HomeMy WebLinkAboutCDP 2020-0026; BEGONIA COURT RETAINING WALL; GEOTECHNICAL INSPECTION OF SLOPE FAILURE; 2020-06-01Martin R. Owen PE, GE
4596 Mount Hubbard Avenue, San Diego, CA 92117
Phone/Text: 619-813-8462
To: Ms. Marylou Powers
La Costa Village HOA
Email: martinowen@geotechengineer.com
Subject: Geotechnical Inspection of Slope Failure
2210 Plaza Bonita
Carlsbad, CA 92009
Dear Ms. Powers:
RECORD COPY
j)f 0:-:
Initial
/ 2 -/1./. 2tJ ' Date
Job No. 200506
June 1, 2020
In accordance with your request, I have conducted a geotechnical inspection of the subject
slope failure. The purpose of the inspection was to evaluate the slope failure and provide
recommendations for slope repair and restoration. My inspection was performed on May 6,
2020.
SITE DESCRIPTION
The subject slope is a steep (approximately 1-1/2:1 H:V) west-facing, graded fill slope, about 15
feet high, that descends from the west side of the subject residence down to a lower level and
swimming pool.
The residence is the westerly unit of a two-story, multi-unit townhome building constructed in
1971. The building is (mostly) supported on conventional shallow footings and has lower level
slab-on-grade floors. However, you indicated that the subject residence previously experienced
foundation settlement and was stabilized by underpinning with pipe piles or other deep
foundations. The date and extent of the foundation repairs are not known.
You also indicated you recently inspected the interior of the residence and no building damage
was observed. In addition, your insurance company sent an engineer to inspect the building
and no damage was reported.
Geotechnical Inspection of Slope Failure
2210 Plaza Bonita
Carlsbad, CA 92009
Page2
Job No. 200506
June 1,2020
Slope vegetation is moderate to good and consists of several shrubs and ivy and other ground
cover.
Reportedly there was a recent leak in a sprinkler line near the top of the slope. It is not known
how long the pipe was leaking. The leak is believed to be factor in the slope failure.
DESCRIPTION OF SLOPE FAILURE
• The slope failure occurred in the upper portion of the slope below the west side of the
subject residence, following recent, heavy rains.
• The failure is a shallow, slump-type landslide, about 3 feet deep maximum, approximately
SO feet long (parallel to slope), and extending about 2/3 of the way down the slope (see
attached Figure 1).
• The landslide occurred along a curved failure surface within the slope fill. The soils at the
top of the slope slid downwards resulting in a 3-feet high, vertical scarp and rotated
outwards accumulating as a soil pile or bulge near the bottom of the slope.
• The failure is less noticeable at the north end of the slope where there has been less slope
displacement at the bottom.
• The failure appears to have occurred due to an increase in weight and loss of shear strength
of the outer slope fill soils resulting from saturation of the slope soils. The source of water
appears to be a combination of recent, heavy rainfall and water from a leaking sprinkler
pipe.
• The residence does not appear to been damaged by the failure. However, the scarp has
exposed some PVC electrical conduits running parallel to the building. The horizontal
distance from the edge of the residence to the edge of the scarp and conduits is about 5
feet.
• I probed the slope soils within and adjacent to the landslide area and the soils were soft and
saturated to a depth of at least 3 feet. Poor compaction of the fill soils appears to be a
factor in the slope failure.
Martin R. Owen PE, GE
Geotechnical Engineer
Geotechnical Inspection of Slope Failure
2210 Plaza Bonita
Carlsbad, CA 92009
Page3
Job No. 200506
June 1, 2020
• The slope is overly steep by today's grading standards, which has also contributed to the
failure.
SOILS AND GEOLOGY
The slope soils are fill soils consisting of gray brown, clayey sand and clayey silt. From
published geologic maps the site is underlain at depth by sedimentary bedrock of the Santiago
Formation.
CONCLUSIONS
• The primary cause of the slope failure appears to be saturation of the slope soils and loss of
shear strength resulting from a combination of recent heavy rainfall and a leaking sprinkler
pipe.
• The steep slope and poor slope fill compaction appear to be other factors in the failure.
• The slope failure is shallow and relatively minor and the subject residence does not appear
to have been damaged or threatened by the failure.
RECOMMENDATIONS
The slope failure should be repaired and the slope restored to its original grade and
configuration, as follows:
• The slope can be repaired using small grading equipment or hand equipment.
• The existing slope vegetation within the slope restoration area should be entirely removed .
Some of the shrubs may be salvageable and can be reused.
• The accumulated soils at the bottom of the slope should be removed and temporarily
stockpiled on the nearby sidewalk or other area.
• In addition, prior to placing fill, a 5-feet wide minimum (measured into slope) fill key, at
least 2 feet deep, should be excavated at the bottom of the slope (see attached Figure 2).
Martin R. Owen PE, GE
Geotechnical Engineer
Geotechnical Inspection of Slope Failure
2210 Plaza Bonita
Carlsbad, CA 92009
Page4
Job No. 200506
June 1,2020
As grading proceeds to the north, where there has been less slope displacement, it may be
possible to excavate the fill key further up the slope (instead of at the bottom).
• The onsite soils may be reused as fill, provided they are free of organics and debris and
rocks and cobbles over 6 inches in dimension. Any import fill soils should be approved by
the undersigned or other soil testing company.
• Fill soils should be placed and compacted in 6 to 8 inches thick lifts/layers starting at the
bottom of the fill key and working upwards. The fill should be moistened or dried as
necessary to slightly above optimum moisture conditions and compacted by mechanical
means to at least 90 percent relative compaction based on ASTM D 1557.
• The 5-feet wide minimum fill width should be maintained as the fill is brought up. The fill
should be benched into the original slope soils in 2 feet minimum, vertical benches (see
attached Figure 1).
• The upper portion of the slope should be overbuilt and cut back.
• Horizontal layers of geogrid fabric should be installed at 4 feet maximum vertical
increments to provide extra strength.
• The slope grading and compaction and placement of geogrid should be observed and tested
as necessary by the undersigned or other soil testing company.
OTHER OPTIONS
You asked for other repair options to be considered such as constructing a retaining wall at the
bottom of the slope.
Constructing a retaining wall at the bottom of the slope instead of regrading the slope is not a
preferred option. The retaining wall would have to be strong enough and high enough (at least
5 feet) to withstand t he soil pressures exerted by the landslide and would probably need to be
supported on drilled, concrete caissons extending several feet into the ground. It would be
necessary to perform a subsurface soil investigation and structurally design the wall, and to
obtain permits from the City of Carlsbad. A retaining wall solution would also leave the slope in
its present, failed condition.
Martin R. Owen PE, GE
Geotech nical E ngineer
Geotechnical Inspection of Slope Failure
2210 Plaza Bonita
Carlsbad, CA 92009
Pages
Job No. 200506
Junel,2020
Constructing a lower (3 to 4-feet high) wall as part of a grading solution is a possible option but
the only perceived benefit is that it would allow you to reconstruct the slope at a flatter angle.
The wall would still have to be designed and permitted.
Construction of a retaining wall at the top of the slope would provide support to the existing
building foundations and conduits. However, the wall would do nothing to stabilize the
landslide and further slope movement could still occur.
SLOPE LANDSCAPING
The slope should be re-landscaped with shrubs and deep-rooted ground cover such as ivy.
Moderate irrigation will be required to establish the landscaping.
FRENCH DRAIN AT BOTTOM OF SLOPE
You also indicated you would like to construct a French drain at the bottom of the slope to
intercept possible below-ground seepage.
A French drain should be at least 3 feet deep and 12 inches wide. A 4-inch diameter,
perforated SDR 35 or better PVC pipe wrapped in a filter sock should be placed at the bottom of
the trench and the trench backfilled with Caltrans Class 2 Permeable Material drain rock (gravel
and sand mix). The pipe should flow at a 1 percent minimum gradient to an approved outlet.
LIMITATIONS
Please note I have reviewed no construction plans or reports as part of t his inspection, and
have performed no subsurface exploration or soil testing. The above co ncl usions and
recom mendations are based on my inspection and experience with other, similar properties in
San Diego County.
This report provides no warranty, either expressed or implied, concerning future building or
slope performance. Future damage from geotechn ical or other causes is a possibility.
Martin R. Owen PE, GE
Geotechnical E ngineer
Geotechnical Inspection of Slope Failure
2210 Plaza Bonita
Carlsbad, CA 92009
Page6
Job No. 200506
June 1, 2020
This opportunity to be of service is appreciated. If you have any questions, please do not
hesitate to call or contact me.
Very truly yours,
M artin R. Owen PE, GE
Geotechnical Engineer
Attachments: Figure 1 and 2
Martin R. Owen PE, GE
Geotechnical Engineer
Geotechnical Inspection of Slope Failure
2210 Plaza Bonita
Carlsbad, CA 92009
2210
Plaza
Bonita 5' ~,
3' ::t
FIGURE 1
SLOPE FAILURE
SCHEMATIC ONLY
EAST-WEST SECTION
THROUGH SLOPE
Scarp Original Slope
/
1.5:1 (H:V)
Approx.
Martin R. Owen PE, GE
Geotechnical Engineer
Page7
Job No. 200506
June 1,2020
Soil Displacement/
Bulge from Slope
/ Failure
15'
Approx.
Geotechnical Inspection of Slope Failure
2210 Plaza Bonita
Carlsbad, CA 92009
2210
Plaza
Bonita
FIGURE 2
SLOPE REPAIR
SCHEMATIC ONLY
EAST-WEST SECTION
THROUGH SLOPE
~5• ~ I
' ' ' '
~Scarp Restored Slope
1.5:1 (H:V)
/ Approx. ' ' ' '
Geofabric Layers
;:I at4'Max.
Height Intervals
2'HighMin/
Fill Benches ➔ .....
2' Deep Min.~
Fill Key ,~
Martin R. Owen PE, GE
Geotechnical Engineer
5'
Min.
Page8
Job No. 200506
June 1, 2020
--I "\
15'
Approx.
Lower
Level
~ ,,
➔I