Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
3310 AVENIDA PLATINO; ; AS070015
City of Carlsbad Sprinkler Permit Permit No: AS070015 3310 AVENIDA Job Address: Status: ISSUED PLATINO Permit Type: SPRINK Applied 1/19/2007 Parcel No: 2230320400 Approved: 1/19/2007 Lot #: 0 Reference No.: Issued: 1/19/2007 PC #: Inspector: Project Title: HUNTER'S POINT THREE FIRE SPRINKLER INSPECTIONS @ $62/EA Applicant: SOUTHLAND FIRE PROTECTION, INC 4733 PT. LOMA AV SAN DIEGO, CA 92107 619-523-1400 I- 1.0717 m; i REAL ESTATE COLLATERAL MANAGEMENT CO C/O MORROW DEV/ LIZ LAYMAN 1903 WRIGHT PL #180 CARLSBAD CA L Fees ($) Add'l Fees ($) Total ($) Balance ($) 186 0 186 0. SEE PERMIT AS070010 7271 CALLE PLATA HUNTER'S POINT FOR CALCS & PLANS NOTE: APPROVED FIRE SPRINKLER PLANS ARE LOCATED IN 7271 CALLE PLATA/HUNTERS POINT. WORKING PLANS, DESIGN, INSTALLATION, ACCEPTANCE TESTS, AND MAINTENANCE I& 13R-9 Figure 2-1.2.1 Contractor's material and test certificate for aboveground piping. Contractor's Material and Test Certificate for Aboveground Piping PROCEDURE Upon completion of work, inspection and tests shall be made by the contractor's representative and witnessed by an owner's representative. All defects shall be corrected and system left in service before contractor's personnel finally leave the job. A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities, owners, and contractor. It is understood the owner's representative's signature in no way prejudices any claim against contractor for faulty material, poor workmanship, or failure to comply with approving authority's requirements or local ordinances. P.roøertv name Hunter's Point fJ 4 1 1 Date 8/23/07 Property address Accepted by a proving authorities (names) Carl hd Pi rp flpt Address Plans Installation conforms to accepted plans kD Yes E No Equipment used is approved E Yes No If no, explain deviations Has person in charge of fire equipment been instructed as J Yes E No to location of control valves and care and maintenance of this new equipment? If no, explain Instructions Have copies of the following been left on the premises? ' £J Yes c: No System components instructions Yes No Care and maintenance instructions j Yes E No NFPA25 x: Yes E No Location of system - Supplies buildings Year of Orifice Temperature Make Model manufacture size Quantity rating Reliable FiRes 9 1/2 iii 15 Tyro TYRB 1/2 67 200 Sprinklers Pipe and Typeof pipe Blazmastr CPVc fittings Type of fittings CPVC Alarm valve or flow Alarm device Maximum time to operate through test connection Type Make Model Minutes Seconds Indicator Flow Switch Potter -0- 45 Dry valve Q. 0. D. Make Model Serial no. Make Model Serial no. Dry pipe operating test - - Time to trip through test connection1 Water pressure Air pressure Trip point air pressure Time water reached test outlet1 Alarm operated properly - Minutes Seconds psi psi psi Minutes I Seconds Yes No N/A Without O.O.D. With QQP._ It no, explain 'Measured from time inspector's test connection is opened 1999 Edition 13R-10 SPRINKLER SYSTEMS IN RESIDENTIAL OCCUPANCIES UP TO AND INCLUDING FOUR STORIES IN HEIGHT Figure 2-1.2.1 (Continued) Operation E Pneumatic E Electric EJ Hydraulic Piping supervised 0 Yes El No Detecting media supervised E Yes E No Does valve operate from the manual trip, remote, or both E Yes No control stations? Deluge and preaction valves Is there an accessible facility in each circuit for testing? E Yes E No If no, explain N / A Make Model Does each circuit operate supervision loss alarm? Does each circuit operate valve release? Maximum time to operate release Yes No Yes No Minutes Seconds / /ere reducing Location and floor Make and model Setting Static pressure Residual pressure (flowing) Flow rate Inlet (psi) Outlet (psi) Inlet (psi) Outlet (psi) Flow (gpm) valve test Hydrostatic: Test Hydrostatic tests shall be made at not less than 200 psi (13.6 bar) for 2 hours or 50 psi (3.4 bar) above static pressure in excess of 150 psi (10.2 bar) for 2 hours. Differential dry-pipe valve clappers shall be left open during the test to prevent damage. All aboveground piping leakage shall be stopped. description Pneumatic: Establish 40 psi (2.7 bar) air pressure and measure drop, which shall not exceed 1½ psi (0.1 bar) In 24 hours. Test pressure tanks at normal water level and air pressure and measure air pressure drop, which shall not exceed 1½ psi (0.1 bar) in 24 hours. All piping hydrostatically tested at .ZQQpsi (_ bar) for _Z.. hours Dry piping pneumatically tested ED Yes x:i No Equipment operates properly CE Yes E No If no, state reason Do you certify as the sprinkler contractor that additives and corrosive chemicals, sodium silicate or derivatives of sodium silicate, brine, or other corrosive chemicals were not used for testing systems or stopping leaks? LXI Yes D No Tests Drain test I Reading of gauge located near water Supply test connection: psi (_ bar) Residual pressure with valve in test connection open wide: psi (...._.... bar) Underground mains and lead in connections to system risers flushed before connection made to sprinkler piping Verified by copy of the U Form No. 858 KJ Yes E No Other Explain Flushed by Installer of underground sprinkler piping J Yes E No If powder-driven fasteners are used in concrete, has El Yes (X No representative sample testing be satisfactorily completed? If no, explain Not Used Blank testing gaskets Number used Locations Number removed Welding piping E Yes EX No If yes... Do you certify as the sprinkler contractor that welding procedures comply E Yes 0 No with the requirements of at least AWS B2.1? Welding Do you certify that the welding was performed by welders qualified in compliance with the requirements of at least AWS B2.1? E Yes No N / A Do you certify that the welding was carried out in compliance with a documented quality control procedure to ensure that all discs are retrieved, that openings in piping are smooth, that slag and other welding residue are removed, and that E Yes E No the internal diameters of piping are not penetrated? Cutouts (discs) Do you certify that you have a control feature to ensure that es N E all cutouts (discs) are retrieved? Y o N/A 1999 Edition WORKING PLANS, DESIGN, INSTALLATION, ACCEPTANCE TESTS, AND MAINTENANCE 13R—II Figure 2-1.2.1 (Continued) Hydraulic Nameplate provided I it no, explain data nameplate K1 Yes E No Date left In service with all control valves open Remarks Name of sprinkler contractor nn Fir Prn1-'t-inn Tnc 7;,L th Tests witnessed by Signatures F Dyerty owner (signed) Title Z ~Us lnl,,r=(X,d Title Pres Date 8/23/07 Additional explanations and S Contact fire dept for fu er test questions. Hydrostatic and final test signatures on permit card. Carlsbad Fire Department Fire Sprinkler System Testing Check List PERMIT #: / DATE:_________________ PREMISES NAME: //L/,jrgifS 1/1iJi' ADDRESS: 33/ô CONTRACTOR: Fg I Sprinkler Pre-Test Items (ALL Systems) OK CN A Stamped, Approved Plans On Job Site V - B Verify Completion Of Underground Rough-In, UG Hydro, Flush of UG, Aboveground Hydro, AG Rough Pipe Inspection Has Been Completed Prior To This Test C Minimum of 2 Personnel Present, 2-Way Communication, Stop Watch - 0 Check "Fire Sprinkler Data Plate" on riser (pipe schedule system does not need plate) Location of design area Discharge density over design area (s) Required flow & residual pressure demand @ base of riser Hose addition demand _stream _demand _in_ _to_sprinkler t/ - Signage - Exterior (minimum of 4" letters) to Interior (minimum 2" letters) doors shall be labeled "Sprinkler Riser Room" and j valves & drains shall be labeled F_G System Type Verifywhat teo sstem: wet, dry, pre-action, deluge, combo. Monitoring - Verify if system is monitoredby a central monitoring agency Yes if - Group R, Div. I = 20+ heads Group I, Div. 1.1 & 1.2 = 20+ heads All other occupancies= 100+ heads H Monitoring - Do not take system "off line" - call NCJPA 858-756-3006, explain "testing" Will start © time/address_of building not have _and _do _CFD_respond. I Riser room - Shall be clear space around sprinkler riser (If in warehouse- falling hazards may constitute a cage or bollards around riser for protection) 1/ - J Riser Schematic/Map - Shall denote riser floor detail I zones throughout building, shall be located at riser, FACP annunciator panel and Knox box- Map shall ID all locations: riser, W/A annunciator panel, FACP & Knox Box - - 2 Operational Trip Test for Dry System - A *** This test requires 2-way communication - B Verify static pressure (Number of #s prior to water flow)- Air gauge should be lower on the system side - C If monitored, all valves shall have tamper switches- if not monitored, chain/lock OS&Y Valve and Water Main Valve in vault (Each water flow switch is separately zoned at FACP) '. Vault- Water Main- Valve Low AiBlesstfre"-ofi-system-side, trip © 10# below normal pressure 3( • OS&Y Valve esUnthQLVae— _. Isolation Valves (Ask sprinkler contractor if there are any of these valves- either remove or provide tamper switch V D Test low air pressure, (bleed off air, fire alarm panel shall indicate supervisory signal) ______ (Tamper switch shall be located on the system side if the line) E 24 Hour Pneumatic Leak Test on Dry System- System shall maintain a minimum of 40 psi for 24 hrs w/ <than I Y psi (0.1 bar) of pressure loss, the 24 hr pneumatic test can be preformed either before or after the acceptance test F Accelerator or Exhauster is required on systems that exceed 500 gal. water volume VA (Exception- if water can be delivered to Insp. Test connection Win 60 sec.) - G Inspector's Test - Water must flow Win 60 seconds or less, fire alarm panel shall-only indicate "general alarm" and water gong/electronic bell shall ring (Shall result in audible alarm on premises within 5 minutes of when flow begins). Signage on bell shall read "Fire Alarm Call 9-1-1" r 6 second water delivery is not required <750 gal.-then acceptable up to 3 minutes) Time it takes for valve to trip after opening the system test valve Air & water pressures before test Air pressure at trip point Delivery time for water to reach the test outlet & Indication of whether or not alarms operated properly H Sprinkler heads in pendant position, shall be listed dry-pendant type if subject to freezing - I Check air compressor refills the system within 30 minutes to original pressure (Check seismic bracing per plan for compressor) J Alarm - Shall have interior water flow alarm @ normally occupied area - K Alarm - Test telephone lines (1 & 2) - Disconnect line, max. of 4 mm. to signal monitoring OK CN agency that a trouble signal has occurred at site, test both lines - L Dry pipe valve & supply pipe shall be protected against freezing and mechanical injury (riser room- heater install to kick in at 40 degrees) M Auxiliary Drains are required, drain locations shall be ID with signs & denoted on riser zone map N Documentation - Shall verify results of trip test with monitoring agency, shall have test results faxed to CFD — Fire Prevention Bureau 760-602-8561, and Contractor shall submit V signed NFPA UG/AG Material & Test Certificate - 0 Telephone NCJPA, verify time of 1 call from monitoring agency and prior to leaving site "on explain test is complete and system is back line." — - 3 Flow Test for Wet System — A Conduct General Pre-Items listed above 17 - B Verify static pressure (Pressure gauges are required above & below each alarm check valve $.-I - when installed; if shotgun riser- one gauge is o.k) V C If monitored, all valves shall have tamper switches- if not monitored, chain/lock OS&Y Valve and Water Main Valve in vault (Each water flow switch is separately zoned at FACP) O. Vault- Water Main- Valve a#-. OS&Y Valve PaaHndic~l~ye Isolation Valves (Ask sprinkler contractor if there are any of these valves- either remove or provide tamper switch) Test All Valves for Tamper Switches - - D Inspector's Test - Water flow, fire alarm panel shall only indicate "general alarm" and water gong/electronic bell shall ring (Shall result in audible alarm on premises within 5 minutes of when flow begins). Signage on bell shall read "Fire Alarm Call 9-1-1" .7 - E Verify residual pressure during flow test F Alarm - Shall have interior water flow alarm @ normally occupied area G Alarm - Test telephone lines (1 & 2) - Disconnect line, max. of 4 mm. to signal monitoring agency that a trouble signal has occurred at site, test both lines - H Documentation - Shall verify results of trip test with monitoring agency, shall have test results faxed to CFD - Fire Prevention Bureau 760-602-8561, and Contractor shall submit signed NFPA UG/AG Material & Test Certificate 1/ I Telephone NCJPA, verify time of 1' call from monitoring agency and prior to leaving site "on explain test is complete and system is back line." - - 4 Fire Department Connections A Connections shall not be connected on the suction side of a pump j7 B Shall be equipped with check valve, with NO shut off valve permitted, unless tamper switch ______ provided and tested 1/ C Piping between check valve and outside hose connection shall be equipped with automatic drip V D FDC pipe size shall be at least 4" (Exception- for hydraulically calc'd systems, FDC pipe serving one system riser may be as small as the system riser) 5 Pre-Action Systems - A Single Interlock- Admits water to sprinkler piping upon operation of detection devices Non-Interlock- Admits water to sprinkler piping upon operation of detection devices or automatic sprinklers Double Interlock- Admits water to sprinkler piping upon operation of both detection devices / and automatic sprinklers 6 Anti-Freeze Systems - - A Solutions— Usted CPVC pipe & fittings shall be protected from freezing w/ Glycerine Prohibited Solutions for CPVC are Diethylene, Ethylene, Propylene Glycols - B Potable water connections- see NFPA 13 & 13D for specific requirements Antifreeze solution shall be prepared with a freezing point to 0-10 degrees F IJIA - C Connections— Between the wet & antifreeze system, shall have back flow prevention device / and pressure reducing device between each double check valve - Site Inspection: Match Plansor N Test Pas,r N Corrections Needed: Y or3lf yes, see Correction Notice for further Information) City of CarIiad Fire Department CFD DerS'utj Firi Marshal -