Loading...
HomeMy WebLinkAbout6255 NYGAARD ST; ; AS10012811/16/23,2:07 PM AS1 00128 Permit Data City of Carlsbad Sprinkler Permit Permit No: AS100128 Job Address: 6255 NYGAARD ST Status: ISSUED Permit Type: SPRINK Applied 10/13/2010 Parcel No: 2131900200 Approved: 10/13/2010 Lot #: 0 Reference No.: Issued: 10/13/2010 PC #: Inspector: Project Title: BRESSI RANCH ASSISTED LIVING UNDERGROUND FIRE SPRINKLER PLAN CHECK & INSPECTIONS Applicant: RAND ENGINEERING P.O. BOX 1830 ALPINE, CA 619-454-2548 Owner: BRESSI HOLDING L L C C/O HEALTH CARE GROUP 9619 CHESAPEAKE DR #103 SAN DIEGO CA Fees ($) Add'I Fees ($) Total ($) Balance ($) 260 0 260 0 about:blank 1/1 Flow Test Record Test Hydrant ) Location_ / (C,414-fJ) .T . -: ................................,..........................__l_. t.. Hydrant ID No. Size Main____________ Static............... Residual ......... . 70 Pressure Drop.. ___(PDI 1)..... K factor for PDI 1 Flow Hydrant(s) Hydrant I location r-r-r - PQ d Hydrant 2 location— Hydrant 3 location ..._: - ...._•_ ___• Hydrant I Pitot cc . PSI GPM:1)1 0 Size of Orifice_ 2121, _________ Hydrant 2 Pitot_ - PSI GPM:_ Size of Orifice.: Hydrant 3 Pitot - PSI GPM: -- Size of Orifice. ................ Total:_______ (Qi) Calculated test and flow data - 0 x PD2 k =Q2 PDI*k Static..................... Desired Residual.......20 Pressure Drop (PD 2).. K factor PD 2: ______ x divided by equals GPM at 20 psi residual Q PD2k PD* lk .Q2 Comments: . . Test conducted for.: Conducted by: Date: Time: _.tO.! 3 5 Reason for Discharge Event: Carlsbad Municipal Water District Potable Water Discharge - Event Report Date: 14/is (g/ Io Type of Event: Initial Dewatering Water Mains Estimated Discharge Flow: 11 C?0 &fM Note: Includes flow testing and flushing Dewatering Reservoirs .J/k Start Time 10 :3 Unscheduled Water Discharge I1k End Time JO Pre-Dechlorination Residual: Clear flow path of debris, surface contaminants andlor hazardous Post-Dechlorination Residual: Q. 09 materials. Do not remove native (less. than 0.1 mglL) vegetation. pH within limits of 6.0 and 9.0 ________ Erosion control, i.e. sandbags, silt fencing, hay bales, gravel bags, decreasing the velocity of discharge water. Upon completion of dewatering, ensure that the flow path is free of all temporary erosion prevention materials. Upon completion completion of dewatering, ensure that any sediment or silted areas are cleared. Water Sampling Performed by: f Comments: Submitted by: Reviewd by: - (Name 8 Date) (Name & Date)