Loading...
HomeMy WebLinkAbout2024-05-06; Traffic Safety and Mobility Commission; ; El Camino Real Roadway Improvements from Poinsettia Lane to Camino Vida Roble, Capital Improvement Program Project No. 6072Meeting Date: May 6, 2024 To: Traffic Safety & Mobility Commission Staff Contact: Brandon Miles, Associate Engineer Brandon.Miles@carlsbadca.gov, 442-339-2745 Subject: El Camino Real Roadway Improvements from Poinsettia Lane to Camino Vida Roble, Capital Improvement Program Project No. 6072 Recommended Action Support staff’s recommendation to the City Council to approve the plans and specifications of the El Camino Real Roadway Improvements from Poinsettia Lane to Camino Vida Roble, Capital Improvement Program, Project No. 6072. Background The project will widen the northbound segment of El Camino Real for approximately 1,500 feet from Cinnabar Way to Camino Vida Roble. The project will also include re-striping northbound El Camino Real between Poinsettia Lane to Cinnabar Way from two vehicle travel lanes to three through vehicle travel lanes and enhancement of existing bike lanes, consistent with the Mobility Element of the City of Carlsbad’s General Plan. Northbound El Camino Real, from Cinnabar Way to Camino Vida Roble, will be physically widened to incorporate several enhancements: •An additional through lane will be added for increased vehicle capacity enhance the existing buffered bike lane by widening the bike lane and adding green paint in the bicycle-vehicle conflict zones •Install a new contiguous and non-contiguous sidewalk that will vary from five to six feet wide in the northbound direction to accommodate a biofiltration system for stormwater treatment along the northbound side of the roadway Currently, the sidewalk terminates in the northbound direction at Cinnabar Way. A portion of the widening segment, north of Cinnabar Way, will require about 200 feet of retaining wall on the east side to minimize the impacts associated with the project to the adjacent private properties. Northbound El Camino Real, from Poinsettia Lane to Cinnabar Way, will be re-striped to include three 11-foot-wide through vehicle lanes and a buffered bike lane. The bike lane will feature eight-foot-wide lanes and three-foot-wide buffers. Approximately 900 feet south of Camino Vida Roble, the median will receive streetscape and landscape improvements to match the existing segments. May 6, 2024 Item #1 Page 1 of 48 This improved roadway segment will include buffered bike lanes with green dashed paint in the conflict zone at bus stops. In addition, four new streetlights will be added for safety on the east side of El Camino Real from Cinnabar Way to Camino Vida Roble. On Nov. 2, 2020, the Traffic & Mobility Commission unanimously supported staff’s recommendation to implement the project as it provided operational improvements consistent with the city’s General Plan Mobility Element. Staff received and noted comments from the Commission on the improvement plans. The approved minutes of this meeting are attached as Exhibit 3. Additionally, on Oct. 3, 2022, the Traffic & Mobility Commission unanimously supported staff’s recommendation to approve the project plans and specifications. The approved minutes of this meeting are attached as Exhibit 4. Next Steps Following the Traffic Safety & Mobility Commission’s review, staff will finalize the project plans and bring a staff report to the City Council in summer of 2024 with a recommendation to approve the plans, specifications, and contract documents, and authorize the City Clerk to advertise for construction bids for the project. After the bidding process is complete, staff will return to the City Council with a request to award a construction contract to the lowest responsive and responsible bidder. The construction is targeted to start in late-2024, with completion expected in late 2025. Exhibits 1. Location map 2. Improvement plans 3. Meeting Minutes from Traffic and Mobility Commission on Nov. 2, 2020 4. Meeting Minutes from Traffic and Mobility Commission on Oct. 3, 2022 May 6, 2024 Item #1 Page 2 of 48 EL CAMINO REAL ROADWAY IMPROVEMENTS FROM POINSETTIA LANE TO CAMINO VIDA ROBLE 6072 1 PA L O M A R AIRPOR T RD. E L CA M I N O RE A L POINS E T T I A LN. EL FU E R T E ST .CA M I N O VIDA ROBLE CASSIA RD. A L I C A N T E RD . SITE PALOMAR AIRPORT SITE Exhibit 1 May 6, 2024 Item #1 Page 3 of 48 PROJECT LOCATION EL C A M I N O R E A L R O A D W A Y I M P R O V E M E N T P L A N S - 1 0 0 % S U B M I T T A L ( 1 2 / 0 9 / 2 0 2 1 ) 811 EL CAMINO REAL ROADWAY IMPROVEMENT PLANS FROM POINSETTIA LANE TO CAMINO VIDA ROBLE PROJECT NO. 6072 FEDERAL NO. 5308(021) FERPL16 CITY OF CARLSBAD CARLSBAD, CALIFORNIA CITY COUNCIL MATT HALL - MAYOR KEITH BLACKBURN - MAYOR PRO TEM PEDER NORBY - COUNCIL MEMBER PRIYA BHAT-PATEL - COUNCIL MEMBER TERESA ACOSTA - COUNCIL MEMBER SCOTT CHADWICK - CITY MANAGER Exhibit 2 May 6, 2024 Item #1 Page 4 of 48 SIGNAL AHEAD SIGNALSIGNALAHEADAHEAD BIKELANE BIKELANE BIKE LANE BIKELANE BIKELANE LANEBIKE LANE BIKE LANEBIKE LANEBIKE LANEBIKE LANEBIKE LANEBIKE AHEADAHEAD SIGNALSIGNAL AHEAD SIGNAL LANEBIKE LANEBIKE LANEBIKE AHEA D SIGN A L AHE A D SIGNA L SIGNAL AHEAD SIGNALSIGNAL AHEADAHEAD BIKELANE BIKELANE BIKELANEBIKELANE BIKELANE LANEBIKE LANEBIKE LANEBIKE LANEBIKE LANEBIKE LANEBIKE LANEBIKE AHEADAHEAD SIGNALSIGNAL AHEAD SIGNAL LANEBIKE LANEBIKE LANEBIKE AHEAD SIGNAL AHEAD SIGNAL EL C A M I N O R E A L R O A D W A Y I M P R O V E M E N T P L A N S - 1 0 0 % S U B M I T T A L ( 1 2 / 0 9 / 2 0 2 1 ) 811 May 6, 2024 Item #1 Page 5 of 48 EL C A M I N O R E A L R O A D W A Y I M P R O V E M E N T P L A N S - 1 0 0 % S U B M I T T A L ( 1 2 / 0 9 / 2 0 2 1 ) 811 May 6, 2024 Item #1 Page 6 of 48 EL C A M I N O R E A L R O A D W A Y I M P R O V E M E N T P L A N S - 1 0 0 % S U B M I T T A L ( 1 2 / 0 9 / 2 0 2 1 ) 811 APN 213-050-16 APN 213-110-16 APN 213-310-11 APN 213-050-16 May 6, 2024 Item #1 Page 7 of 48 EL C A M I N O R E A L R O A D W A Y I M P R O V E M E N T P L A N S - 1 0 0 % S U B M I T T A L ( 1 2 / 0 9 / 2 0 2 1 ) 811 APN 213-050-16 APN 213-310-11 COASTAL ZONE May 6, 2024 Item #1 Page 8 of 48 EL C A M I N O R E A L R O A D W A Y I M P R O V E M E N T P L A N S - 1 0 0 % S U B M I T T A L ( 1 2 / 0 9 / 2 0 2 1 ) 811 APN 213-050-16 APN 213-110-16 May 6, 2024 Item #1 Page 9 of 48 EL C A M I N O R E A L R O A D W A Y I M P R O V E M E N T P L A N S - 1 0 0 % S U B M I T T A L ( 1 2 / 0 9 / 2 0 2 1 ) 811 May 6, 2024 Item #1 Page 10 of 48 EL C A M I N O R E A L R O A D W A Y I M P R O V E M E N T P L A N S - 1 0 0 % S U B M I T T A L ( 1 2 / 0 9 / 2 0 2 1 ) 811 APN 213-050-16 May 6, 2024 Item #1 Page 11 of 48 EL C A M I N O R E A L R O A D W A Y I M P R O V E M E N T P L A N S - 1 0 0 % S U B M I T T A L ( 1 2 / 0 9 / 2 0 2 1 ) 811 APN 213-050-16 May 6, 2024 Item #1 Page 12 of 48 EL C A M I N O R E A L R O A D W A Y I M P R O V E M E N T P L A N S - 1 0 0 % S U B M I T T A L ( 1 2 / 0 9 / 2 0 2 1 ) 811 May 6, 2024 Item #1 Page 13 of 48 EL C A M I N O R E A L R O A D W A Y I M P R O V E M E N T P L A N S - 1 0 0 % S U B M I T T A L ( 1 2 / 0 9 / 2 0 2 1 ) 811 May 6, 2024 Item #1 Page 14 of 48 AH E A D AH E A D SIG N A L SIG N A L AH E A D SIG N A L SIG N A L SIG N A L AH E A D AH E A D AH E A D SI G N A L EL C A M I N O R E A L R O A D W A Y I M P R O V E M E N T P L A N S - 1 0 0 % S U B M I T T A L ( 1 2 / 0 9 / 2 0 2 1 ) 811 ONE WAY TRUCK ROUTE May 6, 2024 Item #1 Page 15 of 48 AH E A D AH E A D SI G N A L SI G N A L AH E A D SI G N A L AH E A D AH E A D SIG N A L SIG N A L AH E A D SIG N A L EL C A M I N O R E A L R O A D W A Y I M P R O V E M E N T P L A N S - 1 0 0 % S U B M I T T A L ( 1 2 / 0 9 / 2 0 2 1 ) 811 ONE WAY ONLY TURN RIGHT STOPTRUCK ROUTE SPEED LIMIT 55 CROSSWALK USE May 6, 2024 Item #1 Page 16 of 48 EL C A M I N O R E A L R O A D W A Y I M P R O V E M E N T P L A N S - 1 0 0 % S U B M I T T A L ( 1 2 / 0 9 / 2 0 2 1 ) 811 May 6, 2024 Item #1 Page 17 of 48 SIG N A L AHE A D SIG N A L SIG N A L AHE A D AHE A D BIKE LAN E BIK E LA N E BIK E LA N E BI K E LA N E BIK ELAN E LA N E BI K E EL C A M I N O R E A L R O A D W A Y I M P R O V E M E N T P L A N S - 1 0 0 % S U B M I T T A L ( 1 2 / 0 9 / 2 0 2 1 ) 811 WORK ROAD AHEADCLOSED SHOULDER CLOSED SHOULDER RIGHT AHEADCLOSED SIDEWALK SHOULDER NO M P H 45SIDEWALK CLOSED AHEAD CROSS HERE LANE BIKE CLOSED CLOSED AHEAD BIKE LANE MAY USE FULL LANE May 6, 2024 Item #1 Page 18 of 48 EL C A M I N O R E A L R O A D W A Y I M P R O V E M E N T P L A N S - 1 0 0 % S U B M I T T A L ( 1 2 / 0 9 / 2 0 2 1 ) 811 ROAD WORK END SIDEWALK CLOSED CROSS HERE May 6, 2024 Item #1 Page 19 of 48 AH E A D AH E A D SI G N A L SI G N A L AH E A D SI G N A L AH E A D AH E A D SIG N A L SIG N A L AH E A D SIG N A L EL C A M I N O R E A L R O A D W A Y I M P R O V E M E N T P L A N S - 1 0 0 % S U B M I T T A L ( 1 2 / 0 9 / 2 0 2 1 ) 811 May 6, 2024 Item #1 Page 20 of 48 EL C A M I N O R E A L R O A D W A Y I M P R O V E M E N T P L A N S - 1 0 0 % S U B M I T T A L ( 1 2 / 0 9 / 2 0 2 1 ) 811 May 6, 2024 Item #1 Page 21 of 48 May 6, 2024 Item #1 Page 22 of 48 May 6, 2024 Item #1 Page 23 of 48 May 6, 2024 Item #1 Page 24 of 48 May 6, 2024 Item #1 Page 25 of 48 May 6, 2024 Item #1 Page 26 of 48 May 6, 2024 Item #1 Page 27 of 48 May 6, 2024 Item #1 Page 28 of 48 May 6, 2024 Item #1 Page 29 of 48 May 6, 2024 Item #1 Page 30 of 48 May 6, 2024 Item #1 Page 31 of 48 May 6, 2024 Item #1 Page 32 of 48 May 6, 2024 Item #1 Page 33 of 48 May 6, 2024 Item #1 Page 34 of 48 May 6, 2024 Item #1 Page 35 of 48 Page 1 of 5 Public Works Transportation 1635 Faraday Avenue  Carlsbad, CA 92008  760-434-2730 t Council Chambers 1200 Carlsbad Village Drive Carlsbad, CA 92008 Monday, Nov. 2, 2020, 3:00 p.m. CALL TO ORDER: Chair Gocan called the Meeting to order at 3:04 p.m. ROLL CALL: Present: Gocan, Hunter, Penseyres, Fowler, Linke Absent: Perez and Wanamaker PLEDGE OF ALLEGIANCE: Commissioner Hunter led the Pledge of Allegiance APPROVAL OF MINUTES: This meeting was conducted virtually via Zoom due to the stay-at-home order for COVID-19. ACTION: Motion by Commissioner Hunter seconded by Commissioner Linke, to approve the minutes for the Oct. 5, 2020 meeting as presented. Motion carried: 4/0/2/1 (Absent: Perez and Wanamaker; Abstained: Gocan) PUBLIC COMMENTS ON ITEMS NOT LISTED ON THE AGENDA: None CONSENT CALENDAR: This item was pulled for discussion by Commissioner Penseyres 1.EL CAMINO REAL WIDENING BETWEEN POINSETIA LANE AND CAMINO VIDA ROBLE – Support staff’s recommendation to the City Council to implement the El Camino Real Roadway Improvements from Poinsettia Lane to Camino Vida Roble, Capital Improvement Program (CIP) Project No. 6072 (Project) providing operational improvements consistent with the city’s General Plan Mobility Element. (Staff Contact: Bandon Miles and Hossein Ajideh, Public Works). DISCUSSION: Commissioner Penseyres requested to pull this item from the consent calendar to address Traffic Control Plan (TCP) for bicyclist during construction and to ask staff to consider reasonable alternative for bicycle commuters. Associate Engineer Miles referenced the TCP and showed that the construction area impacts the third northbound through lane, curb and gutter and sidewalk. Since there is not adequate space to accommodate a bicycle lane, the bicycle lane was removed. The outermost through lane was widened to 14 feet and SHARE THE ROAD signs were specified as well as reducing the posted speed limit through the construction zone by 10 mph. If necessary, a bike lane detour could be considered using Poinsettia Lane/Alicante Road/Town Garden Road. Once a contractor is brought on board, staff could investigate to determine if there is extra room to provide a delineated bike lane through the construction zone. Exhibit 3 May 6, 2024 Item #1 Page 36 of 48 Page 2 of 5 Public Works Transportation 1635 Faraday Avenue  Carlsbad, CA 92008  760-434-2730 t Transportation Director Frank inquired if Commissioner Penseyres had any input to provide staff that would make the TCP better for bicyclist. Commissioner Penseyres answered that he will be glad to discuss with staff potential bike lanes strategies. ACTION: Motion by Commissioner Penseyres, seconded by Commissioner Linke, to approve Consent Calendar Item 1 - El Camino Real Road Improvements between Poinsettia Lane and Vida Roble with the addition of a separate meeting of Commissioner Penseyres with staff to discuss options for the Traffic Control Plan to address bicyclists. The results of the separate meeting will be reported to T&MC through the City Traffic Engineer Report. Motion carried: 5/0/2 (Absent: Perez and Wanamaker) DEPARTMENTAL REPORTS: 2.POLICE MONTHLY REPORT – CANCELLED 3.APPROACH FOR PRELIMINARY ENGINEERING ASSESSMENT FOR COLLEGE BOULEVARD REACH A, CAPITAL IMPROVEMENT PROGRAM PROJECT No. 3636 – (Staff Contact: Tom Frank and Hossein Ajideh, Public Works) Staff’s Recommendation: Receive a presentation and provide input Engineering Manager Ajideh presented the report and reviewed a PowerPoint presentation (on file in the Office of the City Clerk). PUBLIC COMMENT ON DEPARTAMENTAL REPORTS ITEM THREE ON THE AGENDA: Public comments submitted via email prior to the Traffic & Mobility Commission meeting and read into the record: Brian Phillips, submitted historical information and a request on the Marron Rancho that was the first permanent ranch home built in north county during the time that the Native Americans existing in this area were primarily nomadic hunters, gathers, and fishers. This Marron land grant structure still remains intact today at its original location within/adjacent to project limits and may be classified as the oldest and most important structure standing in Carlsbad today. The Rancho was owned by Senior Marron and stretched from present day Oceanside to present day La Costa, easterly to present day Vista/San Marcos. Later in its history the Rancho, owned by Senior Marron, was managed by Mr Kelly, and in subsequent generations following the passing of Senior Marron, deeded to the eight surviving offspring of Mr Kelly's brother. Preliminary engineering scope should include the facts of the original land grant plat and the building of the Marron homestead within/adjacent to the College Reach A project limits, said RFQ scope to include the stated public historical objective to preserve the homestead from any/all deleterious actions capable of undermining/negatively impacting the environment and integrity of the homestead site and structure, and the RFQ scope to include the further stated public policy objective to identify measures within the project scope that will preserve and enhance the Marron homestead structure in its location within and/or adjacent to the CIP 3636 project limits. COMMISSION DISCUSSION: May 6, 2024 Item #1 Page 37 of 48 Page 3 of 5 Public Works Transportation 1635 Faraday Avenue  Carlsbad, CA 92008  760-434-2730 t Commissioner Penseyres inquired if it is already decided that the College Boulevard extension will be a four-lane road or four-lane equivalent and if staff is estimating failure at four-lane what will be done after the extension of College Boulevard to address failure and build-out? Transportation Director Frank explained the importance of adapting the roadway to balance the safety and efficiency needs between all modes of travel, safe routes to schools, and public outreach recommendations. This holds true for the two-lane option which might include a roundabout. Staff wants to study it further and listen to the community concerns to make sure that the project will meet the traffic projections and the community needs. Transportation Director Frank emphasized that the geotechnical, environmental, structural and the hydrology items are the high cost items on this project, the travel lane restriping and the landscaping are relative small and minor cost in comparison and that is the reason for the “equivalent” language added. Commissioner Penseyres asked if the two-lane option with traffic signals will not work, would a roundabout make it better? Transportation Director Frank said at the earlier traffic projections staff was looking at a possible one-lane roundabout and this is one more reason to discuss and study the options in more detail. Commissioner Penseyres inquired if the scope of could include consideration for Class I, two-way, off-road multi-use facility? And if we get some additional right of way when we are buying right away, to provide a completely off-road facility that would provide cyclists/pedestrians a safe route, a Class I roadway. Transportation Director Frank answered yes it could be a part of the project and reminded the commissioners that their feedback is exactly what staff is looking for to put this project forward. Commissioner Linke suggested that staff take another look at the future traffic projections produced by zone 15 to determine what is actually needed there. Staff should also look at funding and timing of funding from the developer and the city and their associated responsibility for the roadway improvements. A recommendation to include the research of alternative designs in the RFP, including the protection of the historic Marron homestead. Commissioner Fowler shared his concern that the finance part for the extension of College Boulevard is still pending. Deputy City Manager Gomez answered that the City Council agreed on a preliminary engineering assessment with an initial 3-million of funding to conduct the study, including project cost estimates, an analysis of future traffic projections, and a community needs assessment. Commissioner Wanamaker joined the meeting at 3:57 p.m. ACTION: Motion by Commissioner Penseyres, seconded by Commissioner Hunter, for staff to consider including in the scope of work a Class I –multiuse trail facility on the eastside of College Boulevard from El Camino Real to Cannon Road. Motion carried: 6/0/1 (Absent: Perez) 4. FISCAL YEAR 2020-21 GROWTH MANAGEMENT PLAN MONITORING REPORT – CIRCULATION SECTION APPROACH – (Staff contact: Tom Frank and Nathan Schmidt, Public Works) Staff’s Recommendation: Receive a presentation and provide input Transportation Planning and Mobility Manager Schmidt presented the report and reviewed the PowerPoint presentation (on file in the Office of the City Clerk). May 6, 2024 Item #1 Page 38 of 48 Page 4 of 5 Public Works Transportation 1635 Faraday Avenue  Carlsbad, CA 92008  760-434-2730 t COMMISSION DISCUSSION: Commissioner Linke presented a PowerPoint presentation and letter in response to the staff report findings (on file in the Office of the City Clerk). Commissioner Linke proposed that the intersection operations analysis should not have been removed from the transportation impact analysis guidelines and GMP monitoring analysis and that the city should consider conducting an operations study at the intersections that are at the 85% of failure rate, saving our resources. This would enable staff to proactively determine if an intersection looks like it might fail in the next year and do the counts in advance of the failure. He proposed more locations to collect traffic counts along Carlsbad Boulevard/Poinsettia Lane/Tamarack Avenue and Faraday Avenue. Transportation Planning and Mobility Manager Schmidt shared that the ADT counts for these locations are available as they were conducted as part of the bicycle and pedestrian mode analysis. Transportation Director said that he likes all the suggestions presented by Commissioner Linke and that staff will evaluate the possibility of incorporating it to the scope of work and bring back to the T&MC. Commissioner Linke showed that including all modes of travel in the Growth Management monitoring program report will make meaningful improvements. Transportation Director Frank suggested to bring these items, as well as where to put potential multimodal counters to see if more activity occurs after improvements, to the ad-hoc committee. Commissioner Linke suggested that the city should harmonize the two paths for (1) the GMP monitoring program and (2) private developers traffic impact analysis. CITY TRAFFIC ENGINEER REPORT: City Traffic Engineer Comments: Attachment A City Traffic Engineer Kim mentioned that the City is in the process of developing a scope of work for the Local Roadway Safety Program grant. The program includes an analysis of traffic collision data on a regular basis to proactively implement safety features on our roadway. The study will be going before the commission to include their input. Transportation Planning and Mobility Manager Schmidt reminded the commissioners that the Sustainable Mobility Plan document will be released to the public on Nov. 4, and public feedback survey will be posted to the city website. Transportation Planning and Mobility Manager Schmidt updated the commission on the MMLOS ad-hoc committee that will hold their first meeting sometime in November. TRAFFIC AND MOBILITY COMMISSION COMMENTS: Commissioner Wanamaker expressed his concerns about the line of sight distance around the curves and plant overgrowth along Jefferson Street between Marron Road and Las Flores Drive very unsafe situation cutting down the view plan and site plan for motorists sharing the road with bikes and with no shoulders. City Traffic Engineer Kim acknowledges receiving the information and staff will return with a plan of action. Transportation Director Frank encouraged the commission to send over their recommendations for roadway safety at any time in the meetings, by email, in the Carlsbad Connects app. Transportation Director Frank will provide a link to the T&MC for the new Carlsbad Connects app. May 6, 2024 Item #1 Page 39 of 48 Page 5 of 5 Public Works Transportation 1635 Faraday Avenue  Carlsbad, CA 92008  760-434-2730 t ADJOURNMENT: Chair Gocan adjourned the Traffic and Mobility Commission Meeting on Nov. 2, 2020, at 5:17 p.m. ___________________________ Eliane Paiva, Minutes Clerk May 6, 2024 Item #1 Page 40 of 48 Page 1 of 8 Council Chambers 1200 Carlsbad Village Drive Carlsbad, CA 92008 Oct. 3, 2022, 4:00 p.m. CALL TO ORDER: 4:02 p.m. ROLL CALL: Perez, Linke, Penseyres, Fowler, Coelho and Proulx Absent: Newlands PLEDGE OF ALLEGIANCE: Chair Perez led the Pledge of Allegiance APPROVAL OF MINUTES: Minutes of the Special Meeting held Aug. 18, 2022. Motion by Vice-Chair Linke, seconded by Commissioner Proulx to approve the minutes of Aug. 18, 2022, meeting as presented. Motion carried, 6/0/0/1 (Absent: Commissioner Newlands) Minutes of the Regular Meeting held Sept. 6, 2022. Motion by Vice-Chair Linke, seconded by Commissioner Proulx to approve the minutes of Aug. 18, 2022, meeting as amended. Motion carried, 6/0/0/1 (Absent: Commissioner Newlands) PUBLIC COMMENT: Tim Morgan spoke about the intersection of Tamarack Avenue and Valley Street and its Phase II of the Traffic Calming Study. There was a lack of engagement and community involvement, and the HAWK signal is putting our community / neighbors in a dangerous situation. Rod Hafeti spoke about speeding around Snug Harbor. The average speed limit noted during the study was over 40-mph in a 25-mph zone. He asked the Commission to consider traffic calming measures. Brian Connor spoke about being proactive and requiring that the residents park their cars in the garage. Residents continue to leave many vehicles on the street, and this causes safety issues for pedestrians. Other cities enforce this issue and charge a permit fee to park vehicles on the street. CONSENT CALENDAR: Motion by Commissioner Vice-Chair Linke, seconded by Commissioner Proulx to approve Consent Item Nos. 1 and 2. Motion carried: 6/0/0/1 (Absent: Newlands) 1.EL CAMINO REAL ROADWAY IMPROVEMENTS FROM SUNNY CREEK ROAD TO JACKSPAR DRIVE, CAPITAL IMPROVEMENT PROGRAM PROJECT NO. 6094 – The Traffic & Mobility Commission supported staff’s recommendation to approve the plans and specifications of the intersection improvements at El Camino Real from Sunny Creek Road to Jackspar Drive, Capital Improvement Program, or CIP, Project No. 6094. Exhibit 4 May 6, 2024 Item #1 Page 41 of 48 Page 2 of 8 Vice-Chair Linke inquired about the exception language on Item 1. Associate Engineer Miles responded that the exception is the second paragraph background for green paint in the bike lane conflicts. We will be working with traffic to add green paint in the bike lane conflict areas. 2.EL CAMINO REAL ROADWAY IMPROVEMENTS FROM POINSETTIA LANE TO CAMINO VIDA ROBLE, CAPITAL IMPROVEMENT PROJECT NO. 6072 – The Traffic & Mobility Commission supported staff’s recommendation to approve the plans and specifications of the intersection improvements at El Camino Real from Poinsettia Lane to Camino Vida Roble, Capital Improvement Program, or CIP, Project No. 6072. DEPARTMENTAL REPORTS: 3.POLICE REPORT REGARDING TRAFFIC & MOBILITY-RELATED MATTERS DURING THE MONTH OF SEPTEMBER 2022 – Receive a presentation from a representative of the City of Carlsbad’s Police Department that provide an overview of traffic and mobility-related police matters during the month of August 2022. (Staff Contact: Acting Sergeant George Zavala, Police Department) Staff’s Recommendation: Receive a presentation Acting Sergeant Zavala presented the report and reviewed a PowerPoint presentation (on file in the Office of the City Clerk) Commissioner Coelho asked how the Police Department collect the community concerns and how do they aggregate them so that they make the list shown in the presentation. Acting Sergeant Zavala responded that they receive emails and phone calls from the community with the mentioned concerns. Vice-Chair Linke inquired about the multiple bicycle fatalities that happened in the month of August and if the police department could share the information. Acting Sergeant Zavala replied that one of the bicycle fatalities was caused by reckless driving. The investigations on both fatalities are still ongoing and have potential criminal processing and filing. 4.APPROVE PLUM TREE ROAD AS AN EXCEPTION INTO PHASE II OF THE CARLSBAD RESIDENTIAL TRAFFIC MANAGEMENT PROGRAM AND ALL-WAY STOP ANALYSIS AT THREE INTERSECTIONS – 1) Approve Plum Tree Road as an exception to the Phase II of the Carlsbad Residential Traffic Management program. 2) Support staff’s recommendation to not install all-way stop on Plum Tree Road at Red Knot Street, Robinea Drive and Windflower Drive. (Staff Contact: Lindy Pham and Miriam Jim, Public Works) Staff’s Recommendation: Receive a presentation Associate Engineer Pham and Senior Engineer Jim presented the report and reviewed a PowerPoint presentation (on file in the Office of the City Clerk) May 6, 2024 Item #1 Page 42 of 48 Page 3 of 8 Commissioner Coelho asked staff to elaborate on what it means to be in the Carlsbad Residential Traffic Management Program. What is the path we are on if we know that we are not installing all-way stops? Associate Engineer Pham responded that the process is the following: during the neighborhood meetings, staff will present traffic calming strategies and other options that residents can consider such as speed cushions or a traffic circle. Staff will receive comments and then go back and finalize the conceptual plan and send out a survey to all the residents in the project area. The results of the survey will determine whether we move forward with the project or not. Commissioner Proulx clarified that staff will go back and review other options for the area, and she inquired what is currently staff recommendation. Associate Engineer Pham responded that staff is recommending that the commission grants approval of the exception into phase two of the Carlsbad Traffic Management Program. The critical speed is below the 32-mph threshold, so they are not currently eligible for any traffic calming measures. Commissioner Fowler asked if speed cushions are the only option left. Associate Engineer Pham said that speed cushions would be the most effective option in this area. Vice-Chair Linke said that he supports the recommendation to approve the exception and added that speed cushions are self-enforcing, and this approach should be used on all of the residential streets that have speeding issues. Chair Perez inquired about what speed cushion is compared to a speed bump. Associate Engineer Pham responded that speed bumps are often found in commercial parking areas as they are narrower and more abrupt. Speed cushions are more gradual. They are about 12 feet wide and span the length of the roadway bed. Commissioner Coelho commented that this is an opportunity to look beyond Plum Tree Road to get the change that we want at Poinsettia Park to enhance the conditions. Maybe add alternate entrances to the park, or striping on Paseo Del Norte. Commissioner Penseyres commented that when we use the critical speed of 32-mph this still means that 15 percent of the people are driving faster than that. If residents are asking for solutions, then we need to look way beyond the 32-mph threshold. Speeding is the most common cause of serious injuries and fatalities on these residential streets. Commissioner Proulx inquired about the distance between the two stop signs on Plum Tree Road. Associate Engineer Pham responded that there is an intersection between the two stop signs and we don’t have the distance noted in the presentation. Residents have complained that vehicles do not always stop at these stop signs. We will work with the residents to find a solution once they are accepted into the CRTMP. May 6, 2024 Item #1 Page 43 of 48 Page 4 of 8 Motion by Commissioner Coelho, seconded by Commissioner Proulx to approve staff recommendations for items 1 and 2. Motion carried: 6/0/0/1 (Absent: Newlands) 5.PRESENTATION ABOUT COMPLETE STREETS IN CARLSBAD AND ACTIONS TAKEN SINCE THE AUG. 23, 2022, PROCLAMATION OF A LOCAL TRAFFIC SAFETY EMERGENCY - Receive a presentation about complete streets in Carlsbad and actions taken since the Aug. 23, 2022, proclamation of a local traffic safety emergency. (Staff Contact: Tom Frank, Public Works) Staff’s Recommendation: Receive a presentation Transportation Director Frank presented the report and reviewed a PowerPoint presentation (on file in the Office of the City Clerk) Chair Perez asked staff to go over the process of what will happen at the meeting being held on Oct. 27, 2022. Transportation Director Frank said that the meeting on Oct. 27, will be a commissioners meeting. There are 44 options on attachment A for consideration. We will be looking for your recommendations for City Council. Chair Perez inquired if they ask questions about the 44 options presented. Transportation Director Frank says that yes, the commission can ask questions on the options. Commissioner Coelho asked how this will overlay with City Council’s meetings and their timeline? Transportation Director Frank responded that City Council directed staff to get the public input as well as the Planning Commission and the Traffic & Mobility Commission. On Nov. 8, 2022, staff will present the recommendations received from the Planning Commission, the Traffic & Mobility Commission and from the public to the City Council. Commissioner Coelho asked if the intent is to review all 44 items and provide a recommendation or to provide a recommendation on all 44 items? Transportation Director Frank responded that it is to review the options and provide recommendations to the City Council. Commissioner Proulx asked about education, engineering and enforcement, the three E’s. Assuming that relates to the comments which show changing laws, controlling speed and more enforcement. It looks like change laws is not part of the three E’s. Did this come out of the community input? Transportation Director Frank said that was part of the communications input effort which was used to tailor the approach for the three E’s. Commissioner Proulx asked how staff will accommodate the change laws suggestion. Transportation Director Frank said that will be covered under the enforcement efforts. May 6, 2024 Item #1 Page 44 of 48 Page 5 of 8 Commissioner Penseyres inquired about Assembly Bill 43 if it is already in effect. Transportation Director Frank said that he does not have this information about Assembly Bill 43 which provides cities more flexibility to set their speed limits on their residential roadways. Cities would not have to comply with the 85-percentile rule. We are reviewing what a work plan would look like to review the speed limits throughout the city. Commissioner Penseyres inquired if staff are monitoring driver behavior before and after to see how they are responding to the green paint? Transportation Director Frank said that he does not believe staff have gone out to do an evaluation of traffic operations since we have put down the recent green markings. It is something that we will be looking at in the future. Commissioner Penseyres said that one of the projects was to consider rumble strips. The rumble strips would be installed where there are buffered bike lanes. The rumble strips would be on the inner stripe of the buffer. Is that correct? How did you decide to make it the inner stripe versus the outer stripe? Transportation Director Frank said this is correct and would be for higher speed roadways. It is something that could be considered and would be brought in front of the public for discussion. We would reach out to the bicycle clubs for input as well. The rumble strip would be inside of the outer bike lane stripe. It is the bike lane stripe on the inside closest to the vehicle. The intent is to notify the driver if they are weaving over the initial bike lane line. It also provides more room for the bicyclists to ride side by side if they choose to. Vice-Chair Linke asked about whether the staff plans to present any aspect of this plan to City Council again before the meeting on Nov. 8, 2022. Transportation Director Frank said that staff is required as part of the emergency proclamation to go back to City Council every 60 days. They will be going back to City Council on Oct. 18, 2022, and he is sure there will be some mention of the actions taken as part of the Safer Streets Together Program. City Council has already acted on Option A which is moving forward. City Council will be considering options in addition to Option A on Nov. 8, 2022. Vice-Chair Linke asked about one of the aspects of Option A which is vision zero commitment. Can staff present to us what that commitment actually entails at the next meeting. As an example, on the vision zero website it says the absolute core strategy focuses in on speeds. The goal is for all non-arterial streets to have a speed limit of 20-mph. On arterial streets the absolute limit should be 30 to 35-mph. It is a step too far to say that all arterial streets should have a speed limit of 30 to 35-mph. In the absence of making that the speed limit on arterial streets it is to have protected bike lanes with physical barriers and automated speed enforcement. What is the goal for our arterial streets as far as the speed limit, the installation of protected bike lanes and the installation of the automated speed enforcement? Deputy City Manager Gomez responded that at the City Council meeting they discussed Vision Zero. The intent is for staff to return with a draft resolution supporting the Vision Zero concept and then City Council will task and direct staff to come back with an action plan on how we are going to move forward. It is in concept at this point and there won’t be any additional information by the Oct. 27, meeting. City Council May 6, 2024 Item #1 Page 45 of 48 Page 6 of 8 has indicated that they want staff to move forward with Vision Zero and staff will look at that and will be asking for assistance on developing the plan. Vice-Chair Linke asked if the Traffic and Mobility Commission will have a chance to review the resolution on Oct. 27, special meeting before it goes before City Council. Transportation Director Frank responded that there is no time schedule given for staff to return to address the Vision Zero resolution. The local agency gets to tailor their own Vision Zero program and therefore changing speed limits on Palomar Airport Road and El Camino Real down to 35-mph would be a serious consideration. He does not see the community getting behind that change. Staff will look at what makes sense for City of Carlsbad. Deputy City Manager Gomez said that on the special meeting on Oct. 27, the Traffic and Mobility Commission will have the ability to weigh in on what they would like to see for the City of Carlsbad. Commissioner Coelho asked if each segment of road will be evaluated individually for Vision Zero and hopes that we are not just going to blanket the entire city with one speed limit. Commissioner Proulx said that she also viewed the website and understands that Vision Zero are strategies that we can implement within the city and not specific ideas that we have to implement. We can do what works within our community. Are we looking to hire a consultant to write this plan? Vice-Chair Linke asked if Option C could be considered without the $44 Million school bussing program? In his opinion, speed cushions and access plans would be more effective than crosswalks. Deputy City Manager Gomez said the questions should be deferred until the special meeting. CITY TRAFFIC ENGINEER COMMENTS: Transportation Planning and Mobility Manager Schmidt said last week he sent out an email outlining the process for the Commissioners to agendize an item. There are three opportunities for bike training this month. On Oct. 4, there is a Smart Cycling Class being held virtually from 6:00 pm – 9:00 pm. You can register through the San Diego County Bike Coalition. On Oct. 15, there is Smart City Cycling and that is in the city of Encinitas. This is an abbreviated course from 9:00 a.m. to 12:00 pm. On Oct. 18, there is a bicycle friendly driver course virtually from 12:00 pm – 1:00 pm. On Oct. 25, is the Annual Boards and Commissioners Event and he encourages everyone to attend to celebrate their hard work. TRAFFIC AND MOBILITY COMMISSION COMMENTS: Commissioner Penseyres said they had a Smart Cycling class for the City of Carlsbad Police Department this past week. The intent is for these police officers to go on and take a league certified seminar so they can become instructors and teach others. Vice-Chair Linke brought up the public comment on Valley Street and Tamarack Avenue and inquired if staff has an update. There was a promise that staff would evaluate how it is working. Are there any May 6, 2024 Item #1 Page 46 of 48 Page 7 of 8 metrics that will be used to evaluate how well it is working? Transportation Director Frank said that staff has committed to a three-phase approach to addressing traffic concerns at the intersection of Tamarack Avenue and Valley Street. You heard about Phase A which we are moving forward with. We have a public meeting scheduled for next week to assess the speeding between Skyline Drive and Adams Street. The second phase is addressing the traffic signal and intersection improvements that are nearly complete. What staff committed to was returning to the Traffic and Mobility Commission within six months of completion of those improvements. We will be analyzing what will be included in that study which will be both quantitative and qualitative. We will review what operations have taken place. The third phase is what we consider our transformative project on Tamarack Avenue and that is following our Sustainable Mobility Plan. That is not going to be worked on until the next fiscal year due to staff’s workload. There will be plenty of public outreach opportunities. We have been addressing some construction related issues tied to the improvements and are working with our existing contractor and staff to alleviate some of these concerns. Vice-Chair Linke brought up the other public comment about speeding in Snug Harbor. Is there an update on this issue? Transportation Director Frank said staff will follow-up on that. Vice-Chair Linke inquired if there is an update on the Multi-Modal Level of Service since the last meeting of the Ad-Hoc Committee meeting on Aug. 3, 2022. Transportation Planning and Mobility Manager Schmidt replied that the consultant is updating the tool and performing the field work analysis. Once completed they will have another ad-hoc committee meeting to present the results and consequently bring to the Traffic and Mobility Commission. Commissioner Penseyres asked to see the results in advance to have time to look at what is being done and provide feedback. He said something good to come out of the City Council meeting last week is that they want to give the Traffic and Mobility Commission about a month to review all the documents. Do we know how soon before the meeting that we will have the information in front of us? Transportation Planning and Mobility Manager Schmidt said that he can commit to provide the ad-hoc Committee a sufficient amount of time to review the results. Vice-Chair Linke wants to remind everyone about the Communication Plan. It says when City Staff plans to bring forward an item related to the Work Plan for action to the Planning Commission or the City Council, staff will seek an advisory recommendation from the Commission beforehand. He says the plan they were presented today falls under the Traffic and Mobility Commissions duties and we should be reviewing it and in contact with some of the City Council members. Staff then decided to bring it to the Traffic and Mobility Commission as an information only item but not for feedback. The City Council has since voted to have us review it. He is frustrated as when he first joined the Traffic and Mobility Commission three years ago they were being bypassed on the most significant issues. He feels we are reverting back to that and that there are a lot of issues that we have been bypassed on. Staff has gone directly to City Council with items that are on our Work Plan. We need to get back to the point where our Commission is reviewing these items. May 6, 2024 Item #1 Page 47 of 48 Page 8 of 8 Chair Perez commented on the pedestrian bridge between Cannon Road and El Camino Real that is operational, and it is beautiful. Lastly, schools are working on sustainability. For Hope Elementary, is there something we can do about idle parking? Is there something we can do to bring attention to this issue? Can we provide information on this or on greenhouse gas? Transportation Director Frank said that staff are working with Hope Elementary to develop their safe routes to school and access plan. Please let us know of any specific people you are talking with that we can reach out to about the idle parking. ADJOURNMENT: Chair Perez adjourned the Traffic & Mobility Commission Special Meeting on Oct. 3, 2022, at 6:30 p.m. ___________________________ Eliane Paiva, Minutes Clerk May 6, 2024 Item #1 Page 48 of 48