HomeMy WebLinkAboutCDP 16-29; LINCOLN RESIDENCE; TEMPORARY SHORING PLAN REVIEW; 2019-07-29HETHERINGTON ENGINEERING, INC.
SOIL & FOUNDATION ENGINEERING • ENGINEERING GEOLOGY • HYDROGEOLOGY
July 29, 2019
Project No. 8081.2
Log No. 20598
Robert Hall Construction
34145 Pacific Coast Highway, #332
Dana Point, California 92629
Attention: Mr. Robert A. Hall
Subject: TEMPORARY SHORING PLAN REVIEW
Proposed Single-Family Residence
5198 Shore Drive
Carlsbad, California
References: Attached
Dear Mr. Hall
In response to your request, we have reviewed the temporary shoring plan (References 2). Based
on our review, the temporary shoring plan has incorporated the geotechnical recommendations
presented in the referenced report (Reference 1) and is approved from a geotechnical standpoint.
This opportunity to be of services is sincerely appreciated. If you have any questions, please contact
this office.
Sincerely,
RETHERJNGTON ENGINEERING, INC.
L1VU r.nglneer i Professional Geologist 3772
Geotechnical Enf Certified Engineering Geologist 1
(expires 3/31/20) Certified Hydrogeologist 591
(expires 3/31/20)
Edwin R. Cunningh
Civil Engineer 81687
(expires 3/31/20)
4-Addressee
1-via e-mail Rrt C493@cox.net)
1-via e-mail Jason Geldert (Jason.Geldertcar1sbadca.gov)
5365 Avenida Encinas, Suite A • Carlsbad, CA 92008-4369 • (760) 931-1917 • Fax (760) 931-0545
333 Third Street, Suite 2 • Laguna Beach, CA 92651-2306 • (949) 715-5440 • Fax (760) 931-0545
www.hetheringtonengineering.com
REFERENCES
"Geotechnical Investigation, Proposed Single-Family Residence, 5198 Shore Drive, Carlsbad,
California", by Hetherington Engineering, Inc., dated November 14, 2016.
Temporary Shoring Plan and Details, 5198 Shore Drive, Carlsbad, CA 92008 (Sheets SH-l),
by Core Structure, Inc., plot dated July 26, 2018.
Project No. 8081.2
Log No. 20598
HETHERINGTON ENGINEERING, INC.