Loading...
HomeMy WebLinkAboutPRE 2024-0008; 2892 JEFFERSON; Admin Decision LetterMarch 27, 2024 Amy Melden Five Coastal Gem Properties, LLC 158 CAvenue Coronado, CA 92118 City of Carlsbad APR 2 7 2024 Planning Division SUBJECT: PRE 2024-0008 (DEV2024-00017} -2892 JEFFERSON APN 203-202-07-00 Dear Amy Melden, Ccityof Carlsbad Thank you for submitting a preliminary review application for a mixed-use residential project proposed at 2892 Jefferson Street, assessor's parcel number (APN) 203-202-07-00, in the Village Center (VC) District of the Village & Barrio Master Plan (VBMP). The project site, an approximately 7,053-square-foot (0.16 acre) lot, is currently developed with a medical office building. Vehicular access to the site is currently provided off Grand Avenue. The preliminary review exhibit(s) propose: • The demolition of an existing medical office building. • Development of a new three-story mixed-use building containing two (2) commercial tenant spaces (1,396 sq. ft.), four (4) three-story apartments, and a parking garage with eight (8) parking spaces on the ground floor. • The proposed apartments range in size from 2,416 sq. ft. to 3,122 sq. ft. In response to your application, the Planning Division has prepared this comment letter. Please note that the purpose of a preliminary review is to provide you with direction and comments on the overall concept of your project. This preliminary review does not represent an In-depth analysis of your project. It is intended to give you feedback on critical issues based upon the information provided in your submittal. This review is based upon the plans. policies. and standards in effect as of the date of this review. Please be aware that at the time of a formal application submittal. new plans. policies, and standards may be in effect and additional issues of concern may be raised through a more specific and detailed review. Planning: General 1. General Plan and zoning designations for the property are as follows: a. General Plan: Village-Barrio (V-B). b. Zoning: Village-Barrio (V-B). Community Development Department Planning Division I 1635 Faraday Avenue Carlsbad, CA 92008-7314 I 442-339-2600 www.carlsbadca.gov PRE 2024-0008 (DEV2024-0017)-2892 JEFFERSON March 27, 2024 Pa e 2 c. Master Plan: Village & Barrio Master Plan (VBMP), Village Center (VC) District 2. The project requires the following permits: a. Site Development Plan (SDP), required for New Construction of buildings over 5,000-square- feet in size. (VBMP, Section 6.3.3.B) The City council will be the decision-making authority on the SDP pursuant to the VBMP, Section 6.3.4(C)(3). 3. The Housing Crisis Act of 2019 (SB 330) established a preliminary streamline application process for housing projects. It is not mandatory unless applicants seek the vesting and processing benefits offered under SB 330. Participation in the SB 330 streamline process would occur first, followed by the formal development application process required under Government Code (Gov. Code)§§ 65940, 65941, 65941.S, and Carlsbad Municipal Code (CMC) § 21.42.050. Acceptance by the city of a complete SB 330 Streamline Application (Form P-32) and fee will vest the project for 180 days in accordance with the ordinances, policies and standards in effect at the time the SB 330 Application is accepted. 4. New requirements related to the city's goals to reduce greenhouse gas (GHG) emissions will likely impact development requirements of this project. A formal application submittal will need to include a completed Climate Action Plan Checklist (Form P-30) to determine what requirements will apply to the project. New GHG reduction requirements are related to energy efficiency, photovoltaic, electric vehicle charging, water heating and traffic demand management requirements, as set forth in the California Green Building Standards Code and in Carlsbad Municipal Code Chapters 18.21, 18.30 and 18.51 which is available on the city's website at the following address: http://www.gcode.us/codes/carlsbad/view.php?topic=18&frames=on To the extent that new GHG reduction requirements are in effect at the time of application for grading or building permits, the project will be required to comply with the effective requirements even if different than what is proposed in the project's planning approvals. GHG reduction requirements may impact, but are not limited to, site design and local building code requirements. If incorporating new GHG reduction requirements results in substantial modifications to the project after planning approvals are obtained, then prior to issuance of grading or building permits, the applicant may be required to submit and receive approval of a Consistency Determination or an Amendment application for the project through the Planning Division. 5. Technical Studies/Exhibits. A formal submittal of this project shall include the following technical studies/exhibits: a. Noise Study. Please submit a noise study with a formal application prepared in accordance with the requirements outlined in the City of Carlsbad's General Plan Noise Element and Noise Guidelines Manual. The City's General Plan Noise Element may be found online at: PRE 2024-0008 (DEV2024-0017) -2892 JEFFERSON March 27, 2024 Pa e 3 https:llwww.carlsbadca.gov/home/showpublisheddocument/3426/637434861102600000 The City's Noise Guidelines Manual may be found online at: https:ljwww.carlsbadca.gov/home/showpublisheddocument/238/637425974092370000 b. Historical. Cultural and Paleontological (3 separate reports). The development of the proposed project will require demolition and excavation in an area of the city known to have a high sensitivity as it relates to (1) architectural history, (2) archeological resources, and (3) paleontological resources. Please direct your consultant to the city's Tribal, Cultural and Paleontological Resources Guidelines. Please note that any archeological pedestrian survey of the site for the cultural resources study shall also include a Native American monitor during the survey. The city's Tribal, Cultural and Paleontological Resources Guidelines may be found on the city's website at: https://www.carlsbadca.gov/home/showpublisheddocument/254/637425976516870000 c. Air Quality Analysis. The Air Quality Analysis is needed for the CEQA In-fill Exemption to demonstrate that the project would not have any significant effects related to air quality. 6. Development Project Public Involvement Policy (Form P-21): The project is subject to Part A-Notice of Project Application Process which applies to all applications that require Planning Commission or City Council approval. The Development Project Public Involvement Policy (Form P-21) can be found on the city's website at: https://www.carlsbadca.gov/home/showpublisheddocument/452/637843403622900000 7. Landscaping. Prior to a formal submittal of the project, conceptual landscape exhibits shall be prepared in accordance with the General Requirements listed in Section 3 of the City of Carlsbad Landscape Manual. All relevant information pertaining to the landscaping requirements and physical barriers such as walls or fences must be plotted, labeled, dimensioned with the material detailed within the exhibits. The Landscape Manual may be obtained at the Planning Division front counter or found online at: https://www .ca rlsbadca .gov /home/showdocument?id= 7032 8. lnclusionary Housing. The project is subject to the City's lnclusionary Housing Ordinance, CMC Chapter 21.85. Please see the informational bulletin (1B-157) linked below. https://www.carlsbadca.gov/home/showpublisheddocument/9634/637897580094270000 9. Proposed Land Use. A mixed-use building containing residential and retail/commercial is permitted within the VC District per the VBMP, Table 2-1. For an exhaustive list of uses permitted, conditionally permitted, and/or prohibited in the VC District, please consult Table 2-1 beginning on page 2-6 of the VBMP. For an exhaustive list of expressly prohibited uses, please see Table 2-1 on page 2-8. PRE 2024-0008 (DEV2024-0017) -2892 JEFFERSON March 27, 2024 Pa e4 The frontages along both Jefferson Street and Grand Avenue are in the Use Restrictions Area as shown in Figure 2-2 on page 2-9 of the VBMP. Residential is not permitted on the ground floor street frontage. Please refer to the permitted uses Table 2-1 and Chapter 2.7.1(1) Ground Floor Street Frontage Uses for restrictions and uses that are allowed on the ground floor street frontage. 10. This project is subject to the Chapter 2.6 Area-Wide Standards of the VBMP beginning on page 2-12. The project does not appear to meet the following standard. a. Chapter 2.6.l(A) Ingress and Egress. A clear zone shall be provided at the intersection of a street and an alley or driveway to maintain a free line of sight. The clear zone shall consist of an isosceles right triangle measured 7.5 feet in both directions from the intersection of the property line and the ends of the driveway approach. The clear zone shall not be occupied by a ground floor building footprint, site features taller than 36-inches, or landscaping that is taller than 30-inches. As currently proposed, the design does not provide a clear zone and will need to be revised. 11. This project is subject to the Chapter 2.7.1-Village Center (VC) Supplemental District Standards of the VBMP beginning on page 2-36. The project does not appear to meet the following standards. a. Chapter 2.7.l(F) Service and Delivery Areas. For the formal submittal, clearly identify where the service and loading area(s) will be on the site plan. b. Chapter 2.7.l(H) Building Massing. Maximum wall plane and roofline: No building facade visible from any public street shall extend more than 40-feet in length without a 5-foot minimum variation in the wall plane, as well as a change in roofline. The 3rd level floor appears to have a fa!;ade that extends more than 40-feet in length without a 5-foot minimum variation in the wall plane along Grand Avenue. Please revise the 3rd level floor plan to meet the building massing standard. c. Chapter 2.7.1(1) Ground Floor Street Frontage Uses. New ground floor street frontage uses permitted within the boundaries of the Use Restriction Area identified on Figure 2-2 shall occupy more than one-half of the habitable space developed on the ground floor and shall span at least 80 percent of the building frontage. With the formal application submittal, provide calculations on the site plan showing how these standards are met. Up to 20 percent of a building frontage may be used for a lobby or entryway to uses above or behind ground floor street frontage uses. With the formal application submittal, provide a calculation on the site plan showing how this standard is met. The portions of Unit A on the Jefferson Street ground floor street frontage and Unit D on the Grand Avenue ground floor street frontage appear to include usable space that is not part of a lobby or entryway. This is not allowed in the Use Restriction Area. Please refer to Table 2-1, Permitted Uses, for uses that are allowed on the ground floor street frontage in the Use Restrictions Area. PRE 2024-0008 (DEV2024-0017) -2892 JEFFERSON March 27, 2024 Pa es 12. No architecture was included with this preliminary review submittal; therefore, no comments regarding architectural design and zoning conformance is being provided. Please be aware that this project is subject to the City's recently adopted Village & Barrio Objective Design Standards. Please find additional information about the Village & Barrio Objective Design Standards below. https://www.carlsbadca.gov/departments/community-development/planning/village-barrio- objective-design-standards 13. Parking. a. Please dimension the length of spaces 1, 3, and 5 to confirm they are 20-feet in length. b. Spaces 7 and 8 do not meet the minimum 8-foot width requirement for compact parking spaces in CMC 21.44.0S0(A). c. A minimum 5-foot turning bump-out located at the end of the parking stall series is required per CMC 21.44.060(A)(3). The plans show only a 3-foot bump-out is provided. Please revise the design to provide a 5-foot bump-out. d. Provide a cross section through parking space 2 and the staircase above it to demonstrate that the staircase is not impeding on the parking space. All necessary application forms, submittal requirements, and fee information are available at the Planning counter located in the Faraday Building at 1635 Faraday Avenue or online at https://www.carlsbadca.gov/departments/community-development/planning. You may also access the General Plan Land Use Element and the Zoning Ordinance online at the website address shown. Please review all information carefully before submitting. Land Development Engineering: 1. Please contact Nick Gorman in the Traffic Division at Nick.Gorman@carlsbadca.gov, a division of the Public Works Department, to determine if a Scoping Agreement is required. Scoping Agreements are used to determine if a Local Mobility Analysis is required and the scope of analysis. Submit either an approved Scoping Agreement or correspondence from the Traffic Division indicating one is not required. Provide ADT and peak hour trips per generation rates from SAN DAG Brief Guide of Vehicular Traffic Generation Rates for the San Diego Region on the site plan/tentative map. 2. If a Local Mobility Analysis is required, refer to the Transportation Impact Analysis Guidelines at https://www.carlsbadca.gov/home/showpublisheddocument/328/637425982502330000. a. Depending on the CEQA determination, which is determined after the application for discretionary permits is submitted, a Vehicle Miles Traveled (VMT) analysis may be required per the Vehicles Miles Traveled Analysis Guidelines available at https:llwww.carlsbadca.gov/home/showdocument?id=312. Be aware that the project site is PRE 2024-0008 (DEV2024-0017) -2892 JEFFERSON March 27, 2024 Pa e 6 within½ mile of the Carlsbad Village Coaster Station for purposes of determining, through a screening analysis, if an in-depth analysis is required. b. A Transportation Demand Management (TOM) plan may be required depending on the number of employee vehicle trips the project will generate from the retail portion of the project. Calculate the gross employee ADT using the generation rates from Table 2-2 of the TOM Handbook linked below. Show calculations on the Climate Action Plan checklist, Form P- 30. If applicable, submit a TOM plan with your application for discretionary permits. https:ljwww.carlsbadca.gov/home/showpublisheddocument/310/637425981338370000 3. Please complete a Stormwater Standards Questionnaire Form E-34. This questionnaire will guide you and the city in determining what type of reports and storm water mitigation must be completed to satisfy state and City storm water quality requirements. The questionnaire is located on the City of Carlsbad website. 4. Based on a preliminary analysis it appears that this project may be a Standards Requirement Project since the redevelopment project is on an existing site that appears to be under 10,000 square feet of impervious area (question 2 in Step 3 of E-34 form). However, if you wish to ever allow a restaurant in the commercial space then the project will likely be defined as a priority development project (PDP) (question 3 in Step 3 of E-34 form). If defined as a Standards Requirement Project, complete the Standard Project Requirement Checklist, Form E-36, and show all source and site design BMPs on the conceptual grading and drainage plans. Otherwise, as a PDP project, submit a preliminary SWQMP with your applications for discretionary permits. Please include pre and post development impervious areas to support conclusions. 5. Based on this project's general land use V-B (Village-Barrio), this project is subject to the City of Carlsbad trash capture requirements. Please incorporate trash capture measures on the project plans. Prepare a preliminary trash capture storm water quality management plan, form E-35A (if standard project) or incorporate into storm water quality management plan, form E-35 (if PDP)]. 6. Please provide a Preliminary Title Report (current within the last six (6) months). 7. Please annotate and delineate all existing easements and encumbrances listed in the Preliminary Title Report on the site plan. If any vacations or quitclaims are planned with this development annotate on the site plan. 8. Per Carlsbad Municipal Code 15.16.060, this project will require a grading permit and grading plan. 9. A separate improvement plan for work within the right-of-way is required for this project. Public improvements will include a new driveway approach, new utility connections to service the commercial units separate from the residential, any upsizing of public water mains as required by CMWD and wider sidewalk on both street frontages. The sidewalk fronting Grand Avenue shall be replaced with a 10-foot wide sidewalk clear of any obstructions (light poles, tree wells, etc.) and be PRE 2024-0008 (DEV2024-0017) -2892 JEFFERSON March 27, 2024 Pa e7 non-contiguous with the curb. The sidewalk fronting Jefferson Street shall be replaced with a new 6- foot wide sidewalk. 10. This project shall utilize City of Carlsbad Survey Control Network established on Record of Survey Map 17271, NAD83, Zone VI, 1991.35 Epoch for horizontal control and NGVD 29 datum for vertical control per City of Carlsbad Engineering Standards. 11. Please delineate and annotate the limits of grading. Include remedial grading quantities on the plan. 12. Please delineate and annotate approximate topographic contours for existing and proposed condition. Provide 1-foot contours for slopes less than 5%; 2' intervals for slopes between 5% and 10%, and 5' intervals for slopes over 10%. Extend contours a minimum 25 feet beyond the project boundary. 13. On the site plan, please show and identify all existing surface improvements screened back (curb, gutter, sidewalk, paving, manholes, inlets, street lights, adjacent driveways, vaults, transformers, etc.) at the project site, project frontage and within 25 feet of the boundary. 14. Please indicate the earthwork quantities (cut, fill, import, export, remedial) proposed for the project in cubic yards. 15. Please provide spot elevations at the corners of each pad in the proposed condition. Include finish pad and floor elevations. 16. Please provide the method of draining each lot. Unless otherwise specified by a geotechnical engineer, method of drainage shall comply with California Building Code (latest version) section 1804.4. 17. Please delineate location of all existing and proposed buildings, walls, fences and permanent structures onsite and within 25 feet of the site. 18. The trees along the Jefferson St. and Grand Ave. frontage are included in the city's street tree inventory. Please indicate on the site plan whether each street tree is proposed to remain or to be removed. Proposed removal of street trees will require approval per Section 11.12.090 of the Carlsbad Municipal Code. Coordinate with the Parks & Recreation Department for additional information. 19. Please show existing lot line bearing. 20. Please clarify if this project is a condominium project or an apartment under one ownership. If condominium, the property will need to be divided into condominium units via a tentative subdivision map followed by a parcel map (4 units or less) or final map (5 units or more). Determine if you wish to only divide the commercial from the residential units (two-unit condominium) or if each residential and commercial unit will be designated as separate condominium units. Add on the tentative tract PRE 2024-0008 (DEV2024-0017) -2892 JEFFERSON March 27, 2024 Pa e 8 map a note to clarify, such as "This is a tentative tract map of a condominium project defined by Section 1350 of the Civil Code of the State of California. The project contains a maximum of 4 airspace residential condominium units and 2 commercial retail condominium units." 21. Please show location and dimensions of all accessways and pathways as required for compliance with Title 24-State Accessibility Requirements. 22. Please provide typical street cross sections for existing frontage streets and proposed streets. Provide existing right-of-way width and existing improvements and proposed improvements and dedications. 23. Please delineate and annotate all proposed driveways and driveway widths. Clarify if the 20-foot wide driveway shown is the existing driveway or a new driveway. If the existing driveway is to be removed and is not aligned with the proposed driveway, indicate that the driveway is to be replaced with curb, gutter, and sidewalk. Assess the available street parking along the property frontage pre and post development. 24. Please show all existing utilities and callout size for: water, sewer, storm drain, underground dry utilities, overhead lines, traffic signals, street lights in Jefferson Street and Grand Avenue, and laterals affecting the property. 25. All transformers and electrical facilities solely serving this project site shall be located on site and outside of the public right-of-way. 26. Please show trash enclosure doors facing the garage rather than the street so that bins will be rolled out through the garage and then driveway. 27. Please design pedestrian doors so that they do not swing into the public right-of-way. 28. Since an undersized 6-inch ACP watermain pipe (current standards require minimum 8: PVC) is provided for service in Grand Avenue, please check with CMWD to determine if a Water Study will be required for the new development based on City of Carlsbad Potable Water Master Plan 2019, Section 4.2 Design Criteria. 29. Public potable water and sewer mains along project frontages must meet minimum design diameter and material as specified in City of Carlsbad Engineering Standards Vol. 2 Section 3.2.2 for water and Volume 1 Section 6.2 for sewer. Utility replacement and/or upsizing may be required as a condition of development. 30. Please locate fire service, backflows, potable and recycled water services, meters, landscape irrigation services, and sewer laterals for the new development in compliance with City of Carlsbad Engineering Standards requirements. 31. If the project is planning to connect a storm drain to the sanitary sewer for emergency and incidental PRE 2024-0008 (DEV2024-0017)-2892 JEFFERSON March 27, 2024 Pa e9 flows in the covered parking garage, the developer shall apply for a provisional source control permit with Encinas Wastewater District. 32. Please meet with the Fire Department to identify the necessary fire protection measures required for this project (access, fire hydrants, sprinkler system, on-site circulation, emergency access, etc.). 33. Please plot stopping sight distance at all driveways and corner sight distance at all street intersections. 34. Please dedicate, for public street and utility purposes, an easement with a 20-foot radius at the southwesterly corner of the property. 35. Please provide a separate demolition plan. Include on-site and public street trees on this plan and specify species and trunk diameter and whether trees are to remain or be removed. 36. Please address the comments on the attached redlined plan. 37. Please be advised that a more in-depth review of the proposed development will occur with the discretionary permit application when a more complete design of the project is provided. Fire Department: 1. Fire access is okay. Any overhead utility lines shall be undergrounded to allow for aerial access for firefighting operations. Full NFPA 13 fire sprinklers required due to presence of mixed-use garage/residential development. Building Division: 1. Although the project is within the ½-mile radius pert AB 2097, the project is still required to comply with ADA and EV parking requirements. Please design and dimension parking spaces for that purpose which may require the removal of some of the other parking stalls. 2. The electric vehicle charging station (EVCS) will need to be van accessible. EV charging equipment must comply with technical requirements for ADA and Architectural Barriers Act (ABA) accessibility standards regarding floor and ground surfaces, clear floor or ground space, reach ranges, operable parts, accessible routes, and other provisions where applicable. Public Works Utilities: 1. Submit a water study for the project that includes domestic meter and fire sizing criteria, as well as modeling of public distribution system in response to on-site water demands per the CMWD 2019 Potable Water Master Plan and applicable NFPA fire flow requirements. 2. Submit a sewer study analyzing existing and proposed demands for the public sewer main. PRE 2024-0008 (DEV2024-0017}-2892 JEFFERSON March 27, 2024 Pa e 10 3. Proposed Ground floor layout shall preserve suitable locations and space for all required utility connections, meters, and backflow devices in conformance with current Engineering Standards. Identify locations and detail fire service, water, irrigation, and sewer connections at property line for the new development in compliance with 2022 Carlsbad Engineering Design Standards requirements. 4. Public potable water mains along project frontages must meet minimum design diameter and material as specified in City of Carlsbad Engineering Standard Vol. 2 Section 3.2.2. Utility replacement and/or upsizing may be required as a condition of development. Transportation Planning & Mobility: 1. Please submit a Scoping Agreement per the latest City of Carlsbad Transportation Impact Analysis Guidelines. The scoping agreement is provided in Appendix A of the TIA guidelines. If you would like to schedule a meeting to discuss this letter with the commenting departments, please contact Edward Valenzuela at the number below. You may also contact each department individually as follows: • Planning Division: Edward Valenzuela, Associate Planner, at (442} 339-2624 • Land Development Engineering: David Rick, Project Engineer, at (442) 339-2744 • Fire Department: Randy Metz, Fire Inspections, at (442) 339-2661 • Building Division: Mike Strong, Assistant Director of Community Development, at (442) 339-2788 • Public Works Utilities: Zac Taylor, Assistant Engineer, at (442) 339-2329 • Transportation: Nick Gorman, Associate Engineer, at (442) 339-2793 Sincerely, CLIFF JONES Principal Planner CJ:EV:CF Enclosures: 1. LOE Redlines c: David Rick, Project Engineer Fire Prevention Laserfiche/File Copy Data Entry