SOIL AND FOUNDATION ENGINEERING • GROUNDWATER • ENGINEERING GEOLOGY
18 July 2019
Ms. Darcy Eaton
5360 Los ·Robles Drive
Carlsbad, CA 92008
Subject: Building Plan Review
Eaton-Stainbeck Residence
5360 Los Robles Drive
Carlsbad, California
Dear Ms. Eaton:
Job No. 17-11606
RECEIVED
LAND OE·vLLOPMENT
ENGtNEERING
As agreed and as required by the City of Carlsbad reviewer, we have reviewed the
structural foundation plan (Sheets S-100 through S-104, S-200, S-300, S-400, and
S-500) prepared by Broderick Engineering, LLC with a revision date of April 18, 2019,
and the undated grading plan by BHA, Inc. (Sheets 1 through 4). The plans were
reviewed from a geotechnical engineering viewpoint.
After suggested corrections were made, we found the plans to be in accordance with
the recommendations presented in our "Preliminary Geotechnical Investigation"
report dated September 28, 2017. A copy of our report and this letter should be
provided to all pertinent contractors involved with soil preparation and foundation
construction. Any grading should be as required by the City of Carlsbad grading
ordinance and per our referenced soils report.
If you have any questions regarding this letter, please contact our office. Reference
to our Job No. 17-11606 will help expedite a response to your inquiry.
Respectfully submitted,
GEOT CHNICAL EXPLORATION, INC.
Jaime A. Cerros, P.E.
R.C.E. 3442
Senior Geo
Richard A. Cerros, E.I.T.
Staff Engineer