HYDROLOGY REPORT for 158 Chestnut Avenue
TABLE OF CONTENTS
SECTION
Executive Summary 1.0
Introduction 1.1
Existing Conditions 1.2
Proposed Project 1.3
Summary of Results and Conditions 1.4
Conclusions 1.5
References 1.6
Methodology 2.0
Introduction 2.1
County of San Diego Criteria 2.2
Runoff coefficient determination 2.3
Hydrology Model Output 3.0
Existing Conditions Hydrologic Model Output 3.1
Proposed Conditions Hydrologic Model Output 3.2
Proposed Storm Drain Hydraulic Calculations 3.3
Attachments
Existing Condition Hydrology Map (pocket) Al
Proposed Condition Hydrology Map (pocket) A2
Runoff Coefficients for Urban Areas A3
Maximum Overland Flow Length & Initial Time of Concentration A4
Soil Hydrologic Groups A5
Rainfall Isopluvials for 100 year Rainfall Event- 6 hours A6
Rainfall lsopluvials for 100 year Rainfall Event- 24 hours A7
Intensity Duration Design Chart A8
Average Velocity Chart for Overland Flow Time Travel A9
1488 Lavin Residence 8/3/2018
HYDROLOGY REPORT for 158 Chestnut Avenue
1.0 EXECUTIVE SUMMARY
1.1 Introduction
This Hydrology Study, for 158 Chestnut Avenue, has been prepared to analyze
the hydrologic characteristics of the existing and proposed project site, and
determine the existing condition offsite hydrologic characteristics that are
conveyed through the proposed project site. This report intends to present the
methodology and the calculations used for determining the runoff from the project
site in both the pre-developed (existing) conditions and the post-developed
(proposed) conditions, as well as the offsite areas, produced by the 100 year 6
hour storm.
1.2 Existing Conditions
The proposed project property is located east of Coast Highway 101, West of
Highway 5, north of Tamarack Avenue, and is located on the north side of
Chestnut Avenue, in the city of Carlsbad, as shown on the vicinity map and aerial
shown below.
Carlsbad hin
,
2
\ Q
"ft
Tama,,ck Beach Recrl %
V41
'\\ \ '\ ?' Sbc 1Jcath d. '
15SCh.etnotAv.na.
'.qeApccmeatcO
ThaSta1d <c$
galPu
vadaO -
ARC
C'
00 \\;I,
,
Ie A,
oe
C'
c'
GoogIe .."
Vicinity Map
1488 Lavin Residence 8/3/2018
HYDROLOGY REPORT for 158 Chestnu: Avenue
Aerial Map
The existing site is a 0.10 acre (4,375sf) residential lot with a single family
residence. In addition to the existing residential structure, the site currently
consists of one driveway, wooden fences, and miscellaneous other hardscape.
Existing impervious surface area on the site is 1,900 sf. The percentage of
existing impervious surface on the site is 43%.
Drainage from the existing site is primarily conveyed in a north to south direction,
and sheet flows across the property. This drainage discharges south into the
curb and utte at Chestnut Avenue.
1.3 Proposed Project
The intent of this project is to remove the entire existing single family residence
and grade a building pad, build a new single family residences, construct
concrete driveway, sidewalks, bic' retention basin, retaining walls, and install a
new water meter.
The proposed impervious surface area on the site is 3,914 sf. The percentage of
proposed impervious surface on the site is 89%. The proposed increase in
impervioLs surface is 2,014 sf, a 106% increase.
1488 Lavin Residence 8/3/2018
HYDROLOGY REPORT for 158 Chestnut Avenue
The drainage from the proposed development will be facilitated by overland
sheet flow and vegetated drainage swales and bio retention basin. The bio
retention basin will allow infiltration, volume reduction, detention, and treatment
of storm water runoff. Vegetated drainage swales along the side yards will allow
storm water to be treated prior to discharge off site. Runoff from the site
discharges south into the curb and gutter at Chestnut Avenue.
A runoff coefficient for Medium Density Residential will be used to determine the
proposed runoff for a future residential building development.
1.4 Summary of Results
Hydrologic analysis of the existing (pre-developed) and proposed (post-
developed) conditions of the proposed project site is included in this report as
section 3.1 and 3.2 respectively. Hydraulic analysis of the proposed conditions
are included in this report as section 3.3. The hydrologic analysis is used in this
report to approximate a peak flow at an assumed point of discharge in the
existing condition, to quantify a pre and post developed condition peak flow. This
assumption is made to develop a model that generates conservative peak flows
to ensure that the storm drain system will be capable of safely conveying
stormwater. The following summarizes the peak discharges at three points of
discharge that resulted from performing hydrologic analysis of the project site in
both the proposed developed and existing condition:
Point of Existing Conditions Developed Conditions
Discharge Qioo Tc AREA Qioo Tc AREA
(cfs) (mm.) (acres) (cfs) (mm.) (acres)
D-25 curb outlet
Node 4) 0.29 6.90 0.065
D-27 curb outlet
(node 1) 0.14 8.41 0.035
(Chestnut
Avenue) 0.31 7.93 0.10 0.40 8.41 0.100
The project site hydrologic models for both the pre- and post-developed
conditions encompass a total area of 0.10 acres. Evaluating the two models, the
proposed development will increase the amount of runoff from the project site by
0.09 cfs or 30%. This increase is based on having a single family building
residences, driveway, and hardscape areas.
Flow to the proposed D-27 curb outlet is 0.14 cfs. A double 3" inch pvc pipe
sidewalk underdrain, at 1% slope minimum, shall be constructed at that location.
1488 Lavin Residence 8/3/2018
HYDROLOGY REPORT for 158 Chestnut Avenue
The double 3" inch pvc pipe can handle 0.13 cfs x 2 = 0.26 cfs (See section 3.3).
Flow to the proposed D-25 curb outlet is 0.29 cfs. The sidewalk underdrain shall
be constructed at 1% slope minimum (See section 3.3).
1.5 Conclusions
As stated in section 1.4, the project site hydrologic models for both the pre- and
post-developed conditions encompass a total area of 0.10 acres. Evaluating the
two models, the proposed development will increase the amount of runoff from
the project site by 0.09 cfs or 30%.
The increase in runoff will be mitigated by creating a bio retention basin at the
front yard, or west side of the site. The required detention volume is V= 0.09 cfs x
(60 s/mm) x 8.41mm (Tc) = 45 cubic feet. The bio retention basin will allow
infiltration and volume reduction by adding a gravel drainage layer underneath.
Total proposed are of the basin is 17' feet long x 15' feet wide x 6" inch deep,
with vegetated detention basin with engineered sandy loam soil media layer and
3/4 inch rock layer. A 12" area drain overflow riser, and 4" perforated pipe placed
within the rock layer, shall be constructed to allow the basin to drain to the street.
See detail on grading plan. Total proposed detention volume is 127 cubic feet.
Drainage from the proposed residence is directed into a bio retention basin and
vegetated swale, prior to discharge off site. The bio retention basin and
vegetated swales will provide treatment and detention. Based on the calculation
in section 3.3, the proposed D-25 and D-27 curb outlet sidewalk underdrains can
handle the runoff.
It is anticipated that the proposed storm drain system will maintain the historic
discharge locations of the existing drainage patterns. The proposed drainage
system will safely convey the entire 100-year peak flow generated by onsite
runoff.
1.6 References
"San Diego County Hydrology Manual" revised June 2003, County of San Diego,
Department of Public Works, Flood Control Section.
"San Diego County Storm water Urban Mitigation Plan (SUSMP)", revised August
2012, County of San Diego.
1488 Lavin Residence 8/3/2018
HYDROLOGY REPORT for 158 Chestnut Avenue
2.0 METHODOLOGY
2.1 Introduction
The hydrologic model used to perform the hydrologic analysis presented in this
report utilizes the Rational Method (RM) equation, Q=CIA. The RM formula
estimates the peak rate of runoff based on the variables of area, runoff
coefficient, and rainfall intensity. The rainfall intensity (I) is equal to:
= 7.44 x P6 x D 15
Where:
= Intensity (in/hi)
P6 = 6-hour precipitation (inches)
D = duration (minutes - use Tc)
Using the Time of Concentration (Tc), which is the time required for a given
element of water that originates at the most remote point of the basin being
analyzed to reach the point at which the runoff from the basin is being analyzed.
The RM equation determines the storm water runoff rate (Q) for a given basin in
terms of flow (typically in cubic feet per second (cfs) but sometimes as gallons
per minute (gpm)). The RM equation is as follows:
Q=CIA
Where:
Q= flow (in cfs)
C = runoff coefficient, ratio of rainfall that produces storm water
runoff (runoff vs. infiltration/evaporation/absorption/etc)
= average rainfall intensity for a duration equal to the Tc for the
area, in inches per hour.
A = drainage area contributing to the basin in acres.
The RM equation assumes that the storm event being analyzed delivers
precipitation to the entire basin uniformly, and therefore the peak discharge rate
will occur when a raindrop, which falls at the most remote portion of the basin,
arrives at the point of analysis. The RM also assumes that the fraction of rainfall
that becomes runoff or the runoff coefficient C is not affected by the storm
intensity, I, or the precipitation zone number.
In addition to the above Rational Method assumptions, the conservative
assumption that all runoff coefficients utilized for this report are based on type "D"
soils.
1488 Lavin Residence 8/3/2018
HYDROLOGY REPORT for 158 Chestnut Avenue
2.2 County of San Diego Criteria
As defined by the County Hydrology Manual dated June 2003, the rational
method is the preferred equation for determining the hydrologic characteristics of
basins up to approximately one square mile in size. The County of San Diego
has developed its own tables, nomographs, and methodologies for analyzing
storm water runoff for areas within the county. The County has also developed
precipitation isopluvial contour maps that show even lines of rainfall anticipated
from a given storm event (i.e. 100-year, 6-hour storm).
One of the variables of the RM equation is the runoff coefficient, C. The runoff
coefficient is dependent on the percent of impervious surface, land use, and soil
type, and the County of San Diego has developed a table of Runoff Coefficients
for Urban Areas to be applied to basin located within the County of San Diego.
The table categorizes the land use, the associated development density (dwelling
units per acre) and the percentage of impervious area. Each of the categories
listed has an associated runoff coefficient, C, for each soil type class.
The County has also illustrated in detail the methodology for determining the time
of concentration, in particular the initial time of concentration. The County has
adopted the Federal Aviation Agency's (FAA) overland time of flow equation.
This equation essentially limits the flow path length for the initial time of
concentration to lengths of 100 feet or less, and is dependent on land use and
slope.
2.3 Runoff Coefficient Determination
As stated in section 2.2, the runoff coefficient is dependent on percent
impervious surface, land use, and soil type, and the County of San Diego has
developed a table of Runoff Coefficients for Urban Areas to be applied to basin
located within the County of San Diego. Table 3-1, included in the appendix,
categorizes the land use, the associated development density (dwelling units per
acre) and the percentage of impervious area.
The total number of dwellings proposed is 1, and the total developed lot area is
roughly equal to 0.10 acres. The dwelling unit per acre (DU/A) ratio is equal 10
DU/A which corresponds to Medium Density Residential DU/A of 10.9 or less on
table 3-1. Assume soil type is D, the runoff coefficient is 0.60.
For the both the existing and proposed development on site conditions, a
weighted C value is determined by the percentage of impervious and pervious
surfaces. The runoff coefficient of 0.90, for impervious surface, and 0.45 for
pervious surface are used.
1488 Lavin Residence 8/3/2018
HYDROLOGY REPORT for 158 Chestnut Avenue
3.0 Hydrology Calculations
3.1 Existing Conditions Hydrology Calculations
SITE RUNOFF COEFFICIENT (DEVELOPED):
C= 0.60 (Table 3-1)
SITE RUNOFF COEFFICIENT (WEIGHTED):
C = 0.90 (Area impervious) + 0.45 (Area pervious)
(Total Lot Area)
C= 0.90 (1.900 s.f.) + 0.45 (2.475 s.f
4,375 s.f.
C=1.710 s.f.+1 113 s.f.
4,375 s.f.
C= 0.65
Flow across initial sub area A, nodes 3 to 2:
C= 0.65
A= 0.026 acres
L= 25 ft
S = (52.40-51.79)/25 = 2.4%
Ti =,3.65 mm. (Table 3-2)
hoo 5.48 in/hr
Qnode2 =CAI = (0.65)(0.026)(5.48) = 0.09 cfs
Flow across sub area B nodes 2 to 1:
A=0.074 acres
L= 77ft
S = 51.79-51.63)/77 = 0.02%
V = (Pavers) = 0.5 ft/s
T(flow) = (77ft I 1 ft/s)/ 60 s/rn = 1.28 mm
Tc = T1 + T(Pavers) = 6.65 min.+ 1.28 mm. = 7.93 minutes
1488 Lavin Residence 8/3/2018
HYDROLOGY REPORT for 158 Chestnut Avenue
lioo = 4.89 in/hr
Qnodel = [CA, + CAb ]1100
= [0.63 (0.026) + 0.63(0.074)] 4.89
Qnode1O.31 cfs
1488 Lavin Residence 8/3/2018
HYDROLOGY REPORT for 158 Chestnut Avenue
3.2 Proposed Conditions Hydrologic Model Output
SITE RUNOFF COEFFICIENT (DEVELOPED):
C= 060 (Table 3-1)
SITE RUNOFF COEFFICIENT (WEIGHTED):
C = 0.90 (Area impervious) + 0.45 (Area pervious)
(Total Lot Area)
0= 0.90 (3,914 s.f.) + 0.45 (461 s.f.)
4,375 s.f.
0=3,522 s.f. + 207 s.f.
4,375 s.f.
0= 0.85
Flow across initial sub area A, nodes 3 to 2:
0= 0.85
A= 0.026 acres
L= 34ft
S = (54.53-54.22)/34 = 1%
Ti =7.9 mm. (Table 3-2)
hoo = 4.90 in/hr
Qnode2 =CAI = (0.85)(0.026)(4.90) = 0.11 cfs
Flow across sub area C nodes 2 to 1:
A=0.009 acres
L= 77ft
S = (54.22-51.50)/77 = 3.5%
V = (ConcreteNegetated swale/pvc pipe) = 2.5 ft/s
T(flow) = (77ft / 2.5 ft/s)/ 60 s/m = 0.51 mm
Tc = T + T(channel) = 7.9 min.+ 0.51 mm. = 8.41 minutes
Iwo = 4.71 in/hr
1488 Lavin Residence 8/3/2018
HYDROLOGY REPORT for 158 Chestnut Avenue
Qnodel = [CAa + CAC] Ii00
= [0.85 (0.026) + 0.85(0.009)] 4.71
Qnodel = 0.14 cfs
Qnodel = [CAa + CA0 + CAb] 1100
= [0.85 (0.026) + 0.85(0.009) + 0.85(0.065)] 4.71
Qnodel total = 0.40 cfs
Flow across sub area B nodes 5 to 4:
A=0.065 acres
L= 74ft
S = (55.60-54.00)/74 = 2 %
Tc = 6.9 minutes
Iioo = 5.35 in/hr
Qnode4 =CAI = (0.85)(0.065)(5.35) = 0.29 cfs
Qnode4 = 0.29 cfs
Flow across sub area B nodes 4 to 1:
Channel Flow
V = (pvc pipe/paved gutter) = 4 ft/s
T(flow) = (74ft / 4.0 ft/s)/ 60 s/rn = 0.30 mm
Tc = T + T(channel) = 6.9 min.+ 0.30 mm. = 7.2 minutes
1100 = 5.20 in/hr
Qnode4 =CAI = (0.85)(0.065)(5.20) = 0.28 cfs
Qnodel =0.28 cfs
1488 Lavin Residence 8/3/2018
HYDROLOGY REPORT for 158 Chestnut Avenue
3.3 Proposed Storm Drain Hydraulic Calculations
3" PVC PIPE, 5=1% (D-27 CURB OUTLET)
Worksheet for Circular Channel
Project Description
Project File c:\from rooioIthhaestad\academicfmw4 inch p.fm2
Worksheet 3 PVC DRAIN PIPE
Row Element Circular Channel
Method Manning's Formula
Solve For Discharge
Input Data
Mannings Coafficienl 0.009
Channel Slope 1.0000%
Depth 3.0 in
Diameter 3.00 in
Results
Discharge 013 cts
Flow Area 0.05 ft2
Wetted Perimeter 0.79 ft
Top Width 0.00 It
Critical Depth 0.21 ft
Percent Full 100.00
Critical Slope 0.009342 ftf It
Velocity 2.60 ft's
Velocity Head 0,11 ft
Specific Energy FULL ft
Froide Number FULL
Maximum Discharge 0,14 cis
Full Flow Capacity 0.13 cis
Full Flow Slope 0.010000 WIt
1488 Lavin Residence 8/3/2018
HYDROLOGY REPORT for 158 Chestnut Avenue
D-25 CURB OUTLET (SIDEWALK UNDERDRAIN)
Worksheet for Rectangular Channel
Project Description
Project File cMrorn root.oldhsIadacademi6\fmw'4 inch p.frn2
Worksheet D25 Rectangular channel
Flow Element Rectangular Channel
Method Mannings Formula
Solve For Channel Depth
Input Data
Mannings Coefficient 0.013
Channel Slope 1.00000/0
Bottom Width 3.00 ft
Discharge 0.29 cfs
Results
Depth 0.7 in
Flow Area 0,17 ft2
Wetted Perimeter 3.12 It
Top Width 3.00 ft
Critical Depth 0.07 ft
Critical Slope 0.1006448 Wft
Velocity 1.67 ftis
Velocity Head 0.04 ft
Specific Energy 0,10 ft
Froude Number 1.22
Flow is supercritical.
1488 Lavin Residence 8/3/2018
HYDROLOGY REPORT for 158 Chestnut Avenue
0-25 CURB OUTLET (SIDEWALK! NDERDRAIN)
Worksheet for Rectangular Channel
Project Description
Project Filee cMrom rootoldthaestathacademicfmw14 inch pim2
Worksheet D-25 Rectangt.Iar channel
Flow Element Rectangular Channel
Method Mannings Formula
Solve For Discharge
Input Data
Mannings Coefficient 0.013
Channel Slope 1.0000%
Depth 3.0 in
UottomWdth 3.00 ft
Results
Discharge 307 cIa
Flow Area 0.75 112
Wetted Perimeter 3.50 It
Top Width 3,00 ft
Critical Depth 0.32 It
Critical Slope 0.004660 ftift
Velocity 4.09 ftFs
Velocity Read 0.26 ft
Specific Energy 0.51 ft
Frotide Number 1.44
Row is supercrlticaL
1488 Lavin Residence 8/3/2018
LEGEND
ITEM SYMBOL
urCARa.oay NOW
SUB AA NAME
FLOW PATH
9JB-BAMN NCIJAXIARY
9J8-BASN AREA
RECAX1Y BOJPWARY
PROPORED coNTouRs aw
OCISTING CONTOURS -- -
+
GRAPAIC SCALE i•-iO
0 10 20 30
EXISTING CONDITION HYDROLOGY MAP
0
COAMMLLAPWsmunomm
!77 XIT c)BCFAI Fli O ==CA
mm FAX t
CLS# 1448
LEGEND
ITEM SYMBOL
HYDROLOGY NODE ()
SUB AREA NAME ()
FLOW PATH
SUB-BASIN BOUNDARY
SUB-BASIN AREA
BUILDING FOOTPRINT
PROPOSED CONCRETE HARDSCAPE
PROPERTY BOUNDARY
PROPOSED CONTOURS
EXISTiNG CONTOURS - - -S---- -
D-27 CURB OUTLET WITH DOUBLE 3' PIPE
D=25 CURB OUTLET
BROOKS BOX DRAIN INLET 0
1+
GRAPHIC SCALE 1=10
0 10 20 30
r .
PROPOSED CONDITION HYDROLOGY MAP
It
FS-55.60
1.
LLJ
• AREA B - 0.065 Ad
IE-5 L50 EX FL -51.50
eft FS-553
__
/Qu-o29
-
p
- -\ . =-S,• yS.• EX Fl. -51.50
rs Ac—o.009Ci —
ooutjo t-1114 cfa
-
Tc-O0
IE=l.85
1
COASTAL LAND SOLUTIONS, INC.
ll 577 SECDO STREET CA SM
)
ETCDIITAS PH C7I 23O- FAX (7w) -EO
CLS# 1'I4B
A2
...........................................
San Diego County Hydrology Manual Section: 3
Date: June 2003 Page: 6of26
Table 3-1
RUNOFF COEFFICIENTS FOR URBAN AREAS
Land Use I Runoff Coefficient "C"
Soil Type
NRCS Elements County Elements -- % J.MPER. A B C D
Undisturbed Natural Terrain (Natural)
Low Density Residential (LDR)
Low Density Residential (LDR)
LOW Density Residential (LDR)
Medium Density Residential (MDR)
Medium Density Residential (MDR)
dium Densit -Residential (MDR),)
Medium Density Residential (MDR)
High Density Residential (HDR)
High Density Residential (HDR)
Commercial/industrial (N. Corn)
Commercial/Industrial (G. Corn)
Commercial/Industrial (O.P. Corn)
Commercial/Industrial (Limited I.)
Commercial/industrial (General 1.)
Permanent Open Space
Residential, 1.0 DU/A or less
Residential, 2.0 DU/A or less
Residential, 2.9 DU/A or less
Residential, 4.3 DU/A or less
Residential, 7.3 DU/A or less
di)9DU/A -or less'
Residential, 14.5 DU/A or less
Residential, 24.0 DU/A or less
Residential, 43.0 DU/A or less
Neighborhood Commercial
General Commercial
Office Professional/Commercial
Limited Industrial
General Industrial
0.25 0.30 0.35
0.32 0.36 0.41
0.38 0.42 0,46
0.41 0.45 0.49
0.45 0.48 0.52
0.51 0.54 0.57
Q)
0.58 0.60 0.63
0.67 0.69 0.71
0.77 0.78 0.79
0.77 0.78 0.79
0.80 0.81 0.82
0.84 0.84 0.85
0.84 0,84 0.85
0.87 0.87 0.87
0* 0.20
10 0.27
20 0.34
25 0.38
30 0.41
40 0,48
50 0.55
65 0.66
80 0.76
80 0.76
85 0.80
90 0.83
90 0.83
95 0.87
*The values associated with 0% impervious may be used for direct calculation of the runoff coefficient as described in Section 3.1.2 (representing the pervious runoff
coefficient, Cp, for the soil type), or for areas that will remain undisturbed in perpetuity. Justification must be given that the area will remain natural forever (e.g., the area
is located in Cleveland National Forest).
DU/A dwelling units per acre
NRCS = National Resources Conservation Service
3-6
'43
San Diego County Hydrology Manual Section: 3
Date: June 2003 Page: 12of26
Note that the Initial Time of Concentration should be reflective of the general land-use at the
upstream end of a drainage basin. A single lot with an area of two or less acres does not have
a significant effect where the drainage basin area is 20 to 600 acres.
Table 3-2 provides limits of the length (Maximum Length (LM)) of sheet flow to be used in
hydrology studies. Initial T1 values based on average C values for the Land Use Element are
also included. These values can be used in planning and design applications as described
below. Exceptions may be approved by the "Regulating Agency" when submitted with a
detailed study.
Table 3-2
MAXIMUM OVERLAND FLOW LENGTH (LM)
& INITIAL TIME OF CONCENTRATION (T'
Element* DU/
Acre
.5% 1% 2% 3% 5% 10%
LM Tj LM Ti LM T1 LM TiLM Tj LM T1
Natural 50 13.2 70 12.5 85 10.9 100 10.3 100 8.7 100 6.9
LDR 1 50 12.2 70 11.5 85 10.0 100 9.5 100 8.0 100 6.4
LIJR 2 50 11.3 70 10.5 85 9.2 100 8.8 100 7.4 100 5.8
LIER 2.9 50 10.7 70 10.0 85 8.8 95 8.1 100 7.0 100 5.6
.MDR 4.3 50 10.2 70 9.6 80 8.1 95 7.8 100 6.7 100 5.3
MDR 7.3 50 9.2 65 8.4 80 7.4 95 7.0 100 6.0 100 4.8
(MDR (ö) (j)
MDR 14.5 50 8.2 65 7.4 80 6.5 90 6.0 100 5.4 100 4.3
HDR 24 50 6.7 65 6.1 75 5.1 90 4.9 95 4,3 100 3.5
HDR 43 50 5.3 65 4.7 75 4.0 85 3.8 95 3.4 100 2.7
N. Corn 50 5.3 60 4.5 75 4.0 85 3.8 95 3.4 100 2.7
G. Corn 50 4.7 60 4.1 75 3.6 85 3.4 90 2.9 100 2.4
G.P./Corn 50 4.21 60 3.7 70 3.1 80 2.9 90 2.6 100 2.2
Limited 1. 50 4.2 60 3.7 70 3.1 80 2.9 90 2.6 100 2.2
General I. 50 3.7 60 3.2 70 2.7 80 2.6 90 2.3 100 1.9
*See Table 3-1 for more detailed description
,411
3-12
b
Orange
County
........................................... County of San Diego
Hydrology Manual
Soil Hydrologic Groups
Soil Groups
[1111] Group A
Group B
Group C
Group
Undetermined
Data Unavailable
Ip 7
E
S
3 0 3MHes
........................................... County of San Diego
33-3 orange
Counti I 3330 Hydrology Manual
-
Riverside County
Rainfall Isopluvials
33 15- - - -
.-- _--..—:::
25 l0O Year Rainfall Event -6Hours
OCANSIOE *
25
.---
'0 -. I IsopuviaI (inches) I
-
cARL58AD
.-..-
- NcIMrs
-
33 00 0 _? _'" 0Y SOLAP4ABEACH ,ow V - 3 —
Q DEL MAR
- -.. - ---S / I -. -., Q :- •----,
-
(T
1l1r3.
ON V
j -
.-
32'45-
SO ............ DPW
C A
IMPERIAL BEACH -)
-. - /
- -
.- - -- -
- M e X I C
- WO N ca,tes
E
s
3 0 3Mltes
...........................................
33 3O Orange
-. County 1
.. .•--.?.
-
- -..___ ____ .____ _______
County of San Diego
Hydrology Manual
Riverside County
" -
Rainfall Is
V.- - V*V0._VV__ 33
100 Year Rainfall Event 24 Hours .--- _______ V /. : .
./. . ... .:.:• .. •. ....6.
a tsop4uvial (Inches)
4.0 —• ' ' 50
C)
- . - . ... 'S 3300 3300
-
CD
0 DEL.'J
. -~ /:
.bp.•........ OD . .. .... .. —
i..i ': .. . . . 0
• . :'-. •. . \ 3 -
32*46
- ;. . ... .. ........ ..•• ... _______________________________
..-. • ' ..-. 0. -,.......... . 'GIS SanGIS
N A - POVOEOWflflt flYOfflftE.4MEfl
IMPERIAL B ..
I .. .. .... . . .. A
e x i C E
32'3V -.. - ........ .• ______________ - 32'30
-a-n-WA-----
3 0 3Miles -
M/
Minutes Hours
Duration
Directions for Application:
From precipitation maps determine 6 hr and 24 hr amounts
for the selected frequency. These maps are included in the
County Hydrology Manual (10, 50, and 100 yr maps included
in the Design and Procedure Manual).
Adjust 6 hr precipitation (if necessary) so that it is within
the range of 45% to 65% of the 24 hr precipitation (not
applicaple to Desert).
Plot 6 hr precipitation on the right side of the chart.
Draw a line through the point parallel to the plotted tines.
This line is the intensityduration curve for the location
being analyzed.
Application Form: 1
(a) Selected frequency year
(b)P6 2.5in.P24 =4.O= 62 %2
. (c) Adjusted P6t2t in.
55
so (d) t 3 •,,,,,,,,,,,,,,,,,,mtn.
4.5 (e) I in/hr.
4.0
35 Note: This chart replaces the Intensity-Duration-Frequency
3.0 curves used since 1965.
9 ç
PS I 18 2 25 3 35 4
I I
45 5
I
65 6
S 2,63 3.96 5.27 6.59 7,90 9,22 1004 1186 13,17 1449 1581
7 21 3 6424 530 636 742 848 94 1000 1186 1272
10 1.58 253 3.37 4.21 5.05 5.90 8.76 7.58 8.42 927 10.11
15 1.30 1,95 2.59 3.24 3.89 4.54 519 5.84 6.49 7.13 778
20 9.08 1.32 3,15 2.55 3.23 3.77 4.31 425 5.39 5.92 546
25 023 ',40 1.87 2.23 2.80327 3.73 4.20 4.67 5.13 0.60 30 0.83 1.24 1.86 2.07 2.49290 3.32 3,73 4.15 4.56 4.88
40 8.09 1.03 i.:39 1.72 2.07 2.41 276 3.10 3.45 3,79
50 060 0.90 1.19 1.40 9.79 2.03 2.39 2.69 2.96 3.28 3.56 60 8.53 0.30 1.06 1.33 1.59 1.86 2.12 2.39 255 2.92 ' 3.18
90 0.41 0.61 0.62 1.02 1.23 1,43 1.63 1.84 2.04 2.25 ' 2.45
120 0.34 0.51 0.65085 1.02 11,19 1.36 1.53, 1.70 167 2.04
150 0.29 0.44 0.59 0,73 0.88 1 03 116 1.32 1.47 1.62 1.75 180 8.26 0.39 0,5' 0,65 0.78 0,91 1.04 1.18 1.31 J,1W 1.57
240 0.22 0330.430240.65 0.76 0.87 0.98 108 '1.19 i30
300 0.19 0.28038 0.47 0.58 0.65 0.75 0.80 0.84 1.03 1.13 360 0.17 025 013 042 0t'O 0'8 0' 07. 084 092 100
2.0
1.5
1,0
F I G U R E
Intensity-Duration Design Chart - Template
II
30
1
0.5
0.1 0.2 0.3 0.5 1 2 3 5 10 20
velocity (ft/sec)
Reprinted from SCS TR-55-1975. TR-55--1986 citains a simi-
lar graph for shallow-concentrated flow over paved and unpaved
surfaces, but it does not contain this particular graph.
Figure 20.4 SCS Average Velocity Chart for Overland Flow
Travel Time