HomeMy WebLinkAboutCT 15-07; OCEAN VIEW POINT; TEMPORARY EXCAVATION FOR THE RETAINING WALL - LOT 3; 2023-03-20
GEOTECHNICAL | ENVIRONMENTAL | MATERIAL
March 20, 2023
Project No. 3738-SD
Rincon Homes
5315 Avenida Encinas, Suite 200
Carlsbad, California 92008
Attention: Mr. Cameron St. Clair
Subject: Temporary Excavations for the Retaining Wall – Lot 13
Proposed Oceanview Project
Twain Avenue
Carlsbad, California
Dear Mr. St. Clair:
As requested, GeoTek, Inc., (GeoTek) has prepared this letter to provide supplemental analysis
and recommendations for the temporary excavation of the retaining wall backcut for Lot 13.
Introduction
Lot 13 is a designed cut lot based on proposed pad grades designed lower than existing grades.
To facilitate the building pad, a retaining wall is proposed along the north and northeast.
Behind the retaining wall is a biological sensitive area that cannot be disturbed. The retaining
wall is anticipated to be constructed with a reinforced concrete foundation and concrete
masonry unit design. The maximum height of the exposed wall face is approximately 10 feet.
The wall is anticipated to have a 2 foot deep footing and due to the proximity of the retaining
wall adjacent to a biological sensitive area, the wall will need a near vertical temporary backcut
to construct the retaining wall. Also due to the design constraints, the wall footing is
anticipated to have a small heal and large toe. The temporary backcut for the retaining wall
outside the maximum height of the wall can facilitate a conventional backcut gradient of 1:1
(horizontal : Vertical), with exception to a localized section that will require a ¾ : 1 temporary
backcut excavation This condition is considered to be less critical than the vertical backcut
condition.
Analysis
In preparation of this letter, onsite information, laboratory test results and analysis were
reviewed, as well as readily available geotechnical information of the area based on a public
records request for the development along Twain Avenue. In addition, a site walk of the area
as well as the existing subdivision along Twain Avenue was observed. Soil strength design
GeoTek, Inc.
1384 Poinsettia Avenue, Suite A Vista, CA 92081-8505
(760) 599-0509 Office (760) 599-0593 Fa www.geotekusa.com
RINCON Project No. 3738-SD
Temporary Retaining Wall Backcut Excavations March 20, 2023
Ocean View, Carlsbad, California Page 2
parameters were based upon existing onsite and offsite information, as well as engineering
judgement. It should be noted that along the north side of Tolkien Way, approximately 100
feet northwest of Twain Avenue, a vertical 10 foot exposure of Old Paralic deposits exists in a
natural state of global stability. This condition appears to predate the existing development
along Twain Avenue, which was developed between 2002 and 2005.
Geologic section C-C’ was prepared and modeled in Slide2 version 7.0 for temporary global
stability analysis. The analysis modeled a 10 foot vertical excavation in Paralic deposits plus an
anticipated additional 2 feet of excavation for the retaining wall footing for a total vertical
excavation of 12 feet. The existing offsite 2-story residential building located at 2090 Twain
Avenue is approximately 23 feet north of the top of temporary excavation and is deemed far
enough away to not influence the excavation.
Conclusion and Supplemental Recommendations
The static global stability analysis results in a Factor of Safety (FOS) of 1.3 based on the soil
strength parameters applied and in a competent excavation (i.e. fractures and tensions cracks
absent) and meets the minimum FOS for temporary excavations considered by City of San
Diego and peer industry standards. A copy of the temporary global stability analysis is
presented in Appendix A.
GeoTek’s analysis does not relieve the contractor from their own analysis and conclusions as
the contractor is responsible for the health and safety of their employees while working.
Excavation means and methods, including employee safety is the responsibility of the employer,
not GeoTek. The employer of the workers should follow CalOSHA guidelines, which include
designating a competent person to evaluate the safety environment of the site.
GeoTek’s analysis is based on our experience at the site, reviewing offsite conditions, and
available information. As such, not every condition can be anticipated and a representative of
the project engineering geologist or soil engineer should be present during the temporary
backcut excavation to identify if conditions are presented that do not meet the assumptions as
analyzed herein. Observations should be periodic thereafter until the retaining wall has been
erected and grouted up to five feet in height.
Work area between the back of the retaining wall and the temporary excavation is anticipated
to be one foot or less. As such, placement of soil derived engineered fills is anticipated to be
difficult and unsafe. An alternative to soil derived engineered backfill is ¾ inch crushed gravel
or pea gravel wrapped in Mirafi 140N filter fabric. As an alternative to the gravel and fabric,
CalTrans Permeable Base can be utilized. The upper one to two feet should be capped with
engineered fill.
GEOTEK
RINCON Project No. 3738-SD
Temporary Retaining Wall Backcut Excavations March 20, 2023
Ocean View, Carlsbad, California Page 3
The opportunity to be of service is sincerely appreciated. If you should have any questions,
please do not hesitate to call GeoTek.
Respectfully submitted,
GeoTek, Inc.
Attachments: Appendix A – Temporary Global Stability Analysis
Distribution: (1) Addressee via email
Edwin R. Cunningham
RCE 81687 Exp. 3/31/24
Project Engineer
Christopher D. Livesey
CEG, 2733 Exp. 05/31/23
Vice President
GEOTEK
Appendix A
Temporary Global Stability Analysis
GEOTEK
Method Name Min FS
Spencer 1.317
GLE / Morgenstern-Price 1.315
Material Name Color Unit Weight
(lbs/Ō3)Strength Type Cohesion
(psf)
Phi
(deg)
Tsa 125 Mohr-Coulomb 300 29
Qop 125 Mohr-Coulomb 300 35
Safety Factor
0.000
0.250
0.500
0.750
1.000
1.250
1.500
1.750
2.000
2.250
2.500
2.750
3.000
3.250
3.500
3.750
4.000
4.250
4.500
4.750
5.000
5.250
5.500
5.750
6.000+
36
0
34
0
32
0
30
0
28
0
0 20 40 60 80 100 120 140
Analysis Description Cross Section C-C' Static Temporary Slope Cut
Company GeoTekScale1:181Drawn By CH
File Name 3738-SD Cross Section C-C' Static Temporary Slope.slimDate2/1/2023
Project
3738-SD Ocean View
SLIDEINTERPRET 7.038
□
□
. rocsc I en ce>-----------------------------<
GEOTECHNICAL | ENVIRONMENTAL | MATERIAL
July 20, 2023
Project No. 3738-SD
Rincon Homes
5315 Avenida Encinas, Suite 200
Carlsbad, California 92008
Attention: Mr. Cameron St. Clair
Subject: Response to City of Carlsbad Cycle No. 3 Review Comments
Temporary Excavations for the Retaining Wall – Lot 13
Proposed Oceanview Project
Twain Avenue
Carlsbad, California
Dear Mr. St. Clair:
As requested, GeoTek, Inc., (GeoTek) has prepared this letter to provide supplemental analysis
and recommendations to respond to the City of Carlsbad review comments regarding the
temporary excavation of the retaining wall backcut for Lot 13. The City review comments
were marked directly on GeoTek’s referenced 2023 report. Screen shots of the review
comments are provided and GeoTek’s responses follow.
Initially, the temporary stability analysis was performed based on assumed wall heights and
footing configurations. Since the analysis was performed structural retaining wall plans have
been prepared by Sergin Engineering Inc. as sheets 15 through 18 of the grading plan set, and
provided to GeoTek for review and analysis.
Review Comment No. 1
GeoTek, Inc.
1384 Poinsettia Avenue, Suite A Vista, CA 92081-8505
(760) 599-0509 Office (760) 599-0593 Fa www.geotekusa.com
Introduction
Lot I 3 is a designed cut lot based on propos
To facilitate the building pad, a retaining
~~~~~~:~tA//fl....J := 7~5'
t-1,5 I vt,,t..r.
d pad grades designed lower than existing grades. CtlJ""
II is proposed along the north and northeast.
Behind the retaining wall is a biological sensitive area that cannot be disturbed. The retaining
wall is anticipated to be constructed with a reinforced concrete foundation and concrete
masonry unit design. The maximum height f the exposed wall face is approximately 10 feet.
The wall is anticipated to have a 2 foot dee footing and due to the proximity of the retaining
wall adjacent to a biological sensitive area, the wall will need a near vertical temporary backcut
to construct the retainin wall. Also due to the desi n constraints, the wall footin is
RINCON HOMES Project No. 3738-SD
Ocean View Point July 20, 2023
Twain Avenue, Carlsbad, California Page 2
Response to Review Comment No. 1
The retaining wall structural plans have been reviewed. As previously mentioned, due to
construction constraints with a biologically sensitive area a steep backcut is required along a
portion of Lot 13. A section was analyzed along the Typical Section B-B’ on sheet 3 of 5 as
noted on the Grading plans prepared by Pasco Laret Suiter & Associates (PLSA).
Based on a review of the retaining wall plans, the overall depth of the footings is a minimum of
9” below finish grade, plus 18” deep footing, plus a 48” deep key. This designed cut has been
modeled for GeoTek’s temporary slope stability analysis.
\ 18. 1'
314.6BW
3'J8.6TF
H•10.0' I I , APAAO IMAIHOCMIONOF
SHORING WALi., LM!ITS OF qHORING
TO BE DETcR!,/IM!D ~11'/ GRADING
PERMIT APf'Rqi'Al ATDISCRfT/00
-.__. __ .__ 10FCIT'YE~ER. -1.__
PROF. J' FREE STAJIDING
MASONRY WALL PER LS
PLAJl(m>.)
TRAIL IMPROVEMENTS
GRADII/G A/ID TOf OF
SL~PERCT1
PERCTIS-01 < ,-----,..----'---' ./
I I ti..J.-1 LJ_J,._...I I L I
LOT11
MAP 14340
APN: 208-181-19
TWA/NAVE
GEOTEK
RINCON HOMES Project No. 3738-SD
Ocean View Point July 20, 2023
Twain Avenue, Carlsbad, California Page 3
The grading for lot 13 is anticipated to be entirely cut to finished design grade including the
foundation for the retaining wall. Overexcavation is not required for the retaining wall
foundation.
Review Comment No. 2
Response to Review Comment No. 2
The retaining wall along Lot 13 can be described as an angular configuration with a beginning
daylight condition at the rear of the property. The height of the retaining wall increases to the
northeast to a retained height of 10 feet at an angle point where the wall turns to an easterly
direction for approximately 80 linear feet and has a maximum retained height of 12 feet. The
anticipated wall backcut is considered to be at the most critical 40 feet before and after the
angle point. Outside this area, the height of the wall backcut is reduced or the contractor can
excavate the backcut at a gradient less than vertical. Global static stability analysis was
performed on the anticipated temporary vertical cuts in this area of 12 to 18.25 feet. Results of
the analysis indicated a factor of safety (FOS) of 1.3.
Area of Critical
Analysis
anticipated to have a small heal and large toe. The temporary backcut for the retaining wall
outside the maximum height of the wall can facilitate a conventional backcut gradient of I: I
(horizontal : Vertical), with exception to a localized section that will require a 3/-1 : I temporary
backcut excavation This condition is considered to be less critical than the vertical backcut
condition.
Analysis
---
PROP. S FREE SJ:
MASONRY IVAl.l
TRAl IMPROVEMENTS
PER CT 15-07
I -
,---,-,---,--,-,
1----...1,.._I I L I
--
LOT11
MAP 14340
APN: 208-181-19
TWA/NAVE
GEOTEK
RINCON HOMES Project No. 3738-SD
Ocean View Point July 20, 2023
Twain Avenue, Carlsbad, California Page 4
The area of critical analysis was assessed based on the retaining wall design detail 13A/13 on
sheet 17 of the PLSA plan set. This wall is analyzed to be pushed back to the property line as a
conservative approach (the civil plan shows the wall 3 feet away from the property line).
As previously discussed, soil strength design parameters were based upon existing onsite and
offsite information, as well as engineering judgement. The strength of the soil’s cohesion was
increased by 50 pcf and is considered to be reasonable based on judgement.
Results of the analysis concludes that the proposed backcut for the retaining wall along lot 13
to a maximum height of 18.25 feet and at the configuration of the retaining wall footings is
geotechnically suitable for a temporary condition. If wall design changes in height or footing
configuration, a revised analysis will be needed.
Review Comment No. 3
Response to Review Comment No. 3
In GeoTek’s 2023 report, the document referenced Section C-C’, however the actual analysis
was modeled as B-B’. This has been corrected.
Area of Critical
Analysis
along Twain Avenue, which was developed between an . . ... _ 1
/ tjlf,.c..J wl~ 'i11'¥7lM½ ~se-vn#'f\J w/Jr-j~1,Jfw-rrv
Geologic section C-C'/was prepared and modeled in Slide2 version 7.0 for te~~ry global
---
TRAIL IMPROVEMENTS
PERcr,s.01
,-----,.--
i .
LOT11
MAP 14340
APN: 208-181-19
TWA/NAVE
GEOTEK
RINCON HOMES Project No. 3738-SD
Ocean View Point July 20, 2023
Twain Avenue, Carlsbad, California Page 5
Review Comment No. 4
Response to Review Comment No. 4
CalOSHA provides temporary excavation guidelines for prescriptive conditions (based on soil
type and groundwater). The prescriptive conditions are soil type A, B, and C. A summary of
prescriptive conditions is presented in Appendix B. Based on our understanding of the earth
materials, they are classified as soil type B. CalOSHA also provides prescriptive temporary
excavation diagrams for soil type B. Temporary excavations not conforming to prescriptive
design may follow Option 4 of the CalOSHA guidelines:
Option (4) - Design by a registered professional engineer.
A) Sloping and benching systems not utilizing Option (1) or Option (2) or Option (3) under
Section 1541.1(b) shall be stamped and signed by a registered professional engineer.
B) Designs shall be in written form and shall include at least the following:
1) The magnitude of the slopes that were determined to be safe for the particular
project;
2) The configurations that were determined to be safe for the particular project;
3) The identity of the registered professional engineer approving the design.
C) At least one copy of the design shall be maintained at the jobsite while the slope is being
constructed. After that time the design need not be at the jobsite, but a copy shall be
made available to the Division upon request.
Diego and peer industry standards. A copy of the temporary global stability a~sis is
presented in Appendix A. "-'1-tl'\1' \S CM.,,o.;\t1't "$c:>\t.,f"\1P6 1> 0~ ttA/r? C~b~ON ~1.,,11"1?;,t) w -o-r-r1f'J'rr"5dl(...,-, v.
GeoTek's analysis does not relie e the contractor from their own analysis and conclusions as
the contractor is responsible for the health and safety of their employees while working.
Excavation means and methods, inc uding employee safety is the responsibility of the employer,
not GeoTek. The employer of the orkers should follow (CalOSH~fguidelines, which include
designating a competent person to evaluate the safety environment o the site. -.... t-(W"=>~ TJj_!:}? / ,-,,...,Pt,,c-f 1N'4. ftf"lt('"{'Z,,--~' MA,=
Cir 1 ~d IL • •• So ,-Jc,f" ~ •
GeoTek's analysis is based on our experience at the site, reviewing o site conditions, and Ct.A'11f4i
GEOTEK
RINCON HOMES Project No. 3738-SD
Ocean View Point July 20, 2023
Twain Avenue, Carlsbad, California Page 6
The first paragraph under Conclusions and Recommendations of GeoTek’s 2023 report states
the temporary excavation meets pier industry guidelines for temporary stability. The second
paragraph states that GeoTek’s analysis is not intended to relieve an Employer’s responsibility
to their Employees for working within the effects of this temporary excavation condition and
are not relieved of responsibility or duties to their employees to provide a safe working
environment.
Conclusion and Supplemental Recommendations
The static global stability analysis results in a Factor of Safety (FOS) of 1.3 based on the soil
strength parameters applied and in a competent excavation (i.e. fractures and tensions cracks
absent) and meets the minimum FOS for temporary excavations considered by City of San
Diego and peer industry standards. A copy of the temporary global stability analysis is
presented in Appendix A.
GeoTek’s analysis does not relieve the contractor from their own analysis and conclusions as
the contractor is responsible for the health and safety of their employees while working.
Excavation means and methods, including employee safety is the responsibility of the employer,
not GeoTek. The employer of the workers should follow CalOSHA guidelines, which include
designating a competent person to evaluate the safety environment of the site.
The subject retaining wall may be excavated into formational material. No overexcavation of
the footing is recommended as long as it is bearing on competent formational material.
GeoTek’s analysis is based on our experience at the site, reviewing offsite conditions, and
available information. As such, not every condition can be anticipated, and a representative of
the project engineering geologist or soil engineer should be present during the temporary
backcut excavation to identify if conditions are presented that do not meet the assumptions as
analyzed herein. Observations may be periodic after the retaining wall has been erected and
grouted up to five feet in height.
The work area between the back of the retaining wall and the temporary excavation is
anticipated to be one foot or less. As such, placement of soil derived engineered fills is
anticipated to be difficult and unsafe. An alternative to soil derived engineered backfill is ¾ inch
crushed gravel or pea gravel wrapped in Mirafi 140N filter fabric. As an alternative to the
gravel and fabric, CalTrans Permeable Base can be utilized. The upper one to two feet should
be capped with engineered fill.
GEOTEK
RINCON HOMES Project No. 3738-SD
Ocean View Point July 20, 2023
Twain Avenue, Carlsbad, California Page 7
The opportunity to be of service is sincerely appreciated. If you should have any questions,
please do not hesitate to call GeoTek.
Respectfully submitted,
GeoTek, Inc.
Attachments: Appendix A – Temporary Global Stability Analysis
Appendix B – Summary of CalOSHA Soil Types.
Distribution: (1) Addressee via email
Edwin R. Cunningham
RCE 81687 Exp. 3/31/24
Project Engineer
Christopher D. Livesey
CEG, 2733 Exp. 05/31/25
Vice President
GEOTEK
RINCON HOMES Project No. 3738-SD
Ocean View Point July 20, 2023
Twain Avenue, Carlsbad, California Page 8
References
Christian Wheeler Engineering, 2018 “Updated Geotechnical Investigation Report, Carlsbad
Tract 02-06, Twain Avenue, Carlsbad, California,” dated February 16, 2018.
GeoTek, Inc., 2022a, “Updated Geotechnical Evaluation, Oceanview Project, South End of
Twain Avenue, Carlsbad, San Diego County, California,” PN 3738-SD, dated March14,
2022.
____, 2022b, “Grading and Improvement and Wall Plan Review, Proposed Oceanview Project,
Twain Avenue, Carlsbad, California,” PN 3738-SD, dated April 12, 2022.
_____, 2023c, “Temporary Excavations for the Retaining Wall - Lot
Pasco Laret Suiter & Associates, 2022, Discretionary Plans, Coastal Development Permit,
Ocean View Point – Terminus of Twain Ave, City of Carlsbad, CDP 2022-0014, 5
Sheets, undated.
GEOTEK
Appendix A
Temporary Global Stability Analysis
GEOTEK
Method Name Min FS
Spencer 1.3
GLE / Morgenstern-Price 1.3
Material Name Color Unit Weight
(lbs/Ō3)Strength Type Cohesion
(psf)
Phi
(deg)
Tsa 125 Mohr-Coulomb 300 29
Qop 125 Mohr-Coulomb 350 35
Safety Factor
0.0
0.3
0.5
0.8
1.0
1.3
1.5
1.8
2.0
2.3
2.5
2.8
3.0
3.3
3.5
3.8
4.0
4.3
4.5
4.8
5.0
5.3
5.5
5.8
6.0+
35
0
34
0
33
0
32
0
31
0
30
0
29
0
20 30 40 50 60 70 80 90 100 110 120 130
Analysis Description Cross Section B-B' Static Temporary Slope Cut
Company GeoTekScale1:138Drawn By CH
File Name3738-SD Cross Section B-B' Static Temporary Slope Revised.slimDate2/1/2023
Project
3738-SD Ocean View
SLIDEINTERPRET 7.038 7/20/2023
□
□
.
Jl---,,1 rocsc1ence>-----------------------------<
Appendix B
Prescriptive CalOSHA Soil Types
GEOTEK
California Code of Regula ons, Title 8, Sec on 1541.1. Requirements for Protec ve Systems, Appendix A
Type A soil. Cohesive soils with an unconfined, compressive strength of 1.5 ton per
square foot (tsf) or greater. Examples of cohesive soils are: clay, silty clay, sandy clay,
clay loam and, in some cases, silty clay loam and sandy clay loam. Cemented soils
such as caliche and hardpan are also considered Type A. However, no soil is Type A
if:
(1) The soil is fissured; or
(2) The soil is subject to vibration from heavy traffic, pile driving, or similar effects;
or
(3) The soil has been previously disturbed; or
(4) The soil is part of a sloped, layered system where the layers dip into the
excavation on a slope of four horizontal to one vertical (4H:1V) or greater; or
(5) The material is subject to other factors that would require it to be classified as a
less stable material.
Type B soil:
(1) Cohesive soil with an unconfined compressive strength greater than 0.5 tsf but less
than 1.5 tsf; or
(2) Granular cohesionless soils including: angular gravel (similar to crushed rock),
silt, silt loam, sandy loam and, in some cases, silty clay loam and sandy clay loam.
(3) Previously disturbed soils except those which would otherwise be classed as Type
C soil.
(4) Soil that meets the unconfined compressive strength or cementation requirements
for Type A, but is fissured or subject to vibration; or
(5) Dry rock that is not stable; or
(6) Material that is part of a sloped, layered system where the layers dip into the
excavation on a slope less steep than four horizontal to one vertical (4H:1V), but only
if the material would otherwise be classified as Type B.
Type C soil:
(1) Cohesive soil with an unconfined compressive strength of 0.5 tsf or less; or
(2) Granular soils including gravel, sand, and loamy sand; or
(3) Submerged soil or soil from which water is freely seeping; or
(4) Submerged rock that is not stable, or
(5) Material in a sloped, layered system where the layers dip into the excavation or a
slope of four horizontal to one vertical (4H:1V) or steeper.
Unconfined compressive strength. The load per unit area at which a soil will fail in
compression. It can be determined by laboratory testing, or estimated in the field
using a pocket penetrometer, by thumb penetration tests, and other methods.
Wet soil. Soil that contains significantly more moisture than moist soil, but in such a
range of values that cohesive material will slump or begin to flow when vibrated.
Granular material that would exhibit cohesive properties when moist will lose those
cohesive properties when wet.
GEOTECHNICAL | ENVIRONMENTAL | MATERIAL
August 24, 2023
Project No. 3738-SD
Rincon Homes
5315 Avenida Encinas, Suite 200
Carlsbad, California 92008
Attention: Mr. Cameron St. Clair
Subject: Response to Geotechnical Review Comments
3rd Party Review Temporary Slopes (1st Review)
Proposed Oceanview Project
Twain Avenue
Carlsbad, California
Dear Mr. St. Clair:
As requested, GeoTek, Inc., (GeoTek) has prepared this letter to respond to the City of
Carlsbad third party geotechnical review comments regarding the temporary excavation of the
retaining wall backcut for Lot 13. The review comments correspond to the numbers on the
review sheet. Comment number 1 is a summary of the geotechnical reviewer’s understanding
of the proposed excavations, a question was not stated. A copy of the review comment letter
dated July 28, 2023 is present in Appendix A.
In preparation of this response, a supplemental field exploration, laboratory testing, and
engineering analysis was performed. The field exploration and laboratory testing is discussed in
detail in response to Review Comment No. 2.
Comment No. 2
Please provide the justification for the strength parameters (C=350 and Φ=35) for the Old
Paralic deposits used in the slope stability analysis for the proposed temporary cut at Lot 13
that is presented in the “Response to City of Carlsbad Cycle No. 3 Review Comments…”. If
increased strength parameters above the C=100 psf and Φ=33 that are supported by the
laboratory testing of the Old Paralic deposits performed at Lot 1 approximately 200’ from the
subject Lot 13 (T-1 by Christian Wheeler) and reported in the “Updated Geotechnical
Evaluation…” by GeoTek are proposed, please provide complete justification and site-specific
laboratory testing to substantiate the values for the temporary slope stability analysis.
GeoTek, Inc.
1384 Poinsettia Avenue, Suite A Vista, CA 92081-8505
(760) 599-0509 Office (760) 599-0593 Fa www.geotekusa.com
RINCON HOMES Project No. 3738-SD
Ocean View Point Response to Comments July 28, 2023 August 24, 2023
Twain Avenue, Carlsbad, California Page 2
Response to Comment No. 2
The increased strength parameters applied to the stability analysis associated with the
temporary cut at Lot 13 presented in GeoTek’s 2023d report were applied based on
engineering judgement from our experience in the area for the formational material. The soil
strengths presented in Christian Wheeler Engineering report represented proposed engineered
fill, not formation. As a follow up, a supplemental geotechnical subsurface evaluation of Lot 13
was performed on August 10, 2023. The subsurface evaluation was performed with a limited
access, rubber track mounted, drilling rig. A solid stem auger with a typical 3.0 inch outside
diameter, split barrel sampler, was utilized to obtain relatively undisturbed soil samples. The
boring and samples were logged by an engineer from GeoTek. Samples obtained were
transported to GeoTek’s laboratory for engineering analysis. The approximate location of the
boring is presented on Figure 2 – Geotechnical Map. A description of the boring log is
provided in Appendix B.
Direct Shear testing was performed in a direct shear machine of the strain-control type in
general accordance with ASTM Test Method D 3080 procedures. The rate of deformation is
approximately 5.3 x 10-3 inches per minute. The samples were sheared under varying confining
loads to determine the coulomb shear strength parameters, angle of internal friction and
cohesion. Two tests were performed on relatively undisturbed samples obtained from the
supplemental subsurface evaluation at depths of 5 and 10 feet. The results of the tests are
graphically presented in Appendix C.
Comment No. 3
Please provide slope stability analysis for the proposed 18’ vertical cut that uses the strength
parameters (C=100 psf and Φ=33) that are supported by the laboratory testing of the Old
Paralic deposits performed at Lot 1 (T-1 by Christian Wheeler) and reported in the “Updated
Geotechnical Evaluation…” by GeoTek. Please include searches for potential failure surfaces
extending from the bottom of the key of the proposed footing and up to the highest point of
the proposed backcut. Please provide the plots (including the plot showing the trial runs) and
print-outs associated with the analysis.
Response to Comment No. 3
The soil strengths obtained from Christian Wheeler Engineering were the results from a
remolded soil sample representing anticipated engineered fill soil strength. The material
exposed during the temporary excavation of lot 13 (Old Paralic deposits) will be native.
Therefore, the engineered soil strength values (C=100 psf and Φ=33) do not represent the
anticipated conditions during the temporary excavation and a slope stability analysis utilizing the
parameters of C=100 psf and Φ=33 is not valid. See GeoTek’s response to Comment No. 4
for slope stability analysis modeled for the temporary excavation exposing Old Paralic deposits.
GEOTEK
RINCON HOMES Project No. 3738-SD
Ocean View Point Response to Comments July 28, 2023 August 24, 2023
Twain Avenue, Carlsbad, California Page 3
Comment No. 4
Based on the additional analysis requested above, please provide updated recommendations as
necessary addressing the up to approximate 18’ high temporary vertical cut along the north and
northeast sides of Lot 13 that will apparently be necessary to construct the proposed retaining
wall. Please provide specific recommendations for the temporary cuts (maximum allowable
vertical height of cuts, inclination of temporary slopes, slot-cutting, etc.) or temporary shoring
as necessary to prevent any adverse impact from the proposed grading/wall construction work
on the adjacent off-site property and promote worker safety.
Response to Comment No. 4
As noted in GeoTek’s response to Comment No. 3, soil strength values of Cohesion of 100 psf
and Phi angle of 33o do not apply. As supplemental laboratory testing is available, the soil
strengths applicable to the temporary excavation associated with Lot 13 have been applied.
The temporary slope stability analysis referenced in GeoTek’s July 20, 2023 response was
modified to represent the anticipated temporary grading conditions most critical condition.
The modifications include a geologic bedding contact line between stratigraphic soil types within
the Old Paralic deposits (noted as Qop1 and Qop2). Soil strengths based on relatively
undisturbed samples representing in-situ conditions were applied to the Old Paralic deposits.
The temporary stability analysis was performed for a static condition based on the following
changes.
1) Analysis performed based on the model from GeoTek’s July 20, 2023 report and
modified with soil strengths referenced within this report.
2) Refining the search boundaries to the bottom of the proposed retaining wall key to the
highest point behind the proposed backcut.
3) Showing up to 100 slip surfaces.
The output for the analytical model is presented in Appendix C and includes the output report,
as requested in Comment No. 3.
The reviewer should consider the following discussion when reviewing the revised analysis. The
analysis performed in GeoTek’s July 20, 2023 letter was performed with an open search
between the search boundaries. This is represented by the blue arrow brackets. The search
analyzes potential paths of failure within these boundary conditions and included the bottom of
the retaining wall footing and the tallest point of the backcut. However, based upon your
request in Comment No. 3, the boundary conditions have been limited to the bottom of the
retaining wall key and extended to the end of the stability section (station no. 120).
The previous analysis was performed to show the path of potential failure with the lowest
Factor of Safety (FOS). This was applied, so that the model would not be obscured with all
GEOTEK
RINCON HOMES Project No. 3738-SD
Ocean View Point Response to Comments July 28, 2023 August 24, 2023
Twain Avenue, Carlsbad, California Page 4
potential failure paths with higher FOSs. As requested in Comment No. 3 trial runs depicting
other potential failure surfaces are presented in the analysis herein, but limited to 100 so as to
not obscure the model. It should be noted that all 100 potential failure paths are limited within
a precise narrow band.
Based on the revised analysis, the excavation associated with the retaining wall is stable as a
temporary condition. Further recommendations for a temporary excavation plan are
presented in Response to Comment No. 5.
Comment No. 5
Without relieving the contractor of their responsibilities and obligations during construction of
temporary slopes as indicated by the geotechnical consultant in the “Response to City of
Carlsbad Cycle No. 3 Review Comments…” and with comment #4 above in mind – CalOSHA
guidelines, California Code of Regulations, Title 8, Section 1541.1 (“Requirements for
Protection Systems,” Appendix A), Option 4 (design by a registered professional engineer)
indicates, in part, that the registered professional should in writing a) state the magnitude of
slopes that were determined to be safe and b) provide the slope configurations that were
determined to be safe for the particular project. If the geotechnical consultant is advocating the
use of vertical cuts that exceed the Cal OSHA guidelines for the specific soil type (A, B, or C),
the above statements should be provided by the geotechnical consultant. In the absence of the
registered professional providing the above the temporary slope inclination provided for the
designated Cal OSHA soil type (in this case soil type B has been provided by the geotechnical
consultant) should be used for the temporary cuts.
Response to Comment No. 5
Based on GeoTeks analysis presented herein and not relieving the contractor of responsibilities
discussed in GeoTek’s “Response to City of Carlsbad Cycle No. 3 Review Comments” dated
July 20, 2023, the temporary excavation for the retaining wall associated with Lot 13 may follow
Option 4 of CalOSHA guidelines, California Code of Regulations, Title 8, Section 1541.1
provided the following conditions and recommendations are implemented into the construction
phases of the project.
Temporary Excavation Conditions for all Slots Associated with Lot 13
1. These recommendations are limited to the areas noted as slot cuts A, B, and C on
Figure 3.
2. The wall will be constructed as designed by Sergin Engineering, Inc., based on the
referenced plan set date.
GEOTEK
RINCON HOMES Project No. 3738-SD
Ocean View Point Response to Comments July 28, 2023 August 24, 2023
Twain Avenue, Carlsbad, California Page 5
3. All slot cuts will be excavated, the foundation and retaining wall constructed before the
next slot is excavated. This does not include the lower planter wall, which can be
constructed in a continuous phase upon completion to the retaining wall designed to be
constructed against the temporary excavation.
4. Where an existing slot cut is excavated adjacent to a future slot cut (for example Slot A
is adjacent to future Slot B), the temporary excavation should be sloped no steeper than
a 1:1 (horizontal to vertical) away from the Slot under construction. Where a slot cut
has been constructed, a temporary earthen berm is not recommended, provided the
constructed wall has been grouted solid for a period of seven days.
5. The temporary excavation exposes Dense to Very Dense undisturbed Old Paralic
deposits. The temporary excavation does not expose friable sands, non-healed
fractures or joints at a depth greater than 24 inches below the top of the backcut or
expose adverse geologic conditions.
6. All temporary excavations are to be continuously monitored by a Professional Engineer
and/or Engineering Geologist from GeoTek, Inc.
Temporary Excavations for Slot A
Maximum excavation of 15.5 feet, including retaining wall foundation footing. The excavation at
its maximum vertical excavation shall not be taller nor steeper than required to be constructed.
Where the heal of the foundation footing is within the grading limits, the backcut of the
excavation shall be inclined from the heal of the foundation footing to the limits of grading.
Figure 4A depicts the tallest cut condition.
Temporary Excavations for Slot B
Maximum excavation of 18 feet, including retaining wall foundation footing. The excavation at
its maximum vertical excavation shall not be taller nor steeper than required to be constructed.
Where the heal of the foundation footing is within the grading limits, the backcut of the
excavation shall be inclined from the heal of the foundation footing to the limits of grading.
Figure 4B depicts the tallest cut condition.
Temporary Excavations for Slot C
Maximum excavation of 21.5 feet, including retaining wall foundation footing. The excavation at
its maximum vertical excavation shall not be taller nor steeper than required to be constructed,
which is 4 feet at the foundation stem wall footing. Where the heal of the foundation footing is
within the grading limits, the backcut of the excavation shall be inclined from the heal of the
foundation footing to the limits of grading. This will result in a temporary excavation from
GEOTEK
RINCON HOMES Project No. 3738-SD
Ocean View Point Response to Comments July 28, 2023 August 24, 2023
Twain Avenue, Carlsbad, California Page 6
grading limits that transitions from Slot B to Slot D, from a near vertical to a 1:2 temporary cut
to the top of the retaining wall footing. Figure 4C depicts the tallest cut condition.
Temporary Excavations for Slot D
Maximum excavation of 21.5 feet, including retaining wall foundation footing. The excavation at
its maximum vertical excavation shall not be taller nor steeper than required to be constructed,
which is 4 feet at the foundation stem wall footing. Where the heal of the foundation footing is
within the grading limits, the backcut of the excavation shall be inclined from the heal of the
foundation footing to the limits of grading. This will result in a temporary excavation from
grading limits that transitions from Slot B at an approximate 1:2 and transition to a 1:1
temporary cut to the top of the retaining wall footing. Figure 4D depicts the tallest cut
condition.
Closure
The opportunity to be of service is sincerely appreciated. If you should have any questions,
please do not hesitate to call GeoTek.
Respectfully submitted,
GeoTek, Inc.
Attachments: Appendix A – Review Comments
Appendix B – Exploration Log
Appendix C – Laboratory Analysis
Appendix D – Slope Stability Analysis.
Figure 2 – Geotechnical Map
Figure 3 – Slot Cut Plan
Figure 4 – Slot Cut Excavation Details
Distribution: (1) Addressee via email
Edwin R. Cunningham
RCE 81687 Exp. 3/31/24
Project Engineer
Christopher D. Livesey
CEG, 2733 Exp. 05/31/25
Vice President
GEOTEK
RINCON HOMES Project No. 3738-SD
Ocean View Point Response to Comments July 28, 2023 August 24, 2023
Twain Avenue, Carlsbad, California Page 7
References
Christian Wheeler Engineering, 2018 “Updated Geotechnical Investigation Report, Carlsbad
Tract 02-06, Twain Avenue, Carlsbad, California,” dated February 16, 2018.
GeoTek, Inc., 2022a, “Updated Geotechnical Evaluation, Oceanview Project, South End of
Twain Avenue, Carlsbad, San Diego County, California,” PN 3738-SD, dated March14,
2022.
____, 2022b, “Grading and Improvement and Wall Plan Review, Proposed Oceanview Project,
Twain Avenue, Carlsbad, California,” PN 3738-SD, dated April 12, 2022.
_____, 2023c, “Temporary Excavations for the Retaining Wall - Lot
_____, 2023d, Response to City of Carlsbad Cycle No. 3 Review Comments, Temporary
Excavations for the Retaining Wall – Lot 13, Proposed Oceanview Project, Twain
Avenue, Carlsbad, California, Project No. 3738-SD, dated July 20, 2023.
Pasco Laret Suiter & Associates, 2023, Grading Plans for Ocean View Point, City of Carlsbad
CT 15-07, drawing no. 534-6A, 21 Sheets.
GEOTEK
HA-3
T-2
T-3
T-4
T-5
T-8
T-9
T-1
T-7
Tsa
Tsa
Tsa
Qop
Qop
Approximate Location of Geological Contact
Quaternary age Old Paralic DepositsQop
Tertiary age Santiago Formation, Circled where BuriedTsa
Approximate Location and Orientation of
Test Pit, CME, 2018
Approximate Location of Hand Auger Boring This Study
T-9
HA-6
LEGEND
Approximate Limits of Study
Tsa
T-6
HA-4 & HA 5
Tsa
HA-2
HA-6
Tsa
Tsa
C
C'
B'
A
A'
Approximate Location of Fill Slope Key
HA-1
B
Approximate Location of Remedial Grading
Scale 1" = 60'
1384 Poinsettia Avenue, Suite A
Vista, California 92081
Figure 2
Geotechnical MapPlan adapted from "Grading Plan" by Pasco Laret Suiter
& Associates
Rincon Homes
Ocean View
Carlsbad, California
PN: 3738-SD DATE: March 2023
B-1
B-1 Approximate Location of
Limited Access Boring
This Report
GeoTek, 2022
I I I I ) EXIST!'IG~ ~-I -------___._~-l._L
I I EX!SllNGJ05
00N1'01/R
EX/SllNGJOO
OON'IOUR
I /
/ (
---
\
)
(
I, I
I
I(! I
\
if!
I
I
0 <o "1
I
I
I
I \
\ I \ I \ I
~
~ --"' \
\
\
\ \
I
PLAN VIEW_ GRADING PLAN
SCi>lE: r, 'J/7l!ORIZONTAL
\
I I
\
J -----------------------' I -, !')()STING31S \ I GOHTOUR EXJSmGJ06
1/= ,-_
,'i 1'~~
ll,IIITOF r EXISTll'IJ2QO GIIADfNGl !AND /~ CON~ DmURIWICE
PROf'OSED
WWH€
"' 0
<%.,-
/
J(
310 --
"------.... ..?q;, ~
'
0 80 60 i-----
~
\
\
'r"
\
90
.,,__
\
\
\
' \
♦
---~
•
GEOTEK
1384 Poinsettia Avenue, Suite A, Vista, CA 92081
(760) 599-0509 (phone) / (760) 599-0593 (FAX)
GEOTECHNICAL | ENVIRONMENTAL | MATERIALS
08/23/23
FIGURE 4A
SLOT CUT A
TYPICAL TEMPORARY EXCAVATION PROFILE
OCEAN VIEW PROJECT
CARLSBAD, CALIFORNIA
Project No.:Report Date:Drawn By:
3738-SD CDL
276
Amelia
Site
Improvements
Artificial
Fill
Test Pit
Exploration
<; c L--=-: l ''= 5 1
GEOTEK
1384 Poinsettia Avenue, Suite A, Vista, CA 92081
(760) 599-0509 (phone) / (760) 599-0593 (FAX)
GEOTECHNICAL | ENVIRONMENTAL | MATERIALS
08/23/23
FIGURE 4B
SLOT CUT B
TYPICAL TEMPORARY EXCAVATION PROFILE
OCEAN VIEW PROJECT
CARLSBAD, CALIFORNIA
Project No.:Report Date:Drawn By:
3738-SD CDL
Af
276
Amelia
Site
Improvements
Artificial
Fill
LoT g
vi
BA-C.K Cvt'
,, I SCA-Le: I = 5
GEOTEK
1384 Poinsettia Avenue, Suite A, Vista, CA 92081
(760) 599-0509 (phone) / (760) 599-0593 (FAX)
GEOTECHNICAL | ENVIRONMENTAL | MATERIALS
08/23/23
FIGURE 4C
SLOT CUT C
TYPICAL TEMPORARY EXCAVATION PROFILE
OCEAN VIEW PROJECT
CARLSBAD, CALIFORNIA
Project No.:Report Date:Drawn By:
3738-SD CDL
276
Amelia
Site
Improvements
Artificial
Fill
Test Pit
Exploration
EL 30'1 .. 2.
GEOTEK
II I I
I
•0 I
II I ~CALE.: I :: s
1384 Poinsettia Avenue, Suite A, Vista, CA 92081
(760) 599-0509 (phone) / (760) 599-0593 (FAX)
GEOTECHNICAL | ENVIRONMENTAL | MATERIALS
08/23/23
FIGURE 4D
SLOT CUT D
TYPICAL TEMPORARY EXCAVATION PROFILE
OCEAN VIEW PROJECT
CARLSBAD, CALIFORNIA
Project No.:Report Date:Drawn By:
3738-SD CDL
276
Amelia
Site
Improvements
Artificial
Fill
Test Pit
Exploration
LOT D
o.s I
I
CA-t..E. I " = 5 /
GEOTEK
Appendix A
Review Comments
GEOTEK
GEOTECHNICAL REPORT REVIEW
__________________________________________________________
DATE: July 28, 2023
TO: City of Carlsbad
Land Development Engineering
1635 Faraday Avenue
Carlsbad, CA 92008
Attention: Nichole Fine
PROJECT ID: CT 15-07
GRADING PERMIT NO.: GR2021-0043
SUBJECT: Ocean View Point development, temporary slopes (1st review)
Items Submitted by Applicant Items Being Returned to Applicant
“Updated Geotechnical Evaluation, Proposed
Oceanview Project, Twain Avenue, Carlsbad,
San Diego County, California,” by GeoTek, dated
November 2, 2021.
“Temporary Excavations for the Retaining Wall –
Lot 13, Proposed Oceanview Project, Twain
Avenue, Carlsbad, California,” by GeoTek, dated
March 20, 2023.
Written report review comments
“Response to City of Carlsbad Cycle No. 3
Review Comments, Temporary Excavations for
Retaining Wall – Lot 13, Proposed Oceanview
Project, Twain Avenue, Carlsbad, California,” by
GeoTek, dated July 20, 2023.
Written report review comments.
Based on our review of the submitted geotechnical reports as they relate to temporary slope
stability, we are providing the following comments that should be addressed prior to the next
submittal. Please provide complete and thorough written responses to all comments.
GEOTECHNICAL COMMENTS:
1. Review of the most recent “Response to City of Carlsbad Cycle No. 3 Review
Comments…” by GeoTek indicates temporary cuts for the proposed retaining wall at Lot
13 will range up to approximately 16 to 18’ (including the depth of footing).
2. Please provide the justification for the strength parameters (C=350 and Φ=35) for the Old
Paralic deposits used in the slope stability analysis for the proposed temporary cut at Lot
13 that is presented in the “Response to City of Carlsbad Cycle No. 3 Review
GR2021-0043
July 28, 2023
Page 2 of 2
Comments…”. If increased strength parameters above the C=100 psf and Φ=33 that are
supported by the laboratory testing of the Old Paralic deposits performed at Lot 1
approximately 200’ from the subject Lot 13 (T-1 by Christian Wheeler) and reported in the
“Updated Geotechnical Evaluation…” by GeoTek are proposed, please provide complete
justification and site-specific laboratory testing to substantiate the values for the temporary
slope stability analysis.
3. Please provide slope stability analysis for the proposed 18’ vertical cut that uses the
strength parameters (C=100 psf and Φ=33) that are supported by the laboratory testing of
the Old Paralic deposits performed at Lot 1 (T-1 by Christian Wheeler) and reported in the
“Updated Geotechnical Evaluation…” by GeoTek. Please include searches for potential
failure surfaces extending from the bottom of the key of the proposed footing and up to
the highest point of the proposed backcut. Please provide the plots (including the plot
showing the trial runs) and print-outs associated with the analysis.
4. Based on the additional analysis requested above, please provide updated
recommendations as necessary addressing the up to approximate 18’ high temporary
vertical cut along the north and northeast sides of Lot 13 that will apparently be necessary
to construct the proposed retaining wall. Please provide specific recommendations for the
temporary cuts (maximum allowable vertical height of cuts, inclination of temporary slopes,
slot-cutting, etc.) or temporary shoring as necessary to prevent any adverse impact from
the proposed grading/wall construction work on the adjacent off-site property and promote
worker safety.
5. Without relieving the contractor of their responsibilities and obligations during construction
of temporary slopes as indicated by the geotechnical consultant in the “Response to City
of Carlsbad Cycle No. 3 Review Comments…” and with comment #4 above in mind - Cal-
OSHA guidelines, California Code of Regulations, Title 8, Section 1541.1 (“Requirements
for Protection Systems,” Appendix A), Option 4 (design by a registered professional
engineer) indicates, in part, that the registered professional should in writing a) state the
magnitude of slopes that were determined to be safe and b) provide the slope
configurations that were determined to be safe for the particular project. If the geotechnical
consultant is advocating the use of vertical cuts that exceed the Cal OSHA guidelines for
the specific soil type (A, B, or C), the above statements should be provided by the
geotechnical consultant. In the absence of the registered professional providing the above,
the temporary slope inclination provided for the designated Cal OSHA soil type (in this
case soil type B has been provided by the geotechnical consultant) should be used for the
temporary cuts.
Appendix B
Exploration Log
GEOTEK
GeoTek, Inc.
LOG OF EXPLORATORY BORING
10 R-1
50/5"
30/6" R-2
18
22 R-3
30
29 R-4
40
50/5"
35 R-5
50/4"
32 R-6
30/3"
---Small Bulk ---No Recovery ---Water Table
CLIENT:Rincon Homes DRILLER:Native LOGGED BY:ERC
8/10/2023
PROJECT NO.:3738-SD HAMMER:140lbs/30in safety RIG TYPE:LAR
PROJECT NAME:Ocean View Point DRILL METHOD:4.5" Solid Auger OPERATOR:Steve Q.
Silty SANDSTONE, yellow to light brown,loose, dry, with gravel to cobble size
rounded
Becomes more yellow
LOCATION:Carlsbad, CA ELEVATION:398 ft DATE:
Dr
y
D
e
n
s
i
t
y
(p
c
f
)
Ot
h
e
r
s
MATERIAL DESCRIPTION AND COMMENTS
Old Paralic Deposits (Qop)
SAMPLES
US
C
S
S
y
m
b
o
l
BORING NO.: B-1
Laboratory Testing
De
p
t
h
(
f
t
)
Sa
m
p
l
e
T
y
p
e
Blo
w
s
/
6
i
n
Sa
m
p
l
e
Nu
m
b
e
r
Wa
t
e
r
C
o
n
t
e
n
t
(%
)
5 Slightly clayey SANDSTONE, orange-yellow to brown, moist, very dense
10 Silty SANDSTONE, yellow with orange streaks, moist, very dense
15 SANDSTONE, light gray to white with orange, moist, very dense
No groundwater encountered
Backfilled with soil cuttings
20 SANDSTONE, yellow and light gray, moist, very dense
HOLE TERMINATED AT 20.5 FEET
25
AL = Atterberg Limits EI = Expansion Index SA = Sieve Analysis RV = R-Value Test
SR = Sulfate/Resisitivity Test SH = Shear Test CO = Consolidation test MD = Maximum Density
30
LE
G
E
N
D
Sample type: ---Ring ---SPT ---Large Bulk
Lab testing:
--....._ ----_....._
-,__ --
------
---------------
---------_,__ -
-------------------
■ I 12] [8J □ ~
Appendix C
Laboratory Analysis
GEOTEK
21.6 21.6 21.6
103.0 101.8 101.6
92.8 90.1 89.6
0.62 0.64 0.65
2.375 2.375 2.375
1.0 1.0 1.0
Water Content, % 26.9 26.6 26.9
Dry Density, pcf 104.6 104.6 101.6
Saturation, %120.4 119.1 111.6
Void Ratio 0.60 0.60 0.65
Height, in.0.985 0.973 0.958
Normal Stress, psf 500 1500 2500
Ф =30 ˚C =202 psf Failure Stress, psf 560 952 1734
Displacement, in.0.060 0.100 0.000
Ultimate Stress, psf
Displacement, in.
Strain rate, in./min.0.0051 0.0051 0.0051
In-situ
3889-SD
Sample ID:B-1
Sample Depth:
Project Number:
Dry Density, pcf
In
i
t
i
a
l
Project Name:Ocean Bluff
Remarks:
Shear Strength:
Description:Soaked, consolidated, drained. 2.375-in. inplace
ring sample.
2 3
5'
Sample No. 1
At
T
e
s
t
Remolded
Void Ratio
Diameter, in.
Height, in.
Condition:
ERC
Saturation, %
Water Content, %
8/15/2023Date:
Technician:
Location:
Apparatus:
0
500
1000
1500
2000
2500
3000
3500
4000
4500
0 500 1000 1500 2000 2500 3000
Sh
e
a
r
S
t
r
e
s
s
(
p
s
f
)
Normal Stress (psf)
c = 202 (psf)
f = (deg) 30
-0.02
-0.01
0.00
0.01
0.02
0.03
0.04
0.05
0.06
0.00 0.10 0.20 0.30 0.40 0.50
Ve
r
t
i
c
a
l
D
e
f
o
r
m
a
t
i
o
n
(
i
n
)
Horiz. Displacement (in)
0
500
1000
1500
2000
2500
3000
3500
4000
4500
0.00 0.10 0.20 0.30 0.40 0.50
Sh
e
a
r
S
t
r
e
s
s
(
p
s
f
)
Horiz. Displacement (in)
DIRECT SHEAR TEST REPORT
-
-
~ __.) ~
I J.-------v--
y_ i-------p
.l-----
V L.------
~
Ir
l.r--"
I
■ □
A
GEOTEK
18.6 18.6 18.6
111.7 111.8 111.2
97.4 97.6 96.1
0.52 0.52 0.53
2.375 2.375 2.375
1.0 1.0 1.0
Water Content, % 24.8 22.5 22.4
Dry Density, pcf 112.3 114.8 111.2
Saturation, %131.9 127.9 115.8
Void Ratio 0.51 0.48 0.53
Height, in.0.995 0.974 0.993
Normal Stress, psf 500 1500 2500
Ф =44 ˚C =417 psf Failure Stress, psf 707 2222 2614
Displacement, in.0.030 0.080 0.000
Ultimate Stress, psf
Displacement, in.
Strain rate, in./min.0.0054 0.0054 0.0054
In-situ
8/15/2023Date:
Technician:
Location:
Apparatus:
2 3
10'
Sample No. 1
At
T
e
s
t
Remolded
Void Ratio
Diameter, in.
Height, in.
Condition:
ERC
Saturation, %
Water Content, %
Dry Density, pcf
In
i
t
i
a
l
Project Name:Ocean Bluff
Remarks:
Shear Strength:
Description:Soaked, consolidated, drained. 2.375-in. inplace
ring sample.
3889-SD
Sample ID:B-1
Sample Depth:
Project Number:
0
500
1000
1500
2000
2500
3000
3500
4000
4500
0 500 1000 1500 2000 2500 3000
Sh
e
a
r
S
t
r
e
s
s
(
p
s
f
)
Normal Stress (psf)
c = 417 (psf)
f = (deg) 44
-0.02
-0.01
0.00
0.01
0.02
0.03
0.04
0.05
0.06
0.07
0.00 0.10 0.20 0.30 0.40 0.50
Ve
r
t
i
c
a
l
D
e
f
o
r
m
a
t
i
o
n
(
i
n
)
Horiz. Displacement (in)
0
500
1000
1500
2000
2500
3000
3500
4000
4500
0.00 0.10 0.20 0.30 0.40 0.50
Sh
e
a
r
S
t
r
e
s
s
(
p
s
f
)
Horiz. Displacement (in)
DIRECT SHEAR TEST REPORT
-
-
/
/
A /◄ ~
I>, ◄► /
V
ti / V
I / V
V
r\ /◄~ -....
" --
I
■ □
A
GEOTEK
Appendix D
Slope Stability Analysis
GEOTEK
1.3621.3621.3621.362
Min FSMethod Name
1.362Bishop simplified
1.413Spencer
1.410GLE / Morgenstern-Price
Ru ValueWater SurfacePhi (°)Cohesion (psf)Strength TypeUnit Weight (lbs/ft3)ColorMaterial Name
0None29300Mohr-Coulomb125Tsa
0None30202Mohr-Coulomb124Qop1
0None44417Mohr-Coulomb129Qop2
Safety Factor
0.000
0.250
0.500
0.750
1.000
1.250
1.500
1.750
2.000
2.250
2.500
2.750
3.000
3.250
3.500
3.750
4.000
4.250
4.500
4.750
5.000
5.250
5.500
5.750
6.000+
35
0
32
5
30
0
27
5
25
0
22
5
-60 -40 -20 0 20 40 60 80 100 120 140 160
Scenario 3738-SD Cross Section B-B' Static Temporary Slope
Revised_ERC_8-23-23.slim
Group 3738-SD Cross Section B-B' Static Temporary Slope
Revised_ERC_8-23-23.slim Company GeoTekDrawn By
File Name 3738-SD Cross Section B-B' Static Temporary Slope
Revised_ERC_8-23-23.slim
Date
Project
3738-SD Ocean View
SLIDEINTERPRET 9.028
ERC
8/23/2023
I 11 I I 11 11 I I
LJ rocscience >---------->-----------------,1
3738-SD Ocean View
GeoTek
Date Created: 8/23/2023
Software Version: 9.028
LJ . rocsc1ence
Table of Contents
Project Summary ...................................................................................................................................................... 3
General Settings ....................................................................................................................................................... 4
Analysis Options ....................................................................................................................................................... 5
Groundwater Analysis ............................................................................................................................................... 6
Random Numbers ..................................................................................................................................................... 7
Surface Options ........................................................................................................................................................ 8
Seismic Loading ........................................................................................................................................................ 9
Materials ................................................................................................................................................................ 10
Global Minimums .................................................................................................................................................... 11
Method: bishop simplified ......................................................................................................................... 11
Method: spencer ...................................................................................................................................... 11
Method: gle/morgenstern-price ................................................................................................................. 11
Valid and Invalid Surfaces ....................................................................................................................................... 12
Method: bishop simplified ......................................................................................................................... 12
Method: spencer ...................................................................................................................................... 12
Method: gle/morgenstern-price ................................................................................................................. 12
Error Code Descriptions .............................................................................................................. 12
Slice Data ............................................................................................................................................................... 13
Global Minimum Query (bishop simplified) - Safety Factor: 1.36184 ............................................................. 13
Global Minimum Query (spencer) - Safety Factor: 1.41272 .......................................................................... 14
Global Minimum Query (gle/morgenstern-price) - Safety Factor: 1.41036 ..................................................... 15
Interslice Data ........................................................................................................................................................ 16
Global Minimum Query (bishop simplified) - Safety Factor: 1.36184 ............................................................. 16
Global Minimum Query (spencer) - Safety Factor: 1.41272 .......................................................................... 17
Global Minimum Query (gle/morgenstern-price) - Safety Factor: 1.41036 ..................................................... 18
Entity Information ................................................................................................................................................... 19
External Boundary .................................................................................................................................... 19
Material Boundary .................................................................................................................................... 19
2/19
Thursday, August 24, 20233738-SD Ocean View
Slide2 Analysis Information
3738-SD Ocean View
Project Summary
3/19
Thursday, August 24, 20233738-SD Ocean View
Slide2 Modeler Version:9.028
Compute Time:00h:00m:02.546s
Author:ERC
Company:GeoTek
Date Created:8/23/2023
General Settings
Units of Measurement:Imperial Units
Time Units:days
Permeability Units:feet/second
Data Output:Standard
Failure Direction:Right to Left
4/19
Thursday, August 24, 20233738-SD Ocean View
Analysis Options
Slices Type:Vertical
Analysis Methods Used
Bishop simplified
GLE/Morgenstern-Price with interslice force function
(Half Sine)
Spencer
Number of slices:50
Tolerance:0.005
Maximum number of iterations:75
Check malpha < 0.2:Yes
Create Interslice boundaries at intersections with water
tables and piezos:Yes
Initial trial value of FS:1
Steffensen Iteration:Yes
5/19
Thursday, August 24, 20233738-SD Ocean View
Groundwater Analysis
Groundwater Method:Water Surfaces
Pore Fluid Unit Weight [lbs/ft3]:62.4
Advanced Groundwater Method:None
6/19
Thursday, August 24, 20233738-SD Ocean View
Random Numbers
Pseudo-random Seed:10116
Random Number Generation Method:Park and Miller v.3
7/19
Thursday, August 24, 20233738-SD Ocean View
Surface Options
Surface Type:Circular
Search Method:Auto Refine Search
Divisions along slope:10
Circles per division:10
Number of iterations:10
Divisions to use in next iteration:50%
Composite Surfaces:Disabled
Minimum Elevation:Not Defined
Minimum Depth:Not Defined
Minimum Area:Not Defined
Minimum Weight:Not Defined
8/19
Thursday, August 24, 20233738-SD Ocean View
Seismic Loading
Advanced seismic analysis:No
Staged pseudostatic analysis:No
9/19
Thursday, August 24, 20233738-SD Ocean View
Materials
Tsa
Color
Strength Type Mohr-Coulomb
Unit Weight 125 lbs/ft3
Cohesion 300 psf
Phi 29 °
Water Surface None
Ru Value 0
Qop1
Color
Strength Type Mohr-Coulomb
Unit Weight 124 lbs/ft3
Cohesion 202 psf
Phi 30 °
Water Surface None
Ru Value 0
Qop2
Color
Strength Type Mohr-Coulomb
Unit Weight 129 lbs/ft3
Cohesion 417 psf
Phi 44 °
Water Surface None
Ru Value 0
10/19
Thursday, August 24, 20233738-SD Ocean View
□
□
Global Minimums
Method: bishop simplified
FS 1.361840
Center:54.882, 321.526
Radius:25.198
Left Slip Surface Endpoint:75.000, 306.353
Right Slip Surface Endpoint:80.080, 321.526
Left Slope Intercept:75.000 320.600
Right Slope Intercept:80.080 321.526
Resisting Moment:191476 lb-ft
Driving Moment:140600 lb-ft
Total Slice Area:50.1723 ft2
Surface Horizontal Width:5.08 ft
Surface Average Height:9.87644 ft
Method: spencer
FS 1.412720
Center:22.477, 349.169
Radius:67.466
Left Slip Surface Endpoint:75.000, 306.824
Right Slip Surface Endpoint:84.271, 322.092
Left Slope Intercept:75.000 320.600
Right Slope Intercept:84.271 322.092
Resisting Moment:709467 lb-ft
Driving Moment:502200 lb-ft
Resisting Horizontal Force:5783.89 lb
Driving Horizontal Force:4094.15 lb
Total Slice Area:71.4856 ft2
Surface Horizontal Width:9.27133 ft
Surface Average Height:7.7104 ft
Method: gle/morgenstern-price
FS 1.410360
Center:22.477, 349.169
Radius:67.466
Left Slip Surface Endpoint:75.000, 306.824
Right Slip Surface Endpoint:84.271, 322.092
Left Slope Intercept:75.000 320.600
Right Slope Intercept:84.271 322.092
Resisting Moment:708284 lb-ft
Driving Moment:502200 lb-ft
Resisting Horizontal Force:5772.88 lb
Driving Horizontal Force:4093.19 lb
Total Slice Area:71.4856 ft2
Surface Horizontal Width:9.27133 ft
Surface Average Height:7.7104 ft
11/19
Thursday, August 24, 20233738-SD Ocean View
Global Minimum Support Data
No Supports Present
Valid and Invalid Surfaces
Method: bishop simplified
Number of Valid Surfaces:2940
Number of Invalid Surfaces:0
Method: spencer
Number of Valid Surfaces:1135
Number of Invalid Surfaces:1805
Error Codes
Error Code -108 reported for 12 surfaces
Error Code -111 reported for 1793 surfaces
Method: gle/morgenstern-price
Number of Valid Surfaces:1251
Number of Invalid Surfaces:1689
Error Codes
Error Code -108 reported for 19 surfaces
Error Code -111 reported for 1670 surfaces
Error Code Descriptions
The following errors were encountered during the computation:
-108 = Total driving moment or total driving force < 0.1. This is to limit the calculation of
extremely high safety factors if the driving force is very small (0.1 is an arbitrary number).
-111 = Safety factor equation did not converge
12/19
Thursday, August 24, 20233738-SD Ocean View
Slice Data
Global Minimum Query (bishop simplified) - Safety Factor: 1.36184
Slice
Number Width [ft]Weight
[lbs]
Angle of
Slice Base
[deg]
Base
Material
Base
Cohesion
[psf]
Base
Friction
Angle
[deg]
Shear
Stress
[psf]
Shear
Strength
[psf]
Base
Normal
Stress
[psf]
Pore
Pressure
[psf]
Effective
Normal
Stress
[psf]
Base
Vertical
Stress
[psf]
Effective
Vertical
Stress
[psf]
1 0.101706 183.605 53.1702 Qop2 417 44 814.923 1109.8 717.408 0 717.408 1805.56 1805.56
2 0.101706 182.05 53.5577 Qop2 417 44 803.792 1094.64 701.714 0 701.714 1790.27 1790.27
3 0.101706 180.469 53.9489 Qop2 417 44 792.571 1079.36 685.888 0 685.888 1774.72 1774.72
4 0.101706 178.862 54.3437 Qop2 417 44 781.258 1063.95 669.933 0 669.933 1758.92 1758.92
5 0.101706 177.228 54.7424 Qop2 417 44 769.849 1048.41 653.844 0 653.844 1742.85 1742.85
6 0.101706 175.565 55.145 Qop2 417 44 758.344 1032.74 637.618 0 637.618 1726.5 1726.5
7 0.101706 173.874 55.5518 Qop2 417 44 746.739 1016.94 621.253 0 621.253 1709.87 1709.87
8 0.101706 172.153 55.9628 Qop2 417 44 735.033 1001 604.746 0 604.746 1692.95 1692.95
9 0.101706 170.401 56.3782 Qop2 417 44 723.221 984.911 588.091 0 588.091 1675.73 1675.73
10 0.101706 168.617 56.7982 Qop2 417 44 711.302 968.679 571.282 0 571.282 1658.19 1658.19
11 0.101706 166.801 57.2229 Qop2 417 44 699.272 952.297 554.314 0 554.314 1640.33 1640.33
12 0.101706 164.95 57.6526 Qop2 417 44 687.129 935.76 537.194 0 537.194 1622.14 1622.14
13 0.101706 163.065 58.0875 Qop2 417 44 674.869 919.063 519.904 0 519.904 1603.6 1603.6
14 0.101706 161.143 58.5277 Qop2 417 44 662.488 902.202 502.442 0 502.442 1584.7 1584.7
15 0.101706 159.183 58.9735 Qop2 417 44 649.982 885.172 484.806 0 484.806 1565.43 1565.43
16 0.101706 157.184 59.4251 Qop2 417 44 637.349 867.967 466.99 0 466.99 1545.77 1545.77
17 0.101706 155.143 59.8829 Qop2 417 44 624.582 850.581 448.987 0 448.987 1525.71 1525.71
18 0.101706 153.061 60.3471 Qop2 417 44 611.679 833.009 430.79 0 430.79 1505.23 1505.23
19 0.101706 150.933 60.8179 Qop2 417 44 598.633 815.243 412.393 0 412.393 1484.31 1484.31
20 0.101706 148.759 61.2959 Qop2 417 44 585.442 797.278 393.789 0 393.789 1462.94 1462.94
21 0.101706 146.537 61.7812 Qop2 417 44 572.097 779.104 374.97 0 374.97 1441.08 1441.08
22 0.101706 144.263 62.2742 Qop2 417 44 558.594 760.715 355.927 0 355.927 1418.73 1418.73
23 0.101706 141.936 62.7755 Qop2 417 44 544.925 742.101 336.651 0 336.651 1395.85 1395.85
24 0.101706 139.553 63.2855 Qop2 417 44 531.085 723.253 317.134 0 317.134 1372.41 1372.41
25 0.101706 137.111 63.8047 Qop2 417 44 517.066 704.161 297.364 0 297.364 1348.4 1348.4
26 0.101706 134.605 64.3336 Qop2 417 44 502.859 684.813 277.329 0 277.329 1323.76 1323.76
27 0.101706 132.034 64.8729 Qop2 417 44 488.456 665.199 257.018 0 257.018 1298.47 1298.47
28 0.101706 129.391 65.4232 Qop2 417 44 473.847 645.304 236.416 0 236.416 1272.5 1272.5
29 0.101706 126.674 65.9853 Qop2 417 44 459.022 625.115 215.509 0 215.509 1245.78 1245.78
30 0.101706 123.877 66.5601 Qop2 417 44 443.968 604.614 194.28 0 194.28 1218.28 1218.28
31 0.101706 120.995 67.1486 Qop2 417 44 428.674 583.785 172.711 0 172.711 1189.93 1189.93
32 0.101706 118.02 67.7517 Qop2 417 44 413.123 562.608 150.782 0 150.782 1160.68 1160.68
33 0.101706 114.945 68.3708 Qop2 417 44 397.301 541.061 128.469 0 128.469 1130.45 1130.45
34 0.101706 111.763 69.0073 Qop2 417 44 381.189 519.119 105.747 0 105.747 1099.16 1099.16
35 0.101706 108.464 69.6628 Qop2 417 44 364.766 496.753 82.587 0 82.587 1066.71 1066.71
36 0.101706 105.035 70.3392 Qop2 417 44 348.009 473.932 58.9551 0 58.9551 1033 1033
37 0.101706 101.465 71.0387 Qop2 417 44 330.889 450.618 34.8128 0 34.8128 997.899 997.899
38 0.101706 97.7378 71.7641 Qop2 417 44 313.376 426.768 10.115 0 10.115 961.244 961.244
39 0.101706 93.8336 72.5185 Qop2 417 44 295.431 402.33 -15.1915 0 -15.1915 922.853 922.853
40 0.101706 89.7297 73.306 Qop2 417 44 277.009 377.242 -41.1706 0 -41.1706 882.499 882.499
41 0.101706 85.3972 74.1314 Qop2 417 44 258.055 351.429 -67.9004 0 -67.9004 839.896 839.896
42 0.101706 80.7992 75.0011 Qop2 417 44 238.5 324.798 -95.4778 0 -95.4778 794.683 794.683
43 0.101706 75.8875 75.9233 Qop2 417 44 218.255 297.229 -124.026 0 -124.026 746.384 746.384
44 0.100951 70.2037 76.9053 Qop1 202 30 157.03 213.85 20.5248 0 20.5248 695.606 695.606
45 0.100951 64.7601 77.9622 Qop1 202 30 140.682 191.586 -18.0381 0 -18.0381 641.678 641.678
46 0.100951 58.7435 79.1207 Qop1 202 30 123.244 167.839 -59.1691 0 -59.1691 582.075 582.075
47 0.100951 51.9029 80.4183 Qop1 202 30 104.336 142.089 -103.768 0 -103.768 514.307 514.307
48 0.100951 43.8771 81.9249 Qop1 202 30 83.4123 113.594 -153.123 0 -153.123 434.797 434.797
49 0.100951 33.7724 83.8058 Qop1 202 30 59.1538 80.558 -210.343 0 -210.343 334.689 334.689
50 0.100951 14.018 87.4348 Qop1 202 30 19.8078 26.975 -303.152 0 -303.152 138.971 138.971
13/19
Thursday, August 24, 20233738-SD Ocean View
Global Minimum Query (spencer) - Safety Factor: 1.41272
Slice
Number Width [ft]Weight
[lbs]
Angle of
Slice Base
[deg]
Base
Material
Base
Cohesion
[psf]
Base
Friction
Angle
[deg]
Shear
Stress
[psf]
Shear
Strength
[psf]
Base
Normal
Stress
[psf]
Pore
Pressure
[psf]
Effective
Normal
Stress
[psf]
Base
Vertical
Stress
[psf]
Effective
Vertical
Stress
[psf]
1 0.187475 326.047 51.251 Qop2 417 44 768.428 1085.57 692.328 0 692.328 1649.8 1649.8
2 0.187475 321.184 51.5061 Qop2 417 44 756.393 1068.57 674.722 0 674.722 1625.85 1625.85
3 0.187475 316.27 51.7626 Qop2 417 44 744.386 1051.61 657.157 0 657.157 1601.83 1601.83
4 0.187475 311.302 52.0206 Qop2 417 44 732.408 1034.69 639.635 0 639.635 1577.77 1577.77
5 0.187475 306.28 52.28 Qop2 417 44 720.458 1017.81 622.153 0 622.153 1553.65 1553.65
6 0.187475 301.203 52.541 Qop2 417 44 708.537 1000.97 604.714 0 604.714 1529.47 1529.47
7 0.187475 296.071 52.8036 Qop2 417 44 696.647 984.167 587.318 0 587.318 1505.24 1505.24
8 0.187475 290.881 53.0678 Qop2 417 44 684.785 967.41 569.965 0 569.965 1480.95 1480.95
9 0.187475 285.633 53.3336 Qop2 417 44 672.954 950.696 552.659 0 552.659 1456.6 1456.6
10 0.187475 280.326 53.601 Qop2 417 44 661.154 934.025 535.394 0 535.394 1432.2 1432.2
11 0.187475 274.958 53.8702 Qop2 417 44 649.384 917.398 518.176 0 518.176 1407.73 1407.73
12 0.187475 269.53 54.1411 Qop2 417 44 637.646 900.815 501.006 0 501.006 1383.21 1383.21
13 0.187475 264.038 54.4138 Qop2 417 44 625.939 884.277 483.879 0 483.879 1358.63 1358.63
14 0.187475 258.483 54.6883 Qop2 417 44 614.265 867.785 466.802 0 466.802 1333.99 1333.99
15 0.187475 252.862 54.9647 Qop2 417 44 602.624 851.339 449.771 0 449.771 1309.28 1309.28
16 0.187475 247.175 55.243 Qop2 417 44 591.017 834.941 432.789 0 432.789 1284.52 1284.52
17 0.187475 241.419 55.5233 Qop2 417 44 579.442 818.59 415.859 0 415.859 1259.69 1259.69
18 0.187475 235.594 55.8056 Qop2 417 44 567.904 802.289 398.978 0 398.978 1234.8 1234.8
19 0.187475 229.699 56.0899 Qop2 417 44 556.4 786.037 382.15 0 382.15 1209.85 1209.85
20 0.187475 223.73 56.3764 Qop2 417 44 544.932 769.836 365.371 0 365.371 1184.83 1184.83
21 0.187475 217.688 56.665 Qop2 417 44 533.501 753.687 348.649 0 348.649 1159.75 1159.75
22 0.187475 211.569 56.9559 Qop2 417 44 522.107 737.591 331.981 0 331.981 1134.6 1134.6
23 0.187475 205.373 57.249 Qop2 417 44 510.752 721.549 315.37 0 315.37 1109.39 1109.39
24 0.187475 199.097 57.5445 Qop2 417 44 499.436 705.563 298.817 0 298.817 1084.12 1084.12
25 0.187475 192.736 57.8424 Qop2 417 44 488.155 689.627 282.313 0 282.313 1058.77 1058.77
26 0.187475 186.146 58.1428 Qop2 417 44 476.736 673.494 265.608 0 265.608 1032.79 1032.79
27 0.187475 179.395 58.4458 Qop2 417 44 465.27 657.296 248.834 0 248.834 1006.47 1006.47
28 0.187475 172.555 58.7513 Qop2 417 44 453.853 641.167 232.132 0 232.132 980.098 980.098
29 0.187475 165.626 59.0596 Qop2 417 44 442.487 625.11 215.504 0 215.504 953.665 953.665
30 0.187475 158.604 59.3707 Qop2 417 44 431.172 609.126 198.952 0 198.952 927.175 927.175
31 0.187475 151.486 59.6847 Qop2 417 44 419.911 593.217 182.478 0 182.478 900.629 900.629
32 0.187475 144.271 60.0016 Qop2 417 44 408.705 577.386 166.084 0 166.084 874.029 874.029
33 0.181784 133.051 60.3167 Qop1 202 30 225.592 318.698 202.126 0 202.126 597.899 597.899
34 0.181784 126.37 60.63 Qop1 202 30 219.246 309.733 186.6 0 186.6 576.175 576.175
35 0.181784 119.594 60.9463 Qop1 202 30 212.947 300.835 171.187 0 171.187 554.507 554.507
36 0.181784 112.723 61.2658 Qop1 202 30 206.702 292.013 155.906 0 155.906 532.922 532.922
37 0.181784 105.751 61.5886 Qop1 202 30 200.519 283.278 140.777 0 140.777 511.455 511.455
38 0.181784 98.6777 61.9148 Qop1 202 30 194.408 274.644 125.824 0 125.824 490.145 490.145
39 0.181784 91.4982 62.2445 Qop1 202 30 188.381 266.129 111.075 0 111.075 469.045 469.045
40 0.181784 84.2093 62.5779 Qop1 202 30 182.45 257.751 96.5638 0 96.5638 448.214 448.214
41 0.181784 76.8074 62.915 Qop1 202 30 176.633 249.534 82.3305 0 82.3305 427.726 427.726
42 0.181784 69.2884 63.2561 Qop1 202 30 170.949 241.504 68.4225 0 68.4225 407.67 407.67
43 0.181784 61.6482 63.6013 Qop1 202 30 165.421 233.694 54.8959 0 54.8959 388.154 388.154
44 0.181784 53.8823 63.9506 Qop1 202 30 160.077 226.144 41.8188 0 41.8188 369.309 369.309
45 0.181784 45.986 64.3044 Qop1 202 30 154.949 218.9 29.271 0 29.271 351.295 351.295
46 0.181784 37.9542 64.6629 Qop1 202 30 150.077 212.017 17.3494 0 17.3494 334.308 334.308
47 0.181784 29.7815 65.0261 Qop1 202 30 145.508 205.562 6.17006 0 6.17006 318.584 318.584
48 0.181784 21.4619 65.3943 Qop1 202 30 141.3 199.617 -4.12743 0 -4.12743 304.417 304.417
49 0.181784 12.9894 65.7677 Qop1 202 30 137.521 194.278 -13.3743 0 -13.3743 292.163 292.163
50 0.181784 4.357 66.1467 Qop1 202 30 133.99 189.29 -22.0143 0 -22.0143 281.017 281.017
14/19
Thursday, August 24, 20233738-SD Ocean View
Global Minimum Query (gle/morgenstern-price) - Safety Factor: 1.41036
Slice
Number Width [ft]Weight
[lbs]
Angle of
Slice Base
[deg]
Base
Material
Base
Cohesion
[psf]
Base
Friction
Angle
[deg]
Shear
Stress
[psf]
Shear
Strength
[psf]
Base
Normal
Stress
[psf]
Pore
Pressure
[psf]
Effective
Normal
Stress
[psf]
Base
Vertical
Stress
[psf]
Effective
Vertical
Stress
[psf]
1 0.187475 326.047 51.251 Qop2 417 44 797.866 1125.28 733.443 0 733.443 1727.6 1727.6
2 0.187475 321.184 51.5061 Qop2 417 44 777.117 1096.01 703.142 0 703.142 1680.32 1680.32
3 0.187475 316.27 51.7626 Qop2 417 44 757.372 1068.17 674.304 0 674.304 1635.46 1635.46
4 0.187475 311.302 52.0206 Qop2 417 44 738.612 1041.71 646.906 0 646.906 1592.99 1592.99
5 0.187475 306.28 52.28 Qop2 417 44 720.809 1016.6 620.903 0 620.903 1552.85 1552.85
6 0.187475 301.203 52.541 Qop2 417 44 703.92 992.781 596.237 0 596.237 1514.97 1514.97
7 0.187475 296.071 52.8036 Qop2 417 44 687.898 970.184 572.839 0 572.839 1479.23 1479.23
8 0.187475 290.881 53.0678 Qop2 417 44 672.688 948.732 550.626 0 550.626 1445.51 1445.51
9 0.187475 285.633 53.3336 Qop2 417 44 658.233 928.346 529.515 0 529.515 1413.68 1413.68
10 0.187475 280.326 53.601 Qop2 417 44 644.476 908.943 509.423 0 509.423 1383.6 1383.6
11 0.187475 274.958 53.8702 Qop2 417 44 631.357 890.441 490.264 0 490.264 1355.13 1355.13
12 0.187475 269.53 54.1411 Qop2 417 44 618.82 872.759 471.953 0 471.953 1328.11 1328.11
13 0.187475 264.038 54.4138 Qop2 417 44 606.81 855.821 454.413 0 454.413 1302.43 1302.43
14 0.187475 258.483 54.6883 Qop2 417 44 595.276 839.554 437.567 0 437.567 1277.94 1277.94
15 0.187475 252.862 54.9647 Qop2 417 44 584.171 823.892 421.348 0 421.348 1254.54 1254.54
16 0.187475 247.175 55.243 Qop2 417 44 573.454 808.777 405.698 0 405.698 1232.11 1232.11
17 0.187475 241.419 55.5233 Qop2 417 44 563.09 794.159 390.559 0 390.559 1210.57 1210.57
18 0.187475 235.594 55.8056 Qop2 417 44 553.05 779.999 375.896 0 375.896 1189.85 1189.85
19 0.187475 229.699 56.0899 Qop2 417 44 543.314 766.268 361.677 0 361.677 1169.91 1169.91
20 0.187475 223.73 56.3764 Qop2 417 44 533.867 752.945 347.883 0 347.883 1150.7 1150.7
21 0.187475 217.688 56.665 Qop2 417 44 524.704 740.021 334.497 0 334.497 1132.22 1132.22
22 0.187475 211.569 56.9559 Qop2 417 44 515.816 727.486 321.519 0 321.519 1114.47 1114.47
23 0.187475 205.373 57.249 Qop2 417 44 507.195 715.328 308.927 0 308.927 1097.42 1097.42
24 0.187475 199.097 57.5445 Qop2 417 44 498.822 703.518 296.699 0 296.699 1081.04 1081.04
25 0.187475 192.736 57.8424 Qop2 417 44 490.651 691.995 284.764 0 284.764 1065.19 1065.19
26 0.187475 186.146 58.1428 Qop2 417 44 482.47 680.457 272.818 0 272.818 1049.23 1049.23
27 0.187475 179.395 58.4458 Qop2 417 44 474.256 668.872 260.821 0 260.821 1033.09 1033.09
28 0.187475 172.555 58.7513 Qop2 417 44 465.957 657.167 248.7 0 248.7 1016.61 1016.61
29 0.187475 165.626 59.0596 Qop2 417 44 457.421 645.128 236.234 0 236.234 999.308 999.308
30 0.187475 158.604 59.3707 Qop2 417 44 448.49 632.532 223.19 0 223.19 980.661 980.661
31 0.187475 151.486 59.6847 Qop2 417 44 439.014 619.168 209.351 0 209.351 960.174 960.174
32 0.187475 144.271 60.0016 Qop2 417 44 428.866 604.855 194.53 0 194.53 937.396 937.396
33 0.181784 133.051 60.3167 Qop1 202 30 291.821 411.572 362.988 0 362.988 874.951 874.951
34 0.181784 126.37 60.63 Qop1 202 30 284.408 401.117 344.881 0 344.881 850.241 850.241
35 0.181784 119.594 60.9463 Qop1 202 30 233.994 330.016 221.73 0 221.73 642.936 642.936
36 0.181784 112.723 61.2658 Qop1 202 30 195.456 275.663 127.589 0 127.589 484.091 484.091
37 0.181784 105.751 61.5886 Qop1 202 30 180.876 255.1 91.9726 0 91.9726 426.337 426.337
38 0.181784 98.6777 61.9148 Qop1 202 30 180.983 255.252 92.2346 0 92.2346 431.398 431.398
39 0.181784 91.4982 62.2445 Qop1 202 30 184.716 260.515 101.352 0 101.352 452.357 452.357
40 0.181784 84.2093 62.5779 Qop1 202 30 186.551 263.103 105.834 0 105.834 465.387 465.387
41 0.181784 76.8074 62.915 Qop1 202 30 185.453 261.556 103.154 0 103.154 465.797 465.797
42 0.181784 69.2884 63.2561 Qop1 202 30 182.035 256.734 94.8024 0 94.8024 456.048 456.048
43 0.181784 61.6482 63.6013 Qop1 202 30 176.942 249.552 82.3615 0 82.3615 438.828 438.828
44 0.181784 53.8823 63.9506 Qop1 202 30 170.465 240.417 66.5403 0 66.5403 415.283 415.283
45 0.181784 45.986 64.3044 Qop1 202 30 162.593 229.315 47.3111 0 47.3111 385.222 385.222
46 0.181784 37.9542 64.6629 Qop1 202 30 153.105 215.933 24.1334 0 24.1334 347.487 347.487
47 0.181784 29.7815 65.0261 Qop1 202 30 141.599 199.706 -3.97405 0 -3.97405 300.047 300.047
48 0.181784 21.4619 65.3943 Qop1 202 30 127.467 179.775 -38.4957 0 -38.4957 239.843 239.843
49 0.181784 12.9894 65.7677 Qop1 202 30 109.818 154.883 -81.6097 0 -81.6097 162.378 162.378
50 0.181784 4.357 66.1467 Qop1 202 30 87.3296 123.166 -136.544 0 -136.544 60.9605 60.9605
15/19
Thursday, August 24, 20233738-SD Ocean View
Interslice Data
Global Minimum Query (bishop simplified) - Safety Factor: 1.36184
Slice Number X coordinate [ft]Y coordinate - Bottom
[ft]
Interslice Normal Force
[lbs]
Interslice Shear Force
[lbs]
Interslice Force Angle
[deg]
1 75 306.353 0 0 0
2 75.1017 306.489 -14.5682 0 0
3 75.2034 306.627 -29.4922 0 0
4 75.3051 306.766 -44.7398 0 0
5 75.4068 306.908 -60.2771 0 0
6 75.5085 307.052 -76.0688 0 0
7 75.6102 307.198 -92.0774 0 0
8 75.7119 307.346 -108.264 0 0
9 75.8136 307.497 -124.586 0 0
10 75.9154 307.65 -141 0 0
11 76.0171 307.805 -157.46 0 0
12 76.1188 307.963 -173.916 0 0
13 76.2205 308.124 -190.317 0 0
14 76.3222 308.287 -206.606 0 0
15 76.4239 308.453 -222.726 0 0
16 76.5256 308.622 -238.613 0 0
17 76.6273 308.795 -254.199 0 0
18 76.729 308.97 -269.414 0 0
19 76.8307 309.149 -284.18 0 0
20 76.9324 309.331 -298.415 0 0
21 77.0341 309.516 -312.03 0 0
22 77.1358 309.706 -324.929 0 0
23 77.2375 309.899 -337.007 0 0
24 77.3392 310.097 -348.153 0 0
25 77.4409 310.299 -358.243 0 0
26 77.5426 310.506 -367.145 0 0
27 77.6443 310.718 -374.711 0 0
28 77.7461 310.934 -380.78 0 0
29 77.8478 311.157 -385.175 0 0
30 77.9495 311.385 -387.698 0 0
31 78.0512 311.62 -388.13 0 0
32 78.1529 311.861 -386.226 0 0
33 78.2546 312.11 -381.708 0 0
34 78.3563 312.366 -374.263 0 0
35 78.458 312.631 -363.533 0 0
36 78.5597 312.906 -349.106 0 0
37 78.6614 313.19 -330.504 0 0
38 78.7631 313.486 -307.165 0 0
39 78.8648 313.795 -278.424 0 0
40 78.9665 314.118 -243.479 0 0
41 79.0682 314.457 -201.351 0 0
42 79.1699 314.815 -150.819 0 0
43 79.2716 315.194 -90.3256 0 0
44 79.3733 315.6 -17.828 0 0
45 79.4743 316.034 -10.8875 0 0
46 79.5752 316.507 11.8498 0 0
47 79.6762 317.033 55.3667 0 0
48 79.7771 317.631 127.952 0 0
49 79.8781 318.342 245.324 0 0
50 79.9791 319.272 446.944 0 0
51 80.08 321.526 0 0 0
16/19
Thursday, August 24, 20233738-SD Ocean View
Global Minimum Query (spencer) - Safety Factor: 1.41272
Slice Number X coordinate [ft]Y coordinate - Bottom
[ft]
Interslice Normal Force
[lbs]
Interslice Shear Force
[lbs]
Interslice Force Angle
[deg]
1 75 306.824 0 0 0
2 75.1875 307.058 -17.6661 -15.8995 41.9872
3 75.375 307.294 -34.9212 -31.4291 41.9872
4 75.5624 307.532 -51.7183 -46.5465 41.9872
5 75.7499 307.772 -68.0095 -61.2086 41.9872
6 75.9374 308.014 -83.7462 -75.3715 41.9872
7 76.1249 308.259 -98.8786 -88.9907 41.9872
8 76.3123 308.506 -113.356 -102.021 41.9874
9 76.4998 308.755 -127.127 -114.415 41.9874
10 76.6873 309.007 -140.139 -126.125 41.9872
11 76.8748 309.261 -152.339 -137.105 41.9872
12 77.0622 309.518 -163.671 -147.304 41.9872
13 77.2497 309.778 -174.079 -156.671 41.9872
14 77.4372 310.04 -183.506 -165.156 41.9873
15 77.6247 310.304 -191.895 -172.705 41.9871
16 77.8121 310.572 -199.184 -179.265 41.9871
17 77.9996 310.842 -205.313 -184.781 41.9871
18 78.1871 311.115 -210.219 -189.197 41.9872
19 78.3746 311.391 -213.837 -192.454 41.9873
20 78.562 311.67 -216.103 -194.493 41.9873
21 78.7495 311.952 -216.949 -195.254 41.9872
22 78.937 312.237 -216.305 -194.675 41.9873
23 79.1245 312.525 -214.101 -192.691 41.9872
24 79.3119 312.816 -210.264 -189.238 41.9873
25 79.4994 313.111 -204.719 -184.247 41.9872
26 79.6869 313.409 -197.387 -177.648 41.9872
27 79.8744 313.711 -188.143 -169.329 41.9873
28 80.0618 314.016 -176.882 -159.194 41.9872
29 80.2493 314.325 -163.518 -147.166 41.9872
30 80.4368 314.638 -147.962 -133.165 41.987
31 80.6243 314.955 -130.123 -117.111 41.9873
32 80.8117 315.275 -109.908 -98.9176 41.9873
33 80.9992 315.6 -87.2208 -78.4988 41.9872
34 81.181 315.919 -110.674 -99.6065 41.9872
35 81.3628 316.242 -131.092 -117.983 41.9873
36 81.5446 316.569 -148.399 -133.559 41.9872
37 81.7263 316.901 -162.517 -146.266 41.9873
38 81.9081 317.237 -173.374 -156.036 41.9871
39 82.0899 317.577 -180.897 -162.808 41.9873
40 82.2717 317.923 -185.022 -166.52 41.9872
41 82.4535 318.273 -185.689 -167.12 41.9872
42 82.6353 318.629 -182.845 -164.561 41.9873
43 82.8171 318.989 -176.453 -158.808 41.9873
44 82.9988 319.356 -166.487 -149.838 41.9872
45 83.1806 319.728 -152.94 -137.646 41.9872
46 83.3624 320.105 -135.831 -122.248 41.9872
47 83.5442 320.489 -115.21 -103.689 41.9872
48 83.726 320.88 -91.1677 -82.0509 41.9872
49 83.9078 321.277 -63.8435 -57.4591 41.9872
50 84.0895 321.68 -33.4429 -30.0986 41.9872
51 84.2713 322.092 0 0 0
17/19
Thursday, August 24, 20233738-SD Ocean View
Global Minimum Query (gle/morgenstern-price) - Safety Factor: 1.41036
Slice Number X coordinate [ft]Y coordinate - Bottom
[ft]
Interslice Normal Force
[lbs]
Interslice Shear Force
[lbs]
Interslice Force Angle
[deg]
1 75 306.824 0 0 0
2 75.1875 307.058 -21.7522 -2.09851 5.51047
3 75.375 307.294 -41.822 -8.05315 10.8993
4 75.5624 307.532 -60.2645 -17.3481 16.0593
5 75.7499 307.772 -77.1392 -29.4681 20.9075
6 75.9374 308.014 -92.5079 -43.9058 25.3898
7 76.1249 308.259 -106.433 -60.1672 29.4797
8 76.3123 308.506 -118.974 -77.7754 33.1734
9 76.4998 308.755 -130.19 -96.2742 36.4826
10 76.6873 309.007 -140.134 -115.229 39.4297
11 76.8748 309.261 -148.856 -134.231 42.0426
12 77.0622 309.518 -156.399 -152.893 44.3505
13 77.2497 309.778 -162.801 -170.856 46.3829
14 77.4372 310.04 -168.095 -187.785 48.1668
15 77.6247 310.304 -172.306 -203.37 49.7269
16 77.8121 310.572 -175.455 -217.332 51.0856
17 77.9996 310.842 -177.557 -229.415 52.2617
18 78.1871 311.115 -178.622 -239.397 53.2722
19 78.3746 311.391 -178.658 -247.086 54.1308
20 78.562 311.67 -177.668 -252.325 54.8497
21 78.7495 311.952 -175.657 -254.996 55.4385
22 78.937 312.237 -172.63 -255.022 55.9051
23 79.1245 312.525 -168.59 -252.366 56.2556
24 79.3119 312.816 -163.542 -247.036 56.4948
25 79.4994 313.111 -157.488 -239.074 56.6254
26 79.6869 313.409 -150.42 -228.553 56.6495
27 79.8744 313.711 -142.277 -215.507 56.5673
28 80.0618 314.016 -132.991 -199.998 56.3776
29 80.2493 314.325 -122.476 -182.114 56.0782
30 80.4368 314.638 -110.604 -161.926 55.6649
31 80.6243 314.955 -97.1938 -139.492 55.1324
32 80.8117 315.275 -82.0146 -114.868 54.4735
33 80.9992 315.6 -64.785 -88.1286 53.6797
34 81.181 315.919 -127.501 -167.797 52.7705
35 81.3628 316.242 -187.201 -237.14 51.712
36 81.5446 316.569 -217.221 -263.421 50.4905
37 81.7263 316.901 -223.994 -258.492 49.0897
38 81.9081 317.237 -222.021 -242.215 47.4908
39 82.0899 317.577 -220.542 -225.783 45.6728
40 82.2717 317.923 -221.975 -211.473 43.6121
41 82.4535 318.273 -225.144 -197.676 41.2831
42 82.6353 318.629 -228.1 -182.475 38.659
43 82.8171 318.989 -229.209 -164.784 35.7133
44 82.9988 319.356 -227.207 -144.308 32.4212
45 83.1806 319.728 -220.966 -121.299 28.7645
46 83.3624 320.105 -209.283 -96.4117 24.7344
47 83.5442 320.489 -190.717 -70.6901 20.3374
48 83.726 320.88 -163.426 -45.6331 15.6012
49 83.9078 321.277 -124.974 -23.3379 10.5777
50 84.0895 321.68 -72.0502 -6.74021 5.3444
51 84.2713 322.092 0 0 0
18/19
Thursday, August 24, 20233738-SD Ocean View
Discharge Sections
Entity Information
External Boundary
X Y
0 240
120 240
120 293
120 314.6
120 315
120 315.6
120 325
91 323
79.653 321.468
75 320.6
75 315.6
75 315
75 314.6
75 306.35
71.5 306.35
71.5 302.35
70 302.35
70 306.35
67 306.35
63.5 309.83
0 309.83
0 293
Material Boundary
X Y
0 293
120 293
Material Boundary
X Y
75 315.6
120 315.6
19/19