HomeMy WebLinkAboutSDP 2021-0016; CARLSBAD OAKS NORTH LOT 3; PLAN REVIEW RETAINING WALL ONLY FOR CARLSBAD OAKS LOT 3; 2024-04-17
True North Compliance Services, Inc.
8369 Vickers Street, Suite 207, San Diego, CA 92111
T | 562.733.8030
April 17, 2024
City of Carlsbad City of Carlsbad – FINAL REVIEW
Community Development Department - Building Division City Permit No: GR2023-0003
1635 Faraday Ave. True North No.: 23-018-1277
Carlsbad, CA 92008
Plan Review: Retaining Wall Only
Address: Carlsbad Oaks Lot 3
Applicant Name: David Rick
Applicant Email: david.rick@carlsbadca.gov
OCCUPANCY AND BUILDING SUMMARY:
Occupancy Groups: N/A
Occupant Load: N/A
Type of Construction: N/A
Sprinklers:N/A
Stories: N/A
Area of Work (sq. ft.): N/A sq. ft.
The plans have been reviewed for coordination with the permit application.
Valuation: See Notes Below
Scope of Work: Confirmed
Floor Area: See Notes Below
Notes: Valuation and floor area were not provided per the permit application.
Attn: Building & Safety Department,
True North Compliance Services, Inc. has completed the final review of the following documents for the project
referenced above on behalf of the City of Carlsbad:
1. Drawings: Electronic copy, by Spear & Associates, Inc .
2. Structural Calculations: Electronic copy dated April 12, 2024, by Earth Retention.
3. Geotechnical Report: Electronic copy dated March 5, 2024, by Geocon Incorporated.
The 2022 California Building, Mechanical, Plumbing, and Electrical Codes (i.e., 2021 IBC, UMC, UPC, and 2020
NEC, as amended by the State of California), 2022 California Green Building Standards Code, 2022 California
Existing Building Code, and 2022 California Energy Code, as applicable, were used as the basis of our review.
Please note that our review has been completed and we have no further comments.
True orth
'/. COMPLIANCE SERVICES
We have enclosed the above noted documents bearing our review stamps for your use. Please call if you have any
questions or if we can be of further assistance.
Sincerely,
True North Compliance Services
Review By: Ali Al-Murshid - Plan Review Engineer