HomeMy WebLinkAboutDEV 2017-0112; HOOVER STREET MINOR SUBDIVISION; HYDROLOGY/HYDRAULIC STUDY;DEXTER WILSON ENGINEERING, INC. WATER • WASTEWATER • ENVIRONMENTAL CONSULTING ENGINEERS 0 703 PALOMAR AIRPORT ROAD, SUITE 300 • CARLSBAD, CA 92009 • (760) 438-4422 SEWER STUDY FOR THE CANTARINI AND HOLLY SPRINGS PROJECT IN THE CITY OF CARLSBAD October 3, 2002 RECEIVED OCT 032002 CITY OF CARLSBAD PLANNING DEPT. Prepared by: Dexter Wilson Engineering, Inc. 703 Palomar Airport Road Suite 300 Carlsbad, CA 92009 Job No. 726-001 DEXTER WILSON ENGINEERING, INC. DEXTER S. WILSON, P.E. ANDREW M. OVEN, P.E. STEPHEN M. NIELSEN, P.E. MICHAEL J. FILECCIA, P.E. October 3, 2002 726-001 Ladwig Design Group • 703 Palomar Airport Road, Suite 300 Carlsbad, CA 92009 Attention: Bob Ladwig, President Subject: Sewer Study for the Cantarini and Holly Springs Projects in the City of Carlsbad Introduction This report provides-an analysis of the offsite sewer service impacts for the Cantarini and Holly Springs projects. The analyses performed verify that sewer capacity is available in the gravity sewer lines to which these two projects are proposing to connect. Project Overview The Cantarini and Holly Springs projects are located east of El Camino Real along the east side of the extension of College Boulevard. These two projects are adjacent to each other with Holly Springs positioned on the north property boundary of the Cantarini project. Access to the Cantarini project will be from the extension of College 703 PALOMAR AIRPORT ROAD, SUITE 300 • CARLSBAD, CA 92009 9 (760) 438-4422 • FAX (760) 438-0173 Bob Ladwig October 3, 2002 Boulevard; the Holly Springs project can only be accessed through the Cantarini project. The Cantarini project proposes a total of 105 single family detached residential homes and 80 multi-family units. The Holly Springs project proposes 39 single family detached residential homes plus four future single family home lots. Finish grades for building pads within these two projects range in elevation from a low of 120 feet to the highest building pad which is 380 feet in elevation. DesiEn Criteria Design criteria for the evaluation of the sewer systems for the Cantarini and Holly Springs projects are in accordance with the Carlsbad Standard Sewer System Design Criteria and Standard Drawings & Specifications dated May ij, 1993. The main criteria used for this study are summarized below. Sewage generation is calculated based upon the number of equivalent dwelling units (EDUs). The generation factor for each EDU is 220 gpd average flow. Peak sewage flow is calculated as 2.5 times the average daily sewage flow. Depth of flow criteria for gravity sewers requires peak sewage flow to be less than half full for 10-inch and smaller lines, and up to three-quarters full for 12-inch and larger lines. Existing Facilities There are two existing gravity sewer lines in the vicinity of the Cantarini and Holly Springs projects. To the south of the projects is the South Agua Hedionda Trunk Sewer DFXER WILSON ENGINEERING, INC. PAGE 2 Bob Ladwig October 3, 2002 located along the south side of Agua Hedionda Creek. This. s an 18-inch sewer main which connects to an existing 24-inch gravity sewer line in El Camino Real. Sewer flow is toward Cannon Road where the flow currently enters the North Agua Hedionda Trunk Sewer system. The second existing facility in the vicinity of the Cantarini and Holly Springs projects is a 10-inch and 12-inch gravity sewer which extends from the Calavera Hills development and connects to the existing North Agua Hedionda Trunk Sewer at the intersection of Cannon Road and El Camino Real. This gravity sewer follows the future alignment of Cannon Road east of El Camino 'Real up to the future intersection with College Boulevard where the sewer turns north to parallel the future alignment of College Boulevard. Exhibit A at the back of this report shows the proposed development projects and the existing gravity sewer lines in their vicinity. Overview of Sewer Service The Cantarini and Holly Springs projects are within the South Agua Hedionda sewer drainage basin and will be paying the sewer benefit area fees for this basin. Ultimately, all the sewerage generated by .these projects will be conveyed through the South Agua Hedionda Interceptor System to the Encina Water Pollution Control Facility which is located between Avenida Enemas the Interstate 5 south of Palomar. Airport Road. Based upon the tentative map submitted for these two projects, the proposed residential dwelling units within the projects fall into two Sewer Benefit Areas: Benefit Area D and Benefit Area E. All of the Holly Springs project's dwelling units are located in Sewer Benefit Area E. For the Cantarini project, only the northwest corner of the project is located in Sewer Benefit Area D; the remainder of the proposed development DEXTER WILSON ENGINEERING, INC. PAGE 3 Bob Ladwig October 3, 2002 is within Sewer Benefit Area E. Table 1 below presents a summary of the number of dwelling units for each project and the Benefit Areas within which they are located. TABLE 1 CANTARINI AND HOLLY SPRINGS PROJECTS EDUs BY SEWER BENEFIT AREA Mgffroj tecl ~1 Sewer Benefit Area D Cantarini Single Family 13 Cantarini Multi-Family 80 Subtotal 93 Sewer Benefit Area E Cantarini Single Family 92 Holly Springs Single Family 39 Holly Springs Future 4 Subtotal 135 fUL___TXThL _4.. r2T8O The dwelling units within Sewer Benefit Area D are proposed to connect to the existing 10-inch and 12-inch gravity sewer line along the future Cannon Road alignment (City designation: Reach SAHT2C of the South Agua Hedionda Sewer Interceptor). The dwelling units within Sewer Benefit Area E are proposed to connect to the existing 18- inch gravity sewer along Agua Hedionda Creek (City designation: Reach SAME of the South Agua Hedionda Sewer Interceptor). DEXTER WILSON ENGINEERING, INC. PAGE 4 Bob Ladwig October 3, 2002 Proposed Sewer System The proposed sewer service for the Cantarini and Holly Springs projects will be divided by Sewer Benefit Area. Exhibit A at the back of this report shows the two projects and the Sewer Benefit Area boundary. The discussion of the sewer analyses performed to evaluate the ability of the existing sewer system to accommodate the additional sewage flow generated by the proposed projects will be divided by Sewer Benefit Area. Sewer Benefit Area D. According to the City of Carlsbad "Updated Fee Study Report for Sewer Benefit Areas C, D, E, and F (South Agua Hedionda Interceptor Sewer), dated July 19, 2002 and prepared by the City of Carlsbad Engineering Department, all of the Cantarini and Holly Springs projects are described to be within Sewer Benefit Area E. However, based upon the proposed tentative map for the Cantarini project, a portion of this development more easily gravity sewers to the north and through Sewer Benefit Area D. Exhibit A at the back of this report shows the proposed adjusted boundary between Sewer Benefit Areas D and E. Because a portion of the Cantarini project is proposed to flow through Sewer Benefit Area D, this report prepared an analysis of the existing 10-inch and 12-inch sewer line serving Sewer Benefit Area D to ascertain if sufficient capacity existed in this gravity sewer line for the additional EDUs. Appendix A presents the results of the computer model of the existing sewer line. Figure A-i in Appendix A shows the computer model input data including the number of buildout EDUs within Sewer Benefit Area D and the location at which the buildout EDUs were modeled to enter the existing sewer system. The Cantarini project proposes to connect to the existing gravity sewer at the future intersection of Cannon Road and College Boulevard. This is Access Hole Number 14 of the computer model. At this access hole, the gravity sewer line increases from a 10-inch main to a 12-inch main. Since the design criteria allows the 12-inch main to DEXTER WILSON ENGINEERING, INC. PAGE 5 Bob Ladwig October 3, 2002 flow three-quarters full, there are no capacity problems downstream of the proposed Cantarini connection based upon ultimate buildout for Sewer Benefit Area D plus the proposed EDUs from the Cantarini project. The greatest depth-to-diameter ratio for the reach of 12-inch gravity sewer downstream of the proposed Cantarini project connection is 0.59. The offsite gravity sewer required from the Cantarini project north in College Boulevard to the existing 10-inch and 12-inch gravity sewer is expected to be an 8-inch line. In addition to serving the 13 single family homes and 80 multi-family homes from the Cantarini project, this line will also serve the future 80 multi-family units at the southeast intersection of Cannon Road and College Boulevard. All the EDUs connecting to the 12-inch gravity sewer will be subject to paying the Sewer Benefit Area Fee for Zone D. Sewer Benefit Area E. The majority of the Cantarini project and all of the Holly Springs project will sewer to the existing 18-inch South Agua Hedionda Interceptor Sewer Reach SAME. This gravity sewer is located on the south side of the Agua Hedionda Creek. It is proposed that an 8-inch gravity sewer line will be constructed in College Boulevard to convey sewage from the two projects south to the interceptor sewer. Capacity is available in the 18-inch South Agua Hedionda Interceptor Sewer since all of the EDUs within Sewer Benefit Area E have been accounted for in the City of Carlsbad sewer study titled, "Updated Fee Study Report for Sewer Benefit Areas C, D, E, and F (South Agua Hedionda Interceptor Sewer)." All the EDUs connecting to the 18-inch gravity sewer will be subject to paying the Sewer Benefit Area Fee for Zone E. DEXTER WILSON ENGINEERING, INC. PAGE 6 Bob Ladwig October 3, 2002 Downstream Sewer System As mentioned earlier in this report, the sewage generated by the Cantarini and Holly Springs projects will be conveyed by the South Agua Hedionda Interceptor Sewer system to the wastewater treatment plant. At this time, the South Agua Hedionda Interceptor Sewer system is not entirely constructed. The main portion of the system which is not yet constructed is the Cannon Road Lift Station. The final design for this facility was initiated at the end of September 2002; it is expected that the design and construction of this lift station will take two years. This time line fits the expected timing of the Cantarini and Holly Springsprojects. The approval and construction time for the development projects will put the first occupancies near the same time frame as the completion of the Cannon Road Lift Station. Thus, sewer facilities are expected to be available for these projects in time for their first occupancies. Recommendations The following recommendations and conclusions are made based on the sewer system analyses performed for the Cantarini and Holly Springs projects. The Cantarini and Holly Springs projects are within the South Agua Hedionda Sewer Drainage Basin and will contribute flow to the South Agua Hedionda Interceptor Sewer system. The Cantarini project is split between Sewer Benefit Area D and E. The Holly Springs project is entirely within Sewer Benefit Area E. There is sufficient capacity in the existing 12-inch gravity sewer serving Sewer Benefit Area D and located along the future alignment of Cannon Road east of El Camino Real for the EDUs within the Cantarini project which are proposed to gravity sewer through Sewer Benefit Area D. DEXTER WILSON ENGINEERING, INC. PAGE 7 Bob Ladwig October 3, 2002 Within Sewer Benefit Area E, the existing 18-inch gravity sewer line along Agua Hedionda Creek has been sized to accommodate all the EDUs proposed by both projects. The proposed dwelling units for both the Cantarini and Holly Springs projects will pay the Sewer Benefit Area Fee for Zone D or Zone E depending upon which zone they are in. Though not all of the South Agua Hedionda Interceptor Sewer facilities are currently constructed, it is anticipated that by the time the Cantarini or Holly Springs project is ready for occupancy (approximately two years) the facilities left to be constructed will be completed. The main portion of the system that needs to be completed is the Cannon Road Lift Station which is currently under final design. Thank you for the opportunity to prepare this report. If you have any questions on the enclosed information, please do not hesitate to call. Dexter Wilson Engineering, Inc. ak Andrew Oven NO. 1015 AO:clr d( Exp1o3 010. l* Appendix DEXTER WILSON ENGINEERING, INC. PAGE 8 APPENDIX A SEWER SYSTEM ANALYSIS FOR SEWER BENEFIT AREA D For Access Manhole Number designations, EDU inputs, and for sewer system layout for Sewer Benefit Area D, refer to Figure A-i within this Appendix. PAGE 1 ,'L41t.(,fJJ lv)4 k B(dEOCJ- h' ~tt.je,t e4J- 44f 14k45- 11%&f 74C 10/ 1/82 2 439 SEWER ANALYSIS GEOMETRY Cantarirti/Holiy Springs Sewer Analysis - LFNP 14 EDUs NH NH --- Design Criteria Down Slope Up n or C Diac d/D Flow Veio 100 .032200 110 .013 15 .75 6.8 10.7 44Th .102800 120 7 .01 ., 6.7 16.5 120 .007000 1 .013 12 .73 1.8 4.3 1 .006700 2 .013 12 .75 1.7 4.2 f .106718 113 . .75 1.7 4.2 7 . .006000 4 .013 L ., 1.6 4.0 4 .004600 5 .013 12 1.4 .05200 6 .013 12 .75 1.5 3.7 6 .004500 7 .013 12 .75 1.4 3.4 7 .006300 8 .013 12 .75 1.7 4.1 8 .004200 9 .013 12 .75 1.4 3,3 9 .004000 10 .013 12 .75 1.3 3.3 10 .004000 11 .@17 12 .7 47 7 11 .004000 12 .013 12 .75 1.3 3.3 12 .004000 47 .013 12 .75 1.3 3113 13 .007600 14 .013 12 .75 1.8 4.5 14 .017600 IC .013 10 .50 .9 5.3 +++++++++++++++++4++++++++++++++ END OF AREA ++++++++++++++++++++++++++++++++ SEWER ANALYSIS UNITS Cartarini/Ho11y Springs Sewer Analysis - LFI4F 14 EDLJs DISTANCE DIAMETER FLOW ELEVATION AREA FEET INCHES MOD FEET ACRES 1/ 1/02 2: 4:42 PAGE I SEWER ANALYSIS LOAD SUMMARY Caritarini/Holly Springs Sewer Analysis - LFMP 14 EDUs Manhole Total Contributed Point Area Flow Source I ' 7 5i 641 .14 .88 4 321.05 .07 .08 13 200,00 .04 Be. 15 908.35 .20 .50 It/ 1/82 2 442 PAGE 2 SEWER ANALYSIS SANITARY LOAD APPLICATIONS Cantarini/Hoily Springs Sewer Anaiysis - LFNP 14 EDUs - NH NH Slope Diac Capa- Area Flow Point Average Peak Vel- Depth Under Capacity Up Down city input Source Flow Flow ocity Ratio Replace Relief Identification 15 14 .01760 10 .94 988.30 .20 .00 .20 .50 4.5 .35 14 13 .80768 12 1.83 .88 .80 .88 .20 .58 3.3 .34 13 12 .80400 12 1.33 200.00 .04 as .24 .61 2.7 .45 12 11 .88408 12 1.33 .88 .80 .88 .24 .61 2.7 .45 11 11 10 .00400 12 1.33 .80 .80 .00 .24 .61 2.7 .45 18 9 .00400 12 1.33 .00 .00 .00 .24 .61 2.7 .45 9 8 .00420 12 1.36 .00 .08 .00 .24 iM 2.8 .44 8 7 .00630 12 1.67 .00 .00 .00 ..24 .61 3.2 .40 7 6 .00458 12 1.41 .00 .00 .00 .24 .61 2.9 .44 6 5 .00520 12 1.51 .88 .00 .00 .24 .61 3.0 .42 5 4 .00460 12 1.42 .00 .00 .00 .24 .61 2.9 .44 4 3 .80600 17 1.63 321.00 .07 .00 .31 .79 3.4 .47 3 2 .00670 12 1.72 641.30 .14 .00 .46 1.14 3.9 .56 2 1 .00670 12 1.72 .00 .00 .00 .46 1.14 3.9 .56 1 120 .00700 12 1.76 .00 .00 .00 .46 1.14 4.0 .55 120 110 .10288 17 6.73 .00 .00 .00 .46 1.14 10.8 .27 110 180 .03220 15 6.83 .00 .00 .00 .46 1.14 6.9 .27 4 + 4 + + + + + + + + 4 + + + + + 4 4 + + + + + + ++ + + END OF AREA• + + + + + + 4 + + + + + + + + + + + + + + + + + + + + + + 4Th! 1/ 82 U!! IOh h. 7.2Q SEWER ANALYSIS GEOMETRY Cantariiii/Holly Springs Sewer Analysis - Add LFNP 15 - NH NH --- Design Criteria Down Slope tip n or C Dim diD Flow Veluc 188 .032200 118 .813 15 .75 6.8 10.7 118 .182800 128 .813 12 .75 6.7 16.5 120 .007000 1 .013 12 .75 1.8 4.3 1 .086780 2 .013 12 .75 1.7 4.2 2 .006708 3 .013 12 .75 1.7 4.2 3 .006808 4 .813 12 .75 1.6 4.0 4 .004600 5 .013 12 .75 1.4 3.5 5 .005280 6 .013 12 .75 1.5 3.7 6 .804508 7 .013 12 .75 1.4 3.4 7 .006300 8 .813 12 .75 1.7 4.1 8 .084200 9 .013 12 .75 1.4 3.3 9 .884008 18 .013 U .75 1.3 3.3 It .804800 11 .813 12 .75 1.3 3.3 11 .804880 12 .013 12 .75 1.3 3.3 12 .004000 13 .013 12 .75 1.3 3.3 13 .087600. 14 .013 12 .75 1.8 4.5 14 .017608 15 .013 18 .50 .9 5.3 ++i+++++++++++++++++++++++++++++ END OF AREA ++++++++++++++++++++++++++++++++ PAGE 1 72.4 .001 4v4s/J7 w,' (1Id'4- £(dc4 CIXI.s 4r Se.A.i' AI&t 7t.. aOf 1CM (pevio C--k; flf'eJ cV E/ 4b L4w J/- ;ras1 '1 ' At *%4 C. (1 . SEWER ANALYSIS UNITS CantariiiHuiIy Springs Sewer Analysis - Add LFt4P 15 DISTANCE DIAMETER FIlM ELEVATION AREA FEET INCHES NOD FEET ACRES 1/ 1/82 2 928 PAGE 1 SEWER ANALYSIS LUAU SUMMARY Cantarini/Holly Springs Sewer Analysis - Add LFNP 15 Manhole Total Contributed Point Area Flow Source 3 641,3 .14 .11 4 321.80 .7 .11 13 28J1 .114 .1111 14 173.1111 .114 .1111 15 9118.311 .211 .1111 10/ 1/82 2 929 PAGE 2 SEWER ANALYSIS SANITARY LOAD APPLICATIONS Cantarini/Holly Springs Sewer Analysis - Add LFNP 15 NH NH Slope Diaa Capa- Area Flow Point Average Peak Vel- Depth Under Capacity Up Down city Input Source Flow Flaw ocity Ratio Replace Relief Identification 15 14 .81768 18 .94 908.30 .28 .00 .28 .50 4.5 .35 14 13 .00768 12 1.83 173.00 .84 .00 .24 .59 3.4 .37 17 '1 ir1rr 1'1 I 7 '1ThTh ThTh A ir fl. 7Th '1 i i. .i,,thj i. 211. 80 .r, .0 .o .iI . 12 11 .88488 12 1.33 .00 .88 .80 .28 .70 2.9 .49 11 18 .00488 12 1.33 .88 .88 .88 .28 .78 2.9 .49 18 9 .88488 12 1.33 .88 .08 .88 .28 .70 2.9 .49 9 8 .08428 12 1.36 .08 .88 .88 .28 .78 2.9 .49 8 7 .88638 12 1.47 .88 .88 .08 .28 .18 3.3 .43 7 6 .08450 12 1.41. .08 .8 .08 .28 .78. 3.8 .47 6 5 .88528 17 1.51 .80 .08 .00 is .70 3.1 .46 5 4 .88460 12 1.42 .00 .00 .88 .28 .70 3.0 .47 4 3 .00608 12 1.83 321.08 .87 .08. .35 .88 3.5 .49 7 '1 I1fII7Th '1 * 1'1 11* 7Th *1 11Th r * '17 '1 3 h .UlIOIS S £.IL Oti.33 .Jt .VII .ti £.L3 t.Th .3 2 1 .88678 12 1.72 .08 .80 .00 .49 1.23 4.8 .59 1 120 .80788 12 1.76 .80 .0 .00 .49 1.23 4.0 .58 120 118 .18280 12 6.73 .00 .80 .00 .49 1.23 10.8 .28 110 180 .03220 15 6.83 .80 .00 .00 .49 1.23 6.9 .27 + + + + + + + + + + ... + + + + + + + + + + + + + + + + + END OF AREA + + + + + + + + + + # + + + + + + + + + + + + + + + + + + U CANTARINI AND HOLLY SPRINGS SEWER BENEFIT AREA D ANALYSIS I CS1 \\FS\DWC\726001 \EXHIBIT-SEWER-A1 ,DWG 10-03-02 13:56:16