CONSTRUCTION WASTE
MANAGEMENT PLAN
B-59
(}eve[op ment Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Many of the materials generated from your project can be recycled. You are required to list materials that will be
reu sed, recycled or disposed from your project. If you have questions about the recycling requirement or completing
this form, please contact Waste Management at (760) 929-9400, a certified C&D recycler, or the Carlsbad Building
Division at (760) 602-2700. Please note: Unless you are self-hauling, Waste Management or approved haulers must be
used for all construction projects within the City of Carlsbad.
PART 1 Complete and submit this form when applying for a Building Permit. Note: Permits will not be issued
without a completed Construction Waste Management Plan.
Applicant Information
Permit No. <]3l U:t'22,-61.-1J Project Title Millipore Sigma -Phase 2B
Project Address 2827 Whiptail Loop West Carlsbad, CA 92010
Applicant Name Edward Burns
Contractor 0
APN
Other
□
Last First
Applicant Address 5825 Oberlin Drive Suite 1 San Diego, CA 92121
Phone 1847 1 421 -4506 E-mail Address Edward.burns@bnbuilders.com
Applicant Mailing Address 5825 Oberlin Drive Suite 1, San Diego, CA 92121
(if different than project address)
Project Type
(check all that apply):
Residential
□
Commercial
0
Brief Description Mixed use Lab -Office -Manufacturing
Public Building □
Project Size 5'::J, 6 (o 'i sf Estimated Cost of Project$ 44,000,000 I -----------------(sq u ore Joo toge)
Please check the appropriate box:
DI plan on using WASTE MANAGEMENT roll-off bin(s) for all materials and will provide all receipts after construction.
D I plan on self-hauling to a certified recycling facility and will provide all receipts after const ruction.
D This is a proposed LEED certified project and I plan on separating materials on site in conjunction with WASTE
MANAGEMENT.
Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information
provided in and with this form pertains to construction and demolition debris generated only from the project listed
in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the
best of my knowledge and belief.
Print Name Edward Burns s;gnature ~~ Date 4 /19 /24
Page 1 of 3 Rev. 2.10.21
DEBRIS RECYCLING REPORT (ACTUAL):
Acknowledgement
I certify under penalty of perjury under the laws of the State of California that the information provided in and with
this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have
reviewed the accuracy of the information, and that the information is true and correct to t he best of my knowledge
and belief.
Permit No. t"Et 1,oz-Z-02JJ.1 Print Name Edward Burns . -------------------
Address 2827 Whiptail Loop West Carlsbad, CA 9201 O Date 4/19/24 -------------1
Use this Final Log below to track loads of materials as they leave the job site.
@@SAVE RECEIPTS@@
Indicate FINAL quantities in tons for each material and save receipts and documents from facilities where material Is taken.
Additional Project Log pages are available if necessary. Use City Conversion Table to convert volume to tons.
Date Material Type
A B C
Actual Amt
Reused or
Salvaged
Actual Amt Actual Amt
Recycled Disposed in
Landfill
Destination Facility
(Name, Address, Phone)
Example:
01/01/2020 Concrete (broken) 5 tons
Palomar Transfer Station, 5960 El
Camino Real
-/760) 603-0153
6/7/23 thru Construction and 59.06 tons 5960 El Camino Real
2/26/24 Demolition 760-332-6464
7/21/23 thru Contamin ated 22.90 tons 5960 El Camino Real
4/1 /24 Waste 760-332-6464
6/13/23 thru Recycled 43.94 tons 5960 El Camino Real
12/13/23 760-332-6464
@TOTAL 103 tons 22.90 tons .,,.
Diversion Rate Achieved _1_0_3 ______ __,/_1_2_s_.9_o ________ =_a_1 ____ % ~65%□
. ,. 0 c 4/23/2024
Totbal of olumns A~B Total of columns A + B + C DIVERSION
Contractor/Owner Signature V ~ Date
Attach the following documentation to this Report: Return completed form and documentation to:
• Original recycling weight tickets, landfill weight tickets
• Original donation receipts with photos and/or itemized descriptions
• Any other relevant Information to support Recycling Report
City of Carlsbad
Building Division (1st Floor)
1635 Faraday Avenue
Carlsbad, CA 92008
Page 2 of 3 Rev. 2110121
~ NONRESIDENTIAL GREEN Develooment Services ~~ City of BUILDING CODE STANDARDS Building Division
MANDATORY MEASURES 1635 Faraday Avenue
Carlsbad CERTIFICATION CHECKLIST 442-339-2719
B-52 www.carlsbadca.gov
This form, signed and completed, and all receipts for the recycled materials shall be
submitted to the Bulld/ng Inspector prior to Final Inspection.
Site Development Mandatory
5.106.1 Storm water pollution prevention plan. For projects of one acre or less, develop a Storm
Water Pollution Prevention Plan (SWPPP) that has been designed specific to its site, conforming to
the State Storm water NPDES Construction Permit or local ordinance, whichever is stricter, as is
(X}
required for projects over one acre. The plan should cover prevention of soil loss by storm water
run-off and/or wind erosion, of sedimentation and/or of dusUoarticulate matter air pollution.
5.106.4 Bicycle parking and changing rooms. Comply with Sections 5.106.4.1 and 5.106.4.2; or (X)
meet local ordinance, whichever is stricter.
5.106.4.1 Short-Term bicycle parking. If the project is expected to generate visitor traffic, provide
permanently anchored bicycle racks within 200 feet of the visitor's entrance, readily visible to (X)
passers-by, for 5 percent of visitor motorized vehicle parking capacity, with a minimum of one two-
bike capacity rack.
5.106.4.2 Long Term bicycle parking. For buildings with over 1 0 tenant-occupants, provide secure
bicycle parking for 5 percent of tenant-occupied motorized vehicle parking capacity, with a minimum (X)
of one space.
5.106.5.2 Designated parking. Provide designated parking for any combination of low emitting,
fuel-efficient and carpool/van pool vehicles as shown in Table 5.1 06.5.3.1. (X)
5.106.8 Light pollution reduction. Comply with lighting power requirements in the California
Energy Code and design interior lighting such that zero direct-beam illumination leaves the building (X)
site. Meet or exceed exterior light levels and uniformity ratios for lighting zones 1-4 as defined in
Chapter 10 of the California Administrative Code, using the following strategies:
1. Shield all exterior luminaries or use cutoff luminaries (X)
2. Contain interior lighting within each source (X)
3. Allow no more than .01 horizontal foot candle 15ft. beyond the site (X)
4. Contain all exterior lighting within property boundaries (X)
Exception: See part 2, Chapter 12, Section 1205.6 for campus lighting requirements for parking
facilities and walkwavs.
5.106.10 Grading and paving. The site shall be planned and developed to keep surface water
away from buildings. Construction plans shall indicate how site grading or drainage system will ( X )
manaae all surface water flows.
Water Efficiency and Conservation
Indoor Water Use
5.303.1 Meters. Separate meters shall be installed for the uses described in Sections 503.1 .1 (X)
through 503.1.3.
5303.1.1 Buildings in excess of 50,000 square feet. Separate sub-meters shall be installed as
follows: (X) 1. For each individual leased, rented, or other tenant space within the building projected to
consume
more than 100 gal/day.
2. For spaces used for laundry or cleaners, restaurant or food service, medical or dental office,
laboratorv or beautv salon or barber shoo projected to consume more than 100 aal/dav.
B-52 Page 1 of 5 Rev. 05/22
5.303.1.2 Excess consumption. Any building within a project or space within a building that is
projected to consume more than 1,000 gal/day.
5.303 Percent savings. A schedule of plumbing fixtures and fixture fittings that will reduce the
overall use of potable water within the building by 20 percent shall be provided (Calculate
savings by Water Use Worksheets or utilize Table 5.303.2.3).
5.303.2.1 Multiple showerheads serving one shower. When single shower fixtures are
served by more than one showerhead, the combined flow rate of all the showerheads shall not
exceed the maximum flow rates specified in the 20 percent reduction column contained in
Table 5.303.2.3 or the shower shall be designed to allow only one showerhead to be in
operation at a time.
5.303.6 Plumbing fixtures and fittings. Plumbing fixtures (water closets
and urinals) and fittings (faucets and showerheads) shall comply with the requirements listed
for each type in items listed in Table 5.303.6.
1. Water closets (toilets) -flushometer type
2. Water closets (toilets) -tank type
3. Urinals
4. Public lavatory faucets
5. Public metering self-closing faucets
6. Residential bathroom lavatory sink faucets
7. Residential bathroom lavatory sinks
8. Residential showerheads
9. Single shower fixtures served by more than one showerhead
Outdoor Water Use
5.304.1 Water Budget. A waler budget shall be developed for landscaping irrigation use.
5.304.2 Outdoor potable water use. For new water service, separate meters or submeters
shall be installed for indoor and outdoor potable water use for landscaped areas between
1,000 and 5,000 square feet.
5.304.3 Irrigation design. In new nonresidential projects with between 1,000 and 2,500
square feet of landscaped area (the level at which the MLO applies), install irrigation controllers
and sensors which include the following criteria and meet manufacturer's recommendations.
5.304.1.1 Irrigation controllers. Automatic irrigation system controllers installed at the time of
final inspection shall comply with the following:
1. Controllers shall be weather-or soil moisture-based controllers that automatically adjust
irrigation in response to changes in plant's needs as weather conditions change.
2. Weather based controllers without integral rain sensors or communication systems that
account for local rainfall shall have separate wired or wireless rain sensors which connects or
communicates with the controller(s). Soil moisture-based controllers are not required to have
rain sensor input.
Construction Waste Management Plan
5.408.1 Construction waste diversion. Establish a construction waste management plan or
meet local ordinance, whichever is more stringent.
5.408.2 Construction waste management plan. Submit plan per this section to enforcement
authority within the city.
5.408.1.4 Documentation. Provide documentation of the waste management plan (see form
B-59) that meets the requirements listed in Section 5.408.1.1 thru 5.408.1.3 and the plan is
accessible to the enforcement authority.
5.408.3 Construction waste. Recycle and/or salvage for reuse a minimum of 50 percent of
nonhazardous construction and demolition debris or meet local ordinance, whichever is more
stringent.
Exceptions:
1. Excavated soil and land-clearing debris
2. Alternate waste reduction methods, developed by working with local agencies if
diversion or recycle facilities capable of compliance with this item do not exist.
5.408.3 Excavated soil and land clearinQ debris. 100 percent of trees. Stumps, rocks and
B-52 Page 2 of 5
(X)
(X)
(X)
As applicable
(X)
(X )
(X )
(X )
(X )
(X )
(X )
(X )
(X )
(X)
(X )
(X )
As applicable
(X )
(X )
(X )
(X )
(X )
Rev. 05/22
associated vegetation and soils resulting primarily from land clearing shall be reused or
recycled.
Building Maintenance and Operation
5.410.1 Recycling by occupants. Provide readily accessible areas that serve the entire
building and are identified for the depositing, storage and collection of nonhazardous materials (X)
for recycling.
5.410.2 Commissioning. For new buildings 10,000 square feet a·nd over, building (X)
commissioning for all building systems covered by T24, Part 6, process systems and
renewable energy systems shall be included in the design and construction processes of the
building project. Commissioning requirements shall include items listed in Section 5.410.2. -
5.410.2.6 (X)
5.410.2.1 Owner's Project Requirements (OPR). Documented before the design phase of
the project begins the OPR shall include items listed in Section 5.410.4. (X )
5.410.2.2 Basis of Design (BOD). A written explanation of how the design of the building
systems meets the OPR shall be completed at the design phase of the building project and
updated periodically to cover the systems listed in Section 5.410.2.2. (X)
5.410.2.3 Commissioning plan. A commissioning plan describing how the project will be
commissioned shall be started during the design phase of the building project and shall include
items listed in Section 5.410.2.3. (X)
5.410.2.4 Functional performance testing shall demonstrate the correct installation and
operation of each component, system and system-to-system interface in accordance with the (X)
approved plans and specifications.
5.410.2.5 Documentation and training. A Systems manual and systems operations training
are required. (X)
5.410.2.5.1 Systems manual. The systems manual shall be delivered to the building owner or
representative and facilities operator and shall include the items listed in Section 5.410.2.5.1. (X)
5.410.2.5.2 Systems operations training. The training of the appropriate maintenance staff
for each equipment type and/or system shall include items listed in Section 5.410.2.5.2. (X)
5.410.2.6 Commissioning report. A complete report of commissioning process activities
undertaken through the design, construction and reporting recommendations for post
construction phases of the building project shall be completed and provided to the owner or
representative.
5.410.4 Testing and adjusting. Testing and adjusting of systems shall be required for (X)
buildings less
than 10,000 square feet.
5.410.4.2 Systems. Develop a written plan of procedures for testing and adjusting systems. (X )
Systems to be included for testing and adjusting shall include, as applicable to the project, the
systems listed in Section 5.410.3.2. (X)
5.410.4.3 Procedures. Perform testing and adjusting procedures in accordance with industry
best practices and applicable national standards on each system. (X)
5.410.4.3 HVAC balancing. Before a new space-conditioned system serving a building or
space is operated for normal use, the system should be balanced in accordance with the
procedures defined by national standards listed in Section 5.410.3.3.1. (X)
5.410.4.4 Reporting. After completion of testing, adjusting and balancing, provide a final report (X)
of testing signed by the individual responsible for performing those services.
maintenance instructions and copies of guaranties/warranties for each system prior to final
inspection.
5.410.4.5 Operation and maintenance manual. Provide the building owner with detailed
operating and maintenance manual
5.410.4.5.1 Inspection and reports. Include a copy of all inspection verifications and reports
required by the enforcino aoencv.
B-52 Page 3 of 5 Rev. 05/22
Environmental Quality
Fireplaces
5.503.1 Install only a direct-vent sealed-combustion gas or sealed wood-burning fireplace or a
sealed woodstove and refer to residential requirements in the California Energy Code, Title 24,
Part 6, Subchapter 7, Section 150.
5.503.1.1 Woodstoves. Woodstoves shall comply with US EPA Phase II emission limits.
Weather Resistance and Moisture Management
5.407.1 Weather protection. Provide a weather-resistant exterior wall and foundation envelope
as required by California Building Code Section 1403.2 and California Energy Code Section 150,
manufacturer's installation instruction instructions or local ordinance, whichever is more stringent.
5.407.2 Moisture control. Employ moisture control measured by the following methods:
5.407.2.1 Sprinklers. Prevent irrigation spray on structures.
5.407.2.2 Entries and openings. Design exterior entries and openings to prevent water intrusion
into buildinos.
Pollution Control
5.504.3 Covering of duct openings and protection of mechanical equipment during
construction. At the time of rough installation or during storage on the construction site and until
final start up of the heating and cooling equipment, all duct and other related air distribution
component openings shall be covered with tape, plastic, sheet metal or other methods to reduce
the amount of debris or duct which may collect in the svstem.
5.504.5.3 Filters. In mechanically ventilated buildings, provide regularly occupied areas of the
buildino with outs ide and return air prior to occupancy that provides at least a MERV of 8.
5.504.4 Finish material pollutant control. Finish materials shall comply with Sections 5.504.4.1
through 5.504.4.6
5.504.4.1 Adhesives, sealants, caulks. Adhesives and sealants used on the project shall meet
the requirements of the following standards:
1. Adhesives, adhesive bonding primers, adhesive primers, sealants, sealant primers and
caulks shall comply with local or regional air pollution control or air quality management
district rules where applicable or SCAQMD Rule 1168 VOC limits as shown in Tables
5.504.4.1 and 5.504.4.2.
2. Aerosol adhesives and smaller unit sizes of adhesives and sealant or caulking
compounds (in units of product, less packaging, which do not weigh more than one pound
and do not consist of more than 16 fluid ounces) shall comply with statewide VOC
standards and other requirements, including prohibitions on use of certain toxic
compounds, of California Code of Regulations, Title 17, commencing with Section 94507.
5.504.4.3 Paint and coatings. Architectural paints and coatings shall comply with Table 5.504.4.3
5.504.4.3.1 Aerosol paints and coatings. Aerosol paints and coatings shall meet the Product-
Weighted MIR limits for ROG in Section 94522 (a)(3) and other requirements, including prohibition
on use of certain toxic compounds and ozone depleting substances (CCR, Title 17, Section 94520
et seq.).
5.504.4 Carpet systems. All carpet installed in the building interior shall meet the testing and
product requirements of one of the standards listed in Section 5.504.4.4.
50504.4.4.1 Carpet cush ion. All carpet cushion installed in the building interior shall meet the
requirements of the Carpet and Rug Institute Green Label Program.
5.504.4.4.2 Carpet adhesive. All carpet adhesive shall meet the requirements of Table 804.4.1.
5.504.4.5 Composite wood products. Hardwood, plywood, particleboard and medium density
fiberboard composite wood products used on the interior or exterior of the building shall meet the
requirements for formaldehyde as specified in Table 5.504.4.
5.504.4.5.2 Documentation. Verification of compliance with this section shall be provided as
requested by the enforcing agency. Documentation shall include at least one of the following:
1. Product certification and specifications
2. Chain of custody certifications
3. Other methods acceptable to fhe enforcing agency
5.504.4.6 Resilient flooring systems. Comply with the VOC emission limits defined in the 2009
CHPS criteria and listed on its Low-emitting Materials List (or product registry) or certified under
the FloorScore program of the Resilient Floor Coverina Institute.
B-52 Page 4 of 5
(X )
As Applicable
(X )
(X )
(X)
(X)
(X )
(X)
( X )
Rev. 05/22
Indoor Moisture and Radon Control
5.505.1 Indoor moisture control. Buildings shall meet or exceed the provisions of the California
Buildino Code, Title 24 Part 2, Sections 1203 (Ventilation) Chanter 14.1. (X)
Air quality and Exhaust
5.506.1 Outside air delivery. For mechanically or naturally ventilated spaces in buildings, meet the (X )
minimum requirements of Section 121 of the California Energy Code, CCR, Title 24, Part 6 and
Chapter 4 of CCR, Title 8 or the applicable local code, whichever is more stringent.
5.506.2 Carbon DIOXIDE (CO2) monitoring. For buildings equipped with demand control ventilation,
CO2 sensors and ventilation controls shall be specified and installed in accordance with the (X )
reauirements of the latest edition of the California Enerav Code, Title 24, Part 6, Section 120.1.(C) (4 ).
Outdoor Air Quality
5.508.1 Ozone depletion and global warming reductions. Installations of HVAC, refrigeration and
fire suppression equipment shall comply with Sections 5.508.1.1 and 5.508.1.2. As
5.508.1 CFCs. Install HVAC and refrigeration equipment that does not contain CFCs. applicable
5.508.1.2 Halons. Install fire suppression equipment that does not contain Halons. (X )
(X )
I, as the professional responsible for this project, certify that, to the best of my knowledge, the mandatory items
listed on this form have been incorporated into the project in order to comply with Title 24, Part 11 of the 2016
California Green Building Standards. All receipts for recycled materials have been attached to this form.
2827 Whiptail Loop West
Project Address: Carlsbad, CA 92010 Plan Check Number: CBC2022-0297
Print Name: Edward Burns Signed: ~~
License Number: 799131 Date: 4 /19/2024
8-52 Page 5 of 5 Rev. 05/22
Republic Services, Inc.
Diversion Report*
Account SN Builde-rs
D1~rslon % 81.S6% Scrv1cc Cont.a1nor Container Account Unit of
Account# Site N.1mc S110 Addrc&S Conumcr N.1mc Period Silo Qty Compoctor Oo&cnpt1on Waste Type Type Schedule Tonnage Mcaaurc
6611001S88-0000I 8NBUILDERS 2827 WHIPT AIL LOOP 40'1"AROC&D 611/23 ..... No
6611001588-00001 8N BUILDERS 2827 'M-IIPT AIL LOOP ,40VAAOC&O 6ll4123 ..... No
11001588·00001 BN BUILDERS i827 'M-tlPT AIL LOOP 40VARDC&O 6/2112) .., ... No
11001588-00001 8N BUILDERS 2827 WHIPT ,&.IL LOOP 40YAAOC&O 6/2~26 40.00 No
f61100JS8S-00001 BN BUILDERS 2327WHIP'fAIL LOOP 40YAAOC&O 6128123 ...... No
661 t00tS$8-00001 BN BUILOERS 282? WHIPT NL LOOP 40YAROC&O 7/5123 40.00 No
6611001588-0000t BN BUILDERS 2821 WHIPT AIL LOOP AOYAROC&D 7ft3/23 ...... No
'611001588-00001 BN BUILDERS 2827 Vv'HIPT AIL LOOP M>YAAOC&O 71l9J23 ... 00 No
6611001588-00001 BN BUILDERS 2827 WHIPTAIL LOOP 40YAAOC&O 7/26/23 "°·'° No
66t 1001S88.00001 BN BUILDERS 2827 WHIPTAIL LOOP 401/ARDC&O !l/2/23 "'"" No
6611001S88-00001 BN BUILDERS 2827 wtUPTAIL LOOP 4'0VAR0C&O 819/23 40.00 No
6611001588-00001 BN BUILDERS 2827\.IMIPTAIL LOOP 40YAROC&O 8116123 "°·"' NO
661100IS811-00001 BN BUII.OERS 2827\YtHPTAILLOOP 40VAAOC&O
6611001588-00001 RN BUILDERS 2827 WHIPTNL LOOP 40VAROC&D 10/11123 '°·"' No
66!1001588-00001 BNBUILDERS 2827 WHIPTAIL LOOP 40VAROC&O 10118/23 "'·"' No
661100158&00001 BN BUILDERS 2827 VMIPTAIL LOOP 40VAROC&D 10/19/23 40,00 No
6611001S$8-00001 BN BUILDERS 2827 WI-IIPTAIL LOOP 40VAROC&D 11/t0/23 "'·"' No
6611001S88-00001 BN BUILDERS 2827 WHIPTAIL LOOP 40VARO C&D 11/22/23 "'·"' No
6611001588-0000\ BN BUILDERS 2&27 WHIP'T NL LOOP 40VAAD C&D 12/6123 "'·"' No
6611001$88-000()1 BN OUILOERS 2827WHIP'TAIL LOOP 40VARO C&O 12/27123 ... oo No
6611001588-00001 8N BUILDERS 2827WHIPTAIL LOOP 40VAROC&D 1113/24 <0.00 No
6611001SSS.0000l BN DUILDCRS 28-27 WI UPTAIL LOOP 40VAAD C&O 21$124 '°·"' No
6611001588,-000()1 SN BUILOtRS 1&27 WHIPTAIL LOOP 40VAA.DC&D 2116124 .. ,,,
Constwc.1lon and Demolition
Constrnctiort and Dtrnolouon
Construction 11\d Oemol1tlon
ConsltU<llon and Oemoli;lon
Contaminated
Cons1rnctlon and Oe,oollcion
Construction ;ind OtmohtiOn
conmuctlon 1od OtmolJtlon
Construction and Oemohtlon
Constntction and Demol1ti0n
Cons1ruction and Demolition
Construction and Dtmol!UOO
COl"lsuuctlon and Otmohrion
Constru<tlon and ~moli1ion
Construction and Demolition
ConstnJctiorl and Demolition
Consl.r\iCtlofl and Otmolll!Ofl
Consuu<tlon and Oemol111011
ConsrnJction and Demotruon
Consuuction and Demolition
Construction .ind Demolition
Construction and Oernofit!Ofl
Conmucttoo and Demolition
R~cycle r"m~ OnCall ,.,a
2,10
TN
TN Recyde Tempor;,,y oncall
Rttyele Temporary
Re<y<I, rempor.,ry
SOl1dWas1e Temporary
Recy<;le Temporary
Recy<~ Temporary
Recyde Tempor•ry
Re<y(le Tcmpor,uy
Recycle Tempotary
Temporary
Temporary
Rccyd, Temporary
Ret:ycle Temporary
Recy<le Tempor.vy
R"'!'k Temporary
Re<y(~ Temporary
Recy<k Temponiiry
Re<y(k Temporary
Recyde Tempora,y
Recycle
OnCaU
OnC.ill
Qn(;'.111
OOCall
OnC.-ilt
OnC~I
Oneal/
0ncau
one.all
OnCaU
OnCall
OnCall
OnCall
OnCall
onc,11
OnCall
OnCall
One.all
OnCall
U,9 TN
1.-41 TN
68 TN
.M TN
l.'12 TN
Ulll TN
2.9:1 TN
.61 TN
t.00
'·"' ·"
,~,
'·" , .....
1.00 ...
3.73 ,.,
7.,0 ,,.
2.71
TN
TN
TN
tN
TN
TN
TN
TN
TN
R~~;;~E 104 31
SOLID
WASTE 23 58
TOTAL
~~~:~ 127 89
•Small containers Me not welghtd, Weights provided ror small con1aintr1 are only MUmates and are based on your contal~r size multlplle<t by the number or schtduled hauls pu month multlplled by the •ssumed weights or 100lbs per cubk y.1rd