HomeMy WebLinkAbout3311 AVENIDA PLATINO; ; AS070016City of Carlsbad
Sprinkler Permit
Permit No: AS070016
3311 AVENIDA
Job Address: Status: ISSUED
PLATINO
Permit Type: SPRINK Applied 1/19/2007
Parcel No: 2230320400 Approved: 1/19/2007
Lot #: 0
Reference No.: Issued: 1/19/2007
PC #: Inspector:
Project Title: HUNTER'S POINT
Applicant:
SOUTHLAND FIRE PROTECTION, INC
4733 PT. LOMA AV
SAN DIEGO, CA 92107
619-523-1400
Owner:
REAL ESTATE COLLATERAL MANAGEMENT
CO
C/O MORROW DEW LIZ LAYMAN
1903 WRIGHT PL #180
CARLSBAD CA
Fees ($) Add'I Fees ($) Total ($) Balance ($)
186 0 186 0
SEE PERMIT
AS070010
7271 CALLE PLATA
HUNTER'S POINT
FOR CALCS &
PLANS
4'
NOTE:
APPROVED FIRE SPRINKLER PLANS ARE LOCATED IN
7271 CALLE PLATAIHUNTERS POINT.
FILE COPY
13-190 INSTALlATION OF SPRINKLER SYSTEMS
Contractor's Material and Test Certificate for Aboveground Piping
PROCEDURE
Upon completion of work, inspection and tests shall be made by the contractor's representative and witnesse
d
b
y
an owners representative. All detects shall be corroded and system left In service- before conbBCtor's personnel finally leave the job.
A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities, pwriers, and contractor. It Is understood the owners representative's signature in no way prejudices any claim against contractor for faulty material, poor
workmanship, or failure to comply with approving authority's requirements or local ordinances.
Property name quinti-olf p6A4-6 Dats
Property address ))(( Mvti PI'cf'\o
Accepted by approving authorities (names)
Address
Plans
Installation conforms to accepted plans . Yes 0 No Equipment used Is approved Yes 0 No If no, explain deviations
Has person In charge of fire equipment been Instructed as Yes D No to location of control valves and care and maintenance
of this new equipment?
If no, explain
Instructions
Have copies of the following been left on the premises? Yes [J No System components Instructions' Yes 0 No Care and maintenance Instructions [J Yes 0 No
NFPA25 We 0 No
Location Of
System
I-.'. Supplies buildings
Year of Orifice Temperature
Le H~k 056— zvbjl. 6 YT Sprinloem wCcci+rf! 4
Pipe and Type of pipe
fittings Type of fittings
Alarm
valve or
now
Alarm device Merdrnurn time to operate
through test connection Type Make Model Minutes Seconds indicator
Dyvelve Ia. O.D.
Make Modal Serial no. Make Modal Serlalno.
Dry pipe
operating
test
ibUS to trip
through test
connection12
Water
pressure
Air
pressure
TO point
air pressure
Time water
reached 1
test outlet12
Alarm
operated
properly Minutes Seconds PSI psi PSI Minutes Seconds Yes No
If no, explain
tMeasured from time Inspector's test connection Is Opened 2 NFPA 13 only requires the 60-second limitation In specific sections
FIGURE 16.1 Contractor's Material and Test Certificate for Aboveground Piping.
2002 Edition
FILE COPY ..:
SYSTEMSACCKPTANCE
. 13-19
OperatIon
0 PneumatIc E Elecitic 0 Hydraulics Piping supervised Yes 0 No Detecting media supervised 0 Yes D. No Does valve operate from the manual alp, remote, or both [J y5 0 No control stations? Deluge and
preaction Is there an accessible facility In each circuit If no explain valves for testing? .
CJ Yes DNo Does each circuit operate Does each circuit operate Mixitnum time to Make Model supervision loss alarm? valve release? operate release.. Yes No Yes . No Seconds Minutes
.. Location Make and Setting Static pressure Residual pressure Flew rate Pressure and floor modal
.. (flowIng)
valve test
reducing J_. Inlet (psi) Outlet (pet) Inlet (psi) 0ut1et451)Flow(gpm)
( Hydrostatic: H tests shall be made at not less than 200 pal (1&6.baij f0r2 hours 0r50 psi (2.4 bar) bove stati urn In excess of 150 psi (10.2 bar) for 2 hours. Oliferentlaidry-pipe valve clappers shall be left
Test open -during the test to prevent damage. All aboveground piping leakage shall be stopped.
description Pneumatic: Establish 40 psi (2.7 bar) air pressure and measure drop, which shall not exceed 1½ psi (01 bar) In 24 hours. Test pressure tanks at normal water level and air pressure and measure air presetiredrop, which strait riot exceed 1½ psi (0.1bar)In24hours.
All piping hydrostatically tested at pal (_- bar) for . hours If reason Dry piping pneumatically tested 0 Yes Q No Equipment operates properly C3 Yes c:j No
Do you certify as the sprinkler contractor that additives and corrosive chemicals, sodi
u
m
s
i
l
i
c
a
t
e
o
r
d
e
r
i
v
a
t
i
v
e
s
of sodium lihilcate, brine, or other corrosive chemicals were not used for testing systems or stopping leaks?
Yes F-1 No
.
Drain Reading of gauge Wjftdjw water Residual pressure with valve In test Tests test supply test connection: psi (_bar) I connection open wide: psi - bar) Underground mains and lead-in connections to system risers flushed before connection
m
a
d
e
t
o
.
sprinkler piping
. . Verified by copy of the Contractors Material and Tog Yes 0 No Other Explain Certificate for Underground Piping.
Rushed by Installer of underground epztrdder piping Yes . .CJ No .
If powder-driven fasteners are used In concrete, D Yes LZ1 No If no explain has representative sample testing been V satisfactorily completed?
Blank testing Number used Locations
Number removed gaskets
Welding piping El Yes No
If yes...
Do you certify as the sprinkler contractor that welding procedures comply El Yes D No with the requirements of at least AWS 82.1?
Weldin Do you certify that the welding was performed by welders qualified In .0 Yes 0 No compliance with the requirements of at least AWS 82.1?
Do you certify that the welding was carried out In cumpllancè with a C. Yes .D No documented quality control procedure to ensure that all discs are retrieved, that
openings In piping are smooth, that slag and Other welding residue am . - removed, and that the Internal diameters of piping are not
Cutouts
(s)
Do you certify that you have a control feature to ensure that
0 Yes No all cutout (discs) are retrieved?
FIGURE 16.1 Continued
FILE COPY
' 13-192
INSTALLATION'OFSPRINKLERSYSTE
M
S
Hydraulic Nameplate provided
..•
.... .,
data nameplate ,... Yes.E. No
. ..
.: Date left In service with all control yes open
Remarks
.. .. -
Name of sprinkler contractor
For property or (signed) ,_-7 Title
Date
Ylzlaz
Signatures
Forspn r ercontra gi)
e
......................
Additional explanations and notes
•
FIGURE 16.1 Continued
:.
. . ..
16.2.1.2 Portions of systems nona11y subjected to system working pressures in excess of
1
5
0
p
s
i
(
1
0
.
4
bar) shall be tested as described in 16.2.2.1 at a pressure of 50 psi (.&.5: bar) in excess of system working pressure.
16.2.1.3 Where cold weather will
n
o
t
p
e
r
m
i
t
tèstingwith Wa-ter, an interim air test shall be permitted.to be conducted as described in 16.2.3.
16.2.1.4 Modifications affecting 2
0
o
r
f
e
w
e
r
sprinklers shall not require testing in excess of system working pressure. 16.2.1.5 Where addition or modifi
c
a
t
i
o
n
i
s
m
a
d
e
t
o
a
n
e
x
i
s
t
-
ing system affecting more than 20 sp
r
i
n
k
l
e
r
s
,
the new portion shall be isolated and tested at not l
e
s
s
t
h
a
n
2
0
0
psi (18.8 bar) for 2 hours.
16.2.1.6 Modifications that cannot be isolated, such as relo
-cated drops, shall not require testi
n
g
i
n
e
x
c
e
s
s
o
f
s
y
s
t
e
m
w
o
r
k
-
ing pressure.
16.2.1.7 Loss.shall be determine
d
b
y
a
d
r
o
p
i
n
g
a
u
g
e
p
r
e
s
-
sure or visual leakage.
16.2.1.8 The test pressure shall be read from a gauge located. at the low elevation point of t
h
e
system or portion being tested.
16.2.1.9 Additives, corrosive ch
e
m
i
c
a
l
s
s
u
c
h
a
s
sodium sili cate or derivatives of sodium silicate brine, or other cherm-cals shall not be used while hydrostatically testing systems or for stopping leaks.
16.2.1.10 Piping between the ext
e
r
i
o
r
fire department con-nection and the check valve in the fire department inlet pipe shall be hydrostatically tested in -th
e
s
a
s
n
e
-
m
a
n
n
e
r
a
s
4
h
e
-
b
a
1
-
•
'
-
ance of the system.
16.2.1.11 When deluge systems are being hydrostatically tested, plugs shall be installed in
f
i
t
t
i
n
g
s
and replaced with
open sprinklers after the jest is completed, or the operating elements of automatic sprinklers shall be removed after the test iscompleted....... .
16-2.1.12 The trench shall be backtilled between joints be-fore tdstinB to prevent movemeitfpip
,
tires presented by the 1azards of çtpe4 tih€s he pipe and joints shall be per-mitted to be backl1ed prowled
t
h
e
installing contractor takes .te spp for.JocaiJ.ng..an4prrecting leakage in excess of
. 16.2.1.14. Provsion.shali&.dë..th pr
o
p
e
r
..disposal-of water used for flushing or tesfing
162 115'TestBlanlrs
16.2.1.15.1 Tesrlianks.shali havèCpaln.&lugs protruding i4 such a way .as to dearly indicate their.presence.
162113.2 ThI test b1ail1S1I1L xuibered, and the stalling codtracthrihali have a redtMkeeping method enMrL ing their removal after work is completed.
.. I
.Ihé dapf per of a differential-type valve shall be held off its seat toprej. .$, .... . .. .... 1622
(9) Air.
alve
i62.2.I Iti dZliuioiftd'-thë n.dhiWhftfróstatic test, an aif .pressureieakage.estat.40psL(2.&
b
a
4
.
s
h
a
l
l
b
e
.
c
o
n
d
u
c
t
e
d
f
o
t
-24
of 1½ psi (0.1 bar)the24 redtihallbe correçtedi
ca-pable of being operated at temperauwbe1ow 32'-F (0),air pressure leakage tests required in 16.2.2 shall be cqnducted at the lowest nominal temperature of the space.
2002 Edition