Loading...
HomeMy WebLinkAboutCT 15-08; SITE AND VILLAS 79, 77, 76 COORDINATION; 2016-06-06BNVE STRUCTURAL ENGINEERING • CIVIL ENGINEERING • LAND SURVEYING • LAND PLANNING July 6, 2016 Mr. Houston Arnold Grand Pacific Resorts Email: HArnold@gpresorts.com Project: Site and Villas 79, 77, 76 Coordination Dear Mr. Arnold, [.ECORT) Copy Date thJiL Per your request, we can confirm that we have coordinated the design intent of the foundations with the Civil drawings, including the deepening of the footings to avoid Geofabric surcharge. The attached details are from our sheet S3.1 on the Villas which have been coordinated with these requirements. Detail 2/S.1 covers the typical deepening requirements, and detail 15 addresses the conditions at the end of Villa 79. This condition is noted to be 5'-O" max which exceeds the final design intent where Wall G encroaches under the building a little less than 1'-0". Please call if you have any questions or concerns. Respectfully, BWE, Inc Charlie Colvin SE 5544 Principal I RECEIVED AUG 0 12016 LAND DEVELOPMENT ENGINEERING 9449 Balboa Avenue • Suite 270 • San Diego . CA • 92123 P 619 299 5550 • F 619 299 9934 • www.bwesd.com Page 1 of 1 LAN TYPICAL EXTERIOR BEARING WALL