Loading...
HomeMy WebLinkAbout2633 BANBURY CT; ; PC2022-0007; RecycleC Cityof Carlsbad CONSTRUCTION WASTE MANAGEMENT PLAN B-59 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Many of the materials generated from your project can be recycled. You are required to list materials that will be reused, recycled or disposed from your project. If you have questions about the recycling requirement or completing this form, please contact Waste Management at (760) 929-9400, a certified C&D recycler, or the Carlsbad Building Division at (760) 602-2700. Please note: Unless you are self-hauling, Waste Management or approved haulers must be used for all construction projects within the City of Carlsbad. PART 1 Complete and submit this form when applying for a Building Permit. Note: Permits will not be issued without a completed Construction Waste Management Plan. Applicant Information Permit No .. __ ftL......>,,LJZ4~....::'t_Z,_-_O=...:Q,,,_O-=--il-___ Project Title Project Address 2633 Banbury Ct APN Applicant Name Musick Construction Inc Contractor [Z] Last First ApplicantAddress 1818 Peacock Blvd., Suite E , Oceanside CA 92056 Phone I 760 > 994-8434 E-mail Address kyle@musickinc.com Applicant Mailing Address Same as applicant address (if different than project address) Project Type (check all that apply): Residential [l] Commercial □ Public Building □ Brief Description Build ADU by converting 222 sq ft of garage + 179 sq ft addition 208 131 08 00 Other □-- Project Size 401 sq ft Estimated Cost of Project $_$_2_2_0_,0_0_0_.0_0 _________ _ (square footage) Please check the appropriate box: DI plan on using WASTE MANAGEMENT roll-off bin(s) for all materials and will provide all receipts after construction. I ✓ I I plan on self-hauling to a certified recycling facility and will provide all receipts after construction. D This is a proposed LEED certified project and I plan on separating materials on site in conjunction with WASTE MANAGEMENT. Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information provided in and with this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to t he best of my knowledge and belief. Print Name Kyle Musick s;gnature 1«~ Date Page 1 of 3 Rev. 2.10.21 PART 2. Complete and submit this form before final inspection. Projects are required to submit their Waste Log, Ackno~led~ement Form, and Weight Receipts prior to Certificate of Occupancy (CO) issuance. Failure to provide dotum~ntation, reporting of waste diversion less than 65%, and failure to provide adequate weight receipts, may r~1ider the Project non-compliant and the responsible parties subject to code enforcement. Last First Use this Final Log below to track loads of materials as they leave the job site. j • @@SAVE RECEIPTS@@ Indicate Fl AL antities in tons for each material a·nd·save receipts and documents from facilities where material is taken. Ad itio el Project Log pages are available if necessary. Use City Conversion Table to convert volume to tons. I. A B C Date Material Type Actual Amt Actual Amt Actual Amt Destination Facility Reused or Recycled Disposed in (Name, Address, Phone) Salvaged Landfill Palomar Transfer Station, 5960 El Concrete (broken) 5 tons Camino Real -03-0 53 \~-.W~ 0 \ .Gt (i ~ TOTAL I I • I Diversion RatJ Achleved 'I I► I Attach tht:i folt wing documentation to this Report: _3_, q_1.n __ ____,1 __ 3_:,_°1_2D ____ . __ l_.:;_00 __ % Total of columns A + B Total of columns A + 8 + C DIVERSION ;;: 65% Return completed form and documentation to: City af Carlsbad • Original ~ecyc(ihg weight tickets, landfill weight tickets • Original ~ona\ipn receipts with photos and/or itemized descriptions • Any othef rel,1ant information to support Recycling Report Building Division (1st Floor) 1635 Faraday Avenue Carlsbad, CA 92008 • • Jt I certify ul1der ~enalty of perjury under the laws of the State of California that the information provided in and with this form ert ins to construction and demolition debris generated only from the project listed in PART 1, that I have reviewed he Ji:curacy of the information, and that the information is true and correct to the best of my knowledge and belief~ l11 Applicant t gn~ture i%:: _..... > Date 6 Y -1.,.\.,,\ -'Z,o '7)v\ , 11 rev 4/24 (J>$ L,,, ..... 5 E \l-i:: 13 µ A-i-.JY / EDCO WASTE & RECYCLING SERVICES, INC 224 S. LAS POSAS RD SAN MARCOS, CA 92078 (760) 744-2700 t-~c \.-tC{__e 1(2-A-$ ti c-eie-,~ INVOICE Customer: 0000 Ticket: 4401 Date: 02/23/23 In: 8: 37 Out: 8:52 Truck: 0000 Container: Route : 08045 CASH CUSTOMER Origin: 080 SAN MARCO SEREBRIANY Commodity Units Rate 45 C & D MIX 1.96 83.00 per TON [Gross(In): 14,200. lbs Scl#l Tare 10,280. lbs Scl#l Extended Charge 162.68 Net: 3,920. lbs] PAID CHECK# 2852 162.68 Construction & Demolition Diversion Certificate --Diversion Percentage 77% This certifies that the company listed above has utilized an EDCO facility to divert construction demolition materials in accordance with LEED requirement. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility. CRUZ Driver