HomeMy WebLinkAbout1081 CHESTNUT AVE; ; CBR2023-2508; Recycle{cityof
Carlsbad
CONSTRUCTION WASTE
MANAGEMENT PLAN
B-59
DevelQPment Services
Building Division
1635 Faraday Avenue
760-602-2719
www. car/sbadca. gov
APPLICABLE TO NEW CONS RUCTION, RESIDENTIAL ADDITIONS AND ALTERAT IONS OVER $6OK
VA LUATION AND COMMERCIAL ADDITIONS AND ALTERATIONS OVER $200K. You are required to list
materials that will be reused, recycled or disposed from your project. If you have questions about the recycling
requirement or completing this form, please contact Republic Services at (760) 332-6464, a certified C&D recycler, or
the Carlsbad Building Division at (442) 339-2719 Please note: Unless you are self-hauling, Republic Services or approved
haulers must be used for all construction projects within the City of Carlsbad.
PART 1 Complete and submit this form when applying for a Building Permit. Note: Permits will not be issued
Applicant Information
1081 Chestnut ADU Permit No. CBR2023-2508 1081 Project Title
Project Address 1 081 Chestnut Avenue
Applicant Name Hill, Whitney
APN 205-190-06-00
□ Contractor
[Z]
Last First
ApplicantAddress PO Box 2685, Carlsbad, CA 92018
Phone (760 > 259-2476 E-mail Address permits@snapadu.com
Applicant Mailing Address _S_a_m_e ___________________________ _
(If different than project address)
Project Type
{check all that apply):
Residential
[Z]
Commercial
□
Brief Description Addition of 980 SF ADU
Public Building
□
Project Size 980 Estimated Cost of Project $_1_3_2_,_3_0_0 __________ _
(square footage)
Please check the appropriate box:
D I plan on using REPUBLIC SERVICES roll-off bin(s) for all materials and will provide all receipts after construction.
I ✓ I I plan on using a City Approved hauler and will provide all receipts at the final occupancy inspection.
D This is a proposed LEED certified project . I plan on separating materials on site in conjunction with Republic.
Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information
provided in and with this form pertains to construction and demolition debris generated only from the project listed
in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the
best of my knowledge and belief.
Print Name_W_h _itn_e_y_H_ill _______ Signature __ w_~_· _ ___,_.__H_UL ____ ,Date 8 /2 9(2 3
Page 1 of 4 Rev. 2.10.21
PART 1 Complete, obtain signature, and submit this form when applying for a Building Permit. Note: Permits will
not be issued without a completed Construction Waste Management Plan.
DEBRIS RECYCLING ESTIMATE:
I . Permit No. Project Title
Project Address APN
Applicant Name Phone
Last First -Complete the following table with estimated waste tonnage to be generated by your project.
This is your plan for construction waste management. Changes can be made on the final recycle report.
Goal: the diversion rate shall be 65% by weights of debris.
A B C
Material Type Estimated Place a(✓) check Place a(✓) check next Place a(✓) check next
Waste Quantity next to items to be to items to be to items to be
(tons) reused or salvaged recycled disposed at landfill
Complete this line of the table only if
only using WASTE MANAGEMENT
rail-off bins.
Mixed C&D Debris
Parking lot Asphalt & Concrete .01 X
Brick/ Masonry/ Tile
Mixed Inert Debris .05 X
Cabinets, Doors, Fixtures,
Windows (circle all that apply)
Carpet
~rpet Padding / Foam ----
Cardboard
Ceiling Tile (acoustic)
Drywall (used, new, scrap) .01 X
Landscape Debris (brush, trees,
stumps, etc.) No dirt.
Unpainted Wood & Pallets .01 X
Concrete Roofing Materials
Scrap Metal 1.0 X
Stucco .01 X
Other:
TOTAL
I
To m eet 65% Diversion Requirement (estimate) X 0 .65 = tons
Total Estimated Waste from above Minimum Required Diversion
Contractor/Owner Signature w~ HUL Date 8/19/23
Page 2 of 4 Rev. 711120
PART 2 Complete before final inspection, obtain City Approved hauler receipts and return prior to final
building approval.
DEBRIS RECYCLING REPORT (ACTUAL):
IH.,•• Acknowledgement
I certify under penalty of perjury under the laws of the State of California that the information provided in and with
this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have
reviewed the accuracy of the information, and that t he information is true and correct to the best of my knowledge
and belief. --
Permit No. CBR2023-2508 Print Name Danielle Boulila
Address 1081 Chestnut Ave, Unit B Date 05/10/24
Eln•h•■:-Use this Final Log below to track loads of materials as they leave the job site.
@@SAVE RECEIPTS@@
Indicate FINAL quantities in tons for each material and save receipts and documents from facilities where material is taken.
Additional Project Log pages are available if necessary. Use City Conversion Table to convert volume to tons.
A B C
Date Material Type Actual Amt Actual Amt Actual Amt Destination Facility
Reused or Recycled Disposed in (Name, Address, Phone)
Salvaged Landfill
Examole: Palomar Transfer Station, 5960 El
01/01/2020 Concrete {broken) 5 tons Camino Real
-(760) 603-0153
12/02/23 Mixed C&D Debris .8 ton Escondido Resource Recovery
-1021 W Mission Ave-1760)745-3203
12/28/23 Mixed C&D Debris 1 ton Palomar Transfer Station,
5960 El Camino Real-1760\603~
01/31/24 Mixed C&D Debris 1.9 tons Palomar Transfer Station,
,:;q~nEIr.~minoRPal-(760)603-0153
04/01 /24 Mixed C&D Debris .93 tons Palomar Transfer Station,
,:;q.60£LC.amino..8eak (.Z60~ 603-0153
05/06/24 Mixed C&D Debris .59 tons Palomar Transfer Station,
5960 El Camino Real 17601 6()1-01 <;1
@TOTAL
•
~ 65%
Diversion Rate Achieved 0 5.22 :0 % ~ 65%1VI --~
71' Tata/ of c Total of columns A + B + C DIVERSION
Contractor/Owner Signature_ Date 05/10/24 -
V v
Attach the following documentation to this Report: Return completed form and documentation to: . Original recycling weight tickets, landfill weight tickets City of Carlsbad . Original donation receipts with photos and/or itemized descriptions Building Division (1st Floor) . Any other relevant information to support Recycling Report
RECORD COPY
1635 Faraday Avenue
Carlsbad, CA 92008
Page 3 of 4
City of Carlsbad
MAY 1 5 2024
BUILDING DIVISION Rev. 04122
PALOMAR TRANSFER
5960 EL CAMINO REAL
CARLSBAD, CA 92008
(760)603-0153
000999 -CASH AND CHECK CUSTOMER
ADDRESS
carlsbad, CA 92008
Contract: 24 MINIMUM-CASH 2
GROSS
TARE
NET
Tracking Qty: 1.00
Scale In
Scale Out
:.,.J Ticket #: 2642290
Weighmaster: macaral
In: December 28, 2023
Out : December 28, 2023
Vehicle: M23
Ref:
B01:
INBOUND
CASH
Rate Extensi on
$55.00 $55 .00
Tax
$0.00
Qty
1.00
Origin:
unit Description
EA MSW
OCEANSIDE 100%
Signature:
Total
Paid
Change
.EDIT CARD-SCALE
3:45 pm
3: 45 pm
Total
$55.00
$55.00
$55 .00
$0.00
V
PALOMAR "'f'AANSFER
5960 EL CAMINO REAL
CARLSBAD, CA 92008
Co-(u, \ \ °' C~tn"'r
.,o
('l6C} 603-0153 ,.\\ l'\5 3
000999 -CASH AND CHECK CUSTOMER
ADDRESS
ca~lsbad, CA 92008
Contract: RESIDENTIAL-Yr. 2
GROSS 21,880 Scale In
TARE 18,080 Tare Out
NET 3 ,800
Tracking Qty: 0.00
Qty Unit Description
1. 90 TN MSW
:,~ Ticket #: 2654866
Weighmaster: diazadl
In : January 31 , 2024
Out : January 31, 2024
Vehicle: Al04498
Ref:
BOL :
INBOUND
CASH
Rate Extension
$96 .28 $182 .93
Tax
$0 .00
Origin: CARLSBAD 100%
•.,··
.. · .
Signature:
Total
Paid
Change
.EDIT CARD-SCALE
1 :20 prr.
1:20 pm
j
Total
$182.93
$182.93
$182.93
S~LOO
V
PALOMAR TRANS FER
596C EL CAMINO REAL
CARLSBAD, CA 92008
(760)603-0153
00 0999 -CASH AND CHECK CUSTOMER
ADDRESS
carlsbad, CA 92008
Contract : RESIDENTIAL-Yr . 2
GROSS 19,940 Scale In
TARE 18 ,080 Tare Out
NET 1 ,860
Tracking Qty: 0 .00
Qty Unit Description
0 .93 TN MSW
54 Tic ket #: 2677857
Weighmaster: martios3
I n: April 01 , 2024
Out: April 01, 2024
Vehicle : A104498
Ref :
BOL :
INBOUND
CASH
Rate Extension
$96 .28 $89.54
Tc.X
$0 .00
Or.:..gin: CARLSBAD 1 0G%
Signature:
Total
Paid
Change
.EDIT CARD-SCALE
2 :28 pm
2 :28 pm
Total
$89 .5 4
$89 .54
$89 .54
$0.00
V
✓
Escondido Resource Recovery
1021 W Mission Ave
Escondido, CA 92025
(760) '745-3203
Customer: 0000 Ticket: 80366
Date: 12/02/23
LIGHTWEIGHT DEBRIS REMOV
Rate
In: 13:29
Out: 13:30
Commodity Units
100.00 per TON
INVOICE
Truck: 7294
Container:
Route: 07636
Origin: 076 Poway
36 Self Haul Greens .80
[Gross (In): 20,780. lbs Scl#2 Tare 19,180. lbs Scl#2
Extended
Charge
80.00
Net: 1,600. lbs]
PAID CREDIT CARD 80.00
RAFAELA Driver
PALOMAR TRANSFER
5960 EL CAMINO REAL
CARLSBAD, CA 9200B
(760) 603-0153
000999 -CASH AND CHECK CUSTOMER
ADDRESS
carlsbad, CA 92008
Contract: RESIDENTIAL-Yr. 2
GROSS 19,260 Scale In
TARE 18 ,080 Tare Out
NET 1,180
Tracking Qty: 0.00
Qty
0.59
Uni t Description
TN MSW
54 Ticket#: 2692004
Weighmaster: macaral
In: May 06, 2024
Out: May 06, 2024
Vehicle: A104498
Ref:
BOL:
INBOUND
CASH
Rate Extension
$96.28 $56 .81
Tax
$0 .00
Origin: CARLSBAD 100%
Signature:
Total
Paid
Change
.EDIT CARD-SCALE
11: 28 am
11: 28 am
Total
$56.81
$56.81
$56 .81
$0.00
V