Loading...
HomeMy WebLinkAbout2799 CREST DR; ; FPR2022-0019PERMIT REPORT (ity of Carlsbad Print Date: 10/18/2023 Job Address: 2799 CREST DR, CARLSBAD, CA 92008-1505 Permit Type: FIRE-Construction Residential Work Class: Parcel #: 1561524500 Track #: Valuation: $192,891.00 Lot #: Occupancy Group: Project #: #of Dwelling Units: Plan #: Bedrooms: Construction Type: Bathrooms: Orig. Plan Check #: Plan Check #: Permit No: FPR2022-0019 Status: Closed - Finaled Single Family Fire Sprinkli Applied: 08/31/2022 Issued: 10/18/2022 Finaled Close Out: 03/08/2023 Final Inspection: INSPECTOR: Cheung, Nathaniel Project Title: Description: ROWE ADU -NEW 13D SPRINKLER SYSTEM IN NEW ADU ADDITION Applicant: FPContractor: INNOVATIVE FIRE PROTECTION INNOVATIVE FIRE PROTECTION INC DONALD SCHROEDER 8779 COTTONWOOD AVE, # STE 101 8779 COTTONWOOD AVE, # 101 SANTEE, CA 92071-4457 SANTEE, CA 92071-4457 (619) 593-8200 (619) 593-8200 FEE AMOUNT FIRE NFPA 13D Single Family System (lnsp/Bldg) $148.00 FIRE NFPA 13D Single Family System (Plan Review) $292.00 Total Fees: $440.00 Total Payments To Date: $440.00 Balance Due: $0.00 Fire Department Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 1442-339-2665 1 Inspections: 442-339-2660 1 www.carlsbadca.gov HYDRAULIC CALCULATIONS for Job Information Project Name: ROWE ADU Contract No.: C8599 City: CARLSBAD, CA 92008 'Project Location: 1799 CREST DRIVE Date: 8/30/2022 Contractor Information Name of Contractor: INNOVATIVE FIRE PROTECTION, INC. Address: 8779 COTTONWOOD AVE.,STE. 101 City: SANTEE, CA 92071 Phone Number: 619-593-8200 E-mail: DERIK@IFPINC.NET Name of Designer: DERIK BROOKS Authority Having Jurisdiction: CARLSBAD FIRE AUTHORITY Design - Remote Area Name Remote Area Location LIVING / KITCHEN Occupancy Classification NFPA 13D Density (gpm/ft2) 0.051 Area of Application (ft2) 392 Coverage per Sprinkler (ft) 196 Number of Calculated Sprinklers 2 In-Rack Demand (gpm) 0 Special Heads Hose Streams (gpm) 5 Total Water Required (Incl. Hose Stern) gpm) 25 Required Pressure at Source (psi) 51.8 Type of System Wet Volume - Entire System (gal) 17.9 gal Water Supply Information Date 8/23/2022 Location CREST DRIVE Source Notes File:Z:\l'iNEE7i1NG13A.Project FiIesC8599 - ROWE ADU\C8599 - ROWE ADU.dwg Date 8/30/2022 Copyright 2002-2012 Tyco Fire Protection Products Page 1 Job: ROWE ADU Hydraulic Analysis for: I Calculation Info Calculation Mode Hydraulic Model Fluid Name Fluid Weight, (ib/ft3) Fluid Dynamic Viscosity, (lb.s/ft2) Water Supply Parameters Supply 1: 1 Supply Analysis Demand Hazen-Williams Water © 60F (15.6C) N/A for Hazen-Williams calculation. N/A for Hazen-Williams calculation. Flow (gpm) Pressure (psi) 0 54 500 49 I Node at Source I Static Pressure I Residual I Pressure Flow Available Pressure I Total Demand I Required Pressure I (psi) I (psi) (gpm) i (psi) (gpm) (psi) 54 49 500 54 25 51.8 Hoses Inside Hose Flow! Standpipe Demand (gpm) 5 Outside Hose Flow (gpm) 0 Additional Outside Hose Flow (gpm) Other (custom defined) Hose Flow (gpm) 0 Total Hose Flow (gpm) 5 Sprinklers Ovehead Sprinkler Flow (gpm) 20 lnRack Sprinkler Flow (gpm) 0 Other (custom defined) Sprinkler Flow (gpm) 0 Total Sprinkler Flow (gpm) 20 Other Required Margin of Safety (psi) 0 BOR - Pressure (psi) 21 BOR -Flow (gpm) 20 Demand w/o System Pump(s) N/A File: Z:ENGlNEERiNG\3A.Project Fiies\C8599 - ROWE ADUtC8599 - ROWE ADU.dwg Date 8/30/2022 Copyright 0 2002-2012 Tyco Fire Protection Products Page 2 Job: ROWE ADU Hydraulic Analysis for: I Supply S System Demand • Available At Source 54 Psi@ 25 gpm 50 r 46.994 i 4° CL - 0 200 300 400 500 600 Flow, gpm File: Z:ENGlNEERlNG3A.Project FilesC8599 - ROWE ADUC8599 - ROWE ADU.dwg Date 8/30/2022 Copyright 0 2002-2012 Tyco Fire Protection Products Page 3 Job: ROWE ADU Hydraulic Analysis for: I Graph Labels Label Label Description Values Flow (gpm) . Pressure (psi) Si Supply point #1 -Static 0 54 S2 Supply point #2 Residual 500 49 Di Elevation Pressure 0 13.9 D2 System Demand 25 51.8 Curve Intersections & Safety Margins Curve Name Intersection I Safety Margin Pressure (psi) Flow (gpm) I PresSure (psi) I @ Flow (gpm) Supply . . 54 25.8 2.1 25 Open Heads Required __________ Calculated Head Ref. Head Type Coverage K-Factor Density Flow Pressure Density Flow Pressure (ft2) (gpm/psi1/2) (gpm/ft2) (gpm) (psi) (gpm/ft2) (gpm) (psi) 101 Overhead Sprinkler 196 3.7 0.05 9.8 7.3 0.051 10 7.3 102 Overhead Sprinkler 196 3.7 0.05 9.8 7.3 0.051 10 7.3 File: Z:ENGlNEERlNG\3A.Project FilesC8599 - ROWE ADUC8599. ROWE ADU;dw9 . . Date 8/30/2022 Copyright 0 2002-2012 Tyco Fire Protection Products Page 4 Job: ROWE ADU Hydraulic Calculations PIPE INFORMATION Node 1 Elev 1 K-Factor 1 Flow added (q) Nominal ID Fittings L C Factor total (Pt) Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES T frict (Pf) (ft) (gpm/ps1½) (gpm) (In) (ft) (ft) (psi) (psi) Path No: I 101 31 3.7 10 1 1x(BM.Tee-Run)=1 3.26 150 7.3 31 32 10 1.101 lx(BM.90)=5 6 0.0188 -0.4 9.26 0.2 31 32 -1.1 1 5x(BM.Tee-Run)=5 43.74 150 7 08 30 8.9 1.101 2x(BM.Tee-Br)=10 25 0.0152 0.9 2x(BM.90)=10 68.74 1 08 30 11.1 1 3x(BM.90)=15 17.87 150 9 TOR 20 20 1.101 lx(BM.Tee-Run)=1 16 0.0679 4.3 33.87 2.3 TOR 20 0 1.25 5.46 150 15.6 R-0 14.54 20 1.394 0 0.0215 2.4 5.46 0.1 R-O 14;54 0 1.25 1.08 18.1 RESI-RISER R-I 13.46 20 0 0 1.6602 0.5 *** 1.08 1.8 R-I 13.46 0 1.25 1.46 150 20.3 BOR 12 20 1.394 0 0.0215 0.6 1.46 0.0 BOR 12 0 1.25 lx(us.Tee-Br)=5.93 1 150 21 3B 11 20 1.265 5.93 0.0345 0.4 6.93 0.2 3B 11 5 1.25 2x(us.90)=5.93 4 150 21.7 3A 9 25 1.265 5.93 0.0522 0.9 9.93 0.5 3A 9 0 1.5 2x(BM.45)=4 75.76 150 23.1 2A -1 25 1.598 4 0.0167 4.3 79.76 1.3 2A -1 0 1 2x(us.90)=5.4 4.5 150 28.7 BF-0 2 25 1.025 5.4 0.1453 -1.3 9.9 1.4 BF-0 2 0 1 0.5 28.9 WILKINS95OX BF-I 2 25 0 0 11.4225 0 L 0.5 5.7 *** BF-I 2 0 1 2x(us.90)=5.4 4.5 150 34.6 2-0 -1 25 1.025 5.4 0.1453 1.3 9.9 1.4 2-0 -1 0 .75 0.5 37.3 METER 2-I -1 25 0 0 22.0479 0 *** 0.5 11 2-I -1 0 1 lx(us.Tee-Br)=5.84 15 150 48.3 1A -1 25 0.995 5.84 0.1679 0 20.84 3.5 1A -1 0 8 1 150 51.8 1 -1 25 7.98 0 0 0 0 1 51.8 File: Z:\ENGlNEERlNG3A.Project FiIesC8599 - ROWE ADUC8599 - ROWE ADU.dwg Date 8/30/2022 Copyright 0 2002-2012 Tyco Fire Protection Products Page 5 Job: ROWE ADU Hydraulic Calculations PIPE INFORMATION Node 1 Elev 1 K-Factor 1 Flow added (q) Nominal ID Fittings L C Factor total (Pt) Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES T frict(Pf) (ft) (gpm/ps1½) Wpm) (in) (ft) (ft) (psi) (psi) Path No: 2 102 31 3.7 10 1 1x(BM.Tee-Run)=1 2 150 7.3 02 32 10 1.101 lx(BM.90)=5 6 0.0188 -0.4 8 0.2 02 32 1.1 1 4x(BM.Tee-Run)=4 31.55 150 7 08 30 11.1 1.101 2x(BM.90)=10 14 0.0227 0.9 45.55 1 08 9 Path No: 3 G5 11 5 1.25 0.5 150 21.7 3B 11 5 1.265 0 0.0026 0 0.5 0 3B 21.7 Path No: 4 31 32 0 1 2x(BM.Tee-Br)=10 13.52 150 7 02 32 1.1 1.101 2x(BM.90)=10 20 0.0003 0 33.52 0.0 02 7 Pressures are balanced to a high degree of accuracy. Values may vary by 0.1 psi due to display rounding. Maximum Velocity of 10.32 ft/s occurs in the following pipe(s): (1A-2-I) **" Device pressure loss (gain in the case of pumps) is calculated from the device's curve. If the device curve is printed with this report, it will appear below. The length of the device as shown in the table above comes from the CAD drawing. The friction loss per unit of length is calculated based upon the length and the curve-based loss/gain value. Internal ID and C Factor values are irrelevant as the device is not represented as an addition to any pipe, but is an individual item whose loss/gain is based solely on the curve data. File: Z:ENGlNEERlNG\3A.Project FilesC8599 - ROWE ADlJC8599 - ROWE ADU.dwg Date 8/30/2022 Copynght 0 2002-2012 Tyco Fire Protecthn Products Page 6 I Job: ROWE ADU Device Graphs Pressure vs. Flow Function Design Area: 1; Supply Ref.:1; Supply Name:1 Flow, am PressureLoss Function Design Area: 1; SIP Ref.: 68 (WILKINS950XL, Size = 1); Inlet Node: BF-I; Outlet Node: BF-0 I,. -- - - -- -- - -- - - - - - - - - - €4. --------- -------- ._.._-..__-________-- - -- €3.: €2.: - - - - -. €0. ---- -------- -- ---.-- ------- - 93 7.5 5.7p518259Pm 43, 2.5 Flow, 9pm File: Z:ENGlNEERlNG3A.Project FilesC8599 - ROWE ADUC8599 - ROWE ADU.dwg Date 8/30/2022 Copyright 0 2002-2012 Tyco Fire Protection Products Page 7 Flow, gprn Pressure Loss Function Design Area: 1; Valve Ref.: 69 (METER. Size = .75); Inlet Node: 2.1; Outlet Node: 2.0 222 l92 I3 t72 I62 152 132 J 123 102 92 Ii, 02 I 212 203 ;iu mmm MINE • am . --.....r__ - iiig1 UI MEN R -- ii! . 143 li Noncoms U I 62 - 43 32 U •• - U... 23. Job: ROWE ADU Device Graphs Pressure Loss Function Design Area: 1; Valve Ref.: 67 (RESI-RISER, Size = 1.25); Inlet Node: R.I; Outlet Node: R.0 1.0 1.8 psi 20 9prn Flow, gpm File: Z:ENGlNEERlNG\3A.Project Files\C8599 - ROWE ADU\C8599 - ROWE ADU.dwg Date 8/30/2022 Copyright 2002-2012 Tyco Fire Protection Products Page 8 DIMENSIONS (approximate WEIGHT MODEL A UNION B LESS BALL LESS WITH SIZE A BALL VALVES C 0 E F G BALL BALL VALVES VALVES VALVES in mm in. mm in. Imm in. Imm in. Imm in. Imm in. mm in. Imm in. Immlbs I kg lbs. I kg 3/4 20 Ill1/4286 1 121/2 318 7 117811/238 3 7631/2 89 3 76 15 381 5 2.3 7 1 3.2 1 25 121/4 311 137/8 353 7 1178 11/2 38 3 76 31/2 89 3 76 173/4 451 8 3.6 12 5.4 11/4 32 151/2419 181/2 470 109/16 268 2 51 31/2 89 41/2 114 4 1/2 114 211/2 546 16 7.3 22 10 11/2 40 171/8435 191/8 486 109/16 268 2 51 31/2 89 41/2 114 41/2 114 223/4 578 16 7.3 22 10 2 50.181/4.460, 20 508 109/16 268 2 51 31/2 89 41/2 114 41/2 114 251/8 638 16 7.3 28 12.7 DOCUMEN #: REVISION: :fr' 7/12 ge I of 2 - . -. WILKINSaZurn company, 1747 Commerce Way, Paso Robles, CA 93446 Phone:605.238.7100 Fax:605.236.5766 Pa SPECIFICATION SUBMITTAL SHEET FEATURES Sizes: U314" U 1" 0 1-1/4" 0 1-1/2" U 2" Maximum working water pressure 175 PSI Maximum working water temperature 180°F Hydrostatic test pressure 350 PSI End connections Threaded ANSI BI.20.1 OPTIONS (Suffixes can be combined) O - with full port QT ball valves (standard) O L - less ball valves 0 U - with union ball valves O S - with bronze "Y" type strainer O TCU - with test cocks "vertical" up O V - with union swivel elbows (3/4° & 1°) O OSY - with OS & Y gate valves U FDC - with fire hydrant connection (2° only) O FT - with integral male 450 flare SAE test fitting ACCESSORIES U Repair kit (rubber only) U Thermal expansion tank (Model WXTP) U QT-SET Quick Test Fitting Set U Test Cock Lock (Model TCL24) D DIMENSIONS & WEIGHTS (do not include pkg.) APPLICATION - Designed for installation on potable water lines to protect against both backsiphonage and backpressure of polluted water into the potable water supply. Assembly shall provide protection where a potential health hazard does not exist. STANDARDS COMPLIANCE (All sizes approved horizontal. Vertical approvals as listed below.) ASSES Listed 1015 (vertical 3/4", 11/4", 11/2" & 2°) IAPMO® Listed (vertical I 1/4"-2") CSA® Listed (vertical 3/4°, 11/4", 1 1/2" & 2°) AWNA Compliant C510 (vertical 3/4") UL® Classified (less shut-off valves only) C-UL® Classified (less shut-off valves only) Approved by the Foundation for Cross Connection Control and Hydraulic Research at the University of Southern California (vertical 3/4") City of Los Angeles Approved (vertical 1-1/4"-2") NYC MEA 426-89-M VOL 3 MATERIALS Main valve body Cast Bronze ASTM B 584 Access covers Cast Bronze ASTM B 584 Internals Stainless Steel, 300 Series Elastomers Silicone (FDA approved) Buna Nitrile (FDA approved) Polymers NoryI, NSF Listed Springs Stainless steel, 300 series ____ B_________ A G in i.anaoa: LUKN urluu I iit LIMI I tu, 3'I4 riasnua Lsr., Mississauga, uniano L4V 1L2 rnone:505405-527 I-ax:90e.409-1 Product Support Help Line: 877-BACKFLOW (877.222-5356) • Website: http:IIwww.zurn.com FLOW CHARACTERISTICS MODEL 950X1 3/4",11",111/4",11112" & 2" (STANDARD & METRIC) FLOW RATES (us) 1.26 2.52 3.8 5.0 15 3.2 6.3 9.5 12.6 15.8 W.iffl _________ _______ ______ ________ _____ 69 _______ ____________ ______ ______ U) 10 __________ _____ ________ _________ ______ 0 ________________ ________ . (50mm):_____ j.2Omm 25mm i: 103 w _______ ___________ _____ _____ 35 ____________ _____ _ Ci) ____________ ______ _ ____________ _____ _ C0 _______ _______ _______ _______ ____________ ______ ______ ____________________________ ____________ ______ ______ UI - 0 20 40 60 80 0 50 100 150 200 250 ° FLOW RATES (GPM) ORated Flow (Established by approval agencies) TYPICAL INSTALLATION Local codes shall govern installation requirements. To be installed in accordancewith the manufacturer's instructions and the latest edition of the Uniform Plumbing Code. Unless: otherwise specified, the assembly shall be mounted at a minimum of 12" (305mm) and a maximum of 30" (762mm) above adequate drains with sufficient side clearance for testing and maintenance. The installation shall be made so that no part of the unit can be submerged. 12" MIN .1 30"MAX I ...... . ...... F '. ' - '' ' -. : .....•. :/' DIRECTION OF FLOW OUTDOOR INSTALLATION INDOOR INSTALLATION SPECIFICATIONS The Double Check Valve Backflow Preventer shall be ASSE® Listed 1015 approved, and supplied with full port ball valves. The main body and access covers shall be bronze (ASTM B 584), the seat rings and all internal polymers shall be NSF® Listed NorylTm and the seat disc elastomers shall be silicone. The first and second checks shall be acces- sible for maintenance without removing the device from the line. The Double Check Valve Backflow Preventer shall be a WILKINS Model 950XL. WILKINS a Zurn company, 1747 Commerce Way, Paso Robles, CA 93446 Phone:805-238-7100 Fax:805-238.5766 IN CANADA: ZURN INDUSTRIES LIMITED, 3544 Nashua Dr., Mississauga, Ontario L4V 1L2' Phone:905.405-8272 Fax:905-405-1292 Product Support Help Line: 877-BACKFLOW (877-222-5356) • Website: http:IIwww.zum.cOm Page 2 of 2 Capacity thruSchedule 40 Pipe Pipe size 5 ft/sec 7.5 ft/sec 10 ft/sec 15 ft/sec 1/8" 1 1 2 3 1/4" 2 2 3 5 3/8" 3 4 6 9 1/2 5 1 7 9 14 3/4" 8 12 17 25 13 20 27 40 1 1/4" 23 35 47 70 1 1/2" 32 48 1 63 95 52 78 1 105 167 TECHNICAL DATA Sizes: 1' 1-1/4' 14/2", 2" Style: Thread x thread Riser Body Finish: Cast brass Water Pressure Gauge: 0-300 psi Optional Accessories: 175 psi pressure relief valve/test and drain In accordance with NFPA 13,1311 and 13D Flow switch and pressure gauge are UL Listed u iNATIONAL FIRE PRODUCTS RESI-RISER'" Pre-assembled, compact fire sprinkler riser unit for residential sprinkler systems B A (2 1/ COMPONENTS DESCRIPTION 1 Manifold body, male thread x male thread 2 Inline check valve, spring-loaded 3 Flow switch with retard 14 Drain valve, with optional pressure relief valve 5 Pressure gauge, 0-300 psi DIMENSIONS DESCRIPTION r 141ir 1412 A Height" 13" 13" 13" 13" S Width" ii" 12" 12-1/4" 12-3/4" C Depth 3-1/2" 3-1/2" 3-1/2" 3-1/2" - Drain Size 1/2" in 1" in Dimensions include all spacing needed to operate drain valve and remove flow switch cover Without check valve "With or without pressure relief valve FEATURES S BENEFITS Manifold is manufactured as a one- piece casting that is air-tested for leaks Raised lettering on both sides allows installation to the right or left and easily Identifies the flow direction and test and drain outlet Two mounting legs are molded onto the manifold allowing for a secure right or left anchoring Flow switch has dual SPDT switches and a retard of 0-90 seconds Optional "all-in-one" cost-saving combination pressure relief valve/test and drain valve is available Unique, compact design allows installation within standard frame construction and in tighter spaces 02019 National Fire Products 08191342881 RESI-RISER" iNATIONAL FIRE PRODUCTS MODEL NUMBERS WITH INLINE WITH SWING WITH PRESSURE WITH CPVC PART CHECK VALVE CHECK VALVE RELIEF VALVE ADAPTERS SR100-IR4 .1 SR100-R4 SR100-SR4 I 5R1001RR4 I SR100SRR4 I SR100-IR4-TD I I SR100-SR4-TD I 'I SR100-IRR4-TD I I I SR100-RR4-TD I I SRI00SRR4-TD I I I SR125-IR4 I SR125-R4 SR125-SR4 I SR125-IRR4 I I SR125-SRR4 I I, SR125-IR4-TD I I SR125-SR4-TD I 1 SR1251RR4TD I I I SR125-RR4-TD I I SR125SRR4TD I I I SR150-IR4 I SR15O-R4 SR150-SR4 I SR150-IRR4 I I SR150-SRR4 I I SR150-IR4-TD I I SR15O-SR4-TD I 1 SR150-IRR4-TD I I I SR150-RR4-TD I I SR150-SRR4-TD I 1 1 SR200-IR4 I SR200-R4 SR200-SR4 I SR200-IRR4 1 1 SR200SRR4 I SR200-IR4-TD I I SR200-SR4-TD 1 1 SR200-IRR4-TD SR200RR4-TD .1 1 SR200-SRR4-TD I I I 02019 National Fire Products 08191342881 RESI-RISERTM i NATIONAL FIRE FIRE PRODUCTS HOW IT WORKS: PRESSURE RELIEF/TEST S DRAIN Normal Position: Relieving pressure Manual Open: Locked closed for Static pressure exceeding 175 psi Drain or flow switch test hydrostatic test PRESSURE LOSS 12 10 8 a 4 2 0 10 20 30 40 50 60 70 80 90 100 Flow (gpm) V 14141 14/2 2" 02019 National Fire Products 08191342881 a RESI-RISERTM NATIONAL FIRE __ FIRE PROOUiiT INLINE SPRING CHECK VALVE DESCRIPTION I Nut 2 Spring Cap 3 Spring I 0-Ring Seat 5 Clapper, Spring-Loaded B Body 7 Washer DIMENSIONS 1• 11/II A 1-9/161, 2° B 3-1/4° 3-5/8" C 1-3/16° 1-9/16° MATERIAL Stainless Steel Stainless Steel Stainless Steel Rubber Brass Brass Teflon" 1-1/F 2-1/8° 4" 1-3/4" r 2-3/4" 5° 2-3/16" 5. 02019 National Fire Products 08191342881 tqca Worldwide Contacts I www.tyco-fire.com BLAZEMASTER CPVC Fire Sprinkler Pipe & Fittings Submittal Sheet General Description TYCO CPVC Pipe and Fittings pro- duced by Johnson Controls are designed exclusively for use in wet pipe automatic fire sprinkler systems. The TYCO CPVC Pipe and Fittings are produced from BLAZEMASTER CPVC compound that is a specially developed thermoplastic compound composed of post chlorinated polyvinyl chloride (CPVC) resin and state of the art addi- tives. TYCO CPVC Pipe and Fittings are easier to install than traditional steel pipe systems, and at the same time, provide superior heat resistance and strength as compared to traditional CPVC and PVC piping materials used in the plumbing trade. Various adapt- ers are available to connect CPVC pipe to metallic piping. All female pipe thread adapters have brass inserts for durability. Grooved adapters connect directly to grooved end valves and metallic pipe, with flexible grooved end couplings. NOTICE The CPVC Pipe and Fittings produced with BLAZEMASTER CPVC compound described herein must be installed and maintained in compliance with this document and with the applica- ble standards of the NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), in addition to the standards of any authorities having jurisdiction. Failure to do so may impair the performance of these devices. The owner is responsible for main- taining their fire protection system and devices in proper operating con- dition. Contact the installing contrac- tor or product manufacturer with any questions. Technical Data Sizes 3/4 Inch to 3 Inch Maximum Working Pressure 175 psi Approvals UL and C-UL Listed FM Approved LPCB Approved NSF Certified MEA Approved (Refer to Installation Handbook IH-1900 dated April 2016 for exact listing/approval information.) Manufacture Source U.S.A. Material Pipe: ASTM F442, SDR 13.5 Fittings: ASTM F438 (Sch. 40) ASTM F439 (Sch. 80) ASTM F1970 Color Orange Installation TYCO CPVC Pipe and Fittings are to be to be installed in accordance with Installation Handbook IH-1900. IMPORTANT Refer to Technical Data Sheet TFP2300 for warnings pertaining to regulatory and health information. Page 1 of 2 AUGUST 2018 TFPI9I5 TFPI9I5 Page 2 of 2 Care and Maintenance TYCO CPVC Pipe and Fittings are to be maintained and serviced in accordance with this section. Before closing a fire protection system control valve for inspection or main- tenance work on the fire protection system that it controls, permission to shut down the affected fire protection system must first be obtained from the proper authorities and all person- nel who may be affected by this action must be notified. After placing a fire protection system in service, notify the proper authorities and advise those responsible for moni- toring proprietary and/or central station alarms. The owner is responsible for the inspec- tion, testing, and maintenance of their fire protection system and de-vices in compliance with this document, as well as with the applicable standards of the NATIONAL FIRE PROTECTION ASSO- CIATION (e.g., NFPA 25), inaddition to the standards of any authority having jurisdiction. Contact the installing con- tractor or product manufacturer with any questions. Automatic sprinkler systems should be inspected, tested, and maintained by a qualified Inspection Service in accor- dance with local requirements and/or national codes. Limited Warranty For warranty terms and conditions, visit www.tyco-fire.com. 1400 Pennbrook Parkway, Lansdale, PA 194461 Telephone +1-215-362.0700! C 2018 Johnson Controls. MI rights reserved. All specifications and oth.rinlenn.tion shown w.v. current as of doornn.ot ronislon dots and sro cubical toohsng.withmotnotice. Johnson NATON,L FIRE PROTECTION dSSOCanON end NroA5On0It.WdtWdt5OIN5tI FIN Protection M.odolw; Controls Bt.AlEMASTERIsnt The UAdaofCOWOr.tlOo SENJU SPRINKLER Model RC-RES K-Factor: 3.7 • SIN: SS8261 Residential Lead Free Flat Concealed Sprinkler, Pendent C®US I.ISTEO 0. I NSF/ANSI/CAN 61 &372 I GENERAL DESCRIPTION The Model RC-RES Residential Flat Concealed Sprinklers are automatic sprinklers of the compressed fusible solder type. They are decorative and fast responding. The Cover Plate Assembly hides the Deflector, Heat Responsive Element etc., which is concealed above the ceiling. The cover plate has a flat profile, and its diameter is extremely small (2-5/8 inch, 68mm). The push-on and/or thread-on, thread-off design of the concealed cover plate assembly allows for easy installation of the cover plate. Therefore, the Model RC-RES should be your first choice when aesthetics is the major consideration for ultimate appeal and unbeatable performance is desired. The Model RC-RES is designed for residential occupancies and is perfect for use in homes, hotels and other living quarters. The Model RC-RES is to be used in wet pipe residential sprinkler systems for One- and Two- Family Dwellings and Manufactured Homes per NFPA 131); wet pipe residential sprinkler systems for Residential Occupancies up to and Including Four Stories in Height per NFPA 13R; or, wet pipe sprinkler systems for the residential portions of any occupancies per NFPA 13. The Model RC-RES has a 3.7 (53.3 LPM/bar1 ) K-factor that meets the required residential flow rates with minimal residual pressure, which allows for smaller pipe sizes and water supply requirements. For extended installation flexibility, the Model RC-RES provides 1/2 inch (12.8mm) vertical adjustment. This adjustment in installation decreases the need for precise cutting of the pipe that drops to the sprinkler and allows for a perfect fit with a range of pipe lengths. The heat sensitivity and water distribution design of Model RC-RES allows for an increased chance of residents to escape or evacuate in case of afire. However, residential fire sprinkler systems are not a substitute for fire safety awareness or fire safety construction required by building codes. "Lead Free" is defined in the Reduction of Lead in Drinking Water Act (S.3874) endorsed by AWWA's Water Utility Council, and California Assembly Bill #1953 as having less than or equal to a weighted average of 0.25% lead in wetted surface of pipes, plumbing fittings and fixtures. www.senjusprinkler.com Page 1 of 8 Document No.U086209 . 01-29-2021 - I 0 Cepper*Jtuy) I ® Defledor(Phoeplioius Bronze) I 2.518' (088mm) I ®GB" (PTFE) (j Fusle Motel (Solder) or 3-114' (083mm) I () Heat Collector (copper) af 2.518' uquars (D68mm) ,I ® Cover Plate Aeaetm*Iy Figure 1: Model RC-RES K = 3.7 Ong: 162'F172 'C er205'Fi96 'C Cover Plate Spmtmlder (Top View) (Boltoni View) Figure 1.1: Marking (Color Code) WARNINGS The Model RC-RES must be installed and maintained in accordance with the rules stated herein as well as in compliance with the applicable standards of the National Fire Protection Association regulations and the standards of any other authorities having jurisdiction. In the event of this condition, consult the authorities having jurisdiction for guidance and approval. Failure to do so may impair the integrity of these devices. It is the responsibility of the installing contractor to provide a copy of this document to the owner or their representative, and in turn, it is the obligation of the owner to provide a copy of this document to a succeeding owner. The owner is responsible for maintaining their fire protection system and devices in proper operating condition. The installing contractor or sprinkler manufacturer should be contacted with any related questions. TECHNICAL DATA Approvals: cULus Listed Markkig NSF/ANSI/CAN 61, NSF/ANSI 372 Lot NO Year ci Manufaature SIN: 058261 Sprinkler Identification Number (SIN): SS8261 -K-Factor K37 Temperature 'Raft: 162'F172 'C er 205 'F196 'C Maximum Working Pressure: 175psi (12.1bar) LL Mart Co,dml No: 6P37 Discharge Coefficient (Nominal K-Factor): -ALS Mart: NSF 611372 K = 3.7 GPM/psi1 (53.3 LPM/bar19 ES SPXR Temperature Rating: 162°F (72°C) Sprinkler. with 140°F (60°C) Cover Plate 205°F (96°C) Sprinkler with 162°F (72°C) Cover Plate Color Code (Sprinkler) 162°F (720C): Uncolored 205°F (960C): White Color Code (Cover Plate) 140°F (600C): No Mark 162°F (720C): White-Colored Mark Vertical Adjustment: 1/2 inch (12.8 mm) Cover Plate Finishes: Standard Finishes: White, Ivory, Beige, Brown, Black, Nickel, Wood Grain 0 Custom Finishes: Custom color and custom pattern cover plates are available on special order. Contact a Senju Sprinkler representative with any custom Orders. Please see chart on Page 8 for more detail. Physical Characteristics: Ref. Figures 1 and 1.1 dà www.senjusprinkler.com Page 2 of 8 Document No.U086209 . 01-29-2021 - - = OPERATION In case of fire, the solder component that holds together the Cover Plate and the Retainer melts. Then the Cover Plate is released at once. As a result, the Deflector drops down to the intended position. Two Heat Collectors are exposed to fire, and when sufficient heat from the fire is reached, internal components of the sprinkler fall apart. This leads to the water flow to be distributed on the affected fire area. (Ref. Figure 2) Normal Condition Cover Plate Operation Sprinkler Operation Water Discharge Figure 2: Operation Process (For illustrative purposes only) DESIGN CRITERIA The herein stated rules for use and installation of Model RC-RES are provided by the manufacturer and must be strictly implemented for safe and full results. Notes Residential Fire Sprinkler Systems should only be designed and installed by individuals who are completely familiar with automatic sprinkler system design, installation procedures, and techniques. Several criteria may apply to the installation and usage of each sprinkler. Consequently, it is recommended that the sprinkler system designer review and develop a working understanding of the complete list of criteria prior to initiating the design of the sprinkler system. Questions concerning sprinkler installation and usage criteria, which are not covered by the following instructions, should be submitted to your contracted company. Include sketches and technical details, as appropriate. In some instances, the requirements of this document may concern specifications which are more stringent, and which take precedence over those specified in NFPA 13, 13D, 13R, or by the authority having jurisdiction. The Model RC-RES must not be used in applications where the air pressure above the ceiling is greater than that below. Inspect all sprinklers after installation to ensure that both the gap between the cover plate, ceiling and the 6 slots in the cup are open and free from any air flow impediment. The spray from the sprinkler is distributed radially outward and downward from the sprinkler deflector. Consequently, the sprinklers must be located such that there will be no blind spaces shielded from spray by partitions, room dividers, overhangs or other parts of the dwelling structure. The number of sprinklers within each compartment (as defined by NFPA 13D, 13R, or 13) must be kept as few as possible while observing all guidelines relating to obstructions and spacing. Use only the Cover Plate provided for the Model RC-RES. The sprinkler must be secured in place by firmly fastening the sprinkler system piping to the structure. If the sprinkler is not properly secured in position, reaction forces resulting from sprinkler operation could alter its orientation and its water distribution pattern. www.senjusprinkler.com Page 3 of 8 Document No.U086209 . 01-29-2021 Obstruction to Water Distribution Locations of sprinklers must follow the obstruction rules of NFPA 13, 13D and 13R for Residential Sprinklers. General Service Conditions The Model RC-RES must only be utilized in WET PIPE sprinkler systems. Heat Source Criteria Refer to NFPA 13D, 13R or 13 for the requirements relating to the prevention of possible activation of the Heat Responsive Element of Model RC-RES, due to the exposure of a heat source other than an actual fire. Precautionary Warnings for Corrosive Environments Model RC-RES sprinklers should not be installed where they may be subjected to a corrosive environment including the following: Chlorine ion and Chloride environment Stress corrosion cracking may be caused by exposure to environments with Chlorine ion and Chloride. Exposure to this environment may result in sprinklers operating u der Non-Fire conditions or Not Operating when exposed to an actual fire. Sprinkler system piping with Copper Sprinkler systems should be constructed in compliance with the applicable standards and the requirements for copper piping when copper piping is used in the sprinkler system. (Reference standards NFPA 13, ASTM B813, B828, and CDA (Copper Development Association) - Solder Joint) All residual flux must be removed from the interior and exterior of the copper piping by thoroughly flushing before installation of the Sprinkler Heads. Otherwise, residues of flux may cause corrosion and/or leakage in the sprinkler system. Hydraulic Design Criteria The minimum required sprinkler flow rates for systems designed to NFPA 13D or 13R are given in Table A as a function of temperature rating and the maximum allowable coverage area. The sprinkler flow rate is the minimum required discharge from the most hydraulically demanding sprinkler from each of the total number of "design sprinklers" as specified in NFPA 13D or 13R. For systems designed to NFPA 13, the number of designed sprinklers is to be the four most hydraulically demanding sprinklers. The minimum required discharge from each of the four sprinklers is to be the greater of the following: The flow rates given in Table A for NFPA 13D and 13R as a function of temperature rating and maximum allowable coverage area. A minimum discharge of 0.1GPM/sq.ft. [4.07LPM/sq.m] over the "design area" comprised of the four most hydraulically demanding sprinklers for the actual coverage area being protected by the four sprinklers. www.senjusprinkler.com Page 4 of 8 Document No.U086209 . 01-29-2021 Table A. NFPA 13D & 13R Wet Pipe Hydraulic Design Criteria for Model SS8261 For systems with ceiling types smooth flat horizontal, or beamed, or sloped, in accordance with NFPA 13D, 13R or 13 as applicable. Maximum Maximum Ordinary Temperature intermediate Temperature Coverage Spacing Rating 1627 (72C) Rating 205F (96C) Deflector to Installation Minimum Area Ft. X Ft. Ceiling Type Spacing R. (m) Flow(I)GPM Pressure' Flow(I)GPM Pressure' (mx m) (m) (LPM) PSI (bar) (LPM) PSI (bar) 12x12 12 10 7.3 10 7.3 Smooth (3.7 x 3.7) (3.7) (37.9) (0.50) (37.9) (0.50) Ceilings 3/8 to 7/8 inches. Beamed 14x14 14 10 7.3 10 73 (4.3 x 4.3) (4.3) (37.9) (0.50) (37.9) (0.50) Ceilings per NFPA 13D, 13R or 13. Concealed 8 (2.4) 15x15 15 12 10.5 12 10.5 (4.6 x 4.6) (4.6) (45.4) (0.72) (45.4) (0.72) Installed in beam 3/8 to 7/8 inches 16x16 16 13 12.3 13 12.3 below bottom (4.9x4.9) (4.9) (49.2) (0.85) (49.2) (0.85) of beam. For coverage area dimensions less than the above mentioned, it needs to use the minimum required flow for the Next Higher Coverage Area listed. Requirement is based on minimum flow in GPM (LPM) from each sprinkler. The associated residual pressures are calculated using the nominal K-Factor. Refer to Hydraulic Design Criteria Section for details. Sprinkler Spacing Criteria The minimum spacing between sprinklers is 8 feet (2.4m). The maximum spacing between sprinklers cannot go beyond the coverage area calculated by using the specific hydraulic factors. (Ref. Table A) INSTALLATION The Model RC-RES must be installed in accordance with the following instructions: NOTES Do not use any sprinklers which have been subjected to potential mechanical damage. Do not use any sprinklers which show deformation or cracking in either the Sprinkler or the Protective Cap. Prior to installation, sprinklers should be maintained in the original cartons and packaging until used to minimize the potential for damage to the sprinklers that could cause improper operation or non-operation. The Protective Cap must remain on the sprinkler during installation. After the installation is completed, the Protective Cap must be removed to place the sprinkler in service. Use a torque of 7 to 14 ftlbs (9.5 to 19.0 N.m) to achieve a 1/2 inch NPT sprinkler joint. if you exceed the recommended maximum torque, this could result in damage to the sprinkler inlet, which may lead to leakage from the sprinkler. Use only NA-H model wrench socket for installation of RC-RES sprinklers. Use of any other wrench or socket is prohibited and may cause damage to the sprinkler. In case of insufficient adjustment in Cover Plate installation, do not try to overly tighten, screw the sprinkler too loosely or make any modification to the cover plate assembly. Readjust the sprinkler fitting for a better fit. Do not rotate the Cap Removal Tool for AC to the left with force when placing the two hook arms into place. The installed sprinkler may become loosened, which may cause water leakage. www.senjusprinkler.com Page 5 of 8 Document No.U086209 . 01-29-2021 Installation Steps Step 1: The installation requirements for the sprinkler are as follows: to be installed only in the pendent position with the waterway perpendicular to the ceiling. Install the sprinkler fitting so that the distance from the face of the fitting to the mounting surface will be nominally 2 inches (50.8mm) as shown in Figure 3. Step 2: With pipe thread sealant applied to the threads, hand tighten the sprinkler into the sprinkler fitting. Then tighten it with the Socket NR-H or Ratchet (3/8" drive) & Socket NA-H Combination (Ref. Figure 4). The teeth of the Socket must fit perfectly with the grooves on the Sprinkler for proper installation (Ref. Figure 4). Step 3: If desired, the Protective Cap may also be used to locate the center of the clearance hole by gently pushing the ceiling material against the center point of the Protective Cap. Before the installation of the ceiling, the sprinkler installation can be started with a 2-3/8 inch (60mm) diameter clearance hole (Ref. Figure 3). Use the "Vertical Adjustment" indicator on the Protective Cap to check for proper installation height (Ref. Figure 3). Correct Incorrect Figure 3: Installation Figure 4: Ratchet & Socket Step 4: Use the Cap Removal Tool for AC to remove the Protective Cap (Ref. Figure 5), and then push or screw a Cover Plate Assembly on the Cup of the Sprinkler by hand until its flange just has contact with the ceiling (Ref. Figure 6 and Figure 7). Stop tightening the Cover Plate Assembly once the flange has contact with the ceiling. If the ceiling has been lifted from its normal position in the process of tightening the Cover Plate Assembly, readjust the cover plate assembly as necessary. If the flange of the Cover Plate Assembly cannot contact the ceiling sufficiently, readjust the sprinkler fitting as necessary. When properly installed, there is a nominal 1/16 inch (1.6mm) air gap between the lip of the Cover Plate and the ceiling, as shown in Figure 6. Hook Up it Cap Removal Tool Step 1 Step 2 Figure 5: Protective Cap Removal S 4 Pull down Step 3 www.senjusprinkler.com Page 6 of 8 Document No.U086209 . 0129-2021 258 I S (omm Figure 6: Installation (Cover Plate Assembly) Incorrect I Correct Incorrect Figure 7: Installation (Correct and Incorrect) CARE & MAINTENANCE The following instructions must be implemented for the maintenance and service of the Model RC-RES. Notes Wet pipe sprinkler systems must be maintained at a minimum temperature of 40°F / 4°C to prevent freezing and bursting of the pipe and/or sprinklers. Automatic sprinklers are not to be tested with a heat source. Operation of the heat responsive element can result. Absence of a Cover Plate Assembly may delay the response time of the sprinkler in case of a fire. Install the cover plate assembly properly, as shown in Figure 6. Improper installation of the cover plate assembly may cause improper operation or non-operation. If the ceiling is to be repainted after the installation of the Sprinkler, care must be exercised to ensure that the new paint does not seal off any of the air gap. Factory painted Cover Plates must not be repainted. They should be replaced, if necessary, by factory painted cover plates. Non- factory applied paint may adversely delay or prevent sprinkler operation in case of afire. Do not pull the Cover Plate. Separation may result. In preparation for maintenance of the fire protection system, permission to close the main control valve must be obtained from the proper authorities, and all affected parties by this action, and must be informed before the maintenance session can commence. Do NOT enclose any sprinklers within drapes, curtains, or valances. Do NOT hang anything from the sprinklers. Do NOT clean the sprinklers with soap and/or water, detergents, ammonia, cleaning fluids, or other chemicals. Remove dust, lint, cobwebs, cocoons, insects, and larvae by gently brushing with a feather duster or gently vacuuming with a soft bristle (i.e., dusting) brush attachment. Exercise suitable safety precautions in the use and storage of highly flammable materials. The rapid rate of fire development and spread of these materials can reduce the ability of the sprinkler system to aid in the control of a fire involving such hazards. www.senjusprinkler.com Page 7 of 8 Document No.U086209 . 01-29-2021 Leaking or corroded sprinklers must be replaced. Automatic Sprinklers must be kept in a cool and dry place. Automatic sprinklers must never be physically altered, such as painted, plated, or coated, once shipped from the factory. If the sprinklers have been in any way modified; they must be replaced. Great caution must be applied to prevent damage to the sprinklers at all stages - before, during, and after installation. Damaged units because of dropping, hitting, over-tightening, or wrench slippage, must be replaced. The Model RC-RES must only be replaced with pendent sprinklers which are listed for residential fire protection service and which have the same nominal K-Factor, the same coverage area, and the same or lower flow ratings (as indicated under Table A "Hydraulic Design Criteria"). When remodeling, such as by adding false beams or light fixtures or changing the location of compartment walls, first verify that the new construction will not violate the installation requirements of the applicable standards of NFPA. Alter the new construction and/or the sprinkler system to suit the requirements of this document and the applicable NFPA regulations. The owner is responsible for the maintenance of the sprinkler system, including inspection and testing of its compliance with this document, as well as the standards of the National Fire Protection Association (e.g., NFPA 25), and the regulations of any other authorities having jurisdiction. The owner should direct any questions regarding the above rules and regulations to the installing contractors or the sprinkler manufacturer. It is recommended that automatic sprinkler systems be inspected, tested, and maintained by a qualified Inspection Service in accordance with NFPA 25. LIMITED WARRANTY For details of warranty, refer to Sales Contract. ORDER PROCEDURE When placing an order, please contact a local distributor with the following information (Model Name, Temperature Rating and Finish). Sprinkler Model: RC-RES SIN: SS8261, Residential Flat Concealed Sprinkler, Pendent, K3.7, Temperature: 162°F (72°C) or 205°F (96°C) Cover Plate Assembly 2-5/8 inch (4,68mm) or 3-1/4 inch (4,83mm) or 2-5/8 inch square (068mm), Order separately from Sprinkler Please refer to the chart below for available sizes, temperature, and finishes. I I White Ivory I I Beige Standard Brown Finishes I I Black Nickel I I Copper Wood Grain Custom Finishes Custom Color Custom Pattern 2-5/8" Round, 140°F 0 0 3-l/4" Round, 140°F 0 0 0 0 0 0 0 0 0 0 2-5/8" Square, 140°F 0 - - 2-5/8" Round, 162°F 0 - 3-1/4" Round, 162°F 0 0 2-5/8" Square, 162°F 1 0 - 1 -• - - - - - 0 0 Tools & Accessories Socket NR-H for use with a 3/8" drive ratchet (not included) Socket NR-H Plastic for use with a 1/2" drive ratchet (not included) Cap Removal Tool for RC Cover Plate Installation Tool www.senjusprinkler.com Page 8 of 8 Document No.U086209 . 01-29-2021 -ii CPVC PIPE HANGER SUPPORT DOUBLE OFFSET DESIGN ARCQ o Hanger & surge restraint for horizontal CPVC piping when installed on supporting structure 'For mounting CPVC pipe to wood 'Flared edges help protect CPVC 'Galvanized steel construction 'Supplied with #10 hex head cap screws 'Complies with the static load requirements of NFPA® 13 'Suitable for fire protection installations 'Size Range: 3/4" through 1" Designed to mount CPVC pipe horizontally or vertically to wood or composite wood joists with a minumum 3/8" thickness. Offset edge eliminates abrasion. Installation: Per NFPA 13,13R and 13D. Install into wood or steel. Slides onto CPVC pipe. 3/4" pipe size I Item #2530181-3/4 1" pipe size I Item #2530181-1 System No. Location Spec Section Paragraph Submitted By Date Approved Date ARGCO.com vARGCO Updated 11/6/2020 © ARGCO rA&RCO .Iwcz o ia.a STAND-OFF TWO HOLE STRAP NO BLOCK FOR CPVC For mounting CPVC pipe to wood Flared edges help protect CPVC Galvanized steel construction Supplied with #10 x 1" hex head cap screws Complies with the static load requirements of NFPA® 13 Suitable for fire protection installations Eliminates spacers or backup blocks Easy installation Designed to mount CPVC pipe horizontally or vertically to wood or composite wood joists with a minimum 3/8" thickness. Can only be used as a guide on top of beam or on vertical piping. May be installed to wood using supplied fastener or into (minimum 18 gauge) steel using two 1/4" x 1" TEK type screws. Provides vertical/lateral restraint and prevents upward movement of the pipe. For use as a restrainer in all sizes when attached to the bottom of structural wood members. For use as a restrainer in the 3/4 inch size when attached to the top of structural wood members. 25" Installation: Per NFPA 13, 13R and 13D. (see next page) Fasteners: Wood - 3/4" to 3" CPVC Pipe - wood screw - no pre-drill Steel- 3/4" to 3" CPVC Pipe - 1/4" TEK screw cPvc DIMENSIONS ITEM # PIPE SIZE A B MAX. HANGER SPACING per NFPA13 2530180-3/4 3/4" 2.69" 3.25" 5.5 ft / 1.68 m 2530180-1 1" 2.94" 3.25" 6 ft / 1.83 m 2530180-1-1/4 1-1/4" 331" 325" 65 ft/1 98 m 2530180-1-1/2 1 1-1/2" 3.56" 4.5" 7 ft / 2.13 m 2530180-2 1 2" 4.06" 5" 8ft/2.44 m System No. Location Spec Section Paragraph Submitted By Date Approved Date ARGCO.com 1 800-854-1015 4'ARGCO Updated 11/5/2020 © ARGCO I',,,, -; STAND-OFF TWO HOLE STRAP NO BLOCK FOR CPVC INSTALLATION INSTRUCTIONS AR CO o Designed to mount CPVC pipe to wood or composite wood joists with a minimum 3/8" thickness. All safety regulations required by the jobsite must be observed. 'Observe all federal and local safety regulations 'Wear safety glasses and hard hat at all times 'Be aware of personnel working above and below 'Wear gloves to avoid splinters and cuts. often working above ground , be sure the structure will support your weight. Snap strap over CPVC pipe. Squeeze strap back around pipe Allow pipe to slide back and forth Fasten the strap to the wood surface using the two hex head screws provided. For use as a restrainer in all sizes when attached to the bottom of structur- al wood members. For use as a restrainer in the 3/4 inch size when attached to the top of structural wood members. System No. Location Spec Section Paragraph Submitted By Date Approved Date ARGCO.com I 800-854-1015 'ARGCO Updated 11/5/2020 0 ARGCO 00-e4-1o1; HEX HEAD SCREWS 114" CPVC TWO HOLE STRAP AR Co .nwe sees Designed for support or restraint for piping in either a vertical or horizontal position. It can be used on top or bottom of a beam. The edges are flared to prevent any damage to the CPVC pipe. It is easily attached using two #10 x 1" hex head self-threading screws (supplied). Galvanized steel construction 1. SNAP CPVC PIPE INTO HANGER 2. MOUNT HANGER TO UNDERSIDE OF BEAM WITH SCREWS PROVIDED NOTE: MAY ALSO BE USED ON TOP SIDE OF BEAM. ITEM # CPVC PIPE SIZE 2530283 3/4" 2530284 1" 2530285 1-1/4" 2530286 1 1-1/2" 2530287 1 2" Galvanized carbon steel construction, supplied with hex slotted screws System No. Location Spec Section Paragraph Submitted By Date Approved Date 800-854-1015 'ARGCO Updated 11/5/2020 0 ARGCO CPVC STRAP TWO HOLE 900 WRAP AROUND Top or bottom beam installation Supplied with #10 x 1" hex head cap screws Snap CPVC pipe hanger into pipe, dimples hold pipe in place Mount hanger onto wood beam with screws provided NOTE: May also be used on the underside of beam. Anchor tightly to surface, NOTE: Ensure that pipe can slide freely through hanger. ITEM # CPVC PIPE SIZE 2530175-3/4 3/4" 2530175-1 1" 2530175-1-1/4 1-1/4" 2530175-1-1/2 1-1/2" 2530175-2 1 2" Galvanized carbon steel construction; supplied with hex slotted screws System No. Location Spec Section Paragraph Submitted By Date Approved Date ARGCO.com I 800-854-1015 k'ARGCQ Updated 11/5/2020 0 ARGCO It