HomeMy WebLinkAbout2180 RUTHERFORD RD; ; CBC2023-0230; PermitBuilding Permit Finaled
{ City of
Carlsbad
Commercial Permit
Print Date: 05/31/2024
Job Address:
Permit Type:
Parcel#:
Valuation:
Occupancy Group:
#of Dwelling Units:
Bedrooms:
Bathrooms:
Occupant Load:
Code Ed ition:
Sprinkled:
Project Ti tle:
2180 RUTHERFORD RD, CARLSBAD, CA 92008-7328
BLDG -Commercial Work Class:
2120702500 Track#:
$27,090.80 Lot#:
Project#:
Plan#:
Con struction Type:
Orig. Plan Check#:
Plan Check#:
Tenant Improvement
Permit No:
Status:
CBC2023-0230
Closed -Finaled
Applied: 07/26/2023
Issued: 01/12/2024
Finaled Close Out: 05/31/2024
Final Inspection: 05/16/2024
INSPECTOR: de Roggenbuke, Dirk
Kersch, Tim
Description: CALLAWAY GOLF COMPANY: T.I. (470 SF); NO CHANGE IN OCCUPANCY, NEW CONTROL ROOM DESIGNATION
Applicant:
BRIDGET CARNEY
3207 GREY HAWK CT
CARLSBAD, CA 92010-6662
(760) 305-1359
FEE
BUILDING PLAN CHECK
Property Owner:
CALLAWAY GOLF COMPANY
2180 RUTHERFORD RD
CARLSBAD, CA 92008
BUILDING PLAN REVIEW -MINOR PROJECTS (LDE)
BUILDING PLAN REVIEW -MINOR PROJECTS (PLN)
COMM/IND Tl -STRUCTURAL
FIRE F Occupancies Tl
Fl RE Plan Resub (3rd&Subsequent Submittal/hr)
SB1473 -GREEN BUILDING STATE STANDARDS FEE
STRONG MOTION -COMMERCIAL (SMIP)
Total Fees: $2,594.39 Total Payments To Date: $2,594.39
Contractor:
PACIFIC BUILDING GROUP
9752 ASPEN CREEK CT, # STE 150
SAN DIEGO, CA 92126-1083
(858) 552-0600
Balance Due:
AMOUNT
$501.80
$197.00
$104.00
$821.00
$791.00
$170.00
$2.00
$7.59
$0.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or ot her exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water an d sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previousl y been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
Building Division Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov
( City of
Carlsbad
COMMERCIAL
BUILDING PERMIT
APPLICATION
B-2
Plan Check
Est. Value
PC Deposit
Date
CE( z,oz3 0230
.,s 2,7,o 90 . 00
Job Address2180 RUTHERFORD ROAD Suite: APN:212-070-25-00 ----·
Tenant Name #:CALLAWAY Lot #:25 Year Built: 1988 ------------------------
Year Built: __ _ Occupancy:_F __ Construction Type:_VB __ Fire sprinklers@'ESQNO A/C:0YESQ NO
BRIEF DESCRIPTION OF WORK:TENANT IMPROVEMENT, NO CHANGE IN OCCUPANCY, NEW CONTROL ROOM DESIGNATION.
D Addition/New: ___________ New SF and Use, _________ New SF and Use
______ SF Deck, SF Patio Cover, SF Other (Specify) ___ _
~Tenant Improvement: _47_0 ___ SF, Existing Use: _F ______ Proposed Use: _F _____ _
____ SF, Existing Use: Proposed Use: _____ _
D Pool/Spa: ____ SF Additional Gas or Electrical Features? ___________ _
D Solar: ___ KW, ___ Modules, Mounted: 0Roof 0Ground
D Reroof: _________________________________ _
~ Plumbing/Mechanical/Electrical IN SERVICE OF Tl
Oother: _________________________________ _
APPLICANT (PRIMARY CONTACT}
Name: BRIDGET CARNEY
Address·3207 GREY HAWK CT SUITE 150
PROPERTY OWNER
Name:CALLAWAY-DOUG CASEY
Address:2180 RUTHERFORD ROAD
City· CARLSBAD State: CA Zip: 92010 City: CARLSBAD State: CA Zip:_92_0_0_8 __ _
Phone· 760-305-1359
Email·BRIDGET.CARNEY@CRBGROUP.COM
Phone:877-723-5218
Email: DOUGCA@TCBRANDS.COM
DESIGN PROFESSIONAL CONTRACTOR OF RECORD
Name: STEVE TOMKO Business Name: BRANDON STEVENS
Address: 100 N PACIFIC COAST HIGHWAY SUITE 600 Address:9752 ASPEND CREEK CT SUITE 150
City:EL SEGUNDO State:CA Zlp:_9_02_4_5 __ City:SAN DIEGO State:CA Zip:_92_1_2_6 ___ _
Phone: 310-612-9659 Phone: 858-552-0600
Email: STEVE. TOMKO@CRBGROUP .COM Email: BSTEVENS@PACIFICBUILDINGGROUP .COM
Architect State License: C-11342 CSLB License #:SOZ.$76:, Class:-=B ______ _
Carlsbad Business License# (Required): '&l.-p$ I l.O 7 '135'
APPLICANT CERTIFICATION: I certify that I have read the application and state that the above information is correct and that the
information on the plans is accurate. /agree to comply with a{{ City ordinances and State laws relating to building
construction.
NAME (PRINT): BRIDGET CARNEY SIGN:_~_._,"Jo.~,d.....__.C_~ ___ --=a, ___ DATE: 26JUL Y2023
1635 Faraday Ave Carlsbad, CA 92008 Ph: 442-339-2719 Fax: 760-60~8 ~ Email: Bullding@carlsbadca.gov
REV. 07/21
..
'!'', IS PAGE REQUIRED AT PERMIT ISSUANCE PLAN CHECK NUMBER: ______ _
A BUILDING PERMIT CAN BE ISSUED TO EITHER A STATE LICENSED CONTRACTOR OR A PROPERTY OWNER. IF THE PERSON
SIGNING THIS FORM IS AN AGENT FOR EITHER ENTITY AN AUTHORIZATION FORM OR LETTER IS REQUIRED PRIOR TO
PERMIT ISSUANCE.
(OPTION A): LICENSED CONTRACTOR DECLARATION:
lherebyaffirmunderpenaltyofperjurythatlamlicensedunderprovisionsofChapter9(commencingwithSection7000)ofDivision3
of the Business and Professions Code, and my license is in full force and effect. I also affirm under penalty of perjury one of the
foUowing declarations (CHOOSE ONE):
□, have and will maintain a certificate of consent to self-insure for workers' compensation provided by Section 3700 of the Labor Code, for the performance of the
work which this permit is issued. Policy No. _____________________________________ _
-OR-
D1 have and will maintain worker's compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.
My workers' compensation insurance carrier and policy number are: Insurance Company Name: ____________________ _
Polley No. __________________________ Expiration Date: ______________ _
-OR-
Ocertificate of Exemption: I certify that in the performance of the work for which this permit Is Issued, I shall not employ any person In any manner so as to become
subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage ls unlawful and shall subject an employer to
crlmlnal penalties and clvll fines up to $100,000.00, In addition the to the cost of compensation, damages as provided for In Section 3706 of the Labor Code,
Interest and attorney's fees.
CONSTRUCTION LENDING AGENCY, IF ANY:
I hereby affirm that there Is a construction lending agency for the performance of the work this permit is Issued (Sec. 3097 {I) Civil Code).
lender's Name: ____________________ lender's Address: ___________________ _
CONTRACTOR CERTIFICATION: I certify that I have read the application and state that the above information is correct and that
the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building
construction.
NAME (PRINT): ________ SIGNATURE: _________ DATE: _____ _
Note: If the person signing above Is an authorized agent for the contractor provide a letter of authorization on contractor letterhead.
-OR -
(OPTION B): OWNER-BUILDER DECLARATION:
I hereby affirm that I am exempt from Contractor's License Law for the following reason: n I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec.
~44, Business and Professions Code: The Contractor's license law does not apply to an owner of property who builds or improves thereon, and who does such
work himself or through his own employees, provided that such improvements are not Intended or offered for sale. If, however, the building or improvement is sold
within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
-OR-
(!]1, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
Contractor's License law does not apply to an owner of property who builds or Improves thereon, and contracts for such projects with contractor(s) licensed
pursuant to the Contractor's license Law).
-OR-□, am exempt under Business and Professions Code Division 3, Chapter 9, Article 3 for this reason:
AND, D FORM B-61 "Owner Builder Acknowledgement and Verification Form" is required for any permit issued to a property owner.
By my signature below I acknowledge that, except for my personal residence in which I must have resided for at least one year prior to completion of the
improvements covered by this permit, I can not legally sell a structure that I have built as an owner-builder if it has not been constructed in its entirety by licensed
contractors. I understand that a copy of the applicable law, Section 7044of the Business and Professions Code, ts available upon request when this application Is
submt tted or at the fol/owing Web site: http: I I www.leglnfo.ca.gov/ ca/aw. html.
OWNER CERTIFICATION: I certify that I have read the application and state that the above information is correct and that the
information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building
construction.
NAME (PRINT): BRIDGET CARNEY
Note: If the person signing above Is an authorized agent for the property owner Include fo
1635 Faraday Ave Carlsbad, CA 92008 Ph: 442-339-2719 Fax: 760-602-8558 Email: Building@carlsbadca.gov
2 REV. 07/21
Building Permit Inspection History Finaled
{City of
Carlsbad
PERMIT INSPECTION HISTORY for (CBC2023-0230)
Permit Type: BLDG-Commercial
Work Class: Tenant Improvement
Application Date: 07/26/2023 Owner: CALLAWAY GOLF COMPANY
Issue Date: 01/12/2024 Subdivision: CARLSBAD TCT#81 -10 UNIT#02A
Status: Closed -Finaled Expiration Date: 10/15/2024
IVR Number: 50908
Scheduled Actual Inspection Type Inspection No. Inspection
Date Start Date Status
01/22/2024 01/18/2024 BLDG-14 237051 -2024 Passed
Frame/Steel/Bolting/We
lding (Decks)
Checklist Item COMMENTS
BLDG-Building Deficiency
02/27/2024 02127/2024 BLDG-85 T-Bar, Ceiling 240504-2024 Partial Pass
Grids, Overhead
Checklist Item COMMENTS
BLDG-Building Deficiency Clarification needed for duct wrap .
BLDG-14
Frame-Steel-Bolling-Welding
(Decks)
BLDG-24 Rough-Topout
BLDG-34 Rough Electrical
BLDG-44
Rough-Ducts-Dampers
03/18/2024 03/18/2024 BLDG-16 Insulation 242402-2024 Partial Pass
Checklist Item COMMENTS
BLDG-Building Deficiency
BLDG-17 Interior 242403-2024 Partial Pass
Lath/Drywall
Checklist Item COMMENTS
BLDG-Building Deficiency
BLDG-85 T-Bar, Ceiling 242372-2024 Partial Pass
Grids, Overhead
Checklist Item COMMENTS
BLDG-Building Deficiency Clarification needed for duct wrap.
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout
BLDG-34 Rough Electrical
BLDG-44
Rough-Ducts-Dampers
BLDG-SW-Inspection 242587-2024 Passed
Friday, May 31, 2024
Address: 2180 RUTHERFORD RD
CARLSBAD, CA 92008-7328
Primary Inspector Reinspection
Tim Kersch
Passed
Yes
Tim Kersch Reinspection
Passed
Yes
Yes
No
No
No
Tim Kersch Reinspection
Passed
Yes
Tim Kersch Reinspection
Passed
Yes
Tim Kersch Reinspection
Passed
No
Yes
Yes
Yes
Yes
Tim Kersch
Inspection
Complete
Incomplete
Incomplete
Incomplete
Incomplete
Complete
Page 1 of 3
PERMIT INSPECTION HISTORY for (CBC2023-0230)
Permit Type: BLDG-Commercial
Work Class: Tenant Improvement
Application Date: 07/26/2023 Owner: CALLAWAY GOLF COMPANY
Status:
Scheduled
Date
0312012024
03/22/2024
04102/2024
04118/2024
Issue Date: 01/12/2024 Subdivision: CARLSBAD TCT#81-10 UNIT#02A
Closed -Finaled Expiration Date: 10/15/2024
IVR Number: 50908
Address: 2180 RUTHERFORD RD
CARLSBAD, CA 92008-7328
Actual Inspection Type
Start Date
Inspection No. Inspection Primary Inspector Reinspection Inspection
Checklist Item
Are erosion control BMPs
functioning properly?
Are perimeter control BMPs
maintained?
Is the entrance stabilized to
prevent tracking?
Have sediments been tracked
on to the street?
Has trash/debris accumulated
throughout the site?
Are portable restrooms
properly positioned?
Do portable restrooms have
secondary containment?
COMMENTS
03/20/2024 BLDG-13 Shear
Panels/HD (ok to wrap)
242732-2024
Checklist Item COMMENTS
BLDG-Building Deficiency
BLDG-16 Insulation
Checklist Item
242731-2024
COMMENTS
BLDG-Building Deficiency
03/22/2024 BLDG-44 243004-2024
Rough/Ducts/Dampers
Checklist Item COMMENTS
BLDG-Building Deficiency
04/02/2024 BLDG-85 T-Bar, Ceiling 243888-2024
Grids, Overhead
Checklist Item COMMENTS
Status
Passed
Passed
Passed
Passed
BLDG-Building Deficiency Clarification needed for duct wrap.
4/2124 T -bar ok. Fire caulking ok
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout
BLDG-34 Rough Electrical
BLDG-44
Rough-Ducts-Dampers
04118/2024 BLDG-34 Rough
Electrical
245532-2024
Checklist Item COMMENTS
BLDG-Building Deficiency
Passed
Passed
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Tim Kersch Complete
Passed
Yes
Tim Kersch Complete
Passed
Yes
Tim Kersch Complete
Passed
Yes
Dirk de Roggenbuke Complete
Passed
Yes
Yes
Yes
Yes
Yes
Tim Kersch Complete
Passed
Yes
Friday, May 31 , 2024 Page 2 of 3
PERMIT INSPECTION HISTORY for (CBC2023-0230)
Permit Type: BLDG-Commercial
Work Class: Tenant Improvement
Status:
Scheduled
Date
04/22/2024
Closed -Finaled
Actual Inspection Type
Start Date
04/22/2024 BLDG-Final Inspection
Checklist Item
Application Date: 07/26/2023 Owner: CALLAWAY GOLF COMPANY
Issue Date: 01/12/2024 Subdivision: CARLSBAD TCT#81-10 UNIT#02A
Expiration Date: 10/15/2024
IVR Number: 50908
Address: 2180 RUTHERFORD RD
CARLSBAD, CA 92008-7328
Inspection No. Inspection Primary Inspector Reinspection Inspection
Status
245834-2024 Partial Pass Tim Kersch Re inspection Incomplete
COMMENTS Passed
BLDG-Building Deficiency No
BLDG-Plumbing Final Yes
BLDG-Mechanical Final No
BLDG-Structural Final Yes
BLDG-Electrical Final No
05/16/2024 05/16/2024 BLDG-Final Inspection 248572-2024 Passed Dirk de Roggenbuke Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-Plumbing Final Yes
BLDG-Mechanical Final Yes
BLDG-Structural Final Yes
BLDG-Electrical Final Yes
Friday, May 31 , 2024 Page 3 of 3
Inspection & Material Testing
PROJECT NAME CallaWa}'. Golf
ADDRESS 2180 Rutherford Rd Carlsbad CA
ARCHITECT
ENGINEER Bin9 V. la
CONTRACTOR PBG Construction
OTHER SBW
INSPECTION DATE 07Feb2024
PLAN FILE/OTHER
BLDG. PERMIT/OTHER CBC2023-0230
City of Carlsbad
MAY 1 G 2024 RECORD co
BUILDING DIVISION
INSPECTION REPORT
INSPECTION
D CONCRETE
□ REINF. STEEL
□ MASONRY
□ P.T. CONCRETE
~ FIELD WELDING
D SHOP WELDING
D BATCH PLANT
D EXP. ANCHOR
D OTHER
MATERIAL SAMPLING
___ OF PAGE
Hours -------
REPORTNO.
MATERIAL IDENTIFICATION
CONC. MIX NO. & lb/in2
GROUT MIX NO. & lb/in2
MORTAR TYPE & lb/in2
REINF. STEEL GR/SIZE
STRUCTURAL STEEL A36A500
HIGH-STRENGTH BOLT
MASONRY BLOCK
OTHER
0 CONCRETE O MORTAR O GROUT O FIREPROOFING O MASONRY BLOCK
0 REINFORCING STEEL O STRUCTURAL STEEL O BOLTS O OTHER
INSPECTIONS PERFORMED, MATERIAL IDENTIFICATION, PROGRESS, WORK REJECTED, REMARKS
PLEASE NOTE ANY RE-INSPECTION, TESTING, OR OTHER PROJECT ISSUES.
Arrived to site listed above as requested to perform visual Inspection of welding per AWS D1 .1 Standards.
Upon Arriving I met with Jeff the Superintendent with PBG and reviewed the design drawings and details that pertain to the work being
done. SBW is re-installing the added HSS beams and Panel Point reinforcement for the new HVAC roof top unit. Details Revised 3,6/S1 .
I then verified the welder certs were current and valid. SBW completed the install and welding of the supplemental steel. All welds are
acceptable.
All work mentioned above is complete and complies with the design drawings and AWS D1 .1 Standards.
~~~a:= ---1-
•rw;,:r.i..,-•~~•LOCO-.O~
Certification of Compliance: All work, unless otherwise noted, complies with applicable codes and the approved plans and specifications.
PRINTED NAME Erich Hansen
CERTIFICATION NO. SD#1418,ICC#9534870,ACl#02080301 SIGNATURE __ J\L':::=--__,,.-c._ _____ _
RJS
Inspection Report
Project Name: Callaway Page: 1 _______ of 1 Report#:'-------
Project Address: 2180 Rutherford Rd, Carlsbad 92008 Pennie#: CBC2023-0230
Archltecc; File#:
Engineer: Prime Engineering DSA#:
Contractor: PBG Other:
INSPECTION MATERIAL SAMPLING QTY MATERIAL DESCRIPTION INSPECTION CHECKLIST
--Structural Steel --H.S. Bolts -----H.S. Bolts __ Pfans/Specs
__ M:isonry --Prisms -----Cone.PSI --Clearances
--Concrete --Mortar/Grout -----Grout PSI --Positions
__ Fireproofing --Cone. Cylinders -----Mortar PSI --Sizes
__ Epoxy --Fireproof -----Steel __ Laps
Other: Other: Elect./Wire Consolidation -----------_X_ Other: Expansion 1 nchor Other: -----Fireproof __ Torque Ft. lbs:
Other: Other: Other: Other: -----------
Other: Other: Other: Other: -----------
Arrived on site to provide periodic special inspection of expansion anchor installations at new mechanical unit
wooa rn1er connecuon m roOT. t1e1erencea sneet .:> 1.u oe1a11 o. 1..,omracmr p1acea Iii::'. ..
di?mo+or Y 6 11?" loon Uil♦i
KB-TZ2 anchors to 4X sleeper. Anchors were installed per ESR 4266. Verified torque to 40 ft/lb.
Inspection took a total of 3 visits.
City of Carlsbad
RECORD COPY MAY 1 G 2024
BUILDING DIVISION
CERTIFICATION OF COMPLIANCE: All reported work. unless otherwise noted, complies with approved plans, specifications and applicable sections
of the building codes. This report covers the locations of the work inspected and does not constitute opinion or project control.
I hereby certify that I have observed to the best of my knowledge all of the above reported work unless otherwise noted. I have found this work to
comply with the approved plans, specifications, and applicable sections of the governing building laws.
s011cc .~n , , . A
Inspector: Michael Vidovich Cert 1262 / 8292714 f U V·J\, v✓,,.,__;\ 2/16/24
SI gnaw re Date
. lnsp. ':)ate: Day I: Day 1: Day 3: Day ◄: :Day 5:
Time Srart: 8 hrs
Tlme Stop:
Approved By: __________________ _
Project Superintendent
October 23, 2023
City of Carlsbad
Community Development Department -Building Division
1635 Faraday Ave.
Carlsbad, CA 92008
Plan Review: Tenant Improvement
Address: 2180 Rutherford Road, Carlsbad CA
Applicant Name: B1idget Camey
Applicant Email: Bridget.carney@crbgroup.com
OCCUPANCY AND BUILDTNG SUMMARY:
Occupancy Groups: A-2, B F-1, -1
Occupant Load: I, 779
Type ofConsh-uction: V-8
Sprinklers: Ye
Stories: 1
Area of Work ( q. ft.): 470 sq. ft.
The plans have been reviewed for coordination with the permit application.
Valuation: ontirmed
Scope of Work: Confirmed
Floor Area: onfirmed
Attn: Building & Safety Department,
True North
COMP IANCE S RVIC S
City of Carlsbad -FINAL REVIEW
ity Permit No: BC2023-0230
True North No.: 23-0l -679
True North ompliancc Services, lnc. bas completed the final review of the following documents for the project
referenced above on behalf of the City of Carlsbad:
I. Drawings: One (1) copy dated October l 0, 2023, by CRB onsulting Engineers, Inc.
2. Structural Calculations: One ( 1) copy dated July 5, 2023 by Prime Strnctural Engineers.
The 2022 California Building, Mechanical, Plumbing, and Electrical Codes (i .e., 2021 IBC, UMC, UP , and 2020
EC, as amended by the State of California), 2022 California Green Building tandards Code, 2022 California
Existing Building Code, and 2022 alifomia Energy Code as appl icable, were used as the basis of our review.
Please note that our review has been completed and we have no further comments, however, we bring th
following to your attention:
1. In order to expedite the pennitting proce ', we have made annotation · (i n red ink) to heel A80-0 l.
We have enclo ed the above noted documents bearing our review tamp for youru e. Plea e call if you have any
que ·tion or ifwe can be of further assistance.
Sincerely,
True North Compliance Services, Inc.
8369 Vickers Street, Suite 207, San Diego, CA 92111
T / 562. 733.8030
CITY
CBC2023-0230
2180 RUTHERFORD RD
CALLAWAY GOLF COMPANY: T.I. (470 SF); NO CHANGE II
OCCUPANCY, NEW CONTROL ROOM DESIGNATION
2120702500
7/27/2023
CBC2023-0230
PRIME STRUCTURAL ENGINEERS
13272 Jacaranda Blossom Dr.
Valley Center, California 92082
Tel (760) 519-5206
STRUCTURAL
CALCULATIONS
Callaway Golf HQ
Tenant Improvement
Mechanical Unit Support
Structural Calculations
Location:
Carlsbad, CA
Job No:
Date:
Pages:
2K23-90
07-05-2023
1 thru 13
A This Is a b~ta release of\he new ATC Hazards ,:;~ocetlon website. Please _co AA wi~ ~: ';~ . •
. ~ ENGINEERS SHT:____,·1'--
0 The ATC Hazards by Location website will not be updated to support ASCE 7-22. E!nd out why,
£\TC Hazards by Location ·
Search Information
Address:
Coordinates:
Elevation:
Timestamp:
. Mazard Ty~:
2180 Rutherford Rd, Carlsbad, CA 92008, US
33 .1324246, -117;2814081
281 ft
2023-06-27T21 :22:25.0342'.
-Wind · ' .•·' ~~• ...
. -'';1':i
,. .. . ...1.!.•~74'-,>"f'!°>'-
.. -.. -•--"--· -· _(:)ogle, INEC,1-Repp a map error
ASCE 7-16 ASCE 7-10 ',,;t:.:. · ASCE 7-05
MRl·.10Near 67 mph MRI 10-Year '" •.. ~ r. ' . 72 mph ASCE 7--05 Wind Speed 85 mph-
MRI 25-Year 72 mph MRI 25-Year 79 mph
77 -:.· · ·as mph . MRI 50-Year mph MRI 50-Year ~~\.:• •. \:~<-·~'''
MRI 100-Year 82 mph MRI 100-Year 91 mph
Risk Category I ... . ,., .... 89 mph Risk Category I ... ~ ..... ' ' .... 100 mph
Risk Category II 96 mph ,. Risk Category II • .' ·, ~:t .. '.:i• ,._. •
• y' \(,~;:
110 mph
Risk Category Ill 102 mph Risk Category Ill-IV 115 mph
Risk Category IV • ......... --• .. 107 mph
Tha results indicated t,ere 00 NOT teflect any state or local amen,c(,nf)tits to the values ,:;r any delineation lines rr,ade during the
• building code adoptio~ process. Users sh~uld co~firm any output obt~ined from this tool with the local Authority Having Jurisdiction ..
before proceeding with design.
P!eese note that the.ATC Hazards by Location website will not be updated to support ASCE 7-22. Find out Wh¼
Disclaimer
Hazard,loads are Interpolated from data provided in ASCE 7 and n;iuBd~d up to.the nearest whole integer, Per ASCE 7, islands and
co{-;stal areas outside the last conto~r should use the last wind spe~d contour of the coastal area -in some cases, this website wil!
ext1'ap0late past the last wind spe~d contour and therefore, provide a wind speed that is slightly higher. NOTE: For queries near wind;
borne deb1is region boundaries, the resulting determination Is sensitive to rounding which may affect whether.or not it is considered t•.>
be within a wind-borne deb~is region ..
Mountainous terrain, gorges, ocean promontories, and special wind regions shall be examined for unusual wind conditions .
. ,. ,.
,' ;,•
-.
2K23-90 . ' ' A PRIME JOB:
a ·r1,1s i's a_ beta reiease ~fthe naw ATC Hazards by L~catlon 'website. Please'. s Sf2\ICIWAL, DATE: 0G/23 . ~ ENGfNEERS SHT: __ 2 _
• 0 Tt,e ATC Hazards by Location website will n~t-be updated to support ASCE 7-22. Find out why.
l\T( Hazards by Location
Search Information
,t\.rldress:
Goordinates: .
El.avation:
• Timestamp:
Hazard Type:
2180 Rutherford Rq, Carls~ad, CA 92008, US.A.
33.1324246, -117.2814081
281 ft
2023-06-27T21:23:33.0172
Seismic·
, ,.· 1· .. ~r ~
i,.., ~••, I
• ~ ! •.
.~\i·)'J
;,ii ·r,;-,:,-~,·
I •
Reforence
Document:
ASCE7-16 ··-......... _ .. . o . epor1 a map mror ·:
Risk Catego1y: II
Bit~ Class: O-default
3~sic Parameters • ',. 1 .. H •
Name Value , Oescriptton
Ss 0.97,9 MCER ground motion (period=0.2s)
,., ,:) 1 0.357 MCER ground motion (perlod=1 .0s) ,\ . •
SrvlS 1.175 Site-n,odified spectral acceleration value
SMi * null Site-modified spectral acceleration value
·StJs d.783 Numeric seismlc·design value at 0.2s SA
S01 *.null Numeric seismic design value at 1.Qs SA . .
* See Section 11.4.8
vAdditional Information
~~::tme Value Description.
SDC * null Seismic design category
Fa 1.2 Site amplification factor at 0.2s
fv • *null . ·:Site amplification factor at 1.0s
GRs 0.9 Coefficient of risk (0.2s)
Cf~1 0.91 1 Coefficient of risk (1, .Os)
WIND LOAD CALCULA1'.IO['l: COMPONENTS AND CLADDING (ASCE 7-16 CHAPTER 30)
PFWJECT DESCR:PTION: 2K23-90 Callaway Golf HQ •
WIND DESIGN CRITERI/-\
BASIC WIND SPEED, V35 (ASCE.7-16, .FIG: 26.5-1B)
DIRECTIONALITY FACTOR., Kd (ASCE 7-16, T.26.6-1)
IMPOl~TANCE FAC1"0f{_I: •
EXPOSUHE, {ASCE 7.-16. 26.7.3) .· 1 ..
, I 'i'••
VELOCWf-PRESSURE EXPOSURE COEFF., KZ (ASCE 7-'1 6 i:. 26.1(
TOPOGRAPHIC FACTOR, K2t (AS.CE 7-16 §26.8.0)
[KZT" 1.0 WILL BE USED, STRUCTµRE IS NOT NEAR A RIDGE _QR_ ESCARPMENT]
MEAI\J ROOF-HEIGHT,' _h • '
. ROOF ANGLE ,-0 • ••
LEAST HORIZ. B~IL_DING DIM.
a=
OCCUPANCY CATEGORY •
96 MPH
0.85
1.00 •
C
1.01
1.00
33.5 FT .
0.00 D
365 FT.'
14.6 FT.·
II •
Velocity P1·essure, qh = :0,00256·Kz·K,t'Kd·Ke-V2·1 (Eq. 26.10-1) Wind Zones (Fig. 30.3-·I)
qh =, 20.16 psf
Int. Pre.ssure Coeff, GCp1 = ± 0.18 (T.26,13-1)
b ternal Pressure Coefficient, GCP (Fig . 30.3-1.): . . --Effective Wind Area· 'IQ ff' 20 ft2 50 ft2 100 ft2 200 ft2 500:ft2
Zone 4, 5 (+) • 0.90 . 0.86 0.81 0.72 0.68 0.63
Zone 4 (-) • -0.99 .-0.95 -0,90 -0.81 -0.77 -0 .72
. Zone 5 (-) -1.26 --1.17 -1 .04 -0.95 -0.86 -0:72
(Note: Where roof angle~ 10°, GCp_is reduced by' 10%.)
' ' .
_Design Wind Pressure on Wall Comppnents and CladdinQ19i 30):
··---~ p ;= qh·[(GCii)-(GCp1)]. (Eq. 30.3-1)
Effectiv'3 Wind· Area 10 ft2 . 20 ft2 50 ft2 100 ft2 200 ft2 500ft2
Zone '4, .5 (-~)-21 .77 20.8?: 19.96 18.14 17.24 16.33
Zone4.H -2,3.59 -22.68 -21 .77 -19.96 -19.05. -18.14
Zone 5 H -29.03 -27.22 ~24,50 -22.68· • -20.87 .-18.14
·,,:.
'. ,' I .~
>-: >:'.·];'fi-~::
. ,:
···,.·,.,,''
2K23-90 Callaway Golf HQ
RTU-116
ROOF MOUNTED MECHANICAL UNITS .ASCE 7-16 (13.3.1}
-, ..
llNII'
1.-· 1;,
ClJRll , .r
I/ l"
t :M t Pd
L X L .
1 . ~
' ' .
Wp1 = 1803.00 lbs.
Y= 47.00 in.
y= 14.00 in.
: X= 58.63 in.
Sos ;::; 0.783
ap = 1.00
Rp = 2.50
I -p-1:-00
z/h::: . 1.00
Roof Curb Wp2= 80.00 lbs.
SEISMIC DEIV\ANOS ON NONSTRUCTURAL COMPONENTS -ASCE 7-16 13.3.1
Fp = 0.376 Wp
Fp.max = 1.2~.3 Wp ·'· ··.•._.
• !.•
Fp,m,n = 0.235 Wp
' •• 'Fp = 0.373 Wp
Fp1 C -877.64 lbs.
Fp2 = 30.07 lbs.-
0.2·S~·(Wp1+Wp2) = Fp,v = O.~$fWp
Fp,v = 294.'88 lbs.
UPLIFT CHECK (ASD)
P.e= 0.7·[FpdY/2+y)/X] +0.7"[ Fp,/2) +0.?'Fp2*y/2/X= ' . . .
0.5Pd.mln =
LOADING CHEC~·(ASO) '.
Pe= 409.14 lbs. ··, ' 4~ \: ,•·:."~·?:
Pd.max (2/3*Wp)= 1242.00 'lbs.
Sum P/1.33= --Z238.36 lbs. 2/3 *. Wp= 1242,000 lbs
i•,·
'• :
'·,
·,··
,, '
409.1 4 lbs.
941.50 lbs.
• (ASCE 7-16 13.3-1)
(ASCE 7-16 .tt3-2)
• (ASCE 7-16 13.3-3)
> Pe, NO lJPLIF'f
DL + LL GOVERNS
.. ' ;
:,.
• ),i.: ~' . :
r. I ,, .. '
'·
'#2 ':7~1 l) ~tt/ t7oq::/j&:
,A,_ 'PRIME JOB: 2K23-90
: Ir£ STRUCTURAL DATE: 06123 • J!la, ~NGINEER~ se~: s I
! .. ---· ., ....
I '
t->tt4D·-/u~; ~--··· -w .)C.; >< · 1-·r ~ hf-✓ s ~ ~~ lrif i :
I tvn,Jit) ,-v~,; u,,[C. •)< '/, C-')l .A-( :: ;~, 'hif w
I I I I ' ', '
' i
)-l.~/?c: .Jr),.D/4 .:;. ~6c> '/F
tP • tt?> -o, c. D = 5,18''"1f (i,17vr rz}
~ '
' ~ C°'c)Jr~: -=--zsy :
; I
' ' I t I '
I l
/
PRIME JOB: 2K23·90
STRUCTURAL DATE: 06123
ENGINEERS SHT: s -------------------------===-==="'----Hilti PROFIS Engineering 3.0.85
www.hlltLcom --· -----· ~---···-----------___ ..... _______________ -.--.. -·~-·-•-----
Company: Page:
Address: Specifier:
Phone I Fax: E-Mail:
Design: Concrete -Jui, 27, 2023 Date:
Fastening point:
Specifier's comments:
tin ut data
J\nchor type and diameter:
Item number:
Effective ernbedment depth:
Material:
Evaluation Service Report:
l5sued I Valicl:
Proof:
Stand-of/ installation:
Anchor pla eR :
Profile:
Base material:
Relmo cement:
Seismic loads (cnt. C, D, E, or F)
Kwik Bolt TZ2 -SS 3M 318 (2) hnom2
2210245 KB-TZ2 3/8x5 SS304
h,.,,,ct = 2.000 in., hnom = 2.500 in.
AISI 304
ESR-4266
12/17/2021 I 12/1/2023
Design Method ACI 318-19 / Mech
e0 = 0.000 in. (no stand-off); t = 0.500 In.
'• x IY x I= 2.000 in. x 2.000 in. x 0.500 in.; (Recommended plate thickness: not calculated)
no profile
cracked lightweight concrete, 3000, fc' = 3.000 psi; h = 4.000 in.
hammer drilled hole, lnotalletion condition: Ory
tension: not present, shear: not present: no supplemental splitllng reinforcement present
edge reinforcement: none or < No: 4 bar
Tension load: yes (17.10.5.3 (c!))
Shear load: yes (17.10.6.3 (c))
R -Tho anchor calculation is based on a rigid anchor plate assumption.
Gl?ometry [In.] & Lo:cidtng [lb, In.lb]
' .,
l(
-·-------·--· Input d~to ond re-wit~ must Lie ct,ecked tor eonfOf'mrly wm, the exisUng tondldon-; and for plaustbiU~-:
PROFIS l!hgineering ( e) 2003-2023 H11ti AG, FL-949• Schaan H,1111, a ,egislered Trademer1< or Hilb AG, 5chaan
6/27/2023
l-lilti PROFIS Engineering 3.0 .. 85
• IIJWW.hilti.com
Company:
Address:
Phone I Fax'.
Design:
Fastening point
1.1 Deslgn res_ults
I
Concrete -Jun 27, 2023
Page:
Specifier:
E-Mail:
Date:
2K23-90 A PRIMEJOB:
J'r.£ STRUCTURAL DATE: 06/23 Ba, ENGINEERS SHT:____,_7_
2
G/27/2023
c_· a_s_e ____ D_e_s_cr...:ip_t_io_n _____________ F_o_rc_e_s...:.[l_b.,___] i_M_om_e_nt_s___,_[_in_.lb--']'----------'-~-e_is_m_l_c __ M~a_x_. U_til. Anchor[%]
1 Combination 1 N = 254; v, = O; Vy::: 375; yes 56
M, "' O; My= O; M, "' O;
Input data and results must be cnecked tor conformity with the-existing conditions and for plauslbllltyr•• : .
PROFIS Engineering ( c) 2003-2023 Hilll AG, Fl-9494 Schaan Hiltt Is a registered Trademark at HII& AG·, Schaan
2
CJIS:;l,,
Hilti PROFIS Engineerin~ 3.o:as
www.hlltl.com
.... ,.
2K23-90 A PRIMEJOB: A _STRUCTURAL DATE: 06/23
1:Z£~ ENGINEERS SHT:~s-
------------------------------;----------------~------Company: Page:
Address: Specifier:
Phone I Fax: I E-Mail:
Design: Concrete -Jun 27, 2023 Date:
Fastening point:
2 Proof I Utilization (Governing Cases)
Design values [lb]
~oadlng
Tension
Shear
Loading
Proof
Concrete Breakout Failure
Concrete edge failure In direction y+
Combined tension and shear loads 0.267
3 Warnings
'.·,).oad
264
375
Pv
0.655
it ...
.• Please consid~r all details and hints/warnings given In the detailed report!
Capacity
952
675
~
5/3
Fastening meets the design criteria!
1;.·,4 .... , · .
. ·,,
I
~~~~-;-;;;;;;; .;-;;;·,e•ults muat b; checlcod for conformity with th" ••isling conditions and for plauslbllltyl
PROFIS Englnurtng ( c ) 2003-2023 Hlltl AG, FL,.9◄9'1 Schaan HIIU Is a regls1ered Tredemer1< of Hiltl AO, Schaan
3
6/27/2023
Utilization
I\ I 13v [%] Status
27 /-OK
-/ 56 OK
Utllizatlon 13N,v [%1 Status •·-----·
49 OK
'·'· ~-STRUCTURAL Oa~:___,.-=---
• ~ENGINEERS'. Sht: 10
RECTANGULAR/SQUARE HSS -SUBJECT TO FLEXURE AND AXIAL FORCE
(LRFO DESIGN PER ANSI/AISC 360-05)
DESCRIPTION, 2K22-90TI GKN Roof Screen
Horizontal Member
DESIGN PROPERTIES:
Shape= HSS4X4X1/4
E = 29000 ksi
-Fy·=
A=
d=
b =
t.design =
bit=
'h/t,,;
Apt= .•
>--11 =
Apw =
Arw =
·MAJOR AXIS:
46.00 ksi
3.37 ir,2
4.00 in
4.00 in
0.233 in
14.20
14.20
28.1 2
35.15
60.76
143.12
kx.:;:
k = . y
Lx=
l!y··= ., '
(KUr)x =
(KL/r)y =
Stress Increase =
• HSS, <t>c =
HSS, ¢b:;:: ·
MINOR AXIS:
'
COMPACT FLANGE
COMPACT WEB
COMPACT FLANGE
COMPACT WEB
APPLIED LOADS~
Loads applied shall be in LRFD .
Axial, Pr = 0.000 k
Bending, M;= 9.09 k-ft = 109.08 k-in (+ in 3-1 Direction)
Bending, My= 0.00 k-ft = 0.00 k-in (+ In 4-2 Dir.ection)
CAPACITY:
<t>c'·Pn ~ 106.68 k
Mex = (Pb·Mmc = 16.18 l~·fi = 194.17 k-in
Mey= <t>b·Mny = 16.18 k-ft = 194.17 k-in
INTERACTION;
1.00 I= X 7.8 in4
1.00 Zx= 4.69 in~
8.00 ft s.= 3.9
8.00 ft '. rx == 1.52
63.16
63.16
1.00
0:9
0.9
I = y 7.8 in4
z = y 4.69 in3
Sv= 3.9
ry= 1.52
Add'I Loads:
• ~ t 83
DL LL
P1= 0.00 k 0.00 k
• P2= 0.00 k 0.00 l<
P3=. 0.00 k 0.00 k
P4= 0.00 k 0.00 k
(Interpolate AISC Table 4-3)
(See AISC Table 3-12 & 3-1 3)
(See AISC Table 3-12 & 3-13)
~
0.00 in
0.00 in
0. din
0.00 ir.
0.56 < 1 HSS4X4X1/4, ... OKI
· .. ,
.,
' . ,··,.
I J;, :•
''.
I
&_, PRIME JOB: 2K2J:90 •• Jlr~, STRUCTURAL DATE: 06/23 sa, ENGINEERS $HT: 1 .11
~· w~11~~ tPM ~ ~t-rp1 s-: r
. ' . * ~ flor-r;: a,mn/c :~1-~ t-J?K-c ~~J<Jc0 rt=>...t. A-WL
. /tx:>/<;.F ~ lt:J/fP 6/L-·1'-f?Pld.r unf-£>, ~'
)#./ Y I A-/VEL. f'c:>1 N r;. 7l/fs 1t..J1S w ~t,c:1,..1r
, ,?t:111--'fit1u1J.r 1 Mre-fl ~ .s . 1 -.:;;/;fe 1 ~ev
~t<'Jf7fi?; ~ "m14tl u4--t>.s.
~~ ~A-!::J f>kc;1;;:I). o/\J ~ lt!?U -!lb -I ~?'o>'fp. ,_ $'-'c:!>, 2
/~'x 9?6~.,...1
( C r 1../'-! _/
::-~-l-1-f/sr <<' /ao;sr-
e.?'/$!.TT~ 4nll-~~
w~ ~L_(IOtff' o/c::::__
'9,!Yf; ~ 'yl'W-~
' . l l.
I ; • i
I . ;
i •
f
A_ PRIME JOB: 2K23-90
• i'r£ STRUCTURAL DATE: os123 ~ ENGINEERS SHT: 12
11:----~--~~:,___-,---"""'7'""-:---r-~r~F~~--r-7'-----::~-0,1~ ill
Tll2 .t T20'3
. .# f7J,V. ,1 /lff!J',PS'l=,. 'r . .:/l"t<;r t,f{!;i;.,J-,.
~ r00f(F • 1, ' f ~ ./'r t,.,?A-Jt' ~ . , ...
rle,r ,,t-Df)EX).
WiJ ~ ~ ft; • .,_. J' 1 ~;-• t/ ~-,!-/ fl'-r
A{ ~ ;ti-, 2--/'>F _><-f' ~ I 2-:i ff .
,r1t-. ~ f ~ re;-/ ,.. l/ c./-o ,fr
.. •. '-L --rr, i
~ .tMT,tC/f
i:::xtrr,t/~ 7'' ,r
C--A--~-1,,,,f-'17 o·,-...:J
.. ;
Existing T112
/k_ PRIME JOB: 2K23-90
,;t>.s::, STRUCTURAL DATE: 06123 l!!/la, ENGINEERS SHT:____,_1,._3 _
06/27/23
2K22-90TI
(8U{slp12vls0b4148TBEAM ANALYSIS PROGRAM(slp9vls0b4148T
SPAN LENGTH= 55.00 ft
(6.43) (Bu(s/Jp
(Simple Span)
UNIFORM.LOADS (k/ft & ft)
wd wl Xl
0.464 0.122 0.00
0.164 0.000 19.50
REACTIONS (k).
LOAD
Dead
Live
Total
MAX:CMUM .FORCES
V max = 16.81
LEFT
13.456
3.355
16.811
k @
Vd max = 13. 46" k @
:>C2
55.00
26 .83
RIGHT
13 .266
3.355
16 .621
0.00 ft .
0.00 ft·
M max = 235 .72 k t't @ 26. 68 ft
Md max -189 .64 ·k£t @ 26 .52 ft
DEFLECT·IONS (EI = kin"2)
LOAD Defl (in) X (ft)
Total 127544058/EI 27.43
Live 25118468/EI 27 .50
Dead 102424486/EI midspan \/
TOTAL Def.l El:
L I 180-34784744
L I 240 46379656
L I 360 69569488
Ll:VE • Defl EI
L I 240 9133988
L I 360 13700983
L I 480 • 18267976
Reference Material
RN --· 0 11 ...: :3. -A ... H 6 f.C 9 -·0 0 0-: BE AD -D ()'O -D S E -· E G C ·-E J' E! O· H O D -0 0 -ll O O O O C O 'V 1.'i ·
Tag~ AHU 4. 8 (ll;l;I) •
Unit Infotmation Job Irj,forn.wti.on .
,Job Name:
,foh N umbe1'.:.·
Caltaivay :w Print Lab
~lob #20220."11051
. )t\, • Approx. Op:/Ship,Weightii:
• : • Supply CFMIESP: •
1717 11 717 lhs. (±5%). ,
3200 I J.S:in. wg.
Site Altitude:
RClfrigei'ant
s;: oti.c Pressure
E::lernal:
r:\'ilpnrator:
:1il.Le1·,; Clean:
Uirt Allowance
Tot1d Capacity:
Sr.:n,;ible Capacity:
),[,tent Capf.!city:
M i:;ed Air Temp: •
1•:r-tc•i:_ing Air Temp:
l,1• Air.Temp (Coil):
f,y_ Air 'l'ernp (Unit)
:sllJJply Air I•';iq: •
:';A ·F,-1r1 RPM/Width:"
· • Bxh'aust Ail_-.Fan: • •
It,\ .Fim kPM ,
Il vi:lporutor Co'il:
l•: v.•1 J);°l'll tor. F.-ace .Vel_ocity:·
.• : tir,ting {rifomialion ' ' '
·•·, ,,·
Of(
R--110A
.1.50 ,in. wg.
O."J 3 i,t. r~;g.
·O.:?(j iii . wg.
0.5 in. wg,
Cross · Net
119.00 113.69 MBH
87.45 82.ltJMBH : ;
3.l./55 MBH ... r{:,
80.,10 °F DB . 66.30 °F WB--.
80.10 ~F DB 66.30 °F VVB
54.27 "F' DB 53.54 °F WB
• 55. 7.9 "F DB 54.16 °F WB
1 x 220D70 @1,87 BHP
ii8313.416''
. l x RM1_2X9X2@ 0.87 BHP
, • : <!51 '!.9.'000" , • .
14. 6ft' 13 Rows.114 li'Pl
21 f!.4 ti/r1/ : .
'.\pplkation EER@ Op. Conditfo~s: ' . . 10.8
ll:iting: .'4 6,0 IJ t60
U11itFLA_:, 27
::XX)lt .'SKAIC-
Qty HP VAC.
• C<imp!'es1.;or 1: •· 1-460 '
< ·curi presi;or 2\ • , l 460'
Curnfon!lel' Faris: 2 0)333 460
~>llf.;rly I<'a.n-:· 1 3.00 . 460
1,;,h;nwt fan: 1 2,00 460
Cabinet Sr,und Powei· Levels* .
Octa,ve Bands;: 6:'f 125· 250 ,
l>i.sch~rgeLW(dB): '. • 88 . 88 • 93 .
• Llt,µm·n '.LW(dB):' . . 86 '., . 82 . · 84 •
"Srn,11.,l j)~1wci· iev~l~;ii,'IJ gi.11e11. fo,. i.n.forinatil:,;wl pu.,Poses oni;,.''tr,e.. sou.ad leuels are ,a.ot g11.oranlecd. •. . . . ' . .
,·•,i-
!l,it& Creat.,d/Morllfl&d16i6!2!)231:W,41 l;'M Using Ve,·-4.232: (CISNi.< 0123456) ' •·,, ' . .
Pre-Filte1· FV I Qty:·
Fi1ial Filter FV I Qty:
Exhaust CFMIES.P/'l'SP:
Outsid·e CPM:
Ambient Telnperature:
Return,Temperature:
: I,
Economize1·:
Rea ting: • ·,
Cabinet: .
Re-Heat Coil:
Total:
Heating Secti.bn('.,'1')
Prirna1·y Heat Type:
• Totai CApacity:.
Integrated Heat' Cap·acity:·
OATe1np: . •
RA Temp:·:··
, Er.tel'ing Air Temp:
Leaving AirTemp:
Auxilia1'.y Heat Tjrpe:
Heating CFM:
Fan Teinp)tise:
Jw-Heat Coil:·
Capacity:
LADBIWB:
Rl-l:
230.40 (pm 14
230.40 fprn 14 ..
3200 10.50 10.70 in. ivg:
960. •
.92 °F DB 175 'FWB
75 °F' DB 162 "F WB
0.-12 in, 0/l;IJ.
o:oo in. ·u;g.
0.07 in. u;g.
,(1.()2 in, 1vg.
2.5.'Jin. wg.
Heat Pump
. 92.4 MBH
.. ?'HMBH
···.·,
·41.0"F DB I.no. °FWB
46,0 "F DB /40.0 °F Wlt
60.0 •p DB 145.0· "l-' W/3'.
86',<1 •p DB l fi6.4 "F 1,fl B
No !Teai.
8200
.L5."F
5~JMBI-i
70.00 •p /59.-(i'i "F
·.55% '
Application COPH @Op._ Conditions; : 3.SJ8
•I
, Minimum:Circu'it Amp: 29
Maximu11i Overcun·ent_: 35
Phase
3
3
1
3
3
500.
81
70
RPM
1110 .
• 1.760
1760
. '
1000
76
69
FLA
l .G
4.8
3.,4
2000
?a
G;3_
RLA .
8.1
7.2
4000
70
t13
• 8000:,
,' ·:
.:•'
.,
·.:-,}::fl;
.-'CLEARANCES
; 'LOCA>i"IOf-! :, UNIT SIZE•
9.• 15 TON·
OUTSIDE AIR --48 ..
. • (BACk) •. ,.
CQNTROLS ,SIDE 48 '(FRONTJ . '
LEFTS/DE 6--
RIGHT SIDE 4-8 '.
TOP .. . iJNOBSTR_L!CTED • .
I
I
•. ,\
R.AISE MINIMU~ r r~R fHE
SLJPPL Y AIR OPENING .. °7• I '•. • ,·
•.. --
DET~ILC ·
,;·•,;_ t' l ,.,.·;' I
FRONT VIEW
·1----'~----~95~---~---~-
~ . 07~~-......... -~58¾
-.~\,,··· •.. ·,
•~ONOf fl~Etl,_,_. 1
C«l.l·C'.:•:BS '-, ':\
. '-' CONlll:.NSEf ' . <:OIL •,
FLllCE OLITLET-
(OAJ•;:Hr:A. ! ONL VJ
• CONTROLS ANO:HEATER .
~ESS •
11--<---.---55.l-·---~--i,
INSIDE ~E R~U .
1--"-"'-'--.---;•':5aa--,..-_-~-
OU1i1~ 8'AS;i RAILS.
RNB-00003)~ev;c 06/18/20 CAR.
RNB-00003 REV:C 08/1f</14"Ml.:W
NOTE: ALL DIMENSIONS ARE:IN INCHES
-------
I
\
c::::::::i
~ _,-/
DETAIL A
'SEE DETAIL "'C"
-------.,,,
T◊PVIEW DETAIL. B
ass.----~·7
··--------
• -24~----39¾° • !'31
RIGHT SIDE V!EW'
aai-----r-22f-·7 --
UFflJJ.tN
I" UPT-Sl",.\JNLl:SS COl'ICENS,HE CONNECnON '
. ,.:i . 4
.. ' .
.·,.
{'
i
s.1.11,
I.D .
• ' • -"-------·· -·7,'JE~~=--:::=-=--~-E:--EEE~-~---S--=3:-~---=-··=--~t===----1:
,---------72 718 in i.0:----~--'-~
,.
: :·'. ::,: ..
,,_ ___ .__ ____ 75_ 1&161/J FlanQe 0,0, ---'--~~--...i
... ',,
,', I
! : ~-\ . \· ~' ~
·; · ...
,;-.
' ,' .;, .•-·· ~ . ."l'""•· "1; 1
... .,, ,. , .. •" r
t ~-~-.. • :~• • .',-\
I • ~. ',• ;•,
', . . ' ~· ~ '
·,··-
. ~ .. '.
. ,yt'/1} I ta?o (Lp~~•o~ ~ q .. o\::--,'
ti\ ( r~ . (1)~~ e. Q,½'f. ' ~llj/4,,·~--
--"t,
k .
'IC,/\
:,\-\ .
• ::n:'RllSS ANALYSIS.; 48.LH98,0/J :::, •• :\
. flN000~5-01 . · · CALLl~WA..Y • Gl .
J:3.J'>.fm LENG~:'H
~ II •• J.1 1/2 ;/ WQRK'.tNG :LENGTH
54 -:7 .1/2·
DEPTit:
4Efi··'.
. BC PP,NLS • LE= 1.0 '-> 0 5 :S.C 'PAN;ELS AT 8-0
·:;:1.i· .PAHLS . LE=
',"f'rl <.:"I' RA I''ii LB=·
5 ..:.• 9 . .7 /8 END STRrJT:: TILTED ·
J. -~!:<-•~.-· • ,J: . 1~ 5 3/4·
!:ei:R,'::3r::' • DIJl,G LE= :t i ~ 5 3/4 '
j DEPTHS . LE= 4s:: ooo . •
t·
1:
I M'Cfl,'T.TPLB! LOADING:. J)L +. LL
·SPECIAL l.S'I' COMP
CENTERLINE :::
EP.F DEPTH
:45. 6 .
.RE=· 10-.0
RE ::-: 5-9
RE= 1-s
RJi;= 11.:. r· .)
RE= . 48. ooo . ·
RUN ON ' j5 ... 3r)' .. )fJ
/66!f
7/8
3/4
3/4
·•. ~;
,, :; : .! :·: . .,-;: :.
': . '
I . . .
I D'r , l,Q)\J) o~ < ·9, 500<1,BS AT PANEL PT 7 . 27. 48 'LB -27 ,_48 'RE • l mtTRPt • SHEAR AD,iJEt.cTo EACH WEB~ 4 7;!5'q ,,,., . : :,.:,·· .
ONIFORM .TC .·LOAD = 980 ,,,, UNIFORM BC LOAlJ= 0
R,•:ACTibNS Ri= +31,5i6.25 • R2'= +311516~.25, MIN Sl{R:-.! 7,879.(16 TL"' 6~ ~ 032. 5:0·
--➔·---·-.:_ ____ STRE SS ANALYSIS • --. -.------
NO .MEM
l W2
TC. F-· •. BC F SHEAR . WEB F CSC . · WEB, ·L .pp· DIST.r,.NCE
~74,38~' · 0 2&,744 '92 ,~21 2.774. 12~.50 0-2
' ,-,•·r·r "'·I<'D END ·S"T'RU,~l' ". ' . . ,. , ..... 1 .L -., .,;.s .. .., -. ,.. .. • ., , ~ v~s -68 ,2~9 • a ~;543 I z .w3 -6a,2s9 ·11,·i21 2Ji 201
f ::; wt1. .-::9 6, 763 • rr,:321· 1a,1470 I ·l iih · •• -9·6, '76:':i . i.1'2, 079 14., 550 •
t W6 ·-123, 268 -112 , 0 7 9 • 10., 6 30 r. t. ,. -·w7 -·123 ,268. •. • ,1:30·,.3'31 6 ,-110
t . '? W7 . ·-123 ,'26'8' .• • 130,331 -6 1 709
r: 13 W6 --123.,26 8 .. 11'2 1 079 -.1 0.,62•9
9 WS '· -96; ·763 ·' 11:2 I 079· -·14:, $4(9
'J.0 W4: . -96 ,76•:f.·• 7.7,32:1 -18,46$1
.i. J W3 -6 8; 289 .: •. '7°7, ·3·21 -23,:., 201 •
... s., 237
,-:2Q ,, 994
. ·_',!.33, 713'
• 28,,02'1'
22, :no
-16 ,.63,B
-16,638
22 I .3~·o·
-28; ·02i
,·',:;.~,3.; 7 13
\'Z;,29·, 994
1. 486.'
-~1 .'073
1.'45·1
-1 .451:
1.451
-1.·451
J.. 45J.
~1., 451:
i ~ 451'
.. J .·4·51
1:0.73
67: .-?,(j
48.-93
6·6 :20,
.6·6 :20
6'6. 20
66 .. ·2 0·
66 .20
6,E;. ~ 20 •
66':20
66. io .
48,;93 l TTLTim END STRUT •
. . V1S · -i4 ,3B3 . 77,321 S,t43 -8;237 -1 .4B6 67 ,76 I :i .. :,;~ . W2 . • .' •.• 7 4 /, 3,8 ~ . • q -2 8.;, 7 4 4 S 2 , 9 21 .. 2 . 7 74 12 6 > 13 0
{ :. . . .. . . . -· ":' -..: .;. : sr1n VERTICALS [;"·'.\_3 . ~'i_i; ··SQE.NI;)·.·,.•. :· .. • 31.,Sl.6 .,31r.5M, 1.000 45 .60
! l-l • •. VJ. E'rND ·.PNI.::,. ·· ·> ·s:,.543 -:-8, 2'.3 7 • i. 486 67. 76
: .l 5 V2 · I N'l~ERIOR • ·:.. . . 3·; 920 ; '-/~:3:,;.920 · 1. 000 45. 60
: MAx. ~r1-c coM~Rt?.ssroN.:.·-12~; ~·6a.· .. 6:? M'A,X' a·c' ·r:rENsrciN= 13 0, 33:i.·. 83
I'. MAX INT • TC 'pllJ~SL • LRNGTII ., 4s. o.o Ml\X INT Be PANEL LENGTH •
I(
,. .': .. ~;
···s-97/fJ
l .0 -6 .
°11 ~-: r.· • 3 j4 · · · ·
1·5-·~ .3/ 4 •. ' ·.•, •• ..• ··•,;\\.
19 -c: 3 /4. . . • ·, ;f,.•··
• ;;J -. , • . 23-·s 3/,L • •
27-5 3 / 4 •
31-5 J/1±
3!;,~ (5. 3/4
39·_ · 5 • 3 /4,.
43.:. 5 • 3/4
4,9 -1 5 /8 .
4-4-11 i/2
96 .00
1 ,..·.• •
' ·: . •. ~· .
...
; :~ ·,:~_.:+:/~
f
I GTRrrns. ANALYSIS: 4BLH9B0/:1 ::;\.~
(: • 8NO o O 7 5 ··OJ. • CALLAWAY GC 1 r . . .
! -Hi:!:.:fm LENGTH WORE'.ING 'LENG"rH.
i ,.,·" .:11. ~l /2 54~ '7 1/2 • •
I.
BC PJ\NLS LE= 10-0 5 BC
.TC PANLS :LE= 5--9 7/8 -END
PE·P'I'H
4 8 , ..
: .:;\·.
PANELS AT 8-
ST,RU'l' rrILTED
t·rR s':r HALF .LE=. -1-s
' PI I{ST DIAG LE= ·.·.11-,. S
3/4 SPECIAL 1ST COMP
f:-3/4
1 ~ n BPTHS ! LE.::: .48 .. 000 . CENTERLI:t-TE= 4$.000 .. ·~ ~
I :ViULT'IPLB LOADING : DL +/-· WL I ~
0
'11:'io'F : -DEPTH
4.S.6
RE= 10-
RE= 5-
RE::: .1-
RE= 1{-
o ·
9
5
r.:· ::,
RE= 48.QOO
RUN ON 5<30 ~-9 8°
I !J 0• (
7/8
3/4
3/4
' r PT LOAD 0.F . ~, 5.0CVLBS A"r :PANEL )?T 7 27. 48_ 1 LE ,,,.. 27. 48 r_RE ,
I
' HORiiON'l'AL FORC.E:S AT ENDS
LEl:i''1' . END TC,_;, 13 , 100. o.o,~ BC:::
r.ilGH'I' END 'I'C:: -13, 100, 00 / · BC:c.::
EXTRA SHEAR .ADDED TO EACH WEB:: 4750 <
-0 .. ,oo .·.·:::Q'::oo
UNIFORM TC LOAD= 85'7 ✓-UNIFORM 'BC LOAD= 0
g_EACTIONS Rl= +28 I, 1$6. 81 R2:= +;28 , 156 .·81 MIN SF{R= • 7 1 039. 20
-------------STRESS ANA!tYS.iS. ------------••
NO lYlEM •re-F .. :BC _ F SHEAR WEB F
1 W2 '._79·1 690 . 0 25,733 84,566
csc WEB L
'i.'IL'I'l"m E:ND, STRtJ'l' •
VlS · ··:--74;361
W3 -:74,3 61
. ., W 4-. -l O O , J. 2 0 • •
4 _W5 -:1,-9·0 1 12.0
!3 W6 • -124, $54
6 .• W7 -124 ;554
i· 7 W7 --124, 55-4
f :J • W 6 -12 4 , 5 5 4
r. 9 W5 -100, 120 I 1 n 'i,'4 --100,12 0
[-1 :_;_ W3 -74, 361
f . 'i:' ILTED J~l'>ID STR"UT-' f \11S -79, 69(?
t 2 W2 ~79~~9◊
·t J SE SQ END
:::.4 Vl END PN'L
·:i...s • V2 INTER:(:OR_
o·.
69,391
69,391
101,042
.i.01 , 0_4:2
. l ,18 J .258
1i-8, 258
101.,042
l0.1, 042
69 ,39:L ,
69,391
69 / 39:1
0 '
-----STP
i-"~b..X TC COMPRESSION'=-124 , 554 .64
4,847
20, 88.5
l6; 74_8
131320
9,892
6,464
:6,464
-9 ,·8-92
-13 ·, 320
-j_6, 74-8
-20,8-85
4 ,-'84:7
-2°5 / 7'3,3-
VERTICALS
\--(-;_ '7 / 2 0 3
:..27,509
31 ,213
-'.4 6,235
2.1. I 158
-16 ,-281
-16-, 2-81
. _·21,25$
'·\•.2.6 / 235
31,21.3
-27 ,509
-7,203
· 8_4: / .5Qb
2 .. 774 126 . .50
-1 .486 67.76
-1.073 48 •. 93
1.451 66. 2·0
.-1.451 .66.20
1-.451 66,. 20
-L451 66 .20
1 ,.45 1 66.20
-1. 4.5.1 66 .20
1.451 66:.'20
..;1.451 -66. 2:0
1.073 48,93
..
-1.486 . 67,76
··2-. 774 12-6. 5.0
2~,156 -~28,156 1 ;000 45.60
·•1,847 ·--<-·1 ,203 _ 1 .486 ,97.7·6
3,428 -3,428 -1.000 45.60
MAX BC ':tENSION.= l.18, 258. 85
,Y~AX IN"r' TC PANE_L LENGTH .= -.4.8 . 0 0 MAX INT • BC PA.i"fEL -LENGTH =
TL=--56 ,313.63
PP. DJ;STANCE
0-2
5-9 7/8
10 -0
11 -5 3/4
15 -5 3/4
19-5 3/4
23-5 3/4:
27-5 3./ 4
31--5 3/1,
-35-5· 3/4
39-5 3/4
43 -5 3./4
49-l 5/8
44-11 1/2
96.00
.·'· ·. ·.,
i; ..:> J. KJ.'.ibb .t~\IJU.t :r: ;:j_J_~ : 4ML.H'.:H.HJ / l • .J-.:..1, l;I·.· 8N00075-01 • CALLAWAY · GC.
RUN ON • $-30 -98
BASE LENGTH WORKI NG LENGTH
54 -11 1/2 -~4-7 ·1/2
BC l?.ANLS LE= 10-0
DEPTH
48
E·FF DEPTH
45 .6
RE= 10-0
'I'C PANLS LE= 5-9 7/8
:FIRST HA'L,F LE=. 1-:-~-3/4·
l?IRS'l' DIAG LE= :(1-5 3. / 4
5 BC PANELS AT 8-0
END . STRUT TILTED
·sPECIAL. lST. COI~P
RE= 5 -9. 7 /8
RB= l ·· 5 3/4
RE= 11-5 3/4
LE= 48 .-000· CENTERLINE::: 48.00 0 RE= 48 .-000
Ui1JLT IPLE LQ.ADING: DL +/-· WL
:P.'l' LOAD ·OF · • ·9,500'."'LB·S, AT PA.l'lEL· l?T
HOIU ZON'rAt FO~CES·: AT. END$ . •
7
.LEFT' END 'l'C~,,·,.13.,10·0 .. oo_...,. BC= ,:·-°.'.·o_o
RIGHT END TC,= • 13 ,100 .·oo ,.., BC:-:: _;:,:i'q-/oo
K'KTR.~ SJIEA.If ADDED TO E:ACH WE:B:::: 475 <Y-
UNIFORM TC LOAD= . 8'57 ,, . tJNIFORM ac-LO.AD::: 0
RE;ACTION'S R:L= +2·8 ,15.6.81 R.2==· +28,156 .--81 MINSBR::: 7,039.-2-0
l
._:_:11_ -----·------'-·-STR.ESS ·ANALYSIS -----·--------
NO· MEM · . TC F . :BC F .· SHEAR. WEB· F CSC WEB L
fl l · W2 • • -53,4QO ·O 25 ,733 ~H ,·566 2 .. 774 l.2q .. S·Q
i '1'ILTJID END STRUT •
· Vl_S .• '.'48 .,.16·1
1 W3 ~48,161
Wf:I, -'73 ,.920
·,:•·:· W5 -73,92:0
S W6 -98 ,3$..4
• ::i W7 ·-.. Qa .,·•354·.
7 W7 -98;35 •..
1. g , W6 ··98,354
9 W5 -73,920 .
[.; .1.◊-W4: .-,73,92 0
11 W3 -4a,161
I::_ 'l'II ."l'ED END ST:Rl.Y.t'
VlS • -53, 490
[: ,):2 W2 • -53, 4_90
,'.' 67. 7 6. . 0 4,847 · '. ·.:;.:::..;q, ,2 0'3 1. 4-86
69,391 20 ,885 ::r:·~··,·.7"• 5·0'9 -1:073 · 48;_9·3 ~-' I ,..
69·, 391 ·16, 7.48 31 ,213 1.451. 66; 2-0.
1 01 ,042 13 ' 32'0 -.26·, 235 -·1 . 4·51 66,. 20'
ld-l,042 9,89~ 2-i 1 258 1.451. 6fr, 20
·l;J.8 1 2°58 6,464 •.• -16,281 ":l,451. ~6·.20
.118; 2.5'8 -6 ,,464 · -16, 28.1 l.451 (56: .. 2·0
10.1 .,_0·42 -9~892 .21 ,258' -1..45.l 66.20
. J.01 ., 042 ' -i'.3,32.0 ,.:·:..;a ·$ 235 .. • 1. "4.S). 66.20
' 69 I 39J. : -16,, 748_ -' • .'}:3·1: 213 -1 . 45~. • 66·.20
.·6:9 ,391 · -20,885 -27(5.09 1 .07~: 1,l,8. 93
GS ,3§1 4,.B47 ~7,~0l ~1 .486 · 67.76
D -25 ,,7.33 84 ·,-S:66 -2. 7,74 126. 50
--·-·--$.Tb. VERTICALS ----!·.
SE SQ E~· 28,156 -.2a,,·1s6 . 1.000 45.,60
MAX
M.A.:X:
in. END,,PNL 4 1 847 ·,>,\_7 1 20'3 1..486 67 .. 76.
V2 • • Ii-iT-ER!OR . 3., 428 .;,3 , 4~8 1. 000 45'. 60
TC COMPREss:i:-oN=: -9$,3~4.64 • MAX BC. 'I'-ENSION;,,, llH ,258.BS
INT TC_ ·PANEL LENGTH ·= 48 . 00 MAX INT BC PANE.L 'LENGTH =
I '
TL= ~6, 31.3 . -6 J
PP DISTA.1'\JCE
0 -2
5 ,. 9 7 /8'
10 --. 0
l1-.5 3/4
15 -5 3/4
19 -5 3/4
23-5 3/4
27-5 3/4
31-, .. ::S· 3/4
35-5 3/4 -
39 -r:-3/4 ..,J
43-5 .3 I 4
49-1 5/8
44 -J.1 1 /2
9~. 00 :
•'· .. :
,,: .,
•.I
.
S'lR88S i\NALYSIS·; 481.\H980/1 ""~. '1'112 ; ~9 RUN ON 5-30 ·98"
H1'1'00075 -0 l . · ~LLAWl-tY G( ' •
BASE LENGTH
r.:· ,, -~ ·t ·1;2 _J liJ: .... .L .. . ~
'W.ORKlNG LENGTH
54-· 7 1/.2 •
r~C PANLf:; LE= 10-0
DEPTH
48
. EFF DEPTH
45. 6"
RE=° 10-
( '1>1 (
0
'I'C l?ANLS LE= 5-9 7 /8
'ti F:CRS'T HAT.,F' LE;; 1.:... 5 • 3'/4.
FIRST DIAG LE=. 11-5 3/4
r . DflPi:IJS •• Llh •4iJ .. 000
5 BC P.AlfELS AT. 8-0
END STRUT TILTE.D
• S-PEeIAL 1ST COMP
.RE=
RE1=
RE=
5-9 7/8
J.-s 3/4
11-5 3/4
CENTERLINE= '48.000 RE'= 48,. 000 l MULTIPLE LOADING: DL + 0. 75 (".LL ➔·/-. WL)
r ~ I ~ L ;1
I
l?T LOAD OF ·9, 500,..,.LBS AT PANEL PT 7 27 .48 1 LE 27.48 1RE
HORI ZONTAL FORC:E;S_: ~T . ENDS
h f.:F."T END TC= 9 ·, 825. o·o:,.. BC=
l R.JGHT END ·re = -9, 825. OQ / BC=
3X'!'Rl~. SHEAR ADDED '!'◊ EACH w:irn ~, 4750·,..,··
0.00 .,o .0.0
UNIFORM TC LOAD ~ 949.25/ UNI.FORM BC LOAD= 0
REACTIONS Rl= +30,676.39 R2:::: +30,·676,:39 MIN S·HR= 7,6€>9.10 TL= 6:L ,3~j2 .78
------~ ---,.. ---STRESS· ~At,YS-I S • 7' --------• -·--
NO MEM T.C F· . BC F SHEJ>J?. WEB F <i:S9 WEE L l?P DISTJ:1.NCE
:L W2 -82·,25.9 . 0 27 1 ·9'91 90 ,832 2·,774 12·6 .. SO ,· 0-2
··p f.LT1:::0 E:.ND STRUT
VlS •• 76 1 357
W3 ::.76,·357
W-4 -104,152
4 ws -104,is2 ·:
5 W6 -130,140 ·
6 W7 ~13Q,i40 .
7 W7 -'13(h J:4Q •
g W6 -130,140
~~ ~'15 .-104,152
tO W4 -1Q4;152
:l.l W3 -76,357
TILTED END S'I'RUT
' ,· 0
75., 338-
75,338
i .09,, 319
109 I 319•
127 ,:313
'127 I 313
,109, 319
109'.; 3 :L9
75·, 3 38'
75 ,338
5,369 '>., .---7 , 978
2.2 , 622 · :..·29, 373
18,039 33,088
14,242 -2 7,575·
10 t 44•5 22 I 062
6,648 -16,'549.
-6,~48 -16 ,549
-10,445 _ 22,·062
. -14,242 ~~27,575
-18,03.9. '°j3,088
-22,62~ -29,373
1.4"86
"'L073
. 1.451
·-.1. ·451
1'.451
-1.4-51
1.451
--1.451
, 1 ~ 4~1
..:1 . 45,1
1.073
67 ·."7·6 5-9 7 /8
• 48 ·.-93 10-0
.66. 20 11-5 3/4
• 6~.20 15-5 3 /4
66 .20 19-5 3/4
6 6 . 2 0 2 3 -5 3 /.-1
66 ~20 Z1-5 3/4
66.20 31-5 3/4
E? 6· . 2 0 \ ' 3 5 -5 3 / ,i
6 6· . 2 0 3 9 ~ 5 3 / 4
'48.93' 43-5 3/4
r. VlS -82,259
:: 1:2 W2 -82,:259
7.5', 3 3 8 9 , 3 6 9 • -7 , 9 7 8 -1 . 4 8 6 Q 7 .. 7 6 49-1 5/$
L14-'11. 1/2 r
I
I .!,3 ::,E SQ ENI?
.1.4 V1 END PNL •
J.S V2 INTERIOR
-0 '-27 ,991 , 90 ,832 -2.774 ·126.50
..:~_.:,_ STD · V.ERTI.CALS ---.-·
,30 I 676 , -30', 676 , 1. 0·00 45. 60
5 ,.369 • :::·.~7', 978 1. 486 , 67. 76
t'l.A..X TC COMPRESS!ON =-130,140 .17
3 ,797 -3,797 . 1..000 45 ,60
MAX BC . TENSION=· 127,313 .-5-9
MAX INT BC PANEL -LENGTH· :::· MAX INT 'I'C-PANEL LENGTJI = 4·8. 00 • ' .
•l ' •
.. :!:(,\; ••••
....... . . ,;
' ''
96 .·oo
I.?
I';-';• ·,
STRESS.· AN.ALYS.XS: 4-8LH9'8Q/J -:-•-:i •. ·.T1_12 > j'Zt!) 1 • RUN ON 5<:s0•· 98
BN0.0075-·0l • • CALLAWAY Q<, ·•
: .· -B.AS E • l!ENGTH
r: ···--if 1/2
BC PA1'1'LS LE·= '.,~c -PlS.:NLS LE;,
FIRS'P HALF ;LE=
FIRS'!' DIAG LE:=
UE\PTHS
·woRRrMG LENGTH
_54_;_ . .7 ·:l/2 _. ••
DEPTH . ;,,
48 .
J.0-• 0
5-9 .. 7 /-8
. 1-· 5, 3/4
:p _-;5 '3/4
5 ·nc PANELS Jl~T 8 -0 •
BND "STRUT TILTED ·
·SPECIAL :i,$1' COMP
.• CENTERLINE= 48.000
MlH.,'TI J?LE ~OADING: ·PL ·+ 0.75 (LL +/-WL) :_ ,_.-.,.·
..
.li f ·LOAD OF .·9,.Stio.~·LBS ·AT PA.r."'JEL. P1'. 7
f' HORIZON'I'At FORCES .AT .ENDS '
• I,E};T • E·ND • TG-~ • . -.9., t,2:5. OQ.,.;, . ·:sc= 0. op
RIGHT END TC=.'• ~ ,'82~. 00 'y,' • BC= . ,.•.=.:_9_:_.,;_·,_·.·.':o·.:·•·:o_ BXTP.A SHEAR ADDEO · TO E.AClLWEB= 4750"""
UNIFORM TC LOAD= ··9·49 .. 25· ,.r UNIF'ORM BC LOA!>= O
EFF DEPTH
45.p
RE= 10-
RE= 5-
RE= .1 ...
I RE= '11-
0
9
5
.5
RE::: 48.0DO
RRACTIONS Rl=· ~;301 •676. 39 R2a: +30, 6~16 . 39 MIN· Si-IR= 7,669 .1.0
----------:.:-,··--S'!'REr:;s Af.l'AtYs~r's ------------
/tJ1'?j
7 /8.
3/4
3/4
TL=
1· NO , • MEM . 'I'C Jr ' . _.'BC l;i" • .' SHEA:B. WEB. F CSC WEB L • PP DJ:ST.A.NCE
• 1 .·:.w2 -GZi6:o9 -:·· •1 •. · o 21,9-91 -• 90-,a3-:2 21774 12q :-so o-2
• • TI l/l~ED END STRUT • • • : .· · ·
VlS -56 I '707' •.
W3 ..:5 6 1 707
~ ~w4 ~a4,so2
-'l W5 -84, 5 02
5 W6 -110,490
6 'rfn • -11 b ,.4 ~i o
·'7 WT -:i.10 ·,490 • ..
t~ t•i G ···110, 490
S-· ws -84 , 50·2
J.. 0 N 4 • •· 84 , 5 0 2 :
1 1 W3 ·-56_·, 7 07_
'TJ:L'I'E:D El\TD STRUT
0
.' 75 3·3.g , . .
. 75,, 338
'.1.'09, 3·19·
109;3:L9.
127,313
12'7 I 3•J.3
109·,· 319
109' I 319.
• ?5, 33-B
'75 I 3 :3 8
• .!? , 3 69
22 622 ,.
'18,.039
14,242
1.0'; 445
6 /· 64·8 .
-6-,648
-1-0:,445
--14,242
--:18 ; 039
-22' 622 . 1 ..
: .. .,_, rr. 9 7·9. ... I ..
. • : -~-'2-st, 3 7 3
• 33; 08·8
-27,S-75
22, 06,2
-16 549 I .
;.16,549
22,062
'~_;,,7 ,-575
, :··/ ~-;3 '/ 0 8 8.
•• -29 ,3'73
1:.4'8'6
-L07'3
1,.4·51
-1 ."4.51
.J..45'.L .
-1. 45.1
1.451
-~:.451
1._.,4 51
··1 ,4 51
67. 'r/.6
·49·_,93
6·~·-.20
66 ;.20
66 .. 20_
66.20
66.20 ·
66 .20
• 66 .. 20 .
66'; 20·
48 ·.·93
•,
5-9
1·0.:..._ O
11-5
'15-5
• Ji9-· 5
23 -5
2.7·-5
:.n-5
3-5 -· 5
~9-5
43-5
3/4
3/4
3/4
3 / ,j_
3/4
3 /4
3 /4
3/-1
3 /4.
r VlS --62,:609,· :'75,338 5,369 . '·-7,_978 ,,-1.486. 67<76 . 49-1 5 /H
t· L.? W2 ~6-2,,60·9 ' • : -o · -·27, 991 ,90, 8J2 -2: 774 126 .50 44.-11 1 /2
ii . .. ·-· -... ~ -• STD· VERT!CALS -.:.. -·-
;: L'. BE SQ END · 3.(J,.676. _· -3·p, 676 • 1._.'0 06 45. 60
I,, ~:~~-~; • , ~~Ei~tR .-. . . • • ~:: ~-i :.·~ • >(:-;i: ;;; t ~~~-. :~·: ~-i
~··mx TC COMI?RESSION::::-i:1.0·, 490'_.17 • MAX BC . TENSION== 127, 3,13 .-59
f~.:AX I NT TC P,ANEL :LENGTH ::· • 4S. 00 Mfl..X INT BC PANEL LENGTH =
. ' ,. ,'.
: ' ,·:
: Ir ..
1-··; • ••. ', ,'
. ' '
,• "'
96. 00 .
.. -. . '
' 43LR980 /,123 T112 1 ',3t)9
; 8N00075-0l CA~LAWAY GOLF
i
-··-----r;ru'LTIJ?,LE ANA.LY.SIS .SUMMARY
TEN TC COM ·BC TEN BC: COM
l
;~
' -) I .,
t 4
!!
.5 ,· 0
·1
! 8
Q -8 2 I 2 5 9 • 0 ,,g '
0 -76-, 357 ·77 1 321 \~~' ••
0 -104,152 77,321 0
0 -104,~52 112,07~ 0
0 -130~l4ci llj_,079 _ 0
0 .-130~140 130,331 0
o . ~130,140 i3d,331 o
0 ~130,14~ 11i,019 0
9
1.()
O -10~,152 112i~~9 . 4 ~
O • -104,152 77,J~l • -:~.
0 -76,357 77,321 0
O -82 ,259 0 -0 o ·o o · o
o d· o o
0 ·O O 0
tlNIFORM LOAD:. TOP. CBORD= 980
WEB _TEN
92 I. 921
0 .
33,7l3
0
22,330
0
0
2.2, 330_
O·
33,713
0
92, 921
0
0
0
-------CONSOLIDA'l'E LE:FT & RIGHT •• ------•·
l
tl
9
TC TEN
0
0
0
0
0
0
0
0
0
TC:: CoM ·
-82 ,_259
-76 ,357
-"104 -;.152
··'.1 0.4 152 , ' :
~130; 140
-1.30,140
0
0
0
BC 'rEN
0
77, 42,1.
77.,-321
11,2 I 079
112,-079
1"3 0, 3.;Sl
0
0
0
BC COM
-0
0
0 o. -
_i.)~:: :: '
0
0
0
: MAXIMUM UNIFORM· LOAD:. TOP ClfORDc• -_-980
WEB TEN
9·2 :9'21. . I ,, I o·
~3, 713".
0
22, 33:0'.
0
0
0
0
W:EB CQM
0
-29 1 994 .•
0
-2 8, 021
0
-16., 638
-1$,€3&
0
-28 / 02-1
0
-29,994
0
-31,516
-8,237
-3 ,920
WEB COM
9
-29 ,994 ' 0
-28,021
0
-16 t 6-:s"s
-311 51.6.
-8, 237
-3 / 92·0
RUN ON 5-30-98 '.
) 073
r . .
t
.• ..,'I
. . 1 ,, .
i MEMBER SIZES:
8N000'75-01
4'8LB:98.~/113 •. T112 ,. 7.tt' 7
C.~LLAW.A,Y -GOLF
F·· . . .
1 • Bih~'r/IN"G LOAD _ -·
= 5:0.,000.00·0 'Fb -= 30,000.000
= • • • 9 .. a·o ·• 0 0 0 AS·SUMETO . F·ORC·E = _13 ·o , t~t-0 . 1·7 0
. OUTS IDE ,DEPTH •·. · · == , . 48. 000 . 'ASSUMED EFF .DEP.TH= 45-.·600
BC -.:: 42
AREA ·= -2.85_90 y ·(x} =·:·i ;1380 Ryy = ---~it Q·5T2 : Rz . -0.7880
13(~ tTN:f.F1 r;o·?ID . = • 18.7 :_ S·Q.0· ... :'' Sl -= 3. 83·0·4 ·-$s = ~;.. 523 0
'EC = 42
1 ARE.'!\. """ • 2. 8590 1-oc·. = .1 . .2.350. Rz = . 0; 7880. Ryy = 2 . 05i 2
~.r .... 1 .. 1380. s1 .. ;: 3. 830.4 . ss . = 1 .. s2-~o· ·Qs !:? J .... oo.o·o
A.CTU~I, EB'F DEPTif = : :--45 ;_7.24 • GAP ·BETWEEN CHORD= L 000
COPRECTED L OAD. 'l'C= 129;787.240 ·Be··. . • --12'.9.,978 .385
1.,/R.x. ~ 2.9. J.49· USING t . =. 4.8. d0 L/Ryy~ 17:,_,?50 USING L •. ~ 36. 00
L/Rz ::; 3 0 ._4;59. USING, ·L ; • 24 . 00 WtTH FILL,EiR:S K= . 0 . 7 5
Fa:= 27 ,096.1. USING L/R= ·.3"0,4.5 'F.1 e= 17 5,743:'82 Clll= 0.:94333
• MID PANEL MbMEN'l' .= 7 1 840. 000 Pi:i..N'EL POINT MOM . == 1-?, 6iso. 000
; MID P.A.:NEL fb -. :,1., 023 .39 q · ·J?ANE~ J?OIN'l'_ fb,. = . 5·; 14 7. 529
! :ta/Fa = · • : 0. 83 7 BENDING RAT:tO . --0 . fJ 37
rvmx LOAD (FI:t.LERS·}-,,;·, ;143, 821 _.·82 MAX-LOAD -NO' FILLER=-l~:9 , 082 .4:E;
1 ::-lO INTERIOR FILLERS REQUIRED .
TOP CHORD l;l']?_= . 0. 87'4.83 ·usil'i(f.TC= 42'. ::~'A X 4. X· . 3.75
pp::;,. 27 / 845. 54254
M.AX .SHEAR. CK= 11,665. :t.4400 AT JOIN~r 7
; BC ·S1'RESS · ;,,. 22 1 7:'$1.44210 -USING BC= 42 -= 4 X 4 X .375
1 • [',tf-\.X SHEAR CK~ .. 11, 87i. 04·1:1,3 AT. ·.rolNT -.6
ce,,_ . ..;LNEO BOT:r.oM: CFIORD STRESSES
: MID -~PANEL --23,-5.14.64:9
E.-.m • P.AN'EL CHECK _
i.\X IAL LOli...D
:cb PANEL . PT
~ND PANEt. CHECK W== 91fo
= • LEFT E!ND LENG'I'.H-
::: .. ·82; 036 ."82 AXI AL STRESS fa
= ·1 ,;is?.61 F 1 e •
·-· l~., 6':11 ~ 7& fb ·MI:D-~·PANEL
,·. ·0.912 fa/Fa ·
2ANRL ·PT= ·_27,958.8 .MID,·:PANEL·= 0 ~ 9679 . ·NO: .:FILLERS
.· -'?{•_':' •. . .
;:;:
• 67 . 87
14,347 .ll,
49,438.51
'3;731 .07 ' .o. 807.
L/R= 86 .°i3
FTRf:-:T PANBL CHECK -· LEFT 'END · l,El~CJTll =-674 ·88 .
.l\X IAL LOAD -• 7 ~ , . .J.5 ()'; 92
_fb PANEL PT
Cm
PANlU , PT=-
. . 1 7 , .;/ 5 r7 : :61
·= ':13,61·1.79
'. .. • • 0. 892
26 ,929 ,5 • .MID< P~EL::%
AXIAL s~r:RESS f,a = 13,317 .-75
F I e = 4·9, ~L3 ~ ·.·51
fr.> :MID-PANEL = .. 2, 04:3 .'4·5
fi/~a -~ 0 ,749
0 ~8331 NO FILLERS L/R= 86'.13-
i • ;,:,J :-
HOTTOM CHORD -L/Rz-=. • • 12i; .827 ·tc OAL/Ti:yf/
MJl~X BRIDGING; CHECK. TC= 29'. OS ,' BC= 41 . 02 1
=
MOMENT .OF INERTIA=. s,·994.7 LL. 360el,374.0 LEN/360= 1.82 11
. : .
', :. ,.\• .
RUN . ON 5 ~ 30 •• 9 8. •
/D ~?tj
I
-'1 '
,. , .. ~-
I ' I I
f· ' ,, t'.
. ·re,,, . 4 2 ,::; 4 x 4 x . 3, s
-··.:. .:. -.-WE'B DESTGN ------•
Nu!ViB:eR -srzB.· QT¥. AcrruAi ·:r ALLow ·T A-C'.I'IJAL c . ALLow c WELD
1. 1~2 32 • 2 ·11 . 92,921 • 97, 3·s .4 o .42r319 2.S .l.
:~ 1~3 ·2 3 2 ·B . •• o· 4i,201 29,~i9~ J2i19s 'io.9:
J W4 '20 2 B ·33,·n3· 36,36'0 .. :;.-, 0 21,353 14 .. 6
,1 v~s 2 4 ;.2 .B o. .49,510 . 2e,02:1: 29,885 a.·a :
5 W6 15 .. 2 B 22 ,33 0 29;088 0 14,9i7 1~:6
G W7 20 2 g O 36,360 • 16,638 21,353 7.2
---·;.: STJ~lDARD VER'rICALS · --•• -
ANGLE
3 . ~,.
. ·.t\. 3 X
2 y.
-· 2 X
2, X 2 X
2 X 2 • .X
,1 3/i,l X
2 X 2 X
. 43·, 2:07 31 , SJ.6 3.3 ,, 238 . 11. 4 -2 X 2 X
·N)\ME
. 28:L
1 , .. ,.1 . d,
.15G
,21~
l 3/4
156
. 18:7
VT
V2
2) .. 2 B •
2·1 :1 .•
15 • 1 .•
0 ·.o 30,7Si 8 1 886 14,262 2.9 2 1/2 X 2 .~/2 X
i4 ,54,4 4,568 7,'.l.6.5 •. 2.2 • ·1 3:/4 Xu. 3/4 X
: '· ...
·-.. , .•
.
' ' .. .,., -~
:156
,,
' .
9.
K ~ O . '7'5 ~IIN -.COMJ?== 0 : 2 5
•·\ .•
. ?\.·
. ]_lJ J
: :' . .:,•; .;,
.,
A TUVRheinland®
TUV Rheinland of North America, Inc.
1279 Quarry Lane
Pleasanton, CA 94566
Web: http://www.tuv.com
US Field Evaluation Report
Equipment type: Powder Sieve Machine
Manufacturer: SLM Solutions Group AG
Model number: PSM100
Serial number: 91.22.6004
CLIENT:
Kevin Luo
SLM Solutions NA, Inc
48561 Alpha Drive
Wixom, Ml 48393, U.S.A.
AUTHORITY HAVING JURISDICTION:
City of Carlsbad, CA
Permit# (if known): N/A
INSPECTION SITE:
Top Golf Calloway Brands
2180 Rutherford Rd
Carlsbad CA 92010, U.S.A.
TRNA file Number (if applicable): US2447TW.02.002
TRNA Project Number: 234216624
TRNA field label number(s): TUVR-108814
Evaluated by: Reviewed by:
Number: MS-0004526
Revision: 8
Effective date: Dec 12 , 2022
Digitally signed by Douglas ~ Jj.U,0tei,.-. Goldstein
Date: 2024.05.14 15:37:38 -07'00'
Justin Goh Date: May 14th 2024 Douglas Goldstein, P.E. Date: May 14th 2024
Test Engineer SeniorTest Engineer
Field Evaluation Services Group Field Evaluation Services Group
Email: jgoh@us.tuv.com Email: douglas.goldstein@us.tuv.com
The test results contained in this report refer exclusively to the equipment presented for Inspection and/or t,isting. No liability may be assumed for
models or equipment not referred to herein. This test report may not be published or duplicated in part with,Jut permission of TUV Rheinland. This
Inspection report by itself does not constitute authorization for the use of a TUV Rheinland test mark. This report shall not be used to claim
equipment endorsement by TUV Rheinland. TUV Rheinland of North America Inc., North American Headquarters, 400 Beaver Brook Road ,
Boxborough, MA 01719 Tel 978-266-9500.
City of Carlsbad
MAY 1 6 2024
BUILDING DIVISION
RECOR[) COPY
Number: MS-0004526
/;!_ TUVRheinland® US Field Evaluation Report Revision: 8
Effective date: Dec 12, 2022
File Number: US2447TW.02.002
INDEX:
• General Conditions of Acceptance and Scope of Inspection
• Inspection Procedures
• Inspection Details
• Field Inspection Test Data
• Required Markings
• Modifications for Compliance (Deviations)
• Terms and Conditions of Acceptability
• Construction and Component Details
• Photos and Illustrations
GENERAL CONDITIONS OF ACCEPTANCE AND SCOPE OF INSPECTION
This test report contains only findings and results regarding the indicated equipment for installation at the particular
inspection site. It is not intended as an endorsement of the equipment, nor an approval of similar or identical
equipment at another location. If this equipment or any of its attendant parts, connections, or components are
modified, changed, or replaced in any way after the inspection, the inspection and lab,31 are considered void. Re-
inspection shall be required.
TRNA's label indicating the equipment as compliant does not relieve the owner/manufacturer of its responsibility for
the safe operation of the equipment.
This inspection is intended to address only potential electrical fire and shock hazards ·to the standards defined in the
body of this report. TUV makes no representations or warranties whatsoever regarding any other aspect of the facility
or equipment at the facility. This inspection does not include inspection of the suitable: operation of the unit and does
not include emission tests and locations defined as hazardous by the US National Electrical Code, NFPA 70, current
edition unless otherwise noted.
If this evaluation is not performed at the final installation site, the AHJ may require an additional inspection and re-
labeling
INSPECTION PROCEDURES
Please refer to the "Standards selected for the evaluation" for additional criteria.
Construction Inspection
The equipment's design was visually inspected with particular attention to the followin:~ areas:
• Use of Certified Components • Wiring methods • Sharp edges
• Proper Motor protection • Guarding of Live Parts • Availability of
• Proper Transformer • Guarding of moving parts suitable markings
protection • Pinching, crushing, cutting • Suitability of power
• Proper conductor protection hazards connection
• Proper wire bending spaces • Damaged Components
• Ground and bonding • Accessibility of moving parts
• Accessibility of live parts • Temperature, moisture, and
• Wiring ampacity UV exposure I conditions
If a particular product, system, or component is not identified above, TUV did not separately evaluate or inspect that
product, system, or component, and TUV makes no representation or warranties concerning the suitability of that
product, system or component for use.
Number: MS-0004526
/;;!,. TUVRheinland® US Field Evaluation Report Revision: 8
Effective date: Dec 12, 2022
File Number: US2447TW.02.002
In detail, the following inspections were performed in accordance with the standards referenced or
defined in this report.
(a) Grounding and Bonding
Exposed non-current carrying parts of the equipment were inspected for effective grounding and
bonding
(b) Guarding of Live and Moving Parts:
All hazardous live electrical components were inspected for installatio in a suitable enclosure.
Moving parts were inspected for suitable guarding against pinching, crushing or cutting injuries.
(c) Overcurrent, Short Circuit and Overload Protection:
Overcurrent, short circuit and overload protection installed in this equipment were identified to be
NRTL Listed or Recognized and of proper size, rating and location.
(d) Internal Wiring:
Internal wiring and wiring methods were evaluated for compliance with applicable provisions of the
standards referenced or defined in this report. Wiring was verified to be, properly sized and rated, with
a temperature rating suitable for the installed application. Securement, routing and segregation of
circuit conductors was determined to be suitable.
(e) Electrical Testing
Non-Destructive Electrical Tests were performed to verify the suitabili1y of operation and safety of the
unit. Selection of tests, are dependent on the type of equipment and applicable provisions of the
standards referenced or defined in this report. Test data sheets are attached to this report.
(f) Environmental Suitability:
The suitability of the specified equipment and components within known ordinary environmental
contexts was evaluated. Outdoor-type equipment was evaluated for suitability for exposure to rain,
dust, humidity, and splashing. Enclosures were required to be NEMA-rated. The suitability of the
specified equipment and components was not evaluated to any standard, code or guideline not
specifically referenced herein.
(g) Installation of the Unit:
It was verified the equipment was installed in accordance with the ins1allation requirements as per
NFPA 70 (US Electrical Code) for working areas and power connectic,n. The equipment
manufacturer's installation instructions were additionally referenced if provided during the inspection.
(h) Functional Check:
A function check of E-Stop, interlock and GFCI protection was made to confirm intended operation of
the devices.
(i) Component List
The following safety relevant components were inspected for suitability of electrical rating and *NRTL approval.
Discrepancies noted during Inspection are noted in the section detailing "Modifications; for Compliance
• Circuit Breakers • Power Cords • Receptacles
• Fuses • Interconnecting cords • Cables and Wires
• Pushbuttons • Motor Controllers • Disconnect Switches
• Relays • Motors • EMO's
• Transformers • Motor Overload • Power Supplies
• Interlocks • Motor Contactors
• Internal Wires • Lamps
*NRTL: Nationally Recognized Testing Laboratory, e.g. TUV Rheinland, UL, CSA, etc
Number: MS-0004526 A TUVRheinland US Field Evaluation Report Revision: 8
Effective date: Dec 12, 2022
FIie Number: US2447TW.02.002
INSPECTION DETAILS:
Description of work ordered / Equipment:
Powder Sieve Machine PSM100 receives the powder and rejects clumps and debris with motorized powder sifting
and ultrasonic powder separation. The unit is intended to run with the SLM280 but is rigged to run from the facility
power. Due to the nature of the powder, this unit relies on the recirculated gas from th,a SLM280 to exclude
oxygen, but also accepts inert Argon to press the Oxygen out in case of fire hazard.
Because of the flammable nature of the powder, an Argon release is built into the system with a very large tank of
liquified Argon in the room. Oxygen level is checked using an external sensor system.
Remote Dust Monitor, mounted in the room, will immediately turn off power to the PSM100, SLM280, SFM-AT200
and other ignition sources, stops HVAC circulation, and activates the exhaust venting.
The Selective Laser Melting Machine SLM280 is evaluated in report PSM-US2447TW.02.002. The powder
removal unit SFM-AT200 is evaluated in report PSM-US2447TW.03.002
Follow-up Inspection on May 1st -2nd:
During this evaluation, the equipment was checked that the non-conformities in the previously issued findings
letter (Letter-234216624.01 .002) was addressed and that no new non-conformities h;:;1d been introduced. Electrical
testing was also performed.
The equipment or major system components, as defined, consists of: :1
1. Plug and Cord
2. Pin and Sleeve Power Entry
3. Disconnect
4. Fuse Bank
5. Power Supply, 24VDC
6. Vibratory Sieve Motor
7. Ultrasonic Generator
8. Variable Drive, Vibratory Sieve
9. Safety Relay with Emergency Stop
10. Argon Valve
11. Inert Gas Regulators
EauiDment omitted from the Inspection: !I
1. The selective laser melting machine SLM280
2. The powder removal unit SFM-AT200
3. Chiller is Listed to UL Standards;
4. Vacuum Cleaner, separate from system
5. Remote Dust Monitor, Room;
6. Oxvqen Sensor, Room;
Date of lnspection(s)
Initial review date: April 19th 2024
Next review: May 1st 2024 to May 2nd 2024
Final review date: May 2nd 2024
Standard(s) selected for the Inspection
The below standards were referenced during our inspection. Note: If a standard, code, or guidoline is not listed then TUV did not
evaluate the equipment to it.
List of standards used b number and edition
US NEC NFPA 70: 2020 Ed, National Electrical Code
Number: MS-0004526
/;!_ TUVRheinland® US Field Evaluation Report Revision: 8
Effective date: Dec 12, 2022
File Number: US2447TW.02.002
ANSI/UL
NFPA
UL 508A, 3rd Ed 2021-07-13 Industrial Control Panels ~
NFPA 79, 2021 Ed. Electrical Standard for Industrial Machir~
Subcontractor information (if applicable):
I Company: IN/A
Evaluator: N/A
DOCUMENTATION SUBMITTED
Installation Instructions: IZI Provided D Not available
Drawings: IZI Provided D Not available
Markings: IZI Provided D Not available
Other N/A
FIELD INSPECTION TEST DATA:
Total number of units/systems 1
System or Unit □ System IZI Unit
Rated voltage: 230 iZ! V AC IZI 1 Phase D 3 Phase
Rated power: 4 A
Rated frequency: 60 Hz
Control voltage: 24 □VAC iZI V DC
Alternate voltages: N/A □VAC □voe
Largest Load: 0.5 □ HP IZI A
*AFC of Facility Mains: N/A1 kA
**SCCR of equipment 5 kA
Hazardous location: D Yes IZI No
Area classification: Ordinary
Location: IZI Indoors D Outdoors [Note 2]
PSM100 Additionally Requires Argon at 6-8 Bar and Compressed Dry Air at 87PSI
Note 1: AFC from facility/ grid was not provided ;
□voe
Note 2: Components checked for NEMA ratings; aggregate environment testing not performed.
Number: MS-0004526
/;!._ TUVRheinland® US Field Evaluation Report Revision: 8
Effective date: Dec 12, 2022
File Number: US2447TW.02.002
Test Parameters·
L1-N L2-L3 L1-L3 See test cc,mments below
VoltaQe: 232.8 N/A N/A
A(A) A<B) A(C)
Current: 0.6 N/A N/A
Insulation resistance: 2014 Mn □ 500V DC IZJ 1,000 v DC
Dielectric withstand test (Alternate) N/A kV □AC □ DC □ Pass □ Fail
Vdc = Vac x 1.414 D 1 Minute D 1 Second
Ground continuity: <0.1 n <0.1 n IZI Pass □ 1=ai1
Leakage current (max): N/A mA IZI Pass □ Fail
Branch circuit protection, Control: 20 A □ Hardwired IZI Cord Connected
Enclosure class: iZJ NEMA Type 1 □ NEMA Typei 3
IZI Metallic D Non-Metallic □ NEMA Type 12 □ NEMA Type 4
E-Stops/lnterlocks: IZI Pass □ Fail □ N/A
Rain test: D Pass □ Fail iZI N/A
GFCI test: D Pass □ Fail iZJ N/A
Additional tests: N/A
GFCI not tested because Outlet Receotacles are not orovided.
* Available Fault Current= AFC (at connection point of facility mains)
** Short Circuit Current Rating = SCCR, (of equipment)
Number: MS-0004526
A, TUVRheinland® US Field Evaluation Report Revision: 8
Effective date: Dec 12, 2022
File Number: US2447TW.02.002
Component Temperatures:
Cords I Input Socket 21 .2 oc Fuse Bank 22.8 oc
Disconnect 22.3 oc Power Suoolv, Sieve 22.5 oc
PowerSuooly,24VDC 27.9 oc Safety Relav 25.5 oc
Motor, Sieve 22.8 oc Ultrasonic Generator 23.2 oc
Metal-Powder ductinQ 21 .8 oc
Test Comments:
Tests performed with the unit not running under full load conditions.
Environmental Conditions (optional and for reference only):
Temperature 21.1 °C Humidity 74% (internet weather). Unit is installed in climate-controlled environment.
Multiple Similar Units
Serial No./ IR IR (MDC Ground Current (amps) Voltage TUV RNA
Position (MO) Bus 2) Cont. (0) A B C L1-L2 L2-L3 L1-L3 Label#
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Note 2: If Units identical; Leakage Test, Current Test not repeated.
If Batch/Lot Inspection and testing is conducted, specify the number of units in the batch and th13 number of units sampled. Sample
selection shall be random, avoiding consecutive numbering if possible and taken from the beginning, middle and end of the lot or
batch. If non-conformity is found in any of the units, the entire lot or batch shall be inspected and tested. A batch inspection is
limited to 500 units of the same model at one time. See Annex B of NAM FES Procedure MS-0014396.
Number of units in the batch: 1
Number of units Sampled: 1
Test Equipment
Device Manufacturer Model Serial Number Calibration Functionality
Due Date Checked P/F
Insulation resistance tester Fluke 1503 43370617WS (18/31/2024 p
Current Clamp Fluke 377C 55850114 (13/20/2025 p
IR Thermometer Fluke 566 58770336WS (13/20/2025 p
Notes: System permanently connected.
Number: MS-0004526
Revision: 8 /;;!_ TUVRheinland® US Field Evaluation Report Effective date: Dec 12, 2022
File Number: US2447TW.02.002
Required Markings:
1. Fuse replacement value (Warning -Risk of Fire. □ Add [ZI Provided □ NA
Replace only with same type and rating fuse)
2. Door service caution (Caution -Risk of Electric □ Add [ZI Provided □ NA
Shock. Disconnect from Power Before Servicing)
3. Nameplate/electrical ratings (Nameplate Ratings □ Add [g,j Provided □ NA
as measured/calculated from "Test Details")
4. Arc flash warning (Danger -Arc flash and shock □ Add [ZI Provided □ NA
hazard. Appropriate PPE required.)
5. Other: (Lockout , HV, Disconnect power warning □ Add [g,j Provided □ NA
labels required on all panel doors/covers)
6. All Markings Shall be in English or symbols as [g,j Pass, D Fail
indicated by the Standard
MODIFICATIONS FOR COMPLIANCE: □ N/A D Open 181 Completed and Accepted
General:
• Reference FES procedure and specified Standard for Safety identified on page, 5.
• Hazardous voltage labels (permanent) shall applied to all electrical control pan13ls with voltages 30 Vrms or
higher. (See required Markings table above).
• Machine nameplate shall include the largest motor/or load rating, AIC or SCCE rating and enclosure type.
• The constructions issues listed below shall be resolved before receiving final Acceptance and Labeling.
Equipment / Deviations:
1. Marking, Ratings, Pressure. UL 508A, Cl. 52 and NFPA 79, Cl. 16.4, R.equire that industrial
machinery requiring Water or gas supply be marked with:
--"Water minimum ????Liters/minute, maximum ????C" or equivalent;
--"Nitrogen/ Argon 6-8Bar" or equivalent, where "6-8Bar" is the rated ga:; pressure.
In our inspection of the PSM 100, the inert-gas marking is missing.
To show compliance, mark the units reliably with these ratings.
Corrective Action:
Markings were provided to show required water and argon needed to operate the equipment.
[Confirmed 2024-05-02)
2. Wiring Diagrams, Component Connections. UL 508A, Cl. 61 and NFPA 79, Cl. 17.7, Require that
wiring schematics and diagrams, depicting the connection of components to sources of power and to
system loads, must be provided for each unit, such that maintenance may diagnose circuits
accurately. Such may be provided electronically and stored in database at the site, or in printed form,
stored inside the units. In our inspection, the PSM100 was provided with no electrical drawings, and
interconnection could not be accurately determined.
To show compliance, provide wiring schematics in paper or electronic form for determination of circuit
connections.
Number: MS-0004526
~ TUVRheinland® US Field Evaluation Report Revision: 8
Effective date: Dec 12, 2022
File Number: US2447TW.02.002
Corrective Action:
Wiring diagram not available during time of evaluation. Accepted since this does not impact
the overall safety of the equipment. Any service or maintenance work is to be performed by
equipment manufacturer only who will be equipped with necessary documentation to perform
task. [Confirmed 2024-05-02]
3. Block Diagrams, Safety-Critical Relays. UL 508A, Cl. 61 and NFPA 7~l. Cl. 17.6, Require that
multi-part Safety Relay circuits, if they encompass multiple pages of a wiring diagram, must be
supplemented with a block diagram of the connections between sensors, Safety Relays, Switches
(e.g., Emergency Stop) and affected components such as Laser shutten,, Inert-gas valves, and
Contactors. In our inspection, PSM100 uses multiple sensors and Relay1, but provides no block
diagram with which to clarify their connection and use.
To show compliance, provide a Safety-Relay block diagram with the Sensors and affected
components to clarify their use.
Corrective Action:
Block diagram not available during time of evaluation. Wiring diagram checked to confirm no
Functional Safety modules in use. [Confirmed 2024-05-02]
4. Components, Approval / Unknown. UL 508A, Cl. 4 and NFPA 79, Cl. 4.2, Require that all Critical
Components which are LIVE (over 30VAC or over 60VDC) or linked to Safety circuits must be
identified by manufacturer, model number, type, ratings, and Approval / Listing Mark. In our
inspection , PSM100 uses multiple components which are obscured in the system panels.
To show compliance, client provided component data and allowed visual confirmation of components
Corrective Action:
All critical components have been verified that they have an Approval / Listing Mark.
[Confirmed 2024-05-02]
5. Components, not Approved. UL 508A, Cl. 4 and NFPA 79, Cl. 4.2, Require that all Critical
Components which are LIVE (over 30VAC or over 60VDC) or linked to Safety circuits must have an
Approval/ Listing Mark and must be rated for use in the system. In our inspection, the PSM100 uses
unknown components, which may not be Approved or may lack a Listin9 mark.
To show compliance, client provided component data and allowed visual confirmation of components
Corrective Action:
All critical components have been verified that they have an Approval / Listing Mark.
[Confirmed 2024-05-02]
6. Egress, Door Handle, Broken. Requires that working space around thei unit must permit egress
without the use of a tool. In our inspection, the door to exit the room containing the PSM 100 required
use of a door handle which came off during use, causing the door to remain latched.
To show compliance, repair or replace the facility door handle.
..
.•
Number: MS-0004526
/;;!,. TUVRheinland® US Field Evaluation Report Revision: 8
Effective date: Dec 12, 2022
File Number: US2447TW.02.002
Corrective Action:
Door handle has been replaced with a functioning door handle. [Confirmed 2024-05-02]
7. Argon Asphyxiation SLM280 Manual. Requires that the use of Argon in quantity be accompanied
with an ambient-Oxygen sensor to prevent asphyxiation hazard caused by displacement of
breathable air. In our inspection, the room containing the PSM100 was provided with Argon in a large
tank, with sufficient capacity to displace a significant amount of ambient air, but no Oxygen sensor
was provided.
To show compliance, provide an Oxygen sensor for the room, and a warning light, numeric display or
other early-warning device outside the room.
Corrective Action:
Oxygen sensor for the room with a warning light and numeric display was provided.
[Confirmed 2024-05-02]
TERMS AND CONDITIONS OF ACCEPTABILITY FOR THE EQUIPMENT INSPECTED:
1. The Available Fault Current was not provided or identified at the time of the eivaluation. For Permanently
connected equipment, the equipment was evaluated to ensure the equipment was marked with the SCCR
corresponding to the construction of the equipment. Consideration should bE~ given to ensuring AFC
does not exceed installed equipment rating.
2. The equipment has been evaluated for electrical safety only, for installation cind use in ordinary (non
hazardous) locations in accordance with National and Local Code.
3. The equipment or system shall be used in a manner consistent with the manufacturer's design and
instructions. Instructions shall be provided in an accessible location for maintenance and reference.
4. The area surrounding the equipment or system will be kept free and clear from combustible material.
Adequate clearances will be maintained for proper safety, operation and senticing.
5. A maintenance and servicing schedule will be followed to keep the equipment or system operating as
designed. The final responsibility for establishing a maintenance program will rest with the end user.
6. As parts deteriorate or cease to function properly they will be replaced or repaired or the equipment shall
be removed from service. No changes to the design, construction or use shall be made without the
written acknowledgment and approval of this agency. Additional testing may be required to determine
acceptability of any changes made.
:
Number: MS-0004526
A, TUVRheinland® US Field Evaluation Report Revision: 8
Effective date: Dec 12, 2022
File Number: US2447TW.02.002
CONSTRUCTION AND COMPONENT DETAILS:
Non-standard Inspection procedure used (if applicable):
N/A
Notes:
Enclosure accepted with ground bonding and required use of a TOOL.
Grounding confirmed between Equipment Grounding Plug and Ground Bus, and all accessible metal.
Insulation Resistance tested between Ground Bus or Chassis and the LIVE circuits, including the following:
--.MAINS input LIVE+NEUTRAL;
--DC 24V Bus for Control: DC-is bonded to ground, not tested
EIA:
--Grounding conductors are accepted without marking due to their gauge exceeding that of the LIVE wiring, and
running zero voltage.
Number: MS-0004526
~ TUVRheinland® US Field Evaluation Report Revision: 8
Effective date: Dec 12, 2022
File Number: US2447TW.02.002
List of Critical and non-Recognized or un-Listed Components for Review
Model Mark(s) of
Component MANUFACTURER conformity
SLM280, sheet metal
coated with paint, EIA; Accepted with Enclosure, System Overall SLM 16Gauge, 1.6mm thick, bonding
NEMA Tvoe rat,ad 1
DSN20, rated 27i'VAC, Connector, Pin and Sleeve MELTRIC 20A, 2W+P.E., 50-60Hz, UL,cCSAus Entry 2HP
' LEVITON NEMA L6-20P, rated cULus Plug, Wall 240VAC, 20A, 2W+P.E.
RITTAL AX1038.000, rated NEMA cULus Enclosure, Control Panel Tvoe 1,3R,4, ·12
P1-25/EA/SVB/N, rated
Disconnect, MAINS 051 EATON 600VAC, 30A, 3F'hase, UL, CSA
50/60Hz
FAZ-B10/1-NA, rated Circuit Breaker, 24VDC Primary EATON 277/480VAC, 10A, 1Phase, UL, CSA F50 50/60Hz
QUINT-PS, rated Input
PHOENIX CONTACT 100-240VAC, 120W. 50-cULus Power Supply, 24VDC G50 60Hz, 1 Phase; Output:
24VDC, 5A
3NW1040-0HG, rated Fuse, 24VDC Secondary SIEMENS 6600VAC, 4.0A, 50-60Hz, UL, CSA F50DC IR: 200kA, Clas:, CC
3NW1015-0HG, rated
Fuse, Vibratory Sieve FU50 SIEMENS 6600VAC, 1.5A, 50-60Hz, UL.CSA
IR: 200kA, Class CC
SRAE-C50, ratecl 220-EIA; Accepted with Variable Frequency Controller, VIBTRONIC 240VAC, 6A, 5Q/I30Hz, OCP and Vibration Sieve U50 1 Phase; Output Siiwe onlv Enclosures
3NW1008-0HG, rated Fuse, Ultrasonic Deblinding SIEMENS 6600VAC, 0.8A, 50-60Hz, UL.CSA FX50 IR: 200kA, Class CC
3NW7 5130HG, rated Fuse-Holders, Fuse Bank FU50, SIEMENS 600V, 30A, 1 Pole, Class UL,CSA FU50DC, FX50 CC, IR: 200kA
KF0.9-1/R2-HUT, rated EIA; Accepted with Sieve, Vibrational AVITEQ 230VAC, 1.25A, 1 Phase, OCP 60Hz
SG4L pro 60W, rated
TELSONIC 115/230VAC, 0.4A, cULus Ultrasonic Generator 1 Phase, 50/60Hz; Output:
24VDC
I
Number: MS-0004526 & TUVRheinland® US Field Evaluation Report Revision: 8
Effective date: Dec 12, 2022
File Number: US2447TW.02.002
Component MANUFACTURER Model Mark(s) of
conformitv
PSR-ESA4_8, rated
Relay, Safety U51 PHOENIX CONTACT 24VDC, Safety Ratings: PL: cULus
E, Sil: 3
Door interlock EATON LS-11S, 230VAC, 6A UL,CSA
SILO2 Type 01-758 , rated -
Sensor, Oxygen NTRON 20 to 60C, relays 600VAC cETLus
@5A; 300VDC @5A
Other components are Listed or approved for the application
*EIA-Evaluated in Application (See also Notes Section)
Note: Critical Components shall be Listed or Recognized, (example: Breakers, Fuses, motors etc.)
,
/;;!,. TUVRheinlan d® US Field Evaluation Report
PHOTOS AND ILLUSTRATIONS:
~~!!!!!!!!~===_]J ffi• l-Cw-
4 A
~~~;_j_~!i:ii::.::.:::J:J [j;..,. c;.. ..
NA.
5.00l<A
SLM
(1 N~
] {fu,«MMlltlet•r. :J
2022
~ [l,,<1o~~ ,,.. ~
Type 1
■LMhltlt,._G_.act I.HM-..,.,.
0"'-lf•UUfl~t ...._ ......... ,,,... ... ,.,. .... ,., .. , ... ,..tlH --------·~-
Number: MS-0004526
Revision: 8
Effective date: Dec 12, 2022
File Number: U52447TW.02.002
I
Number: MS-0004526 A TUVRheinland® US Field Evaluation Report Revision: 8
Effective date: Dec 12, 2022
Unit interior shows Sieve, center, below the Control
Panel.
Marking for ratings and identity, next to pin-and-
sleeve Inlet
File Number: US2447TW.02.002
Control Panel includes Hafety Relay and Sieve
Variable drive, top left; ~!4VDC Supply, top-right;
Disconnect, Center; Fuses for Ultrasonic, top
center.
Rilllal Fin: Replac6 .tly with rating oflialed
wllues 111d ctJaracteri1tica
c....11.,. CluaCClnsl CO!llpOM--nt--
Rl!O ISAT llftwaloly5-
~ &AT 24V5-iclar,
OUT ~~
Control Panel mark identifies Fuses, Excepted
wirin , and AC circuits.
End of Report
/;;!. TUVRheinland®
TUV Rheinland of North America, Inc.
1279 Quarry Lane
Pleasanton, CA 94566
Web: http://www.tuv.com
US Field Evaluation Report
Equipment type: Selective Laser Melting Machine
Manufacturer: SLM Solutions Group AG
Model number: SLM280
Serial number: 28.22.0152
CLIENT:
Kevin Luo
SLM Solutions NA, Inc
48561 Alpha Drive
Wixom, Ml 48393, U.S.A.
AUTHORITY HAVING JURISDICTION:
City of Carlsbad, CA
Permit# (if known): N/A
INSPECTION SITE:
Top Golf Calloway Brands
2180 Rutherford Rd
Carlsbad CA 92010, U.S.A.
TRNA file Number (if applicable): US2447TW.01 .002
TRNA Project Number: 234216624
TRNA field label number(s): TUVR-108813
Number: MS-0004526
Revision: 8
Effective date: Dec 12 , 2022
Digitally signed by Douglas
PL,_I_ .. ), ,lj.u,.t,J,... Goldstein ~ Date: 2024.05.14 15:40:33 -07'00'
Justin Goh Date: May 14th 2024
Test Engineer
Field Evaluation Services Group
Email: jgoh@us.tuv.com
Douglas Goldstein, P.E. Date: May 14th 2024
Test Engineer Senior
Field Evaluation Services Group
Email: Douqlas.Goldstein@us.tuv.com
The test results contained in this report refer exclusively to the equipment presented for Inspection and/or te,sting. No liability may be assumed for
models or equipment not referred to herein. This test report may not be published or duplicated in part without permission of TUV Rheinland. This
Inspection report by itself does not constitute authorization for the use of a TUV Rheinland test mark. This mport shall not be used to claim
equipment endorsement by TUV Rheinland. TUV Rheinland of North America Inc., North American Headquarters, 400 Beaver Brook Road ,
Boxborough, MA 01719 Tel 978-266-9500.
City of Carlsbad
MAY 1 G 2024
BUILDING DIVISION
ECOIR co
Number: MS-0004526 A TUVRheinland® US Field Evaluation Report Revision: 8
Effective date: Dec 12, 2022
File Number: US2447TW.01.002
INDEX:
• General Conditions of Acceptance and Scope of Inspection
• Inspection Procedures
• Inspection Details
• Field Inspection Test Data
• Required Markings
• Modifications for Compliance (Deviations)
• Terms and Conditions of Acceptability
• Construction and Component Details
• Photos and Illustrations
GENERAL CONDITIONS OF ACCEPTANCE AND SCOPE OF INSPECTION
This test report contains only findings and results regarding the indicated equipment for installation at the particular
inspection site. It is not intended as an endorsement of the equipment, nor an approval of similar or identical
equipment at another location. If this equipment or any of its attendant parts, connections, or components are
modified, changed, or replaced in any way after the inspection, the inspection and labe1I are considered void. Re-
inspection shall be required.
TRNA's label indicating the equipment as compliant does not relieve the owner/manufacturer of its responsibility for
the safe operation of the equipment.
This inspection is intended to address only potential electrical fire and shock hazards to the standards defined in the
body of this report. TUV makes no representations or warranties whatsoever regardin9 any other aspect of the facility
or equipment at the facility. This inspection does not include inspection of the suitable operation of the unit and does
not include emission tests and locations defined as hazardous by the US National Electrical Code, NFPA 70, current
edition unless otherwise noted.
If this evaluation is not performed at the final installation site, the AHJ may require an additional inspection and re-
labeling
INSPECTION PROCEDURES
Please refer to the "Standards selected for the evaluation" for additional criteria.
Construction Inspection
The equipment's design was visually inspected with particular attention to the followin~1 areas:
• Use of Certified Components • Wiring methods • Sharp edges
• Proper Motor protection • Guarding of Live Parts • Availability of
• Proper Transformer • Guarding of moving parts suitable markings
protection • Pinching, crushing, cutting • Suitability of power
• Proper conductor protection hazards connection
• Proper wire bending spaces • Damaged Components
• Ground and bonding • Accessibility of moving parts
• Accessibility of live parts • Temperature, moisture, and
• Wiring ampacity UV exposure I conditions
If a particular product, system, or component is not identified above, TUV did not separately evaluate or inspect that
product, system, or component, and TUV makes no representation or warranties concerning the suitability of that
product, system or component for use.
Number: MS-0004526
A, TUVRheinland® US Field Evaluation Report Revision: 8
Effective date: Dec 12, 2022
File Number: US2447TW.01.002
In detail, the following inspections were performed in accordance with th1~ standards referenced or
defined in this report.
(a) Grounding and Bonding
Exposed non-current carrying parts of the equipment were inspected for effective grounding and
bonding
(b) Guarding of Live and Moving Parts:
All hazardous live electrical components were inspected for installation in a suitable enclosure.
Moving parts were inspected for suitable guarding against pinching, crushing or cutting injuries.
(c) Overcurrent, Short Circuit and Overload Protection:
Overcurrent, short circuit and overload protection installed in this equipment were identified to be
NRTL Listed or Recognized and of proper size, rating and location.
(d) Internal Wiring:
Internal wiring and wiring methods were evaluated for compliance with applicable provisions of the
standards -referenced or defined in this report. Wiring was verified to bi~. properly sized and rated, with
a temperature rating suitable for the installed application. Securemenl, routing and segregation of
circuit conductors was determined to be suitable.
(e) Electrical Testing
Non-Destructive Electrical Tests were performed to verify the suitability of operation and safety of the
unit. Selection of tests, are dependent on the type of equipment and applicable provisions of the
standards referenced or defined in this report. Test data sheets are attached to this report.
(f) Environmental Suitability:
The suitability of the specified equipment and components within known ordinary environmental
contexts was evaluated. Outdoor-type equipment was evaluated for suitability for exposure to rain,
dust, humidity, and splashing. Enclosures were required to be NEMA-rated. The suitability of the
specified equipment and components was not evaluated to any standard , code or guideline not
specifically referenced herein.
(g) Installation of the Unit:
It was verified the equipment was installed in accordance with the installation requirements as per
NFPA 70 (US Electrical Code) for working areas and power connection. The equipment
manufacturer's installation instructions were additionally referenced if provided during the inspection.
(h) Functional Check:
A function check of E-Stop, interlock and GFCI protection was made to confirm intended operation of
the devices.
(i) Component List
The following safety relevant components were inspected for suitability of electrical rating and *NRTL approval.
Discrepancies noted during Inspection are noted in the section detailing "Modifications for Compliance
• Circuit Breakers • Power Cords • Receptacles
• Fuses • Interconnecting cords • Cables and Wires
• Pushbuttons • Motor Controllers • Disconnect Switches
• Relays • Motors • EMO's
• Transformers • Motor Overload • Power Supplies
• Interlocks • Motor Contactors
• Internal Wires • Lamps
•NRTL: Nationally Recognized Testing Laboratory, e.g. TUV Rheinland, UL, CSA, etc
Number: MS-0004526
A, TOVRheinland® US Field Evaluation Report Revision: 8
Effective date: Dec 12, 2022
File Number: US2447TW.01.002
INSPECTION DETAILS:
Description of work ordered/ Equipment:
The unit is a 3-D printer for metals, using powdered metals as substrate and a laser to weld them together. The
system includes multiple dust traps, a powder filtration and purifier to provide the powder to the chamber. The
powder spreader/ re-coater and stage lowering Motors are servo type; the Gas Reciri;ulation Pump and water
Pump are Variable Frequency-Driven (VFD); the Laser is computer controlled. The shutter is linked to interlocks
on the chamber door and others, including Emergency Stop. System uses a Chiller (Listed) to cool the laser and
other components using recirculated water; filtration and distribution are below the chamber. Nitrogen is used to
purge the chamber of Oxygen before welding.
Because of the flammable nature of the powder, an Argon release is built into the sysl:em with a very large tank of
liquified Argon in the room. Oxygen level is checked using an external sensor system.
Remote Dust Monitor, mounted in the room, will immediately turn off power to the PSM100, SLM280, SFM-AT200
and other ignition sources, stops HVAC circulation, and activates the exhaust venting .
The powder filtration unit PSM 100 is evaluated in report PSM-US2447TW.02.002
Follow-up Inspection on May 1st -2nd:
During this evaluation, the equipment was checked that the non-conformities in the previously issued findings
letter (Letter-234216624.01 .002) was addressed and that no new non-conformities hc1d been introduced. Electrical
testing was also performed.
The equipment or major system components, as defined, consists of:
1. Pin-and-Sleeve Power Entry
2. Disconnect I Circuit Breaker with locking Handle
3. Circuit Breakers
4. Spare Breaker: PSV power (not used)
5. Power Supply, 24VDC
6. Relays
7. Servo Drive: Stage and Re-Coater
8. Variable Drives: Gas Recirculation and Water Pump
9. Heater Control
10. Laser Generator
11. Control Computer
12. Emergency Stop Relays, Interlocks, and Door Locks
13. Argon Valve
EQuipment omitted from the Inspection:
1. The powder filtration system PSM100;
2. The powder removal unit SFM-AT200 is evaluated in report PSM-US2447TW.03.002 ;
3. Chiller is Listed to UL Standards;
4. Vacuum Cleaner, separate from system;
5. Remote Dust Monitor, Room;
6. Oxyqen Sensor, Room
Date of lnspection(s)
Initial review date: April 19th 2024
Next review: May 1st 2024 to May 2nd 2024
Final review date: May 2nd 2024
Standard(s) selected for the Inspection
The below standards were referenced during our inspection. Note: If a standard, code, or guideline is not listed then TUV did not
evaluate the equipment to it.
I
Number: MS-0004526
/)!. TUVRheinland® US Field Evaluation Report Revision: 8
Effective date: Dec 12, 2022
File Number: US2447TW.0l .002
List of standards used by number and edition
US NEC NFPA 70: 2020 Ed, National Electrical Code
ANSI/UL UL 508A, 3rd Ed (2021-07-13) Industrial Control Panels
NFPA NFPA 79, 2021 Ed. Electrical Standard for Industrial Machi
Subcontractor information (if applicable):
I Company:
Evaluator:
DOCUMENTATION SUBMITTED
Installation Instructions: IZI Provided D Not available
Drawings: 1:8:1 Provided D Not available
Markings: IZi Provided D Not available
Other NIA
FIELD INSPECTION TEST DATA:
Total number of units/systems 1
System or Unit □ System IZl Unit
Rated voltage: 400Y/ IZi V AC D 1 Phase IZl 3 Phase □voe
230
Rated power: 40 A
Rated frequency: 50/60 Hz
Control voltage: 24 □VAC 1:8:1 V DC
Alternate voltages: N/A □VAC □voe
Largest Load: 10 iZl HP 0 A {18.75A)
*AFC of Facility Mains: N/A1 kA
**SCCR of equipment 5 kA
Hazardous location: D Yes IZl No
Area classification: Ordinary
Location: IZl Indoors D Outdoors [Note 2]
SLM280 Additionally Requires Argon at 6-8 Bar and Compressed Dry Air at 87'PSI
Note 1: AFC from facility/ grid was not provided;
Note 2: Components checked for NEMA ratings; aggregate environment testing not performed.
Number: MS-0004526
/;;!,. TUVRheinland® US Field Evaluation Report Revision: 8
Effective date: Dec 12, 2022
File Number: US2447TW.01.002
Test Parameters·
L1-N L2-L3 L1-L3 See test comments below
Voltage: 402.6 403.0 403.2
L1 L2 L3
Current: 1.1 2.5 1.5
Insulation resistance: >2200 Mn □ 500 V DC IZl 1,ooov DC
Dielectric withstand test (Alternate) N/A kV □AC □ DC □ Pass □ Fail
Vdc = Vac x 1.414 D 1 Minute D 1 Second
Ground continuity: <0.1 n <0.1 n IZl Pass □ Fail
Leakage current (max): N/A mA IZl Pass □ Fail
Branch circuit protection, Control: 40 A IZl Hardwired D Cord Connected
Enclosure class: iZ! NEMA Type 1 □ NEMA Type 3
IZl Metallic D Non-Metallic □ NEMA Type 12 □ NEMA Type 4
E-Stops/lnterlocks: IZI Pass □ Fail □ N/A
Rain test: D Pass □ Fail iZI N/A
GFCI test: D Pass □ Fa il iZI NIA
Additional tests: N/A
GFCI not tested because Outlet Receptacles are not provided .
* Available Fault Current= AFC (at connection point of facility mains)
** Short Circuit Current Rating = SCCR, (of equipment)
Number: MS-0004526 A TUVRheinland® US Field Evaluation Report Revision: 8
Effective date: Dec 12, 2022
File Number: US2447TW.01.002
Component Temperatures:
Cords/ lnout Socket 21.6 oc Breaker Bank, Lower 23.4 oc
Disconnect I Breaker 23.4 oc Contactors 23.4 oc
Power Suooly, 24VDC 31.4 oc Safety Relay 31 .4 oc
VFD, Vacuum Pump 31 .9 oc Servo Drive U1 33.7 oc
Motor, Vacuum Pump 22.1 oc Servo Drive U3 29.0 oc
Laser Emitter, Chamber Top 27.5 oc Motor, Water Pump 35.5 oc
Rear, Laser/ Exhaust 21 .7 oc Rear, CPU / Exhaust 25.6 oc
Accessible Face, Chamber Door I Glass 21.8 oc Accessible Pipes, Lower Front 21 .9 oc
Accessible Face, Laser/ CPU Box 26.1 oc User Interface, Accessible 33.9 oc
External Powder Pioinq 23.2 oc
Test Comments:
Tests performed with the unit not running under full load conditions.
Environmental Conditions (optional and for reference only):
Temperature 21.4 °C Humidity 74% (internet weather). Unit is installed in climate-controlled environment.
Multiple Similar Units
Serial No./ IR IR(MDC Ground Current (amps) Voltage TUV RNA
Position (MO) Bus 2) Cont. (Q) A B C L1-L2 L2-L3 L1-L3 Label#
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Note 2: If Units identical; Leakage Test, Current Test not repeated.
If Batch/Lot Inspection and testing is oonducted, specify the number of units in the batch and thEi number of units sampled. Sample
selection shall be random, avoiding consecutive numbering if possible and taken from the beginning, middle and end of the lot or
batch. If non-conformity is found in any of the units, the entire lot or batch shall be inspected ancl tested. A batch inspection is
limited to 500 units of the same model at one time. See Annex B of NAM FES Procedure MS-0014396.
Number of units in the batch: 1
Number of units Sampled: 1
Test Equipment
Device Manufacturer Model Serial Number Calibration Functionality
Due Date Checked P/F
Insulation Resistance Fluke 1503 43370617WS 08/31/2024 p
Tester
Current Clamp Fluke 377C 55850114 03/20/2025 p
IR Thermometer Fluke 566 58770336WS 03/20/2025 p
Notes: System permanently connected.
Number: MS-0004526
Revision: 8 /;;!,_ TUVRheinland® US Field Evaluation Report Effective date: Dec 12, 2022
File Number: US2447TW.0l.002
Required Markings:
1. Fuse replacement value (Warning -Risk of Fire. □ Add ~ Provided □ NA
Replace only with same type and rating fuse)
2. Door service caution (Caution -Risk of Electric □ Add ~ Provided □ NA
Shock. Disconnect from Power Before Servicing)
3. Nameplate/electrical ratings (Nameplate Ratings □ Add ~ Provided □ NA
as measured/calculated from "Test Details")
4. Arc flash warning (Danger -Arc flash and shock □ Add ~ Provided □ NA
hazard. Appropriate PPE required.)
5. Other: (Lockout , HV, Disconnect power warning □ Add ~ Provided □ NA
labels required on all panel doors/covers)
6. All Markings Shall be in English or symbols as ~ Pass D Fail
indicated by the Standard
MODIFICATIONS FOR COMPLIANCE: 0 N/A D Open (gl Completed and Accepted
General:
• Reference FES procedure and specified Standard for Safety identified on page 5.
• Hazardous voltage labels (permanent) shall applied to all electrical control panols with voltages 30 Vrms or
higher. (See required Markings table above).
• Machine nameplate shall include the largest motor/or load rating, AIC or SCCR rating and enclosure type.
• The constructions issues listed below shall be resolved before receiving final Ai:ceptance and Labeling.
Equipment / Deviations:
1. Marking, Ratings, Pressure. UL 508A, Cl. 52 and NFPA 79, Cl. 16.4, Require that industrial
machinery requiring Water or gas supply be marked with:
--"Water minimum ????Liters/minute, maximum ????C" or equivalent;
--"Nitrogen I Argon 6-8Bar" or equivalent, where "6-8Bar" is the rated gaf; pressure.
In our inspection of the SLM280, it is missing both markings at the ports.
To show compliance, mark the units reliably with these ratings.
Corrective Action:
Markings were provided to show required water and argon needed to operate the equipment.
[Confirmed 2024-05-02]
2. Wiring Diagrams, Component Connections. UL 508A, Cl. 61 and NFPA 79, Cl. 17.7, Require that
wiring schematics and diagrams, depicting the connection of components to sources of power and to
system loads, must be updated where circuits are changed in production. In our inspection, SLM280
F6 Circuit Breaker is specified as 25A in drawing, but the system uses a 20A Breaker. FPSX, which is
identified as the source of power for PSM100, is not connected to a load and is actually a Spare.
To show compliance, ed it the drawing to correct the FM6 designation to :20A, and designate FPSX as
"Spare". Additionally, mark FPSX in the system as "Spare".
Corrective Action:
Wiring diagram not available during time of evaluation. Accepted since this does not impact
the overall safety of the equipment. Any service or maintenance work is to be performed by
Number: MS-0004526
/;;!._ TUVRheinland® US Field Evaluation Report Revision: 8
Effective date: Dec 12, 2022
File Number: US2447TW.0l.002
equipment manufacturer only who will be equipped with necessary documentation to perform
task. [Confirmed 2024-05-02]
3. Block Diagrams, Safety-Critical Relays. UL 508A, Cl. 61 and NFPA 7~t, Cl. 17.6, Require that
multi-part Safety Relay circuits, if they encompass multiple pages of a wiring diagram, must be
supplemented with a block diagram of the connections between sensors, Safety Relays, Switches
(e.g., Emergency Stop) and affected components such as Laser shutters., Inert-gas valves, and
Contactors. In our inspection, SLM280 uses multiple sensors and RelayE, but provides no block
diagram with which to clarify their connection and use.
To show compliance, provide a Safety-Relay block diagram with the Sensors and affected
components to clarify their use.
Corrective Action:
Block diagram not available during time of evaluation. Wiring diagram checked to confirm no
Functional Safety modules in use. [Confirmed 2024-05-02]
4. Components, Approval / Unknown. UL 508A, Cl. 4 and NFPA 79, Cl. 4.2, Require that all Critical
Components which are LIVE (over 30VAC or over 60VDC) or linked to Safety circuits must be
identified by manufacturer, model number, type, ratings, and Approval / Listing Mark. In our
inspection, SLM280 uses multiple components which cannot be identified by the closed Control
Panel or which are obscured in the system panels.
To show compliance, client provided component data.
Corrective Action:
All critical components have been verified that they have an Approval / Listing Mark.
[Confirmed 2024-05-02]
5. Components, not Approved. UL 508A, Cl. 4 and NFPA 79, Cl. 4.2, Require that all Critical
Components which are LIVE (over 30VAC or over 60VDC) or linked to Safety circuits must have an
Approval/ Listing Mark and must be rated for use in the system. In our inspection, multiple
components of SLM280 use unknown components, which may not be Approved or may lack a Listing
mark.
To show compliance, client provided data for all components and allowed visual confirmation
Corrective Action:
All critical components have been verified that they have an Approval/ Listing Mark.
[Confirmed 2024-05-02]
6. Egress, Door Handle, Broken. NFPA 79, Cl. 11.5.3, Requires that working space around the unit
must permit egress without the use of a tool. In our inspection, the door to exit the room containing
the SLM280 and PSM100 required use of a door handle which came off during use, causing the door
to remain latched.
To show compliance, repair or replace the facility door handle.
Number: MS--0004526
/;;!._ TUVRheinland® US Field Evaluation Report Revision: 8
Effective date: Dec 12, 2022
File Number: US2447TW.01.002
Corrective Action:
Door handle has been replaced with a functioning door handle. [Confirmed 2024-05-02]
7. Argon Asphyxiation. The SLM280 Manual, Requires that the use of Aruon in quantity be
accompanied with an ambient-Oxygen sensor to prevent asphyxiation hazard caused by
displacement of breathable air. In our inspection, the room containing thH SLM280 and PSM100 was
provided with Argon in a large tank, with sufficient capacity to displace a significant amount of
ambient air, but no Oxygen sensor was provided.
To show compliance, provide an Oxygen sensor for the room, and a warning light, numeric display or
other early-warning device outside the room.
Corrective Action:
Oxygen sensor for the room with a warning light and numeric display was provided.
[Confirmed 2024-05-02]
TERMS AND CONDITIONS OF ACCEPTABILITY FOR THE EQUIPMENT INSPECTED:
1. The Available Fault Current was not provided or identified at the time of the evaluation. For Permanently
connected equipment, the equipment was evaluated to ensure the equipment was marked with the SCCR
corresponding to the construction of the equipment. Consideration should bE~ given to ensuring AFC
does not exceed installed equipment rating.
2. The equipment has been evaluated for electrical safety only, for installation c1nd use in ordinary (non
hazardous) locations in accordance with National and Local Code.
3. The equipment or system shall be used in a manner consistent with the manufacturer's design and
instructions. Instructions shall be provided in an accessible location for maintenance and reference.
4. The area surrounding the equipment or system will be kept free and clear from combustible material.
Adequate clearances will be maintained for proper safety, operation and servicing.
5. A maintenance and servicing schedule will be followed to keep the equipment or system operating as
designed. The final responsibility for establishing a maintenance program will rest with the end user.
6. As parts deteriorate or cease to function properly they will be replaced or repaired or the equipment shall
be removed from service. No changes to the design, construction or use shall be made without the
written acknowledgment and approval of this agency. Additional testing may be required to determine
acceptability of any changes made.
Number: MS-0004S26 /d!.. TUVRheinland® US Field Evaluation Report Revision: 8
Effective date: Dec 12, 2022
File Number: US2447TW.01.002
CONSTRUCTION AND COMPONENT DETAILS:
Non-standard Inspection procedure used (if applicable):
N/A
Notes:
Enclosure accepted with ground bonding and required use of a TOOL.
Grounding confirmed between Equipment Grounding Plug and Ground Bus, and all a1ccessible metal.
Insulation Resistance tested between Ground Bus or Chassis and the LIVE circuits, including the following:
--.MAINS input LIVE+NEUTRAL;
--DC 24V Bus for Control: DC-is bonded to ground, not tested
EIA:
--Grounding conductors are accepted without marking due to their gauge exceeding 1:hat of the LIVE wiring, and
running zero voltage.
Number: MS-0004526
A, TUVRheinland ® US Field Evaluation Report Revision: 8
Effective date: Dec 12, 2022
File Number: US2447TW.01.002
List of Critical and non-Recognized or un-Listed Components for Review
MANUFACTURER Model Mark(s) of
Component conformity
SLM280, sheet etal
Enclosure, System Overall SLM coated with paint, E IA; Accepted with
16Gauge, 1.6mm thick, bonding
NEMA Tvoe ratod 1
Connector, Pin and Sleeve ME560C7W, rated
MENNEKES 277/480VAC, 60A, cULus Entry 4W+P.E., 50-60Hz
ME560B7W, rated
Inlet, Pin and Sleeve Entry MENNEKES 277/480VAC, 6DA, cULus
4W+P.E., 50-60Hz
NZM B 1-AF45-NA, rated
Circuit Breaker, Unit Disconnect EATON 480VAC, 45A, 3Phase, UY.CSA F0 50/60Hz, Interrupting
Rating: 35kP1
FN3256 H-64-34, rated cRUus; Accepted
Filter, MAINS Power L 1 SCHAFFNER 480VAC, 64A, with enclosure and
3Phase+NEUTRAL OCP
VAL-MS 230/3+1 2838209,
Surge Protection, MAINS FOO PHOENIX rated 480VAC, Clamp at cULus
500VAC, SCCR: 25kA
FAZ-C10/1-NA, rated
Circuit Breaker, Platform Servo EATON 480/277VAC, 1 0A, ·1 Phase, UL,CSA U1 FU1 50-60Hz, Interrupting
Rating: 10kP1
FAZ-C10/1-NA, rated
Circuit Breaker, Recoater Servo EATON 480/277VAC, 1 0A, ·1 Phase, UL.CSA U2 FU2 50-60Hz, Interrupting
Ratinq: 1 Ok)\
FAZ-C10/1-NA, rated
Circuit Breaker, Powder Loader EATON 480/277VAC, 10A, ·!Phase, UL, CSA Servo U3 FU3 50-60Hz, Interrupting
Rating: 1 0kA
Circuit Breaker, Cooling Unit E1 FAZ-B10/1-NA, rated
and E2, Absorption Dryers, 02 EATON 480/277VAC, 10A, 1 Phase, UL, CSA
Sensors FE1 50-60Hz, Interrupting
Rating: 1 0kA
FAZ-C10/1-NA, rated
Circuit Breaker, 15V Power EATON 480/277VAC, 10A, 1Phase, UL,CSA G1 ,G2 FG1 50-60Hz, Interrupting
Rating: 1 Qk)\
FAZ-C10/1 -NA, rated
Circuit Breaker, Control EATON 480/277VAC, 1 QA, 1 Phase, UL.CSA Computer FPC 50-60Hz, Interrupting
Ratinq: 1 0kJ,
Number: MS-0004526
A_ TUVRheinland® US Field Evaluation Report Revision: 8
Effective date: Dec 12, 2022
File Number: US2447TW.01.002
MANUFACTURER Model Mark(s) of
Component conformity
FAZ-B10/1-NA, rated
Circuit Breaker, Platform Heater EATON 480/277VAC, 1 0A, ·1 Phase, UL, CSA FHE 50-60Hz, Interrupting
Ratina: 1 0kA
F AZ-B 15/ 1-NA, rated
Circuit Breaker, Laser 1 FA 10 EATON 480/277VAC, 15A, ·1 Phase, UL.CSA 50-60Hz, Interrupting
Ratina: 1 0kP,
F202 A, rated 230VAC,
Circuit Breaker, Residual ABB 1 0mA leakage, ·1 sA, UL,CSA Current, Laser 1 FCA 10 1 Phase+NEUTHAL,
50/60Hz
FAZ-B15/1-NA, rated
Circuit Breaker, Laser 2 FA10.2 EATON 480/277VAC, 15A, '!Phase, UL, CSA 50-60Hz, Interrupting
Ratina: 1 0kP,
F202 A, rated 230VAC,
Circuit Breaker, Residual ABB 1 0mA leakage, ·1 sA, UL,CSA Current, Laser 2 FCA 10.2 1 Phase+NEUTFtAL,
50/60Hz
FAZ-B 10/3-NA, rated
Circuit Breaker, 24V Supply EATON 480/277VAC, 10A, :lPhase, UL.CSA FFG0 50-60Hz, Interrupting
Ratina: 10kP,
FAZ-C20/3-NA, rated
Circuit Breaker, Gas EATON 480/277VAC, 10A, :IPhase, UL.CSA Recirculation Pump, FM6 50-60Hz, Interrupting
Rating: 1 0kP,
FAZ-C20/3-NA, rated
Circuit Breaker, Power to PSM, EATON 480/277VAC, 20A, :!Phase, UL.CSA FPSV (Spare) 50-60Hz, Interrupting
Ratina: 1 0kP.
FAZ-B20/3-NA, rated
Circuit Breaker, Gas EATON 480/277VAC, 20A, :lPhase, UL, CSA Recirculation Pump FM6 50-60Hz, Interrupting
Rating: 1 0kA.
LP-CC-25 with H,::,lder
Fuses, Gas Recirculation Pump BUSSMANN CHCC1DIU, rated 6D0VAC, UL, CSA FCM6, (3) 25A, 1 Pole, 50-601-iz, IR:
200kA, Class CC
LP-CC-10 with Holder
Fuse, Recoater FCU2 BUSSMANN CHCC1DIU, rated 6D0VAC, UL, CSA 10A, 1Pole, 50-601-iz, IR:
200kA, Class CC
Number: MS-0004526
/;!.. TUVRheinland® US Field Evaluation Report Revision: 8
Effective date: Dec 12, 2022
File Number: US2447TW.0l.002
Model Mark(s) of
Component MANUFACTURER conformity
LP-CC-4, with Holder
Fuse, System Cooling Units BUSSMANN CHCC1 DIU, rated ~,00VAC, UL, CSA FXE1 4A, 1Pole, 50-60Hz, IR:
200kA, Class CC
LP-CC-25 with Holder
Fuses, Recirculating Gas Pump BUSSMANN CHCC1DIU, rated Ei00VAC, UL,CSA FCM6 (3) 25A, 1 Pole, 50-60Hz, IR:
200kA, Class CC
CC 600V 30A, rated UL, CSA; Accepted Fuse-Holders, FCU2, FXE1 EATON BUSSMANN 600VAC, 30A, 1Pole, 50-with Listed Fuses 60Hz, Class CC, IR:: 200kA
Vacuum Control Box, SCHNEIDER ELECTRIC LMC058 LF, rated 24VDC cURus Recirculating Gas Pump U6
79630287115, rated Input:
400-480VAC, 14.8A, Variable Drive, Recirculating BECKER 50/60Hz, 3Phase; Output: cULus Gas Pump M6 0-480VAC, 17.8A, 0-400Hz,
3Phase
SV300/2-050A0, rated Motor, Recirculating Gas Pump BECKER 480VAC, 9600W, 15.3A, cTUVRus M6 3Phase
FNQ-R-1 /4 with Holder
Fuse, Gas Pump Cooling Fan BUSSMANN CHCC1DIU, rated 600VAC, UL, CSA FM6A 0.25A, 1 Pole, 50-60Hz, IR:
200kA, Class CC
B31 IL-2-2, rated 220-UR; Accepted with Fan, Gas Pump Cooling M6A WISTRO 332VAC, 65W, 3Phase, OCP 60Hz
SD328A AU25S2,. rated Servo Drive, Platform/ Elevator SCHNEIDER ELECTRIC Input: 115/230\/AC, cULus Servo U1 1Phase;
LXM32AD18M2, rated
Servo Drive, Recoater Servo U2 SCHNEIDER ELECTRIC Input: 230VAC, 8.4A, 60Hz, cULus 1 Phase; Output: o-n0VAC,
6A, 0-399Hz, 3Phase
SD328A AU25S2, rated Servo Drive, Powder Loader SCHNEIDER ELECTRIC Input: 115/230\/AC, cULus Servo U3 1Phase;
BRS39AW60067, rated Motor, Platform / Elevator Servo SCHNEIDER ELECTRIC 230VAC, ????W, 5.8A, cRUus M1 3Phase, 5.3Hz
BMH0702T17A1A, rated
Motor, Recoater Servo M2 SCHNEIDER ELECTRIC 240VAC, 1076W, 5.38A, cRUus
3Phase,
SCHNEIDER ELECTRIC BRS368W131ACA, rated cRUus Motor, Powder Loader M3 230VAC, 3Ph~1se
--
Number: MS-0004526
/;!. TOVRheinland® US Field Evaluation Report Revision: 8
Effective date: Dec 12, 2022
FIie Number: US2447TW.01 .002
Component MANUFACTURER Model Mark(s) of
conformity
Cooling Unit, Machine Overall SK3364.104, ri:1ted
RITTAL 230VAC, 950W, 1I=>hase, cULus E1 50/60Hz
Cooling Unit, Control Cabinet Seifert RK2114, rated 230VAC, cRUus E2 80W, 1 Phase, 50/60Hz
Computer, CPU A 15PC p SPECTRA 100-240VAC, 600W, cRUus 50/60Hz, 1 Phcise
YLR-400-WC-Y14, rated
Power Supply, Laser IPG PHOTONICS 200-240VAC, 1600VA, cTUVus
50/60Hz, 1 PhctSe
SCHNEIDER ELECTRIC XPSMCMCP0802, rated
Relay, Safety KO MODICON PREVENTA 24VDC, Safety Ratings: PL: cULus
e, Sil: 3
Relay, Safety KOO SCHNEIDER ELECTRIC Di16, rated 24VDC, Safety cULus MODICON Ratings: PL: e, ~iiL: 3
Relay, Safety K1 SCHNEIDER ELECTRIC R04, rated 24VDC, Safety cULus MODICON Ratings: PL: e, Sil: 3
QUINT-PS, rated input: cURus; Accepted Power Supply, 12VDC GO PHOENIX 400VAC, 1000W, 50-60Hz,
3Phase; Output: 24V @40A with Enclosure
PC-FU/DC24, rated
24VDC, 40A; 0 tput:
Circuit Protector, 24VDC BLOCK 24VDC; set to 24V1 : 6A, cULus Distribution FG0 24V2: 6A, 24V3: 4P,, 24V4:
6A, 24V5: 4A, 24\/6: 6A,
24V7: 6A, 24V8: 4A,
PC-0112-150-0, rated
Power Supplies, 15V G1 ,G2 BLOCK Input: 100-240VAC, 150W, cULus 1 Phase, 50/60Hz; Output:
set to 15VDC, 8A
PC-0112-150-0, rated
Power Supply, 14.5VDC G3 BLOCK Input: 100-240VAC, 150W, cULus 1 Phase, 50/60Hz; Output:
set to 14.5VDC , 8A
Solid State Relay, Heaters CRYDOM CWD2425P, rated ~:30VAC, cURus; Accepted
K1 .14 1 0A, 1 Phase; Coil: 24VDC with OCP
Heater, Platform R1 .14, R1 .14.2 BACH 210x210x6, rated 2.30VAC, EIA; Accepted with
1200W, 1Phase, 50-60Hz OCP and SSR
Limiter, Thermal, Platform PHOENIX MCR-2-TC-U I-PT-TYPK, cURus; Accepted
Heaters B800 rated 24VDC with power supply
DILM25-01
Contactors, Heater Selector EATON XTCE025C01 E, rated UL.CSA K3.07, K3.08 400VAC, 1Pole, 1!>A, 50-
60Hz; Coil: 24\/DC
Number: MS·0004526
A_ TUVRheinland® US Field Evaluation Report Revision: 8
Effective date: Dec 12, 2022
File Number: US2447TW.01.002
Component MANUFACTURER Model Mark(s) of
conformity
Laser, Optical A 17 VARIOUS VARIOUS, rated ±·15VDC, UR; Accepted with
Class 1 power supply
YLR-400-WC-Y14 OR YLR-
Laser, Laser 1 and 2 A 10, IPG LASER 700-WC-Y14, rated cTUVus A10.2 230VAC, 1600W, 1Phase,
50/60Hz
Monitor BECKHOFF CP3924-0000, rated cULus 24VDC
AZM 170ST-02/01ZK-2197,
Interlocks, Glove Box Schmersal rated 24VDC, Safety cULus
Ratings: PL: D, Sil: 3
SILO2 Type 01-758, rated -
Sensors, Oxygen (2) NTRON 20 to 60C, relays 600VAC cETLus
@5A; 300VDC (1v5A
Other components are Listed or approved for the application
*EIA-Evaluated in Application (See also Notes Section)
Note: Critical Components shall be Listed or Recognized, (example: Breakers, Fuses, motors etc.)
Number: MS-0004526
A_ TUVRheinland® US Field Evaluation Report Revision: 8
Effective date: Dec 12, 2022
PHOTOS AND ILLUSTRATIONS:
~~;_J!!!!~!!!====~J @1 L-c.,_
4A
SLM Ci TJ:JNr;
J {1;.,.,.._, .... ,. ':J
2022
_] [Endo..,,. r,.. -::J
Type 1
,...,,......,,o,L.oai,
0 SA J [E~al°'!!f'""""""'iiil
PSM100_3.2.001
~I oc:~c•[:=====::11 NA Option 5,00 kA
•LMe.,o,f,ipfttDl'OOljlA(i tr,....,.., ..
~YlUHt#-""'-••tffJ ... tl4H0-4 ,~ ..... ,.,,,, .... J.PH "" ......... .....__ .. _ w •• ....,..,.__,..__
File Number: U52447TW.0l.002
Equipment nameplate w/ TUVR label: TUVR 108813 Front left side shows Powder eject and dump taps,
left; glovebox door with Interlock, center; Emergency
Stop Switch next to Monitor, right; CPU and Laser
Power are behind lower-ri ht door.
Rear Side, right, of unit shows Disconnect and
Warnings, mid center; gas, water and signal
connections, bottom, next to Pin-and-Sleeve Inlet.
Detail view of connections shows rating and identity
markings.
Number: MS-0004526 A TUVRheinland ® US Field Evaluation Report Revision: 8
Effective date: Dec 12, 2022
Detail of right, lower-front view with open door
shows CPU above Laser Power Supply.
Control Panel, shown here locked, has Circuit
Breakers and Oxygen sensors, bottom row, below
Servo Drives, far-ri ht.
FIie Number: US2447TW.01.002
Rear with doors open shows, top to bottom: Control
Panel with Disconnect, rEiar view of Laser and CPU
with Vacuum Control. ,..--·--------s-
Left-rear of unit, open view shows platform, center,
below chamber. Gas Reciirculation Pump, center,
connects to the as su I to remove Ox en.
Number:
A,. TUVRheinland® US Field Evaluation Report Revision:
Effective date:
MS-0004526
8
Dec 12, 2022
US244 7TW .01 .002
Chamber, in unit rear view, has Recoater Servo
Motor at ri ht.
•• A DANGER
& ......_ ....... & """"' __ .,.. ... -.
&.
_.....,_ ~-Ute11.0mm'Qot,.WGl)IOfflllooi 0 -·-Wlltntht....,IJWitdllldf,IN ___ ,. ... --~ .... ., ........
&.
__ .,.. ___ ____ ..... -
-~ -~---
Workinr. on ('lrctril.11 componc-nh I NOTE --· • ~ the rMCHnt
• 5ec»r111taealnltmtatml
• 'Watt f'Df 15 mlnUln ll!ICN'N
-) o,,d<--•'-ol .......
__ ... __ _
_,, ___ .. _ .., __
Main switch
Disconnect Warning of Electrical shock.
File Number:
, PGWdar with slcln,
nes or the tesp1rae
may c!ause ~ to hea
seven, llijurtes_ Some metal
•re ClOnSldered to be rclnoaan4c.
• "-• the P0IWder bottle only whenbl>d,~_,..cbed
• Obsen.it the lnnructlon,, In ,;,.
operati,-Instructions ,_
-· rhe powder bottles.
Equipment gas and water markings
/;;!.. TUVRheinland ®
-'
US Field Evaluation Report
1
19--"""_ .....
I Ca...rlor
2,_.,,
]CMneta
40iltlf
5()pllcll
6 SIM,
7 SaftlY
I
p FW naalll1111Raulll""84~
10....-
11 ~
IA)Lodildpl'dl ........
IO Flllldgua,ds
IDl~ca,,lld
Number: MS-0004526
Revision: 8
Effective date: Dec 12, 2022
File Number: US2447TW.0l.002
System layout with PSM100 shows powder feed Safety equipment of syst,em with PSM100
and as return.
Number:
/;;!. TUVRheinland® US Field Evaluation Report Revision:
Effective date:
2
1
f").4·Locationd.,__.....,._ __ ,_
2
3 • s
Ii
7 Sidi
~
ml.odad
Cl «>I
7 6
Safet e ui ment on rear side of unit with PSM100
5
2
1
161514
19,14:Posft'c,n of the stkkffl topff•hM Slidfl
1 Earthing pOlnts
2 l\,lovlng port, pldog,am (llnl1llt
3 Moving paru pl<t<>grlffl c,,MUallllt
4 lnvi51ble Jlser rodlallon llMlde
s Risk of osphyxlotlon pldagrllll
6 1.o>e<radl1tlon plc10grllll
7 Laser class rv 1pplles alw opeNl9
e Hot surfaces pldogratn (bulld
9 Pe,sonol protectlW equlplllllll
10 Laser class 1 (connedlon bole)
11 zype plate (on connection bOld
12 Danger due 10 lnctfl1H leelclgt
13 Electrlcal cu,rflll p1c1ogram
14 QbservemewlotylMtl\lCIIONfor
1 s Electrical current pictogram (on the
16 PSV type plllt
File Number:
Stickers front side with PSM100
MS00004526
8
Dec 12, 2022
US2447TW.01.002
Number:
A,. TUVRheinland® US Field Evaluation Report Revision:
Effective date:
MS-0004526
8
Dec 12, 2022
US2447TW .01 .002
1 4 n,. ll Polttlon of tr. Ukken c,..,t
1 Electrblc......,tplctogtl,ffl!fftquoncy_, ___ ,,-tion bo•(lnl~
riot), main .switch control)
2 Sof<tyfnstructJons ro, moln swffdl
3 Mo"'og pans pktogrom ""1oufflotk chtdl-,
• Hot-•~lbulldchambor,.,.__I
S S.lety Instruction, for rot•tlng lOOl (rnaln !an'I
6 Obww tht Yloly 1nstructioN ro, tht _,
1 S41etynote ro, PSV_,,
• --~O'SVcllwpumpl
J.t.l Prohibitory .....
Do ftOt .tWtKh on
No .......
/:l:\_ llwortclsarried0<11a1..,-..,1sy,tem.--mustbep, \U .... i.c1 from rtstMtlng tho mocl,lr,e,
~that.,.prOYldodwtlhlNlllgn....,notbeactuottd
Thh wllly Sign rnayonl)' be ,_111 tht Pfflllft Whohung It.
Q Thote 11 • "'" hlzard due 10 combustlble or _,,....,,~aolld \!Y IIQuldor-,,._tols.
Stickers rear side, with PSM100
File Number:
Risk of asphyxiation from 11,gonl
Argon that escapes In high oncentratlons suppresses the oxygen In
the air and can lead to asphJrxlatton If inhaled.
► Observe the manufact~ rer's safety data sheet.
If the process waste ga. cannot be guided out of the production
room, the production n)Om must be adequately ventilated In fine
with the size of the room.
► A residual oxygen mon torlng system should be Installed at the
workplace. Residual OIC),gen monitoring may also be required If
adjacent rooms are lower down or the machine Itself Is set up on a
lower floor, out of whl , argon Is unable to escape by Itself.
► We recommend keeping a self-contained respirator ready for
emergency situations.
► Cable shafts In the floo may fill with argon.
Attentlonl
Particular caution Is r ulred when dealing with accessible shafts.
Always ensure a su of fresh air In the event of argon leaks. In
the event of accidental nhalatlon, remOYt the affected person
from the area lmmedla !!IY, provide them with fresh ak and keep
them warm. If the persc stops breathing. conduct first aid mea-
sures with artlflclal resp ration. Immediately seek medical atten·
lion.
DANGER
D1119wofcleathdueto
Theft Is I fatal risk d when touching the power circuits
(fJril9lltlngulshlng device) hen the ffllln switch Is deactivated .
UMI marked In orange ue to conduct electrtclty. Damage to
or lndtvlclua may be 1h thrNtenlng.
ng 1t I or1nge, always cut off the power to
, protect st restart and disconnect It from the
Insulation. fmmedlately switch elf
"Pllllby"'ellctrlclan.
Pldonn fflllntenance on the
Number:
/;!._ TUVRheinland® US Field Evaluation Report Revision:
Effective date:
MS-0004526
8
Dec 12, 2022
US2447TW.01.002
...... """-•--,.; -----
This 19'1 I.I locatPd 11'1 ltle lntmc!dlete vkinlty of tht conMak>n boll. ft
lndlc.lit.-s, tN1 mt tnlll'e, r'IWC'hlM SLM 280 Is a ct.us I ltwr device.
This Ilg,, klocoted in lhe lmmodio .. ,lclnlly of tho Dloter port and
UW cow, of the oPtial bench. ti lndk:Mes thit lase, class 4 applies on
onc• lht ~ hive beton oPl"lfd. The ml(hine, MVJt
--•-cow11ng,.,1warc1ousi...,,~,.don-~ope,-wd. -an....::emtt~
'lhlsllgnll-.tlnthemrntdlo~>fdniti,ol
-boo. It lndla!Hthol fhoPfOloctlvo :ho....in CEEon lht
QOIHildlon(CuJ muubtatlNst 10mm' onductortermtn,i1
Manual warnings about Laser, and manual fire
extin uisher
File Number:
-. . ., .
._ •• C • '__ . • f "-.
O...,.. olcloolll In .. ,. olftreand • .,.,...Ion_ to h,.._I
Powdffl; tOll$1sting of atumlnum alloyi ,eact upoo contact with w.at.,.
This P,O<hJQK high 1empe,•tures ood hi,jr09"1', tr h)'d,ogen lgnilOS. N
ml)' cauu u ,1ou, or even fatal lnJurles.
;;. 00 not Jmokf-in~ the dangf'f zon-e or kt the ntarby tnvlto,,•
ff'lffll., M in from uslng open llght, fite Of Ignition sou,cts of Ml)'
kind,
; ""-> If lP'optlalt txtlo<Julshlng agents 11 hind(,-. txtlogulshel,
In cl611 D, O< dry sand).
, tn aw1,t fire. stop work lmmed~ely. Le-ave the da~ mnt until
~ clttf slgool Is glwn ond •Iott th• em,rgoncy strvlces.
► Thi-If must be flooded and cleaned In weN ~til,ttd .,Hs.
► f'Mtw efi,nwnts; 1191. ~ Cttet• wh,ch a,e COf"lamlNted with Ml·
rnhum powder must be ttored ln OPf'r'I cont,il')ers in weN Yl'ntf-
lltfd ro s.
► Only •~:wrn clt>n tho rntUI ~ ..ith on Industrial vocuum
-forn.m..,.ble ond nploslw dum.
►-~ tho-.,,t-..Jpowdors._yi_fhtp,o-
-ONIUlfl in the corrospondlngsoftty lnfo,moflon leollets
► In the "'• In w•hln lht P<OCOU chamber, dost the
pro(ffl ~door Wpouiblo>nd ka-s,lhedoordo...iuntil llwlft loxt/ngulshed.
10n~uptoboclyo,t11cosCmoutt,,....,
lho_uum....,..cels-onorlllf.
suction holo..,_,f-.,_. bocly,
Manual warnings of Aluminum, Hydrogen, and
vacuum suction
Number: A TUVRheinland ® US Field Evaluation Report Revision:
Effective date:
MS-0004526
8
Dec 12, 2022
US244 7TW .01.002
Danger of death due to u1e of unsulu ble Industrial vacuum clean-
ersl
Using the Incorrect Industrial vacuum cleaner may lead to fire or explo-
sion. Such fire or explosion may Jead to severe Injuries or even death.
,. When using the different metal powders, always observe the pro-
tective measures In the corresponding safety Information leaflets.
,. Only use Industrial vacuum cleaners that are approved for the
metal powder used.
► Observe the safety Instructions In the manual of the industrial vac-
uum cleaner.
Danger of doth In th• event of fire and explosion due to meUII
powder!
~tal powde~ may Ignite or form an explosive mixture when dis-
persed In atmospheric air. This may cause serious and even fatal Injury.
► Zone 22 applies within the danger zone following a build process
when the process chamber door Is open. Therefore, do not smoke
in the Immediate vicinity and refrain from using any exposed
flame, fire or sources of ignition of any kind.
,. Let the metal powder run gently Into the conversion shafts while
unpacking the component. Use the glove ports to unpack the
aimponents In the sealed process chamber.
► Never let the metal powder stir up with the ambient air.
► Keep appropriate extinguishing agents at hand (fire extinguisher,
fire class 0, or dry sand).
► In case of heavy dust formation, lmmrdtately stop the task. Walt
until the dust has settled and then remove the dust layer.
In case of llre, stop work Immediately. Leave the da~ zone untU
the clear signal is given and alert the emergency services.
► Clean the area regularly to prevent the accumul1tl0n of dust.
► Only vacuum metal powde, with a safety vacuum cleaner suitable
for flammable and explosive dusts.
When using the different metal powders, always observe the pro-
tective measures In the corresponding safety lnformatlOn leaflllls.
Never use compressed alt to blow dry parts or system rnachlne,y,
If there are leaks on the hoses or tines, switch off the machine us-
Ing the emergency shutdown switch.
1n tM event of a flre Within the proc~ chamber, clow the
process chamber door If possible and kHp the door dosad until
1M fire luxtlngulShed.
owder.
,,
SLM280_2.0.006, page 1, concerns power entry and
Disconnect.
File Number:
SLM280_2.0.006, page 2,, concerns AC power
Distribution.
Number: MS-0004526 A TUVRheinland® US Field Evaluation Report Revision: 8
Effective date: Dec 12, 2022
SLM280_2.0.006, page 13, concerns Gas
Recirculation Motor M6.
File Number: US2447TW.01.002
SLM280_2.0.006, page 4, concerns M1 Platform
Elevator Servo Motor
SLM280 2.0.006, a e 8, concerns Loader Motor M3.
SLM280_2.0.006, page 15, concerns Cooling Units
and D er.
Number:
~ TUVRheinland® US Field Evaluation Report Revision:
Effective date:
MS-0004526
8
Dec 12, 2022
US244 7TW .01.002
SLM280_2.0.006, page 17, concerns Oxygen sensors
and DC ower.
Los•r 1 ~·"" .,.. .. ' I
SLM280_2.0.006, page 23, concerns Laser 1, similar
to Laser 2 on a e 24.
File Number:
I
I
I
I
I
I
L
I -Al 1:_i I 11111110.,
I u~~
I I H,gh-lempeioturt
I Heol'1 Option
.l----
SLM280_2.0.006, page 18, concerns Heater elements
for latform.
Col'f\ ro
r Cot\1rot
I Pn ~mD\tC
ltr 1n /OutPU\ tor
t.lPt.1
SLM280_2.0.006, page 30, concerns 24VDC
Distribution.
Number: MS-0004526
/;!., TUVRheinland® US Field Evaluation Report Revision: 8
Effective date: Dec 12, 2022
)ll •7/2.6t-------=
H/24.21-
Pl/25.21
au 16 AWO
-FG2DC
f'hocf'l•IC 8#1 TCP-'ST
8IJ 16 "WG
(Mt5 1) 15V+/20.7;_ ______ _
(llt5 2) 1511M/20 7 ======--------------' (X15.}) t51/ /20 71
SLM280_2.0.006, page 31, concerns -15 VDC and
15VDC ower source. r-------------------------+-
SLM280_2.0.006, page 36, concerns the Interlocks
and E-Sto s
File Number: US2447TW.0l.002
SLM280_2.0.006, pago 33, concerns Emergency
Sto and other interloclt connected to Safet Rela
•XAI 14 2 I 2 -fi -1)(1{{0 1 ,, .
. ' -\1/XRTQ . -~ .. . ,.
7 I
J
SLM280_2.0.006, page 61, concerns the Type K Limit
Controller for llatform tern erature.
l
A TUVRheinland ® US Field Evaluation Report
6
•t
Nrtrog•n Generator ( Opbon )
End of Report
Number:
Revision:
MS-0004526
8
Effective date: Dec 12, 2022
US2447TW .01.002 File Number:
r--tt•--
~ tor
Optical Bench
XY onntr
--
Process
Chamber
Tub< Colo,.
BU • f!IU4
PK • P'an~
JR • Tr nsPQreri.t
0
Air .61ala.11c~ Ca. l.11c.
Air !!Ji.au,,d Hgdna~lc C'o,at_ral Erlgl,a .,,_
~-1-1840 Commercial Street, Escondido, CA 92029
760-741-5401 • abco@alrbalanceco.com
TEST AND BALANCE REPORT
Project Name: Callaway 30 Print Lab
Location: 2180 Rutherford Road, Carlsbad, CA 92008
Architect: CRB Architects P.C.
Engineer: McParlane & Associates
Contractor: MW Mechanical , Inc.
Project Number: 21170
This is to certify that Air Balance Co., Inc. (ABCO) has balanced the systems described herein
to their optimum performance capabilities. The testing and balancing has been performed in
accordance with the standard requirements and procedures of the Associated Air Balance
Council and the results of these tests are herein recorded.
Associated Air Balance Council TBE Number: 00-01-48
Completion Date: 15 April 2024
Reviewed By: Jeffrey L. Wicka, TSE
Test & Balance Technician: Jesse Steeves
AABC
C.rtllled Mtmb<r
RECORD COPY
City of Carlsbad
MAY 16 2024
BUILDING DIVISION
Page 1 of 15
r ,,~. T --!.__•+--r-I
' .... \_
1--_,_J_ ! 1 I • ""E ~ LAB i
I 1:! I '
--,--,-· -~ j \~, ) Bux
!E ---+l : i I I i;: ,;..· ..J.~--.i---1---'----+
i I f-.t. I
~ ··--+-t -t-·-~
'-----+-.; --+---
-l------l--±: --f;"~-•-•-~
• -~ -~ -,1 -~r:--T-f'~
=======-~€==::9::=::==+~~l~~~~
--n
-:;.·:1:.vc
j -J.. ~-l I ----~, ___ciµ--=i,..~ I • Ii.fl~ L::£·..._.._~: ' Y 1 ·'-l I ~~~/4~-~ '~~,
,t '
W'
:~;,
1,"' I
Sh'<f i' , . ~
'
I 1111 -r
' fl
I I ·~
I I I I
I .I I 1~~rLLilJ1---, ,-+:--! -H-I --f:rtP.-f-:R okl-t-t-t-mtf 1 I -I: I : , _ )ii,
C[:-_ -h1 -h---kuld--J_--J:<~JL-~il~l ~J -ill-
(i) ~5.?NICAL DEMOLITION FLOOR PlAN. LEVE\__ 1
-r, (1)
I
--. I -=±-t'-u ( D ) 0 .-·: , -I . ,_ 7 1. : -....::_/ • •• ,-... -'---t-I 'I
I 81 i I --◄-,. -.r-r-
--I ,.,c:·:.:;--fl~-
! rt -------~------~---=~=====p==-=;:''
I ,
~
(2\-1 ~. '...__,
@ ~~~NICAL NEW FLOOR PLAN -LEVEL~
OJJ.>IN4YSOMH?LU
AICOJOIN0::21110
MEOlstlTIIO:M01-G1
CWl:°"'11~
P.'.l:iv m
........., I Q ~ l'2..J
GENERAL NOTES
SHEET NOTES
'-~~,
llo\~11
i--~WAYACOITh'ELAI l
--'
0-
IECHANICAl
DEMOUT1011Alll lEW
A.OORPWI l.EVB. 1 1-M01-01
_J
( City of
Carlsbad
PURPOSE
CLIMATE ACTION PLAN
CONSISTENCY CHECKLIST
B-50
Development Services
Building Division
1635 Faraday Avenue
442-339-2719
www.carlsbadca.gov
This checklist is intended to help building permit applicants identify which Climate Action Plan (CAP) ordinance requirements
apply to their project. This completed checklist (B-50) and summary (B-55) must be included with the building permit
application. The Carlsbad Municipal Code (CMC) can be referenced during completion of this document.
NOTE: The following type of permits are not required to fill out this form
❖ Patio I ❖ Decks I ❖ PME (w/o panel upgrade) I ❖ Pool
The B-50 checklist was originally developed several years ago to support implementation of the CAP. Recent updates to
the California Building Standards Code have imposed newer performance standards on building permit applications.
Therefore, the applicant is advised to review all applicable code sections and apply the maximum performance standard,
which may exceed the CAP consistency checklist requirements
Consultation with a certified Energy Consultant is encouraged to assist in filling out this document. Appropriate
certification includes, but is not limited to: Licensed, practicing Architect, Engineer, or Contractor familiar with Energy
compliance, IECC/HERS Compliance Specialist, ICC G8 Energy Code Specialist, RESNET HERS rater certified, certified
ICC Residential Energy Inspector/Plans Examiner, ICC Commercial Energy Inspector and/or Plans Examiner, ICC CALgreen
Inspector/Plans Examiner, or Green Building Residential Plan Examiner.
If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required by ordinance,
check N/A and provide an explanation or code section describing the exception.
The project plans must show all details as stated in the applicable Carlsbad Municipal Code (CMC) and/or Energy Code and
Green Code sections.
All'F-=;;;;;;;;;;;..;;;_, .... ;;;;;.;;.jjiiiiiii-i;jiijiiiiiiijiiijjjiiiiiiiiio-iiiiiiiiijii~...-iiiiiii;;;;;;;;;;a;;;;;;;;.,-.-~;;-::-~;;;;;;;;;;;;;;;;;;;;;;;;;;.;.;;;;;;;.;;.;;;.a;;;~;;;;;;;;.;=;.;;;;;;;;;;;;;;;;;;;;=---==;;;;;;;;;;;==;;;;;;
Project Name/Building
Permit No.: CALLAWAY ADDITIVE PRINTING LAB BP No.: Date:26JUL23
Property Address/APN: 2180 RUTHERFORD ROAD 212-070-25-00
ApplicantName/Co.: BRIDGET CARNEY
Applicant Address: 3207 GREY HAWK CT SUITE 150 CARLSBAD CA 92010
Contact Phone: 760-305-1359 contact Email: BRIDGET.CARNEY@CRBGROUP.C
Contact information of person completing this checklist (if different than above):
Name:
Company
name/address:
B-50
Contact Phone:
Contact Email:
Page 1 of 7 Revised 12/22
Use the table below to determine which sections of the Ordinance checklist are applicable to your project. For alterations and additions to existing
buildings, attach a Permit Valuation breakdown on a separate sheet. For purposes of determining valuation, the amount should be upon either
the actual contract price for the work to be permitted or shall be determined with the use of the current "ICC Building Valuation Data• as
published by the International Code Council, whichever is higher (refer to Section 18.04.035 of the CMC).
Building Permit Valuation (BPV) $ breakdown __________ _
Construction Type Complete Sectlon(s) Notes:
D Residential
D New construction 2A*, 3A*, 4A* *Includes detached, newly constructed ADU
D Additions and alterations:
D BPV < $60,000 NIA All residential additions and alterations
D BPV ~ $60,000 1A,4A 1-2 family dwellings and townhouses with attached garages
D Electrical service panel upgrade only only.
*Multi-family dwellings only where interior finishes are
D BPV ~ $200,000 1A, 4A* removed and significant site work and upgrades to structural
and mechanical, electrical, and/or plumbing systems are
proposed
28* *Multi-family dwellings only where ~$1 ,000,000 BPV AND
BPV ~ $1,000,000 affecting ~75% existing floor area
i] Nonresldentlal and hotels/motels
D New construction 1 B, 28, 38, 48 and 5
l!!!I Alterations:
l!!!I BPV ~ $200,000 or additions ~ 18,5 1,000 square feet
D BPV ~ $1,000,000 18, 28, 5 Building alterations of~ 75% existing gross floor area
~ 2,000 sq . ft. new roof addition 28,5 1 B also applies if BPV ~ $200,000
Instructions:
1. Choose first between residential or non-residential based on the type of project being submitted.
2. Next chose between new construction or addition/alteration for residential or non-residential.
3. The columns to the right of your selection will determine which sections of the CAP program are applicable to your project.
4. Appropriate details must be included on the plans for selections made.
EXAMPLE:
Scope of work includes a new, 2 story, single family residential structure.
I
The selections would be: Residential and New construction in the table above. For a 2-story structure, CAP sections 2A, 3A and 4A would be
applicable. (Solar PV, water heating, EV charging) The * indicates that new detached ADU's are included.
EXAMPLE:
Scope of work includes a tenant improvement (i.e., alterations) valued at over one million dollars.
The selections would be: Non-residential and Alteration BPV ~ $1,000,000. CAP sections 1 B, 2B and 5 would be applicable to this project. (Energy
efficiency, Solar PVand Transportation Demand Management (TOM)*)
It may be necessary to supplement the completed checklist with supporting materials, calculations or certifications, to demonstrate full compliance with
CAP ordinance requirements. For example, projects that propose or require a performance approach to comply with energy-related measures will need
to attach to this checklist separate calculations and documentation as specified by the ordinances.
3
Checkllst Item
Check the appropriate boxes, explan al not applicable and exception items, and provide supporting calwations and documentation as necessary.
1. Energy Efficiency
Please refer to Section 18.30.060 of the Carlsbad Municipal Code (CMC) and Section 150.2 of the CEC for more information. Appropriate
details and notes must be placed on the plans according to selections chosen in the design.
A. 0 Residential addition or alteration ~ $60,000 building permit valuation.
Details of selectlon chosen below must be placed on the plans
referencing CMC 18.30.060.
D N/A ________ _
D Exception: Home energy score
~ 7 (attach certification)
Year Built Slngle-famlly Requirements Multi-family Requirements
D Befa'e1978 Select one option:
□ Duct sealing □ Attic insulation □Coolroof D Attic insulation
D 1978 and later Select one option:
D Lighting oackage □ Water heating package
D Between1978 -1991 Select one option:
□ Duct sealing □ Attic insulation D Cool roof
D 1992 and later Select one option:
□ Lighting package □ Water-heating package
8. E] New Nonresldentlal construction (lncludlng additions over 1,000sf), new hotel/motel construction AND alterations ~
$200,000 building permit valuation. See Section 18.21.050 of the CMC and CALGreen Appendix AS.
At least one measure from each applicable building component required. El N/A _______ _
AS.203.1.1 Choose one:
D Outdoor lighting D Restaurant service water heating (Section 140.5 of the CEC)
D Warehouse dock seal doors D Daylight design PAFs D Exhaust air heat recovery
AS.203.1.2.1 Choose one: □ .95 Energy budget
(Projects with indoor lighting OR mechanical)
l!!I .90 Energy budget
(Projects with indoor lighting AND mechanical)
A5.211.1 ** D On-site renewable energy:
AS.211.3,.,. D Green power: (If offered by local utility provider, 50% minimum renewable sources)
AS.212.1 □ Elevators and escalators:(Project with more than one elevator or two escalators)
AS.213.1 D Steel framing: (Provide details on plansforoptions 1-4 chosen)
• High-rise residential buildings are 4 or more stories.
El N/A ----------
0 N/A ________ _
El N/A
8 N/A
8 N/A
El N/A. _______ _
** For alterations~ $1,000,000BPV and affecting> 75%existing gross floor area, OR alterations that add 2,000 square feet of new roof addition: comply
with Section 18.030.040 of the CMC (section 2B below) instead.
4
2. Photovoltaic Systems
A. □ Residential new construction. Refer to Section 150.1 (c)14 of the CEC for single-family requirements and Section
170.2(d) of the CEC for multi-family requirements. If project Includes Installation of an electric heat pump water
heater pursuant to CAP section 3 below (residential water heating), Increase system size by .3kWdc If PV offset
option is selected.
Floor Plan ID (use additional CFA orSARA #<l.u. Calculated kWdc* Exception
sheets if necessary}
□
D
□
□
Total System Size: kWdc
kWdc = (CFAx.572} / 1,000 + (1.15 x #d.u.}
*Formula calculation where CFA = conditional floor area, #du= number of dwellings per plan type
If proposed system size is less than calculated size, please explain.
8. □ Nonresidential, hotel/motel and multifamily additions, alterations and repairs of these projects ~$1,000,000 BPV AND
affecting ~75% existing floor area, OR addition that Increases roof area by ~2,000 square feet. Please refer to
Section 18.30.040 and 18.30.070 of the CMC when completing this section.
Choose one of the following methods: (Gross floor area or Time-Dependent Valuation method}
□ Gross Floor Area (GFA)Method
GFA: Min.System Size: kWd
□ If< 1 0,000s.f. Enter: 5 kWdc
□ If~ 10,000s.f. calculate: 15 kWdcx (GFA/10,000} **
**Round building size factor to nearest tenth, and round system size to nearest whole number.
□ Time-Dependent Valuation Method
C. 0
AnnualTDV Energyuse:*** ______ x .80= Min. system size: _____ kWdc
*** Attach calculation documentation using modeling software approved by the California Energy Commission.
* All newly constructed non residential, hotel/motel and highrise multifamily buildings that are required by CEC section
140.10(a} to have a PV system shall also have a battery storage system meeting CEC section 140.10(b). Non
residential, hoteVmotel and multifamily additions, alterations or repairs that bigger solar due to the Carlsbad Climate Action
Plan will NOT require battery storage. Battery storage is required when triggered by CEC section 140.10(a) and/or 170.2(g).
5
3. Water Heating
A. Residential. Refer to Section 18.30.050 of the CMC and Sections 150.1 (c)8 or 170.2(d) of the CEC when completing this
section. Provide complete details on the plans.
Residential new construction and alterations:
D Required: 60% of energy needed for service water heating from on-site solar or recovered energy.
For systems serving individual units, choose one system:
D Single 240-volt heat pump water heater AND compact hot water distribution AND Drain water heat recovery (low-rise
residential only)
D Single 240-volt heat pump water heater AND PV system .3 kWdc larger than required.
D Heat pump water heater meeting NEEA Advanced Water Heating Specification Tier 3 or higher.
D Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors
D Gas or propane system with a solar water hearing system and recirculation system.
For systems serving multiple units, choose one system:
D Heat pump water heating system with recirculation loop tank and electric backup.
□ Solar water heating system that is either:
D .20 solar savings fraction D .15 solar savings fraction, plus drain water heat recover
OR:
D System meets performance compliance requirements of section 150.1(d) or 170.2(d) and deriving at least 60% of energy from
on-site solar or recovered energy.
D Exception:. ____________________________________ _
8. Nonresidential and hotel/motel new construction. This section also applies to high-rise residential. Refer to Sections 18.030.020
and 18.040.030 of the CMC and Sections 140.5 and 170.2 of the CEC when completing this section. Provide complete details
on the plans.
1. Non-residential:
D Required: Water heating system derives at least 40% of its energy from one of the following:
D Solar-thermal □ Photovoltaics D Recovered energy
D Required: High-capacity service water heating system
2. Water heating system Is (choose one):
0 Heat pump water heater
□ Electric resistance water heater(s)
D Solar water heating system with .40 solar savings fraction
3. Hotel/motel:
D Required: High-capacity service water heating system (meeting Section 170.2(d) of the CEC)
D Required: Located in garage or conditioned space
Exception:
6
4. Electric Vehlcle Charging
A D Residential -New construction and major alterations.* This section also applies to hoteVmotel projects. Refer to Section
18.21.030 of the CMC and Section 4.106.4 of the GBSC when completing this section.
Choose one:
D One and two-family residential dwelling alterations with attached private garage. {not required if a panel upgrade would be needed)
D New detached ADU. {no EV space required when no additional parking facilities are added)
D New one and two-family residential dwellings and townhouse with attached private garage.
D One EV Ready parking space required D Exception: __________ _
D New arxl major alterations to multi-family and hoteVmotel projects: D Exception: ________________ _
Total Pari<ing Spaces Proposed EVSE Spaces
EV Capable (10% of total) I EV Ready (25% ofT olal) I EV chargers (5% ofTotal)
I I
*Major alterations are:
(1) for one and two-family dwellings and for town houses with an attached garage, alterations have a building permit valuation ~$60,000 or
include an electrical service panel upgrade.
(2) for multifamily dwellings {three units or more without attached garages), alterations have a building permit valuation~ $200,000, i nteriorfinishes are
removed and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are p reposed .
B. D Non-Resldentlal -New construction D Exception: _____________ _
Please refer to Section 18.21 .040 of the CMC when completing this section
Total Parking Spaces
Proposed EV Capable I EVCS (Installed with EVSE) I EV Ready (optional) I EV Space (optional)
I I I
Calculation: Refer to the table below:
Total Number of Parking Spaces provided Number of required EV Capable Spaces Number of required EVCS (Installed with EVSE)
□ 0-9 1 1
□ 10-25 4 1
□ 26-50 8 2
□ 51-75 13 3
□ 76-100 17 5
□ 101-150 25 6
□ 151-200 35 9
□ 201 andover 20 percent of total 25 percent of Required EV Spaces
Calculations: Total EV Capable spaces= .20x Total parking spaces proposed {rounded up to nearest whole number)
EVSE Installed = Total EVSE Spaces x .25 {rounded up to nearest whole number)
EVSE other may be "EV Ready" or "EV Space"
7
..
5. Iii Transportation Demand Management (TOM): Nonresidential ONLY
An approved Transportation Demand Management (TDM) Plan is required for all nonresidential projects that meet a threshold of employee-generated ADT.
City staff will use the table below based on your submitted plans to determine whether your permit requires a TOM plan. If TOM is applicable to
your pem,it, staff will contact the applicant to develop a site-specific TDM plan based on the pem,it details.
Acknowledgment:
Employee ADT Estimation for Various Commercial Uses
Use
Office (all)2
Restaurant
Retaib
Industrial
Manufacturing
Warehousing
EmpADTfor
first 1,000 s.f.
20
11
8
4
4
4
EmpADT/
1000 s.f.1
13
11
4.5
3.5
3
1
1 Unless otherwise noted, rates estimated from /TE Trip
Generation Manual, 10'hEdition
2 For all office uses, use SAN DAG rate of 20 ADT/1,000 sf to
calculate employee ADT
3 Retail uses include shopping center, variety store, supermarket,
gyms, pharmacy, etc .
Other commercial uses may be subject to special
consideration
sample ca!cylaUons;
Office: 20,450 sf
1. 20,450 sf/ 1000 x 20 = 409 Employee ADT
Retail: 9,334 sf
1. First 1,000 sf= 8 ADT
2. 9,334 sf -1,000 sf= 8,334 sf
3. (8,334 sf/ 1,000 x 4.5) + 8 = 46 Employee ADT
I acknowledge that the plans submitted may be subject to the City of Carlsbad's Transportation Demand Management Ordinance. I agree to be
contacted should my permit require a TOM plan and under ancttliat an approved TOM plan is a condition of permit issuance.
Applicant Signature: ~:.U,l.U~UJ/!~~~4--
Name: BRIDGET CA
Date: 26JUL2023
Phone No.: 760-305-1359
8
( City of
Carlsbad
CLIMATE ACTION PLAN (CAP} COMPLIANCE
CAP Building Plan
Template
B-55
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
The following summarizes project compliance with the applicable Climate Action Plan ordinances of the Carlsbad Municipal Code and California
Green Building Standards Code (CALGreen), current version. The following certificate shall be Included on the plans for all building permits that
are required to comply with the CAP measures:
1. ENERGY EFFICIENCY APPLICABLE: Dru [I] NO
Complies with CMC 18.30.060
or 18.21.050 0Yes ON/A
Existing Structure, year built: ____ _
Prepared Energy Audit? Qes D No
Energy Score: _____ _
Efficiency Measures included in scope:
2. PHOTOVOLTAIC SYSTEM APPLICABLE: OYES [I] NO
Complies with CMC section 18.30.040 and 2022 California Energy
Code section 150.l(c}14 D Yes OJA
Size of PV system (kWdc):
Sizing PV by load calculations
If by Load Calculations:
0Yes 0No
Total calculated electrical load:
80% of load:
Exception Requested
Exception Approved BYes ~
Yes ONo
3. ALTERNATIVE WATER HEATING SYSTEM APPLICABLE: □ YES Ii) NO
4.
s.
Complies with CMC sections 18.30.020
18.20.030 and/or 18.30.050?
Alternative Source:
o Electric
o Passive Solar
Exception Requested
Exception Approved
ELECTRIC VEHICLE (EV) CHARGING APPLICABLE:
0Yes
0Yes
DYES
Complies with CMC
section 18.21.030?
Panel Upgrade?
0Yes ON/A D Yes ONo
Required Provided
Total EV Parking Spaces:
No. of EV Capable Spaces:
No. of EV Ready Spaces:
No. of EV Installed Spaces:
Hardship Requested
Hardship Approved
----r::'.jyes
□Yes
TRAFFIC DEMAND MANAGEMENT APPLICABLE:
Compliant?
TOM Report on file with city?
0No
□No
DYEs0No
0Yes0No
□Yes □No