Loading...
HomeMy WebLinkAbout2024-06-18; Municipal Water District; Resolution 1741RESOLUTION NO. 1741 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE CARLSBAD MUNICIPAL WATER DISTRICT OF THE CITY OF CARLSBAD, CALIFORNIA, ADOPTING CHANGES TO THE MASTER FEE SCHEDULE WHEREAS, the Board of Directors of the Carlsbad Municipal Water District of the City of Carlsbad, California, has the authority to establish fees for district services; and WHEREAS, from time to time the fees are reviewed and evaluated to maintain an adequate fee structure recovering costs for district services; and WHEREAS, the Board of Directors ha s determined the cost of providing water services; and WHEREAS, the Board of Directors finds it necessary to recover the costs for water services; and WHEREAS, the Board of Directors has held the necessary public hearing and allowed for public comment on the establishment of the fees. NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Carlsbad Municipal Water Di strict of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the changes to the Master Fee Schedule as shown in Attachment A are adopted. 3. This resolution shall become effective on Sept. 1, 2024; not sooner than 60 days after adoption in accordance with California Government Code Section 66017 for water fees. PASSED, APPROVED AND ADOPTED at a Joint Special Meeting of the Board of Directors of the Carlsbad Municipal Water District, the City Council of the City of Carlsbad, the Board of Directors of the Carlsbad Public Financing Authority, the Community Development Commission, and the City Council as Successor Agency to the Carlsbad Redevelopment Agency held on the 18th day of June, 2024, by the following vote, to wit: AYES: NAYS: ABSTAIN: ABSENT: BLACKBURN, BHAT-PATEL, ACOSTA, BURKHOLDER, LUNA. NONE. NONE. NONE. SHERR (SEAL) Proposed Master Fee Schedule FY 2024-25 All Fees Within, except Trash Collection Rates and Park Land In- Lieu Fees, Effective Sept. 1, 2024 Trash Collection Rates and Park Land In-Lieu Fees Effective July 1, 2024 Attachment A June 18, 2024 Item #11 Page 231 of 625 C cityof Carlsbad Proposed Master Fee Schedule FY 2024-25 Contents Section 1 – General City Service Fees, Deposits, Rates, Penalties and Fines Miscellaneous Fees and Returned Checks ....................................................................................... 4 Deposits and Securities .................................................................................................................... 5 Special Events and Safety Training Center ....................................................................................... 6 Ambulance and Street Light Energizing ........................................................................................... 7 City Clerk Fees .................................................................................................................................. 8 Library Fees ...................................................................................................................................... 9 Fire (Fire Extinguishing and Alarm Systems) .................................................................................. 10 Fire (Development Applications, Plan Review, and Inspection) .................................................... 11 Fire (Fire and Life Safety Inspections and Fire Code Permits) .......................................................12 Police Department Fees ................................................................................................................. 14 Administrative and Vehicle, Traffic, and Parking Penalties ........................................................... 15 Trash Collection Rates .................................................................................................................... 16 Utility Account and Service Fees ....................................................................................................24 Utility Meter Installation and Connection .....................................................................................26 Utility (San Diego County Water Authority) ..................................................................................28 Section 2 – Development Related Fees Planning Department Fees ............................................................................................................30 Engineering Department Fees .......................................................................................................35 Building (New Construction, Additions and Major Remodels) ......................................................40 Building (Minor/Miscellaneous Residential & Commercial Improvements) .................................45 Building (Plumbing, Mechanical, and Electrical) ............................................................................49 Building (Simple Single or Combination Permits List) ....................................................................51 Section 3 – Development Impact Fees Bridge and Thoroughfare District 2 Map .......................................................................................53 Local Facilities Management Zones Map .......................................................................................54 Park Land In-Lieu Fees, Park Districts Map ....................................................................................55 Planned Local Drainage Fee Areas and Map ..................................................................................56 Sewer Benefit Area and Connection Fees Map .............................................................................58 Affordable Housing, Habitat Mitigation, and Traffic .....................................................................60 June 18, 2024 Item #11 Page 232 of 625 C cityof Carlsbad Section 1 General City Service Fees, Deposits, Rates, Penalties and Fines June 18, 2024 Item #11 Page 233 of 625 Fee Name Fee Type No t e s Fee/Deposit Miscellaneous Fees 1 Administrative Fee for 1915 Act Bond Call - 1% of principal being repaid (All Assessment Districts using 1915 Act Bonds)each [1]$50 min/$500 max 2 Business License - additional CA fee each [4],[6] $ 1.00 3 Business License - master list of active business licenses each [2]$ 39.00 4 Business License - monthly list of new licenses each [2]$ 7.00 5 Cable Channel Administration Fee per hour [3]$ 115.00 6 Electric Vehicle Charging Fee per kWh [1]$ 0.35 7 GIS - digital data delivery, production of new documents, reproduction of existing documents, and technical services per hour [1]Actual Cost 8 Hearing Disposition Services for Parking Citations - Personal Hearings each [1]Actual Cost 9 Hearing Disposition Services for Parking Citations - Written Review each [1]Actual Cost 10 City Publications each [1]Copy Charge 11 Community Facilities District Annexation - City Labor (Plus actual consultants costs)each [2]$ 1,920.00 12 Sign Collection and Pickup Fee (plus $5 fee per sign)each [1]$ 26.00 Returned Check Fee 13 First Returned Check each [5]$ 25.00 14 Each Additional Check each [5]$ 35.00 [Notes] [1] Set per City policy [2] Set per 2021 - Cost of Service Study and Fee Schedule Update. Indexed to West Region Urban CPI. [3] Set per 2021 - Cost of Service Study and Fee Schedule Update. [4] Set per CA Government Code 4467 [5] Set per CA Civil Code 1719 [6] Business license tax, set per Carlsbad Municipal Code 5.08.010, is separate from these fees. 4June 18, 2024 Item #11 Page 234 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit Deposits and Securities Grading and Erosion Control 15 Grading Security (with approved plans)deposit [1],[2] Based on Grading Cost Estimate 16 Grading Cash Deposit deposit [1],[2] Up to 10% of total grading security Development/Subdivision Improvements 17 Faithful Performance Security deposit [1],[2] Based on Improvement Cost Estimate 18 Labor and Materials Security deposit [1],[2] 50% of Faithful Performance Security 19 Monumentation Security deposit [1],[2] Based on Total Cost of Monumentation [Notes] [1] Set per City policy [2]Per CA Government Code 53079, 1% shall be deducted from any interest due. The city may require a security be provided to ensure work related to a project is completed in accordance with the Carlsbad Municipal Code and development agreements executed with the city. This information is to help understand the standard structure of how these deposits and securities are calculated. The security amounts are calculated using final city-approved cost estimates, not initial or draft estimates during plan check. 5June 18, 2024 Item #11 Page 235 of 625 Fee Name Fee Type No t e s Fee/Deposit Special Events Fees 20 Special Event Application - Minor - 2 or less intersections (fee + services rendered)each [1],[3]158.00$ 21 Special Event Application - Major - 3 or more intersections (fee + services rendered) each [1],[2]474.00$ 22 Special Event Application - Third party Vendor Fee per day [1],[2]106.00$ 23 Special Event City Services - Staff Time per hour [1] Actual Cost Safety Training Center Facility Fees 24 One Shooting Range full day [1]1,395.00$ 25 One Shooting Range 1/2 day [1]698.00$ 26 Two Shooting Ranges full day [1]1,567.00$ 27 Two Shooting Ranges 1/2 day [1]819.00$ 28 Classroom full day [1]662.00$ 29 Classroom 1/2 day [1]379.00$ 30 Confined Space Prop full day [1]733.00$ 31 Confined Space Prop 1/2 day [1]366.00$ 32 Grinder full day [1]525.00$ 33 Grinder 1/2 day [1]306.00$ 34 Grinder/Commercial Prop full day [1]759.00$ 35 Grinder/Commercial Prop 1/2 day [1]379.00$ 36 Grinder/Residential Prop full day [1]759.00$ 37 Grinder/Residential Prop 1/2 day [1]379.00$ 38 PriSim (Training Simulator)full day [1]552.00$ 39 PriSim (Training Simulator)1/2 day [1]276.00$ 40 Pump Draft Pit full day [1]442.00$ 41 Pump Draft Pit 1/2 day [1]221.00$ 42 Streetscape full day [1]185.00$ 43 Streetscape 1/2 day [1]135.00$ 44 Shooting Range - Hourly hourly [1]141.00$ [Notes] [1]Set per City policy [2] Carlsbad Municipal Code 8.17 defines and outlines Special Events which may require a permitting. [3] Fee charged as determined by staff Full details on how to apply for a Special Event Application can be referenced in the Special Event Reference Handbook available on the City of Carlsbad website. The below fees are listed for reference only and may not be representative of the entirety of a Special Event Application cost. A valid, unexpired City of Carlsbad Business License is required for all special event applicants. Carlsbad Municipal Code Section 8.17.070 CMC requires an applicant to pay a non-refundable fee to allow third party vendors to participate under the applicant’s business License. 6June 18, 2024 Item #11 Page 236 of 625 Fee Name Fee Type No t e s Fee/Deposit Ambulance Fees 45 Assessment/Non-Transport with medication given. No charge for assessment if no medication given and non-transport. per [1]472.00$ 46 Advanced Life Support 1 - plus Level I or Level II supplies and medications per [1]2,668.00$ 47 Advanced Life Support 2 - plus Level II supplies and medications per [1]2,668.00$ 48 Basic Life Support per [1]2,668.00$ 49 Mileage Charge mile [1]42.00$ 50 Oxygen Charge per [1]124.00$ Street Light Energizing Fees 51 40 watts each [2]88.00$ 52 45 watts each [2]96.00$ 53 70 watts each [2]133.00$ 54 85 watts each [2]156.00$ 55 100 watts each [2]179.00$ 56 120 watts each [2]209.00$ 57 150 watts each [2]254.00$ 58 200 watts each [2]330.00$ 59 250 watts each [2]405.00$ [Notes] [1] Set per City policy [2]Street Light Energizing Fees are the cost for energizing each street light for eighteen months, and include a $30.00 charge per light for connecting the light to an SDG&E service point. 7June 18, 2024 Item #11 Page 237 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit City Clerk Fees 60 Appeals to City Council each [2],[8]126.00$ 61 Candidate Filing Fee each [3]25.00$ 62 Notice of Intention to Circulate Initiative Petition each [4]200.00$ Subpoena Fees 63 Deposition Subpoena per day [5]275.00$ 64 Records Subpoena - research per hour [6]15.00$ Copy Fees 65 Copies & Printing - Black & White each [1]0.10$ 66 Copies & Printing - Color each [1]0.10$ 67 CD Copy each [1] Actual Cost 68 DVD Copy each [1] Actual Cost 69 USB Drive Copy each [1] Actual Cost FPPC Fees 70 Campaign Statements per page [7]0.10$ 71 Conflict of Interest Statement per page [7]0.10$ 72 Fees for services not listed will be determined on a case-by-case basis. It will be based on the fully burdened hourly rate and the time of service provided. per hour [2]137.00$ [Notes] [1] Set per City policy [2]Set per 2021 - Cost of Service Study and Fee Schedule Update. Indexed to West Region Urban CPI. [3] Set per City of Carlsbad Municipal Code 1.12.010 [4] Set per CA Elections Code 9202 [5] Set per CA Government Code 68096.1(b) [6] Set per CA Evidence Code 1563(b)(1) [7] Set per CA Government Code 81008 [8] Additional department processing fees may apply. 8June 18, 2024 Item #11 Page 238 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit Library Fees 73 Account Collection Fee per item [1]10.00$ 74 Hold Request Non-Pickup Fee per item [2]1.00$ 75 Borrowing - Audio/Visual Equipment, per item per day [1]5.00$ 76 Card Replacement per card [2]2.00$ 77 Carlsbad History Collection Photo Fee per request [1] Actual Cost 78 Interlibrary Loan per request [2]6.00$ 79 Lost/Damaged Item Processing fee per item [2]6.00$ 80 Lost/Damaged Item per item [1]List Price 81 Fees for services not listed will be determined on a case-by-case basis. It will be based on the fully burdened hourly rate and the time of service provided. per hour [2]12.00$ [Notes] [1] Set per City policy [2] Set per 2021 - Cost of Service Study and Fee Schedule Update 9June 18, 2024 Item #11 Page 239 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit Fire Extinguishing and Alarm Systems New Sprinkler System 82 ESFR Fire Sprinkler System (Initial System)each [2]1,117.00$ 83 Each Additional System each [2]309.00$ 84 Per Additional Inspection each [2]133.00$ 85 ESFR Fire Sprinkler System with In-Rack Sprinklers each [2]1,292.00$ 86 Each Additional System each [2]309.00$ 87 Per Additional Inspection each [2]133.00$ 88 Fire Pump (First Pump)each [2]1,028.00$ 89 Each Additional Pump each [2]352.00$ 90 NFPA 13 System < 100 Heads each [2]807.00$ 91 Per Additional Inspection each [2]133.00$ 92 Per Additional Plan Type each [2]176.00$ 93 NFPA 13 System > 100 Heads (Includes One Riser)each [2]1,117.00$ 94 Each Additional Riser each [2]309.00$ 95 Per Additional Inspection each [2]133.00$ 96 Per Additional Plan Type each [2]176.00$ 97 NFPA 13R System 3-16 units (Per Building)each [2]1,117.00$ 98 Per Additional Inspection (Per Building)each [2]176.00$ 99 Per Additional Plan Type each [2]176.00$ 100 NFPA 13D Single Family System (Plan Review Per Initial or Single Plan Type)each [2]320.00$ 101 Per Additional Plan Type each [2]176.00$ 102 NFPA 13D Single Family System (Inspection Per Building)each [2]162.00$ 103 Underground Piping with up to 4 Hydrants/Risers each [2]982.00$ 104 Underground Piping with 5 or more Hydrants/Risers each [2],[3]1,295.00$ Tenant Improvement Sprinkler System 105 NFPA 13 or 13R System 6 Heads or Less each [2]162.00$ 106 NFPA 13 or 13R System 7 - 100 heads each [2]718.00$ 107 Per Additional Inspection each [2]176.00$ 108 Per Additional Plan Type each [2]176.00$ 109 NFPA 13 or 13R System > 100 Heads each [2]850.00$ 110 Per Additional Inspection each [2]176.00$ 111 Per Additional Plan Type each [2]176.00$ Other Extinguishing Systems 112 Gas Systems (Med Gas, Industrial Gas, LPG)each [2]541.00$ 113 Hood & Duct Extinguishing System each [2]541.00$ 114 Each Additional System each [2]264.00$ 115 Pre-Action System with Alarm each [2]718.00$ 116 Refrigeration Systems < 500 lbs.each [2]939.00$ 117 Refrigeration Systems > 500 lbs.each [2]1,601.00$ 118 Special Equipment (Ovens, Dust, Battery)each [2]541.00$ 119 Special Extinguishing System each [2]762.00$ 120 Spray Booths each [2]541.00$ Alarm Systems 121 New Alarm System each [2]1,646.00$ 122 Per Additional Inspection each [2]176.00$ 123 Per Additional Plan Type each [2]176.00$ 124 Sprinkler Monitoring each [2]498.00$ 125 Per Additional Inspection each [2]176.00$ 126 Per Additional Plan Type each [2]176.00$ 10June 18, 2024 Item #11 Page 240 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit 127 Tenant Improvement Fire Alarm System each [2]807.00$ 128 Per Additional Inspection each [2]176.00$ 129 Per Additional Plan Type each [2]176.00$ Development Applications, Plan Review and Inspection Building Construction Plan (Architectural Review) 130 A-1 Occupancies - New each [2]1,545.00$ 131 A-1 Occupancies - Tenant Improvements each [2]1,182.00$ 132 A-2 & A-3 Occupancies - New each [2]1,060.00$ 133 A-2 & A-3 Occupancies - Tenant Improvements each [2]817.00$ 134 A-4 & A-5 Occupancies - New each [2]1,545.00$ 135 A-4 & A-5 Occupancies - Tenant Improvements each [2]1,182.00$ 136 E Occupancies - New each [2]1,545.00$ 137 E Occupancies - Tenant Improvements each [2]1,182.00$ 138 E Occupancies (Daycare Only) each [2]618.00$ 139 F Occupancies - New each [2]1,060.00$ 140 F Occupancies - Tenant Improvements each [2]817.00$ 141 H Occupancies (Not Including Chem Class) - New each [2]1,060.00$ 142 H Occupancies (Not Including Chem Class) - Tenant Improvements each [2]817.00$ 143 I Occupancies - New each [2]1,060.00$ 144 I Occupancies - Tenant Improvements each [2]817.00$ 145 L Occupancies - New each [2]618.00$ 146 L Occupancies - Tenant Improvements each [2]487.00$ 147 R-1 & R-2 Occupancies <50 Units New flat [2]1,545.00$ 148 R-1 & R-2 Occupancies ≥50 Units New flat [2]1,910.00$ 149 R-3 Townhomes New each [2]1,060.00$ 150 R Occupancies All - Tenant Improvements each [2]817.00$ 151 S Occupancies < 50,000 sq. ft. New flat [2]618.00$ 152 S Occupancies < 50,000 sq. ft. - Tenant Improvements flat [2]487.00$ 153 S Occupancies ≥ 50,000 sq. ft. New flat [2]1,149.00$ 154 S Occupancies ≥ 50,000 sq. ft. - Tenant Improvements flat [2]882.00$ Plan Review and Inspection Hazardous Materials Storage 155 Chem Class <10 Chemicals flat [2]630.00$ 156 Chem Class 10- 25 Chemicals flat [2]982.00$ 157 Chem Class 26 - 100 Chemicals flat [2]1,425.00$ 158 Chem Class >100 Chemicals flat [2]1,867.00$ 159 Fire Department Access & Fire Lanes flat [2]320.00$ 160 High Piled Storage flat [2]982.00$ 161 High Rise Structure Greater Than 55 feet 441.00$ 162 Per Additional Floor flat [2]352.00$ Storage Tanks 163 Aboveground Storage Tanks (First Tank)each [2]939.00$ 164 Underground Storage Tanks (First Tank)each [2]850.00$ 165 Each Additional Tank each [2]133.00$ Vegetation Fuel Modification 166 Custom Home flat [2]630.00$ 167 Tract <75 Homes flat [2]1,161.00$ 168 Tract ≥75 Homes flat [2]1,690.00$ 169 Smoke Control - Rationale Analysis & Plan Review 1,779.00$ 11June 18, 2024 Item #11 Page 241 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit Other Fire Fees Aerial Fireworks Display 170 Major each [2]1,678.00$ 171 Minor each [2]971.00$ Plan Review 172 Processing Fee each [2]30.00$ 173 Per Hour - Overtime hourly [2]191.00$ 174 Per Hour - Regular Office Hours hourly [2]176.00$ Hourly Services for: Alternate Methods and Materials Review, Time and Materials Review, Project Meetings, etc. 175 First Hour each [2]207.00$ 176 Each Additional Hour hourly [2]176.00$ 177 Plan Resubmittal (3rd and Subsequent Submittal, Per Hour)hourly [2]176.00$ 178 Reinspection (Per Inspection)each [2]250.00$ Tent Permit (Not associated with special events) 179 Single Tent each [2]264.00$ 180 2-5 Tents flat [2]529.00$ 181 6 or More Tents flat [2]708.00$ 182 Weed Abatement Administrative Fee 352.00$ 183 Fire Nuisance Alarm - 1st Response in 12 Month Period each [1]-$ 184 Fire Nuisance Alarm - 2nd Response in 12 Month Period each [1]105.00$ 185 Fire Nuisance Alarm - 3rd Response in 12 Month Period each [1]210.00$ 186 Fire Nuisance Alarm - Each Additional Response Thereafter each [1]412.00$ 187 Fire Nuisance Alarm - Each Billing each [1]14.00$ 188 Special Events Application Processing flat [2],[6]176.00$ 189 Special Events - Fire Prevention/Operations Support Prior To/During Event each [2],[6] Actual Cost Fire & Life Safety Inspections and Fire Code Permits Fire Inspections for the following Occupancies: 190 Care Facility for More than 6 Ambulatory & Non-Ambulatory Clients each [2],[4]191.00$ 191 Hospitals, Nursing Homes, Mental Hospitals, Detoxification and Surgery Centers each [2],[4]368.00$ 192 Commercial Care Facility (i.e. Child, Drug & Alcohol, Juvenile, Etc.)each [2],[4]191.00$ 193 Pre-Inspection Residential Care Facility (i.e. Single Family Residences)each [2],[4]191.00$ 194 High Rise Facility > 75 ft. (Per Floor of Building)each [2],[4]191.00$ State Mandated School Inspection - Public or Private School [2],[4] 195 Pre-School each [2],[4]441.00$ 196 Elementary/Middle School each [2],[4]708.00$ 197 High School each [2],[4]1,060.00$ State Mandated Hotel and Motel Inspection 198 1-5 Buildings Per Property flat [2],[4]618.00$ 199 6-10 Buildings Per Property flat [2],[4]1,060.00$ 200 11 or More Buildings Per Property flat [2],[4]1,324.00$ State Mandated Apartment Inspection 201 3-10 Units Per Building flat [2],[4]221.00$ 202 11-40 Units Per Building flat [2],[4]264.00$ 203 Greater than 40 Units Per Building flat [2],[4]353.00$ 12June 18, 2024 Item #11 Page 242 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit Fire Code Permits - Initial Permit 204 Tier 1 each [2],[5]191.00$ 205 Tier 2 each [2],[5]368.00$ 206 Tier 3 each [2],[5]544.00$ Fire Code Permits - Annual Renewal Permit 207 Tier 1 each [2],[5]103.00$ 208 Tier 2 each [2],[5]191.00$ 209 Tier 3 each [2],[5]280.00$ Assembly 210 < 300 people flat [2]191.00$ 211 > 300 people flat [2]368.00$ All Other Occupancies Annual Inspections 212 Tier 1 - 5,000 sq. ft. or Less flat [2]147.00$ 213 Tier 2 - 5,001 to 20,000 sq. ft.flat [2]234.00$ 214 Tier 3 - 20,001 and Greater flat [2]368.00$ 215 Fees for services not listed will be determined on a case-by-case basis. It will be based on the fully burdened hourly rate and the time of service provided. per hour [2]176.00$ [Notes] [1] Set per City policy [2]Set per 2021 - Cost of Service Study and Fee Schedule Update. Indexed to West Region Urban CPI. [3] Additional Reinspection fees shall apply for phased inspection projects at the discretion of the Fire Marshall [4] [5] [6]Additional fees for Standby of fire personnel and equipment during event will apply. All annual inspection fees shall include time for the initial inspection and 1 reinspection. All subsequent reinspection shall be charged an additional rate per inspection. Tier 1 – Candles – Open Flame; Cryogens; Dry Cleaning; Liquefied Petroleum Gas (LPG); Motor Vehicle Fuel Dispensing; Industrial Ovens; Hot Works; Welding Tier 2 – Aerosol; Aviation Facility; Waste Handling; Carnival/Fair; Combustible Materials Storage; Compressed Gas; Dust Producing Operations; Flammable Liquids – Storage; Combustible Liquids – Storage; Flammable/Combustible Liquids – Tanks; Flammable/Combustible Liquids – AST/UST Removal; Fruit Ripening; Hazardous Materials; Magnesium Work; Repair Garage; Tire Storage; Explosives-Model Rockets Tier 3 – Aircraft Refueling; Explosives – Blasting & Fireworks; High Piled Combustible Storage (HPS); Lumber Yards & Woodworking Plants; Refrigeration Equipment; Spraying or Dipping Operations Package Permits – All permits associated in the following activities are included in the Tier priced above: Dry Cleaning; Motor Vehicle Fuel Dispensing; Repair Garage; Welding 13June 18, 2024 Item #11 Page 243 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit Police Fees 216 Audio/Photos on USB each [2]44.00$ 217 Burglary Alarm Registration Fee each [2]29.00$ 218 False Alarm Response - Second Occurrence each [2]39.00$ 219 False Alarm Response - Additional Occurrence each [2]73.00$ 220 Excess False Alarm Panic Response - Robbery each [3]100.00$ 221 Excess False Alarm Panic Response - Burglary each [3]100.00$ 222 Copy Investigation Record each [2]60.00$ 223 Dispatch Records Searches per query [2]24.00$ 224 Entertainment License each [2]308.00$ 225 Fingerprinting processing Fee each [2],[5]27.00$ 226 Fix-It Ticket - moving violation each [2],[6]21.00$ 227 Fix-It Ticket - parking/registration violation each [2],[6]13.00$ 228 Handicap Placard Violation Waiver Processing Fee each [2],[7]29.00$ 229 Photograph Copy - Subpoena or Records requests that require retrieval in QueTel evidence program.each [2]21.00$ 230 Police/Fire - Emergency Response DUI Traffic Collision (max $12,000 per incident)each [1] Actual Cost 231 Production of body worn camera videos. Staff time per hour of production and redaction of videos.each [1] Actual Cost 232 Report Copy Fee (Free to Victim)each [2]13.00$ 233 Rental of Conference rooms to Safety Personnel each [2]230.00$ 234 Storage/Impounded Vehicle Administrative Charge each [2]159.00$ 235 Fees for services not listed will be determined on a case-by-case basis. It will be based on the fully burdened hourly rate and the time of service provided. per hour [2]88.00$ [Notes] [1] Set per City policy [2]Set per 2021 - Cost of Service Study and Fee Schedule Update. Indexed to West Region Urban CPI. [3] Set per City of Carlsbad Municipal Code 8.50.080 [E] [4] Set per City of Carlsbad Municipal Code 5.16.070 [5] Plus actual cost from processing agency [6] Requires proof of correction [7] Waived with proof of correction 14June 18, 2024 Item #11 Page 244 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit Administrative Citation Penalties 236 1st Violation of a City Ordinance each [2]100.00$ 237 2nd Violation of a City Ordinance each [2]200.00$ 238 3rd Violation of a City Ordinance each [2]500.00$ 239 Subsequent violation of same ordinance within one year each [2]500.00$ Vehicle, Traffic, and Parking Civil Penalties 240 CA Vehicle Code Parking Violation, if not specified by separate fee amount (rounded)each [3]48.00$ 241 CA VC 22500(i) Bus Zone each [3]263.00$ 242 CA VC 22500(l) Curb Cut/Disabled Access each [3]343.00$ 243 CA VC 22507.8 (a)-(c) Disabled Parking Space/Access Area/Loading Area each [3]343.00$ 244 CA VC 22522 Sidewalk Access Ramp (3 ft. away)each [3]343.00$ 245 CA VC 22526 (a)(b) Block Intersection/Gridlock each [3]63.00$ 246 CA Vehicle Code Violation for Equipment, if not specified by separate fee amount (rounded)each [3]38.00$ 247 CA VC 4000(a) Expired Registration each [3]63.00$ 248 CA VC 26100C Tinted Covers on Headlights each [3]48.00$ 249 CA VC 28071 Passenger Car Bumpers Required each [3]88.00$ 250 Carlsbad Municipal Code Parking Violations, if violation not established by the CA Vehicle Code Parking Violation or CA Vehicle Code Equipment Violation. each [1]50.00$ [Notes] [1] Set per City policy [2] Set per City of Carlsbad Resolution 2001-167 and limit set per CA Government Code Section 36900 [B] [3] Set per City Policy to the San Diego County Sheriff's Department Parking Fee Violation Table. 15June 18, 2024 Item #11 Page 245 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit Trash Collection Rates (Stormwater fee included) Residential Services 251 3-Cart (64 or 96 gallon cart)[1]30.67$ 252 3-Cart Low Generator (35 gallon cart)[1]27.96$ 253 Back Yard Service Fee (added to curbside rate)[1]38.60$ 254 Additional Solid Waste Cart [1]3.34$ 255 Additional Recycled Materials Cart (4+)[1]3.34$ 256 Additional Organics Cart (4+)[1]3.34$ Commercial Services Commercial Solid Waste - 64 or 96 Gallon Cart 257 One pick-up per week [1]30.59$ 258 Two pick-ups per week [1]61.19$ 259 Three pick-ups per week [1]91.78$ 260 Four pick-ups per week [1]118.52$ 261 Five pick-ups per week [1]145.37$ 262 Six pick-ups per week [1]172.20$ 263 Extra pick-up per week [1]14.41$ Commercial 96 Gallon Cart - Recycling and Organics Included 264 One pick-up per week [1]64.16$ 265 Two pick-ups per week [1]113.41$ 266 Three pick-ups per week [1]162.60$ 267 Four pick-up per week [1]209.98$ 268 Five pick-ups per week [1]257.56$ 269 Six pick-ups per week [1]305.10$ 270 Multi-Family: Set of Solid Waste, Recycling, and Organics (per unit)[1]13.98$ Commercial Solid Waste Yard Bins 271 1-yard bin - one pick-up per week [1]80.61$ 272 1-yard bin - two pick-ups per week [1]136.92$ 273 1-yard bin - three pick-ups per week [1]193.44$ 274 1-yard bin - four pick-ups per week [1]249.78$ 275 1-yard bin - five pick-ups per week [1]306.40$ 276 1-yard bin - six pick-ups per week [1]362.95$ 277 1-yard bin - extra pick-up [1]38.77$ 278 2-yard bin - one pick-up per week [1]109.50$ 279 2-yard bin - two pick-ups per week [1]192.71$ 280 2-yard bin - three pick-ups per week [1]275.96$ 281 2-yard bin - four pick-ups per week [1]359.06$ 282 2-yard bin - five pick-ups per week [1]442.34$ 283 2-yard bin - six pick-ups per week [1]525.57$ 284 2-yard bin - extra pick-up [1]52.66$ 285 3-yard bin - one pick-up per week [1]148.75$ 286 3-yard bin - two pick-ups per week [1]271.23$ 287 3-yard bin - three pick-ups per week [1]393.68$ 16June 18, 2024 Item #11 Page 246 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit 288 3-yard bin - four pick-ups per week [1]525.57$ 289 3-yard bin - five pick-ups per week [1]638.59$ 290 3-yard bin - six pick-ups per week [1]761.08$ 291 3-yard bin - extra pick-up [1]70.68$ 292 4-yard bin - one pick-up per week [1]198.38$ 293 4-yard bin - two pick-ups per week [1]370.45$ 294 4-yard bin - three pick-ups per week [1]542.59$ 295 4-yard bin - four pick-ups per week [1]714.67$ 296 4-yard bin - five pick-ups per week [1]886.76$ 297 4-yard bin - six pick-ups per week [1]1,058.86$ 298 4-yard bin - extra pick-up [1]84.56$ 299 5-yard bin - one pick-up per week [1]248.02$ 300 5-yard bin - two pick-ups per week [1]469.78$ 301 5-yard bin - three pick-ups per week [1]691.49$ 302 5-yard bin - four pick-ups per week [1]886.76$ 303 5-yard bin - five pick-ups per week [1]1,134.97$ 304 5-yard bin - six pick-ups per week [1]1,356.73$ 305 5-yard bin - extra pick-up [1]98.41$ 306 6-yard bin - one pick-up per week [1]271.23$ 307 6-yard bin - two pick-ups per week [1]525.57$ 308 6-yard bin - three pick-ups per week [1]761.08$ 309 6-yard bin - four pick-ups per week [1]1,058.86$ 310 6-yard bin - five pick-ups per week [1]1,356.73$ 311 6-yard bin - six pick-ups per week [1]1,738.39$ 312 6-yard bin - extra pick-up [1]123.03$ Commercial Split Bins (includes 2 locks )[1] 313 One pick-up per week [1]120.13$ 314 Two pick-ups per week [1]219.25$ 315 Three pick-ups per week [1]318.35$ 316 Four pick-ups per week [1]417.45$ 317 Five pick-ups per week [1]516.55$ 318 Six pick-ups per week [1]615.67$ Commercial Bin Compactor - Solid Waste 319 3-yard bin - one pick-up per week [1]208.52$ 320 3-yard bin - two pick-ups per week [1]390.48$ 321 3-yard bin - three pick-ups per week [1]572.44$ 322 3-yard bin - four pick-ups per week [1]754.38$ 323 3-yard bin - five pick-ups per week [1]936.35$ 324 3-yard bin - six picks-up per week [1]1,118.35$ 325 3-yard bin - extra pick-up [1]84.80$ 326 4-yard bin - one pick-up per week [1]344.35$ 327 4-yard bin - two pick-ups per week [1]659.76$ 328 4-yard bin - three pick-ups per week [1]975.65$ 329 4-yard bin - four pick-ups per week [1]1,291.47$ 330 4-yard bin - five pick-ups per week [1]1,607.40$ 17June 18, 2024 Item #11 Page 247 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit 331 4-yard bin - six picks-up per week [1]1,923.39$ 332 4-yard bin - extra pick-up [1]140.04$ 333 6-yard bin - one pick-up per week [1]538.27$ 334 6-yard bin - two pick-ups per week [1]1,060.96$ 335 6-yard bin - three pick-ups per week [1]1,584.60$ 336 6-yard bin - four pick-ups per week [1]2,108.77$ 337 6-yard bin - five pick-ups per week [1]2,633.18$ 338 6-yard bin - six picks-up per week [1]3,157.70$ 339 6-yard bin - extra pick-up [1]218.89$ Commercial Recycling 340 32 gal cart - one pick-up per week [1]22.36$ 341 32 gal cart - two pick-ups per week [1]44.74$ 342 32 gal cart - three pick-ups per week [1]67.10$ 343 32 gal cart - four pick-ups per week [1]86.64$ 344 32 gal cart - five pick-ups per week [1]106.28$ 345 32 gal cart - six pick-ups per week [1]125.90$ 346 64 or 96 gal cart - one pick-up per week [1]24.48$ 347 64 or 96 gal cart - two pick-ups per week [1]48.95$ 348 64 or 96 gal cart - three pick-ups per week [1]73.42$ 349 64 or 96 gal cart - four pick-ups per week [1]94.82$ 350 64 or 96 gal cart - five pick-ups per week [1]116.30$ 351 64 or 96 gal cart - six pick-ups per week [1]137.76$ 352 64 or 96 gal cart - extra pick-up [1]11.53$ 353 1-yard bin - one pick-up per week [1]64.49$ 354 1-yard bin - two pick-ups per week [1]109.53$ 355 1-yard bin - three pick-ups per week [1]154.75$ 356 1-yard bin - four pick-ups per week [1]199.82$ 357 1-yard bin - five pick-ups per week [1]245.12$ 358 1-yard bin - six pick-ups per week [1]290.36$ 359 1-yard bin - extra pick-up [1]31.01$ 360 2-yard bin - one pick-up per week [1]87.61$ 361 2-yard bin - two pick-ups per week [1]154.16$ 362 2-yard bin - three pick-ups per week [1]220.76$ 363 2-yard bin - four pick-ups per week [1]287.24$ 364 2-yard bin - five pick-ups per week [1]353.87$ 365 2-yard bin - six pick-ups per week [1]420.46$ 366 2-yard bin - extra pick-up [1]42.13$ 367 3-yard bin - one pick-up per week [1]119.00$ 368 3-yard bin - two pick-ups per week [1]216.99$ 369 3-yard bin - three pick-ups per week [1]314.95$ 370 3-yard bin - four pick-ups per week [1]420.46$ 371 3-yard bin - five pick-ups per week [1]510.87$ 372 3-yard bin - six pick-ups per week [1]608.86$ 373 3-yard bin - seven pick-ups per week [1]709.49$ 374 3-yard bin - extra pick-up [1]56.54$ 18June 18, 2024 Item #11 Page 248 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit 375 4-yard bin - one pick-up per week [1]158.69$ 376 4-yard bin - two pick-ups per week [1]296.36$ 377 4-yard bin - three pick-ups per week [1]434.07$ 378 4-yard bin - four pick-ups per week [1]571.73$ 379 4-yard bin - five pick-ups per week [1]709.41$ 380 4-yard bin - six pick-ups per week [1]847.09$ 381 4-yard bin - seven pick-ups per week [1]984.90$ 382 4-yard bin - extra pick-up [1]67.65$ 383 5-yard bin - one pick-up per week [1]198.41$ 384 5-yard bin - two pick-ups per week [1]375.82$ 385 5-yard bin - three pick-ups per week [1]553.19$ 386 5-yard bin - four pick-ups per week [1]709.41$ 387 5-yard bin - five pick-ups per week [1]907.97$ 388 5-yard bin - six pick-ups per week [1]1,085.39$ 389 5-yard bin - extra pick-up [1]78.73$ 390 6-yard bin - one pick-up per week [1]216.99$ 391 6-yard bin - two pick-ups per week [1]420.46$ 392 6-yard bin - three pick-ups per week [1]608.86$ 393 6-yard bin - four pick-ups per week [1]847.09$ 394 6-yard bin - five pick-ups per week [1]1,085.39$ 395 6-yard bin - six pick-ups per week [1]1,390.71$ 396 6-yard bin - extra pick-up [1]98.43$ Commercial Bin Compactor - Recycling 397 3-yard bin - one pick-up per week [1]166.82$ 398 3-yard bin - two pick-ups per week [1]312.39$ 399 3-yard bin - three pick-ups per week [1]457.95$ 400 3-yard bin - four pick-ups per week [1]603.50$ 401 3-yard bin - five pick-ups per week [1]749.08$ 402 3-yard bin - six picks-up per week [1]894.67$ 403 3-yard bin - extra pick-up [1]67.84$ 404 4-yard bin - one pick-up per week [1]275.48$ 405 4-yard bin - two pick-ups per week [1]527.81$ 406 4-yard bin - three pick-ups per week [1]780.51$ 407 4-yard bin - four pick-ups per week [1]1,033.17$ 408 4-yard bin - five pick-ups per week [1]1,285.93$ 409 4-yard bin - six picks-up per week [1]1,538.71$ 410 4-yard bin - extra pick-up [1]112.03$ 411 6-yard bin - one pick-up per week [1]430.62$ 412 6-yard bin - two pick-ups per week [1]848.77$ 413 6-yard bin - three pick-ups per week [1]1,267.67$ 414 6-yard bin - four pick-ups per week [1]1,687.02$ 415 6-yard bin - five pick-ups per week [1]2,106.55$ 416 6-yard bin - six picks-up per week [1]2,526.17$ 417 6-yard bin - extra pick-up [1]175.11$ 19June 18, 2024 Item #11 Page 249 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit Commercial Organics Recycling 418 32 gal cart - one pick-up per week [1]22.36$ 419 32 gal cart - two pick-ups per week [1]44.74$ 420 32 gal cart - three pick-ups per week [1]67.10$ 421 32 gal cart - four pick-ups per week [1]86.64$ 422 32 gal cart - five pick-ups per week [1]106.28$ 423 32 gal cart - six pick-ups per week [1]125.90$ 424 64 or 96 gal cart - one pick-up per week [1]24.48$ 425 64 or 96 gal cart - two pick-ups per week [1]48.95$ 426 64 or 96 gal cart - three pick-ups per week [1]73.42$ 427 64 or 96 gal cart - four pick-ups per week [1]94.82$ 428 64 or 96 gal cart - five pick-ups per week [1]116.30$ 429 64 or 96 gal cart - six pick-ups per week [1]137.76$ 430 64 or 96 gal cart - extra pick-up [1]11.53$ 431 1-yard bin - one pick-up per week [1]64.49$ 432 1-yard bin - two pick-ups per week [1]109.53$ 433 1-yard bin - three pick-ups per week [1]154.75$ 434 1-yard bin - four pick-ups per week [1]199.82$ 435 1-yard bin - five pick-ups per week [1]245.12$ 436 1-yard bin - six pick-ups per week [1]290.36$ 437 1-yard bin - extra pick-up [1]31.01$ 438 1.5-yard bin - one pick-up per week [1]76.05$ 439 1.5-yard bin - two pick-ups per week [1]131.85$ 440 1.5-yard bin - three pick-ups per week [1]187.76$ 441 1.5-yard bin - four pick-ups per week [1]243.53$ 442 1.5-yard bin - five pick-ups per week [1]299.50$ 443 1.5-yard bin - six pick-ups per week [1]355.41$ 444 1.5-yard bin - extra pick-up [1]36.57$ 445 2-yard bin - one pick-up per week [1]87.61$ 446 2-yard bin - two pick-ups per week [1]154.16$ 447 2-yard bin - three pick-ups per week [1]220.76$ 448 2-yard bin - four pick-ups per week [1]287.24$ 449 2-yard bin - five pick-ups per week [1]353.87$ 450 2-yard bin - six pick-ups per week [1]420.46$ 451 2-yard bin - extra pick-up [1]42.13$ 452 3-yard bin - one pick-up per week [1]119.00$ 453 3-yard bin - two pick-ups per week [1]216.99$ 454 3-yard bin - three pick-ups per week [1]314.95$ 455 3-yard bin - four pick-ups per week [1]420.46$ 456 3-yard bin - five pick-ups per week [1]510.87$ 457 3-yard bin - six pick-ups per week [1]608.86$ 458 3-yard bin - extra pick-up [1]56.54$ 459 4-yard bin - one pick-up per week [1]158.69$ 460 4-yard bin - two pick-ups per week [1]296.36$ 20June 18, 2024 Item #11 Page 250 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit 461 4-yard bin - three pick-ups per week [1]434.07$ 462 4-yard bin - four pick-ups per week [1]571.73$ 463 4-yard bin - five pick-ups per week [1]709.41$ 464 4-yard bin - six pick-ups per week [1]847.09$ 465 4-yard bin - extra pick-up [1]67.65$ Commercial Bin Compactor - Organics Recycling 466 3-yard bin - one pick-up per week [1]166.82$ 467 3-yard bin - two pick-ups per week [1]312.39$ 468 3-yard bin - three pick-ups per week [1]457.95$ 469 3-yard bin - four pick-ups per week [1]603.50$ 470 3-yard bin - five pick-ups per week [1]749.08$ 471 3-yard bin - six picks-up per week [1]894.67$ 472 3-yard bin - extra pick-up [1]67.84$ 473 4-yard bin - one pick-up per week [1]275.48$ 474 4-yard bin - two pick-ups per week [1]527.81$ 475 4-yard bin - three pick-ups per week [1]780.51$ 476 4-yard bin - four pick-ups per week [1]1,033.17$ 477 4-yard bin - five pick-ups per week [1]1,285.93$ 478 4-yard bin - six picks-up per week [1]1,538.71$ 479 4-yard bin - extra pick-up [1]112.03$ 480 6-yard bin - one pick-up per week [1]430.62$ 481 6-yard bin - two pick-ups per week [1]848.77$ 482 6-yard bin - three pick-ups per week [1]1,267.67$ 483 6-yard bin - four pick-ups per week [1]1,687.02$ 484 6-yard bin - five pick-ups per week [1]2,106.55$ 485 6-yard bin - six picks-up per week [1]2,526.17$ 486 6-yard bin - extra pick-up [1]175.11$ Special Haul Bin Rate 487 3-yard bin - one pick-up per week [1]181.85$ 488 3-yard bin - two pick-ups per week [1]284.20$ 489 3-yard bin - three pick-ups per week [1]386.54$ 490 3-yard bin - four pick-ups per week [1]488.89$ 491 3-yard bin - five pick-ups per week [1]591.25$ 492 3-yard bin - six pick-ups per week [1]693.60$ 493 3-yard bin - extra pick-up [1]59.37$ Construction and Demolition Recycling 494 Special Haul Bin (no Storm Water Fees) 1 week or less [1]128.43$ 495 2-yard temporary C&D Recycling Bin [1]149.74$ 496 3-yard temporary C&D Recycling Bin [1]152.19$ 497 4-yard temporary C&D Recycling Bin [1]165.40$ 498 6-yard temporary C&D Recycling Bin [1]170.87$ 21June 18, 2024 Item #11 Page 251 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit Other Fees and Charges 499 Bin Exchange [1]83.11$ 500 Bin Lock Set Up Fee [1]51.94$ 501 Locking Fee [1]19.75$ 502 Overloaded Bins [1]71.56$ 503 Bin paint charge fee - allowed 1 per year. After first paint within one year, there will be a charge per paint request.[1]143.04$ 504 Bin Relocation (first 25 feet free)9.87$ 505 Special haul bin delivery [1]57.28$ 506 Certified burial at Miramar plus special handling fee charged by Miramar [1]448.40$ 507 Commercial Return to Service Fee - The return to service fee for two or more calls in a one-month period by a bin [1]92.16$ 508 Copy Fee - The charge for copies requested by customers [1]1.96$ 509 Delivery of extra cart [1]16.05$ 510 Late Fee - There will be a minimum fee on any delinquent account - $3 minimum charge [1]4.94$ 511 Bulky Item - Exceeding 5 per pick up - First item [1]58.35$ 512 Bulky Item - Exceeding 5 per pick up - each addl item [1]14.95$ 513 Per Bulky Item - first item [1]58.35$ 514 Per Bulky Item - each additional item [1]14.95$ 515 Bulky Item requiring 2 people to handle [1]83.79$ 516 Contamination Fee - to recover costs for separating solid waste placed in a recycling or green waste container or for arranging a special, unscheduled collection due to contamination. [1]74.39$ 517 Scout service per bin per service [1]67.31$ 518 Residential Return to Service Fee - The return to service fee for two or more calls in a one-month period by a residential customer [1]46.86$ 519 Restart Fee - The fee for restarting commercial service when a permanent account has been terminated for non-payment.[1]28.11$ Roll off Service 520 Service Fee - Roll off service [1]305.27$ 521 Disposal Fee per Ton (pass through)[1]59.91$ 522 Recycling Processing Fee per Ton (pass through)[1]39.23$ 523 Organics Processing Fee per Ton (pass through)[1]85.76$ 524 C&D Processing Fee per Ton (pass through)[1]80.72$ 525 Contaminated Load (per occurrence)[1]305.27$ 526 Roll off - Demurrage Per Day Charge [1]6.50$ Single and Multi-Family Resident Bulky Item Pick-Ups - 5 items maximum per pick up Commercial Bulky Item Pick-Ups 22June 18, 2024 Item #11 Page 252 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit 527 Delivery [1]78.56$ 528 Delivery Demo (includes signage) [1]83.05$ 529 Relocation Charge onsite [1]61.38$ 530 Relocation Charge offsite [1]87.56$ 531 Wash Out Receiver Boxes [1]70.22$ 532 Dead Run charge [1]105.25$ 533 Standby charge after 5 minutes [1]2.78$ [Notes] [1] Set per contract by Republic Services 23June 18, 2024 Item #11 Page 253 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit Utility Account and Service Fees Water Account Fees 534 Discontinuation of Service - Non-Payment (Shut-off)each [2]72.00$ 535 Service Reconnection (Non-Payment) - Same Day/Non-Business hours (After Hours Turn-On)each [2],[3]275.00$ 536 Continuity of Service each [2]9.00$ 537 Electronic Notice (in lieu of door hanger)each [2]3.00$ 538 Door Hanger Notice each [2]46.00$ 539 New Account Set Up (Admin)each [2]44.00$ 540 Service Reconnection for Non-Payment (Next Day) Business Hours (Next Scheduled Day Turn-On)each [2],[3]109.00$ 541 New Account Service Connection - (Same Day) Business Hours (Same Day Turn-On)each [2]148.00$ Water Services Fees 542 Utility Standards and Specifications each [1] Actual Cost 543 Potable Water Meter - Construction Meter Deposit deposit [1]1,000.00$ 544 Potable Water Meter - Construction Meter Installation each [2]325.00$ 545 Potable Water Meter - Construction Meter Relocation each [2]163.00$ 546 Potable Backflow Preventer Annual Testing - 1st Notice each, per month [1]3.00$ 547 Potable Backflow Preventer Annual Testing - 2nd Notice per month [1]22.00$ 548 Potable Backflow Preventer Annual Testing - 3rd Notice per month [1]55.00$ 549 Potable Water Shutdown Fee each [1]952.00$ Recycled Water Fees 550 Cross-Connection Inspection - County Department of Environmental Health (CDEH)each [2] Actual Cost 551 Cross-Connection Reinspection each [2] Actual Cost 552 Recycled Water Meter - Construction Meter Deposit deposit [1]1,000.00$ 553 Recycled Water Meter - Construction Meter Installation each [2]325.00$ 554 Recycled Water Meter - Construction Meter Relocation each [2]163.00$ 555 E28 Recycled Water Shutdown - Actual Cost each [2]952.00$ Wastewater Fees 556 Fats, Oils, and Grease (FOG) Fee each [1]166.00$ 557 Temporary Discharge to Sewer (city processing fee, plus actual cost) per permit [6]531.00$ Third Party Hydraulic Modelling Fees 558 Third Party Hydraulic Modelling - Consultant Cost (All Water Systems) per project [1],[4] Actual Cost Processing Fees - Wastewater 559 1-4 units residential and commercial > 9,400 s.f.per project [2],[5]419.00$ 560 All others per project [2],[5]839.00$ Processing Fees - Potable Water 561 System Pressure Check each [2]358.00$ 562 1-4 units residential and commercial > 9,400 s.f.per project [2],[5]715.00$ 563 All others per project [2],[5]1,191.00$ Processing Fees - Recycled Water 24June 18, 2024 Item #11 Page 254 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit 564 System Pressure Check each [2]332.00$ 565 1-4 units residential and commercial > 9,400 s.f.per project [2],[5]553.00$ 566 All others per project [2],[5]1,103.00$ Utilities Department Fees 567 Fees for services not listed will be determined on a case-by-case basis. It will be based on the fully burdened hourly rate and the time of service provided. per hour [2]179.00$ [Notes] [1] Set per City policy [2]Set per 2021 - Cost of Service Study and Fee Schedule Update. Indexed to West Region Urban CPI. [3] Set per CA Health and Safety Code 1169149(a)(1) [4] Total fee will reflect actual consultant billings [5] Staff cost is in addition to actual consultant billings [6]Actual cost is calculated based on cost per gallon to treat the added discharge, plus the city processing fee. 25June 18, 2024 Item #11 Page 255 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit Utility Meter Installation Fees Potable Water (meter size, inches) 568 5/8" Ultrasonic per [1]469.00$ 569 Fire Protection – 5/8" Ultrasonic per [1]469.00$ 570 3/4” Ultrasonic per [1]465.00$ 571 1” Ultrasonic per [1]595.00$ 572 1-1/2” Ultrasonic per [1]723.00$ 573 1-1/2” Turbo per [1]877.00$ 574 2” Ultrasonic per [1]1,027.00$ 575 2” Turbo per [1]1,081.00$ 576 3" Ultrasonic per [1] Actual Cost 577 4" Ultrasonic per [1] Actual Cost 578 6” Ultrasonic per [1] Actual Cost 579 8” Ultrasonic per [1] Actual Cost 580 10” Ultrasonic per [1] Actual Cost 581 12” Ultrasonic per [1] Actual Cost Recycled Water (meter size, inches) 582 5/8" Ultrasonic per [1]469.00$ 583 Fire Protection – 5/8" Ultrasonic per [1]469.00$ 584 3/4” Ultrasonic per [1]465.00$ 585 1” Ultrasonic per [1]595.00$ 586 1-1/2” Turbo per [1]877.00$ 587 2” Turbo per [1]1,081.00$ 588 3" Ultrasonic per [1] Actual Cost 589 4" Ultrasonic per [1] Actual Cost 590 6” Ultrasonic per [1] Actual Cost 591 8” Ultrasonic per [1] Actual Cost 592 10” Ultrasonic per [1] Actual Cost 593 12” Ultrasonic per [1] Actual Cost The following language is based on Carlsbad Municipal Water District Ordinance 45: Where a single family residential water meter is required to be 1” due to a fire sprinkler requirement, the Connection Fee, SDCWA System Capacity Charge and the Water Treatment Capacity Charge will be based on the size of the meter necessary to meet the water use requirements, not the actual meter size of 1”. These fees are in addition to the Potable & Recycled Water Connection Fees and SDCWA Fee. 26June 18, 2024 Item #11 Page 256 of 625 Fee Name Fee Type No t e s Fee/Deposit Utility Potable and Recycled Water Connection Fees (meter size, inches) Ultrasonic 594 5/8” each [1]5,733.00$ 595 3/4”each [1]8,173.00$ 596 1”each [1]12,899.00$ 597 1-1/2”each [1]24,366.00$ 598 2”each [1]36,694.00$ 599 3”each [1]62,079.00$ 600 4”each [1]96,568.00$ 601 6”each [1] 179,341.00$ 602 8”each [1] 211,967.00$ Turbo (All Irrigation Meters) 603 1-1/2”each [1]28,605.00$ 604 2”each [1]45,865.00$ 605 3”each [1]96,568.00$ 606 4”each [1] 275,910.00$ 607 6”each [1] 551,808.00$ 608 8”each [1] 772,797.00$ [Notes] [1] Set per City policy These fees are in addition to the Meter Installation Fees and SDCWA Fees. 27June 18, 2024 Item #11 Page 257 of 625 Fee Name Fee Type No t e s Fee/Deposit San Diego County Water Authority (SDCWA) Fees SDCWA System Capacity Charge (meter size, inches) 609 Fire Protection per [1] Based on size of meter 610 5/8" Displacement per [1]5,700.00$ 611 3/4” Displacement per [1]5,700.00$ 612 1” Displacement per [1]9,120.00$ 613 1-1/2” Displacement per [1]17,100.00$ 614 1-1/2” Turbo per [1]17,100.00$ 615 2” Displacement per [1]29,640.00$ 616 2” Turbo per [1]29,640.00$ 617 3” per [1]54,720.00$ 618 4” per [1]93,480.00$ 619 6”per [1] 171,000.00$ 620 8”per [1] 296,400.00$ 621 10”per [1] 444,600.00$ 622 12”per [1] 752,400.00$ Water Treatment Capacity Charge (meter size, inches) 623 Fire Protection per [1] Based on size of meter 624 5/8" Displacement per [1]159.00$ 625 3/4” Displacement per [1]159.00$ 626 1” Displacement per [1]254.00$ 627 1-1/2” Displacement per [1]477.00$ 628 1-1/2” Turbo per [1]477.00$ 629 2” Displacement per [1]827.00$ 630 2” Turbo per [1]827.00$ 631 3” per [1]1,526.00$ 632 4” per [1]2,608.00$ 633 6”per [1]4,770.00$ 634 8”per [1]8,268.00$ 635 10”per [1]12,402.00$ 636 12”per [1]20,988.00$ [Notes] [1] The following language is based on Carlsbad Municipal Water District Ordinance 45: Where a single family residential water meter is required to be 1” due to a fire sprinkler requirement, the Connection Fee, SDCWA System Capacity Charge and the Water Treatment Capacity Charge will be based on the size of the meter necessary to meet the water use requirements, not the actual meter size of 1”. These fees are set by San Diego County Water Authority, effective January 1, 2023, and are in addition to the Meter Installation Fees and Potable and Reclaimed Connection Fees. The Water Authority left these fees unchanged for 2024. 28June 18, 2024 Item #11 Page 258 of 625 Section 2 Development Related Service Fees June 18, 2024 Item #11 Page 259 of 625 Fee Name Fee Type No t e s Fee/Deposit Planning Department Fees 637 Agricultural Mitigation Fee per net converted acre [1]10,000.00$ 638 Amendments and Revisions to Approved Projects flat [1] 50% of Current Application Fee 639 Appeals to Planning Commision/City Council [2]930.00$ Building Plan Review 640 Minor Projects, per permit each [3]107.00$ 641 Major Projects, per permit each [4]324.00$ 642 City Planner Determination each [1]1,047.00$ Coastal Development Permit (CDP) 643 2 - 4 unit or lot subdivision/Multifamily Project per permit [2]6,699.00$ 644 5 or more units or lot subdivision/Multifamily Project per permit [2]12,072.00$ 645 Emergency flat [2]2,352.00$ 646 Exemption flat [2]347.00$ 647 Minor Permit flat [2]3,131.00$ 648 Non-Residential + 10 cents per sq. ft.flat [2]3,297.00$ 649 Single Family Home flat [2]4,388.00$ 650 Single Family Home w/bluff per permit [2]6,699.00$ Conditional Use Permit (CUP) 651 Within Biological Habitat Preserve flat [2]2,863.00$ 652 Minor flat [2]2,984.00$ 653 Regular flat [2]11,170.00$ 654 Daycare Permit (7 - 14 Children)flat [2]299.00$ Environmental Impact Assessment (EIA) 655 Initial Study - NEGATIVE DECLARATION base fee (flat) [2]2,984.00$ 656 Initial Study - MITIGATED NEG DEC base fee (flat) [2]6,027.00$ 657 Initial Study – checklist for streamlining or within the scope determinations base fee (flat) [2]2,508.00$ 658 Initial Study – addendum for MNDs or NDs (city processing fee plus actual cost)base fee (flat) [2]3,449.00$ Environmental Impact Report (EIR) Addendum 659 First 20 hours of project planner base fee (flat) [2]4,642.00$ 660 >20 hours of project planner per hour [2]130.00$ Focused/Supplemental (requiring a public hearing) 661 First 120 hours of project planner and 20 hours of project engineer base fee (flat) [2]20,196.00$ 662 >120 project planner hours and >20 project engineer hours per hour [2]300.00$ 30June 18, 2024 Item #11 Page 260 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit FULL EIR 663 First 180 hours of project planner and 40 hours of project engineer base fee (flat) [2]31,140.00$ 664 >180 project planner hours and >40 project engineer hours per hour [2]300.00$ Fish & Game Fee 665 Environmental Impact Report (EIR)flat [5]4,101.25$ 666 Environmental Document pursuant to a Certified Regulatory Program (CRP)flat [5]1,427.25$ 667 Negative Declaration (ND)/Mitigated Negative Declaration (MND) flat [5]2,966.75$ 668 Extensions to projects in process flat [1] 25% of current fee 669 General Plan Amendment deposit [2]16,186.00$ Habitat Management Plan (HMP) 670 Amendment to Plan Document - Major - first 60 hours of project planner base fee (flat) [2]8,975.00$ 671 >60 hours of project planner per hour [2]130.00$ 672 Amendment to Plan Document - Minor flat [2]5,133.00$ 673 Permit - Major -first 40 hours of project planner base fee (flat) [2]6,543.00$ 674 >40 hours or project planner per hour [2]130.00$ 675 Permit - Minor - first 20 hours of project planner base fee (flat) [2]772.00$ 676 >20 hours of project planner per hour [2]130.00$ 677 Permit - MINOR W/MINISTERIAL PERMIT flat [2]686.00$ 678 Hillside Development Permit - Major - first 40 hours of project planner base fee (flat) [2]6,939.00$ 679 Hillside Development Permit - Minor - first 20 hours of project planner base fee (flat) [2]1,772.00$ Historic Preservation Permit 680 Local Register Application each [2]1,964.00$ 681 Mills Act Application each [2]4,211.00$ 682 Concurrent Local Register and Mills Act Applications each [2]4,823.00$ 683 Third Party Technical Report Review - Contractor Cost each [2] Actual Cost 684 Mills Act Inspections each [2]No Fee 685 Inspection - Additional Planning per hour [2]130.00$ 686 Inspection - Overtime per hour per hour [2]148.00$ Landscape Plan Check/Inspection Fees 687 City Processing Fee per project [2]389.00$ 688 Contractor Cost per project [1] Actual Cost 689 Local Coastal Plan - Amendment flat [2]12,792.00$ 690 Local Facilities Management Fees - as established by Council deposit [1] Actual Cost 691 Local Facilities Management Plan/Amendment - Fee + deposit in minimum increments of $5,000 deposit [1]10,000.00$ 31June 18, 2024 Item #11 Page 261 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit Master Plan 692 Master Plan - Pre-Filing Submittal flat [1]9,477.00$ 693 First 200 hours of project planner and 100 hours of project engineer base fee (flat) [2]44,331.00$ 694 >200 project planner hours and >100 project engineer hours per hour [2]381.00$ Major Amendment 695 First 100 hours of project planner and 40 hours of project engineer base fee (flat) [2]21,100.00$ 696 >100 project planner hours and >40 project engineer hours per hour [2]355.00$ Minor Amendment 697 First 30 hours of project planner and 7 hours of project engineer base fee (flat) [2]4,005.00$ 698 >30 project planner hours and >7 project engineer hours per hour [2]355.00$ 699 Non-Conforming Construction Permit flat [2]969.00$ 700 Notice Fee (+ postage)flat [1] Actual Cost 701 Plan Consistency Determination [2]1,008.00$ 702 Planned Development (residential/non-residential) - 5 or more lots/units - Major Subdivision per project [2]16,454.00$ 703 Planned Development (residential/non-residential) - 4 or fewer lots/units per project [2]7,953.00$ 704 Planning Commission Agenda and Minutes (+ postage)per page [1] Copy Charge 705 Planning Commission Determination-other flat [2]2,788.00$ 706 Postage (All)flat [1] Current Postage Rate x Number of labels 707 Precise Development Plan flat [2]16,114.00$ 708 Preliminary Plan Review - Major (Other)flat [2]1,008.00$ 709 Preliminary Plan Review - Minor (SFD)flat [2]283.00$ 710 Re-Recording or Cancellation of an Instrument on Real Property (city processing fee, plus actual cost)each [1]228.00$ Reversion to Acreage (Consistent with city payroll records charged against a $3,100 deposit) 711 First 25 hours of project planner and 20 hours of project engineer base fee (flat) [2]5,627.00$ 712 Satellite Antenna Permit flat [2]598.00$ 713 Short-Term Vacation Rental Permit Application Fee per application [2]220.00$ Sign Program 714 Sign Permit (including non-commercial)flat [2]72.00$ 715 Sign Program flat [2]1,503.00$ 716 Modified Minor Sign Program flat [2]996.00$ 717 Modified Regular Sign Program flat [2]2,685.00$ 32June 18, 2024 Item #11 Page 262 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit Site Development Plan 718 Minor - Village Area Request for a Parking Option flat [2]638.00$ 719 Minor - Residential, less than or equal to 4 units/lots or as required per CMC/PLAN flat [2]5,566.00$ 720 Major - 5 or more units/lots or as required per CMC/PLAN flat [2]19,965.00$ 721 Special Use Permit - Other flat [2]6,338.00$ 722 Special Use Permit - Floodplain flat [2]5,951.00$ Specific Plan Base Fee 723 First 200 hours of project planner and 60 hours of project engineer base fee (flat) [2]41,176.00$ 724 >200 project planner hours and >60 project engineer hours per hour [2]355.00$ Amendment - Major 725 First 180 hours of project planner and 30 hours of project engineer base fee (flat) [2]31,760.00$ 726 >180 project planner hours and >30 project engineer hours per hour [2]355.00$ Amendment - Minor 727 First 20 hours of project planner and 7 hours of project engineer base fee (flat) [2]3,918.00$ 728 >20 project planner hours and >7 project engineer hours per hour [2]355.00$ 729 Street Name Change flat [2]2,354.00$ Tentative Maps 730 Tentative Parcel Map - Minor Subdivision - 0- 4 Lots/Units flat [2]6,860.00$ 731 Tentative Tract Map - 5 - 49 units/lots flat [2]14,074.00$ 732 Tentative Tract Map - 50 + units/lots flat [2]20,026.00$ 733 Tentative Tract Map Litigation Stay flat [1] 25% of current fee Third Party Review 734 Processing Fee per project [2]799.00$ 735 Consultant Cost per project [1] Actual Cost 736 Variance flat [2]5,146.00$ 737 Variance - Minor flat [2]1,070.00$ Village Area 738 Village Area Review - Administrative flat [2]586.00$ 739 Village Area Review - Major - Plus Noticing Costs flat [2]4,145.00$ 740 Village Area Review - Minor - Plus Noticing Costs flat [2]2,261.00$ 741 Village Area - Parking In Lieu Fee each [1]11,240.00$ 33June 18, 2024 Item #11 Page 263 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit 742 Wireless Communication Third Party Review flat [1] Actual Cost 743 Zone Change flat [2]12,586.00$ 744 Zone Code Compliance Letter flat [2]164.00$ 745 Research Fee per hour [2]164.00$ 746 Fees for services not listed will be determined on a case-by-case basis. It will be based on the fully burdened hourly rate and the time of service provided. per hour [2]117.00$ TOTAL [Notes] [1] Set per City policy [2] Set per 2021 - Cost of Service Study and Fee Schedule Update. Indexed to West Region Urban CPI. [3] Minor: residential new/remodel, commercial/industrial tenant improvement [4] Major: Commercial/Industrial new [5]Set by Department of Fish and Wildlife. Fish & Game fees are additional to the EIA/EIR fees. Includes $50.00 County Clerk processing fee. Updated with new fees effective Jan. 1, 2024. 34June 18, 2024 Item #11 Page 264 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit Engineering Department Fees 747 Adjustment Plat per project [2]1,834.00$ Building Plan Review 748 Minor Projects, per permit each [3]204.00$ 749 Major Projects, per permit each [4]638.00$ Certificate 750 Certificate of Compliance each [2]1,488.00$ 751 Certificate of Compliance In Lieu of Parcel Map each [2]4,104.00$ 752 Certificate of Correction each [2]1,156.00$ Construction Change Review - Major 753 Base Fee per project [2]976.00$ 754 Plus fee per sheet per sheet [2]378.00$ Construction Change Review - Minor 755 Base Fee per project [2]693.00$ 756 Plus fee per sheet per sheet [2]313.00$ 757 Developer Agreements - Deposit $10,000 increments (Consistent with city payroll records + overhead)deposit [1] Actual Cost 758 Easement Document Processing and Recording per project [2]1,635.00$ 759 Encroachment Agreement Processing per project [2]511.00$ 760 Grading Permit Investigation Fee (Consistent with city payroll records + overhead) deposit [1] Actual Cost Grading Plan Check Fees (cubic yard) 761 0 - 100 CY flat [2]2,023.00$ 762 101 CY flat [2]2,700.00$ 763 each additional 100 CY up to 1,000 each [2]170.00$ 764 1,001 CY flat [2]4,717.00$ 765 each additional 1,000 CY up to 10,000 each [2]234.00$ 766 10,001 flat [2]6,923.00$ 767 each additional 10,000 CY up to 100,000 each [2]333.00$ 768 100,001 flat [2]9,912.00$ 769 each additional 10,000 CY up to 200,000 each [2]382.00$ 770 200,001 flat [2]14,435.00$ 771 each additional 100,000 CY up to 400,000 each [2]826.00$ 772 400,001 flat [2]16,104.00$ 773 each additional 100,000 CY up to 1,000,000 each [2]574.00$ 774 1,000,001 flat [2]19,600.00$ 775 each additional 100,00 CY each [2]1,887.00$ 35June 18, 2024 Item #11 Page 265 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit Grading Permit Fees (cubic yard) 776 0 - 100 CY flat [2],[4], [5]2,675.00$ 777 101 CY flat [2],[4], [5]2,681.00$ 778 each additional 100 CY up to 1,000 each [2],[4], [5]208.00$ 779 1,001 CY flat [2],[4], [5]4,605.00$ 780 each additional 1,000 CY up to 10,000 each [2],[4], [5]209.00$ 781 10,001 flat [2],[4], [5]6,539.00$ 782 each additional 10,000 CY up to 100,000 each [2],[4], [5]328.00$ 783 100,001 flat [2],[4], [5]9,597.00$ 784 each additional 10,000 CY up to 200,000 each [2],[4], [5]189.00$ 785 200,001 flat [2],[4], [5]11,685.00$ 786 each additional 100,000 CY up to 400,000 each [2],[4], [5]209.00$ 787 400,001 flat [2],[4], [5]17,627.00$ 788 each additional 100,000 CY up to 1,000,000 each [2],[4], [5]1,791.00$ 789 1,000,001 flat [2],[4], [5]28,892.00$ 790 each additional 100,00 CY each [2],[4], [5]2,768.00$ Improvement Plan Review Fee 791 $0 - $20,000 flat [2]3,461.00$ 792 $20,001 flat [2]4,853.00$ 793 each additional $10,000 up to $50,000 each [2]426.00$ 794 $50,001 flat [2]6,273.00$ 795 each additional $10,000 up to $100,000 each [2]461.00$ 796 $100,001 flat [2]8,686.00$ 797 each additional $10,000 up to $250,000 each [2]426.00$ 798 $250,001 flat [2]17,817.00$ 799 each additional $10,000 up to $500,000 each [2]214.00$ 800 $500,001 flat [2]23,566.00$ 801 each additional $10,000 up to $1,000,000 each [2]116.00$ 802 $1,000,001 flat [2]29,771.00$ 803 each additional $10,000 each [2]277.00$ 36June 18, 2024 Item #11 Page 266 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit Improvement Inspection 804 $0 - $20,000 flat [2]1,732.00$ 805 $20,001 flat [2]3,029.00$ 806 each additional $10,000 up to $50,000 each [2]473.00$ 807 $50,001 flat [2]5,016.00$ 808 each additional $10,000 up to $100,000 each [2]251.00$ 809 $100,001 flat [2]6,327.00$ 810 each additional $10,000 up to $250,000 each [2]195.00$ 811 $250,001 flat [2]9,402.00$ 812 each additional $10,000 up to $500,000 each [2]205.00$ 813 $500,001 flat [2]14,436.00$ 814 each additional $10,000 up to $1,000,000 each [2]133.00$ 815 $1,000,001 flat [2]22,135.00$ 816 each additional $10,000 each [2]206.00$ Mapping Fees Final Tract Map - Major Subdivision 817 Base Fee per project [2]11,424.00$ 818 additional acre per acre [2]125.00$ 819 Parcel Map - Minor Subdivision per project [2]5,411.00$ 820 Neighborhood Improvement Agreements each [2]224.00$ 821 Oversize Load Permit - 1 trip each [6]16.00$ 822 Oversize Load Permit - Annual/Per Year each [6]90.00$ 823 Quitclaim of Easement each [2]976.00$ 824 Reapportionment Fees for 1911 Act Assessment Districts each [1] Actual Cost Retaining Wall Plan Check Fees Retaining Wall Plan Check Valuation 825 $0 - $50,000 flat [2]519.00$ 826 $50,001 - $250,000 flat [2]2,407.00$ 827 $250,000+flat [2]4,239.00$ 828 Reversion to Acreage deposit [2]4,033.00$ Right-of-Way Permit 829 Minor - Non-Construction each [2]244.00$ 830 Minor - Construction each [2]570.00$ Telecommunications (WCF/Broadband) 831 City Processing Fee - single telecommunications application each [1]344.00$ 832 City Processing Fee - batched applications (for each 10 telecommunications nodes)each [1]1,033.00$ 833 City Processing Fee - concurrent microtrenching (up to 50 linear feet)each [1]128.00$ Utility 834 City Processing Fee each [2]401.00$ 835 Inspector's Time hourly [2]151.00$ 836 Utility (by contract)each [2]1,155.00$ 37June 18, 2024 Item #11 Page 267 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit Use - Initial Permit 837 Curb Cafe each [2]584.00$ 838 Outdoor Display each [2]244.00$ 839 Sidewalk Café each [2]584.00$ Use - Annual Renewal 840 Curb Cafe each [2]244.00$ 841 Outdoor Display each [2]244.00$ 842 Sidewalk Café each [2]244.00$ 843 Village Area - Curb Café (max of two parking spaces)per space/ per year [2]1,200.00$ 844 Secured Agreement Processing - Extension each [2]405.00$ 845 Secured Agreement Processing - Replacement, plus improvement plan revision fees if required each [2]714.00$ 846 Segregation of Assessments - 1- 4 lots (Consistent with city payroll records + overhead, consultant cost and recording fee. Also see Streets and Highways Code Section 8760-8769 ) deposit [1] Actual Cost 847 Segregation of Assessments - 5 lots or more - fee + $20 per lot (Consistent with city payroll records + overhead, consultant cost and recording fee. Also see Streets and Highways Code Section 8760- 8769) deposit [1] Actual Cost Storm Water Pollution Prevention Plan (SWPPP) Fees Plan Review Fee 848 Tier 1 per site [2]85.00$ 849 Tier 2 per site [2]401.00$ 850 Tier 3 one acre or less [2]917.00$ 851 Tier 3 - Supplemental Fee per acre [2]147.00$ Inspection Fee 852 Tier 1 per site [2]302.00$ 853 Tier 2 per site [2]5,469.00$ 854 Tier 3 one acre or less [2]6,488.00$ 855 Tier 3 - Supplemental Fee per acre [2]1,346.00$ Storm Water Quality Management Plan (SWQMP) Fees 856 Plan Review - Base Fee each [2]1,415.00$ 857 Plan Review - For each subsequent acre or portion thereof over one half acre per acre [2]115.00$ 858 Plan Review - Trash Capture Only each [2]1,650.00$ 859 Inspection Fee - Base Fee each [2]879.00$ 860 Inspection Fee - For each subsequent acre or portion thereof over one half acre per acre [2]617.00$ 861 Street Vacation - Street/Public Service Easement Vacation - Regular each [2]4,761.00$ 862 Street Vacation - Street/Public Service Easement Vacation - Summary each [2]2,051.00$ Third Party Review 863 Processing Fee per project [2]356.00$ 38June 18, 2024 Item #11 Page 268 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit 864 Consultant Cost per project [1] Actual Cost 865 Fees for services not listed will be determined on a case-by-case basis. It will be based on the fully burdened hourly rate and the time of service provided. per hour [2]229.00$ [Notes] [1] Set per City policy [2] Set per 2021 - Cost of Service Study and Fee Schedule Update. Indexed to West Region Urban CPI. [3] Minor: residential new/remodel, commercial/industrial tenant improvement [4] Major: Commercial/Industrial new [5] [6] [7] Maximum limit set by CA Vehicle Code 35795(b)(1) Quantities are calculated by using the greater of cut/fill, plus remedial work. Plan checks extending more than 24 months may be assessed an additional fee of 25% of the current plan check fee. Minor grading plan check fees are 50% of standard plan check fees. Qualifying for minor grading plan check is subject to City Engineer approval per CMC 15.16.062. 39June 18, 2024 Item #11 Page 269 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit Building Department Fees New Construction, Additions, and Major Remodels [1] Commercial/Industrial Uses - Structural (All newly constructed or added space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule) 866 0 - 500 sq. ft.flat [2]1,235.00$ 867 additional sq. ft. up to 4,999 each [2]0.39$ 868 5,000 sq. ft.flat [2]2,977.00$ 869 additional sq. ft. up to 9,999 each [2]0.52$ 870 10,000 sq. ft.flat [2]5,575.00$ 871 additional sq. ft. up to 49,999 each [2]0.05$ 872 50,000 sq. ft.flat [2]7,634.00$ 873 additional sq. ft. up to 99,999 each [2]0.11$ 874 100,000 sq. ft.flat [2]13,557.00$ 875 additional sq. ft.each [2]0.13$ Commercial Residential and Multifamily Residential Uses - (All newly constructed or added space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) 876 0 - 500 sq. ft.flat [2]1,171.00$ 877 additional sq. ft. up to 4,999 each [2]0.65$ 878 5,000 sq. ft.flat [2]4,086.00$ 879 additional sq. ft. up to 9,999 each [2]0.64$ 880 10,000 sq. ft.flat [2]7,286.00$ 881 additional sq. ft. up to 49,999 each [2]0.06$ 882 50,000 sq. ft.flat [2]9,661.00$ 883 additional sq. ft. up to 99,999 each [2]0.17$ 884 100,000 sq. ft.flat [2]17,865.00$ 885 additional sq. ft.each [2]0.18$ Low and Moderate Hazard Storage - (All newly constructed or added space for storage occupancies classified as CBC Group S, or other storage occupancies not specifically addressed elsewhere in this Fee Schedule) 886 0 - 500 sq. ft.flat [2]1,110.00$ 887 additional sq. ft. up to 4,999 each [2]0.39$ 888 5,000 sq. ft.flat [2]2,863.00$ 889 additional sq. ft. up to 9,999 each [2]0.26$ 890 10,000 sq. ft.flat [2]4,151.00$ 891 additional sq. ft. up to 49,999 each [2]0.03$ 892 50,000 sq. ft.flat [2]5,349.00$ 893 additional sq. ft. up to 99,999 each [2]0.01$ 894 100,000 sq. ft.flat [2]5,846.00$ 895 additional sq. ft.each [2]0.06$ 40June 18, 2024 Item #11 Page 270 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit Attached Accessory and Utility Uses - (All newly constructed, added or structurally remodeled space for utility and accessory occupancies classified as CBC Group U, or other utility and accessory occupancies not specifically addressed elsewhere in this Fee Schedule 896 0 - 200 sq. ft.flat [2]585.00$ 897 additional sq. ft. up to 399 each [2]2.00$ 898 400 sq. ft.flat [2]906.00$ 899 additional sq. ft. up to 599 each [2]0.73$ 900 600 sq. ft.flat [2]1,053.00$ 901 additional sq. ft. up to 999 each [2]0.36$ 902 1,000 sq. ft.flat [2]1,198.00$ 903 additional sq. ft. up to 2,999 each [2]0.18$ 904 3,000 sq. ft.flat [2]1,550.00$ 905 additional sq. ft.each [2]0.52$ Detached Accessory and Utility Uses - (All newly constructed, added, or structurally remodeled space for utility and accessory occupancies/uses not specifically addressed elsewhere in this Fee Schedule) 906 0 - 200 sq. ft.flat [2]585.00$ 907 additional sq. ft. up to 399 each [2]2.00$ 908 400 sq. ft.flat [2]906.00$ 909 additional sq. ft. up to 599 each [2]0.73$ 910 600 sq. ft.flat [2]1,053.00$ 911 additional sq. ft. up to 999 each [2]0.36$ 912 1,000 sq. ft.flat [2]1,198.00$ 913 additional sq. ft. up to 2,999 each [2]0.18$ 914 3,000 sq. ft.flat [2]1,550.00$ 915 additional sq. ft.each [2]0.52$ Shell Buildings for all Commercial/Industrial Uses - (The enclosure for all newly constructed or added space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the interior is not completed or occupiable) 916 0 - 500 sq. ft.flat [2]965.00$ 917 additional sq. ft. up to 4,999 each [2]0.26$ 918 5,000 sq. ft.flat [2]2,105.00$ 919 additional sq. ft. up to 9,999 each [2]0.30$ 920 10,000 sq. ft.flat [2]3,625.00$ 921 additional sq. ft. up to 49,999 each [2]0.02$ 922 50,000 sq. ft.flat [2]4,793.00$ 923 additional sq. ft. up to 99,999 each [2]0.01$ 924 100,000 sq. ft.flat [2]5,379.00$ 925 additional sq. ft.each [2]0.05$ 41June 18, 2024 Item #11 Page 271 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit Commercial/Industrial Tenant Improvement - Structural - (Structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the structure is not altered) 926 0 - 500 sq. ft.flat [2]848.00$ 927 additional sq. ft. up to 4,999 each [2]0.24$ 928 5,000 sq. ft.flat [2]1,930.00$ 929 additional sq. ft. up to 9,999 each [2]0.10$ 930 10,000 sq. ft.flat [2]2,455.00$ 931 additional sq. ft. up to 49,999 each [2]0.06$ 932 50,000 sq. ft.flat [2]4,970.00$ 933 additional sq. ft. up to 99,999 each [2]0.05$ 934 100,000 sq. ft.flat [2]7,570.00$ 935 additional sq. ft.each [2]0.07$ Commercial/Industrial Tenant Improvement - Non-structural - (Non- structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the structure is not altered) 936 0 - 500 sq. ft.flat [2]766.00$ 937 additional sq. ft. up to 4,999 each [2]0.23$ 938 5,000 sq. ft.flat [2]1,812.00$ 939 additional sq. ft. up to 9,999 each [2]0.08$ 940 10,000 sq. ft.flat [2]2,221.00$ 941 additional sq. ft. up to 49,999 each [2]0.05$ 942 50,000 sq. ft.flat [2]4,413.00$ 943 additional sq. ft. up to 99,999 each [2]0.04$ 944 100,000 sq. ft.flat [2]6,635.00$ 945 additional sq. ft.each [2]0.06$ Commercial Residential and Multifamily Residential Remodels - Structural - (Structurally remodeled space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) 946 0 - 500 sq. ft.flat [2]906.00$ 947 additional sq. ft. up to 4,999 each [2]0.50$ 948 5,000 sq. ft.flat [2]3,421.00$ 949 additional sq. ft. up to 9,999 each [2]0.40$ 950 10,000 sq. ft.flat [2]5,416.00$ 951 additional sq. ft. up to 49,999 each [2]0.08$ 952 50,000 sq. ft.flat [2]8,552.00$ 953 additional sq. ft. up to 99,999 each [2]0.10$ 954 100,000 sq. ft.flat [2]13,747.00$ 955 additional sq. ft.each [2]0.13$ 42June 18, 2024 Item #11 Page 272 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit Commercial Residential and Multifamily Residential Remodels - Non Structural - (Non-Structurally remodeled space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) 956 0 - 500 sq. ft.flat [2]982.00$ 957 additional sq. ft. up to 4,999 each [2]0.32$ 958 5,000 sq. ft.flat [2]2,408.00$ 959 additional sq. ft. up to 9,999 each [2]0.49$ 960 10,000 sq. ft.flat [2]4,815.00$ 961 additional sq. ft. up to 49,999 each [2]0.07$ 962 50,000 sq. ft.flat [2]7,666.00$ 963 additional sq. ft. up to 99,999 each [2]0.10$ 964 100,000 sq. ft.flat [2]12,734.00$ 965 additional sq. ft.each [2]0.12$ Single Family Dwellings and Duplexes - (All newly constructed or added space for residential occupancies classified as CBC Group R-3, including custom builds and model homes for tract master plans, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 966 0 - 1,000 sq. ft.flat [2]1,374.00$ 967 additional sq. ft. up to 2,499 each [2]0.49$ 968 2,500 sq. ft.flat [2]2,105.00$ 969 additional sq. ft. up to 3,999 each [2]0.31$ 970 4,000 sq. ft.flat [2]2,572.00$ 971 additional sq. ft. up to 5,999 each [2]0.29$ 972 6,000 sq. ft.flat [2]3,157.00$ 973 additional sq. ft. up to 7,999 each [2]0.32$ 974 8,000 sq. ft.flat [2]3,799.00$ 975 additional sq. ft.each [2]0.48$ Duplicate Floor Plan Review - Single Family Dwellings and Duplexes 976 0 - 1,000 sq. ft.flat [2]1,147.00$ 977 additional sq. ft. up to 2,499 each [2]0.29$ 978 2,500 sq. ft.flat [2]1,579.00$ 979 additional sq. ft. up to 3,999 each [2]0.15$ 980 4,000 sq. ft.flat [2]1,812.00$ 981 additional sq. ft. up to 5,999 each [2]0.24$ 982 6,000 sq. ft.flat [2]2,280.00$ 983 additional sq. ft. up to 7,999 each [2]0.21$ 984 8,000 sq. ft.flat [2]2,689.00$ 985 additional sq. ft.each [2]0.34$ 43June 18, 2024 Item #11 Page 273 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit Duplicate Floor Plan Review - Attached or Detached Accessory and Utility Uses 986 0 - 200 sq. ft.flat [2]556.00$ 987 additional sq. ft. up to 399 each [2]0.88$ 988 400 sq. ft.flat [2]731.00$ 989 additional sq. ft. up to 599 each [2]0.29$ 990 600 sq. ft.flat [2]788.00$ 991 additional sq. ft. up to 999 each [2]0.52$ 992 1,000 sq. ft.flat [2]994.00$ 993 additional sq. ft. up to 2,999 each [2]0.17$ 994 3,000 sq. ft.flat [2]1,315.00$ 995 additional sq. ft.each [2]0.43$ Site Improvements - This includes substantial development of private parking lots which are processed separate of the structure and include any combination of the following: Underground utilities, parking lot lighting, accessible path of travel analysis, grading, drainage and compliance with the City's parking and driveway standards. 996 0 - 500 sq. ft.flat [2]467.00$ 997 additional sq. ft. up to 4,999 each [2]0.14$ 998 5,000 sq. ft.flat [2]1,139.00$ 999 additional sq. ft. up to 9,999 each [2]0.07$ 1000 10,000 sq. ft.flat [2]1,520.00$ 1001 additional sq. ft. up to 49,999 each [2]0.01$ 1002 50,000 sq. ft.flat [2]1,754.00$ 1003 additional sq. ft. up to 99,999 each [2]0.01$ 1004 100,000 sq. ft.flat [2]2,221.00$ 1005 additional sq. ft.each [2]0.02$ [Notes] [1] [2]Set per 2021 - Cost of Service Study and Fee Schedule Update. Indexed to West Region Urban CPI. Valuation based on current valuation multiplier published by the San Diego Chapter of the International Code Council. CBC 109.3 Building permit valuations. 44June 18, 2024 Item #11 Page 274 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit Building Department Fees Minor/Miscellaneous Residential & Commercial Improvements [3] 1006 Above Ground Storage Tank per permit [2]$ 275.00 Cell Site 1007 Radio over 30 ft. high each [2]$ 765.00 1008 Dish, 10 ft. dia. w/decoder each [2]$ 506.00 1009 Equipment Enclosure each [2]$ 1,156.00 1010 Awning or Canopy per permit [2]$ 289.00 1011 Bollards up to 4pcs per permit [2]$ 362.00 1012 Certificate of Occupancy per permit [2]$ 21.00 Decks / Balcony 1013 Repair each [2]$ 119.00 1014 New/Replace each [2]$ 325.00 Demolition of Building 1015 Commercial each [2]$ 370.00 1016 Residential each [2]$ 650.00 1017 Fence or Freestanding Wall up to 100'each [2]$ 650.00 1018 Fire Damage Repair - Residential - Minor per permit [2]$ 257.00 1019 Fireplace Repair/Replace per permit [2]$ 488.00 Foundation Repair 1020 Commercial each [2]$ 542.00 1021 Residential each [2]$ 542.00 1022 Greenhouse per permit [2]$ 542.00 Manufactured House / Building 1023 Commercial per permit [2]$ 345.00 1024 Residential per permit [2]$ 204.00 1025 Mobile Home (Within a park, per current edition of Title 25, published by California Division of Housing and Community Development.) per permit [2],[7] $ 462.00 1026 Partition/ Wall - Interior/Non-Structural <100'per permit [2]$ 190.00 Patio 1027 Frame with Cover each [2]$ 119.00 1028 Frame with Cover & Walls each [2]$ 650.00 1029 Screen or Plastic Walls each [2]$ 488.00 1030 Plastering Outside per permit [2]$ 135.00 Remodel - Residential 1031 Kitchen/Bath each [2]$ 414.00 1032 Other - up to 500 sq. ft.each [2]$ 569.00 1033 Other - above 500 sq. ft.per 100 sq. ft. [2] $ 0.40 Repairs - Miscellaneous 1034 Commercial each [2]$ 433.00 1035 Residential each [2]$ 102.00 45June 18, 2024 Item #11 Page 275 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit Retaining Wall 1036 Non-Engineered - City Standard per permit [2]$ 158.00 Reroofing 1037 Commercial per permit [2]$ 314.00 1038 Residential per permit [2]$ 87.00 Roof Structure Repair / Reinforcement 1039 Commercial each [2]$ 299.00 1040 Residential each [2]$ 299.00 1041 Saunas (Steam)per permit [2]$ 325.00 Sign 1042 Wall - Illuminated per permit [2]$ 164.00 1043 Wall - Non-Illuminated per permit [2]$ 164.00 1044 Pole per permit [2]$ 362.00 1045 Monument per permit [2]$ 164.00 Skylight 1046 Commercial each [2]$ 362.00 1047 Residential each [2]$ 362.00 1048 Solar - SolarApp+ Residential per permit [1]$ 183.00 1049 Solar - Residential (Up to 15 kW)per permit [2],[4] $ 307.00 1050 Per kW above 15kW per kW [2],[4] $ 15.00 1051 Add Residential Battery Back-up per permit [2],[4] $ 210.00 1052 Add Residential Panel Upgrade per permit [2],[4] $ 245.00 1053 Add Reverse Tilt System/ Ground Mount per permit [2],[4] $ 315.00 1054 Solar - Commercial (Up to 50 kW)per permit [2],[4] $ 629.00 1055 Per kW between 50kW - 250kW per kW [2],[4] $ 7.00 1056 Per kW above 250kW per kW [2],[4] $ 5.00 1057 Spray Booth Install / Clean Room per permit [2]$ 293.00 Stairs 1058 New/Replace First Story each [2]$ 447.00 1059 Additional Story each [2]$ 366.00 1060 Repair each [2]$ 447.00 Siding 1061 Stucco each [2]$ 149.00 1062 Stone/Brick Veneer each [2]$ 204.00 Storage Racks 1063 <8 ft, first 100 lf per permit [2]$ 469.00 1064 each add'l. 100 lf each [2]$ 87.00 1065 >8 ft, first 100 lf per permit [2]$ 506.00 46June 18, 2024 Item #11 Page 276 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit 1066 >8 ft, ea. Add'l 100 lf each [2]$ 231.00 Swimming Pool 1067 Commercial per permit [2]$ 320.00 1068 Residential per permit [2]$ 270.00 1069 Temporary Seating or Bleachers Install per permit [2]$ 204.00 1070 Trash Enclosure Install per permit [2]$ 283.00 Windows / Door 1071 Commercial each [2]$ 325.00 1072 Residential each [2]$ 122.00 Other Inspections (Per Hour) 1073 Inspections outside of normal business hours (minimum charge: two hours)per hour [2]$ 156.00 1074 Re-inspection fees per hour [2]$ 156.00 1075 Inspections for which no fee is specifically indicated (minimum charge: one half-hour)per hour [2]$ 156.00 1076 Special third party, multiple or recurring inspections (city processing fee per permit plus actual cost)flat [2]$ 541.00 1077 Additional plan review required by changes, additions or revisions to approved plans (minimum charge: one half-hour)per hour [2]$ 146.00 Other Building Fees 1078 Appeal of Building Official Decision per permit [1]$ 1,527.00 1079 Building Permit Revision, Fee + Third Party Hourly Charge per hour [2]Actual Cost 1080 Building Plan Check Fee (8% discount on repetitive plan checks) each [2],[5] Actual Cost 1081 Green Building Standards Plan Check and Inspection each [2]Actual Cost 1082 Green Building State Standards Fee (SB1473)each [1] $1.00 per every $25,000 in building valuation or fraction thereof (minimum fee $1.00) 1083 Strong Motion Instrumentation Fee (SMIP) and Seismic Hazard Mapping Fee - Residential each [1] Pass through from State: $13.00 per $100,000 valuation (minimum $0.50 fee) 1084 Strong Motion Instrumentation Fee (SMIP) and Seismic Hazard Mapping Fee - Commercial each [1] Pass through from State: $28.00 per $100,000 valuation (minimum $0.50 fee) 47June 18, 2024 Item #11 Page 277 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit 1085 Penalty for Commencing Work Before Permit Issuance each [6] Double the permit fee 1086 Fees for services not listed will be determined on a case-by-case basis. It will be based on the fully burdened hourly rate and the time of service provided. per hour [2]$ 144.00 [Notes] [1] Set per City policy [2]Set per 2021 - Cost of Service Study and Fee Schedule Update. Indexed to West Region Urban CPI. [3] [4] Limited to maximum amounts set by AB 1414. [5] Plan check fee based on 65% of the current building permit fee and is due upon initial submittal [6] CMC 18.20.010 and CMC 18.04.010 [7]Limited to maximum amounts consistent with Sections 1017, 1020.1 and 1020.7 of Title 25 of the California Code of Regulations. Valuation based on current valuation multiplier published by the San Diego Chapter of the International Code Council. CBC 109.3 Building permit valuations. 48June 18, 2024 Item #11 Page 278 of 625 I I I I Fee Name Fee Type No t e s Fee/Deposit Building Department Fees 1087 Simple Single or Combination Permits (see list of simple items)per permit [1]$ 228.00 1088 Water Heater Only per permit [1]$ 133.00 Complex Mechanical Permits 1089 FAU less than 100,000 Btu/h per permit [1]$ 569.00 1090 FAU greater than 100,000 Btu/h per permit [1]$ 731.00 1091 Floor furnace (including vent)per permit [1]$ 406.00 1092 Suspended, wall, or floor-mounted heaters per permit [1]$ 325.00 1093 Appliance vents not included in an appliance permit per permit [1]$ 650.00 1094 Boiler up to 100,000 Btu/h per permit [1]$ 772.00 1095 Boiler 100,000 Btu/h to 500,000 Btu/h per permit [1]$ 325.00 1096 Compressor up to 3 HP per permit [1]$ 366.00 1097 Compressor up to 3 HP to 15 HP per permit [1]$ 382.00 1098 Other Complex Mechanical per permit [1]$ 488.00 Complex Electrical Permits 1099 Commercial Appliance per permit [1]$ 325.00 1100 Power Apparatus per permit [1]$ 325.00 1101 Motor not over 1 HP each [1]$ 325.00 1102 Motor over 1 HP and not over 10 HP each [1]$ 325.00 1103 Motor over 10 HP and not over 50 HP each [1]$ 325.00 1104 Motor over 50 HP and not over 100 HP each [1]$ 366.00 1105 Motor over 100 HP each [1]$ 406.00 1106 Generator not over 1 KW each [1]$ 325.00 1107 Generator over 1 KW and not over 10 KW each [1]$ 366.00 1108 Generator over 10 KW and not over 50 KW each [1]$ 488.00 1109 Generator over 50 KW and not over 100 KW each [1]$ 488.00 1110 Generator over 100 KW each [1]$ 569.00 1111 Transformer not over 1 KVA each [1]$ 406.00 1112 Transformer over 1 KVA and not over 10 KVA each [1]$ 406.00 1113 Transformer over 10 KVA and not over 50 KVA each [1]$ 447.00 1114 Transformer over 50 KVA and not over 100 KVA each [1]$ 488.00 1115 Transformer over 100 KVA each [1]$ 488.00 1116 Services of 600 volts or less and over 400 amperes to 1000 amperes in rating each [1]$ 488.00 1117 Services over 600 volts or over 1000 amperes in rating each [1]$ 650.00 1118 Other Complex Electrical each [1]$ 488.00 Complex Plumbing Permits 1119 Fire Suppression System/Commercial Hood per permit [1]$ 691.00 1120 Onsite Sewer 6" & Over per permit [1]$ 447.00 1121 Onsite Water 6" & Over per permit [1]$ 447.00 1122 Onsite Storm Drain 6" & Over per permit [1]$ 447.00 Plumbing, Mechanical, and Electrical Permits - Not Associated with a Building Permit 49June 18, 2024 Item #11 Page 279 of 625 Fee Name Fee Type No t e s Fee/Deposit 1123 Utilities (private - main) city processing fee per permit [1]$ 902.00 1124 Utilities (private - main) plans examiner fee per permit [1]Actual Cost 1125 Other Complex Plumbing per permit [1]$ 488.00 [Notes] [1]Set per 2021 - Cost of Service Study and Fee Schedule Update. Indexed to West Region Urban CPI. 50June 18, 2024 Item #11 Page 280 of 625 Fee Name Simple Mechanical Items: Addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system. HVAC change out - existing dwelling Air-handling unit under 10,000 CFM Evaporative cooler Ventilation fan connected to a single duct Hood and duct system Duct systems Miscellaneous mechanical (wall furnace, condensing units, gas outlet/gas test, etc.) Other simple mechanical Simple Electrical Items: Receptacle, switch, and lighting outlets Lighting fixtures Pole or platform-mounted lighting fixtures Theatrical-type lighting fixtures or assemblies Appliances not exceeding one horsepower (HP), kilowatt (KW), or kilovolt-ampere (KVA), in rating Busways Trolley and plug-in-type busways - each 100 feet or fraction thereof Signs, outline lighting, or marquees supplied from one branch circuit Services of 600 volts or less and not over 200 amperes in rating Miscellaneous apparatus, conduits, and conductors Portable generators less than 10,000 W Temporary power panel/service Temporary power pole Other simple electrical Simple Plumbing Items: Plumbing fixtures Building sewer Rainwater systems Water heater Industrial waste pretreatment interceptor Water piping and/or water treating equipment Repair or alteration of drainage or vent piping Backflow devices Atmospheric-type vacuum breakers Gas test Gas outlets Residential remodel/repairs Other simple plumbing Simple Single or Combination Permits List 51June 18, 2024 Item #11 Page 281 of 625 Section 3 Development Impact Fees June 18, 2024 Item #11 Page 282 of 625 I I t \ \ 53June 18, 2024 Item #11 Page 283 of 625 \ I Boundary of Bridge and Thoroughfare District No. 2 {Aviara Parkway -Poinsettia Lane) Fee Schedule: !Sm Exempt From Fee Area c=J Fee Paid by Agreement E"""J Fee Previously Paid c::J Local Facility Management Zones Zone 5 -$ 496 / ADT * Zone 20 -$ 2,569 / ADT * Zone 21 -$ 2,073/ ADT * [2Z2J Fee Area = Fee Boundary Area l *Average Daily Trips (ADT) per SANDAG Vehicular Traffic Generation Rates ;/ /ml'.'r,rr ~ ~ 1"';jw/-,i J l~ r/"\~\ I , I" 5 \ ,,.._ / ',\0 }/.... / r / , ~ ,> / I I~ 1 )-t , r " '-< ~ I "'r' ) \ /-1, t:< Z'-;,, ">-( l J ~ co. t jHj! <04t, <1 ,<__ ( \ ~~~D L \J ~ r , ~ I~ ;d, \\\ ~ le 1 ~ L I' I' 'ftfjl-'\ )' -/J p~\ 0 --t.__ 1 ~ t ~ , L pni-~ ............... .t ~ '-' '"-iJ:l TI ( ~~~~\\\ --~---~l~~~· ~i, "" ii¾tID1t ""A i If ~ i p\ J : \cbgis\products\Standard Maps\FI NANCE\FeeSchedules \BandT2_Rev2024. pagx © 2024 City of cartsbad 54June 18, 2024 Item #11 Page 284 of 625 City of Carlsbad Local Facilities Management Zones (LFMZ) LEGEND 0 = Outside CFD #1 Zone 1 • No Fee Zone 14 • No Fee Zone 2 • No Fee Zone 15 • No Fee Legend .r{7 LFMZ L,:j BOUNDARY 16 Zone 3 • No Fee Zone 16 • $0.40/SqFt Zone 4 • No Fee Zone 17 • $0.40/SqFt (New Construction) ,..w,i=~.lli"'U. Zone 5 • $0.40/SqFt (New Construction) Zone 18 • $0.40/SqFt (New Construction) Zone 6 • $310/Unit Zone 19 • No Fee Zone 7 • No Fee Zone 20 • No Fee Zone 8 • No Fee Zone 21 • No Fee Zone 9 • No Fee Zone 22 • No Fee Zone 10 • No Fee Zone 11 • No Fee Zone 12 • No Fee Zone 13 • $0.40/SqFt Zone 23 • No Fee Zone 24 • No Fee Zone 25 • No Fee J:lcarg,s2\produds\planning\r197.08\LFMZ.mxd 55June 18, 2024 Item #11 Page 285 of 625 Park Districts Quadrant/Park Area Quadrant 1 = NW Quadrant 2 = NE Quadrant 3 = SW Quadrant 4 = SE Account No 330 0000 5561 331 0000 5561 332 0000 5561 333 0000 5561 Fee Applicable to Residential Subdivisions Only: Residential< 800 sq. ft. Residential 800-1 ,300 sq. ft. Residential 1,300-2,000 sq. ft. Residential 2,000-2,500 sq. ft. Residential >2 ,500 sq. ft. NE SE. SW (per unit) $4,471 $6,373 $7,763 $9,838 $10,750 J:\cbgis\products\Standard Maps\FINANCE\FeeSchedules\Park Districts -2024.mxd NW (per unit) $5,296 $7,410 $8,836 $11 ,119 $12,031 SE 56June 18, 2024 Item #11 Page 286 of 625 Planned Local Drainage Fee Areas J:\cargis2\products\planning\r197.08\Planned Local Drainage Fees.mxd 0,~ ~·~ ~ J ( I Fee Name Fee Type No t e s Fee Level/Deposit Planned Local Drainage Area Fees (PLDA) 1126 PLDA A, Low Runoff per acre $ 8,736.00 1127 PLDA B, Low Runoff per acre $ 3,266.00 1128 PLDA C, Low Runoff per acre $ 3,169.00 1129 PLDA D, Low Runoff per acre $ 3,005.00 1130 PLDA A, Medium Runoff per acre $ 17,372.00 1131 PLDA B, Medium Runoff per acre $ 6,294.00 1132 PLDA C, Medium Runoff per acre $ 4,483.00 1133 PLDA D, Medium Runoff per acre $ 4,916.00 1134 PLDA A, High Runoff per acre $ 37,855.00 1135 PLDA B, High Runoff per acre $ 14,148.00 1136 PLDA C, High Runoff per acre $ 13,736.00 1137 PLDA D, High Runoff per acre $ 13,025.00 Low Runoff Potential Medium Runoff Potential High Runoff Potential CF ♦ GC ♦ L ♦ O ♦ OS ♦ P ♦ PI ♦ PI/O ♦ R ♦ R1.5 ♦ R4 ♦ R8 ♦ R15 ♦ R15/L ♦ R15/O ♦ R15/VC ♦ R23 ♦ R30 ♦ OK-TC ♦ VC ♦ VC/OS ♦ V ♦ PLDA FEE CATEGORYGeneral Plan Land Use Designation 57June 18, 2024 Item #11 Page 287 of 625 58June 18, 2024 Item #11 Page 288 of 625 CARLSBAD 1635 Faraday Av Carlsbad, CA 92008 (760) 602-2750 VALLECITOS 201 Vallecitos de Oro San Marcos, CA 92069 (760) 7 44-0460 LEUCADIA 1960 La Costa Av Carlsbad, CA 92009 (760) 753-0155 Sewer Districts Legend Sewer Service Area D CARLSBAD ~ VALLECITOS D LEUCADIA J:\cargis2\products\planning\r167. 05\Water Districts.mxd 59June 18, 2024 Item #11 Page 289 of 625 Sewer Fees Sewer Connection Fees* General Capacity Fee of $1 ,265 per EDU for *CMC 13.10.020(C) shall be used to determine Equivalent Dwelling Units (EDU). All Areas Plus Sewer Benefit Fees Shown Below Sewer Benefit Area Fees* Area A B C D E F G H I J K L M Cost Per EDU ($) 0 0 3,252 3,259 4,807 4,832 0 1,418 0 0 0 0 0 J \cbg1s\products\Standard Maps\FINAl'ICE\FeeSchedules, Dale 5/15/2024 LEUCADIA BL Legend A,B,C Sewer Benefit Area Sewer Benefit Area Boundary Previous Sewer Benefit Areas I and Kare now in L w SAN tJil\RcoS BL Fee Name Fee Type No t e s Fee/Deposit Affordable Housing Credit 1138 Cassia Heights (Southeast and Southwest quadrants)per unit [1]$ 78,409.00 1139 Tavarua Senior Affordable Apartments (Northwest quadrant)per unit [1]$ 116,043.00 Affordable Housing Impact Fee 1140 Affordable Housing Impact Fee per unit [1]$ 2,925.00 1141 Affordable Housing In-Lieu Fee (per single-family market rate unit on single-family lot)per unit [2]$ 10,040.00 1142 Affordable Housing In-Lieu Fee (residential development projects proposing two to six units), per sq. ft. of net building area per unit per sq. ft. [2]$ 18.00 Habitat Mitigation Fees, Per Acre 1143 Type D - Coastal Sage Scrub per acre [1]$ 39,381.00 1144 Type E - Non-Native Grassland per acre [1]$ 19,692.00 1145 Type F - Agricultural Land, Disturbed Land, Eucalyptus Woodland per acre [1]$ 3,938.00 Public Facilities and Community Facilities District Fees 1146 Public Facilities Fee - inside CFD per project [1] 1.82% of building permit valuation 1147 Public Facilities Fee - outside CFD per project [1] 3.5% of building permit valuation 1148 Community Facilities District #1 Fees [1] Please see current information packet Traffic Impact Fees 1149 Apartment (Inside of CFD 1)per ADT [1]$ 463.00 1150 Apartment (Outside of CFD 1)per ADT [1]$ 544.00 1151 Commercial/Industrial Cost Per Trip (Inside CFD)per ADT [1]$ 184.00 1152 Commercial/Industrial Cost Per Trip (Outside of CFD)per ADT [1]$ 217.00 1153 Condominium (Inside of CFD 1)per ADT [1]$ 463.00 1154 Condominium (Outside of CFD 1)per ADT [1]$ 544.00 1155 Single Family (Inside of CFD 1)per ADT [1]$ 463.00 1156 Single Family (Outside of CFD 1)per ADT [1]$ 544.00 [Notes] [1] Set per City policy [2] Updated via City Council Resolution; effective April 1, 2022. 60June 18, 2024 Item #11 Page 290 of 625 I I I I