HomeMy WebLinkAbout2515 PALOMAR AIRPORT RD; ; CBC2023-0030; PermitBuilding Permit Finaled
(city of
Carlsbad
Commercial Permit
Print Date: 05/22/2024
Job Address: 2515 PALOMAR AIRPORT RD, CARLSBAD, CA 92011-1510
Permit Type: BLDG-Commercial Work Class: Cogen
Parcel#: 2130201800 Track#:
Valuation: $475,200.00 Lot#:
Occupancy Group: Project#:
#of Dwelling Units: Plan#:
Bedrooms: Construction Type:
Bathrooms: Orig. Plan Check#:
Occupant Load: Plan Check#:
Code Edition:
Sprinkled:
Project Title:
Description: LOWES: 641.52 KW ROOF MOUNT PV SYSTEM, 1,188 MODS (E-REVIEW)
Applicant:
TAMBRA NANCE
7201 BAKER BLVD, # C
RICHLAND HILLS, TX 76118-5864
FEE
BUILDING INSPECTION FEE
BUILDING PLAN CHECK FEE (manual)
SB1473 -GREEN BUILDING STATE STANDARDS FEE
SOLAR-COMMERCIAL: per kW
STRONG MOTION -COMMERCIAL (SMIP)
Total Fees: $3,618.06 Total Payments To Date: $3,618.06
Permit No:
Status:
CBC2023-0030
Closed -Finaled
Applied: 02/02/2023
Issued: 03/30/2023
Finaled Close Out: 05/22/2024
Final Inspection: 11/13/2023
INSPECTOR: Renfro, Chris
Contractor:
DISTRIBUTED SOLAR OPERATIONS LLC
200 HARBORSIDE DR, # 200
SCHENECTADY, NY 12305-1020
(518) 918-6342
Balance Due:
AMOUNT
$604.00
$240.00
$20.00
$2,621.00
$133.06
$0.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
Building Division Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov
( City of
Carlsbad
Job Address 2515 PALOMAR AIRPORT RD
COMMERCIAL
BUILDING PERMIT
APPLICATION
B-2
Plan Check ________ _
Est. Value
PC Deposit
Date
Suite:. _____ APN: ___________ _
Tenant Name #:. _________________ Lot #:. ____ Year Built: _________ _
Year Built: __ _ Occupancy: __ _ Construction Type: __ _ Fire sprinklersQi'ESQ No A/C:Q YEsQ No
BRIEF DESCRIPTION OF WORK: Installation of roof mounted commercial solar panels
D Addition/New: ____________ New SF and Use, __________ New SF and Use
_______ SF Deck, _______ SF Patio Cover, SF Other (Specify) ___ _
OTenant Improvement: _____ SF,
_____ SF,
Existing Use: _______ Proposed Use: ______ _
Existing Use: Proposed Use: ______ _
□ Pool/Spa: _____ SF Additional Gas or Electrical Features? -------------
l ✓I Solar:641 .52 KW, 1188 Modules, Mounted: O Roof O Ground
D Reroof: _____________________________________ _
D Plumbing/Mechanical/Electrical
Oother: _____________________________ _
APPLICANT {PRIMARY CONTACT)
Name: Tambra Nance
Address: 200 Harborside Dr suite 200
City· Schenectady State:_N_Y __ Zip: 12305
Phone: 817-778-9195
Email: tambran@pstitan.com
PROPERTY OWNER
Name: Lowes --------------------Address: 2515 PALOMAR AIRPORT RD
City: Carlsbad State:_C_A __ Zip: ____ _
Phone: ___________________ _
Email: ___________________ _
DESIGN PROFESSIONAL CONTRACTOR OF RECORD
Name· DSD Construction Business Name: DSD Construction
Address: Address: 200 Harborside Dr suite 200
City· State: ___ .Zip: _____ City: Schenectady State:_N_Y __ Zip: 12305
Phone: Phone: ___________________ _
Email: Email: ___________________ _
Architect State License: CSLB License #:_1_05_5_6_17 _____ Class:._c_1_0 _____ _
Carlsbad Business License # (Required): _______ _
APPLICANT CERTIFICATION: I certify that I have read the application and state that theaboveinformation is correct and that the
information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building
construction.
NAME (PRINT): Tambra Nance SIGN: / a,J,nb-uz, A/~ DATE: 1/30/23 -----------
1635 Faraday Ave Carlsbad, CA 92008 Ph: 442-339-2719 Fax: 760-602-8558 Email: Building@carlsbadca.gov
REV. 07/21
THIS PAGE REQUIRED AT PERMIT ISSUANCE PLAN CHECK NUMBER: ______ _
A BUILDING PERMIT CAN BE ISSUED TO EITHER A STATE LICENSED CONTRACTOR OR A PROPERTY OWNER. IF THE PERSON
SIGNING THIS FORM IS AN AGENT FOR EITHER ENTITY AN AUTHORIZATION FORM OR LETTER IS REQUIRED PRIOR TO
PERMIT ISSUANCE.
{OPTION A): LICENSED CONTRACTOR DECLARATION:
lherebyaffirmunderpenaltyofperjurythatlamlicensedunderprovisionsofChapter9(commencingwithSection7000)ofDivision3
of the Business and Professions Code, and my license is in full force and effect. I also affirm under penalty of perjury one of the
following declarations {CHOOSE ONE):
D 1 have and will maintain a certificate of consent to self-insure for workers' compensation provided by Section 3700 of the Labor Code, for the performance of the
work which this permit is issued. Policy No. _______________________________________ _
-OR-l~Jli have and will maintain worker's compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.
My workers' compensation insurance carrier and policy number are: Insurance Company Name: _____________________ _
Policy No. ___________________________ Expiration Date: _______________ _
-OR-
D lcertificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become
subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage is unlawful and shall subject an employer to
criminal penalties and civil fines up to $100,000.00, in addition the to the cost of compensation, damages as provided for in Section 3706 of the Labor Code,
interest and attorney's fees.
CONSTRUCTION LENDING AGENCY, IF ANY:
I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code).
Lender's Name: ____________________ Lender's Address: ____________________ _
CONTRACTOR CERT/FICA TION: I certify that I have read the application and state that the above information is correct and that
the information on the plans is accurate./ agree to comply with all City ordinances and State laws relating to building
construction.
NAME (PRINT): Tambra Nance SIGNATURE: /~-uz,A/~ DATE: 1/30/23 ---------Note: If the person signing above is an authorized agent for the contractor provide a letter of authorization on contractor letterhead.
-OR -
{OPTION B): OWNER-BUILDER DECLARATION:
I hereby affirm that I am exempt from Contractor's License Law for the following reason: D I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec.
7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such
work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold
within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
-OR-
D1, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed
pursuant to the Contractor's License Law).
-OR-□I am exempt under Business and Professions Code Division 3, Chapter 9, Article 3 for this reason:
AND, D FORM B-61 "Owner Builder Acknowledgement and Verification Form" is required for any permit issued to a property owner.
By my signature below I acknowledge that, except for my personal residence in which I must have resided for at least one year prior to completion of the
improvements covered by this permit, I cannot legally sell a structure that I have built as an owner-builder if it has not been constructed in its entirety by licensed
contractors./ understand that a copy of the applicable law, Section 7044 of the Business and Professions Code, is available upon request when this application is
submitted orat the following Web site: http:llwww.leginfo.ca.gov/calaw.html.
OWNER CERTIFICATION: I certify that I have read the application and state that the above information is correct and that the
information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building
construction.
NAME (PRINT): SIGN: __________ DATE: ______ _
Note: If the person signing above is an authorized agent for the property owner include form B-62 signed by property owner.
1635 Faraday Ave Carlsbad, CA 92008 Ph: 442-339-2719 Fax: 760-602-8558 Email: Building@carlsbadca.gov
2 REV. 07/21
PERMIT INSPECTION HISTORY for (CBC2023-0030)
Permit Type: BLDG-Commercial Application Date: 02/02/2023 Owner: SUDBERRY PROPERTIES
Work Class: Cogen Issue Date:
Status: Closed -Finaled Expiration Date:
IVR Number:
Scheduled Actual Inspection Type Inspection No.
Date Start Date
Monday, November 13, 2023
Checklist Item
BLDG-Building Deficiency
BLDG-Structural Final
BLDG-Electrical Final
COMMENTS
03/30/2023 Subdivision: RANCHO AGUA HEDIONDA POR
OF
05/06/2024 Address: 2515 PALOMAR AIRPORT RD
46376 CARLSBAD, CA 92011-1510
Inspection Primary Inspector Reinspection Inspection
Status
Passed
Yes
Yes
Yes
Page 2 of 2
Building Permit Inspection History Finaled
{city of
Carlsbad
PERMIT INSPECTION HISTORY for (CBC2023-0030)
Permit Type: BLDG-Commercial
Work Class: Cogen
Application Date: 02/02/2023 Owner: SUDBERRY PROPERTIES
Issue Date: 03/30/2023 Subdivision: RANCHO AGUA HEDIONDA POR
Status:
Scheduled
Date
08/23/2023
11/06/2023
11/13/2023
OF
Closed -Finaled Expiration Date: 05/06/2024
IVR Number: 46376
Address: 2515 PALOMAR AIRPORT RD
CARLSBAD, CA 92011-1510
Actual Inspection Type
Start Date
08/23/2023 BLDG-34 Rough
Electrical
Checklist Item
Inspection No.
221847-2023
COMMENTS
Inspection
Status
Primary Inspector
Partial Pass Chris Renfro
BLDG-Building Deficiency Partial pass on rough electrical on rooftop
equipment, inverters, conduit, and racking
ballast for solar equipment. AC disconnect
and final connection at main electrical
switchgear pending.
BLDG-35 Solar Panel
Checklist Item
221639-2023
COMMENTS
Partial Pass Chris Renfro
BLDG-Building Deficiency Partial pass on rough electrical on rooftop
equipment, inverters, conduit, and racking
ballast for solar equipment. AC disconnect
and final connection at main electrical
switchgear pending.
BLDG-Final Inspection
Checklist Item
221641-2023
COMMENTS
Partial Pass Chris Renfro
BLDG-Building Deficiency Not ready. Partial pass on rough electrical
on rooftop equipment, inverters, conduit,
and racking ballast for solar equipment. AC
disconnect and final connection at main
electrical switchgear pending.
BLDG-Structural Final
BLDG-Electrical Final
11/06/2023 BLDG-34 Rough
Electrical
Checklist Item
229326-2023 Passed Chris Renfro
COMMENTS
BLDG-Building Deficiency OT inspection of SDG&E shut down for line
side tap completed on evening of
BLDG-35 Solar Panel
Checklist Item
11/3/2023
230204-2023
COMMENTS
Scheduled Chris Renfro
BLDG-Building Deficiency Partial pass on rough electrical on rooftop
equipment, inverters, conduit, and racking
ballast for solar equipment. AC disconnect
and final connection at main electrical
switchgear pending.
BLDG-Final Inspection 230205-2023 Passed Chris Renfro
Reinspection Inspection
Reinspection Incomplete
Passed
Yes
Reinspection Incomplete
Passed
Yes
Reinspection Incomplete
Passed
No
No
No
Passed
Yes
Passed
Yes
Complete
Incomplete
Complete
Monday, November 13, 2023 Page 1 of 2