Loading...
HomeMy WebLinkAboutCDP 16-29; LINCOLN RESIDENCE; TEMPORARY SHORING PLAN REVIEW; 2019-07-29HETHERINGTON ENGINEERING, INC. SOIL & FOUNDATION ENGINEERING • ENGINEERING GEOLOGY • HYDROGEOLOGY July 29, 2019 Project No. 8081.2 Log No. 20598 Robert Hall Construction 34145 Pacific Coast Highway, #332 Dana Point, California 92629 Attention: Mr. Robert A. Hall Subject: TEMPORARY SHORING PLAN REVIEW Proposed Single-Family Residence 5198 Shore Drive Carlsbad, California References: Attached Dear Mr. Hall In response to your request, we have reviewed the temporary shoring plan (References 2). Based on our review, the temporary shoring plan has incorporated the geotechnical recommendations presented in the referenced report (Reference 1) and is approved from a geotechnical standpoint. This opportunity to be of services is sincerely appreciated. If you have any questions, please contact this office. Sincerely, RETHERJNGTON ENGINEERING, INC. L1VU r.nglneer i Professional Geologist 3772 Geotechnical Enf Certified Engineering Geologist 1 (expires 3/31/20) Certified Hydrogeologist 591 (expires 3/31/20) Edwin R. Cunningh Civil Engineer 81687 (expires 3/31/20) 4-Addressee 1-via e-mail Rrt C493@cox.net) 1-via e-mail Jason Geldert (Jason.Geldertcar1sbadca.gov) 5365 Avenida Encinas, Suite A • Carlsbad, CA 92008-4369 • (760) 931-1917 • Fax (760) 931-0545 333 Third Street, Suite 2 • Laguna Beach, CA 92651-2306 • (949) 715-5440 • Fax (760) 931-0545 www.hetheringtonengineering.com REFERENCES "Geotechnical Investigation, Proposed Single-Family Residence, 5198 Shore Drive, Carlsbad, California", by Hetherington Engineering, Inc., dated November 14, 2016. Temporary Shoring Plan and Details, 5198 Shore Drive, Carlsbad, CA 92008 (Sheets SH-l), by Core Structure, Inc., plot dated July 26, 2018. Project No. 8081.2 Log No. 20598 HETHERINGTON ENGINEERING, INC.