HomeMy WebLinkAboutPRE 2024-0023; MOTEL 6 EV CHARGERS; Admin Decision LetterCity of Carlsbad
JUN O 5 2024
Planning Division
June 5, 2024
Farid Hamidy
8977 Activity Road, STE 200
San Diego, CA 92126
SUBJECT: PRE 2024-0023 (DEV2024-0046) -MOTEL 6 EV CHARGERS
APN: 205-191-09-00
Ccityof
Carlsbad
Thank you for submitting a preliminary review to construct a parking lot with 22 paved spaces two steel
carport structures with roof mount photovoltaic (PV) systems and 10 electric vehicle (EV) charging stations
at 3666 Pio Pico Drive. The project site, an approximately 1-acre lot, is currently developed with a 39-
guestroom, two story-motel and a 39-space parking lot. The project proposes to add a new driveway
approach on Magnolia Drive to access the proposed parking lot. The motel is currently considered legal
non-conforming due to parking. Pursuant to CMC 21.44.020 Table A, parking for a hotel/motel is required
at 1.2 spaces per unit. The 39-room motel requires 47 spaces. Including the proposed 22-space parking
lot, there will be a total of 61 spaces. Therefore, the proposed parking lot would allow the motel to exceed
the required number of parking spaces and the motel would no longer be considered legal nonconforming
due to parking.
In response to your application, the Planning Division has prepared this comment letter. Please note that
the purpose of a preliminary review is to provide you with direction and comments on the overall concept
of your project. This preliminary review does not represent an f n-depth analysis of your prolect. It Is
Intended to give you feedback on critical issues based upon the information provided In your submittal.
This review is based upon the plans, policies, and standards In effect as of the date of this review. Please
be aware that at the time of a formal application submittal, new plans, policies. and standards may be
in effect and additional issues of concern may be raised through a more specific and detailed review.
Planning:
General
1. General Plan and zoning designations for the property are as follows:
a. General Plan: Visitor Commercial (VC)
b. Zoning: Commercial Tourist (C-T)
c. Commercial/Visitor-Serving Overlay Zone: The project site is located within the
Commercial/Visitor Serving Overlay Zone pursuant to CMC 21.208. However, pursuant to CMC
21.208.040, uses which are authorized as permitted uses in the underlying zone are not subject
Community Development Department
Planning Division I 1635 Faraday Avenue I Carlsbad, CA 92008-7314 I 442-339-2600
PRE 2024-0023 {DEV2024-0046} -MOTEL 6 EV CHARGERS
June 5, 2024
Page 2
to the provisions of CMC Chapter 21.208, and shall be subject to the development standards
and entitlement process required by the underlying zone. Hotel/Motel uses are a permitted
use in the C-T zone. Therefore, the project is not subject to the Commercial/Visitor-Serving
Overlay zone entitlement process or development standards.
2. The project requires the following permits:
a. Grading Permit -A grading permit may be required depending on the amount of grading
proposed.
b. Landscape Permit -A landscape permit may be required depending on the amount of
landscaping proposed.
c. Building Permit
3. New requirements related to the city's goals to reduce greenhouse gas (GHG) emissions will likely
impact development requirements of this project. A formal application submittal will need to include
a completed Climate Action Plan Checklist (Form P-30) to determine what requirements will apply to
the project. New GHG reduction requirements are related to energy efficiency, photovoltaic, electric
vehicle charging, water heating and traffic demand management requirements, as set forth in the
california Green Building Standards Code and in Carlsbad Municipal Code Chapters 18.21, 18.30 and
18.51 which is available on the city's website at the following address:
http://www.gcode.us/codes/carlsbad/view.php?topic=18&frames=on
To the extentthatnew GHG reduction requirements are in effect at the time of application for grading
or building permits, the project will be required to comply with the effective requirements even If
different than what is proposed in the project's planning approvals. GHG reduction requirements may
impact, but are not limited to, site design and local building code requirements. If incorporating new
GHG reduction requirements results in substantial modifications to the project after planning
approvals are obtained, then prior to issuance of grading or building permits, the applicant may be
required to submit and receive approval of a Consistency Determination or an Amendment
application for the project through the Planning Division.
Plans
4. Provide a site plan showing all property lines. Please see Information Bulletin IB-201 for a list of
minimum requirements for site plans:
https://www.carlsbadca.gov/home/showpublisheddocument/10800/637945928288670000
5. Provide dimensions of the proposed parking spaces, driveway, and drive-aisle.
6. Clarify on the plans if an additional driveway is proposed on Pio Pico Drive. If an additional driveway
is proposed, please show the driveway apron ..
Community Development Department
Planning Division I 1635 Faraday Avenue I Carlsbad, CA 92008-7314 I 442-339-2600
PRE 2024-0023 (DEV2024-0046) -MOTEL 6 EV CHARGERS
June 5, 2024
Page3
7. Indicate the square footage of each shade structure and provide the overall height from existing or
proposed grade, whichever is lower, to the highest point of the structure.
8. Show the following setbacks on the plans:
Property Lines Abutting Residential Use -10'
Parking/PY Carports
9. The parking spaces and drive aisle must meet the requirements of CMC Chapter 21.44,including but
not limited to the following:
a. Parking spaces are required to be a minimum of 8.5-feet-wide by 20-feet-long. Please
dimension the parking spaces.
b. Indicate the angle of parking, dimension the drive aisle, and clarify if the drive aisle is
intended for one-way traffic or two-way traffic. 30-and 45-degree parking requires a 14-
foot-wide drive aisle for one-way traffic and a 24-foot-wide drive aisle for two-way traffic.,
while 60-degree parking requires an 18-foot-wide drive aisle for one-way traffic and a 24-
foot-wlde drive aisle for two-way traffic. Please note, additional width may be required
for vehicle/emergency vehicle maneuvering area.
c. At least 3% of the parking area shall be planted and maintained with trees listed on the
city's official street tree list, or approved shrubs. Said trees or shrubs shall be:
i. Contained in planting areas with a minimum dimension of 4 feet and bounded by
a concrete or masonry curb of a minimum of 6 inches in height;
ii. Located throughout the off-street parking areas in order to obtain the maximum
amount of dispersion.
d. Parking areas adjacent to streets shall be screened through the use of planting or any
combination of planting, mounding and decorative walls. Please refer to the city's
landscape Design Manual for additional information and revise the plans accordingly:
https:Uwww.carlsbadca.gov/home/showpublisheddocument/11160/637985942877070
000
e. All landscaped areas shall be served by a water irrigation system and be supplied with
bubblers or sprinklers. And all plans for such landscaped areas shall be approved by the
city planner prior to the construction and placement thereof.
f. Every parking area that is not separated by a fence from any street or alley property line
upon which it abuts, shall be provided with a suitable concrete curb or timber barrier not
less than 6 inches in height, and located not less than 2 feet from such street or alley
property lines, and such curb or barrier shall be securely installed and maintained;
provided no such curb or barrier shall be required across any driveway or entrance to
such parking area. Please show how the project complies with this requirement.
Community Development Department
Planning Division I 1635 Faraday Avenue I Carlsbad, CA 92008-7314 I 442-339-2600
PRE 2024-0023 (DEV2024-0046) -MOTEL 6 EV CHARGERS
June 5, 2024
Page4
g. Every parking area abutting property located in a residential zone shall be separated from
such property by a solid wan, view-obscuring fence or compact evergreen hedge 6 feet in
height measured from the grade of the finished surface of such parking lot closest to the
contiguous residentially zoned property; provided, that along the required front yard, the
fence, wall or hedge shall not exceed 42 inches in height. Please show how the project
complies wlth this requirement.
10. The proposed parking canopy must maintain a 10-foot setback from the interior property line
abutting the residence to the east. Please revise the project for compliance.
11. The proposed shade structure appears to be crossing the west property line into the right-of-way.
The shade structure cannot be in the right-of-way. Please revise the project for compliance.
12. A habitat-in-lieu fee to construct on the undeveloped portion of the lot will be required prior to
issuance of grading permit or building permit, whichever comes first. The fee will be calculated on a
per acre basis as Type F habitat (Disturbed Land). Please see the master fee schedule at the
following link for current fee amounts:
https://www.carlsbadca.gov/home/showpublisheddocument/14226/638506893877800000
All necessary application forms, submittal requirements, and fee information are available at the Planning
counter located in the Faraday Building at 1635 Faraday Avenue or online at
https:llwww.carlsbadca.gov/departrnents/community-development/planning. You may also access the
General Plan Land Use Element and the Zoning Ordinance online at the website address shown. Please
review all information carefully before submitting.
Land Development Engineering:
Land Development Engineering Division staff has completed a preliminary review of the above-referenced
project. Prior to formal application for the discretionary permit submittal the following items must be
adequately resolved/addressed, unless otherwise noted:
1. Complete a Stormwater Standards Questionnaire Form E-34. This questionnaire will guide you and
the city in determining what type of reports and storm water mitigation must be completed to satisfy
state and City storm water quality requirements. The questionnaire ls located on the City of Carlsbad
website.
2. Based on a preliminary analysis it appears that this project may be a Priority Development Project
(PDP). All impervious surfaces being created or replaced (onsite and offsite) shall be included for
treatment. Submit a Storm Water Quality Management Plan. Review the Hydromodification
Exemption Map and Potential Critical Coarse Sediment Yield Area Map on the City website to see if
this criterion applies to your project. The post construction stormwater treatment BMPs shall be
shown on a conceptual grading plan and drainage plan with the discretionary application.
3. Based on this project's general land use, VC, this project is subject to the City of Carlsbad trash capture
requirements. Incorporate trash capture measures on the project plans and include in the storm
water quality management plan, Form E-35.
Community Development Department
Planning Division I 1635 Faraday Avenue I Carlsbad, CA 92008-7314 I 442-339-2600
PRE 2024-0023 (DEV2024-0046) -MOTEL 6 EV CHARGERS
June 5, 2024
Page 5
4. Clearly show on the site plan the difference between the existing improvements (curbs, buildings,
utilities, pavement, fences, etc.) and the proposed improvements (curbs, pavement, striping, etc.).
5. Provide a preliminary grading and drainage plan (using an engineer scale: 1" =5', 1" =10', etc.). Include
all required BMP's required to comply with current storm water quality regulations.
6. Provide topographic contours for existing and proposed condition. Provide 1-foot contours for slopes
less than 5%; 2' intervals for slopes between 5% and 10%, and 5' intervals for slopes over 10%. Extend
contours a minimum 15 feet beyond the project boundary.
7. Provide dimensions of the drive aisle and parking spaces for the proposed parking lot. Clearly
delineate the direction of travel in the parking plot.
8. Plot the truck turning movements from the proposed parking lot/drive aisle into and out of the
existing parking lot/drive aisle. Plot the turning movements into and out of Pio Pico Drive and
Magnolia Drive. Plot turning radii per Caltrans figure 404.58 and/or 404.SF.
9. The proposed design does not appear to meet engineering standards for queuing distances and
turning movements into and out of Pio Pico Drive, the existing parking lot/drive aisle and the proposed
drive aisle and will not be supported. A complete review will be performed by the city's traffic and
engineering department after the turning movements and queuing are plotted on the site plan and
submitted as part of the discretionary permit.
10. Add curb return to provide for turning movements where the proposed drive aisle connects to the
existing parking lot, see attached redlines.
11. Re-locate the proposed driveway on Magnolia to avoid conflict with the existing curb inlet.
12. Re-locate the solar panels outside of the city right-of-way.
13. Add proposed sidewalk on Pio Pico Drive between the existing sidewalk and the existing ped ramp.
14. Provide a Preliminary Title Report (current within the last six (6) months).
15. Annotate and delineate all existing easements and encumbrances listed in the Preliminary Title Report
on the site plan.
16. A Preliminary Hydrology Study including map and calculations is required to demonstrate
capacity/sizing of proposed and existing storm drain infrastructure. Show 100-year storm hydrologic
calculations before and after development.
17. Per CMClS.16.060 this project may require a grading permit and grading plan.
18. A separate improvement plan for work within the right-of-way may be required for this project.
Community Development Department
Planning Division I 1635 Faraday Avenue I Carlsbad, CA 92008-7314 I 442-339-2600
PRE 2024-0023 (DEV2024-0046) -MOTEL 6 EV CHARGERS
June 5, 2024
Page 6
19. This project shall utilize City of Carlsbad Survey Control Network established on Record of Survey Map
17271, NAD83, Zone VI, 1991.35 Epoch for horizontal control and NGVD 29 datum for vertical control
per City Engineering Standards Volume 1, Chapter 2.
20. On the site plan, show and identify all existing surface improvements screened back (curb, gutter,
sidewalk, paving, manholes, inlets, street lights, adjacent driveways, vaults, transformers, buildings,
fences, etc.) at the project site, project frontage and within 15 feet of the boundary.
21. Indicate the earthwork quantities (cut, fill, import, export, remedial) proposed for the project in cubic
yards.
22. The trees along the Pio Pico Drive and Magnolia Drive frontage are included in the city's street tree
inventory. Indicate on the site plan that they are to remain or to be removed. Proposed removal of
street trees will require approval per Section 11.12.090 of the Carlsbad Municipal Code. Coordinate
with the parks and recreation department for additional information.
23. Show the bearings and distances for the entire lot line.
24. Provide typical street cross sections for existing frontage streets. Provide existing right-of-way width
and existing improvements and proposed improvements and dedications.
25. Applicant shall coordinate with the fire department to ensure width of driveway meets fire
department requirements.
26. Show all existing utilities and callout size for: water, sewer, storm drain, underground dry utilities,
overhead lines, power poles, guy wires, street lights and laterals affecting the property.
27. Provide multiple cross-sections of the site to demonstrate differences in grade from adjacent
properties, existing and proposed grades on-site, fences and location of structures on-site and on
adjacent properties.
28. Meet with the Fire Department to identify the necessary fire protection measures required for this
project (access, fire hydrants, sprinkler system, on-site circulation, emergency access, etc.)
29. Plot all columns supporting the solar panels on the preliminary grading plan for the parking lot.
30. Address the comments on the attached red lined plan.
31. Please be advised that a more in-depth review of the proposed development will occur with the
discretionary permit application when a more complete design of the project is provided.
Fire:
The Carlsbad Fire Department has reviewed the project and has no comments or concerns.
Building:
Community Development Department
Planning Division I 1635 Faraday Avenue I Carlsbad, CA 92008-7314 I 442-339-2600
PRE 2024-0023 (DEV2024-0046}-MOTEL 6 EV CHARGERS
June 5, 2024
Page7
The following will be required at building permit plan check review:
1. Structural review from True North.
2. Electrical/Transformer -Provide SDG&E connection plan/approval.
If you would like to schedule a meeting to discuss this letter with the commenting departments, please
contact Lauren Yzaguirre at the number below. You may also contact each department individually as
follows:
• Planning Division: Lauren Yzaguirre, Associate Planner, at {442) 339-2634
• Building Division: Shawn Huff, Building Official, at (442) 339-5338
• Land Development Engineering: Tim Carroll, Project Engineer, at (442) 339-2737
• Fire Department: Randy Metz, Fire Inspections, at (442) 339-2661
Sincerely,
ERIC LARDY, AICP
City Planner
EL:LY:cf
Attachments: LDE Redlined Plans
c: Shanup Patel, 3666 Pio Pico Drive, Carlsbad, CA 92008-2554
Tim Carroll, Project Engineer
Fire Prevention
Laserfiche/File Copy
Data Entry
Community Development Department
Planning Division I 1635 Faraday Avenue I Carlsbad, CA 92008-7314 I 442-339-2600