Loading...
HomeMy WebLinkAbout2515 PALOMAR AIRPORT RD; ; CBC2023-0030; PermitBuilding Permit Finaled (city of Carlsbad Commercial Permit Print Date: 05/22/2024 Job Address: 2515 PALOMAR AIRPORT RD, CARLSBAD, CA 92011-1510 Permit Type: BLDG-Commercial Work Class: Cogen Parcel#: 2130201800 Track#: Valuation: $475,200.00 Lot#: Occupancy Group: Project#: #of Dwelling Units: Plan#: Bedrooms: Construction Type: Bathrooms: Orig. Plan Check#: Occupant Load: Plan Check#: Code Edition: Sprinkled: Project Title: Description: LOWES: 641.52 KW ROOF MOUNT PV SYSTEM, 1,188 MODS (E-REVIEW) Applicant: TAMBRA NANCE 7201 BAKER BLVD, # C RICHLAND HILLS, TX 76118-5864 FEE BUILDING INSPECTION FEE BUILDING PLAN CHECK FEE (manual) SB1473 -GREEN BUILDING STATE STANDARDS FEE SOLAR-COMMERCIAL: per kW STRONG MOTION -COMMERCIAL (SMIP) Total Fees: $3,618.06 Total Payments To Date: $3,618.06 Permit No: Status: CBC2023-0030 Closed -Finaled Applied: 02/02/2023 Issued: 03/30/2023 Finaled Close Out: 05/22/2024 Final Inspection: 11/13/2023 INSPECTOR: Renfro, Chris Contractor: DISTRIBUTED SOLAR OPERATIONS LLC 200 HARBORSIDE DR, # 200 SCHENECTADY, NY 12305-1020 (518) 918-6342 Balance Due: AMOUNT $604.00 $240.00 $20.00 $2,621.00 $133.06 $0.00 Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherwise expired. Building Division Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov ( City of Carlsbad Job Address 2515 PALOMAR AIRPORT RD COMMERCIAL BUILDING PERMIT APPLICATION B-2 Plan Check ________ _ Est. Value PC Deposit Date Suite:. _____ APN: ___________ _ Tenant Name #:. _________________ Lot #:. ____ Year Built: _________ _ Year Built: __ _ Occupancy: __ _ Construction Type: __ _ Fire sprinklersQi'ESQ No A/C:Q YEsQ No BRIEF DESCRIPTION OF WORK: Installation of roof mounted commercial solar panels D Addition/New: ____________ New SF and Use, __________ New SF and Use _______ SF Deck, _______ SF Patio Cover, SF Other (Specify) ___ _ OTenant Improvement: _____ SF, _____ SF, Existing Use: _______ Proposed Use: ______ _ Existing Use: Proposed Use: ______ _ □ Pool/Spa: _____ SF Additional Gas or Electrical Features? ------------- l ✓I Solar:641 .52 KW, 1188 Modules, Mounted: O Roof O Ground D Reroof: _____________________________________ _ D Plumbing/Mechanical/Electrical Oother: _____________________________ _ APPLICANT {PRIMARY CONTACT) Name: Tambra Nance Address: 200 Harborside Dr suite 200 City· Schenectady State:_N_Y __ Zip: 12305 Phone: 817-778-9195 Email: tambran@pstitan.com PROPERTY OWNER Name: Lowes --------------------Address: 2515 PALOMAR AIRPORT RD City: Carlsbad State:_C_A __ Zip: ____ _ Phone: ___________________ _ Email: ___________________ _ DESIGN PROFESSIONAL CONTRACTOR OF RECORD Name· DSD Construction Business Name: DSD Construction Address: Address: 200 Harborside Dr suite 200 City· State: ___ .Zip: _____ City: Schenectady State:_N_Y __ Zip: 12305 Phone: Phone: ___________________ _ Email: Email: ___________________ _ Architect State License: CSLB License #:_1_05_5_6_17 _____ Class:._c_1_0 _____ _ Carlsbad Business License # (Required): _______ _ APPLICANT CERTIFICATION: I certify that I have read the application and state that theaboveinformation is correct and that the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction. NAME (PRINT): Tambra Nance SIGN: / a,J,nb-uz, A/~ DATE: 1/30/23 ----------- 1635 Faraday Ave Carlsbad, CA 92008 Ph: 442-339-2719 Fax: 760-602-8558 Email: Building@carlsbadca.gov REV. 07/21 THIS PAGE REQUIRED AT PERMIT ISSUANCE PLAN CHECK NUMBER: ______ _ A BUILDING PERMIT CAN BE ISSUED TO EITHER A STATE LICENSED CONTRACTOR OR A PROPERTY OWNER. IF THE PERSON SIGNING THIS FORM IS AN AGENT FOR EITHER ENTITY AN AUTHORIZATION FORM OR LETTER IS REQUIRED PRIOR TO PERMIT ISSUANCE. {OPTION A): LICENSED CONTRACTOR DECLARATION: lherebyaffirmunderpenaltyofperjurythatlamlicensedunderprovisionsofChapter9(commencingwithSection7000)ofDivision3 of the Business and Professions Code, and my license is in full force and effect. I also affirm under penalty of perjury one of the following declarations {CHOOSE ONE): D 1 have and will maintain a certificate of consent to self-insure for workers' compensation provided by Section 3700 of the Labor Code, for the performance of the work which this permit is issued. Policy No. _______________________________________ _ -OR-l~Jli have and will maintain worker's compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Insurance Company Name: _____________________ _ Policy No. ___________________________ Expiration Date: _______________ _ -OR- D lcertificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage is unlawful and shall subject an employer to criminal penalties and civil fines up to $100,000.00, in addition the to the cost of compensation, damages as provided for in Section 3706 of the Labor Code, interest and attorney's fees. CONSTRUCTION LENDING AGENCY, IF ANY: I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code). Lender's Name: ____________________ Lender's Address: ____________________ _ CONTRACTOR CERT/FICA TION: I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate./ agree to comply with all City ordinances and State laws relating to building construction. NAME (PRINT): Tambra Nance SIGNATURE: /~-uz,A/~ DATE: 1/30/23 ---------Note: If the person signing above is an authorized agent for the contractor provide a letter of authorization on contractor letterhead. -OR - {OPTION B): OWNER-BUILDER DECLARATION: I hereby affirm that I am exempt from Contractor's License Law for the following reason: D I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). -OR- D1, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). -OR-□I am exempt under Business and Professions Code Division 3, Chapter 9, Article 3 for this reason: AND, D FORM B-61 "Owner Builder Acknowledgement and Verification Form" is required for any permit issued to a property owner. By my signature below I acknowledge that, except for my personal residence in which I must have resided for at least one year prior to completion of the improvements covered by this permit, I cannot legally sell a structure that I have built as an owner-builder if it has not been constructed in its entirety by licensed contractors./ understand that a copy of the applicable law, Section 7044 of the Business and Professions Code, is available upon request when this application is submitted orat the following Web site: http:llwww.leginfo.ca.gov/calaw.html. OWNER CERTIFICATION: I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction. NAME (PRINT): SIGN: __________ DATE: ______ _ Note: If the person signing above is an authorized agent for the property owner include form B-62 signed by property owner. 1635 Faraday Ave Carlsbad, CA 92008 Ph: 442-339-2719 Fax: 760-602-8558 Email: Building@carlsbadca.gov 2 REV. 07/21 PERMIT INSPECTION HISTORY for (CBC2023-0030) Permit Type: BLDG-Commercial Application Date: 02/02/2023 Owner: SUDBERRY PROPERTIES Work Class: Cogen Issue Date: Status: Closed -Finaled Expiration Date: IVR Number: Scheduled Actual Inspection Type Inspection No. Date Start Date Monday, November 13, 2023 Checklist Item BLDG-Building Deficiency BLDG-Structural Final BLDG-Electrical Final COMMENTS 03/30/2023 Subdivision: RANCHO AGUA HEDIONDA POR OF 05/06/2024 Address: 2515 PALOMAR AIRPORT RD 46376 CARLSBAD, CA 92011-1510 Inspection Primary Inspector Reinspection Inspection Status Passed Yes Yes Yes Page 2 of 2 Building Permit Inspection History Finaled {city of Carlsbad PERMIT INSPECTION HISTORY for (CBC2023-0030) Permit Type: BLDG-Commercial Work Class: Cogen Application Date: 02/02/2023 Owner: SUDBERRY PROPERTIES Issue Date: 03/30/2023 Subdivision: RANCHO AGUA HEDIONDA POR Status: Scheduled Date 08/23/2023 11/06/2023 11/13/2023 OF Closed -Finaled Expiration Date: 05/06/2024 IVR Number: 46376 Address: 2515 PALOMAR AIRPORT RD CARLSBAD, CA 92011-1510 Actual Inspection Type Start Date 08/23/2023 BLDG-34 Rough Electrical Checklist Item Inspection No. 221847-2023 COMMENTS Inspection Status Primary Inspector Partial Pass Chris Renfro BLDG-Building Deficiency Partial pass on rough electrical on rooftop equipment, inverters, conduit, and racking ballast for solar equipment. AC disconnect and final connection at main electrical switchgear pending. BLDG-35 Solar Panel Checklist Item 221639-2023 COMMENTS Partial Pass Chris Renfro BLDG-Building Deficiency Partial pass on rough electrical on rooftop equipment, inverters, conduit, and racking ballast for solar equipment. AC disconnect and final connection at main electrical switchgear pending. BLDG-Final Inspection Checklist Item 221641-2023 COMMENTS Partial Pass Chris Renfro BLDG-Building Deficiency Not ready. Partial pass on rough electrical on rooftop equipment, inverters, conduit, and racking ballast for solar equipment. AC disconnect and final connection at main electrical switchgear pending. BLDG-Structural Final BLDG-Electrical Final 11/06/2023 BLDG-34 Rough Electrical Checklist Item 229326-2023 Passed Chris Renfro COMMENTS BLDG-Building Deficiency OT inspection of SDG&E shut down for line side tap completed on evening of BLDG-35 Solar Panel Checklist Item 11/3/2023 230204-2023 COMMENTS Scheduled Chris Renfro BLDG-Building Deficiency Partial pass on rough electrical on rooftop equipment, inverters, conduit, and racking ballast for solar equipment. AC disconnect and final connection at main electrical switchgear pending. BLDG-Final Inspection 230205-2023 Passed Chris Renfro Reinspection Inspection Reinspection Incomplete Passed Yes Reinspection Incomplete Passed Yes Reinspection Incomplete Passed No No No Passed Yes Passed Yes Complete Incomplete Complete Monday, November 13, 2023 Page 1 of 2