HomeMy WebLinkAbout1818 ASTON AVE; ; CBC2022-0119; Recycle{"Cityof
Carlsbad
CONSTRUCTION WASTE
MANAGEMENT PLAN
B-59
Develonment Services
Building Division
1635 Faraday Avenue
442-339-2719
www.carlsbadca.gov
APPLICABLE TO NEW CONSTRUCTION, ALL RES IDENTIAL ADDITIONS AND ALTERATIONS AND
CO MMERCIAL ADDITIONS AND ALTERATIONS OVER $200K. If you have questions about the recycling
requirement or completing this form, please contact Republic Services at (760) 332-6464 a certified C&D
recycler, or the Carlsbad Building Division at (442) 339-2700. Please note: Unless you are self-hauling, Republic
Services or approved haulers must be used for all construction projects within the City of Ca rlsbad.
PART 1 Complete and submit this form when applying for a Building Permit. Note: Permits will not be issued
without a completed Construction Waste Management Plan.
Applicant Information
Perr\,it NoCO C '2022-,()l l 9 Project Title
Project Address I f/18 fJ.S7tJp\). t4:: ve ✓ G/:l llLSB,9 o A~N
Applicant Name [3vM C7L c-.a:J.-!za. Jcr10N' [j c& t~T El
Last First
~pplicant Address Lj q W cABfl./[/ I C/j N jfJA/ I
Phone ( 85,8 ) ]S° S'-19((;, E-mail Address
Applicant Mailing Address
(if different than project address)
Project Type
(check all that apply):
rief Description -,-.
Residential
□
go 1z.l 2../
Public Building □
roject Size ___________ Estimated Cost of Project$ ________________ _
(square footage)
Please check the appropriate box:
~ I plan on using REPUBLIC SERVICES roll-off bin(s) for all materials and will provide all receipts after construction.
D I plan on self-hauling to a certified recycling facility and will provide all receipts after construction.
□ This is a proposed LEED certified project and I plan on separating materials on site in conjunction with REPUBLIC
SERVCES.
Acknowledgement: I certify under penalty of perjury under the laws of the State of Ca lifornia that the information
provided in and with this form pertains to construction and demolition debris generated only from the project list ed
in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the
best of my knowledge and belief.
Print Name IV , c)< RA y Signature/V. _ _._\_v?'\. __ .,..___--_______ Date fl,. I<?" 21)1. L---
Page 1 of 3 Rev. 05122
'("City of
Carlsbad
CONSTRUCTION WASTE
MANAGEMENT PLAN
B-59 part 2
Development Services
Building Division
1635 Faraday Avenue
422-339-2719
www.carlsbadca.gov
Your project qualifies for the City of Carlsbad Construction Waste Management Plan (CWMP): Section 4.408.1 and Section 5.408.1
of the California Green Building Standards Code requires at least 65% of non-hazardous construction debris is recycl ed and/
or salvaged for reuse.
NEXT STEPS:
STEP 1. Before the project -
a. Review your CWMP completed prior to permit iss uance. (copy is attached to your job card) This plan demonstrates how
you will recycle a minimum of 65% of the construction waste generated from your project by choosing: Republic
Services or Self Haul.
STEP 2 -During the Project
a. Save all receipts and/or documents from reuse facilities, recycling centers, processing facilities, and landfills where
materials were taken.
b. Complete the Debris Recycling Report (ORR) on the next page as your project progresses. Recycling/diversion goals are
(at a minimum) 65% of the waste generated by your project
STEP 3 -After the Project
a. Prior to receiving inspection for final sign off the Building Permit or Certificate of Occupancy, Applicant must submit the
fully completed and approved (ORR) of the Construction Waste Management Plan (CWMP) Table.
b. Provide the ORR and receipts to your building inspector.
FOR MORE INFORMATION:
NOTICE: Applicant (contractor and subcontractors) shall comply with the project's CWMP. It is the Applicant's responsibility to
collect all receipts from the facilities that recycle their materials AND all project waste/landfill disposal receipts. When working
with the City's franchised hauler, Republic Services, one cumulative project receipt is acceptable. However, it is the Applicant's
responsibility to confirm that the bins are collected for C&D Recycling.
1. This project shall generate the least amount of waste possible by planning and ordering carefully, following all proper
storage and handling procedures to reduce broken and damaged materials, and reusing materials whenever possible.
2. Republic Services can provide 2 roll-off bins, one for commingled construction debris and one for trash. The
commingled construction roll-off bin will be taken to a Certified Mixed C&D Processing Facility to sort the material and
create receipt{s), to demonstrate the project has met a 65% diversion rate or greater.
3. Applicants with a goal of recycling greater than 65% of the project's total waste should work with the City's exclusive
franchised waste hauler to develop a more specific CWMP. This plan may include using additional roll-off bins for
particular phases of construction (e.g., concrete and wood waste) to ensure the highest waste diversion rate possible.
4. Contractors/subcontractors hauling their own waste as part of their scope of work (e.g., construction clean up companies,
etc.) SHALL NOT be excluded from complying with the CWMP and shall provide weight and waste diversion receipts from
a Certified Source Separated Recycling Facility. For a current list of Certified Recycling Facilities go to
http :ljwww. sand i ego .gov/ environ men ta I-se rvices/ recycling/ cd/i ndex. s htm I .
5. If contractors/subcontractors furnish their own debris boxes as part of their scope of work, they SHALL NOT be excluded
from complying with the CWMP and shall provide weight and waste diversion receipts from a Certified Source Separated
Recycling Facility.
Rev. 05122
PAR,. 2 Complete before final inspection, obtain City Approved hauler receipts and return prior to final
building approval.
DEBRIS RECYCLING REPORT (ACTUAL):
SECTION A Acknowledgement
I certify under penalty of perjury under the laws of the State of California that the information provided in and with
this form pertains to construction and demolition debris generat ed only from the project listed in PART 1, that I have
reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge
and belief.
Permit No. CBC2022-0119 Print Name Cobra Puma Golf
Address
SECTION B
1818 Aston Ave Carlsbad CA 92008 Date 05/31 /2023 --------------------------
Use this Final Log below to track loads of materials as they leave the job site.
@@SAVE RECEIPTS@@
Indicate FINAL quantities in tons for each material and save receipts and documents from facilities where material is taken.
Additional Project Log pages are available if necessary. Use City Conversion Table to convert volume to tons.
Date Material Type
A B C
Actual Amt
Reused or
Salvaged
Actual Amt
Recycled
Actual Amt
Disposed in
Landfill
Destination Facility
(Name, Address, Phone)
Example:
01/01/2020 Concrete (broken) 5 tons
Palomar Transfer Station, 5960 El
Camino Real
-760 603-0153
SEE ATTACHED WORKSHEET
@TOTAL 158.74 2.89
SECTION C
Diversion Rate Achieved _1_5_8_. 7_4 _____ __./_1_6_1_.6_3 ________ =_9_8_.2_1 ___ %
Total of colupinS A ?1 / T°;al of columns A + 8 + C DIVERSION
Contractor/Owner s;gnature ~ ~ Date 5/ 3 ) / 2.J .
Attach the following documentation to this Report: Return completed form and documentation to:
• Original recycling weight tickets, landfill weight tickets
• Original donation receipts with photos and/or itemized descriptions
• Any other relevant information to support Recycling Report
City of Carlsbad
Building Division (1st Floor)
1635 Faraday Avenue
Carlsbad, CA 92008
Page 3 of 4 Rev. 04/22
Republic Services. Inc.
Diversion Report*
Account: BURGER CONSTRUCTION
oife,s,011•· ', •• ·1,.a_ 100.oo;i.
Account Numbei,661-1001592-00001i. :0 • ,_ ', .; : ...,...-• '.!,,"?' ,•;_.,,---:;rp .. _,. I• -
l:t·ffl'iGtffM J 661-1001592-00001
661-1001592-00001
661-1001592-00001
661-1001592-00001
Site Name
BURGER CONSTRUCTION
BURGER CONSTRUCTION
BURGER CONSTRUCTION
BURGER CONSTRUCTION
Site Address
1818 ASTON AVE
1818 ASTON AVE
1818 ASTON AVE
1818 ASTON AVE
Container Name
C&O Dumpster (Recyde)
C&O Dumpster (Recycle)
C&O Dumpster (Recycle)
C&D Dumpster (Recycle)
,. l:ll
Service Period
11-0ct
4-Nov
22-Nov
7-0ec
• ·~--; --•_.; "-r_ -~--~ -. • .-1. .. ., ., .. ,~ .r _ .. 1'1' ,,11, __ • IJ, . ,. .. •-.~-• T-••· l
-..:::_ ~'--• • ~lj. -• -~ } -
...... f.0_· :J :.:_ !}·:~1-~-!;·sr~-.1 ~ ·.-_ I ' .·1-1-··-T' ?, ... 'S;: .,__:'}___ . •. ,. . '
Container Container
Size Qty ltiii3U44® IJ'tffltittm Schedule Tonnage
Unit of
Measure
40.00 1 Construction & Oemohtt C&D OnCall 8.13 TN
40.00 1 Construction & Oemolitc C&D OnCall 5.73 TN
40.00 1 Construction & Oemolitc C&D OnCall 4.◄1 TN
◄0.00 ' Construction & Oemohtc C&D OnCatl 3,37 TN
RECYCLE TOTAL 21.64
SOLID WASTE TOTAL .00
GRAND TOTAL 21.64
*Sm.all containers are not weighed. Weights provtded for small containers are only estimates and c1re bc1sed on your container size multiplied by the number of scheduled hauls per month multiplied by the assumed weights of lOOlbs per cub4c yard for waste or Sotbs per cubic yard for recycling.
Republic Services, Inc.
Diversion Report*
Aci:ount;COBRA GOLF • Account Number: 6611002017
Diversion %:. 100.00%
Container ID# Site Name Site Address Container Name Service Period
66110020170000101 COBRA GOLF 1818 Aston Ave Carlsbad, CA 92008 RECYCLE CONTAINER 3 CU YO 08/18/2022 • 05/27/2023
i,' '10------..-,f-:"°' •--~· ,•~~ • ,~:,./rJr:: ~ -£ttlirJ?:;'\tt:~----~-,~·-·~ :.:~ y,.;~:. 1 r " ~ " .., .....-±hr•-=# :e:::e
Container Container
Size Qty l•ffl!ifflfflffi tN®Ah Schedule ::.:.:,:;.:siiill
J.00 None Recycle 1 Every Week 3.15 TN
RECYCLE TOTAL 3.15
SOLID WASTE TOTAL .00
GRAND TOTAL 3.15
*Small containers are not weighed. Weights provided for small comainers are only estimates and are based on your container size multiplied by the number of scheduled hauls per month multiplied by the assumed weights of 1 OOlbs per cubic yard for waste or SOlbs per cubic yard for recycling
Republic Services, Inc.
661 1 0034560000101 BURGER CON 1818 Aston Ave Carlsbad. CA 92008 RECYCLE CONTAINER 3 CU YD 01/09/2023 • 04/28/2023 3.00 All-In-one Recychng Re<yde OnCall 60 TN
RECYCLE TOTAL .60
SOLID WASTE TOTAL .00
GRAND TOTAL .60
*Small containers are not weighed. Weights provided for small containers are only estimates and are based on your container size multiplied by the number of scheduled hauls per month multiplied by the assumed weights of 1 00lbs per cubic yard for waste or SOlbs per cubic yard for recycling
EDCO Transfer Station
3660 Dalbergia St .
San Diego, CA 921 36
(619) 234-0848
customer: 0017
CEMENT CUTTING
i~~
Ticket : 11707
Date: 12/01/22
Commodity Uni ts Rate
20 Commercial Refuse 2.21
f\<;w~ ,fwc
In: 14:13
Out: 14:14
0 '-"'</Cf\-
INVOI CE
Truck: 8424/8424
Container:
Route : 02020
Origin: 02 0 SAN DIEGO
[Gross(In): 7.61 tons Scl#l Tare 5 .40 tons Stored Net:
Extended
Charge
209.95
2 . 21 tons]
TOTAL DUE 209.95
RBOTE Driver
\Y()(,sh ~°'~ r }5 4-f {;/Af-
Rock Ridge Crushing
13465 Camino Canada #106-501
CAUS
619-324-7065
BILLING ADDRESS
Cement Cutting Inc
3610 Hancock Street
San Diego, CA 92110
Platefrag: 41
TICKET
TICKET Number: 110045
Ticket Date: 0W06/?.022
Payment Terms: Net 6:J
Ticket Amount: $205.00
➔ T~,~ ~v}".ur lttA,S 1~t1 2os.oo
C Z>rtl-V'~ 'f'.l, 1 ~ (Al.,, Hvlt.4s
--U Subtotal
Sales Tax
Ticket Amount
Payment
Payment Method
Carrier:
Job I#: 1818 Asto~ ~ Cm (s {-=i1 ',)
NOTICE: No claims ailowed unless rr.ade when material is delivered and receipted for.
205.00
A finance charge per month on the unpaid balance shall be charged on all accounts 30 days or more past due. Customers agrees to pay all
costs and expenses of collection of any amount here-under.
RAC will make all reasonable efforts to deliver all material to customer on the date and time specified by customer and in sufficient incremental
quantity to meet customers specification therefore when customer order is placed. ARC however, disclaims any responsibility for late delivery or
insufficient incremental quantity delivered and customer expressly waivers a claim of damages, right of offset or back charge as a result of late
delivery or Insufficient incremental quantities delivered. The above waiver of damages shall include actual or consequential damages or any
damages under the California Commercial Code.
Customer agrees to notify RAC in wr:ting of any claims including dairns of defects associated with the material delivered and or picked up here
under within 72 hours after the first date and item set forth on the front of the certification and the afford RAC the opportunity to correct a such
claims prior to customer incurring any cost or expense in attempting to correct sale.
Customer acknowledges and accepts the health hazards associated wrth aggregates. asphalt, cement or other construction products. By
acceptance of such materials customer releases RAC for all liability associated with such health hazards.
Title passes to purchaser at the time of loading
PROP 65 -Warning to customers and employees products sold or used on these premises may contain chemicals known to the state to cause
cancer or birth defects.
Seller makes no warranty as to suitability of material for an intended use by customer.
Page , of 1
EDCO Transfer Station
3660 Dalbergia St.
San Diego, CA 92136
(619) 234-0848
Customer: 0017
CEMENT CUTTING
Commodity
Ticket: 97709
Date: 09/13/22
Rate
In: 10: 39
Out: 10:40
INVOICE
Truck: 0004/0004
Container:
Route: 02013
Origin: 020 SAN DIEGO
13 Concrete
tGross ( In) :
Units
1.24
6 .50 tons Scl#l Tare 5 .26 tons Stored Net :
Extended
Charge
62.00
1 . 24 tons]
TOTAL DUE 62.00
RBOTE Driver
□
□
□
D
IE
□
□
D
□
□
□
□
ABC Industrial Services Inc.
1411-1419 N. Magnolia Ave., El Cajon, CA 92020
598 .
Name
619.499.7201
abcindustrialservJces@gmail.com
Date
(1~L G,.:\}""' \ l-'"l ·-kJ-,
Rec.By I Oia,ge I ueaKCard I cash Oledt
Desaipdon Amount
Dump Fee
1 Ton Truck $
Single Axle Trailer $
Dual Axle Trailer $
Bobtail Truck $
Ten-Wheeler 61-~ \\-, f J., $LC() ·~
Super 10-Wheeler $
Boosters $
End Dump/Semi $
Other $
Note: $
Additional Charge : □Red Brick $ D Oversize 0Petromat Ornrt □Trash
Base Fee
Yards Amount $
I Total $2.uo . ....,
PO I. ______ Job Name: Jg l ~ ~J l,-r
Trucking Compa"o/'~ G.-1:J-'6 ,, Ya
Driver Signature:__.~,c;,__ ______________ _
Print Name: _________________ _
PALOMAR TRANSFER
'5960 'EL CAMINO REAL
CARLSBAD, CA .92008
(760) 603-0153.
J01858 -CEMENT CUTTING INC .
3610 HANCOCK STREET
SAN DIEGO, CA 92110
Contract: COMM-GATE
GROSS
TARE
NET
T!:acking Qty:
Yr . 200
48,800
27,140
21,660
0.00
Qty
10 .83
Unit Description
TN C&D
Crigin: CARLSBAD
Scale In
Scale Out
100%
Ticket #: 2450049
Weighrnaster: IN -marticy OUT
In: September 02, 2022
Out: September 02, 2022
Vehicle : CD
riverno
1 :32 pm
1:53 pm
Ref:
BOL:
A61900 -Truck #38 w/B Box -181
ASTON
INBOUND
INVOICE
Rate Extension
$87.54 $948 .06
Tax
$0 .00
Total
$948.06
~\~ ~tU.,,\t.L.,\ ~~~ C\\\ ~-t., C't1i\~\-Y\\.v\:t)V\ ~\,(i's
R~~,o \\ L,'k,,\s
Signature:
Total
Paid
Change
$948 .06
$0.00
$0.00
' •PALOMAR TRANSFER
5960 EL CAMINO REAL
CARLSBAD , Ch 92008
(760) 603-0153
001858 -CEMENT CUTTING INC.
3610 HANCOCK STREET
SAN DIEGO, CA 92~10
Contract: INDJSTRIAL-GATE 2
GROSS 43,380 Scale In
TARE 27,100 Tare Out
NET 16,280
Tracking Qty: 0.00
Qty U~it Description
8 .14 TN MSW
Origin: SAN DIEGO 100%
f).S To/""
Signature:
'·,-l Ticket ff:: 2440192
Weighmaste r: aceveos
In: August 10, 2022
Out : August 10, 2022
Vehicle: a61927
Ref:
BOL :
INBOUND
INVOICE
Rate Extension
$87.54 $712.58
Tax
so 00
Total
Paid
Change
11:44 am
11:44 am
Total
$712.58
$712. SE
$0. oc
$0. oc
PALOMAR TRANSFER
,960 EL CAMINO REAL
CARLSBAD, CA 92008
(760)603-0153
001858 -CEMENT CUTTING INC.
3610 HANCOCK STREET
SAN DIEGO, CA 92110
Contract: COMM-GATE Yr. 200
GROSS 42,380
TARE
NET
27,400
14,980
Tracking Qty: 0.00
Qty
7.49
Unit Description
TN MSW
Origin: CARLSBAD
Signature:
~)4 Ticket #: 2441156
Weighmaster: marticy
Scale In
Tare Out
100%
In: August 12,
Out: August 12,
Vehicle: A61930
Ref: 1818 Aston
BOL:
INBOUND
INVOICE
Rate Extension
$87.54 $655 .67
2022
2022
Tax
$0 00
Total
Paid
Change
12:01 pm
12 :01 pm
Total
$655 .67
$655 67
$0.00
$0.00
'PALOMAR TRA~S?ER
5960 EL CAMIN•) REAL
CARLSBAD, CA 32008
(760) 6'J3-0153
001858 -CENEUT CUTTING INC .
3610 HANCOCK STREET
SAN DIEGO, CA 92ll0
Contract: INDCSTRIAL-GATE 2
GROSS 39,640 Scale In
TARE 27,100 Tare Out
NET 12,540
Tracking Q~v: 0.00
Qty
6.27
Unit Description
TN MSW
Origin: CARLSBAD
Si gnature:
100%
s ,: Ticket #: 24 42194
Weighmaster: cisneadl
I n: August 15, 2022
Out: August 15, 2022
Vehicle: a6192J~
Ref:~~)
BOL: ~
INBOUND
INVOICE
Rate Extension
$87.54 $548.88
Tax
$0.00
Total
Paid
Change
1:12 pm
1:12 pm
To:.al
SS48. ea
$548.88
$0 .00
$0.C0
PALOMAR TRANSFER
5960,EL CAMINO REAL
CARLSBAD, CA 92008
(760)603-0153
001858 -CEMENT CUTTING INC.
3610 HANCOCK STREET
SAN DIEGO, CA 92110
Contract: INDUSTRIAL-GATE 2
GROSS 37,880 Scale In
TARE
NET
Tracking Qty:
27,100 Tare Out
10,780
0.00
Qty Unit Description
5. 39 TN MSW
Origin: CARLSBAD 100%
Signature:
•:: -~ Ticket #: 24 43172
Weighmaster: marticy
In: August 1 7 , 2022
Out: August 17, 2022
Vehicle: a61927
Ref: Daniel
BOL:
INBOUND
INVOICE
Rate Extension
$87.54 $471.84
Tax
$0 .00
Total
Paid
Change
1 :39 pm
1 :39 p:r::
Total
$471.84
$471 .84
$0.0'.)
$0.0J
I PALOMAR TRANSFER
5960 EL CAMI NO REAL
CARLSBAD, CA 92008
(7~0)603-0153
001858 -CEMENT CUTTING INC.
3610 HANCOCK STREET
SAN DIEGO, CA 92110
Contract: INDUSTRIAL-GATE 2
GROSS 37,700 Scale In
TARE 27,100 Tare Out
NET 10,600
Tracking Qty: 0.00
Qty Unit Description
5.30 TN MSW
Origin : CARLSBAD 100%
Signature:
54 Ticket #: 2 ~4 3354
Weighmaster: venegem
In: August 18 ,, 2022
Out: August 18 .,., 2022
Vehicle: a61927
Ref: DANIEL
BOL:
INBOUND
INVOICE
Rate Extension
$87.54 $463.96
Tax
$0.0 0
Total
Paid
Change
7: oo am
7:00 a.:1
Total
$463.96
$463 .96
$0 .00
$0 .00
PALOMAR TRANSFER
5960 FL CAMINO REAL CARLSBAD, CA 92008
(760) 603-0153
001858 -CEMENT CUTTING I NC.
3610 HANCOC3: STREET
SAN DIEGO, CA 92110
Contract: INDUSTRIAL-GATE 2
GROSS 44,820
TARE 27,100
NET
Tracking Qty:
17,720
0 .00
Qty
8.86
Unit Description
TN MSW
Origin: CARLSBAD
Si gna"t:.u re:
Scale In
Tare Out
100%
~) ~-Ticket #: 24~
Weighmaster: marticy
In: August
Out: August
Vehicle: a61927
Ref: Torta
801:
INBOUND
INVOICE
Rate Extensio~
$87.54 $775.60
19,
19,
3978
2022
2022
Tax
$0.00
Tot a l
Paid
Cha nge
11 :09 are
11: 09 ar.i
Tota.!.
$775.60
$775. 60
$0.00
$0.00
PALOMAR TRANSFER
5960 EL CAMINO REAL CARLSBAD, CA 92008
(760)603-0153
001858 -CEMENT CUTTING INC.
3610 HANCOCK STREET
SAN DIEGO, CA 92110
Contract: INDUSTRIAL-GATE 2
GROSS 36,320 Scale In
TARE 27,100 Tare Out
NET 9,220
Tracking Qty: 0.00
Qty Unit Description
4 • 61 ~~~\
Origi~
Si gnat ure:
lOO!i;
:·j Ticket #: 2445119
Weighmaster: marticy
In: August 22, 2022
Out: August 22, 2022
Vehicle:~7
Ref: Daniel
BOL:
INBOUND
INVOICE
Rate Extension
$87.54 $403.56
Tax
$0.00
Total
Paid
Change
1: 09 pm
1 : 09 pm
Total
$403.56
$403.56
$0.0C
$0.00
'· . PALOMAR TRANSFER
5960 EL CAMINO REAL
CARLSBAD, CA 92008
(760)603-0153
001858 -CEMENT CUTTING INC.
3610 HANCOCK STREET
SAN DIEGO, CA 92110
Contract: INDUSTRIAL-GATE 2
GROSS 39,440 Scale In
TARE 27 ,100 Tare Out
NET 12,340
Tracking Qty: 0 .00
Qty Unit Description
6.17 ~
Origin:~
Signature:
100%
~,cl Ticket #:: 2445050
Weighmaster: marticy
In: August 22, 2022
Out:
Vehicle:
Ref:
BOL:
INBOUND
INVOICE
Rate Extension
$87 .5 4 $540.12
22 , 2022
Tax
$0 .00
Total
Paid
Change
11: 4 5 arr.
11:45 an:
Total
$540 .12
$540 .12
$0.0J
$0.0)
, PALOMAR TRANSFER
5960 EL CAMINO REAL
CARLSBAD , CA 92008
(760)603-0153
001858 -CEMENT CUTTING INC.
3610 HANCOCK STREET
SAN DIEGO, CA 92110
Contract: COMM-GATE
GROSS
TARE
NET
Tracking Qty:
Yr. 200
39,120
27,640
11,480
0.00
Qty
5.74
Unit Description
TN MSW
Origin: CARLSBAD
Signature:
Scale In
Tare Out
100%
Weighmaster: rnarticy
In: August 24, 2022
Out: August 24, 2022
Vehicle: A61900
Ref: Aston
801:
INBOUND
INVOICE
Rate Extension
$87.54 $502.48
Tax
$0 .00
Total
Paid
Change
10:08 am
10: 08 a.~
Tot3l
$502. 43
$502.48
$0.00
$0.00
' PALOMAR· TRANSFER
5960 EL CAMINO REAL
CARLSBAD, CA 92008
(760)603-0153
001858 -CEMENT CUTTING INC.
3610 HANCOCK STREET
SAN DIEGO, CA 92110
Contract: INDUSTRIAL-GATE 2
GROSS 37,740 Scale In
TARE 27 ,100 Tare Out
NET 10,64 0
Tracking Qty: 0.00
Qty Unit Description
100%
Signature:
.: Ticket #: 2446432
Weighmaster: marticy
In: August 25, 2022
Out: August 25, 2022
Vehicle: a61927
Ref :/~
BOL: (_______.-/
INBOUND
INVOICE
Rate Extension
$87.54 $465.71
Tax
$0 .00
Total
Paid
Change
10:22 ~-
10:22 an
Total
$465 .7:..
$ 4 65 71
$0.00
$0.00
PALOMAR. TRANSFER
5960 EL CAM I NO REAL
CARLSBAD , CA 92008
(760)603-0153
001858 -CEMENT CUTTING INC .
3610 HANCOCK STREET
SAN DIEGO, CA 92110
Contract: INDUSTRIAL-GATE 2
GROSS 40,880 Scale In
TARE 27,100 Tare Out
NET 13,780
Tracking Qty: 0.00
Qty Unit Description
6. 89 . -~-~-N-~
Ori~) 100%
Signature:
•• .i Ticket #: 2446456
Weighrnaster: marticy
In : August 25, 2022
Out: August 25, 2022
Vehicle: a61927 ---· -......
Ref:/ Darrtel ~ 1
BOL:~
INBOUND
INVOICE
Rate Extension
$87. 54 $603 .15
Tax
$0.00
Total
Paid
Change
10:54 a::i
10: 54 a~
Total
$603 .15
$603.15
$0. 00
$0.00
' PALOMAR TRANSFER
5960 EL CAM[NO REAL
CARLSBAD, CA 92008
(760)603-0153
001858 -CEMENT CUTTING INC .
3610 HANCOCK STREET
SAN DIEGO, CA 92110
Contract: INDUSTRIAL-GATE 2
GROSS 36,300 Scale I n
TARE 27,100 Tare Out
NET 9,200
Tracking Qty: 0.00
Qty Unit Description
4. 60 = /ci::ir Originu 100%
Signature:
SA Ticket #:2446803
Weighmaster: reyesrna3
In: August 26, 2022
Out: August 26, 2022
Vehicle:
Ref:
BOL: e
INBOUND
INVOICE
Rate Extension
$87.54 $402 .68
Tax
$0.00
Total
Paid
Change
7:47 dl".I
7:47 :U:!
To::al
$402.€8
$402 .68
$0 .00
$0. 00
PALOMAR TRANSFER
5960 EL CAM!NO REAL
CARLSBAD, CA 92008
(760)603-0153
001858 -CEMENT CUTTING INC.
3610 HANCOCK STREET
SAN DIEGO, CA 92110
Contract: COMM-GATE
GROSS
TARE
NET
Tracking Qty:
Yr. 200
46,300
27,640
18,660
0.00
Qty
9.3 3
Origin :
Unit Description
TN MSW
CARLSBAD
Signature:
Sc~In
Ta "Pe"" Out
100%
5.:; Ticket #: 2448488
Weighmaster: rivernol
In: August 30, 2022
Out: August 30, 2 022
Vehicle: A61900
Ref:
BOL:
INBOUND
INVOICE
Rate Extension
$87 .54 $816.7 5
Tax
$0.0 0
Total
Paid
Change
12:22 prtt
~
12:22 pm
Total
$816.75
$816.75
$0 .00
$0 .00
PA,LOMAR' TRANSFER
' 596U EL CAMINO REAL
CARLSBAD, CA 92008
(760)603-0153
001858 -CEMENT CUTTING INC.
3610 HANCOCK STREET
SAN DIEGO, CA 92110
Contract: COMM-GATE
GROSS
TARE
NET
Tracking Qty:
Yr 200
44,780
27,640
17,140
0 .00
Qty
8.57
Unit Description
TN MSW
Origin: CARLSBAD
Signature:
Scale In
Tare Out
100%
Ticket #: 2449079
Weighmaster: venegem
In: August 31, 2022
Out: August 31, 2022
Vehicle: A61900
Ref:
BOL:
INBOUND
INVOICE
Rate Extension
$87 .54 $750 .22
........
• ...•
.,,,1. Tax
~· $0.00
Total
Paid
Change
2:00 pm
2:00 pm
Total
$750.22
$750 22
$0.00
$0.00
PALOMAR,TRANSFER
5960 EL CAMINO REAL
CARLSBAD, CA 92008
(760)603-0153
001858 -CEMENT CUTTING INC.
3610 HANCOCK STREET
SAN DIEGO, CA 92110
Contract: COMM-GATE Yr. 200
GROSS 11,360
TARE 0
NET
Tracking Qty:
11,360
0 .00
Qty Unit Description
5. 68 TN MSW
Origin: CARLSBAD
Signature:
Scale I n
Scale Out
100%
Ticket#: 2474508
Weighmaster: venegem
In: October 31, 2022
Out: October 31, 2022
Vehicle: A50232
Ref: C/D 1818 Aston Ave
801:
INBOUND
INVOICE
Rate Extension
$87 .54 $497.23
Tax
$0.00
Total
Paid
Change
10:42 am
10:42 am
Total
$497 .23
$497.23
$0.00
$0.00
PALOMAR TRANSFER
5960 EL CAMINO REAL
CARLSBAD, CA 92008
(760)603-0153
001858 -CEMENT CUTTING INC.
3610 HANCOCK STREET
SAN DIEGO, CA 92110
Contract: COMM-GATE Yr. 200
GROSS 11,960 Scale In
TARE 11,180 Tare Out
NET 780
7racking Qty: 0.00
Qty
0.39
Unit Description
TN MSW
-... Ticket #: 2474667
Weighrnaster: marticy
In: October 31, 2022
Out: Octobe::-31, 2022
Vehicle: A50232
Ref: JOB: 1818 Aston Avenue
BOL:
INBOUND
INVOICE
Rate Extensior.
$87 .54 $50 .07
Tax
$0 .00
Origin: CARLSBAD 100%
Signature:
Total
Paid
Change
1 :35 pm
1: 35 pm
Total
$50.07
$50.07
$0.00
$0.00
Pl,iLOMA,R TRANSFER
5960 EL CAMINO REAL
CARLSBAD , CA 92008
(760; 603-0153
0 01 858 -CEMENT CUTTING INC.
3610 HANCOCK STREET
3~N DIEGO, CA 92110
Concract: COMM-GATE Yr. 200
GROSS 11,L20 Scale In
TARE 11,180 Tare Out
NET 40
Tracking Qty: 0.00
Qty Unit Description
O.G2 TN MSW
:, ; Ticket #: 2475042
Weighmaster: rnarticy
In: November 01, 2022
Out: November 01, 2022
Vehicle:
INBOUND
INVOICE
Rate Extension
$87.54 $50.07
Tax
$0 .00
Origin: CARLSBAD 100%
Signature:
Total
Paid
Change
11 : 43 am
11:43 am
Total
$50.07
$50.07
$0.00
$0 .00
\I \Jl',l\)5lt.
6~71lff~
lEMOtl r .A 919·
•covery
l'I, 1~'2022 CREDH l AAO
94 5
I/ISA SALE
C-4tl ;;
u11)CMd:
MO·
SEQ~:
1'>3\lh t
INVOICE
~1~c1al eooe:
01b11~M
wxie·
S~Lr. AMOUNi
C
l'f..:OOJJJJif.J..~l,
CHASE'll',
AOOOOOOOU310\0
5
Sl9
5
Ticket :
Date:
Units
.42
Scl #l
I NVOI CE
2475 3 In: 13:29 Truck: 0294/0294
09/14/22 Out : 13 :35 Cont aine r :
Route: 0203 4
Origin : 020 SAN DIEGO
Extend ed
Rate Charge
83.00 pe r TON 60.00
Tare 10,680 . l bs Scl#l Ne t : 840. l bs]
PAI D CREDI T CARD 60.00
Tt
wi
3rtificate •• Diversion Percentage 69%
,ove has utilized an EDCO facility to divert construction demolition materials in accordance
tonnage is based on an overall tonnage percentage of the respective EDCO facility.
Br ayan Tapia Driver
EOCu Dt~MAL CORP
6670 FtUfRAI. BLVD
LEMON GR(11( CA 911H513
Ill 16 2022 ll20·JO
Ckt&II ~
VISA SAl.f
1.JfJ ~ XXXXXXXIDXXliM
~114, Caa: CHASE VISA
Aft, AOOOOOOOOJlOI~
5fQ :;· 11
BlW1 :;: 858
IINOICE 11
;,pro1al Cock 009050
61by Melf¥,d Olp Re.Id
Mode Issuer
SALE AMOUNT sEJj,00
CuS r ONER COPY
:ry
Ticket: 30238
Date : 10/26/22
In: 13:0 7
Out : 13 :20
Uni ts
IOL . 58
.b s Sc l #l
Rate
83 .00 per TON
Ta r e 1 0,260 . l bs Scl #l
p;, .. c, G-t\(
I NVOICE
Truck: 0294/0294
Container:
Route: 02034
Origin: 020 SAN DIEGO
Extended
Charge
60 .00
Net : 1 ,160 . lbs]
PAID CREDIT CARD 60 .00 )n Certificate •• Diversion Percentage 69%
ed above has utilized an EDCO facility to divert construction demolition materials in accordance
·sion tonnage is based on an overall tonnage percentage of the respective EDCO facility.
Driver
f(Xv OLh.iSAL rnRP
6&70 fflltt<Al BLVD
!£MON GRUft,\A m:fs13
11 13·2022 H:27:~9
CRtD!l (AAO
C'IIJ :;
SEQ 11:
Bat.ch;:
IINOICE
i\-,lf o,al Code:
f. ;b ~ MeU'Kld.
~:
SALE AMOUNT
VISA SALE
JXl.JJ.JJ:ttfil?li J
I I
895
H
092717
~a11.:a1
{)ff
rery
15
Ticket: 36567
Date : 12/13/22
In : 14:21
Out: 14 :27
Units
~MOL 1 . 01
lbs Scl#J,.
Rate
83.00 per TON
Tare 10,540. lbs Scl#l
INVOICE
Truck: 0294/0294
Container:
Route : 02034
Origin: 020 SAN DIEGO
Extended
Charge
83.83
Net : 2,020. lbs]
ClJS'fOl11f:k COPY sion Certificate ·-Diversion Percentage 69%
PAID CREDIT CARD 83.83
sted above has utilized an EDCO facility to divert construction demolition materials in accordance
•ersion tonnage is based on an overall tonnage percentage of the respective EDCO facility.
CHRISTIAN ENCISO
EDCO Station
8184 Commercial St .
La Mesa, CA 91942
(61 9) 466-3355
Customer: 0491 Ticket:
TOWNE DRYWALL INC
10612 PROSPECT AVE #105
SANTEE, CA 92071
Date:
Cornmodity Units
20 Commercial Refuse .93
[Gross {In): 6.25 tons Scl#l
Miguel E.
27868
02/21/23
Rate
In :
Out:
7:06
7:13
Tare 5 .32 tons Scl#l
Drive r
Truck:
Contain er:
Route:
Origin:
INVOICE
9999
02020
020 S-Afl DIEGO
Extended
Charge
91.14
Net: . 93 tons]
TOTAL DUE 91.14
Driver
' EDCO Station
8184 Commercial St .
La Mesa, CA 91942
(619) 466-3355
Customer: 0491 Ticket : 38074
.,. __ 'Date: 03/22/23
TOWNE DRYWALL INC
10612 PROSPECT AVE #105
SANTEE, CA 92071
Commodity Units
20 Commercial Refuse .22
Rate
In: 5 : 59
Out: 6:07
INVOICE
Truck: 9999
Container:
Route: 02020
Origin: 020 SAN DIEGO
Extended
Charge
75 .00 [Gross (In): 5 .62 tons Scl#l Tare 5.40 tons Scl#l Net : . 22 tons]
TOTAL DUE 75.00
Miguel E . Driver
CMS
: ,,-,•11 r, lr1
05/24/23
Burger Construction
San Diego, CA
Job Name: Cobra Puma Golf
Job Number: 1085516
Acoustical Ceilings Acoustical Panels
Specialty Wood & Metal Ceilings
FRP T ackboard
Doors Frames Hardware
Job Address: 1818 Aston Ave. Carlsbad, CA 92008
To whom it may concern,
In reference to the work performed at Cobra Puma Golf:
-.Jiu7
Lio#871262
DIR#1000005814
www .cmsint-inc.com
Approximately 2500lbs of recyclable materials, plastic and cardboard were disposed of in the appropriate C&D
receptacle provided by EDCO. Since our HOA pays for this service, we do not receive a monthly bill for the combined
materials, as such we are unable to provide a project specific rece ipt.
Sincerely,
Nancy Mertz
Adm in Assistant
McBride
Door l, lldrdwdrt Inc.
Contractors License #788702
May 23, 2023
Burger Construction
11760 Sorrento Valley Road, Suite A
San Diego, CA 92121
To: Whom it May Concern
13811 Danielson Street, Poway, California 92064
Ph (858) 842-4480, Fax (858) 842-4481 , www.mcbridedoor.com
In reference to the work performed at Cobra Puma Golf Tl Burger Job #1085516).
McBride brought all trash and recyclable material back from the jobsite to our warehouse and disposed of it in the
dumpsters provided by EDCO. We do not make dump trips per project. We receive a monthly bill from EDCO for the
combined services. Therefore we are unable to provide a specific receipt for this project.
The estimated amount of debris brought to our warehouse is as follows including the % Recycled.
244 Cardboard Boxes -100% Recycled -Approx Weight 486 lbs
Please contact me directly if you require any further information.
Cheri Smea l
Accounts Payable
INSULATION + FIRESTOP
May 30, 2023
Burger Construction
4920 Carroll Canyon Rd Ste 200
San Diego, CA 92121
To Whom It May Concern,
~-SPEC-~~ 'fl Q.UALITY SERVICES DELIVERED
In reference to the work performed at Cobra Puma Golf Tl, 1818 Aston Avenue, Carlsbad, CA 92008,
Burger Job 1085516.
We brought back from jobsite to our office/warehouse approximately:
5 lbs of trash and disposed of it in appropriate trash receptacle provided by Edco Disposal. Since we
receive a monthly bill for the combined material, we are unable to provide a project specific receipt.
5 lbs of recyclable materials (plastic) and disposed of it in appropriate C&D receptacle provided by Edco
Disposal. Since we receive a monthly bill for the combined material, we are unable to provide a project
specific receipt.
Sincerely,
Scott McClure
President
CORPORAr E OF I ICE 9/49 CAC rus Sr, LAKl:.SIDE, CA 92040 / ONTARIO Off ICI:. 1920 AllCHIBALO AVE, UNlf K, ON1ARIO, CA 91/61
0 619.938.9727 F 619.938.9757 M 619.822.0056 / LICENSE It 1028492 CA0IR It 1000050446
spec7con.com
10178 Willowcreek Road
San Diego, CA 92131
Phone: (858) 630-5200
Contractor's License# 999046
Date:
5/31 /2023
To:
BURGER CONSTRUCTION
4920 CARROLL CANYON ROAD STE 200
SAN DIEGO CA 92121
To Whom It May Concern,
PROJECT:
COBRA PUMA GOLF
1818 ASTON AVE
CARLSBAD CA 92008
In reference to the work preformed at Cobra Puma Golf at 1818 Aston Ave. Carlsbad Ca.
92008 (Burger Project #1085516):
We did not dispose of any debris on site.
We brought back from the jobsite to our office/warehouse approximately:
25 lbs. of trash and disposed of it in appropriate waste receptacles provided by
Republic Services.
50 lbs . of recyclable material (Carpet, Plastic & Cardboard) and disposed of it in
appropriate C&D receptacle provided by LA Fiber. Since we receive a monthly bill for
the combined material, we are unable to provide a project specific receipt.
Thank you,
Lori,, tv1. O-¥W
Project Coordinator for John Bracha
10178 Willow Creek Road
San Diego, CA 92131
Office: 858-630-5132
Cell: 760-805-2835
Date: 1/27/23
MAXIMUM
Painting and Wallcoverings
GUARANTEE
License# 547831
Construction Company: BURGER
Address 4920 Carroll Canyon Road, Ste. #200
City, state, zip San Diego CA 92121
RE:
Project:
Project #:
Recycling
Cobra Puma Golf TI
10855 16
To whom it may concern:
Maximum Painting & Wallcoverings Corporation returns all paint not used on
projects to the manufacturer for recycling.
Subcontractor:
MAXIMUM
Painting and Wallcoverings, Corp.
2357 Monte Vista Drive
Vista CA 92084
(0) 760-415-1735
(F) 866-405-4816
Date: 6/2/23
MAXIMUM
Painting and Wallcoverinus
GUARANTEE
License# 547831
Construction Company: BURGER
Address 4920 Carroll Canyon Road, Ste. #200
City, state, zip San Diego CA 92121
RE:
Project:
Project #:
Recycling
Cobra Puma Golf Fit Bay / Showroom / Test Bay
10855 16
To whom it may concern:
Maximum Painting & Wallcoverings Corporation returns all paint not used on
projects to the manufacturer for recycling.
Subcontractor:
MAXIMUM
Painting and Wallcoverings, Corp.
2357 Monte Vista Drive
Vista CA 92084
(0) 760-415-1735
(F) 866-405-4816
5-30-23
Burger Construction
4920 Carroll Canyon Rd Ste 200
San Diego CA 92121
To Whom It May Concern,
In reference to the work performed at COBRA PUMA GOLF-181 ASTON AVE.
CARLSBAD, CA.:
We did not dispose of any debris on site. All of our product was used for
this project.
Sincerely,
NICOLE COLE
PROJ. COORD.
llS MIIRKFT Pl /\CF
fSCONDIDO Cl\ 9)0,<J
7b0 738 3837
GENESIS
WOODWORK I NG
SO ~ CA
RECYCLING LETTER
5/30/23
TO: Burger Construction
4920 Carroll Canyon Rd. #200
San Diego, CA 92121
To Whom It May Concern,
In reference to the work performed at Cobra Puma Golf-1818 Aston Ave. Carlsbad. CA
92008:
We did not dispose of any debris on site. All of our product was used for this project.
Sincerely,
Miles Lachance
Project Coordinator
GENESIS\VOOD\VORKING COM
Burger Construction
11760 Sorrento Valley Rd, Ste A
San Diego, CA 92121
JOB
VENDOR NAME
LIST OF MATERIALS
TAKEN OFF OF JOBSITE
AND TONNAGE/LBS
HOW MANY LBSffONS
WAS RECYCLED
FOR EVERYTHING THAT
WAS RECYCLED DO YOU
HA VE A C&D DIVERSION
CERTIFICATE AND
INVOICE?
HOW MANY LBS/TONS
WAS THROWN AWAY
DATES YOU WERE ON
THE JOB
NOTES
Recycling Deposit Refund
Co 6 r-o-.-Ruv1 CL Gol-P TI
Davis Framing
J\A
tJ\ ~
J\f\-
N' \ f\-
'
.;;;} I \1 l ~~ i\~ \d-d -+o
4\ \\ '(Y\O..,,i,ev{o__,~~ v)ev f. \).5-t.ci er---Projot-