119.350 (Ft.)
Downstream point elevation = 117.400 (Ft.)
Channel length thru subarea = 70.000 (Ft.)
Channel base width = 4.000(Ft.)
Slope or IZI of left channel bank = 2.000
Slope or 'Z of right channel bank = 2.000
Estimated mean flow rate at midpoint of channel = 0.940(CFS)
Mannings 'N = 0.040
Maximum depth of channel = 1.000 (Ft.)
Flow(q) thru subarea = 0.940(CFS)
—Depth of flow = 0.139(Ft.), Average velocity = 1.580(Ft/s)
Channel flow top width = 4.556 (Ft.)
Flow Velocity = 1.58 (Ft/s)
Travel time = 0.74 min.
Time of concentration = 5.48 mm.
Critical depth = 0.117(Ft.)
Adding area flow to channel
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[HIGH DENSITY RESIDENTIAL
(24.0 DU/A or Less
Impervious value, Ai = 0.650
Sub-Area C Value = 0.710
Rainfall intensity = 6.459(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.710 CA = 0.270
Subarea runoff = 1.692(CFS) for 0.370 (Ac.)
Total runoff = 1.743(CFS) Total area = 0.380(Ac.)
Depth of flow = 3.200(Ft.), Average velocity = 1.977(Ft/s)
Critical depth = 0.176(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++-1-+++++++++
Process from Point/Station 212.000 to Point/Station 209.000
kkkk PIPEFLOW TRAVEL TIME (User specified size) ****
Upstream point/station elevation = 112.000 (Ft.)
Downstream point/station elevation = 111.600 (Ft.)
Pipe length = 12. 00 (Ft.) Manning's N = 0.011
No. of pipes = 1 Required pipe flow = 1.743(CFS)
Given pipe size = 12.00(In.)
Calculated individual pipe flow = 1.743(CFS)
Normal flow depth in pipe = 3.88(In.)
Flow top width inside pipe = 11.23(In.)
Critical Depth = 6.74(In.)
Pipe flow velocity = 7.92(Ft/s)
Travel time through pipe = 0.03 mm.
Time of concentration (TC) = 5.50 mm.
+++-F++++++++++++++++++++++++++++++++-1-+++++++++++++++++++++++++++++++++
Process from Point/Station 212.000 to Point/Station 209.000
CONFLUENCE OF MINOR STREAMS ****
Along Main Stream number: 2 in normal stream number 2
Stream flow area = 0.380 (Ac.)
Runoff from this stream = 1.743(CFS)
Time of concentration = 5.50 mm.
Rainfall intensity = 6.440(In/Hr)
Summary of stream data:
Stream Flow rate TC Rainfall Intensity
No. (CFS) (mm) (In/Hr)
1 2.706 6.80 5.619
2 1.743 5.50 6.440
Qmax(l) =
1.000 * 1.000 * 2.706) +
0.873 * 1.000 * 1.743) + = 4.227
Qmax(2) =
1.000 * 0.809 * 2.706) +
1.000 * 1.000 * 1.743) + = 3.933
Total of 2 streams to confluence:
Flow rates before confluence point:
2.706 1.743
Maximum flow rates at confluence using above data:
4.227 3.933
Area of streams before confluence:
0.610 0.380
Results of confluence:
Total flow rate = 4.227(CFS)
Time of concentration = 6.798 mm.
Effective stream area after confluence = 0.990 (Ac.)
I
I 25
I
I
I
I
I
I
LI
I
I
I
I
I
Process from Point/Station 209.000 to Point/Station 213.000
PIPEFLOW TRAVEL TIME (Program estimated size)
Upstream point/station elevation = 111.600(Ft.)
Downstream point/station elevation = 110.300 (Ft.)
Pipe length = 175.00(Ft.) Mannings N = 0.011
No. of pipes = 1 Required pipe flow = 4.227(CFS)
Nearest computed pipe diameter = 15.00(In.)
Calculated individual pipe flow = 4.227(CFS)
Normal flow depth in pipe = 8.74(In.)
Flow top width inside pipe = 14.79(In.)
Critical Depth = 10.00(In.)
Pipe flow velocity = 5.69(Ft/s)
Travel time through pipe = 0.51 mm.
Time of concentration (TC) = 7.31 mm.
+++.+++++++++++++++++++++++.++++++++++++++++++++++++++++++++++1-+++++++
Process from Point/Station 209.000 to Point/Station 213.000
kk* CONFLUENCE OF MINOR STREAMS ****
Along Main Stream number: 2 in normal stream number 1
Stream flow area = 0.990(Ac.)
Runoff from this stream = 4.227(CFS)
Time of concentration = 7.31 mm.
Rainfall intensity = 5.362(In/Hr)
+++ .I-++++++++++++++++++++++++++++++++++++++++++++++++++++++++++.+++++++
Process from Point/Station 214.000 to Point/Station 215.000
INITIAL AREA EVALUATION ****
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[HIGH DENSITY RESIDENTIAL I
(24.0 DU/A or Less
Impervious value, Ai = 0.650
Sub-Area C Value = 0.710
Initial subarea total flow distance = 40.000(Ft.)
Highest elevation = 119.700(Ft.)
Lowest elevation = 118.400(Ft.)
Elevation difference = 1.300(Ft.) Slope = 3.250 %
INITIAL AREA TIME OF CONCENTRATION CALCULATIONS:
The maximum overland flow distance is 90.00 (Ft)
for the top area slope value of 3.25 %, in a development type of
24.0 DU/A or Less
In Accordance With Figure 3-3
Initial Area Time of Concentration = 4.50 minutes
TC = [1.8* (1.1-C) *distance(Ft. ) ".5) / (% slope" (1/3)1
TC = [1.8*(1.1_0.7100)*( 90.000".5)/( 3.250A (1/3)1= 4.50
Rainfall intensity (I) = 7.336(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area (Q=KCiA) is C = 0.710
Subarea runoff = 0.052(CFS)
Total initial stream area = 0.010(Ac.)
Aw
Process from Point/Station 215.000 to Point/Station 216.000
STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ****
Top of street segment elevation = 118.400 (Ft.)
End of street segment elevation = 116.700 (Ft.)
Length of street segment = 135.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 42.000(Ft.)
Distance from crown to crossfall grade break = 40.500(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.020
Gutter width = 1.500(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 0.483(CFS)
Depth of flow = 0.220(Ft.), Average velocity = 1.755(Ft/s)
Streetfiow hydraulics at midpoint of street travel:
Halfstreet flow width = 4.155 (Ft.)
Flow velocity = 1.76(Ft/s)
Travel time = 1.28 min. TC = 5.78 mm.
Adding area flow to street
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[HIGH DENSITY RESIDENTIAL
(24.0 DU/A or Less
Impervious value, Ai = 0.650
Sub-Area C Value = 0.710
Rainfall intensity = 6.240(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.710 CA = 0.156
Subarea runoff = 0.923(CFS) for 0.210 (Ac.)
Total runoff = 0.975(CFS) Total area = 0.220(Ac.)
Street flow at end of street = 0.975(CFS)
Half street flow at end of street = 0.975(CFS)
Depth of flow = 0.261(Ft.), Average velocity = 1.986(Ft/s)
Flow width (from curb towards crown)= 6.232 (Ft.)
Process from Point/Station 216.000 to Point/Station 213.000
IMPROVED CHANNEL TRAVEL TIME (1
I /'s
Upstream point elevation = 116.700 (Ft.)
Downstream point elevation = 115.700(Ft.)
Channel length thru subarea = 12.000(Ft.)
Channel base width = 16.000(Ft.)
Slope or 'Z' of left channel bank = 2.000
Slope or 'Z' of right channel bank = 2.000
I
27
Manning's 'N' = 0.040
Maximum depth of channel = 1.000 (Ft.)
Flow(q) thru subarea = 0.975(CFS)
-Depth of flow = 0.045(Ft.), Average velocity = 1.349(Ft/s)
Channel flow top width = 16.180 (Ft.)
Flow Velocity = 1.35(Ft/s)
Travel time = 0.15 mm.
Time of concentration = 5.93 mm.
Critical depth = 0.049(Ft.)
+++++++++++.++-I-++++++++++++++++++++++++++++++++++++++++++++++++++.++++
Process from Point/Station 216.000 to Point/Station 213.000
CONFLUENCE OF MINOR STREAMS ****
Along Main Stream number: 2 in normal stream number 2
Stream flow area = 0.220(Ac.)
Runoff from this stream = 0.975(CFS)
Time of concentration = 5.93 mm.
Rainfall intensity = 6.139(In/Hr)
Summary of stream data:
Stream Flow rate TC Rainfall Intensity
No. (CFS) (mm) (In/Hr)
1 4.227 7.31 5.362
2 0.975 5.93 6.139 I Qmax(l) =
1.000 * 1.000 * 4.227) +
0.873 * 1.000 * 0.975) + = 5.078 I Qmax(2) =
1.000 * 0.811 * 4.227) +
1.000 * 1.000 * 0.975) + = 4.401
I Total of 2 streams to confluence:
Flow rates before confluence point:
4.227 0.975
I Maximum flow rates at confluence using above data:
5.078 4.401
Area of streams before confluence:
I 0.990 0.220
Results of confluence:
Total flow rate = 5.078(CFS)
Time of concentration = 7.310 mm.
Effective stream area after confluence = 1.210 (Ac.)
I +++-I--4-++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 213.000 to Point/Station 125.000
PIPEFLOW TRAVEL TIME (User specified size) kk
Upstream point/station elevation = 110.300(Ft.) I Downstream point/station elevation = 103.700 (Ft.)
Pipe length = 17.00 (Ft.) Manning's N = 0.011
No. of pipes = 1 Required pipe flow = 5.078(CFS)
I G:ven pipe size = 18.00(In.)
1 28
H
n
n
I
Calculated individual pipe flow = 5.078(CFS)
Normal flow depth in pipe = 3.13 (In.)
Flow top width inside pipe = 13.64(In.)
Critical Depth = 10.41(In.)
Pipe flow velocity = 24.74 (Ft/s)
Travel time through pipe = 0.01 mm.
Time of concentration (TC) = 7.32 mm.
+++++++++++++++++++++++++++++++++++++++.++++++++++++++++++++++,-+++++++
Process from Point/Station 213.000 to Point/Station 125.000
kkk CONFLUENCE OF MAIN STREAMS
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 1.210(Ac.)
Runcff from this stream = 5.078(CFS)
Time of concentration = 7.32 mm.
Rainfall intensity = 5.356(In/Hr)
Summary of stream data:
I Stream Flow rate TC Rainfall Intensity
No. (CFS) (mm) (In/Hr)
1 12.947 8.08 5.028
2 5.078 7.32 5.356
Qmax(l) = I 1.000 * 1.000 * 12.947) +
0.939 * 1.000 * 5.078) + = 17.714
Qmax(2) = U 1.000 * 0.906 * 12.947) +
1.000 * 1.000 * 5.078) + = 16.814
Total of 2 main streams to confluence: I Flow rates before confluence point:
12.947 5.078
Maximum flow rates at confluence using above data: I 17.714 16.814
Area of streams before confluence:
3.620 1.210
Results of confluence:
Total flow rate = 17.714(CFS)
Time of concentration = 8.077 mm. I Effective stream area after confluence = 4.830(Ac.)
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++-I-++++++
Process from Point/Station 125.000 to Point/Station 126.000
PIPEFLOW TRAVEL TIME (User specified size)
Upstream point/station elevation = 103.700 (Ft.)
Downstream point/station elevation = 97.500 (Ft.)
Pipe length = 28.00 (Ft.) Manning 's N = 0.013
No. of pipes = 1 Required pipe flow = 17.714(CFS)
I 29
I
I
I
-
Given pipe size = 18.00(In.)
Calculated individual pipe flow = 17.714(CFS)
Normal flow depth in pipe = 7.45(In.)
Flow top width inside pipe 17.73 (In.)
- Critical depth could not be calculated.
Pipe flow velocity = 25.65 (Ft/s)
Travel time through pipe = 0.02 mm.
Time of concentration (TC) = 8.10 mm.
End of computations, total study area = 4.830 (Ac.)
I
I
Mi
BASIN SUMMARY
Basin 1
See Nodes 115-116 of proposed hydrology study
Q=1.86cfs
Depth of Flow = 0.50 ft
Basin 2
See Nodes 207-208 of proposed hydrology study
Q= 1.12 cfs
Depth of Flow = 0.10 ft
Basin 3
See Node 103 of proposed hydrology study & trapezoidal channel calculation this section
Q = 2.75 cfs
Depth of Flow = 0.28 ft
Basin 4
See Nodes 211-212 of proposed hydrology study
Q = 0.94 cfs
Depth of Flow = 0.14 ft
Basin 5
See Nodes 216-213 of proposed hydrology study
Q=0.98cfs
Depth of Flow = 0.05 ft
Basin 6
See Node 120 of proposed hydrology study & trapezoidal channel calculation this section
Q=3.06cfs
Depth of Flow = 0.13 ft
Basin 7
See Node 106 of proposed hydrology study & trapezoidal channel calculation this section
Q=1.07cfs
Depth of Flow = 0.16 ft
Basin 8
See Nodes 123-124 of proposed hydrology study
Q= 1.35 cfs
Depth of Flow = 0.20 ft
Basin 9
See Node 109 of proposed hydrology study & trapezoidal channel calculation this section
Q=0.70cfs
Depth of Flow = 0.19 ft
Basin 10
See Node 112 of proposed hydrology study & trapezoidal channel calculation this section
Q= 1.61 cfs
Depth of Flow = 0.23 ft
Basin 11
See Nodes 202-203 of proposed hydrology study
Q = 1.62 cfs
Depth of Flow = 0.15 ft
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
* O'Day Consultants, Inc. *
I* 2710 Loker Avenue West, Suite 100 *
* Carlsbad, CA 92008 *
* Tel: 760-931-7700 Fax: 760-931-8680 *
I *** ***
*** ***
I *** ***
1<-------------( 7.13) -------------->1
'''""" Water Depth ( 0.28) '"***
I *** ***
*** ***
*** ***
- ***I<-----( 6.00)____>l***
I
************************
********************
Trapezoidal
------------------
Channel
Flowrate ..................2.750 CFS I Velocity ..................1.492 fps
-)'Depth of Flow .............0.281 feet
Critical Depth . ...........0.184 feet
Freeboard ..................0.000 feet I Total Depth ...............0.281 feet
Width at Water Surface 7.126 feet
I
Top Width .................7.126
Slope cf Channel 1.000
feet
%
Left Side Slope ...........2.000 : 1
Right Side Slope ..........2.000 : 1 I Base Width ................6.000 feet
X-Sectional Area 1.847 sq. ft.
Wetted Perimeter 7.259 feet
AR'(2/3) ..................0.742 I 0.040
I
I
I
* O'Day Consultants, Inc. *
2710 Loker Avenue West, Suite 100 *
Carlsbad, CA 92008 *
* Tel: 760-931-7700 Fax: 760-931-8680 *
ij rT iJo d o
****** ******
*** ***
*** ***
*** ***
-------------------( 26.501 ) -------------->1
Water Depth ( 0.13
*** ***
*** ***
*** ***
***l<-----( 26.00)___>I***
* ** * ** ** *** *** * * * * * * * ** *
** ** * * * ** *** * * * * ** **
Trapezoidal Channel
------------------
Flowrate ..................3.060 CFS
Velocity ..................0.926 fps
.-*Depth of Flow .............0.126 feet
Critical Depth ............0.078 feet
Freeboard .................0.000 feet
Total Depth ...............0.126 feet
Width at Water Surface ... 26.503 feet
Top Width .................26.503 feet
Slope of Channel 1.000 %
Left Side Slope 2.000 : 1
Right Side Slope 2.000 : 1
Base Width ................26.000 feet
X-Sectonal Area 3.304 sq. ft.
Wetted Perimeter 26.563 feet
AR"(2/3) ..................0.823
Mannings In' .............. 0.040
* O'Day Consultants, Inc. *
2710 Loker Avenue West, Suite 100 *
Carlsbad, CA 92008 *
* Tel: 760-931-7700 Fax: 760-931-8680 *
I *** ***
*** ***
*** ***
-
------- -------------- ( 6.64') -------------->1
Water Depth ( 0.16) ""***
***
*** ***
*** ***
***I<-----( 6.00)____>***
************************
********************
Trapezoidal Channel
------------------
Flowrate ...................1.070 CFS
Velocity ..................1.056 fps
-Depth of Flow .............0.161 feet
Critical Depth ............0.102 feet
Freeboard .................0.000 feet
Total Depth ...............0.161 feet
Width at Water Surface 6.644 feet
Top Width .................6.644 feet
Slope cf Channel 1.000 %
Left Side Slope 2.000 : 1
Right Side Slope 2.000 : 1
Base
Width ................6.000 feet
X-Sectional Area 1.018 sq. ft.
Wetted Perimeter 6.720 feet
0.289
AR(2/3) ................. 0.040
******************k
* O 'Day Consultants, Inc. *
2710 Loker Avenue West, Suite 100 *
Carlsbad, CA 92008 *
* Tel: 760-931-7700 Fax: 760-931-8680 *
ce AJt)c1 )Ci
******
*** ***
*** ***
*** ***
1<-,------------( 3.741 ) --------------
'""' Water Depth ( 0.19I)""'***
*** ***
*** ***
***
***<------3.00 )____>I***
* ** * *** * * *** **** * * * ** * **
* * * * * * * * * * * * * * * * * * * *
Trapezida1 Channel
------------------
Flowrate ..................0.700 CFS
Velocity ..................1.112 fps
—Jepth of Flow .............0.186 feet
Critical Depth ............0.117 feet
Freeboard .................0.000 feet
Total Depth ...............0.186 feet
Width ac Water Surface 3.744 feet
Top Width .................3.744 feet
Slope of Channel 1.000 %
Left Side Slope 2.000 : 1
Right Side Slope 2.000 : 1
Base Width ................3.000 feet
X-Sectional Area 0.627 sq. ft.
Wetted Perimeter 3.832 feet
AR"(2/3) ..................0.188
Mannincs 'n' .............. 0.040
* O'Day Consultants, Inc. *
2710 Loker Avenue West, Suite 100 *
Carlsbad, CA 92008 *
* Tel: 760-931-7700 Fax: 760-931-8680 *
0
****** ******
*** ***
***
*** ***
*** -- ------------- ( 5.91') --------------> ***
***-A^A^A^ Water Depth ( 0.23) """"***
*** ***
*** ***
*** ***
1 <-----( 5.00)----> ***
*** *** *** * **** * * * * * * * ***
***** ** * ** * *** *** ** *
Trapezoidal Channel
------------------
Flowrate ..................1.610 CFS
Velocity ..................1.298 fps
Depth of Flow .............0.228 feet
Critical Depth ............0.142 feet
Freeboard .................0.000 feet
Total Depth ...............0.228 feet
Width at Water Surface 5.911 feet
Top Width .................5.911 feet
Slope of Channel 1.000 %
Left Side Slope 2.000 : 1
Right Side Slope 2.000 : 1
Base Width ................5.000 feet
X-Sectional Area 1.243 sq. ft.
Wetted Perimeter 6.019 feet
AR"(2/3) ...................0.434
Mannings In' .............. 0.040