HomeMy WebLinkAboutCDP 14-07; PRYOR RESIDENCE; Basement Wall Verification; 2016-04-01S0\/\/ARDS AND ErlOV\/N ENGINEERllv·~. INC.------,
~ ~
April 1, 2016
City of Carlsbad
1635 Faraday Avenue
Carlsbad CA 92008
Re: Basement Wall Verification
5243 Shore Drive, Carlsbad, California
APN: 210-061-06
RECORD COPY
RECEIVED
APR O 6 2016
CITY OF CARLSBAD
PLANNING o\VIS\ON
We field surveyed the new residence under construction at the subject site on March 28, 2016
to determine the location of Grid Lines 2, 0.5, and the Building Stringline. We determined said
lines are in accordance with the stamped construction plans dated 7 /23/15 and revised 11/9/15.
In addition, the basement walls west of the building string line are in the original location per
the stamped set of plans.
Feel free to call if you have any questions after reviewing this letter.
Randy R. Brown
LS 5406
15013.ltr
2187 NEWCASTLE AVENUE• SUITE 103 • CARDIFF BY THE SEA, CA 92007
[760) 436·8500 • FAX [760) 436-8603